Attachment 12 - 3WeekLookahead_KamasBunkhouses_Template.xlsx

XLSX spreadsheet 77 KB Posted

Attached to
GAOA – Strawberry – Kamas Bunkhouse Renovations on the Uinta/Wasatch/Cache National Forest
Solicitation number
1240LT26Q0003
Issued by

About this file

This is a Three-Week Look Ahead construction scheduling template for the Kamas Bunkhouse Renovations project on the Uinta/Wasatch/Cache National Forest. The template is provided as an example document with multiple building-specific schedules covering a three-week period from March 7, 2027 through March 28, 2027. The template includes separate detailed schedules for all buildings combined, plus individual schedules for the West, East, North, and South buildings, along with a section for option items applicable to all buildings.

The renovation work encompasses multiple construction trades and activities across all four bunkhouse buildings, including surface repairs and painting, door replacement and repairs, exterior door installation with electronic keypad locks, ventilation replacement, LED lighting and exhaust fan installation, electrical outlet and switch updates, smoke and carbon monoxide detector installation, window blind installation, furnace and water heater servicing, flooring replacement (LVT and carpet), bathroom tile work, concrete porch and sidewalk replacement, masonry repairs, kitchen cabinetry refinishing, hardwood floor refinishing, and various optional items such as furnace and water heater replacement, countertop replacement, garage door systems, and plumbing upgrades. The template provides columns for activity identification, responsible parties, original duration, daily scheduling across the three-week period, completion status percentages, and notes. This is a blank scheduling template designed to track and manage construction activities and progress reporting.

View the file

Other files

File Type Posted
1240LT26Q0003-0004 Attachment 1 SOI Strawberry Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0004 SF30 Amendment 04.pdf PDF
1240LT26Q0003-0003 SF30 Strawberry Kamas Bunkhouse UWCNF.pdf PDF
1240LT26Q0003-0002 Questions and Answers Amendment 02 .pdf PDF
1240LT26Q0003-0002 Attachment 6A - Kamas Bunkhouses Floorplans.pdf PDF
1240LT26Q0003-0002 Attachment 2 SOI_Kamas Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0002 SF-30 Amendment 02 Strawberry Kamas Bunkhouse UWCNF.pdf PDF
1240LT26Q0003-0002 Attachment 1 SOI Strawberry Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0002 Attachment 6B Kamas East Bunkhouse Asbestos Report .pdf PDF
1240LT26Q0003-0001 Attachment 1 SOI Strawberry Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0001 Questions and Answers Amendment 02 .pdf PDF
1240LT26Q0003-0001 Attachment 2 SOI_Kamas Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0001 Attachment 6A - Kamas Bunkhouses Floorplans.pdf PDF
1240LT26Q0003-0001 Attachment 6B Kamas East Bunkhouse Asbestos Report .pdf PDF
1240LT26Q0003-0001 SF-30 Amendment 02 Strawberry Kamas Bunkhouse UWCNF.pdf PDF
1240LT26Q0003-0001 QA Strawberry Kamas Bunkhouse UWCNF.pdf PDF
1240LT26Q0003-0001 SF30 Strawberry Kamas Bunkhouse UWCNF.pdf PDF
Attachment 1 - SOI_Strawberry Renovations.xlsx XLSX spreadsheet
Attachment 10 Kamas Site Pictures.docx DOCX document
Attachment 5 - Signed Drawing Strawberry Kamas Bunkhouse Renovations.pdf PDF
Attachment 11 - 3WeekLookahead_StrawberryBunkhouses_Template.xlsx XLSX spreadsheet
Attachment 3 - Spec Package_Strawberry Renovations.pdf PDF
Attachment 2 - SOI_Kamas Renovations.xlsx XLSX spreadsheet
Attachment 7 - DBA WD UT202601 Wasatch Co 010226.pdf PDF
Attachment 8 - DBA WD UT202635 Summit Co 010226.pdf PDF
1240LT26Q0003 RFQ GAOA Strawberry Kamas Bunkhouse Renovations FInal.pdf PDF
Attachment 9 Strawberry Site Pictures.docx DOCX document
Attachment 4 - Spec Package_Kamas Renovations FINAL.pdf PDF
Attachment 6 - Existing Conditions Kamas Bunkhouse.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALLKamas 3-Week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - ALL BUILDINGSWork Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
11900Mobilization, including bonding, Measurement & Payment, Close Out Procedures0
013100Project Management & Utility Coordination0
099120-01Repair, patch & paint ALL surfaces.0
099120-02Repair and paint/stain All interior doors.0
081110-1Replace ALL exterior doors, frames & hardware, install electronic coded keypad entry locks.0
233713.23-01Replace vents, grills & cold air returns.0
081110-2Install door stop/protectors for ALL doors.
265000Replace ALL light fixtures & ceiling fans with LED Lights. Install new or replace old exhaust fans in all restrooms.
262726Inspect, update & replace ALL electrical outlets, switches & covers.
267500Provide and install smoke alarms and carbon monoxide detectors.
122113Provide & Install horizonal lift blinds.
159500.2Full Service ALL furnaces - describe 'full service' meaning in specs
223400.2Full Service ALL water heaters.
24230Asbestos Inspection/Testing (ALL except East Bunkhouse)

0601 KAMAS WEST 3-Week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - WEST BUILDING 19030601Work Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
85413-601Replace ALL windows, finish inside of window frame.0
96519-601East entry way to Kitchen, Provide and install LVT, including PVC baseboard.0
96816-601Replace carpet flooring, in bedrooms & Living rm.0
093033-601.12West bathroom Re-tile floor, provide and install e-longated toilet.0
233113-601Rear entryway, re-route dryer exhaust through exterior wall. Furnace area move furnace exhaust from N side to S side of unit, construct linin shelving install folding door.0
061000-601Remove un-used door frame kitchen, Remove paneling, Remove center bedroom interior window. Finish to match.0
090190-601Kitchen, west batroom, rear hallway & utility areas, replace ALL cabinet hinges, door glides, and handles. Deep clean & paint/refinish all cabinetry
33000-601Replace rear concrete porch.

0405 KAMAS EAST 3-Week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - EAST BUILDING 19030405Work Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
96400-405Living room, Repair, sand and, prep re-surface hardwood floors.0
90190-405Kitchen, entryway, hallway -deep clean, repair & refinish ALL shelves, drawers, doors. Remove door jam, laundry chute, old fuse box & other closets. Replace with wood drawers, cupboards, doors, add & extend more shelving, cupboards & doors.0
61000-405.10Remove Main floor & 2nd floor stair landing cold air return, repair floor, install in wall.0
61000-405.05Basement, rebuild lower wood section of stairs, frame & finish both sides of inside walls.0
96519-405Kitchen, rear entryway, stairs down & stairs to kitchen, hallway to stairs & ALL landings, stairs to second floor, remove, replace existing flooring with LVT flooring & PVC baseboard.0
96816-405All 4 bedrooms, replace/or supply carpet.0
049030-1Living rm replace broken bricks, clean all masonary, repoint joints & re-seal masonary, resurface mantel.
093033-405.101st floor east bathroom, prepare and install ceramic tile on floor and walls & inside tub/shower area
093033-405.202nd floor bathroom install, tile wall & flooring, sink & vanity, elongated toilet & 3 lg inset medicine cabinets,

0501 KAMAS NORTH 3-week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - NORTH BUILDING 19030501Work Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
96530-501Reglaze bathtub, replace baseboard & trimboard in bathroom, hallway, kitchen & Utility room. Replace with PVC.0
49030-2Living rm replace broken bricks, clean all masonary, re-point joints, seal masonary, replace mantle.0
090190-501ALL Cabinetry & drawers deep clean & refinish to original, replace door glides, handles.0
33000-501Replace concrete side walks front & rear of house, replace rear porch.0
33000-501Replace concrete side walks front & rear of house, replace rear porch.0
0

0701 KAMAS SOUTH 3-week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - SOUTH BUILDING 19060701Work Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
85413-701Replace ALL windows, finish inside of window frame.0
96530-701Replace baseboard & trimboard in Bathroom, Kitchen & Utility room. Replace with PVC.0
96816-701Replace Front Room carpet0
099300-701Remove carpet 4' wide walk way strip from front door to hallway & including halway, Re-finish hardwood flooring.0
099111-701Prepare, repaint backyard shed.0
33000-701Replace concrete under garage door & pad at rear exterior door, Replace front Porch, Replace front portion of sidewalk, remove dirt to slope exisiting ground away from concrete behind the house.0

0701 KAMAS OPTION 3-week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - ALL BLDGS OPTION ITEMSWork Type 1
Start DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
220500Replace tub, shower drains as needed0
235416.13Replace Furnace0
223400Replace Water Heater0
96816-01Demo and remove existing carpet, provide and install carpet flooring.0
123661.16Kitchen Remove and replace laminate countertops.0
74293Replace soffit and fascia.0
093033-601.10East bathroom, demolish & rebuild, as per specification.
151400-601.1Outside of SW bedroom remove shower, Relocate water heater to this area, extend piping to new location & frame in new water heater area, build catch pan to drain, install vent through roof, finish area, install door. Replace ALL water lines to entire house with Pex piping.
83613-501New Insulated Garage door system, with remotes and keypad.
83613-701New Insulated Garage door system, with remotes and keypad.
91110-405.05Build & finish Storage room Basement of East House.

EXAMPLE 3-Week LA

Three-Week Look Ahead Construction Schedule Template Example
Project NameProject Location
Project AlphaAddress, City, State ZIPWork Type 1
Project ManagerStart DateWork Type 2
Henry McNeal03/07/27Work Type 3
Project NumberEnd DateWork Type 4
001-ABC-DEF03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
A10300Prepare/Submit Project Scheduler QualificationsHenry McNeal335
A10301Prepare/Submit Insurance CertificatesBrent Williams522
A10302Prepare/Submit Preliminary Project ScheduleHenry McNeal510
A10303Prepare/Submit Quality Control PlanJason Desjardins37
A10304Review/Approve Health and Safety PlanJason Desjardins380Contact SSHO Manager
A10305Review/Approve List of Proposed ContractorsJason Desjardins530
A10305Mobilization0

CLICK HERE TO CREATE IN SMARTSHEET

http://bit.ly/2ZM77jmhttps://www.smartsheet.com/try-it?trp=10669&utm_source=template-excel&utm_medium=content&utm_campaign=Three-Week+Look+Ahead+Construction+Schedule-excel-10669&lpa=Three-Week+Look+Ahead+Construction+Schedule+excel+10669 BLANK 3-Week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
Work Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
0
0
0
0
0
0