This document contains questions and responses related to Amendment 2 of solicitation 70B01C21R00000007 from the Department of Homeland Security Customs and Border Protection seeking maintenance, repair, and improvement services for Tactical Infrastructure assets in the Big Bend and El Paso Sectors in Texas. Services include roads and bridges, fence and gates, vegetation control, debris removal, border lighting and electrical, drainage and grate systems, and tunnel remediation. Questions clarify details around attachments, quantities, and specifications for tasks in the statement of work such as gate inspections, vegetation removal, and materials pricing. Responses update attachments and confirm distances, quantities, and equipment requirements for various tasks.

View the file

Other files

File Type Posted
Copy of Contractor Unit Pricing Sheet 04262021.xlsx XLSX spreadsheet
70B01C21R00000007 IT Maintenance Contractor Questions From Amendment 2 04072021 (revised).docx DOCX document
ATTACHMENT 4 - Notional Work Plan 04072021.xlsx XLSX spreadsheet
Contractor Unit Pricing Sheet 04072021.xlsx XLSX spreadsheet
ATTACHMENT 7 Work Order Form.xlsx XLSX spreadsheet
ATTACHMENT 4 -- Notional Work Plan 3-29-21.xlsx XLSX spreadsheet
ATTACHMENT 1 -- SOW EPT BBT North TI Maintenance IDIQ Rev 03292021.pdf PDF
70B01C21R00000007 ATTACHMENT 9 PM Checklist.pdf PDF
TI Maintenance Work Plan Development Process Flowchart_3-19-21.pdf PDF
ATTACHMENT 2 -- Line Item Summary EPT BBN 3-28-21.xlsx XLSX spreadsheet
70B01C21R00000007 IT Maintenance Contractor Questions Resp 03292021.pdf PDF
RFP 70B01C21R00000007 Amendment A0002 SF30.pdf PDF
ATTACHMENT 5 -- PAST PERFORMANCE INFORMATION SURVEY 3-29-21.docx DOCX document
ATTACHMENT 8 Estimate Form 70B01C21R00000007 3-29-21.xlsx XLSX spreadsheet
Site Visit Attendees.docx DOCX document
Meeting Location for Day 1 of the site vists.pdf PDF
70B01C21R00000007 Amendment 1.pdf PDF
Site Visit Signup El Paso and Big Bend Sector.xlsx XLSX spreadsheet
Attachment 6 Wage Determination DBA Presidio Hwy.pdf PDF
Attachment 1 SOW EPT BBT North TI Maintenance IDIQ 12012020.docx DOCX document
Attachment 4a TI Design Standards_v1_Chapter 1_Sept 2012.pdf PDF
Attachment 4 Boat Ramp Design Standards.pdf PDF
Attachment 6 Wage Determination DBA El Paso Hwy.pdf PDF
Attachment 3 Inventory Asset List 12-08-2020 (003).pdf PDF
Attachment 4 Boat Ramp Detail.pdf PDF
CUS1449 - Commercial Items (SF1449).pdf PDF
Attachment 4 Submittal 01 Engineering Letter and Shop Drawings.pdf PDF
Attachment 4 TI Design Standards_v1_Chapter 3_Sept 2012.pdf PDF
RFP 70B01C21R00000007 Line Item Summary 01212021.xlsx XLSX spreadsheet
RFP 70B01C21R00000007 continuation pages.pdf PDF
Attachment 5 Notional Work Plan.xlsx XLSX spreadsheet
Attachment 4 TI Design Standards_v1_Sept 2012 - Roads Section.pdf PDF
Attachment 6 Wage Determination DBA Presidio Bldg.pdf PDF
Attachment 2 Contractor Unit Pricing Sheet final.xlsx XLSX spreadsheet
Attachment 6 Wage Determination SCA El Paso.pdf PDF
Attachment 4 TI Standards v2_Wall-Fence-Gates Drawing Updates_080618 (003).pdf PDF
Attachment 6 Wage Determination DBA El Paso Bldg.pdf PDF
Attachment 4 TI Design Standards_v1_Chapter 2_Sept 2012.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Questions from Amendment 2

Question #43 Will the Government provide a revised Unit Price Sheet? - Yes

Question # 42 Reference: Q&A Responses, 3-29-21, Q&A Response #6 Can offerors submit the completed .pdf versions of Attachment 4 and Attachment 8 in an Appendix that is part of Volume 1 that is not included in the Volume 1-page count limitations? Procurement

Question # 43 Reference: Q&A Responses, 3-29-21, Q&A Response #29 The response to this question indicates that a revised copy of Attachment 3 was included in list of documents posted in Amendment #0002. Attachment 3 was not included in the list of updated documents provided to offerors as part of Amendment #0002, will the government please provide a copy of the revised version of Attachment 3? There is no revision to attachment 3 – Inventory Asset List

Question # 44 Reference: Q&A Responses, 3-29-21, Q&A Response #30

The corrections were not completely made:

1. There is the same circular reference in cell L3 in the L&E tab of “ATTACHMENT+4+--+Notional+Work+Plan+3-29-21” (formerly Attachment+5+Notional+Work+Plan) – Revised Notional Work Plan to be provided

2. There is a link to a CTIRM excel file in the updated “ATTACHMENT+7+Work+Order+Form”- This is to be deleted, Attachment 8 is to be used with the Notional Work Plan Will the government update these documents? See response above

Question # 45 Reference: Q&A Responses, 3-29-21, Q&A Response #35, #36, #37, #37 and #39

It appears that the Gov’t intended to provide the same direction on responses to these 5 questions – namely that the RFP was revised by updating section C.5.4 in the updated Statement of Work to provide a new definition for the Coefficient Mark up. Please confirm. - Correct

Question # 46 Reference: Amendment 0002, Attachment 4, F&G Task 1:

F&G Task 1 states: “Gate Inspections: Perform inspection and maintenance of 119 manual gates on a monthly basis. Inspections shall be completed three times: July, August and September. Maintenance includes cleaning out the tracks and moving parts with air, greasing, lubricating, test”

Is test the last word in this sentence?

Should the last sentence read “ Maintenance includes cleaning out the tracks and moving parts with air, greasing, lubricating, and test” Notional work plan to be updated – correct language is “test gate for smooth operation.”

Question # 47 Reference: Amendment 0002, Attachment 4, F&G Task 2:

F&G Task 2 states: “Perform inspection and maintenance of 10 gates once a week (for 90 day POP): 4 gates at Santa Teresa, 1 gate at Ft Hancock,1 gate at County Lakes Road, 1 Gate at Camp 8 and 3 automated gates. Maintenance includes cleaning out tracks and moving parts with air and lubrication if” Will the government please complete the last sentence of this section? Notional work plan to be updated – same as Task 1

Question # 48 Reference: Amendment 0002, Attachment 4, F&G Task 3:

F&G Task 3 states: “Urgent fence breach repairs; estimated quantity is 225 for 3 Months. Work will be requested by the Government and completed 7 days a week. All work will occur in Texas with 10-mile segment. For this exercise figure the following: 4 beaches 3' X 3' full replacement of mesh style fencing in accordance with Ti standards and 6 breaches 2' x 2' full replacement of mesh style fencing in accordance with TI standards.”

Please clarify the quantity that offerors are to use to estimate this task?

Are offerors supposed to estimate the repair of quantity 4 ea. 3’ x 3’ full replacement of mesh style fencing and quantity 6 ea. 2' x 2' full replacement of mesh style fencing in accordance with TI standards.” Notional work plan to be updated

Question # 49 Reference: Amendment 0002, Attachment 4, R&B Task 3:

R&B Task 3 states: “Maintenance Blading of 2.2 miles of Bosque Rd near BSI 46-50, .4 miles of Lopez Road, near BSI #53 and .9 miles of County Lakes Rd near BSI #79. QTY: 3.7 miles. Contractor will complete maintenance blading (smoothing) on roadways to include, gathering road base material off side of road, watering, and compacting. "Its a 1/2 mile between BSI markers."

The quantity of road to be bladed appears to be the sum of 2.2+ .4+ .9 = 3.5. Please confirm that the desired quantity is 3.5 Miles (not 3.7 miles). Notional Work Plan to be updated – should be 3.5 miles

Question # 50 Reference: Amendment 0002, Attachment 4, L&E Task 1:

L&E Task 1 states: “During the work plan period, it is estimated that forty five (45) light fixtures will be found not working. Subcontractor to make repairs to the 45 fixtures, estimated to require replacement of lamp, ballast, or fuse.

For estimating purposes, what is the distance between light fixtures? Distance between light fixtures is 160 feet.

Also, the formula in the “Occurrences” box has caused a circular reference in the government provided excel file. Please provide offeror’s the number of occurrences anticipated for this task. Notional Work Plan updated

Question # 51 Reference: Amendment 0002, Attachment 4, L&E Task 2:

L&E Task 2 states: “Work Element Description: Columbus POE: Repair circuit LP 45-50 which appears to be a blowout due to moisture and compromised conductor jacketing. Estimate is based on replacing four conductors between junction boxes at Light Poles 23 and 27. Includes This sentence appears to be incomplete. Is there missing information that was meant to be provided to offeror’s after the word “includes” in the last sentence. ” Notional Work Plan updated – “includes” deleted

Question # 52 Reference: Amendment 0002, Attachment 4, V&D Task 1:

V&D Task 1 Narrative: “Vegetation Removal from BSI #46 to BSI #78/79. North and South sides of Fence. 25% remaining for CWP #14. Vegetation Control from BSI 46 to BSI 79:

A. North side of the TI: Cut/mulch all vegetation from the TI to the top of the adjacent canal wall or to a width of ten feet, whichever is closer.

B. South side of the TI: Cut/mulch all vegetation from the TI to the top of the levee road.

C. Use an ATV for work east of BSI 60. Use Government provided incinerator. use weed eaters to mulch material and leave in place. *** Any accumulation will be loaded and hauled offsite.

Option – debris (Tumble weeds) can be burned in an Incinerator and may result in a small amount of cost savings. Assume 300 Cu yds of silt and debris/mile to be hauled off to an approved local landfill.

"It’s a 1/2 mile between BSI markers."

Please confirm that offers will be required to only estimate the removal of the remaining 25% of the V&D in BSI 46-79? - Notional Work Plan updated Also, does this task contemplate/require offerors to operate a government provided incinerator? - Yes Question # 53 Reference: Amendment 0002, Attachment 4, V&D Task 2:

V&D Task 2 states: “BSI 89 to BSI 93: Remove vegetation on the south side of the TI to include tumbleweeds and with the use of an incinerator. *** estimate includes additional insurance premium for Gov't incinerator. It’s a 1/2 mile between BSI markers."

Does this task contemplate/require offerors to operate a government provided incinerator? Yes

Question # 54 Reference: Amendment 0002, Attachment 4, V&D Task 5:

V&D Task 5 states” “Remove silt accumulation and vegetation at the TI between BSI 31 - 46. Clean sand out of TI (north and south) Footing and remove vegetation West of Zaragoza POE, QTY 9.5 miles: Gather, load, haul and dispose of debris/silt/sand. There are some areas where silt and debris has accumulated on the north side of the TI where it will be necessary to use a wheelbarrow to remove this material. Use pedestrian access gates. North side material to be blown over to the south side for hand work removal. Notes: Mostly Hand Work. Use of a mini excavator and the incinerator will be needed. The incinerator can be staged by the Zaragoza POE. Assume 300 Cu yds of silt and debris/mile to be hauled off to an approved local landfill. It’s a 1/2 mile between BSI markers."

We calculate the distance between BSI 31-46 to be 7.5 Miles. Please confirm the quantity for this task 9.5 or 7.5 Miles? Please confirm. 9.5 is the correct

Are offerors using a GFE incinerator or are offerors to provide the incinerators for this activity? Contractor incinerator required

Question # 55 Reference: Amendment 0002, Attachment 2, Contractor Unit Pricing Final – Materials Tab

There is missing or insufficient information for a number of items listed in the All CLIN’s – Materials list. Will the government please provide product and specification data for the following material items listed in the materials tab of this document itemized in the table on the next page/below: A revised Unit Price Sheet to be provided.

El Paso AOR

Materials Itemized Pricing List

ALL CLIN's - Materials

No:
Description
UoM
Unit Price
Specification, Product and/or Vendor Data
157
LED Failsafe Light
EA

Insufficient Info - Need specs

173
Thermostat
EA

Insufficient Info - Need specs or product data

174
Fan
EA

Insufficient Info - Need specs or product data

180
4K Lamp
EA

Insufficient Info - need lamp type and specs

185
Hammond Transformer
EA

Insufficient Info - Need specs or product data

186
Main Disconnect Gate O-21_18
EA

Insufficient Info - Need specs or product data

187
Line reactor
EA

Insufficient Info - Need specs or product data

188
Surge for Gate
EA

Insufficient Info - Need specs or product data

195
AC Line Reactors
EA

Insufficient Info - Need specs or product data

200
Thread Rod for Trolley Shaft
EA

Insufficient Info - Need specs or product data

201
TVSS DISPLAY KIT
EA

Insufficient Info - Need specs or product data

202
VFD Assy
EA

Insufficient Info - Need specs or product data

203
VFD brakes for Gates
EA

Insufficient Info - Need specs or product data

204
VFD Assy for Gates
EA

Insufficient Info - Need specs or product data

208
PCB Gate Operator Boards
EA

Insufficient Info - Need specs or product data

209
Solid State Relay
EA

Insufficient Info - Need specs or product data

210
AC Motor Drive Assy 230V 3p 10hp
EA

Insufficient Info - Need specs or product data

211
ASSA Abloy Spring Load
EA

Insufficient Info - Need specs or product data

212
Atronix SMPS Power Supply/Charger
EA

Insufficient Info

215
1 TON Push Trolley Flange
EA

Insufficient Info - Specify size as this is not shown in TI standards

216
Trolleys for Gates
EA

Insufficient Info - Need specs or product data

217
Master Keypad
EA

Insufficient Info - Need specs or product data

218
Photo Eyes
EA

Insufficient Info - Need specs or product data

229
BSI Marker (sign)
EA

Insufficient Info - not shown in TI standards, drawing needed

234
Anchor Plate Assembly (12x12x1/2)
EA

Insufficient Info - not shown in TI standards, drawing needed