Attachment 11 Drawings 10 of 13 Muskogee 623-21-700.pdf
PDF 20 MB Posted
- Solicitation number
- 36C77624R0046
About this file
These are architectural demolition drawings for the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma, detailing the communication infrastructure removal across multiple buildings and floors. The comprehensive set includes demolition plans for Buildings 1, 22, 24, 52, 53, and 60, covering basement through fourth floor levels, with each drawing meticulously marking communication infrastructure elements like wireless access points (WAP), IP cameras, telemetry devices, and existing cable trays and conduit pathways. The drawings feature systematic documentation of room-specific details, serving zones, cable routing, and general notes emphasizing the contractor shall reuse existing conduit pathways to the extent possible while ensuring no more than 40% fill on existing or new pathways during the infrastructure upgrade project.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHOLE BUILDING
B1
(44) 13933 SQ. FT.
STAIRWELL
601B-1
(11) 153 SQ. FT.
CORRIDOR
601B1-1
(11) 249 SQ. FT.
ELEV EQUIP
601B1A-1
(11) 497 SQ. FT.
ELEV EQUIP
600A-1
(11) 234 SQ. FT.
EQUIP
601A-1
(11) 54 SQ. FT.
EL
EV
L O
BB
Y
0-
(1
1)
SQ
. F T.
ATTIC
601-1
(11) 11584 SQ. FT./
STAIRWELL
601C-1
(11) 150 SQ. FT.
WHOLE BUILDING
B1 PENT
(44) 304 SQ. FT.
WHOLE BUILDING
B53
(44) 3112 SQ. FT.
STAIR
6A-ST1
(11) 182 SQ. FT.
MOTOR CONTROL
6A-103
(11) 148 SQ. FT.
MACHINE PENTHOUSE
6A100-53
(11) 2158 SQ. FT.
MECH
6A-101
(11) 208 SQ. FT.
DN
SERVING ZONE: 503A-1
SERVING ZONE: 5C-100A-53
SERVING ZONE: 5C-100A-53
SERVING ZONE: 5C-108A-53
SERVING ZONE: 5C-108A-53
Department of Veteran Affairs
TN-11
BUILDINGS 1, 53 - SIXTH FLOOR - KEY PLAN - DEMOLITION
SCALE: 1' = 20'-0"
B22
(44) 1889 SQ. FT.
MECH
SB02-22
(11) 1588 SQ. FT.
UPS
SB01-22
(11) 109 SQ. FT.
SERVING ZONE: B05B-22
Department of Veteran Affairs
TN-12
BUILDING 22 - SUB BASEMENT - DEMOLITION
SCALE: 1/8" = 1"-0'
DRAWING NOTES
REMOVE 66 BLOCK(PUNCH DOWN) & TERMINATED
CABLES BACK TO SOURCE
(6) EXISTING 4" OSP CONDUITS ROUTED BETWEEN
BUILDING 18 AND SB02-22. ALL CONDUITS SHALL BE
SEALED AND WEATHERPROOFED FOLLOWING
REMOVAL OF COMMUNICATIONS CABLING.
(2) EXISTING 4" CONDUITS AND (3) EXISTING 1.25"
INNERDUCTS EXTENDING FROM BUILDING
ENTRANCE TO MECHANICAL CHASE. CONDUITS
AND INNERDUCT TO REMAIN FOLLOWING REMOVAL
OF COMMUNICATIONS CABLING.
EXISTING COMMUNICATIONS CABLE ROUTES
THROUGH NEMA ENCLOSURE AND INTO BUILDING
CHASE. ENCLOSURE AND CONDUIT TO REMAIN
FOLLOWING REMOVAL OF COMMUNICATIONS
CABLING.
KEY PLAN
B22
B24
B52
B53
B56
ENGINEERING
EMSNUTRITION CANTEEN
WHOLE BUILDING
B24
(44) 4809 SQ. FT.
MECH SPACE
SB1-24
(11) 333 SQ. FT.
GENERAL STORAGE
SB4-24
(27) 490 SQ. FT.
W
AL
K-
IN
R
EF
G
SB
3-
(2 7)
SQ
. F
T.
MECH SPACE
SB2-24
(11) 70 SQ. FT.
WALK-IN FREEZER
SB6-24
(27) 609 SQ. FT.
GENERAL STORAGE
SB5-24
(27) 239 SQ. FT.
GENERAL STORAGE
SB7-24
(7) 218 SQ. FT.
CORRIDOR
SB8-24
(11) 78 SQ. FT. /
CORRIDOR
SBC10-24
(11) 316 SQ. FT.
ELEV EQUIP
SB9-24
(11) 90 SQ. FT. /
ELEV
SBSE4-24
(11) 72 SQ. FT.
STAIR
SB4S
(11) 140 SQ. FT.
MECH SPACE
SB7A-24
(18) 335 SQ. FT.
C O
R R
ID
O
R
SB
-2
(1
1)
SQ
. F T. /
STORAGE
SB14-24
(17) 94 SQ. FT. /
GREASE TRAP
SB15-24
(18) 144 SQ. FT.
CORRIDOR
SBC11-24
(11) 320 SQ. FT.
EMS STORAGE
SB12-24
(17) 129 SQ. FT.
AC STORAGE
SB17-24
(18) 47 SQ. FT. /
AC STORAGE
SB17A-24
(18) 50 SQ. FT.
AC STORAGE
SB16-24
(18) 214 SQ. FT.
SERVING ZONE: B4A-24
WAP
1D
WAP
1D
WAP
1D
WAP
1D
Department of Veteran Affairs
TN-13
BUILDING 24 - SUB BASEMENT - DEMOLITION
SCALE: 1/8" = 1"-0'
KEY PLAN
B22
B24
B52
B53
B56
(44) 5006 SQ. FT.
ENGINEERING
WHOLE BUILDING
(44) 2358 SQ. FT.
CONTROL ROOM
(11) 636 SQ. FT.
GENERATOR ROOM
(11) 1525 SQ. FT.
SWITCHGEAR
(11) 2227 SQ. FT.
GENERATOR TRANSFER ROOM
(11) 1039 SQ. FT.
MECH
(18) 943 SQ. FT.
FIRE PUMP
(11) 479 SQ. FT.
ENGINEERING
C100-52
(11) 784 SQ. FT.
EM
PL
O
YE
E
TO
IL
ET
1C
-5
(1 8)
S
Q . F
T.
ST
AI
R W
EL
L
0S
-5
(1 8)
S
Q . F
T.
CONTROLER
101B-52
(18) 346 SQ. FT. /
W
AT
ER
S
AM
PL
IN
G
1A
-5
(1 8)
SQ
. F
T.
VS DRIVE
101A1-52
(18) 165 SQ. FT.
SWITCH GEAR ROOM
101F-52
(11) 1915 SQ. FT.
CHILLER ROOM
101-52
(11) 6179 SQ. FT.
SWITCH GEAR ROOM
101D-52
(11) 724 SQ. FT.
WHOLE BUILDING
(44) 10929 SQ. FT.
SERVING ZONE: 201B-52 SERVING ZONE: BC-100A-53
SERVING ZONE: 201B-52 SERVING ZONE: BC-100A-53
Department of Veteran Affairs
TN-14
BUILDING 52, 53 - SUB BASEMENT AND BUILDING 56 FIRST FLOOR - DEMOLITION
SCALE: 1/8" = 1"-0'
DRAWING NOTES
(2) EXISTING CONDUITS ROUTED INTO
UNEXCAVATED SPACE. (1) 4" CONDUIT WITH (2)
EXISTING 1.25" INNERDUCTS AND HIGH PAIR
COPPER CABLE. (1) 4" VACANT CONDUIT WITH PULL
STRING.
(2) EXISTING 4" CONDUITS ROUTED ON CEILING
TRANSITION TO ABOVE THOUGH CONCRETE
CEILING.
(2) EXISTING 4" CONDUITS ROUTED ON CEILING.
(2) EXISTING 4" CONDUITS EXTENDING TO
TELEPHONE EQUIPMENT ROOM 201B-52.
CONTRACTOR TO VERIFY PATHWAY. REFER TO
SHEET TN-18 FOR MORE INFORMATION.
KEY PLAN
B22
B24
B52
B53
B56
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS
CABLING TO SUPPORT NEW CABLING.
CONTRACTOR MUST NOT EXCEED 40% FILL ON
EXISTING OR NEW PATHWAYS
B22
(44) 6524 SQ. FT.
CORRIDOR
BC1A-22
(11) ###########
OFFICE
B14-22
(23) 222 SQ. FT.
EL
EV
AT
O
R E
Q U
IP
B1
5-
(1 1)
OFFICE
B14A-22
(23) 189 SQ. FT.
OFFICE
B10B-22
(23) 128 SQ. FT.
TOILET F
B12-22
(9) 98 SQ. FT.
TOILET M
B13-22
(9) 125 SQ. FT.
HAC
B11-22
(17) 39 SQ. FT.
OFFICE
B10-22
(23) 87 SQ. FT.
STORAGE
B10A-22
(23) 257 SQ. FT.
CORRIDOR
B10B-22
(23) 49 SQ. FT.
OFFICE
B09-22
(23) 149 SQ. FT./
CONFERENCE
B09A-22
(23) 236 SQ. FT.
OFFICE
B08A-22
(24) 313 SQ. FT.
OFFICE
B08-22
(24) 129 SQ. FT.
OFFICE
B09B-22
(24) 119 SQ. FT.
VESTIBULE
BC1C-22
(11) 47 SQ. FT.
STAIRWELL
BS5-22
(11) 142 SQ. FT.
OFFICE
B07-22
(24) 155 SQ. FT.
OFFICE
B06-22
(39) 197 SQ. FT.
STORAGE
B06B-22
(39) 26 SQ. FT.
MECH
B05-22
(11) 410 SQ. FT.
TELE
B05B-22
(23) 11 SQ. FT.
STORAGE
B04-22
(23) 367 SQ. FT.
IRM WORK ROOM
B03-22
(23) 807 SQ. FT.
CORRIDOR
BC1B-22
(11) ##########
STAIRWELL
BS1-22
(11) ###########
C O
R R
ID
O
R
BC
1-
(1 1)
OFFICE
B07A-22
(24) 152 SQ. FT.
CENTRALIZED
STAFFING
IRM
LOGISTICS
TENANT SPACE
EMS
SERVING ZONE: B05B-22
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
TN-45
Department of Veteran Affairs
TN-15
BUILDING 22 - BASEMENT - DEMOLITION
SCALE: 1/8" = 1"-0'
DRAWING NOTES
REMOVE 66 BLOCK(PUNCH DOWN) & TERMINATED
CABLES BACK TO SOURCE
(4) EXISTING 4" CONDUITS PENETRATING ABOVE
DOORWAY.
(2) EXISTING 4" CONDUITS ROUTED ABOVE DROP
CEILING.
EXISTING NEMA RATED ENCLOSURE
(2) EXISTING 4" CONDUITS EXTENDING BETWEEN
BUILDING 22 AND BUILDING 24. CONDUIT PATHWAY
ROUTES ABOVE LOADING DOCK AREA. REFER TO
SHEET TN-16 FOR MORE INFORMATION.
EXISTING 9" W x 6" D CABLE TRAY ABOVE LAY-IN
CEILING. APPROXIMATELY 27" OF CLEARANCE
ABOVE LAY-IN CEILING TILE.
EXISTING 9" W x 6" D CABLE TRAY ABOVE LAY-IN
CEILING. APPROXIMATELY 27" OF CLEARANCE
ABOVE LAY-IN CEILING TILE.
KEY PLAN
B22
B24 B53
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS
MECH
B6-24
(11) 915 SQ. FT.
MAIL ROOM
B7A-24
(24) 387 SQ. FT.
MAIL ROOM
B7-24
(24) 67 SQ. FT.
STORAGE
B8A-24
(24) 104 SQ. FT.
WAREHOUSE
B1-24
(24) 4322 SQ. FT.
CORRIDOR (TUNNEL)
100T-1
(11) 590 SQ. FT.
ELEV SHAFT
S1T-1
(11) 77 SQ. FT.
ELEV SHAFT
S2T-1
(11) 77 SQ. FT.
ST
AI
R W
EL
L
BS
3-
(1
1)
SQ
. F T.
STAIR
BS4-1
(11) 162 SQ. FT.
ELEV SHAFT
BSE4-24
(11) 65 SQ. FT.
CORRIDOR
BC7-24
(11) 147 SQ. FT.
CORRIDOR
BC7A-24
(11) 88 SQ. FT.
CANTEEN STORAGE
B4-24
(7) 575 SQ. FT.
STORAGE
B4B-24
(7) 100 SQ. FT.
TOILET
B5-24
(9) 75 SQ. FT.
TELE
B4A-24
(23) 25 SQ. FT.
WHOLE BUILDING
B24
(44) 8570 SQ. FT.
LOGISTICS
IRM
CANTEEN
CENTRALIZED
STAFFING
WAP
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
ALL CABLING SHOWN ON THIS SHEET
SERVING ZONE B4A-24
Department of Veteran Affairs
TN-16
BUILDING 24 - BASEMENT - DEMOLITION
SCALE: 1/8" = 1"-0'
TN-45
KEY PLAN
B22
B24 B53
DRAWING NOTES
(2) EXISTING 4" CONDUITS EXTENDING BETWEEN
BUILDING 22 AND BUILDING 24. CONDUIT PATHWAY
ROUTES ABOVE LOADING DOCK AREA. REFER TO
SHEET TN-15 FOR MORE INFORMATION.
REMOVE (1) EXISTING CATEGORY CABLE SERVING
ENGINEERING NETWORK SWITCH EXTENDING TO
201A-52 AND (6) CATEGORY CABLES EXTENDING TO
DEVICE LOCATIONS. COORDINATE REMOVAL WITH
OWNER AS WORK MAY NEED TO BE PHASED FOR
NEW CABLING AT DEVICE LOCATIONS, SHOWN ON
NEW WORK DRAWINGS, TO BE OPERATIONAL PRIOR
TO REMOVAL OF EXISTING CABLES.
(2) EXISTING 4" CONDUITS ROUTED ON CEILING.
(2) EXISTING 4" CONDUITS EXTENDING BETWEEN
BUILDING 24 AND BUILDING 52. CONDUIT PATHWAY
ROUTES ALONG CEILING. REFER TO SHEET TN-18
FOR MORE INFORMATION.
(2) EXISTING 4" CONDUITS PASSING THROUGH THE
WALL AND TURNING UP THROUGH THE CEILING.
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS
3 4
(44) 0 SQ. FT.
PUMP
58-102
(11) 323 SQ. FT.
TR
EA
TM
EN
T
-1
(1 1)
S
Q . F
T.
SIGNAL
BC-100A
(11) 87 SQ. FT.
MECH
BC-100
(11) 1019 SQ. FT.
FITNESS CENTER
BB-115
(27) 1253 SQ. FT.
M TOILET/SHOWER
BB-113B
(9) 344 SQ. FT.
W LOCKER ROOM
BB-113A
(9) 363 SQ. FT.
CORRIDOR
BB-113
(9) 111 SQ. FT.
M O
R G
U E
VE
ST
IB
U
LE
BB
1-
(3
6)
SQ
. F T.
WALK-IN COOLER
BB111B-53
(36) 199 SQ. FT.
AUTOSPY
BB111A-53
(36) 392 SQ. FT.
ST
AF
F
TO
IL
ET
BB
1A 1-
(3
6)
S Q
. F T.
LOCKER/SHOWER
BB111A2-53
(36) 70 SQ. FT.
BULK STORAGE
BB-100E
(24) 269 SQ. FT.
BULK STORAGE
BB-100D
(24) 155 SQ. FT.
INPATIENT PHARMACY
BB-100
(24) 1117 SQ. FT.
OFFICE
BB-102
(24) 147 SQ. FT.
OFFICE
BB-103
(24) 133 SQ. FT.
BREAK AREA
BB-100A
(24) 193 SQ. FT./
DW-1
BB-100A1
(24) 32 SQ. FT. /
STORAGE
BB-100B1
(24) 398 SQ. FT.
VAULT
BB-101
(24) 375 SQ. FT.
STAIR
BA-ST1
(11) 209 SQ. FT.
SERVICE ELEV
BA-100A1
(11) 141 SQ. FT.
SERV ELEV LOBBY
BA-100A
(11) 849 SQ. FT.
SERVICE ELEV
BA-100A2
(11) 133 SQ. FT.
SERVICE ELEV
BA-100A3
(11) 128 SQ. FT.
SUMP PUMP RM
BA-100B
(11) 172 SQ. FT.
C O
N
TR
O L
R M
BA
-1
(1
1)
S Q
. F T.
CORRIDOR
CB1
(11) 777 SQ. FT.
CORRIDOR
CB2
(11) 348 SQ. FT.
PHARMACY VAULT
BB-104
(30) 795 SQ. FT.
CORRIDOR
CB3
(11) 1366 SQ. FT.
OFFICE
BB-107
(18) 197 SQ. FT.
ADMIN OFFICE
BB-107B
(18) 323 SQ. FT.
OFFICE
BB-107D
(18) 95 SQ. FT.
OFFICE
BB-107C
(18) 108 SQ. FT.
LINEN STORAGE
BB-106
(17) 818 SQ. FT.
CLEAN LINEN
BB-105
(17) 1138 SQ. FT.
EMERGENCY STORAGE
BB-110
(17) 122 SQ. FT.
ELECTRICAL
BB-108
(11) 86 SQ. FT.
HAC
BB-109
(17) 85 SQ. FT.
RECORDS FILE ROOM
BB-119
(21) 1270 SQ. FT.
STORAGE
BB-120
(18) 897 SQ. FT.
STORAGE
(11) 16 SQ. FT.
WHOLE BUILDING
(44) 409 SQ. FT.
LOCKSMITH
(21) 146 SQ. FT.
DOCK OPEN
TO OUTSIDE
TO B52
SUB-BASEMENT
ENGINEERING
ENGINEERING
EMS
HEALTHCARE ADMINISTRATION
PHARMACY
CENTRALIZED STAFF NUTRITION/FOODSPECIALITY SERVICELOGISTICS
WM
WM
WM
WM
WM
WM
WM
WAP
1D
WAP
1D
IP CAMERA
1D
IP CAMERA
1D
WAP
1D
IP CAMERA
1D
WAP
1D
WAP
1D
WAP
1D
IP CAMERA
1D
RTLS
1D
WAP
1D
IP CAMERA
1D
IP CAMERA
1D
IP CAMERA
1D
WAP
1D
IP CAMERA
1D
IP CAMERA
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
IP CAMERA
1D
WAP
1D
WAP
1D IP CAMERA
1D
WAP
1D
WAP
1D
IP CAMERA
1D
ALL CABLING SHOWN ON THIS SHEET
SERVING ZONE BC-100A-53
Department of Veteran Affairs
TN-17
BUILDING 53 - BASEMENT - DEMOLITION
SCALE: 1/8" = 1"-0'
TN-45
KEY PLAN
B22
B24 B53
DRAWING NOTES
EXISTING 4" CONDUIT WITH (3) 1.25" INNERDUCTS
ROUTED ABOVE LAY-IN CEILING. CONDUIT
TRANSITIONS THROUGH CEILING INTO BUILDING 53
MEZZANINE. REFER TO DRAWING TN-18 FOR MORE
INFORMATION.
ACCESS LADDER TO CRAWL SPACE ABOVE CEILING
OVER PHARMACY AND MORGUE.
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS
(44) 2928 SQ. FT.
S-6
S-5
S-4
P7-P8 ELEVATOR PIT
MA-102
(11) 228 SQ. FT.
STAIRWELL
1A-ST1
(11) 208 SQ. FT.
MECH SPACE
MA02
(18) 518 SQ. FT.
GIP
CMA-101
(24) 613 SQ. FT.
GIP OFFICE
MA-100
(24) 168 SQ. FT.
SERVICE ELEV
CMA-100C
(11) 139 SQ. FT.
SERVICE ELEV
CMA-100A
(11) 146 SQ. FT.
GIP
CMA-100
(24) 453 SQ. FT.
SERVICE ELEV
CMA-100B
(11) 139 SQ. FT.
ENGINEERING
LOGISTICS
WHOLE BUILDING
(44) 10951 SQ. FT.
MEZZANINE
201-52
(11) 5186 SQ. FT.
DDC SERVER ROOM
201A-52
(23) 106 SQ. FT.
UPS WORK ROOM
201A2-52
(23) 91 SQ. FT.
STORAGE IT
201A1B-52
(23) 123 SQ. FT.
PACS/VIDEO
201A1-52
(23) 124 SQ. FT.
STORAGE
201A1A-52
(23) 56 SQ. FT.
TELEPHONE EQUIP. ROOM
201B-52
(23) 806 SQ. FT.
TOILET
201C-52
(18) 80 SQ. FT.
CORRIDOR
C200-52
(11) 330 SQ. FT.
C O
R R
ID
O
R /S
TO
R
AG
E
C
1-
(1 1)
SQ
. F
T.
IRM
ALL CABLING SHOWN ON THIS SHEET
SERVING ZONE 201B-52
WAP
1D
WAP
1D
TELEMETERY
1D
WAP
1D
PP
1D
IP CAMERA
TN-45
Department of Veteran Affairs
TN-18
BUILDING 52, 53 - MEZZANINE - DEMOLITION
SCALE: 1/8" = 1'-0"
DRAWING NOTES
REMOVE 66 BLOCK (PUNCH DOWN) & TERMINATED
CABLES BACK TO SOURCE
(4) EXISTING 4" CONDUITS EXTENDING BETWEEN
BUILDING 24 AND BUILDING 52. CONDUIT PATHWAY
ROUTES ALONG CEILING. REFER TO SHEET TN-16
FOR MORE INFORMATION.
EXISTING NEMA RATED ENCLOSURE.
(2)EXISTING 4" CONDUITS ROUTED ON CEILING.
CONDUIT TRANSITIONS FROM CEILING TO
SUB-BASEMENT OF BUILDING 52 BELOW. REFER TO
DRAWING TN-14 FOR MORE INFORMATION.
EXISTING 18" W x 6" D LADDER TRAY MOUNTED
ALONG CEILING GRID. (3) EXISTING CONDUIT
PENETRATIONS INTO 201B-52 AND C200-52.
(1) EXISTING 4" CONDUIT WITH (3) 1.25" INNERDUCTS
ROUTED ON CEILING.
EXISTING 18" W X 6" D CABLE TRAY MOUNTED
ALONG WALL.
EXISTING SLEEVE INTO CRAWL SPACE / STEAM
TUNNEL AREA LOCATED UNDER ROOM 1C143-1.
REFER TO SHEET TN-20 FOR MORE INFORMATION.
(3) EXISTING 1.25" INNERDUCTS THROUGH WALL
INTO NEMA ENCLOSURE.
(1) EXISTING 4" CONDUIT WITH (3) 1.25" INNERDUCTS
ROUTED ON CEILING AND THROUGH MEZZANINE OF
BUILDING 53. CONDUIT TRANSITIONS INTO ABOVE
LAY-IN CEILING SPACE OF CORRIDOR CB3,
LOCATED IN THE BASEMENT OF BUILDING 53.
REFER TO SHEET TN-45 AND SHEET TN-46 FOR
MORE INFORMATION.
EXISTING IP CAMERA AND MOUNT ON THE ROOF.
REMOVE EXISTING CATEGORY CABLE AND REUSE
EXISTING PATH FOR INSTALLATION OF NEW CABLE
SHOWN ON NEW WORK PLANS.
REMOVE EXISTING WALL RACK. COORDINATE
REMOVAL WITH LOCAL IT FOLLING ROUGH IN AND
CUTOVER OF NEW CABLING AS RACK SERVES IT
OFFICE AREA/PC IMAGING BENCH. REMOVE
APPROXIMATELY (58) HORIZONTAL CABLES
EXTENDING TO IMAGING RACKS IN CMA-100 AND IT
SUITE TO SOURCE. REMOVE FIBER OPTIC CABLING
EXTENDING FROM RACK TO 201B-52.
KEY PLAN
B52,53
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS
B1
(44) #############
OFFICE
1B05-1
(37) 144 SQ. FT.
STERILE PROCESSING SERVICE
1E01-1
(37) 1153 SQ. FT.
VCS
1B28-1
(7) 207 SQ. FT.
OFFICE
112-1
(32) 388 SQ. FT.
PATIENT TOILET
113A-1
(32) 43 SQ. FT.
OFFICE
113-1
(32) 120 SQ. FT.
STORAGE
114-1
(32) 72 SQ. FT.
PATIENT TOILET
115A-1
(32) 36 SQ. FT.
EXAM
115-1
(32) 113 SQ. FT.
EXAM
116-1
(32) 144 SQ. FT.
OFFICE
117-1
(32) 90 SQ. FT.
HAC
118-1
(32) 56 SQ. FT.
OFFICE
119-1
(32) 234 SQ. FT.
LIQUID NITROGEN STOR
(32) 18 SQ. FT.
OFFICE
120-1
(32) 237 SQ. FT.
EXAM
121-1
(32) 120 SQ. FT.
EXAM
122-1
(32) 127 SQ. FT.
CORRIDOR
100C-1
(32) 829 SQ. FT.
EXAM
123-1
(32) 154 SQ. FT. /
OFFICE
124-1
(32) 111 SQ. FT.
OFFICE
125-1
(32) 108 SQ. FT.
STORAGE
100D1-1
(11) ##########
PSA
101-1
(32) 121 SQ. FT.
M
ED
S
TO
R
1A -1
(3 2)
S
Q . F
T.
BREAK
101B-1
(32) 139 SQ. FT./
EXAM
102-1
(32) 143 SQ. FT./
EXAM
103-1
(32) 142 SQ. FT./
EXAM
104-1
(32) 142 SQ. FT./
TOILET
105-1
(32) 223 SQ. FT.
SOILED UTILITY
106-1
(32) 73 SQ. FT.
OFFICE
107-1
(32) 74 SQ. FT.
EXAM
108-1
(32) 130 SQ. FT.
C O
R R
ID
O
R
0B -1
(3 2)
SQ
. F
T.
CORRIDOR
100B1-1
(32) 50 SQ. FT.
STAFF TOILET
109-1
(32) 81 SQ. FT.
EXAM
110-1
(32) 98 SQ. FT.
NURSING OFFICE
111-1
(32) 102 SQ. FT.
PATIENT TOILET
111A-1
(32) 47 SQ. FT.
WAITING
100A1-1
(32) 341 SQ. FT.
STAFF TOILET
(30)
STAFF TOILET
1B104I-1
(19) 59 SQ. FT.
OCT
1B104J-1
(19) 72 SQ. FT.
OFFICE/BREAK
1B104H-1
(19) 112 SQ. FT.
ST
O
R
AG
E 1B
4G
-1 (1
9)
S Q
. F T.
EXAM 3
1B104F-1
(19) 175 SQ. FT.
EXAM 4
1B104K-1
(19) 161 SQ. FT.
EXAM 5
1B104L-1
(19) 161 SQ. FT.
C O
R R
ID
O
R 1B
C 6B
-1 (1
9)
SQ
. F T.
EXAM 2
1B104E-1
(19) 176 SQ. FT.
EXAM 1
1B104D-1
(19) 209 SQ. FT.
EXAM 6
1B104M-1
(19) 159 SQ. FT.
AUTO REFRACTOR
1B104N-1
(19) 143 SQ. FT.
DILATION
1B104C-1
(19) 102 SQ. FT.
EY
E
EX
AM
1B
4B -1
(1 9)
S
Q . F
T.
ST
O
R
AG
E 1B
4A
-1 (1
9)
S Q
. F T.
MECHANICAL
1B1040-1
(19) 96 SQ. FT.
ST
O
R
AG
E 1B
4A
-1 (1
9)
SQ
. F
T.
EYE CLINIC
1B29-1
(19) 176 SQ. FT.
/PS
A
1B
-1 (1
9)
SQ
. F T.
CHAPEL
1B35-1
(10) 1058 SQ. FT.
WORK
1B40-1
(10) 340 SQ. FT.
PATIENT REP OFFICE
1B38-1
(10) 255 SQ. FT.
C H
AP
EL
E N
TR
AN
C E
1B
-1 (1
0)
S Q
. F T.
CORRIDOR
1B37-1
(10) 125 SQ. FT.
OFFICE
1B33-1
(10) 139 SQ. FT.
ST
AI
R W
EL
L
1B S5
-1 (1
1)
STAIRWELL
1BS4-1
(11) ###########
C O
R R
ID
O
R 1B
C 6B
-1 (1
1)
HW TANK
1B03-1
(11) ###########
UNISEX TOILET
1B31-1
(11) ##########
CORRIDOR
1BC6A-1
(11) ###########
UNISEX TOILET
1B32-1
(11) ##########
LOBBY
1B06-1
(11) ###########
ELEVATOR
1BP6-1
(11) ########### /
ELEVATOR
1BSE2-1
(11) ##########
ELEVATOR
1BSE3-1
(11) ##########
LOBBY
1B100B-1
(11) ###########
ENTRANCE
1B130-1
(11) ###########/
EL
EC
TR
IC
AL
1B
-1
(1 1)
SWITCHGEAR
1B26-1
(11) ###########
STAIRWELL
1BS3-1
(11) ###########
ELEVATOR
1BP2-1
(11) ##########
ELEVATOR
1BP1-1
(11) ##########
CORRIDOR
100E-1
(11) ###########
LOBBY
100D-1
(11) ###########
VENDING
(7) 30 SQ. FT.
VESTIBULE
100F-1
(11) ###########
VESTIBULE
100G-1
(11) ###########
STAIRWELL A-EAST
1AS1-1
(11) ###########
STAIRWELL
1AS2-1
(11) ###########
IT
0A 2-
(1
1)
LOBBY
100A-1
(11) ###########
ENTRANCE
100-1
(11) ###########
MECHANICAL
1B34-1
(11) ###########
EY
E
C
LI
N
IC
1B
A-
(1 9)
SQ
. F
T.
WM
WAP
1D
WAP
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
TELEMETRY
1D
WAP
1D
RTLS
1D
IP CAMERA
1D
TELEMETRY
1D
WAP
1D
WAP
1D
WAP
1D
TELEMETRY
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1DPRIMARY CARE
CHAPLAIN
EYE
CLINIC
EYE
CLINIC
CANTEEN
WMWM
WM
WM
WM
WM
WM
SERVING ZONE: 100A2-1 SERVING ZONE: 1C08-1
TN-19
BUILDING 1 - FIRST FLOOR - AREA A - DEMOLITION
SCALE: 1/8" = 1'-0"
TN-19
TN-23TN-25
TN
-20
TN
-19
TN
-20
TN-46
Department of Veteran Affairs
A B C
D E F
G
KEY PLAN
DRAWING NOTES
EXISTING 9" W CABLE TRAY & J-HOOK SYSTEM
ROUTED THROUGH HALLWAY ABOVE DROP
CEILING.
EXISTING CABLE SLEEVE THROUGH FIREWALL.
(2) EXISTING 4" CABLING SLEEVES THROUGH
WALL.
(2) EXISTING 4" SWEEPS THOUGH CEILING TO
FLOOR ABOVE.
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS.
B. DUE TO LIMITED / CONGESTED ABOVE CEILING
SPACE IN THIS AREA, IT IS RECOMMENDED THE
CONTRACTOR REMOVE CABLING SHOWN ON
DEMOLITION PLANS FROM EXISTING CABLE TRAY
SYSTEM TO SUPPORT NEW CABLE INSTALLATION.
TE
LE
H
EA
LT
H
1C
-1 (3
2)
SQ
. F T.
FIRE ALARM
1C144-1
(11) ###########/
EMPLOYEE LOUNGE
1C11A-1
(37) 217 SQ. FT. /
OFFICE
1C11-1
(24) 200 SQ. FT.
OFFICE
1C10A-1
(24) 136 SQ. FT.
STORAGE
1C12A-1
(24) 162 SQ. FT. /
ST
ER
IL
E
PR
O
C
ES
SI
N
G S
ER
VI
C E
1C
-1 (3
7)
SQ
. F T.
D U
M
BW
AI
TE
R 1C
D W
-1 (3
7)
S Q
. F T.
WAITING
1C148-1
(32) 364 SQ. FT.
IT
C100M1B-1
(32) 34 SQ. FT.
WAITING
1C165-1
(32) 254 SQ. FT. /
WAITING
1C164-1
(32) 226 SQ. FT.
MILLION VET PROGRAM
1C138-1
(32) 202 SQ. FT. /
C
LE
AN
U
TI
LI
TY
(3 2)
S
Q . F
T.
SOILED UTILITY
1C139-1
(32) 78 SQ. FT.
/H
AC
1C
0-
(3 2)
S
Q . F
T.
EN
TR
AN
C
E
(3 2)
S
Q . F
T.
C O
R R
ID
O
R C
0C
1-
(3 2)
S
Q . F
T.
STAFF TOILET M
1C142-1
(32) 64 SQ. FT.
STAFF TOILET W
1C141-1
(32) 84 SQ. FT.
OFFICE
1C146A1-1
(32) 63 SQ. FT. /
PATIENT TOILET
1C146A2-1
(32) 70 SQ. FT. /
WORK
1C146A3-1
(32) 124 SQ. FT.
OFFICE
1C146A4-1
(32) 143 SQ. FT.
OFFICE
1C146A5-1
(32) 146 SQ. FT.
OFFICE
1C146A6-1
(32) 113 SQ. FT.
STORAGE
1C146A7-1
(32) 23 SQ. FT.
CORRIDOR
C100J-1
(32) 352 SQ. FT.
OFFICE
1C157F-1
(32) 123 SQ. FT.
EXAM
1C159E-1
(32) 135 SQ. FT.
EXAM
1C159F-1
(32) 121 SQ. FT.
STORAGE
1C159G-1
(32) 17 SQ. FT.
PATIENT TOILET
1C159H-1
(32) 41 SQ. FT.
EXAM
1C159I-1
(32) 138 SQ. FT.
EXAM
1C159J-1
(32) 141 SQ. FT.
/H
AC
1C
0-
(3 2)
S
Q . F
T.
WAITING
1C158-1
(32) 423 SQ. FT.
PSA OFFICE
1C159A-1
(32) 172 SQ. FT.
PUBLIC TOILET
1C157I-1
(32) 63 SQ. FT.
EXAM
1C159B-1
(32) 127 SQ. FT.
EXAM
1C157H-1
(32) 110 SQ. FT.
NURSING WORK AREA
1C159C-1
(32) 147 SQ. FT.
EXAM
1C157G-1
(32) 131 SQ. FT.
ST
O
R
AG
E 1C
9D
-1 (3
2)
S Q
. F T.
C O
R R
ID
O
R C
0K
-1 (3
2)
SQ
. F T.
WAITING
1C146A-1
(32) 245 SQ. FT.
OFFICE
1C146A8-1
(32) 102 SQ. FT.
EXAM
1C157E-1
(32) 124 SQ. FT./
EXAM
1C156G-1
(32) 120 SQ. FT.
NURSING WORK AREA
1C156H-1
(32) 110 SQ. FT. /
NURSING WORK AREA
1C157D-1
(32) 110 SQ. FT.
C O
R R
ID
O
R C
0I
-1 (3
2)
SQ
. F T.
EXAM
1C157C-1
(32) 110 SQ. FT./
EXAM
1C156I-1
(32) 110 SQ. FT.
EXAM
1C156J-1
(32) 110 SQ. FT. /
EXAM
1C157B-1
(32) 110 SQ. FT.
RECEPTION
1C157A-1
(32) 119 SQ. FT./
RECEPTION
1C156K-1
(32) 119 SQ. FT.
EXAM
1C156A-1
(32) 126 SQ. FT.
C O
R R
ID
O
R C
0H
-1 (3
2)
SQ
. F T.
EXAM
1C156B-1
(32) 120 SQ. FT.
PATIENT TOILET
1C156C-1
(32) 53 SQ. FT.
MEDICATION
1C156D-1
(32) 23 SQ. FT.
STORAGE
1C156E-1
(32) 22 SQ. FT.
ST
O
R
AG
E 1C
6F
-1 (3
2)
S Q
. F T.
OFFICE
1C146B-1
(32) 136 SQ. FT.
SPECIAL PROCEDURE
1C151F-1
(32) 181 SQ. FT.
OFFICE
1C151E-1
(32) 132 SQ. FT./
OFFICE
1C149F-1
(32) 130 SQ. FT.
EXAM
1C149G-1
(32) 136 SQ. FT. /
EXAM
1C151D-1
(32) 139 SQ. FT.
ST
O
R
AG
E 1C
1G
-1 (3
2)
S Q
. F T.
PA
TI
EN
T
TO
IL
ET
1C
1F
1-
(3 2)
S
Q . F
T.
EXAM
1C151H-1
(32) 120 SQ. FT.
C O
R R
ID
O
R C
0F
-1 (3
2)
SQ
. F T.
PATIENT TOILET
1C151I-1
(32) 61 SQ. FT.
EXAM
1C151J-1
(32) 120 SQ. FT.
WAITING
1C150-1
(32) 332 SQ. FT.
PSA OFFICE
1C151A-1
(32) 92 SQ. FT./
PSA OFFICE
1C149J-1
(32) 90 SQ. FT.
EXAM
1C149I-1
(32) 126 SQ. FT. /
EXAM
1C151B-1
(32) 121 SQ. FT.
NURSING WORK AREA
1C151C-1
(32) 126 SQ. FT./
NURSING WORK AREA
1C149H-1
(32) 126 SQ. FT.
C O
R R
ID
O
R C
0E
-1 (3
2)
SQ
. F T.
EXAM
1C149A-1
(32) 121 SQ. FT.
PATIENT TOILET
1C148B-1
(32) 62 SQ. FT.
EXAM
1C149C-1
(32) 121 SQ. FT.
PA
TI
EN
T
TO
IL
ET
1C
9E
1-
(3 2)
S
Q . F
T.
ST
O
R
AG
E 1C
9D
-1 (3
2)
S Q
. F T.
SPECIAL PROCEDURE
1C149E-1
(32) 193 SQ. FT.
WHEELCHAIR STOR
C100M1A-1
(43) 80 SQ. FT.
OFFICE
1C167-1
(43) 113 SQ. FT.
EQUIP STOR
1C147-1
(43) 52 SQ. FT.
N
IT
R O
X
ST
O R
1C
3B -1
(3 8)
S
Q . F
T.
OFFICE
1C04-1
(20) 127 SQ. FT.
OFFICE
1C05-1
(20) 193 SQ. FT.
OFFICE
1C06-1
(20) 192 SQ. FT.
PHARMACY VAULT
1C02B-1
(30) 707 SQ. FT.
OFFICE
1C02A-1
(30) 145 SQ. FT.
OUTPATIENT PHARMACY
1C02-1
(30) 3270 SQ. FT.
COUNSEL OFFICE
1C03A-1
(30) 133 SQ. FT. /
WAITING
C100A1-1
(30) 271 SQ. FT.
OUTPATIENT LOBBY
1C03-1
(30) 357 SQ. FT.
D
IS
PE
N
SI
N
G 1C
C
-1 (3
0)
S Q
. F T.
CONFERENCE
1C02G-1
(30) 250 SQ. FT.
/H
AC
1C
-1 (3
0)
S Q
. F T.
IT
1C
-1
(3 0)
S
Q . F
T.
SE
C
R
ET
AR
Y
O
FF
IC
E
1C
F-
(3 0)
SQ
. F
T.
CHIEF OFFICE
1C02E-1
(30) 225 SQ. FT./
M
ED
IC
AT
IO
N
P R
EP
1C
D
-1 (3
0)
SQ
. F T.
STAFF TOILET
1C02C-1
(30) 97 SQ. FT.
112 SQ. FT.
OFFICE
1C169-1
(19) 99 SQ. FT.
OFFICE
1C168-1
(6) 138 SQ. FT. /
OFFICE
1C168A-1
(6) 111 SQ. FT. /
OFFICE
1C168B-1
(5) 146 SQ. FT. /
OFFICE
1C166-1
(5) 148 SQ. FT.
OFFICE
1C163-1
(5) 124 SQ. FT. /
OFFICE
1C162-1
(5) 132 SQ. FT.
ARMORY
1D125A1A-1
(31) 61 SQ. FT.
SAFE ROOM
1D125A1-1
(31) 47 SQ. FT.
ARMORY ENTRANCE
1D125A-1
(31) 51 SQ. FT.
ENTRANCE
C100L1-1
(11) ###########
CORRIDOR
C100L-1
(11) ###########
MAIN CORRIDOR
C100M-1
(11) ############
TOILET W
1C152-1
(11) ###########
TOILET M
1C153-1
(11) ###########
ELEVATOR
1CP5-1
(11) ###########
CORRIDOR
C100G-1
(11) ###########
ELEV EQUIP
1C154-1
(11) ##########
STAIRWAY
1CS9-1
(11) ###########
ELEC
1C155-1
(11) ##########
CORRIDOR
C100C-1
(11) ###########
CRAWL SPACE
1C143-1
(11) #########
ELECTRICAL
1C145-1
(11) ###########
CORRIDOR
C100D-1
(11) ###########
CORRIDOR
C100A-1
(11) ###########
CORRIDOR
C100-1
(11) ###########
STAIRWELL
1CS6-1
(11) ###########
ELEC
1C10B-1
(11) ##########
C O
R R
ID
O
R
(1 1)
LOBBY
1C10C-1
(11) ##########
ELEVATOR
1CP3-1
(11) ##########
/EL
EC
1C
A-
(1 1)
ENTRANCE
C100M1-1
(11) ###########
COUNSEL OFFICE
1C03B-1
(30) 133 SQ. FT.
RTLS
WAP
1D
IP CAMERA
1D
IP CAMERA
1D
WAP
1D
IP CAMERA
1D
WAP
1D
WAP
1D
TELEMETRY
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
IP CAMERA
1D
WAP
1D
WAP
1D
RTLS
1D
RTLS
1D
IP CAMERA
1D
IP CAMERA
1D
TELEMETRY
1D
RTLS
1D
IP CAMERA
1D
WAP
1D
WAP
1D
IP CAMERA
1D
IP CAMERA
1D
IP CAMERA
1D
IP CAMERA
1D
WAP
1D
IP CAMERA
1D
WAP
1D
WAP
1D
IP CAMERA
1D
IP CAMERA
1D
WAP
1D
WAP
1D
IP CAMERA
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D WAP
1D
WAP
1D
IP CAMERA
1D
IP CAMERA
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
TELEMETRY
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
ENTRANCE
EMERGENCY
BED ICU
SERVING ZONE: 1C08-1SERVING ZONE: 1C08-1
TN-20
BUILDING 1 - FIRST FLOOR - AREA B - DEMOLITION
SCALE: 1/8" = 1'-0"
TN-22
TN
-21
TN
-20
TN
-21
TN
-20
TN
-19
TN-46
TN-46
Department of Veteran Affairs
TN-23
TN
-19
A B C
D E F
G
KEY PLAN
DRAWING NOTES
EXISTING LADDER TO BELOW FOR CONTRACTOR
TO USE FOR ACCESS INTO CRAWL SPACE.
EXISTING UNDER FLOOR PENETRATION BETWEEN
BUILDING 1 AND BUILDING 52. REFER TO DRAWING
TN-18 FOR MORE INFORMATION.
(6) EXISTING 4" COUNDUITS EXTENDING TO
OUTSIDE PLANT CONDUIT SYSTEM. CONTRACTOR
TO MAINTAIN HIGH PAIR COPPER AND MULTI-MODE
FIBER OPTIC CABLING EXTENDING TO BUILDING 6 /
COTTAGES.
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS.
ARMORY ENTRANCE
51 SQ. FT.
WHOLE BUILDING
B53
(44) #############
O&P PATIENT
1D-159
(32) 163 SQ. FT.
/U
TI
LI
TY
1D -1
D
(3 5)
S
Q . F
T.
PHY THER ADMIN
1D-142C
(35) 155 SQ. FT.
C THER ADMIN
1D-142B
(35) 148 SQ. FT.
SPECIAL TREATMENT
1D-142A
(35) 125 SQ. FT.
EMG
1D-141
(35) 154 SQ. FT.
COVID TESTING
1D-140B
(11) ###########
COVID TESTING
1D-140A
(11) ###########
COVID TESTING
1D-140
(11) ###########
ENTRY VESTIBULE
1D-120
(11) ###########
/O
FF
IC
E
1D -1
(3
S Q
. F T.
CORRIDOR
C 1 10
(11) ###########
ER WAITING
1D-132
(3) 489 SQ. FT.
COVID TESTING
1D-139
(11) 31 SQ. FT.
/EL
EC
1D -1
(3
5)
S Q
. F T.
TREATMENT
1D-142
(35) 1705 SQ. FT.
TOILET
1D-146D
(35) 58 SQ. FT. /
TOILET
1D-145
(35) 57 SQ. FT.
TREATMENT
1D-144
(35) 417 SQ. FT.
OFFICE
(35) 86 SQ. FT.
OFFICE
(35) 160 SQ. FT.
OFFICE
(35) 176 SQ. FT.
C O
R R
ID
O
R
(3 5)
SQ
. F
T.
OFFICE
(35) 88 SQ. FT.
STORAGE
1D-143
(35) 86 SQ. FT.
IT
1C-102A
(11) ##########
MECHANICAL
1C-102
(11) ############
EQUIPMENT
1D-157A1
(33) 232 SQ. FT./
TOILET
1D-154A
(3) 190 SQ. FT.
TOILET
1D-156A
(3) 190 SQ. FT.
HAC
1D-156B
(3) 63 SQ. FT.
VESTIBULE
1D-156
(3) 51 SQ. FT.
VESTIBULE
1D-154
(3) 49 SQ. FT.
WORK
1D-157A
(33) 229 SQ. FT.
ORTHOTIC LAB
1D-157
(33) 185 SQ. FT.
/(11) ############
COFFEE SHOP
1D-106
(7) 145 SQ. FT.
STORAGE
1D-106A
(7) 65 SQ. FT.
1A-100A1
(11) ##########
TOILET
1A-101
(11) ########## /TE
LE
1A -1
(3
4)
S Q
. F T.
OMNICELL
1D-110
(3) 110 SQ. FT.
CORRIDOR
1D-100B1
(3) 287 SQ. FT.
EXAM 3
1D-112
(3) 133 SQ. FT.
EXAM 4
1D-113
(3) 132 SQ. FT.
EXAM 5
1D-114
(3) 132 SQ. FT. /
EXAM 6
1D-115
(3) 205 SQ. FT.
CORRIDOR
1D-100B2
(3) 316 SQ. FT.
SOILED
1D-116
(3) 63 SQ. FT.
EXAM 7
1D-117
(3) 125 SQ. FT.
EXAM 8
1D-118
(3) 125 SQ. FT.
EXAM 9
1D-119
(3) 136 SQ. FT.
CORRIDOR
1D-100B3
(3) 172 SQ. FT.
NURSE STATION
1D-111
(3) 330 SQ. FT.
CORRIDOR
1D-100B
(3) 220 SQ. FT.
EXAM 1
1D-108
(3) 142 SQ. FT.
EXAM 2
1D-109
(3) 136 SQ. FT.
OBSERVATION
1D-107
(3) 244 SQ. FT.
ISOLATION
1D-121
(3) 140 SQ. FT. /
EXAM 10
1D-120
(3) 140 SQ. FT.
STAFF LOUNGE
1D-125
(3) 153 SQ. FT.
SPD STORAGE
1D-126
(3) 41 SQ. FT.
/O N
-C
AL
L 1D
-1
(2 8)
C O
R R
ID
O
R 1D
-1
C
(3
S
Q . F
T./
SPD STORAGE
1D-124
(3) 82 SQ. FT.
CORRIDOR
1D-100C
(3) 103 SQ. FT.
PA
TI
EN
T
TO
IL
ET
1D
-1
(3
S
Q . F
T.
ST
AF
F
TO
IL
ET
1D -1
(3
S Q
. F T.
CORRIDOR
1D-100
(3) 315 SQ. FT.
AOD/CHECK-IN
1D-129
(3) 154 SQ. FT. /
OFFICE
1D-130
(3) 74 SQ. FT.
ON-CALL TOILET
1D-127A
(28) ##########
VA POLICE OPERATIONS
1D-134
(31) 310 SQ. FT.
HOLDING
1D-134A
(31) 48 SQ. FT.
OFFICE
1D-137
(31) 394 SQ. FT.
/TO
IL
ET
1D
-1
(1 1)
/TO
IL
ET
1D
-1
(1 1)
TRIAGE
1D-133
(3) 94 SQ. FT.
CORRIDOR
C 1 11
(11) ###########
/VA
C
AN
T
1D -1
(3
S Q
. F T.
OFFICE
1D-102
(3) 56 SQ. FT./
OFFICE
1D-103
(3) 78 SQ. FT.
D O
C U
M
ED
1D -1
(3
S Q
. F T.
CORRIDOR
1D-100A
(3) 119 SQ. FT.
OFFICE
1D-105
(3) 68 SQ. FT.
SECLUSION BH
1D-106
(3) 129 SQ. FT.
CORRIDOR
C 1 9
(11) ############
HAC
1D-128
(3) 25 SQ. FT.
107-60
(34) 27 SQ. FT.
DRESSING 1
109-60
(34) 45 SQ. FT.
RESTROOM
108-60
(9) 52 SQ. FT.
EGRESS CORRIDOR
103-60
(11) ###########
M R
I A C
C
ES
S C
O R
R
ID
O R
RTLS
1D
IP CAMERA
1D
WAP
1D
RTLS
1D
WAP
1D
IP CAMERA
1D
IP CAMERA
1D
WAP
1D
TELEMETRY
1D
RTLS
1D
IP CAMERA
1D
IP CAMERA
1D
IP CAMERA
1D
WAP
1D
WAP
1D
TELEMETRY
1D
WAP
1D
TELEMETRY
1D
RTLS
1D
TELEMETRY
1D
TELEMETRY
1D
IP CAMERA
1D
IP CAMERA
1D
IP CAMERA
1D
IP CAMERA
1D
RTLS
1D
IP CAMERA
1D
WAP
1D
WAP
1D
WAP
1D
TELEMETRY
1D
RTLS
1D
IP CAMERA
1D
TELEMETRY
1D
TELEMETRY
1D
WAP
1D
IP CAMERAS
2D
ENTRANCE
EMERGENCY
ON-CALL
POLICE/SECURITY
REHAB
BED ICU
SERVING ZONE 1C-102A-53
SERVING ZONE 1C-102A-53
Department of Veteran Affairs
TN-21
BUILDING 53 - FIRST FLOOR - AREA C - DEMOLITION
SCALE: 1/8" = 1'-0"
TN-47
TN-22
TN-22
TN
-21
TN
-20
TN
-20
TN-21
DRAWING NOTES
IP CAMERAS SERVED BY THE TERMINATIONS
SHOWN ARE LOCATED UNDER AWNING ON THE
EXTERIOR OF THE ENTRANCE. CABLES ENTER
FACILITY THROUGH ENTRY VESTIBULE 1D-120.
A B C
D E F
G
KEY PLAN
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS.
ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg
MULTIMEDIA
(15) 30 SQ. FT.
OFFICE
1C146A4-1
(32) 143 SQ. FT. OFFICE
O&P PATIENT
1D-159
(32) 163 SQ. FT.
OFFICE
EQUIPMENT
1D-157A1
(33) 232 SQ. FT./
TOILET
1D-154A
(3) 190 SQ. FT.
TOILET
1D-156A
(3) 190 SQ. FT.
HAC
1D-156B
(3) 63 SQ. FT.
VESTIBULE
1D-156
(3) 51 SQ. FT.
VESTIBULE
1D-154
(3) 49 SQ. FT.
WORK
1D-157A
(33) 229 SQ. FT.
ORTHOTIC LAB
1D-157
(33) 185 SQ. FT.
EGRESS CORRIDOR
102-60
(11) ###########
LOBBY
1A-100
(11) ############
COFFEE SHOP
1D-106
(7) 145 SQ. FT.
STORAGE
1D-106A
(7) 65 SQ. FT.
ELEV LOBBY
1A-100A
(11) ###########
PASS ELEV
1A-100A2
(11) ##########
PASS ELEV
1A-100A1
(11) ##########
STAIRWELL
1A-ST1
(11) ###########
TOILET
1A-102
(11) ##########
CORRIDOR
C 1 1
(11) ###########
TOILET
1A-101
(11) ########## /TE
LE
1A -1
(3
4)
S Q
. F T.
VESTIBULE
1A-103
(11) ##########
SERVICE ELEV
1A-100B1
(11) ###########
ELEV LOBBY
1A-100B
(11) ###########
SERVICE ELEV
1A-100B2
(11) ###########
SERVICE ELEV
1A-100B3
(11) ###########
VA POLICE PIV
1A-104
(31) 233 SQ. FT. /
CORRIDOR
C 1 2
(11) ###########
HAC
1A-106
(11) ########## /
ELEC
1A-107
(11) ##########
OMNICELL
1D-110
(3) 110 SQ. FT.
CORRIDOR
1D-100B1
(3) 287 SQ. FT.
EXAM 3
1D-112
(3) 133 SQ. FT.
EXAM 4
1D-113
(3) 132 SQ. FT.
EXAM 5
1D-114
(3) 132 SQ. FT. /
EXAM 6
1D-115
(3) 205 SQ. FT.
SOILED
1D-116
(3) 63 SQ. FT.
OFFICE
1B-119
(31) 208 SQ. FT./
OFFICE
1B-119A
(15) 128 SQ. FT.
OFFICE
1B-119B
(15) 128 SQ. FT.
ENTRY
(31) 62 SQ. FT.
C O
R R
ID
O
R C
(1 5)
SQ
. F
T.
CONFERENCE
1B-120
(15) 534 SQ. FT.
COFFEE
1B-120A
(15) 63 SQ. FT.
STORAGE
1B-120B
(15) 79 SQ. FT.
EV
ID
EN
C
E
LO
C
KE
R 1B
-1
(3 1)
S
Q . F
T.
OFFICE
1B-118
(31) 197 SQ. FT.
OFFICE
1B-102
(21) 160 SQ. FT.
OFFICE
1B-101
(21) 109 SQ. FT.
OFFICE
1B-100
(21) 97 SQ. FT.
OFFICE
1B-104
(21) 462 SQ. FT.
OFFICE
1B-107
(21) 430 SQ. FT.
OFFICE
1B-106
(21) 143 SQ. FT.
STORAGE
1B-108
(21) 13 SQ. FT. /
COAT
1B-111
(21) 25 SQ. FT.
OFFICE
1B-103
(21) 89 SQ. FT.
OFFICE
1B-113
(21) 114 SQ. FT. /
OFFICE
1B-114
(21) 114 SQ. FT.
OFFICE
1B-116
(21) 120 SQ. FT.
OFFICE
1B-112
(21) 748 SQ. FT.
OFFICE
1B-112A
(21) 989 SQ. FT.
OFFICE
1B-127
(15) 129 SQ. FT.
CLERICAL
1B-126
(15) 380 SQ. FT.
FILE/WORK
1B-128
(15) 98 SQ. FT.
OFFICE
1B-129
(15) 160 SQ. FT.
KITCHEN
1B-124
(15) 80 SQ. FT.
OFFICE
1B-131
(15) 231 SQ. FT.
/EL
EC
1B -1
(1
5)
S Q
. F T.
C
LE
R
IC
AL
1B
-1
(1 5)
S
Q . F
T.
TOILET
1B-134A
(15) 54 SQ. FT.
OFFICE
1B-134
(15) 375 SQ. FT.
OFFICE
1B-136
(15) 231 SQ. FT.
CORRIDOR
C 1 5
(15) 760 SQ. FT.
CONFERENCE
1B-122
(15) 323 SQ. FT.
COPY
1B-144
(15) 80 SQ. FT.
CLERICAL
1B-142
(15) 379 SQ. FT.
ST
O
R
AG
E 1B
-1
D (1
5)
S Q
. F T.
C O
R R
ID
O
R C
(1 5)
SQ
. F
T.
STORAGE
1B-146
(15) 63 SQ. FT.
OFFICE
1B-121C
(15) 154 SQ. FT. /
OFFICE
1B-121A
(15) 135 SQ. FT.
STORAGE
1B-121B
(15) 60 SQ. FT./
STORAGE
1B-121C1
(15) 68 SQ. FT.
C O
R R
ID
O
R C
(1 5)
SQ
. F
T.
STORAGE
1B-126A
(15) 64 SQ. FT.
CORRIDOR
1B-121
(15) 276 SQ. FT.
C O
R R
ID
O
R C
(1 5)
SQ
. F
T.
STORAGE
1A-109
(33) 140 SQ. FT.
STORAGE
1B-159
(33) 110 SQ. FT.
WAITING
1B-166
(33) 506 SQ. FT.
TOILET
1B-162
(33) 39 SQ. FT.
OFFICE
1B-157A
(33) 135 SQ. FT.
STORAGE
1B-157
(33) 127 SQ. FT.
STORAGE
1B-158
(33) 157 SQ. FT. /
STORAGE
1B-158A
(33) 28 SQ. FT.
STORAGE
1B-164A
(33) 32 SQ. FT.
OFFICE
1B-164
(33) 137 SQ. FT. /
OFFICE
1B-163
(33) 171 SQ. FT.
MECHANICAL
1C-100
(11) ############
IT/PHONE
1C-100A
(11) ##########
FILE/LOUNGE
1B-149
(25) 333 SQ. FT.
OFFICE
1B-148
(25) 130 SQ. FT.
CORRIDOR
C 1 7
(25) 435 SQ. FT.
OFFICE
1B-156
(25) 143 SQ. FT.
OFFICE
1B-154
(25) 96 SQ. FT.
OFFICE
1B-147
(25) 91 SQ. FT.
OFFICE
1B-153
(15) 164 SQ. FT.
TOILET
1B-151
(25) 73 SQ. FT.
OFFICE/CONF
1B-152
(25) 339 SQ. FT.
STORAGE
1B-152A
(25) 62 SQ. FT.
OFFICE
1B-153A
(15) 155 SQ. FT.
OFFICE
1B-139
(15) 130 SQ. FT.
FILE/WORK
1B-138
(15) 98 SQ. FT.
OFFICE
1B-137
(15) 160 SQ. FT.
INFORMATION
1A-110
(15) 164 SQ. FT.
WHOLE BUILDING
B60
(44) ############
MRI SHELL SPACE
123-60
(34) 507 SQ. FT.
EQ
U
IP
R
O O
M S
H
EL
L
4-
(3 4)
SQ
. F
T.
CONTROL ROOM
120-60
(34) 396 SQ. FT.
MRI EQUIP ROOM
122-60
(34) 240 SQ. FT.
MRI SCAN ROOM 1
121-60
(34) 480 SQ. FT.
RESTROOM
119-60
(9) 53 SQ. FT./
RADIOLOGIST
118-60
(34) 88 SQ. FT.
HAC
116-60
(17) ##########
RECEPTION
114-60
(34) 188 SQ. FT.
INPATIENT HOLDING
117-60
(34) 104 SQ. FT.
LOBBY/WAITING
105-60
(34) 368 SQ. FT.
FERRO QUARANTINE
107-60
(34) 27 SQ. FT.
STO
R
AG
E
115-60 (34)
29 SQ
. FT.
O U
TP
AT
IE
N
T
SC
R
EE
N
IN
G
6-
(3 4)
SQ
. F
T.
INPATIENT TRANSFER
113-60
(34) 178 SQ. FT.
STAFF
112-60
(34) 58 SQ. FT.
DRESSING 3
111-60
(34) 45 SQ. FT.
DRESSING 2
110-60
(34) 45 SQ. FT.
DRESSING 1
109-60
(34) 45 SQ. FT.
RESTROOM
108-60
(9) 52 SQ. FT.
ENTRANCE
104-60
(11) ##########
EGRESS CORRIDOR
103-60
(11) ###########
EG
R
ES
S
C O
R R
ID
O
R
2-
(1 1)
M R
I A C
C
ES
S C
O R
R
ID
O R
1-
(1
1)
CORRIDOR
(11) ###########
STORAGE
(33) 159 SQ. FT.
OFFICE
(33) 87 SQ. FT.
OFFICE
(33) 43 SQ. FT.
OFFICE
(21) 71 SQ. FT.
WM
RTLS
WAP
1D
WAP
1D
TELEMETRY
1D
WAP
1D
WM
WAP
1D
WAP
1D
TELEMETRY
1D
RTLS
1D
IP CAMERA
1D
IP CAMERA
1D
WAP
1D
WAP
1D
IP CAMERA
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
IP CAMERA
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
IP CAMERA
1D
WAP
1D
WAP
1D
F.E.C.
T
ST
O
R
AG
E
PFV
4.
D M
LL
R
KC
^9
1^
ST
O
R
AG
E
P FV
4.
D M
LL
R
KC
^9
1^
F.E.C.
F.E.C.
F.E.C.
EMS
SERVING ZONE: 1C-102A-53
SERVING ZONE: 1C-100A-53
SERVING ZONE: 1C-100A-53
Department of Veteran Affairs
TN-47
TN-21
TN-22
TN-22
BUILDINGS 53, 60 - FIRST FLOOR - AREA D - DEMOLITION
SCALE: 1/8" = 1'-0"
TN-21
TN-22
SERVING ZONE: 1C-102A-53
A B C
D E F
G
KEY PLAN
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS.
DRAWING NOTES
EXISTING 12"X6" CABLE TRAY SYSTEM.1
ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg
ELECTRICAL
1E10-1
(18) 585 SQ. FT.
ELECTRICAL
1E09-1
(18) 278 SQ. FT.
ELEV EQUIP
1E11-1
(18) 60 SQ. FT.
LINEN PREP
1E06A-1
(24) 154 SQ. FT.
STORAGE
1E06B-1
(24) 126 SQ. FT.
/H
AC
1E
-1 (2
4)
S Q
. F T.
ST
ER
IL
E
PR
O
C
ES
SI
N
G S
ER
VI
C E
STERILE PROCESSING SERVICE
1E01-1
(37) 1153 SQ. FT.
ELEC
1E01A-1
(37) 44 SQ. FT.
CLEAN UTILITY
1E08-1
(37) 1111 SQ. FT.
/H
AC
1E
B-
(3 7)
S
Q . F
T.
/EL
EC
1E
C -1
(3 7)
S
Q . F
T.
SOILED UTILITY
1E03-1
(37) 214 SQ. FT.
C O
R R
ID
O
R
(3 7)
SQ
. F
T.
STAFF TOILET
1E04-1
(37) 149 SQ. FT.
STAFF TOILET
1E05-1
(37) 147 SQ. FT.
GENERAL STORAGE
1E06-1
(37) 3003 SQ. FT.
D U
M
BW
AI
TE
R
S
Q . F
T.STAIRWELL
C O
R R
ID
O
R 1E
C
-1 (1
1)
CORRIDOR
1EC10A-1
(11) ###########
RETAIL
1EC11-1
(7) 303 SQ. FT.
STAIRWELL
152-24
(11) ###########
ELEVATOR
1BP6-1
(11) ########### /
ELEVATOR
1BSE2-1
(11) ##########
ELEVATOR
1BSE3-1
(11) ##########
LOBBY
1B100B-1
(11) ###########
CORRIDOR
1EC6-1
(11) ###########
DISHWASHER
101-24
(7) 118 SQ. FT.
CANTEEN STORAGE
114-24
(7) 179 SQ. FT.
CORRIDOR
100-24
(11) ########### / 113-24
(9) 92 SQ. FT.
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
RTLS
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
TELEMETRY
1D
SPS
SURGERY
PRIMARY
CARE
ENGINEERING
ENGINEERING
SERVING ZONE: 1C08-1
SERVING ZONE: 112-24
TN-23
BUILDING 1 - FIRST FLOOR - AREA E - DEMOLITION
SCALE: 1/8" = 1'-0"
TN-24
TN-24
TN
-22
TN
-23
TN
-22
TN
-23
TN
-19
TN-20
TN
-19
Department of Veteran Affairs
TN
-23
TN-20
SERVING ZONE: 1C08-1
A B C
D E F
G
KEY PLAN
DRAWING NOTES
EXISTING UNDER FLOOR PENETRATION BETWEEN
BUILDING 1 AND BUILDING 52. REFER TO DRAWING
TN-18 FOR MORE INFORMATION.
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS.
ELECTRICAL
1E09-1
(18) 278 SQ. FT.
LINEN PREP
1E06A-1
(24) 154 SQ. FT.
STORAGE
1E06B-1
(24) 126 SQ. FT.
S
Q . F
T.
S
Q . F
T.
RETAIL
1EC11-1
(7) 303 SQ. FT.
STAIRWELL
152-24
(11) ###########
ELECTRICAL
B26
271 SQ. FT.
WHOLE FLOOR
B26
(44) ###########
WHOLE BUILDING
B24
(44) ############
/ST
AI
R S
1S 3-
(1
1)
DINING AREA
103-24
(7) 1646 SQ. FT.
FOOD SERVICE AREA
103B-24
(7) 272 SQ. FT.
FOOD PREP AREA
103A-24
(7) 376 SQ. FT.
KITCHEN
102-24
(7) 278 SQ. FT.
DISHWASHER
101-24
(7) 118 SQ. FT.
CANTEEN STORAGE
114-24
(7) 179 SQ. FT.
CORRIDOR
100-24
(11) ########### /
W PUBLIC RESTROOM
113-24
(9) 92 SQ. FT.
OFFICE
108-24
(7) 299 SQ. FT.
IRM
112-24
(7) 34 SQ. FT.
CORRIDOR
100A-24
(11) ###########
DRY FOOD STORAGE
104-24
(7) 270 SQ. FT.
/H
AC
0-
(1
7)
/EL
EC
9-
(1
1)
SERVICE ELEV
1SE-24
(11) ##########
STAIRS
1S4-24
(11) ###########
RETAIL STORAGE
105-24
(7) 660 SQ. FT.
VESTIBULE
106-24
(7) 62 SQ. FT.
CORRIDOR
100A1-24
(11) ###########
RETAIL STORE
107-24
(7) 1396 SQ. FT.
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
TELEMETRY
1D
WAP
1D
IP CAMERA
1D
WAP
1D
WAP
1D
WAP
1D
IP CAMERA
1DTELEMETRY
1D
IP CAMERA
1D
IP CAMERA
1D
WAP
1D
ENGINEERING
SERVING ZONE: 1C08-1
SERVING ZONE: 112-24
SERVING ZONE: 112-24
Department of Veteran Affairs
TN-24
BUILDING 24 - FIRST FLOOR - AREA F - DEMOLITION
SCALE: 1/8" = 1'-0"
TN-23
TN-24
TN-23
TN-24
TN-47
A B C
D E F
G
KEY PLAN
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
B22
(44) ############
STAIRWELL
1S5-22
(11) ###########
COMPUTER LAB
(16) 595 SQ. FT.
LIBRARY
104-22
(16) 956 SQ. FT.
WORK AREA
(16) 234 SQ. FT.
/TE
LE
4E
-2
(1 6)
S
Q . F
T.
OFFICE, CHIEF
104A1-22
(16) 153 SQ. FT.
OFFICE
104A-22
(16) 248 SQ. FT.
OFFICE
104A2-22
(16) 211 SQ. FT.
TRAINING ROOM
102-22
(16) 373 SQ. FT.
STORAGE
101A-22
(16) 150 SQ. FT.
STORAGE
101-22
(16) 136 SQ. FT.
C O
R R
ID
O
R 1C
1-
(1 1)
/M
EC
H
7B -2
(1
6)
S Q
. F T.
IT
107A-22
(11) ##########/
MECH
107-22
(11) ##########
CORRIDOR
1C2-22
(11) ###########
COMPUTER ROOM
106-22
(23) 661 SQ. FT.
OFFICE
105-22
(23) 202 SQ. FT.
ELEVATOR
1P6-22
(11) ##########
TOILET M
104C-22
(16) 108 SQ. FT.
TOILET F
104B-22
(16) 28 SQ. FT.
COMPUTER LAB
(16) 283 SQ. FT.
STAIRWELL
1S1-22
(11) ###########
ST
AI
R W
EL
L
1S 2-
(1
1)
ST
AI
R W
EL
L
1S 3-
(1
1)
# /H
AC
4C
1-
(1 6)
S
Q . F
T.
WAP
1D
WAP
1D
SERVING ZONE: 104E-22
OFFICE
105-22
(23) ###########
SERVING ZONE: 104E-22
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
Department of Veteran Affairs
TN-25
BUILDING 22 - FIRST FLOOR - AREA G - DEMOLITION
SCALE: 1/8" = 1'-0"
TN-47
TN-48
TN-19
TN-25
TN
-25
TN
-24
A B C
D E F
G
KEY PLAN
DRAWING NOTES
(2) EXISTING 4" CONDUITS EACH WITH (2) 1.25"
INNERDUCTS.
(2) EXISTING 4" FLEX CONDUITS EXTENDING FROM
106-22 TO 107A-22
(2) EXISTING 4" CONDUIT SLEEVES LOCATED AT
FLOOR LEVEL.
EXISTING 9" W x 6" D CABLE TRAY ABOVE LAY-IN
CEILING. APPROXIMATELY 27" OF CLEARANCE
ABOVE LAY-IN CEILING TILE.
CONTRACTOR TO INCLUDE REMOVAL AND
REPLACEMENT OF (18) ADDITIONAL CATEGORY
CABLES IN SERVING ZONE, NOT SHOWN ON
DRAWINGS. CABLING HAS PURPLE JACKET,
INSTALLATION HAD NOT BEEN COMPLETE AT TIME
OF DRAWING.
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS.
B1
(44) 46658 SQ. FT.
STAIRWELL
2BS5-1
(11) ###########
TOILET
2B38-1
(34) 66 SQ. FT.
CORRIDOR
2BC4F-1
(34) 113 SQ. FT.
CAMERA TWO
2B37-1
(34) 449 SQ. FT.
WAITING
(34) 90 SQ. FT.
HOUSEKEEPING
MECHANICAL
2B39-1
(34) 121 SQ. FT. /
CAMERA ONE
2B36-1
(34) 327 SQ. FT.
INJECTION
2B40-1
(34) 135 SQ. FT.
HOT LAB
2B40A-1
(34) 150 SQ. FT.
C O
R R
ID
O
R 2B
C 4E
-1 (3
4)
SQ
. F T.
SERVICE CHIEF
2B35-1
(34) 158 SQ. FT.
OFFICE
2B34-1
(34) 164 SQ. FT.
MULTIPURPOSE
2B41-1
(34) 150 SQ. FT.
TOILET M
2B49-1
(11) ###########
C O
R R
ID
O
R 2B
C 4A
-1 (1
1)
STAIRWELL
2BS4-1
(11) ###########
(34)
DOWNING
2B54-1
(15) 1259 SQ. FT.
CLOSET
2B54B-1
(15) 38 SQ. FT.
OFFICE
2B53-1
(38) 241 SQ. FT.
C O
R R
ID
O
R 2B
C
-1 (1
1)
CLOSET
2B54A-1
(15) 54 SQ. FT.
OFFICE
2B50-1
(25) 311 SQ. FT./
OFFICE
2B51-1
(25) 166 SQ. FT. /
C O
R R
ID
O
R 2B
C
A-
(1 1)
CORRIDOR
2BC4B-1
(11) ###########
CORRIDOR
2BC4D-1
(11) ###########
WAITING
2B33-1
(34) 144 SQ. FT./
LOBBY
2BC4C-1
(11) ###########
ELEVATOR
2BP6-1
(11) ###########
ELEVATOR
2BSE3-1
(11) ##########
ELEVATOR
2BSE2-1
(11) ##########
D
IR
. R
ES
ER
VE
2B C
4C -1
(1 1)
OFFICE
2B32-1
(25) 284 SQ. FT./
OFFICE
2B31-1
(25) 148 SQ. FT./
OFFICE
2B30-1
(25) 128 SQ. FT./O
FF
IC
E
2B
-1 (1
0)
S Q
. F T.
STAIRWELL
2BS3-1
(11) ###########
ELEVATOR
2BP2-1
(11) ##########
ELEVATOR
2BP1-1
(11) ##########
CORRIDOR
200C-1
(11) ###########
ELEC EQUIP
238-1
(11) ##########
OFFICE
239B1-1
(42) 168 SQ. FT.
OFFICE
2B52-1
(38) 236 SQ. FT.
OFFICE
239B-1
(42) 121 SQ. FT.
WAITING
239-1
(11) ###########
IT
9A -1
(1 1)
OFFICE
240-1
(42) 135 SQ. FT./
OFFICE
241-1
(42) 154 SQ. FT./
OFFICE
241A-1
(42) 144 SQ. FT.
CORRIDOR
(11) ###########
IS
O
O
FF
IC
E
7-
(3
9)
SQ
. F T.
PU
BL
IC
T
O
IL
ET
F
6-
(1
1)
PU
BL
IC
T
O
IL
ET
M
5-
(1
1)
C H
AP
LA
IN
O
FF
IC
E
4-
(1 0)
SQ
. F
T.
DENTAL WAITING
243-1
(12) 199 SQ. FT.
SECRETARY OFFICE
242T-1
(12) 204 SQ. FT.
CHIEF OFFICE
242S-1
(12) 172 SQ. FT.
DENTAL HYGIENE
242R-1
(12) 430 SQ. FT.
CORRIDOR
200A1-1
(12) 380 SQ. FT.
OPERATORY 1
242A-1
(12) 130 SQ. FT./
OPERATORY 2
242B-1
(12) 133 SQ. FT.
ORAL SURGERY
242C-1
(12) 174 SQ. FT.
SOILED UTILITY
242E-1
(12) 52 SQ. FT.
CLEAN
242F-1
(12) 63 SQ. FT.
242G-1
(12) 67 SQ. FT.
SUPPLY
242H-1
(12) 117 SQ. FT.
STAIRWELL
2AS1-1
(11) ###########/
CORRIDOR
200A2-1
(12) 675 SQ. FT./
DENTAL LAB
242N-1
(12) 384 SQ. FT.
TOILET F
242O-1
(12) 104 SQ. FT.
HAC
242P-1
(12) 44 SQ. FT.
STAIRWELL
2AS2-1
(11) ###########
OPERATORY 3
242I-1
(12) 133 SQ. FT.
OPERATORY 4
242J-1
(12) 127 SQ. FT.
OFFICE
242K-1
(12) 149 SQ. FT.
AO OFFICE
242L-1
(12) 72 SQ. FT.
HYGENE OPERATORY
242L1-1
(12) 131 SQ. FT.
X-RAY
242M-1
(12) 103 SQ. FT.
STORAGE
(12) 49 SQ. FT.
WM
WM
WM
WM WM
WM
WM
SERVING ZONE: 239A-1
WAP
1D
WAP
1D
WAP
1D
TELEMETRY
1D
WAP
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
PP
WAP
1D
RTLS
1D
WAP
1D WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
RTLS
1D
RTLS
1D
TELEMETRY
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
TELEMETRY
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
SERVING ZONE: 239A-1 SERVING ZONE: 2C25-1
TN-26
BUILDING 1 - SECOND FLOOR - AREA A - DEMOLITION
SCALE: 1/8" = 1'-0"
TN-26
TN-31TN-31
TN
-27
TN
-26
TN
-27
Department of Veteran Affairs
TN-48
TN-26
A B C
DE
F
KEY PLAN
DRAWING NOTES
EXISTING 12" "I" BEAM TYPE CABLE SUPPORT
SYSTEM ABOVE DROP CEILING.
(4) EXISTING 4" CABLING SLEEVES THOUGH WALL.
EXISTING MIX OF 9" W CABLE TRAY, J-HOOK, AND
I-BEAM CABLING SUPPORT SYSTEMS ROUTED
THOUGH HALLWAY ABOVE LAY-IN CEILING.
(4) EXISTING 4" CABLING SLEEVE THOUGH WALL
ABOVE LAY-IN CEILING.
(4) EXISTING 4" CONDUITS CONTAINING BACKBONE
COPPER CABLING.
(4) EXISTING 4" SLEEVES THROUGH FLOOR.
REMOVE EXISTING CATEGORY CABLE SERVING
EXTERIOR MOUNTED VIDEO SURVEILLANCE
CAMERA. REUSE PATHWAY FOR INSTALLATION OF
NEW CATEGORY 6A CABLE SHOWN ON NEW WORK
PLANS.
EXISTING (NEW) 12" x 6" CABLE TRAY SYSTEM.
(8) EXISTING (New) 1-1/2" EMT CONDUITS TIED INTO
THE CABLE TRAY SYSTEM.
(1) EXISTING (New) 1-1/2" EMT CONDUIT TIED INTO
THE CABLE TRAY SYSTEM.
EXISTING EXTERIOR IP CAMERA LOCATED ON SIDE
OF THE BUILDING AT THE TOP OF THE WINDOW
(COMMUNICATIONS CABLING ROUTED IN FLEX
DUCT AND EMT CONDUIT. CONTRACTOR TO REUSE
EXISTING CABLE PATH FOR NEW CABLE
INSTALLATION.).
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS.
B. DUE TO LIMITED/CONGESTED ABOVE CEILING
SPACE IN THIS AREA, IT IS RECOMMENDED THE
CONTRACTOR REMOVE CABLING SHOWN ON
DEMOLITION PLANS FROM EXISTING CABLE TRAY
SYSTEM TO SUPPORT NEW CABLE INSTALLATION.
9 9
EF
F
VF
D OF
LR
HOUSEKEEPING
2C17-1
(34) 57 SQ. FT.
ELEC
2C25A-1
(34) 49 SQ. FT.
C O
R R
ID
O
R 2C
C
A-
(1 1)
TELE
2C25-1
(34) 58 SQ. FT.
PR
IV
AC
Y
O
FF
IC
ER
2C
B-
(1 5)
SQ
. F
T.
OPHTHALMOLOGY WAITING AREA
2C28-1
(32) 250 SQ. FT.
M
EC
H
AN
IC
AL
2C
-1 (3
4)
S Q
. F T.
C O
R R
ID
O
R 2C
C
A-
(3 4)
SQ
. F
T.
/O
FF
IC
E
2C
-1 (3
4)
SQ
. F T.
BREAK
2C21-1
(34) 128 SQ. FT.
FI
LE
S
TO
R
AG
E 2C
-1
(3 4)
S
Q . F
T.
X- R
AY
S
TO
R
AG
E
(3
4)
SQ
. F T. /
MECHANICAL
2C20-1
(34) 86 SQ. FT.
PACS
2C19-1
(18) 95 SQ. FT.
OFFICE
(34) 55 SQ. FT.
OFFICE
2C18-1
(34) 149 SQ. FT.
OFFICE
2C16-1
(34) 131 SQ. FT.
GEN STORAGE
2C15-1
(34) 137 SQ. FT. /
KITCHEN
2C14A-1
(34) 137 SQ. FT.
CORRIDOR
2CC15A-1
(34) 867 SQ. FT.
C O
R R
ID
O
R 2C
A-
(3
4)
S Q
. F T.
OFFICE
2C12-1
(34) 136 SQ. FT.
PACS CONTROL
2C19A-1
(18) 379 SQ. FT.
X-RAY
2C13-1
(34) 258 SQ. FT.
EXAM/TREATMENT
2C14-1
(34) 216 SQ. FT.
X-RAY
2C31-1
(34) 256 SQ. FT.
TOILET M
2C31B-1
(34) 38 SQ. FT.
CONTROL
2C30B-1
(34) 238 SQ. FT.
C O
R R
ID
O
R 2C
C
A-
(3 4)
SQ
. F
T.
CORRIDOR
2CC36-1
(34) 732 SQ. FT.
CT SCAN #2
2C38-1
(34) 333 SQ. FT. /
CT SCAN #1
2C39-1
(34) 416 SQ. FT.
DRESSING
2C32A-1
(34) 67 SQ. FT.
/TO
IL
ET
2C
A-
(3
4)
S Q
. F T.
D R
ES
SI
N G
2C
A-
(3 4)
S
Q . F
T.
C O
R R
ID
O
R 2C
C
B-
(3 4)
S
Q . F
T.
TOILET M
2C32-1
(34) 49 SQ. FT. /
TO
IL
ET
M
2C
-1 (3
4)
S Q
. F T.
DRESSING
2C33A-1
(34) 42 SQ. FT.
CORRIDOR
2CC36C-1
(34) 160 SQ. FT.
DRESSING
2C34A-1
(34) 51 SQ. FT.
TOILET F
2C34-1
(34) 71 SQ. FT. /
TOILET F
2C35-1
(34) 62 SQ. FT.
DRESSING
2C35A-1
(34) 44 SQ. FT.
C O
R R
ID
O
R 2C
C
E-
(3 4)
SQ
. F
T. /
DRESSING
2C04C-1
(34) 46 SQ. FT.
DRESSING
2C04B-1
(34) 46 SQ. FT.
DRESSING
2C04A-1
(34) 45 SQ. FT.
CONFERENCE
2C02-1
(34) 401 SQ. FT.
C O
R R
ID
O
R 2C
C 1A
-1 (3
4)
SQ
. F T.
X-RAY
2C04-1
(34) 302 SQ. FT./
X-RAY
2C06-1
(34) 365 SQ. FT.
X-RAY
2C09-1
(34) 377 SQ. FT./
X-RAY
2C11-1
(34) 350 SQ. FT.
CORRIDOR
2C10A-1
(34) 128 SQ. FT.
PLATE READER
2C10-1
(34) 44 SQ. FT.
STORAGE
2C08-1
(34) 92 SQ. FT.
OFFICE
2C07-1
(34) 256 SQ. FT.
CORRIDOR
2CC3A-1
(34) 232 SQ. FT.
OFFICE
2C03-1
(34) 260 SQ. FT. /
OFFICE
2C02A-1
(34) 161 SQ. FT.
LAB STORAGE
2C01-1
(34) 691 SQ. FT.
OFFICE
2C58B-1
(29) 95 SQ. FT.
OFFICE
2C52I-1
(29) 130 SQ. FT. /
LAB
2C52H-1
(29) 300 SQ. FT. /
OFFICE
2C52G-1
(29) 128 SQ. FT. /
BREAK
2C52F-1
(29) 215 SQ. FT. /
LAB
2C52E-1
(29) 326 SQ. FT.
CORRIDOR
2CC58A-1
(29) 470 SQ. FT.
LAB
2C52K-1
(29) 937 SQ. FT.
LAB
2C52-1
(29) 2136 SQ. FT.
LAB
2C55J-1
(29) 119 SQ. FT.
LAB
2C55A2-1
(29) 96 SQ. FT.
HOUSEKEEPING
2C58-1
(29) 25 SQ. FT.
U N
IS
EX
T O
IL
ET
2C
-1 (2
9)
S Q
. F T.
U N
IS
EX
T O
IL
ET
2C
-1 (2
9)
S Q
. F T.
WAITING
2C56A-1
(29) 600 SQ. FT.
FILE
2C01-1
(34) 744 SQ. FT.
CORRIDOR
2CC36D-1
(34) 440 SQ. FT.
CONTROL
2C43-1
(34) 137 SQ. FT.
WAITING
2C43A-1
(34) 264 SQ. FT.
C O
R R
ID
O
R 2C
C
B-
(1 1)
FILE STORAGE
2C45-1
(34) 305 SQ. FT.
ELEVATOR
2CP5-1
(11) ###########
C O
R R
ID
O
R 2C
C
A-
(1 1)
STAIRWELL
2CS9-1
(11) ###########
ELEC
2C54-1
(29) 65 SQ. FT.
LAB
2C53A-1
(29) 127 SQ. FT.
LAB
2C53-1
(29) 415 SQ. FT.
LAB
2C55A1-1
(29) 79 SQ. FT.
LAB
2C55A-1
(29) 265 SQ. FT.
LAB
2C55-1
(29) 135 SQ. FT.
C O
R R
ID
O
R 2C
C
A-
(1 1)
OFFICE
2C52A-1
(29) 188 SQ. FT.
AUTOCLAVE
2C52D-1
(29) 173 SQ. FT.
LAB SUPPLY
2C60-1
(29) 125 SQ. FT.
CONFERENCE
2C61-1
(29) 268 SQ. FT./
CHIEF OFFICE
2C50A-1
(29) 254 SQ. FT./
OFFICE
2C50-1
(29) 230 SQ. FT./
OFFICE
2C49-1
(29) 174 SQ. FT./
OFFICE
2C48-1
(29) 154 SQ. FT./
TELEHEALTH OFFICE
2C47-1
(32) 228 SQ. FT.
CORRIDOR
2CC45A-1
(11) ###########
TE
LE
H
EA
LT
H
O
FF
IC
E
2C
-1 (3
2)
SQ
. F T.
OFFICE
2C45-1
(32) 139 SQ. FT./
EXAM
2C44A-1
(34) 150 SQ. FT.
OFFICE
2C44-1
(34) 160 SQ. FT.
TO
IL
ET
M
2C
-1 (1
1)
DUMBWAITER
2CDW-1
(38) 54 SQ. FT.
ELEVATOR
2CP3-1
(11) ##########
STAIRWELL
2CS6-1
(11) ###########
CORRIDOR
2CC45-1
(11) ############
UNISEX TOILET
2C40-1
(11) ########## /
STORAGE
2C41-1
(43) 38 SQ. FT./
ELEV LOBBY
2CP3A-1
(11) ##########
OFFICE
2C37-1
(32) 122 SQ. FT./
OFFICE
2C30-1
(32) 134 SQ. FT.
EQUIP STORAGE
2EC26A-1
(23) 307 SQ. FT./
EQUIP STORAGE
2EC26-1
(17) 255 SQ. FT.
C&P 2C29A-1
(32) 169 SQ. FT.
C&P 2C27-1
(32) 243 SQ. FT.
C&P 2C26-1
(32) 169 SQ. FT.
MECHANICAL
2E01-1
(11) ###########
OFFICE
2C52B-1
(29) 157 SQ. FT.
OFFICE
2C52C-1
(29) 148 SQ. FT.
CORRIDOR
(29) 51 SQ. FT.
C O
R R
ID
O
R
(2 9)
S
Q . F
T.
ENTRY
2C52E1-1
(29) 21 SQ. FT.
OFFICE
2C52G-1
(29) 148 SQ. FT.
DUMBWAITER
2CDW-1
(37) ##########
CORRIDOR
C IN2 1
(11) ###########
SERVICE ELEV LOBBY
IN2A-100
(11) ###########
LAB STORAGE
IN2A-107
(29) 119 SQ. FT.
SERVICE ELEV
IN2A-100A
(11) ###########
SERVICE ELEV
IN2A-100B
(11) ###########
IN2A-100C
(11) ###########
STAIR
IN2A-ST1
(11) ###########
ELEV
(11) ##########
ELEV
(11) ##########
TOILET
IN2A-102
(11) ##########
TOILET
IN2A-101
(11) ##########
EL
EC
TR
IC
AL
(3 4)
S
Q . F
T.
STORAGE
(29) 29 SQ. FT.
CORRIDOR
(11) ###########
SERVING ZONE: 2C25-1
WAP
WAP
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D WAP
1D
WAP
1D
TELEMETRY
1D
TELEMETRY
1D
RTLS
1D
TELEMETRY
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
RTLS
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
RTLS
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
WAP
1D
TELEMETRY
1D
WAP
1D
WAP
1D
TELEMETRY
1D
RTLS
1D
WAP
1D
IP CAMERA
1D
IP CAMERA
1D
TELEMETRY
1D
IP CAMERA
1D
RTLS
1D
TELEMETRY
1D
WAP
1D
SERVING ZONE: 206A-24
SERVING ZONE: 2C25-1
3 2
WAP
1D
TN-27
BUILDING 1 - SECOND FLOOR - AREA B - DEMOLITION
SCALE: 1/8" = 1'-0"
TN-30TN-30
TN
-28
TN
-27
TN
-28
TN
-27
TN
-26
Department of Veteran Affairs
TN-48
TN
-26 TN-27TN-27
DRAWING NOTES
EXISTING 12" WIDE CABLE TRAY ABOVE LAY-IN
CEILING.
EXISTING 12" WIDE CABLE TRAY BELOW LAY-IN
CEILING.
EXISTING CABLING SLEEVES THOUGH WALL.
EXISTING 9" W CABLE TRAY & J-HOOK SYSTEM
ROUTED THOUGH HALLWAY ABOVE LAY-IN CEILING.
EXISTING I-BEAM SUPPORT & J-HOOK SYSTEM
ROUTED THROUGH HALLWAY ABOVE LAY-IN
CEILING.
EXISTING CABLE PATHWAY THROUGH FIREWALL
LOCATED ABOVE LAY-IN CEILING
MAINTAIN EXISTING 24-STRAND OM4 MULTI-MODE
AND OM1 MULTI-MODE BACKBONE FIBER OPTIC
CABLES FROM THIS SPACE TO SOURCE.
COORDINATE WITH OWNER PRIOR TO ANY
MODIFICATION OF FIBER OR COPPER CABLING
EXTENDING TO/FROM THIS THIS SPACE AS
CRITICAL SURGERY EQUIPMENT IS SERVED FROM
THIS LOCATION.
EXISTING 12" X 6" CABLE TRAY SYSTEM.
(3) EXISTING 1-1/2" EMT CONDUITS TIED INTO THE
CABLE TRAY SYSTEM. CONTRACTOR IS TO
REMOVE A PART OF THE (3) 1-1/2" EMT CONDUITS,
FOR TIE IN TO THE NEW CABLE TRAY SYSTEM
BEING INSTALLED SEE DRAWING # TN-88.
A B C
DE
F
KEY PLAN
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
NOT EXCEED 40% FILL ON EXISTING OR NEW
PATHWAYS.
8 8
SIGNAL CLOSET
IN2C-102
(11) ###########
MECH
IN2D-101
(11) ###########
INTERSTITIAL SPACE
IN2D-100
(11) #############
ALL CABLING IN THIS ZONE
SERVED BY 2C25-1
Department of Veteran Affairs
TN-28
BUILDING 53 - SECOND FLOOR - AREA C - DEMOLITION
SCALE: 1/8" = 1'-0"
TN-29
TN-28
TN-29
TN
-28
TN
-27
TN
-27
A B C
DE
F
KEY PLAN
B53
(44) 41890 SQ. FT.
SIGNAL CLOSET
IN2C-100
(11) ###########
INTERSTITIAL SPACE
IN2B-100
(11) #############
INTERSTITIAL LANDING
IN2C-101
(11) ###########
STAIR
IN2C-ST2
(11) ###########
CORRIDOR
C IN2 1
(11) ###########
SERVICE ELEV LOBBY
IN2A-100
(11) ###########
LAB STORAGE
IN2A-107
(29) 119 SQ. FT.
SERVICE ELEV
IN2A-100A
(11) ###########
SERVICE ELEV
IN2A-100B
(11) ###########
SERVICE ELEV
IN2A-100C
(11) ###########
VOL TRANSPORT
1N2A-103
(43) 250 SQ. FT.
HAC
IN2A-106
(11) ##########
ELEC
IN2A-104A
(11) ##########
INTERSTITIAL ENTRANCE
IN2A-104
(11) ##########
STAIR
IN2A-ST1
(11) ###########
ELEV
(11) ##########
ELEV
(11) ##########
TOILET
IN2A-102
(11) ##########
TOILET
IN2A-101
(11) ##########
STORAGE
(11) 53 SQ. FT.
INTERSTITIAL ENTRANCE
(11) 223 SQ. FT.
IP CAMERA
1D
WAP
1D
WAP
1D
RTLS
1D
TELEMETRY
1D
WAP
1D
ALL CABLING IN THIS ZONE
SERVED BY 2C25-1
Department of Veteran Affairs
TN-29
BUILDING 53 - SECOND FLOOR - AREA D - DEMOLITION
SCALE: 1/8" = 1'-0"
TN-28
TN-29
TN-28
TN-29
A B C
DE
F
KEY PLAN
DRAWING NOTES
LOCATION OF ACCESS TO INTERSTITIAL SPACE.1
GENERAL NOTES
A. CONTRACTOR SHALL REUSE EXISTING CONDUIT
PATHWAY TO THE EXTENT POSSIBLE FOLLOWING
REMOVAL OF EXISTING COMMUNICATIONS CABLING
TO SUPPORT NEW CABLING. CONTRACTOR MUST
EMS
WHOLE BUILDING
B24
(44) 7897 SQ. FT.
CHEMICAL STORAGE
226-24
(27) 89 SQ. FT.
KITCHEN
225-24
(27) 1110 SQ. FT.
FOOD PREP
227-24
(27) 436 SQ. FT.
/H
AC
8-
(1
7)
S Q
. F T.
OFFICE
230-24
(27) 136 SQ. FT.
CORRIDOR
2C22
(27) 235 SQ. FT.
OFFICE
221-24
(27) 206 SQ. FT.
STORAGE
220-24
(27) 23 SQ. FT.
OFFICE
219-24
(27) 219 SQ. FT.
WALK-IN REF
229-24
(27) 152 SQ. FT.
CORRIDOR
2C22
(27) 164 SQ. FT.
CORRIDOR
2C18
(11) ###########/
STAIR
2S2-24
(11) ###########
VACANT
217-24
(27) 94 SQ. FT.
DISH MACHINE
214-24
(27) 710 SQ. FT.
TRAINING
206-24
(27) 298 SQ. FT.
PH
206A-24
(27) 34 SQ. FT.
BREAKR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .