ATTACHMENT 8 Estimate Form 70B01C21R00000007 3-29-21.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Tactical Infrastructure (TI) Maintenance for Big Bend Sector and El Paso Sector in Texas
- Solicitation number
- 70B01C21R00000007
About this file
This document includes an estimate form and details of a federal contract opportunity. The estimate form is a template for contractors to provide pricing details for maintenance, repair and improvement services for Tactical Infrastructure assets in the Big Bend and El Paso Sectors in Texas. The related federal contract opportunity is solicitation number 70B01C21R00000007 issued by the Department of Homeland Security Customs and Border Protection seeking these Tactical Infrastructure maintenance services, including roads and bridges, fence and gates, vegetation control, debris removal, border lighting and electrical, drainage and grate systems, and tunnel remediation. Contractors should fill out and return the attached site visit form by March 11, 2021 if attending the pre-bid site visit. Pricing details in the estimate form template should include labor, travel labor, equipment, materials, mobilization and other costs.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Work Estimate Form | |||||||
| Work Activity (WA) Number: | Date: | REV: | |||||
| Work Plan: | Element: | ||||||
| Project: | TSM: | ||||||
| WORK DESCRIPTION | |||||||
| Scope of Work: | |||||||
| Work Category: | Location: | ||||||
| Work Classification: | Sector: | ||||||
| Work Subdivisions: | Work Element | GPS: | B |
E N:
G W: E N N:
D W:
| Lead Contact: | Name: | Ph: | Email: | ||||
| Lead Contact: | Name: | Ph: | Email: | ||||
| Pricing Schedule | |||||||
| Labor | |||||||
| Item | UoM | Qty | Price | Total | |||
| $ | $ |
| Labor Sub Total | $ | ||
| Travel Labor | |||
| $ | $ |
| Travel Labor Sub Total | $ | ||
| Equipment | |||
| $ | $ | ||
| $ | $ | ||
| $ | $ | ||
| $ | $ |
| Equipment Sub Total | $ | ||
| Material | |||
| $ | $ |
| Material Sub Total | $ | |
| Mobilization | ||
| $ ‐ | ||
| $ ‐ | ||
| Mobilization Sub Total | $ ‐ | |
| Other Costs | ||
| $ ‐ |
File details come from the government source that posted it. Updated .