This is a Schedule of Items (SOI) pricing template for the GAOA Strawberry Kamas Bunkhouse Renovations project on the Uinta/Wasatch/Cache National Forest under Solicitation No. 1240LT26Q0003. The solicitation seeks renovation work across multiple buildings at the Kamas facility, with contractors required to submit unit prices for all base items and optional items.
The base work encompasses five subitems: (1) All Buildings general work including mobilization, project management, surface repairs and painting, door replacements and hardware installation, LED lighting upgrades, electrical outlet and switch updates, smoke and carbon monoxide detector installation, window treatment installation, HVAC and water heater servicing, and asbestos inspection; (2) West House renovations including window replacement, flooring installation, bathroom retiling, HVAC modifications, cabinetry refinishing, and concrete porch replacement; (3) East Bunkhouse renovations with hardwood floor resurfacing, extensive kitchen and storage cabinet work, stair repairs, flooring replacement, and dual bathroom updates; (4) North House work featuring bathtub reglazing, masonry repairs, cabinetry refinishing, and concrete replacement; and (5) South House improvements including window replacement, baseboard updates, flooring refinishing, exterior shed repainting, and concrete work. Optional items include drain replacement, furnace and water heater replacement, carpet removal and installation (approximately 4,000 square feet), countertop replacement, soffit and fascia work, bathroom demolition and rebuild, water line upgrades, insulated garage door systems for two properties, and basement storage room construction. The SOI notes specify that one award will be made, contractors must submit pricing for both base and optional items, unit prices will govern in case of calculation errors, and submission constitutes the contractor's commitment to accuracy of all proposed pricing.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KAMAS_SOI
| SCHEDULE OF ITEMS |
| SOLICITATION NO. 1240LT26Q0003 |
| ITEM 0002 - KAMAS BUNKHOUSE RENNOVATIONS |
| UNITA/WASATCH/CACHE NATIONAL FOREST |
| ITEM/ SPECIFICATION | SUBITEM 2001 - All Buildings - BASE | METHOD OF MEAS | PAY UNIT | EST QTY | Unit Price | TOTAL |
| 011900 | Mobilization, including bonding, Measurement & Payment, Close Out Procedures | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 013100 | Project Management & Utility Coordination | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 099120-01 | Repair, patch & paint ALL surfaces. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 099120-02 | Repair and paint/stain All interior doors. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 081110-1 | Replace ALL exterior doors, frames & hardware, install electronic coded keypad entry locks. | AQ | EA | 9 | $ - 0 | $ - 0 |
| 233713.23-01 | Replace vents, grills & cold air returns. | AQ | EA | 52 | $ - 0 | $ - 0 |
| 081110-2 | Install door stop/protectors for ALL doors. | AQ | EA | 60 | $ - 0 | $ - 0 |
| 265000 | Replace ALL light fixtures & ceiling fans with LED Lights. Install new or replace old exhaust fans in all restrooms. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 262726 | Inspect, update & replace electrical outlets & switches. | AQ | EA | 110 | $ - 0 | $ - 0 |
| 267500 | Provide and install smoke alarms and carbon monoxide detectors. | AQ | EA | 27 | $ - 0 | $ - 0 |
| 122113 | Provide & Install horizonal lift blinds. | AQ | EA | 57 | $ - 0 | $ - 0 |
| 159500.2 | Full Service ALL furnaces - describe 'full service' meaning in specs | AQ | EA | 4 | $ - 0 | $ - 0 |
| 223400.2 | Full Service ALL water heaters. | AQ | EA | 4 | $ - 0 | $ - 0 |
| 024230 | Asbestos Inspection/Testing (ALL except East Bunkhouse) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| TOTAL ALL BUILDINGS - BASE | $ - 0 |
| ITEM/ SPECIFICATION | SUBITEM 2002 - 19030601: West House - BASE | METHOD OF MEAS | PAY UNIT | EST QTY | Unit Price | Total |
| 85413-601 | Replace ALL windows, finish inside of window frame. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 96519-601 | East entry way to Kitchen, Provide and install LVT, including PVC baseboard. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 96816-601 | Replace carpet flooring, in bedrooms & Living rm. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 093033-601.12 | West bathroom Re-tile floor, provide and install elongated toilet. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 233113-601 | Rear entryway, re-route dryer exhaust through exterior wall. Furnace area move furnace exhaust from N side to S side of unit, construct linin shelving install folding door. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 061000-601 | Remove un-used door frame kitchen, Remove paneling, Remove center bedroom interior window. Finish to match. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 090190-601 | Kitchen, west batroom, rear hallway & utility areas, replace ALL cabinet hinges, door glides, and handles. Deep clean & paint/refinish all cabinetry | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 33000-601 | Replace rear concrete porch. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| TOTAL WEST HOUSE - BASE | $ - 0 |
| ITEM/ SPECIFICATION | SUBITEM 2003 - 19030405: East Bunkhouse - BASE | METHOD OF MEAS | PAY UNIT | EST QTY | Unit Price | Total |
| 96400-405 | Living room, Repair, sand and, prep re-surface hardwood floors. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 90190-405 | Kitchen, entryway, hallway -deep clean, repair & refinish ALL shelves, drawers, doors. Remove door jam, laundry chute, old fuse box & other closets. Replace with wood drawers, cupboards, doors, add & extend more shelving, cupboards & doors. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 61000-405.10 | Remove Main floor & 2nd floor stair landing cold air return, repair floor, install in wall. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 61000-405.05 | Basement, rebuild lower wood section of stairs, frame & finish both sides of inside walls. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 96519-405 | Kitchen, rear entryway, stairs down & stairs to kitchen, hallway to stairs & ALL landings, stairs to second floor, remove, replace existing flooring with LVT flooring & PVC baseboard. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 96816-405 | All 4 bedrooms, replace/or supply carpet. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 049030-1 | Living rm replace broken bricks, clean all masonary, repoint joints & re-seal masonary, resurface mantel. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 093033-405.10 | 1st floor east bathroom, prepare and install ceramic tile on floor and walls & inside tub/shower area | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 093033-405.20 | 2nd floor bathroom install, tile wall & flooring, sink & vanity, elongated toilet & 3 lg inset medicine cabinets, | LSQ | LS | 1 | $ - 0 | $ - 0 |
| TOTAL EAST BUNKHOUSE - BASE | $ - 0 |
| ITEM/ SPECIFICATION | SUBITEM 2004 - 19030501: North House - BASE | METHOD OF MEAS | PAY UNIT | EST QTY | Unit Price | Total |
| 96530-501 | Reglaze bathtub, replace baseboard & trimboard in bathroom, hallway, kitchen & Utility room. Replace with PVC. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 49030-2 | Living rm replace broken bricks, clean all masonary, re-point joints, seal masonary, replace mantle. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 090190-501 | ALL Cabinetry & drawers deep clean & refinish to original, replace door glides, handles. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 33000-501 | Replace concrete side walks front & rear of house, replace rear porch. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| TOTAL NORTH HOUSE - BASE | $ - 0 |
| ITEM/ SPECIFICATION | SUBITEM 2005 - 19060701: South House - BASE | METHOD OF MEAS | PAY UNIT | EST QTY | Unit Price | Total |
| 85413-701 | Replace ALL windows, finish inside of window frame. | LSQ | LS | 13 | $ - 0 | $ - 0 |
| 96530-701 | Replace baseboard & trimboard in Bathroom, Kitchen & Utility room. Replace with PVC. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 96816-701 | Replace Front Room carpet | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 099300-701 | Remove carpet 4' wide walk way strip from front door to hallway & including halway, Re-finish hardwood flooring. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 099111-701 | Prepare, repaint backyard shed. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 33000-701 | Replace concrete under garage door & pad at rear exterior door, Replace front Porch, Replace front portion of sidewalk, remove dirt to slope exisiting ground away from concrete behind the house. | LSQ | LS | 1 | $ - 0 | $ - 0 |
| TOTAL SOUTH HOUSE - BASE | $ - 0 | |||||
| BASE TOTAL (SUBITEMS 2001-2005) | $ - 0 |
| ITEM/ SPECIFICATION | SUBITEM 2006 - All Buildings - Options | METHOD | |||||
| OF MEAS | PAY UNIT | EST QTY | Unit Price | Total | |||
| 220500 | Replace tub, shower drains as needed | AQ | EA | 3 | $ - 0 | $ - 0 | |
| 235416.13 | Replace Furnace | AQ | EA | 1 | $ - 0 | $ - 0 | |
| 223400 | Replace Water Heater | AQ | EA | 1 | $ - 0 | $ - 0 | |
| 96816-01 | Demo and remove existing carpet, provide and install carpet flooring. Total sqft aprox 4K | AQ | SF | 2000 | $ - 0 | $ - 0 | |
| 123661.16 | Kitchen Remove and replace laminate countertops. | AQ | LF | 300 | $ - 0 | $ - 0 | |
| 074293 | Replace soffit and fascia. | AQ | LF | 30 | $ - 0 | $ - 0 | |
| 093033-601.10 | East bathroom, demolish & rebuild, as per specification. | LSQ | LS | 1 | $ - 0 | $ - 0 | |
| 151400-601.1 | Outside of SW bedroom remove shower, Relocate water heater to this area, extend piping to new location & frame in new water heater area, build catch pan to drain, install vent through roof, finish area, install door. Replace ALL water lines to entire house with Pex piping. | LSQ | LS | 1 | $ - 0 | $ - 0 | |
| 83613-501 | New Insulated Garage door system, with remotes and keypad. | LSQ | LS | 1 | $ - 0 | $ - 0 | |
| 83613-701 | New Insulated Garage door system, with remotes and keypad. | LSQ | LS | 1 | $ - 0 | $ - 0 | |
| 91110-405.05 | Build & finish Storage room Basement of East House. | LSQ | LS | 2 | $ - 0 | $ - 0 | |
| TOTAL ALL BUILDINGS - OPTIONS | $ - 0 | ||||||
| TOTAL ALL BASE & OPTIONAL SUBMITEMS (SUBITEMS 2001-2006) | $ - 0 | ||||||
| SOI NOTES: | |||||||
| NOTE 1: Contractor input Unit Prices | |||||||
| NOTE 2: Auto Calculated Values | |||||||
| NOTE 3: One award will be made from this solicitation. Contractors shall submit a quote for all Base Items and all Optional Items in the Schedule of Items. In the event of an error in extending the proposed prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations. | |||||||
| NOTE 4: Submission of a signed SOI represents the Contractors commitment to the data herein. It is the responsibility of the Contractor to verify that all values presented in the signature certified SOI, including auto-calculated cells, accurately represent the Contractor's intended price elements. The Government shall not be held liable for any errors in calculation or pricing data. |