1240LT26Q0003-0001 SF30 Strawberry Kamas Bunkhouse UWCNF.pdf

PDF 89 KB Posted

Attached to
GAOA – Strawberry – Kamas Bunkhouse Renovations on the Uinta/Wasatch/Cache National Forest
Solicitation number
1240LT26Q0003
Issued by

About this file

This is an Amendment of Solicitation (Amendment 0001) issued by USDA Forest Service CSA Intermountain Region for Solicitation 1240LT26Q0003, Strawberry-Kamas Bunkhouse Renovations at Uinta/Wasatch/Cache National Forest. The amendment is effective January 30, 2026, and was issued from the Ogden, UT office (324 25th St, Ogden UT 84401-2310). The amendment modifies technical specifications and administrative deadlines for the renovation project at two administrative sites.

The key changes include: (a) updating all references in the signed drawings (Attachment 5, Sheet 10 of 10) from Building #1063 to Building #1065; (b) extending the proposal submission deadline from February 27, 2026 at 1:00 p.m. to March 13, 2026 at 1:00 p.m. MST; (c) adjusting the government point of contact inquiries deadline from February 17, 2026 to March 3, 2026 at 4:30 p.m. MST; (d) deleting the last sentence from Section 024230 (Asbestos Abatement) in the Kamas specification package; and (e) clarifying that the Strawberry site work involves replacing doorknobs with lever-type handles and inspecting door hardware, not replacing all doors, along with adding specifications for demo and installation of level-type handle faucets in buildings 1062, 1063, and 1065. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

File Type Posted
1240LT26Q0003-0004 Attachment 1 SOI Strawberry Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0004 SF30 Amendment 04.pdf PDF
1240LT26Q0003-0003 SF30 Strawberry Kamas Bunkhouse UWCNF.pdf PDF
1240LT26Q0003-0002 Questions and Answers Amendment 02 .pdf PDF
1240LT26Q0003-0002 Attachment 6A - Kamas Bunkhouses Floorplans.pdf PDF
1240LT26Q0003-0002 Attachment 2 SOI_Kamas Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0002 SF-30 Amendment 02 Strawberry Kamas Bunkhouse UWCNF.pdf PDF
1240LT26Q0003-0002 Attachment 1 SOI Strawberry Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0002 Attachment 6B Kamas East Bunkhouse Asbestos Report .pdf PDF
1240LT26Q0003-0001 Attachment 1 SOI Strawberry Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0001 Questions and Answers Amendment 02 .pdf PDF
1240LT26Q0003-0001 Attachment 2 SOI_Kamas Renovations Amended.xlsx XLSX spreadsheet
1240LT26Q0003-0001 Attachment 6A - Kamas Bunkhouses Floorplans.pdf PDF
1240LT26Q0003-0001 Attachment 6B Kamas East Bunkhouse Asbestos Report .pdf PDF
1240LT26Q0003-0001 SF-30 Amendment 02 Strawberry Kamas Bunkhouse UWCNF.pdf PDF
1240LT26Q0003-0001 QA Strawberry Kamas Bunkhouse UWCNF.pdf PDF
Attachment 1 - SOI_Strawberry Renovations.xlsx XLSX spreadsheet
Attachment 12 - 3WeekLookahead_KamasBunkhouses_Template.xlsx XLSX spreadsheet
Attachment 10 Kamas Site Pictures.docx DOCX document
Attachment 5 - Signed Drawing Strawberry Kamas Bunkhouse Renovations.pdf PDF
Attachment 11 - 3WeekLookahead_StrawberryBunkhouses_Template.xlsx XLSX spreadsheet
Attachment 3 - Spec Package_Strawberry Renovations.pdf PDF
Attachment 2 - SOI_Kamas Renovations.xlsx XLSX spreadsheet
Attachment 7 - DBA WD UT202601 Wasatch Co 010226.pdf PDF
Attachment 8 - DBA WD UT202635 Summit Co 010226.pdf PDF
1240LT26Q0003 RFQ GAOA Strawberry Kamas Bunkhouse Renovations FInal.pdf PDF
Attachment 9 Strawberry Site Pictures.docx DOCX document
Attachment 4 - Spec Package_Kamas Renovations FINAL.pdf PDF
Attachment 6 - Existing Conditions Kamas Bunkhouse.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240LT26Q0003

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40LT

OGDEN UT 84401-2310

324 25TH ST

USDA-FS CSA INTERMOUNTAIN 8

GAOA02/23/20260001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/30/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation 1240LT26Q0003, Strawberry-Kamas Bunkhouse Renovations, Uinta/Wasatch/Cache

National Forest, is amended as follows:

a. See Attachment 5 Signed Drawings Strawberry-Kamas Bunkhouse Renovations, Sheet 10 of 10, change all references from Bldg #1063 to Bldg #1065.

b. See Solicitation, SF-1442, Pg 1, Section 13. Additional Solicitation Requirements, change due date and time from February 27, 2026 at 1:00 p.m. to March 13, 2026 at 1:00 p.m.

MST.

c. See Solicitation, Page 33, Government Point of Contact, change inquiries due date from

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

KELLIE J. SHAW

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240LT26Q0003/0001

February 17, 2026 to March 3, 2026 at 4:30 p.m.

MST.

Kamas Administrative Site:

d. See Attachment 4 Spec Package Kamas

Renovations Final, Page 41, Section 024230

Asbestos Abatement, Part 1 General, 1.1 Scope, Paragraph A., delete the last sentence in its entirety.

Strawberry Administrative Site:

e. See Attachment 3 Spec Package Strawberry

Renovations, Page 141, Section 087100 oor

Hardware, Part 1 General, Section 1.2 Description of Work, Paragraph A.

f. Clarification: Not replacing all doors, just doorknobs with lever type handles, and inspecting door hardware as stated in Schedule of Items line item.

g. See Attachment 3 Spec Package Strawberry

Renovations, Page 246, Section 224216.13 -

Commercial Lavatories, add the following:

Description: Demo and remove existing bathroom and kitchen faucets. Provide and install level type handle faucet in buildings 1062, 1063, and

1065.

All other terms and conditions remain unchamged

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .