FA4819-XX-R-XXXX
21 March 2022
APPENDIX B
MAPS, DRAWINGS AND OTHER
PROJECT SPECIFICS
REPAIR (RESTORE) STORM
WATER DRAINAGE 1200 AREA
TYNDALL AFB FLORIDA
PROJECT XLWU211017
ZONE A: Construct approx. 890 Feet of 4’ Trapezoidal channel with 2‘ concrete trickle channel in bottom
ZONE A: Remove and replace approx. 60’ of crossroad pipe with a 32”x49” elliptical pipe
ZONE A: Remove and replace approx. 270’ of 15” pipe with 18”x24” elliptical pipe
ZONE A: Construct approx. 470 of
Trapezoidal channel w/ 2’ Trickle channel in bottom. Replace 4 foot sidewalk and 22”x34” elliptical pipe.
ZONE A: Construct a 6’x6’ concrete FDOT junction box. Include outlets for new
32”x49”, 18”x24” pipe and trapezoidal channel
Zone B: Install approx. 750’ of trapezoidal channel with varying width between road and parking lot with 2’ trickle channel in bottom
ZONE B: Remove and replace the north and south entrance pipes with 22” x 34” elliptical pipes
ZONE B: Remove and replace entrance pipe with an 18”x24” elliptical pipe ZONE A: Construct approx. 200’ of trapezoidal channel
ZONE B: Reconstruct approx. 700’ of trapezoidal channel, no trickle Channel
ZONE A: Install 32”x49” entrance pipe at Fire Station
ZONE A: Regrade, topsoil and sod area between parking lot
CONSTRUCTION
LAYOUT
Silted pipes and Structures ---------------
Remove and Replace ---------------
Trapezoidal Channel =========
Trickle Channel ---------------
General Grading
Google Link https://earth.google.com/earth/d/1rbpvROqSpufxVODmKgyBokWZ6z1VxaeT?usp=sharing use this link to get live view of above
SOLAR ARRAY
Pipes and structures to be cleaned
GRADING AND CHANNEL WORK
AFNORTH at 0530 AM - 6 to 10 inches Higher in 2 Hours
Dejarnette and Beacon Beach Flooding
2021 Maintenance
| Appendix B |
| Construction Layout_rev |
| Grading and Channel Work |
| AFNORTH at 0530 AM - 6 to 10 inches Higher in 2 hrs |
| Dejarnette and Beacon Beach Flooding |
| 2021 Mainentance |