Attachment 12 - 3WeekLookahead_KamasBunkhouses_Template.xlsx
XLSX spreadsheet 77 KB Posted
- Attached to
- GAOA – Strawberry – Kamas Bunkhouse Renovations on the Uinta/Wasatch/Cache National Forest
- Solicitation number
- 1240LT26Q0003
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Three-Week Look Ahead construction scheduling template for the Kamas Bunkhouse Renovations project on the Uinta/Wasatch/Cache National Forest. The template is provided as an example document with multiple building-specific schedules covering a three-week period from March 7, 2027 through March 28, 2027. The template includes separate detailed schedules for all buildings combined, plus individual schedules for the West, East, North, and South buildings, along with a section for option items applicable to all buildings.
The renovation work encompasses multiple construction trades and activities across all four bunkhouse buildings, including surface repairs and painting, door replacement and repairs, exterior door installation with electronic keypad locks, ventilation replacement, LED lighting and exhaust fan installation, electrical outlet and switch updates, smoke and carbon monoxide detector installation, window blind installation, furnace and water heater servicing, flooring replacement (LVT and carpet), bathroom tile work, concrete porch and sidewalk replacement, masonry repairs, kitchen cabinetry refinishing, hardwood floor refinishing, and various optional items such as furnace and water heater replacement, countertop replacement, garage door systems, and plumbing upgrades. The template provides columns for activity identification, responsible parties, original duration, daily scheduling across the three-week period, completion status percentages, and notes. This is a blank scheduling template designed to track and manage construction activities and progress reporting.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALLKamas 3-Week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| KAMAS BUNKHOUSE RENOVATIONS - ALL BUILDINGS | Work Type 1 | ||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| 11900 | Mobilization, including bonding, Measurement & Payment, Close Out Procedures | 0 | |||||||||||||||||||||||||
| 013100 | Project Management & Utility Coordination | 0 | |||||||||||||||||||||||||
| 099120-01 | Repair, patch & paint ALL surfaces. | 0 | |||||||||||||||||||||||||
| 099120-02 | Repair and paint/stain All interior doors. | 0 | |||||||||||||||||||||||||
| 081110-1 | Replace ALL exterior doors, frames & hardware, install electronic coded keypad entry locks. | 0 | |||||||||||||||||||||||||
| 233713.23-01 | Replace vents, grills & cold air returns. | 0 | |||||||||||||||||||||||||
| 081110-2 | Install door stop/protectors for ALL doors. | ||||||||||||||||||||||||||
| 265000 | Replace ALL light fixtures & ceiling fans with LED Lights. Install new or replace old exhaust fans in all restrooms. | ||||||||||||||||||||||||||
| 262726 | Inspect, update & replace ALL electrical outlets, switches & covers. | ||||||||||||||||||||||||||
| 267500 | Provide and install smoke alarms and carbon monoxide detectors. | ||||||||||||||||||||||||||
| 122113 | Provide & Install horizonal lift blinds. | ||||||||||||||||||||||||||
| 159500.2 | Full Service ALL furnaces - describe 'full service' meaning in specs | ||||||||||||||||||||||||||
| 223400.2 | Full Service ALL water heaters. | ||||||||||||||||||||||||||
| 24230 | Asbestos Inspection/Testing (ALL except East Bunkhouse) |
0601 KAMAS WEST 3-Week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| KAMAS BUNKHOUSE RENOVATIONS - WEST BUILDING 19030601 | Work Type 1 | ||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| 85413-601 | Replace ALL windows, finish inside of window frame. | 0 | |||||||||||||||||||||||||
| 96519-601 | East entry way to Kitchen, Provide and install LVT, including PVC baseboard. | 0 | |||||||||||||||||||||||||
| 96816-601 | Replace carpet flooring, in bedrooms & Living rm. | 0 | |||||||||||||||||||||||||
| 093033-601.12 | West bathroom Re-tile floor, provide and install e-longated toilet. | 0 | |||||||||||||||||||||||||
| 233113-601 | Rear entryway, re-route dryer exhaust through exterior wall. Furnace area move furnace exhaust from N side to S side of unit, construct linin shelving install folding door. | 0 | |||||||||||||||||||||||||
| 061000-601 | Remove un-used door frame kitchen, Remove paneling, Remove center bedroom interior window. Finish to match. | 0 | |||||||||||||||||||||||||
| 090190-601 | Kitchen, west batroom, rear hallway & utility areas, replace ALL cabinet hinges, door glides, and handles. Deep clean & paint/refinish all cabinetry | ||||||||||||||||||||||||||
| 33000-601 | Replace rear concrete porch. |
0405 KAMAS EAST 3-Week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| KAMAS BUNKHOUSE RENOVATIONS - EAST BUILDING 19030405 | Work Type 1 | ||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| 96400-405 | Living room, Repair, sand and, prep re-surface hardwood floors. | 0 | |||||||||||||||||||||||||
| 90190-405 | Kitchen, entryway, hallway -deep clean, repair & refinish ALL shelves, drawers, doors. Remove door jam, laundry chute, old fuse box & other closets. Replace with wood drawers, cupboards, doors, add & extend more shelving, cupboards & doors. | 0 | |||||||||||||||||||||||||
| 61000-405.10 | Remove Main floor & 2nd floor stair landing cold air return, repair floor, install in wall. | 0 | |||||||||||||||||||||||||
| 61000-405.05 | Basement, rebuild lower wood section of stairs, frame & finish both sides of inside walls. | 0 | |||||||||||||||||||||||||
| 96519-405 | Kitchen, rear entryway, stairs down & stairs to kitchen, hallway to stairs & ALL landings, stairs to second floor, remove, replace existing flooring with LVT flooring & PVC baseboard. | 0 | |||||||||||||||||||||||||
| 96816-405 | All 4 bedrooms, replace/or supply carpet. | 0 | |||||||||||||||||||||||||
| 049030-1 | Living rm replace broken bricks, clean all masonary, repoint joints & re-seal masonary, resurface mantel. | ||||||||||||||||||||||||||
| 093033-405.10 | 1st floor east bathroom, prepare and install ceramic tile on floor and walls & inside tub/shower area | ||||||||||||||||||||||||||
| 093033-405.20 | 2nd floor bathroom install, tile wall & flooring, sink & vanity, elongated toilet & 3 lg inset medicine cabinets, |
0501 KAMAS NORTH 3-week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| KAMAS BUNKHOUSE RENOVATIONS - NORTH BUILDING 19030501 | Work Type 1 | ||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| 96530-501 | Reglaze bathtub, replace baseboard & trimboard in bathroom, hallway, kitchen & Utility room. Replace with PVC. | 0 | |||||||||||||||||||||||||
| 49030-2 | Living rm replace broken bricks, clean all masonary, re-point joints, seal masonary, replace mantle. | 0 | |||||||||||||||||||||||||
| 090190-501 | ALL Cabinetry & drawers deep clean & refinish to original, replace door glides, handles. | 0 | |||||||||||||||||||||||||
| 33000-501 | Replace concrete side walks front & rear of house, replace rear porch. | 0 | |||||||||||||||||||||||||
| 33000-501 | Replace concrete side walks front & rear of house, replace rear porch. | 0 | |||||||||||||||||||||||||
| 0 |
0701 KAMAS SOUTH 3-week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| KAMAS BUNKHOUSE RENOVATIONS - SOUTH BUILDING 19060701 | Work Type 1 | ||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| 85413-701 | Replace ALL windows, finish inside of window frame. | 0 | |||||||||||||||||||||||||
| 96530-701 | Replace baseboard & trimboard in Bathroom, Kitchen & Utility room. Replace with PVC. | 0 | |||||||||||||||||||||||||
| 96816-701 | Replace Front Room carpet | 0 | |||||||||||||||||||||||||
| 099300-701 | Remove carpet 4' wide walk way strip from front door to hallway & including halway, Re-finish hardwood flooring. | 0 | |||||||||||||||||||||||||
| 099111-701 | Prepare, repaint backyard shed. | 0 | |||||||||||||||||||||||||
| 33000-701 | Replace concrete under garage door & pad at rear exterior door, Replace front Porch, Replace front portion of sidewalk, remove dirt to slope exisiting ground away from concrete behind the house. | 0 |
0701 KAMAS OPTION 3-week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| KAMAS BUNKHOUSE RENOVATIONS - ALL BLDGS OPTION ITEMS | Work Type 1 | ||||||||||||||||||||||||||
| Start Date | Work Type 2 | ||||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| 220500 | Replace tub, shower drains as needed | 0 | |||||||||||||||||||||||||
| 235416.13 | Replace Furnace | 0 | |||||||||||||||||||||||||
| 223400 | Replace Water Heater | 0 | |||||||||||||||||||||||||
| 96816-01 | Demo and remove existing carpet, provide and install carpet flooring. | 0 | |||||||||||||||||||||||||
| 123661.16 | Kitchen Remove and replace laminate countertops. | 0 | |||||||||||||||||||||||||
| 74293 | Replace soffit and fascia. | 0 | |||||||||||||||||||||||||
| 093033-601.10 | East bathroom, demolish & rebuild, as per specification. | ||||||||||||||||||||||||||
| 151400-601.1 | Outside of SW bedroom remove shower, Relocate water heater to this area, extend piping to new location & frame in new water heater area, build catch pan to drain, install vent through roof, finish area, install door. Replace ALL water lines to entire house with Pex piping. | ||||||||||||||||||||||||||
| 83613-501 | New Insulated Garage door system, with remotes and keypad. | ||||||||||||||||||||||||||
| 83613-701 | New Insulated Garage door system, with remotes and keypad. | ||||||||||||||||||||||||||
| 91110-405.05 | Build & finish Storage room Basement of East House. |
EXAMPLE 3-Week LA
| Three-Week Look Ahead Construction Schedule Template Example | ||||||||||||||||||||||||||||
| Project Name | Project Location | |||||||||||||||||||||||||||
| Project Alpha | Address, City, State ZIP | Work Type 1 | ||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | ||||||||||||||||||||||||||
| Henry McNeal | 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | ||||||||||||||||||||||||||
| 001-ABC-DEF | 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | ||||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | |||
| (BY PERCENT) | Notes | |||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | ||||||||
| A10300 | Prepare/Submit Project Scheduler Qualifications | Henry McNeal | 3 | 35 | ||||||||||||||||||||||||
| A10301 | Prepare/Submit Insurance Certificates | Brent Williams | 5 | 22 | ||||||||||||||||||||||||
| A10302 | Prepare/Submit Preliminary Project Schedule | Henry McNeal | 5 | 10 | ||||||||||||||||||||||||
| A10303 | Prepare/Submit Quality Control Plan | Jason Desjardins | 3 | 7 | ||||||||||||||||||||||||
| A10304 | Review/Approve Health and Safety Plan | Jason Desjardins | 3 | 80 | Contact SSHO Manager | |||||||||||||||||||||||
| A10305 | Review/Approve List of Proposed Contractors | Jason Desjardins | 5 | 30 | ||||||||||||||||||||||||
| A10305 | Mobilization | 0 |
CLICK HERE TO CREATE IN SMARTSHEET
http://bit.ly/2ZM77jmhttps://www.smartsheet.com/try-it?trp=10669&utm_source=template-excel&utm_medium=content&utm_campaign=Three-Week+Look+Ahead+Construction+Schedule-excel-10669&lpa=Three-Week+Look+Ahead+Construction+Schedule+excel+10669 BLANK 3-Week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| Work Type 1 | |||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| 0 | |||||||||||||||||||||||||||
| 0 | |||||||||||||||||||||||||||
| 0 | |||||||||||||||||||||||||||
| 0 | |||||||||||||||||||||||||||
| 0 | |||||||||||||||||||||||||||
| 0 |
image1.png image2.svg
.MsftOfcThm_Accent4_lumMod_75_Stroke_v2 { stroke:#BF9000;
File details come from the government source that posted it. Updated .