1240LT26Q0003-0004 SF30 Amendment 04.pdf

PDF 93 KB Posted

Attached to
GAOA – Strawberry – Kamas Bunkhouse Renovations on the Uinta/Wasatch/Cache National Forest
Solicitation number
1240LT26Q0003
Issued by

About this file

This is Amendment 0004 to Solicitation 1240LT26Q0003 for Strawberry-Kamas Bunkhouse Renovations at Uinta/Wasatch/Cache National Forest, issued by USDA-FS CSA Intermountain on January 30, 2026. The amendment extends the offer submission deadline from March 13, 2026 at 1:00 p.m. MST to March 18, 2026 at 1:00 p.m. MST. Offerors must acknowledge receipt of this amendment prior to the revised deadline through one of three methods: completing the amendment cover page, acknowledging receipt on each offer copy, or sending separate written confirmation referencing the solicitation and amendment numbers. Failure to acknowledge receipt by the specified deadline may result in offer rejection.

The amendment deletes and replaces Attachment 1 (SOI Strawberry Renovations) with an amended version containing highlighted line item changes. The amendment also provides Questions and Answers addressing clarifications for both the Strawberry and Kamas bunkhouse projects. Key clarifications include: confirming the number of smoke/carbon monoxide detectors required for Unit 1062; directing pricing for thermostat relocation to line item 265000 (LED light fixture replacement); referencing Specification 265000 for light fixture and ceiling fan quantities; directing bidders to Specification 091110-405.05 for storage room basement finishing scope in the Kamas East Bunkhouse; and referencing Section 083613 for garage door sizing to be determined from existing frames. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

File Type Posted
1240LT26Q0003-0004 Attachment 1 SOI Strawberry Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0003 SF30 Strawberry Kamas Bunkhouse UWCNF.pdf PDF
1240LT26Q0003-0002 Questions and Answers Amendment 02 .pdf PDF
1240LT26Q0003-0002 Attachment 6A - Kamas Bunkhouses Floorplans.pdf PDF
1240LT26Q0003-0002 Attachment 2 SOI_Kamas Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0002 SF-30 Amendment 02 Strawberry Kamas Bunkhouse UWCNF.pdf PDF
1240LT26Q0003-0002 Attachment 1 SOI Strawberry Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0002 Attachment 6B Kamas East Bunkhouse Asbestos Report .pdf PDF
1240LT26Q0003-0001 Attachment 1 SOI Strawberry Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0001 Questions and Answers Amendment 02 .pdf PDF
1240LT26Q0003-0001 Attachment 2 SOI_Kamas Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0001 Attachment 6A - Kamas Bunkhouses Floorplans.pdf PDF
1240LT26Q0003-0001 Attachment 6B Kamas East Bunkhouse Asbestos Report .pdf PDF
1240LT26Q0003-0001 SF-30 Amendment 02 Strawberry Kamas Bunkhouse UWCNF.pdf PDF
1240LT26Q0003-0001 QA Strawberry Kamas Bunkhouse UWCNF.pdf PDF
1240LT26Q0003-0001 SF30 Strawberry Kamas Bunkhouse UWCNF.pdf PDF
Attachment 1 - SOI_Strawberry Renovations.xlsx XLSX spreadsheet
Attachment 12 - 3WeekLookahead_KamasBunkhouses_Template.xlsx XLSX spreadsheet
Attachment 10 Kamas Site Pictures.docx DOCX document
Attachment 5 - Signed Drawing Strawberry Kamas Bunkhouse Renovations.pdf PDF
Attachment 11 - 3WeekLookahead_StrawberryBunkhouses_Template.xlsx XLSX spreadsheet
Attachment 3 - Spec Package_Strawberry Renovations.pdf PDF
Attachment 2 - SOI_Kamas Renovations.xlsx XLSX spreadsheet
Attachment 7 - DBA WD UT202601 Wasatch Co 010226.pdf PDF
Attachment 8 - DBA WD UT202635 Summit Co 010226.pdf PDF
1240LT26Q0003 RFQ GAOA Strawberry Kamas Bunkhouse Renovations FInal.pdf PDF
Attachment 9 Strawberry Site Pictures.docx DOCX document
Attachment 4 - Spec Package_Kamas Renovations FINAL.pdf PDF
Attachment 6 - Existing Conditions Kamas Bunkhouse.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240LT26Q0003

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40LT

OGDEN UT 84401-2310

324 25TH ST

USDA-FS CSA INTERMOUNTAIN 8

GAOA03/11/20260004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/30/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation 1240LT26Q0003, Strawberry-Kamas Bunkhouse Renovations, Uinta/Wasatch/Cache

National Forest, is amended as follows:

The solicitation is amended as follows:

See Solicitation, SF-1442, Pg 1, Section 13. Additional Solicitation Requirements,change due date and time from March 13, 2026 at 1:00 p.m. to March 18, 2026 at 1:00 p.m.

MST.

See Attachment 1 SOI Strawberry Renovations, delete in its entirety and replace with the attached Attachment 1 SOI Strawberry Renovations Amended (Changed line item is highlighted

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

KELLIE J. SHAW

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240LT26Q0003/0004

in yellow)

The following questions and answers are being provided for informational or clarification purposes only.

Question & Answer:

Strawberry:

Q: Unit 1062 states on the bid form that there are only 2 required smoke/carbon monoxide detectors. There are 5 listed on the plan.

Please advise

A: See Amended Schedule of Items attached to this

Amendment.

Q: It states on the plan for strawberry to move the thermostat but there is no line item on the bid form. Can you identify what line item contractors should price this work?

A: Please include this pricing within building

1062 line item 265000 [Replace all interior and exterior light fixtures with LED Lights per drawings]. The thermostat location change shall be included within the Lump Sum.

Kamas:

Q: It states to Replace ALL light fixtures & ceiling fans with LED Lights. In all building does this include the exterior lights? Fixtures are not specified per plans should the electrician plan for one in each bedroom and bathroom. A quantity should be given on this line item. Please advise.

A: Please see Specification number 265000 for the numerical information.

Q: On the bid form for Kamas it states East

Bunkhouse - Build and finish storage room basement. Quantity (2) there are no drawings for this area to what extent does this area need to be finished is electrical/hvac or plumbing required in this area. Or is this a wood framed to sheetrock phase? Please advise. Should an allowance just be placed in this bid form?

A: Please see specification number 091110-405.05 for details on work for this line item.

Q: On the Kamas Bunkhouse Renovations Schedule of

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240LT26Q0003/0004

Items, there is a call out for garage doors, under the ¿OPTIONS¿, subitem 2006, for the North

House, 083613-501 and the South House, 083643-701. We are in need of dimensions of the garage doors so we can bid them properly. The specifications do not list them, or any measurements pertaining to them.

A: See SECTION 083613 - SECTIONAL DOORS. C.

Sizing to be determined from existing garage door frame.

All other terms and conditions remain unchanged.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .