Attachment 11 Drawings 10 of 13 Muskogee 623-21-700.pdf

PDF 20 MB Posted

Attached to
Y1DA--623-21-700 | Construct EHRM Infrastructure Upgrades | Jack C. Montgomery VAMC - Muskogee, OK | Samantha/Leslie
Solicitation number
36C77624R0046
Issued by

About this file

These are architectural demolition drawings for the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma, detailing the communication infrastructure removal across multiple buildings and floors. The comprehensive set includes demolition plans for Buildings 1, 22, 24, 52, 53, and 60, covering basement through fourth floor levels, with each drawing meticulously marking communication infrastructure elements like wireless access points (WAP), IP cameras, telemetry devices, and existing cable trays and conduit pathways. The drawings feature systematic documentation of room-specific details, serving zones, cable routing, and general notes emphasizing the contractor shall reuse existing conduit pathways to the extent possible while ensuring no more than 40% fill on existing or new pathways during the infrastructure upgrade project.

View the file

Other files

File Type Posted
36C77625R0046 0009.pdf PDF
Attachment 21 - Tech Questions Tracker - FINAL07162025.pdf PDF
Attachment 21 - Tech Questions Tracker - FINAL_07142025.pdf PDF
36C77625R0046 0008.pdf PDF
Attachment to Tech Questions- ASI-001 Mechanical Ductwork Drawings- 20250714.pdf PDF
36C77625R0046 0007.pdf PDF
Attachment 21 - Tech Questions Tracker - 07082025.pdf PDF
Attachment 21 - Tech Questions Tracker - 07022025.pdf PDF
36C77625R0046 0006.pdf PDF
36C77625R0046 0005.pdf PDF
Attachment 16 Muskogee County Wage Rates_06272025.pdf PDF
Attachment 20 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
36C77625R0046 0004.pdf PDF
Attachment 21 - Tech Questions Tracker - 20250623 Partial.pdf PDF
36C77625R0046 0003.pdf PDF
Attachment 19 Site Visit Sign In Sheet 62323700.pdf PDF
36C77625R0046 0002.pdf PDF
36C77625R0046 0001.pdf PDF
Attachment 05 Drawings 4 of 13 Muskogee 623-21-700.pdf PDF
Attachment 17- Limitations on Subcontracting - Muskogee EHRM.pdf PDF
Attachment 08 Drawings 7 of 13 Muskogee 623-21-700.pdf PDF
Attachment 01 - 623-21-700 - Muskogee - Updated Combined Specifications-20250501.pdf PDF
Attachment 03 Drawings 2 of 13 Muskogee 623-21-700.pdf PDF
36C77625R0046_1.pdf PDF
Attachment 04 Drawings 3 of 13 Muskogee 623-21-700.pdf PDF
Attachment 18 Site Map.pdf PDF
Attachment 02 Drawings 1 of 13 Muskogee 623-21-700.pdf PDF
Attachment 16 Muskogee County Wage Rates.pdf PDF
Attachment 07 Drawings 6 of 13 Muskogee 623-21-700.pdf PDF
Attachment 06 Drawings 5 of 13 Muskogee 623-21-700.pdf PDF
Attachment 12 Drawings 11 of 13 Muskogee 623-21-700.pdf PDF
Attachment 14 Drawings 13 of 13 Muskogee 623-21-700.pdf PDF
Attachment 10 Drawings 9 of 13 Muskogee 623-21-700.pdf PDF
Attachment 13 Drawings 12 of 13 Muskogee 623-21-700.pdf PDF
Attachment 09 Drawings 8 of 13 Muskogee 623-21-700.pdf PDF
Attachment 15- PCRA for EHRM 623-700.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WHOLE BUILDING

B1

(44) 13933 SQ. FT.

STAIRWELL

601B-1

(11) 153 SQ. FT.

CORRIDOR

601B1-1

(11) 249 SQ. FT.

ELEV EQUIP

601B1A-1

(11) 497 SQ. FT.

ELEV EQUIP

600A-1

(11) 234 SQ. FT.

EQUIP

601A-1

(11) 54 SQ. FT.

EL

EV

L O

BB

Y

0-

(1

1)

SQ

. F T.

ATTIC

601-1

(11) 11584 SQ. FT./

STAIRWELL

601C-1

(11) 150 SQ. FT.

WHOLE BUILDING

B1 PENT

(44) 304 SQ. FT.

WHOLE BUILDING

B53

(44) 3112 SQ. FT.

STAIR

6A-ST1

(11) 182 SQ. FT.

MOTOR CONTROL

6A-103

(11) 148 SQ. FT.

MACHINE PENTHOUSE

6A100-53

(11) 2158 SQ. FT.

MECH

6A-101

(11) 208 SQ. FT.

DN

SERVING ZONE: 503A-1

SERVING ZONE: 5C-100A-53

SERVING ZONE: 5C-100A-53

SERVING ZONE: 5C-108A-53

SERVING ZONE: 5C-108A-53

Department of Veteran Affairs

TN-11

BUILDINGS 1, 53 - SIXTH FLOOR - KEY PLAN - DEMOLITION

SCALE: 1' = 20'-0"

B22

(44) 1889 SQ. FT.

MECH

SB02-22

(11) 1588 SQ. FT.

UPS

SB01-22

(11) 109 SQ. FT.

SERVING ZONE: B05B-22

Department of Veteran Affairs

TN-12

BUILDING 22 - SUB BASEMENT - DEMOLITION

SCALE: 1/8" = 1"-0'

DRAWING NOTES

REMOVE 66 BLOCK(PUNCH DOWN) & TERMINATED

CABLES BACK TO SOURCE

(6) EXISTING 4" OSP CONDUITS ROUTED BETWEEN

BUILDING 18 AND SB02-22. ALL CONDUITS SHALL BE

SEALED AND WEATHERPROOFED FOLLOWING

REMOVAL OF COMMUNICATIONS CABLING.

(2) EXISTING 4" CONDUITS AND (3) EXISTING 1.25"

INNERDUCTS EXTENDING FROM BUILDING

ENTRANCE TO MECHANICAL CHASE. CONDUITS

AND INNERDUCT TO REMAIN FOLLOWING REMOVAL

OF COMMUNICATIONS CABLING.

EXISTING COMMUNICATIONS CABLE ROUTES

THROUGH NEMA ENCLOSURE AND INTO BUILDING

CHASE. ENCLOSURE AND CONDUIT TO REMAIN

FOLLOWING REMOVAL OF COMMUNICATIONS

CABLING.

KEY PLAN

B22

B24

B52

B53

B56

ENGINEERING

EMSNUTRITION CANTEEN

WHOLE BUILDING

B24

(44) 4809 SQ. FT.

MECH SPACE

SB1-24

(11) 333 SQ. FT.

GENERAL STORAGE

SB4-24

(27) 490 SQ. FT.

W

AL

K-

IN

R

EF

G

SB

3-

(2 7)

SQ

. F

T.

MECH SPACE

SB2-24

(11) 70 SQ. FT.

WALK-IN FREEZER

SB6-24

(27) 609 SQ. FT.

GENERAL STORAGE

SB5-24

(27) 239 SQ. FT.

GENERAL STORAGE

SB7-24

(7) 218 SQ. FT.

CORRIDOR

SB8-24

(11) 78 SQ. FT. /

CORRIDOR

SBC10-24

(11) 316 SQ. FT.

ELEV EQUIP

SB9-24

(11) 90 SQ. FT. /

ELEV

SBSE4-24

(11) 72 SQ. FT.

STAIR

SB4S

(11) 140 SQ. FT.

MECH SPACE

SB7A-24

(18) 335 SQ. FT.

C O

R R

ID

O

R

SB

-2

(1

1)

SQ

. F T. /

STORAGE

SB14-24

(17) 94 SQ. FT. /

GREASE TRAP

SB15-24

(18) 144 SQ. FT.

CORRIDOR

SBC11-24

(11) 320 SQ. FT.

EMS STORAGE

SB12-24

(17) 129 SQ. FT.

AC STORAGE

SB17-24

(18) 47 SQ. FT. /

AC STORAGE

SB17A-24

(18) 50 SQ. FT.

AC STORAGE

SB16-24

(18) 214 SQ. FT.

SERVING ZONE: B4A-24

WAP

1D

WAP

1D

WAP

1D

WAP

1D

Department of Veteran Affairs

TN-13

BUILDING 24 - SUB BASEMENT - DEMOLITION

SCALE: 1/8" = 1"-0'

KEY PLAN

B22

B24

B52

B53

B56

(44) 5006 SQ. FT.

ENGINEERING

WHOLE BUILDING

(44) 2358 SQ. FT.

CONTROL ROOM

(11) 636 SQ. FT.

GENERATOR ROOM

(11) 1525 SQ. FT.

SWITCHGEAR

(11) 2227 SQ. FT.

GENERATOR TRANSFER ROOM

(11) 1039 SQ. FT.

MECH

(18) 943 SQ. FT.

FIRE PUMP

(11) 479 SQ. FT.

ENGINEERING

C100-52

(11) 784 SQ. FT.

EM

PL

O

YE

E

TO

IL

ET

1C

-5

(1 8)

S

Q . F

T.

ST

AI

R W

EL

L

0S

-5

(1 8)

S

Q . F

T.

CONTROLER

101B-52

(18) 346 SQ. FT. /

W

AT

ER

S

AM

PL

IN

G

1A

-5

(1 8)

SQ

. F

T.

VS DRIVE

101A1-52

(18) 165 SQ. FT.

SWITCH GEAR ROOM

101F-52

(11) 1915 SQ. FT.

CHILLER ROOM

101-52

(11) 6179 SQ. FT.

SWITCH GEAR ROOM

101D-52

(11) 724 SQ. FT.

WHOLE BUILDING

(44) 10929 SQ. FT.

SERVING ZONE: 201B-52 SERVING ZONE: BC-100A-53

SERVING ZONE: 201B-52 SERVING ZONE: BC-100A-53

Department of Veteran Affairs

TN-14

BUILDING 52, 53 - SUB BASEMENT AND BUILDING 56 FIRST FLOOR - DEMOLITION

SCALE: 1/8" = 1"-0'

DRAWING NOTES

(2) EXISTING CONDUITS ROUTED INTO

UNEXCAVATED SPACE. (1) 4" CONDUIT WITH (2)

EXISTING 1.25" INNERDUCTS AND HIGH PAIR

COPPER CABLE. (1) 4" VACANT CONDUIT WITH PULL

STRING.

(2) EXISTING 4" CONDUITS ROUTED ON CEILING

TRANSITION TO ABOVE THOUGH CONCRETE

CEILING.

(2) EXISTING 4" CONDUITS ROUTED ON CEILING.

(2) EXISTING 4" CONDUITS EXTENDING TO

TELEPHONE EQUIPMENT ROOM 201B-52.

CONTRACTOR TO VERIFY PATHWAY. REFER TO

SHEET TN-18 FOR MORE INFORMATION.

KEY PLAN

B22

B24

B52

B53

B56

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS

CABLING TO SUPPORT NEW CABLING.

CONTRACTOR MUST NOT EXCEED 40% FILL ON

EXISTING OR NEW PATHWAYS

B22

(44) 6524 SQ. FT.

CORRIDOR

BC1A-22

(11) ###########

OFFICE

B14-22

(23) 222 SQ. FT.

EL

EV

AT

O

R E

Q U

IP

B1

5-

(1 1)

OFFICE

B14A-22

(23) 189 SQ. FT.

OFFICE

B10B-22

(23) 128 SQ. FT.

TOILET F

B12-22

(9) 98 SQ. FT.

TOILET M

B13-22

(9) 125 SQ. FT.

HAC

B11-22

(17) 39 SQ. FT.

OFFICE

B10-22

(23) 87 SQ. FT.

STORAGE

B10A-22

(23) 257 SQ. FT.

CORRIDOR

B10B-22

(23) 49 SQ. FT.

OFFICE

B09-22

(23) 149 SQ. FT./

CONFERENCE

B09A-22

(23) 236 SQ. FT.

OFFICE

B08A-22

(24) 313 SQ. FT.

OFFICE

B08-22

(24) 129 SQ. FT.

OFFICE

B09B-22

(24) 119 SQ. FT.

VESTIBULE

BC1C-22

(11) 47 SQ. FT.

STAIRWELL

BS5-22

(11) 142 SQ. FT.

OFFICE

B07-22

(24) 155 SQ. FT.

OFFICE

B06-22

(39) 197 SQ. FT.

STORAGE

B06B-22

(39) 26 SQ. FT.

MECH

B05-22

(11) 410 SQ. FT.

TELE

B05B-22

(23) 11 SQ. FT.

STORAGE

B04-22

(23) 367 SQ. FT.

IRM WORK ROOM

B03-22

(23) 807 SQ. FT.

CORRIDOR

BC1B-22

(11) ##########

STAIRWELL

BS1-22

(11) ###########

C O

R R

ID

O

R

BC

1-

(1 1)

OFFICE

B07A-22

(24) 152 SQ. FT.

CENTRALIZED

STAFFING

IRM

LOGISTICS

TENANT SPACE

EMS

SERVING ZONE: B05B-22

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

TN-45

Department of Veteran Affairs

TN-15

BUILDING 22 - BASEMENT - DEMOLITION

SCALE: 1/8" = 1"-0'

DRAWING NOTES

REMOVE 66 BLOCK(PUNCH DOWN) & TERMINATED

CABLES BACK TO SOURCE

(4) EXISTING 4" CONDUITS PENETRATING ABOVE

DOORWAY.

(2) EXISTING 4" CONDUITS ROUTED ABOVE DROP

CEILING.

EXISTING NEMA RATED ENCLOSURE

(2) EXISTING 4" CONDUITS EXTENDING BETWEEN

BUILDING 22 AND BUILDING 24. CONDUIT PATHWAY

ROUTES ABOVE LOADING DOCK AREA. REFER TO

SHEET TN-16 FOR MORE INFORMATION.

EXISTING 9" W x 6" D CABLE TRAY ABOVE LAY-IN

CEILING. APPROXIMATELY 27" OF CLEARANCE

ABOVE LAY-IN CEILING TILE.

EXISTING 9" W x 6" D CABLE TRAY ABOVE LAY-IN

CEILING. APPROXIMATELY 27" OF CLEARANCE

ABOVE LAY-IN CEILING TILE.

KEY PLAN

B22

B24 B53

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS

MECH

B6-24

(11) 915 SQ. FT.

MAIL ROOM

B7A-24

(24) 387 SQ. FT.

MAIL ROOM

B7-24

(24) 67 SQ. FT.

STORAGE

B8A-24

(24) 104 SQ. FT.

WAREHOUSE

B1-24

(24) 4322 SQ. FT.

CORRIDOR (TUNNEL)

100T-1

(11) 590 SQ. FT.

ELEV SHAFT

S1T-1

(11) 77 SQ. FT.

ELEV SHAFT

S2T-1

(11) 77 SQ. FT.

ST

AI

R W

EL

L

BS

3-

(1

1)

SQ

. F T.

STAIR

BS4-1

(11) 162 SQ. FT.

ELEV SHAFT

BSE4-24

(11) 65 SQ. FT.

CORRIDOR

BC7-24

(11) 147 SQ. FT.

CORRIDOR

BC7A-24

(11) 88 SQ. FT.

CANTEEN STORAGE

B4-24

(7) 575 SQ. FT.

STORAGE

B4B-24

(7) 100 SQ. FT.

TOILET

B5-24

(9) 75 SQ. FT.

TELE

B4A-24

(23) 25 SQ. FT.

WHOLE BUILDING

B24

(44) 8570 SQ. FT.

LOGISTICS

IRM

CANTEEN

CENTRALIZED

STAFFING

WAP

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

ALL CABLING SHOWN ON THIS SHEET

SERVING ZONE B4A-24

Department of Veteran Affairs

TN-16

BUILDING 24 - BASEMENT - DEMOLITION

SCALE: 1/8" = 1"-0'

TN-45

KEY PLAN

B22

B24 B53

DRAWING NOTES

(2) EXISTING 4" CONDUITS EXTENDING BETWEEN

BUILDING 22 AND BUILDING 24. CONDUIT PATHWAY

ROUTES ABOVE LOADING DOCK AREA. REFER TO

SHEET TN-15 FOR MORE INFORMATION.

REMOVE (1) EXISTING CATEGORY CABLE SERVING

ENGINEERING NETWORK SWITCH EXTENDING TO

201A-52 AND (6) CATEGORY CABLES EXTENDING TO

DEVICE LOCATIONS. COORDINATE REMOVAL WITH

OWNER AS WORK MAY NEED TO BE PHASED FOR

NEW CABLING AT DEVICE LOCATIONS, SHOWN ON

NEW WORK DRAWINGS, TO BE OPERATIONAL PRIOR

TO REMOVAL OF EXISTING CABLES.

(2) EXISTING 4" CONDUITS ROUTED ON CEILING.

(2) EXISTING 4" CONDUITS EXTENDING BETWEEN

BUILDING 24 AND BUILDING 52. CONDUIT PATHWAY

ROUTES ALONG CEILING. REFER TO SHEET TN-18

FOR MORE INFORMATION.

(2) EXISTING 4" CONDUITS PASSING THROUGH THE

WALL AND TURNING UP THROUGH THE CEILING.

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS

3 4

(44) 0 SQ. FT.

PUMP

58-102

(11) 323 SQ. FT.

TR

EA

TM

EN

T

-1

(1 1)

S

Q . F

T.

SIGNAL

BC-100A

(11) 87 SQ. FT.

MECH

BC-100

(11) 1019 SQ. FT.

FITNESS CENTER

BB-115

(27) 1253 SQ. FT.

M TOILET/SHOWER

BB-113B

(9) 344 SQ. FT.

W LOCKER ROOM

BB-113A

(9) 363 SQ. FT.

CORRIDOR

BB-113

(9) 111 SQ. FT.

M O

R G

U E

VE

ST

IB

U

LE

BB

1-

(3

6)

SQ

. F T.

WALK-IN COOLER

BB111B-53

(36) 199 SQ. FT.

AUTOSPY

BB111A-53

(36) 392 SQ. FT.

ST

AF

F

TO

IL

ET

BB

1A 1-

(3

6)

S Q

. F T.

LOCKER/SHOWER

BB111A2-53

(36) 70 SQ. FT.

BULK STORAGE

BB-100E

(24) 269 SQ. FT.

BULK STORAGE

BB-100D

(24) 155 SQ. FT.

INPATIENT PHARMACY

BB-100

(24) 1117 SQ. FT.

OFFICE

BB-102

(24) 147 SQ. FT.

OFFICE

BB-103

(24) 133 SQ. FT.

BREAK AREA

BB-100A

(24) 193 SQ. FT./

DW-1

BB-100A1

(24) 32 SQ. FT. /

STORAGE

BB-100B1

(24) 398 SQ. FT.

VAULT

BB-101

(24) 375 SQ. FT.

STAIR

BA-ST1

(11) 209 SQ. FT.

SERVICE ELEV

BA-100A1

(11) 141 SQ. FT.

SERV ELEV LOBBY

BA-100A

(11) 849 SQ. FT.

SERVICE ELEV

BA-100A2

(11) 133 SQ. FT.

SERVICE ELEV

BA-100A3

(11) 128 SQ. FT.

SUMP PUMP RM

BA-100B

(11) 172 SQ. FT.

C O

N

TR

O L

R M

BA

-1

(1

1)

S Q

. F T.

CORRIDOR

CB1

(11) 777 SQ. FT.

CORRIDOR

CB2

(11) 348 SQ. FT.

PHARMACY VAULT

BB-104

(30) 795 SQ. FT.

CORRIDOR

CB3

(11) 1366 SQ. FT.

OFFICE

BB-107

(18) 197 SQ. FT.

ADMIN OFFICE

BB-107B

(18) 323 SQ. FT.

OFFICE

BB-107D

(18) 95 SQ. FT.

OFFICE

BB-107C

(18) 108 SQ. FT.

LINEN STORAGE

BB-106

(17) 818 SQ. FT.

CLEAN LINEN

BB-105

(17) 1138 SQ. FT.

EMERGENCY STORAGE

BB-110

(17) 122 SQ. FT.

ELECTRICAL

BB-108

(11) 86 SQ. FT.

HAC

BB-109

(17) 85 SQ. FT.

RECORDS FILE ROOM

BB-119

(21) 1270 SQ. FT.

STORAGE

BB-120

(18) 897 SQ. FT.

STORAGE

(11) 16 SQ. FT.

WHOLE BUILDING

(44) 409 SQ. FT.

LOCKSMITH

(21) 146 SQ. FT.

DOCK OPEN

TO OUTSIDE

TO B52

SUB-BASEMENT

ENGINEERING

ENGINEERING

EMS

HEALTHCARE ADMINISTRATION

PHARMACY

CENTRALIZED STAFF NUTRITION/FOODSPECIALITY SERVICELOGISTICS

WM

WM

WM

WM

WM

WM

WM

WAP

1D

WAP

1D

IP CAMERA

1D

IP CAMERA

1D

WAP

1D

IP CAMERA

1D

WAP

1D

WAP

1D

WAP

1D

IP CAMERA

1D

RTLS

1D

WAP

1D

IP CAMERA

1D

IP CAMERA

1D

IP CAMERA

1D

WAP

1D

IP CAMERA

1D

IP CAMERA

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

IP CAMERA

1D

WAP

1D

WAP

1D IP CAMERA

1D

WAP

1D

WAP

1D

IP CAMERA

1D

ALL CABLING SHOWN ON THIS SHEET

SERVING ZONE BC-100A-53

Department of Veteran Affairs

TN-17

BUILDING 53 - BASEMENT - DEMOLITION

SCALE: 1/8" = 1"-0'

TN-45

KEY PLAN

B22

B24 B53

DRAWING NOTES

EXISTING 4" CONDUIT WITH (3) 1.25" INNERDUCTS

ROUTED ABOVE LAY-IN CEILING. CONDUIT

TRANSITIONS THROUGH CEILING INTO BUILDING 53

MEZZANINE. REFER TO DRAWING TN-18 FOR MORE

INFORMATION.

ACCESS LADDER TO CRAWL SPACE ABOVE CEILING

OVER PHARMACY AND MORGUE.

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS

(44) 2928 SQ. FT.

S-6

S-5

S-4

P7-P8 ELEVATOR PIT

MA-102

(11) 228 SQ. FT.

STAIRWELL

1A-ST1

(11) 208 SQ. FT.

MECH SPACE

MA02

(18) 518 SQ. FT.

GIP

CMA-101

(24) 613 SQ. FT.

GIP OFFICE

MA-100

(24) 168 SQ. FT.

SERVICE ELEV

CMA-100C

(11) 139 SQ. FT.

SERVICE ELEV

CMA-100A

(11) 146 SQ. FT.

GIP

CMA-100

(24) 453 SQ. FT.

SERVICE ELEV

CMA-100B

(11) 139 SQ. FT.

ENGINEERING

LOGISTICS

WHOLE BUILDING

(44) 10951 SQ. FT.

MEZZANINE

201-52

(11) 5186 SQ. FT.

DDC SERVER ROOM

201A-52

(23) 106 SQ. FT.

UPS WORK ROOM

201A2-52

(23) 91 SQ. FT.

STORAGE IT

201A1B-52

(23) 123 SQ. FT.

PACS/VIDEO

201A1-52

(23) 124 SQ. FT.

STORAGE

201A1A-52

(23) 56 SQ. FT.

TELEPHONE EQUIP. ROOM

201B-52

(23) 806 SQ. FT.

TOILET

201C-52

(18) 80 SQ. FT.

CORRIDOR

C200-52

(11) 330 SQ. FT.

C O

R R

ID

O

R /S

TO

R

AG

E

C

1-

(1 1)

SQ

. F

T.

IRM

ALL CABLING SHOWN ON THIS SHEET

SERVING ZONE 201B-52

WAP

1D

WAP

1D

TELEMETERY

1D

WAP

1D

PP

1D

IP CAMERA

TN-45

Department of Veteran Affairs

TN-18

BUILDING 52, 53 - MEZZANINE - DEMOLITION

SCALE: 1/8" = 1'-0"

DRAWING NOTES

REMOVE 66 BLOCK (PUNCH DOWN) & TERMINATED

CABLES BACK TO SOURCE

(4) EXISTING 4" CONDUITS EXTENDING BETWEEN

BUILDING 24 AND BUILDING 52. CONDUIT PATHWAY

ROUTES ALONG CEILING. REFER TO SHEET TN-16

FOR MORE INFORMATION.

EXISTING NEMA RATED ENCLOSURE.

(2)EXISTING 4" CONDUITS ROUTED ON CEILING.

CONDUIT TRANSITIONS FROM CEILING TO

SUB-BASEMENT OF BUILDING 52 BELOW. REFER TO

DRAWING TN-14 FOR MORE INFORMATION.

EXISTING 18" W x 6" D LADDER TRAY MOUNTED

ALONG CEILING GRID. (3) EXISTING CONDUIT

PENETRATIONS INTO 201B-52 AND C200-52.

(1) EXISTING 4" CONDUIT WITH (3) 1.25" INNERDUCTS

ROUTED ON CEILING.

EXISTING 18" W X 6" D CABLE TRAY MOUNTED

ALONG WALL.

EXISTING SLEEVE INTO CRAWL SPACE / STEAM

TUNNEL AREA LOCATED UNDER ROOM 1C143-1.

REFER TO SHEET TN-20 FOR MORE INFORMATION.

(3) EXISTING 1.25" INNERDUCTS THROUGH WALL

INTO NEMA ENCLOSURE.

(1) EXISTING 4" CONDUIT WITH (3) 1.25" INNERDUCTS

ROUTED ON CEILING AND THROUGH MEZZANINE OF

BUILDING 53. CONDUIT TRANSITIONS INTO ABOVE

LAY-IN CEILING SPACE OF CORRIDOR CB3,

LOCATED IN THE BASEMENT OF BUILDING 53.

REFER TO SHEET TN-45 AND SHEET TN-46 FOR

MORE INFORMATION.

EXISTING IP CAMERA AND MOUNT ON THE ROOF.

REMOVE EXISTING CATEGORY CABLE AND REUSE

EXISTING PATH FOR INSTALLATION OF NEW CABLE

SHOWN ON NEW WORK PLANS.

REMOVE EXISTING WALL RACK. COORDINATE

REMOVAL WITH LOCAL IT FOLLING ROUGH IN AND

CUTOVER OF NEW CABLING AS RACK SERVES IT

OFFICE AREA/PC IMAGING BENCH. REMOVE

APPROXIMATELY (58) HORIZONTAL CABLES

EXTENDING TO IMAGING RACKS IN CMA-100 AND IT

SUITE TO SOURCE. REMOVE FIBER OPTIC CABLING

EXTENDING FROM RACK TO 201B-52.

KEY PLAN

B52,53

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS

B1

(44) #############

OFFICE

1B05-1

(37) 144 SQ. FT.

STERILE PROCESSING SERVICE

1E01-1

(37) 1153 SQ. FT.

VCS

1B28-1

(7) 207 SQ. FT.

OFFICE

112-1

(32) 388 SQ. FT.

PATIENT TOILET

113A-1

(32) 43 SQ. FT.

OFFICE

113-1

(32) 120 SQ. FT.

STORAGE

114-1

(32) 72 SQ. FT.

PATIENT TOILET

115A-1

(32) 36 SQ. FT.

EXAM

115-1

(32) 113 SQ. FT.

EXAM

116-1

(32) 144 SQ. FT.

OFFICE

117-1

(32) 90 SQ. FT.

HAC

118-1

(32) 56 SQ. FT.

OFFICE

119-1

(32) 234 SQ. FT.

LIQUID NITROGEN STOR

(32) 18 SQ. FT.

OFFICE

120-1

(32) 237 SQ. FT.

EXAM

121-1

(32) 120 SQ. FT.

EXAM

122-1

(32) 127 SQ. FT.

CORRIDOR

100C-1

(32) 829 SQ. FT.

EXAM

123-1

(32) 154 SQ. FT. /

OFFICE

124-1

(32) 111 SQ. FT.

OFFICE

125-1

(32) 108 SQ. FT.

STORAGE

100D1-1

(11) ##########

PSA

101-1

(32) 121 SQ. FT.

M

ED

S

TO

R

1A -1

(3 2)

S

Q . F

T.

BREAK

101B-1

(32) 139 SQ. FT./

EXAM

102-1

(32) 143 SQ. FT./

EXAM

103-1

(32) 142 SQ. FT./

EXAM

104-1

(32) 142 SQ. FT./

TOILET

105-1

(32) 223 SQ. FT.

SOILED UTILITY

106-1

(32) 73 SQ. FT.

OFFICE

107-1

(32) 74 SQ. FT.

EXAM

108-1

(32) 130 SQ. FT.

C O

R R

ID

O

R

0B -1

(3 2)

SQ

. F

T.

CORRIDOR

100B1-1

(32) 50 SQ. FT.

STAFF TOILET

109-1

(32) 81 SQ. FT.

EXAM

110-1

(32) 98 SQ. FT.

NURSING OFFICE

111-1

(32) 102 SQ. FT.

PATIENT TOILET

111A-1

(32) 47 SQ. FT.

WAITING

100A1-1

(32) 341 SQ. FT.

STAFF TOILET

(30)

STAFF TOILET

1B104I-1

(19) 59 SQ. FT.

OCT

1B104J-1

(19) 72 SQ. FT.

OFFICE/BREAK

1B104H-1

(19) 112 SQ. FT.

ST

O

R

AG

E 1B

4G

-1 (1

9)

S Q

. F T.

EXAM 3

1B104F-1

(19) 175 SQ. FT.

EXAM 4

1B104K-1

(19) 161 SQ. FT.

EXAM 5

1B104L-1

(19) 161 SQ. FT.

C O

R R

ID

O

R 1B

C 6B

-1 (1

9)

SQ

. F T.

EXAM 2

1B104E-1

(19) 176 SQ. FT.

EXAM 1

1B104D-1

(19) 209 SQ. FT.

EXAM 6

1B104M-1

(19) 159 SQ. FT.

AUTO REFRACTOR

1B104N-1

(19) 143 SQ. FT.

DILATION

1B104C-1

(19) 102 SQ. FT.

EY

E

EX

AM

1B

4B -1

(1 9)

S

Q . F

T.

ST

O

R

AG

E 1B

4A

-1 (1

9)

S Q

. F T.

MECHANICAL

1B1040-1

(19) 96 SQ. FT.

ST

O

R

AG

E 1B

4A

-1 (1

9)

SQ

. F

T.

EYE CLINIC

1B29-1

(19) 176 SQ. FT.

/PS

A

1B

-1 (1

9)

SQ

. F T.

CHAPEL

1B35-1

(10) 1058 SQ. FT.

WORK

1B40-1

(10) 340 SQ. FT.

PATIENT REP OFFICE

1B38-1

(10) 255 SQ. FT.

C H

AP

EL

E N

TR

AN

C E

1B

-1 (1

0)

S Q

. F T.

CORRIDOR

1B37-1

(10) 125 SQ. FT.

OFFICE

1B33-1

(10) 139 SQ. FT.

ST

AI

R W

EL

L

1B S5

-1 (1

1)

STAIRWELL

1BS4-1

(11) ###########

C O

R R

ID

O

R 1B

C 6B

-1 (1

1)

HW TANK

1B03-1

(11) ###########

UNISEX TOILET

1B31-1

(11) ##########

CORRIDOR

1BC6A-1

(11) ###########

UNISEX TOILET

1B32-1

(11) ##########

LOBBY

1B06-1

(11) ###########

ELEVATOR

1BP6-1

(11) ########### /

ELEVATOR

1BSE2-1

(11) ##########

ELEVATOR

1BSE3-1

(11) ##########

LOBBY

1B100B-1

(11) ###########

ENTRANCE

1B130-1

(11) ###########/

EL

EC

TR

IC

AL

1B

-1

(1 1)

SWITCHGEAR

1B26-1

(11) ###########

STAIRWELL

1BS3-1

(11) ###########

ELEVATOR

1BP2-1

(11) ##########

ELEVATOR

1BP1-1

(11) ##########

CORRIDOR

100E-1

(11) ###########

LOBBY

100D-1

(11) ###########

VENDING

(7) 30 SQ. FT.

VESTIBULE

100F-1

(11) ###########

VESTIBULE

100G-1

(11) ###########

STAIRWELL A-EAST

1AS1-1

(11) ###########

STAIRWELL

1AS2-1

(11) ###########

IT

0A 2-

(1

1)

LOBBY

100A-1

(11) ###########

ENTRANCE

100-1

(11) ###########

MECHANICAL

1B34-1

(11) ###########

EY

E

C

LI

N

IC

1B

A-

(1 9)

SQ

. F

T.

WM

WAP

1D

WAP

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

TELEMETRY

1D

WAP

1D

RTLS

1D

IP CAMERA

1D

TELEMETRY

1D

WAP

1D

WAP

1D

WAP

1D

TELEMETRY

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1DPRIMARY CARE

CHAPLAIN

EYE

CLINIC

EYE

CLINIC

CANTEEN

WMWM

WM

WM

WM

WM

WM

SERVING ZONE: 100A2-1 SERVING ZONE: 1C08-1

TN-19

BUILDING 1 - FIRST FLOOR - AREA A - DEMOLITION

SCALE: 1/8" = 1'-0"

TN-19

TN-23TN-25

TN

-20

TN

-19

TN

-20

TN-46

Department of Veteran Affairs

A B C

D E F

G

KEY PLAN

DRAWING NOTES

EXISTING 9" W CABLE TRAY & J-HOOK SYSTEM

ROUTED THROUGH HALLWAY ABOVE DROP

CEILING.

EXISTING CABLE SLEEVE THROUGH FIREWALL.

(2) EXISTING 4" CABLING SLEEVES THROUGH

WALL.

(2) EXISTING 4" SWEEPS THOUGH CEILING TO

FLOOR ABOVE.

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS.

B. DUE TO LIMITED / CONGESTED ABOVE CEILING

SPACE IN THIS AREA, IT IS RECOMMENDED THE

CONTRACTOR REMOVE CABLING SHOWN ON

DEMOLITION PLANS FROM EXISTING CABLE TRAY

SYSTEM TO SUPPORT NEW CABLE INSTALLATION.

TE

LE

H

EA

LT

H

1C

-1 (3

2)

SQ

. F T.

FIRE ALARM

1C144-1

(11) ###########/

EMPLOYEE LOUNGE

1C11A-1

(37) 217 SQ. FT. /

OFFICE

1C11-1

(24) 200 SQ. FT.

OFFICE

1C10A-1

(24) 136 SQ. FT.

STORAGE

1C12A-1

(24) 162 SQ. FT. /

ST

ER

IL

E

PR

O

C

ES

SI

N

G S

ER

VI

C E

1C

-1 (3

7)

SQ

. F T.

D U

M

BW

AI

TE

R 1C

D W

-1 (3

7)

S Q

. F T.

WAITING

1C148-1

(32) 364 SQ. FT.

IT

C100M1B-1

(32) 34 SQ. FT.

WAITING

1C165-1

(32) 254 SQ. FT. /

WAITING

1C164-1

(32) 226 SQ. FT.

MILLION VET PROGRAM

1C138-1

(32) 202 SQ. FT. /

C

LE

AN

U

TI

LI

TY

(3 2)

S

Q . F

T.

SOILED UTILITY

1C139-1

(32) 78 SQ. FT.

/H

AC

1C

0-

(3 2)

S

Q . F

T.

EN

TR

AN

C

E

(3 2)

S

Q . F

T.

C O

R R

ID

O

R C

0C

1-

(3 2)

S

Q . F

T.

STAFF TOILET M

1C142-1

(32) 64 SQ. FT.

STAFF TOILET W

1C141-1

(32) 84 SQ. FT.

OFFICE

1C146A1-1

(32) 63 SQ. FT. /

PATIENT TOILET

1C146A2-1

(32) 70 SQ. FT. /

WORK

1C146A3-1

(32) 124 SQ. FT.

OFFICE

1C146A4-1

(32) 143 SQ. FT.

OFFICE

1C146A5-1

(32) 146 SQ. FT.

OFFICE

1C146A6-1

(32) 113 SQ. FT.

STORAGE

1C146A7-1

(32) 23 SQ. FT.

CORRIDOR

C100J-1

(32) 352 SQ. FT.

OFFICE

1C157F-1

(32) 123 SQ. FT.

EXAM

1C159E-1

(32) 135 SQ. FT.

EXAM

1C159F-1

(32) 121 SQ. FT.

STORAGE

1C159G-1

(32) 17 SQ. FT.

PATIENT TOILET

1C159H-1

(32) 41 SQ. FT.

EXAM

1C159I-1

(32) 138 SQ. FT.

EXAM

1C159J-1

(32) 141 SQ. FT.

/H

AC

1C

0-

(3 2)

S

Q . F

T.

WAITING

1C158-1

(32) 423 SQ. FT.

PSA OFFICE

1C159A-1

(32) 172 SQ. FT.

PUBLIC TOILET

1C157I-1

(32) 63 SQ. FT.

EXAM

1C159B-1

(32) 127 SQ. FT.

EXAM

1C157H-1

(32) 110 SQ. FT.

NURSING WORK AREA

1C159C-1

(32) 147 SQ. FT.

EXAM

1C157G-1

(32) 131 SQ. FT.

ST

O

R

AG

E 1C

9D

-1 (3

2)

S Q

. F T.

C O

R R

ID

O

R C

0K

-1 (3

2)

SQ

. F T.

WAITING

1C146A-1

(32) 245 SQ. FT.

OFFICE

1C146A8-1

(32) 102 SQ. FT.

EXAM

1C157E-1

(32) 124 SQ. FT./

EXAM

1C156G-1

(32) 120 SQ. FT.

NURSING WORK AREA

1C156H-1

(32) 110 SQ. FT. /

NURSING WORK AREA

1C157D-1

(32) 110 SQ. FT.

C O

R R

ID

O

R C

0I

-1 (3

2)

SQ

. F T.

EXAM

1C157C-1

(32) 110 SQ. FT./

EXAM

1C156I-1

(32) 110 SQ. FT.

EXAM

1C156J-1

(32) 110 SQ. FT. /

EXAM

1C157B-1

(32) 110 SQ. FT.

RECEPTION

1C157A-1

(32) 119 SQ. FT./

RECEPTION

1C156K-1

(32) 119 SQ. FT.

EXAM

1C156A-1

(32) 126 SQ. FT.

C O

R R

ID

O

R C

0H

-1 (3

2)

SQ

. F T.

EXAM

1C156B-1

(32) 120 SQ. FT.

PATIENT TOILET

1C156C-1

(32) 53 SQ. FT.

MEDICATION

1C156D-1

(32) 23 SQ. FT.

STORAGE

1C156E-1

(32) 22 SQ. FT.

ST

O

R

AG

E 1C

6F

-1 (3

2)

S Q

. F T.

OFFICE

1C146B-1

(32) 136 SQ. FT.

SPECIAL PROCEDURE

1C151F-1

(32) 181 SQ. FT.

OFFICE

1C151E-1

(32) 132 SQ. FT./

OFFICE

1C149F-1

(32) 130 SQ. FT.

EXAM

1C149G-1

(32) 136 SQ. FT. /

EXAM

1C151D-1

(32) 139 SQ. FT.

ST

O

R

AG

E 1C

1G

-1 (3

2)

S Q

. F T.

PA

TI

EN

T

TO

IL

ET

1C

1F

1-

(3 2)

S

Q . F

T.

EXAM

1C151H-1

(32) 120 SQ. FT.

C O

R R

ID

O

R C

0F

-1 (3

2)

SQ

. F T.

PATIENT TOILET

1C151I-1

(32) 61 SQ. FT.

EXAM

1C151J-1

(32) 120 SQ. FT.

WAITING

1C150-1

(32) 332 SQ. FT.

PSA OFFICE

1C151A-1

(32) 92 SQ. FT./

PSA OFFICE

1C149J-1

(32) 90 SQ. FT.

EXAM

1C149I-1

(32) 126 SQ. FT. /

EXAM

1C151B-1

(32) 121 SQ. FT.

NURSING WORK AREA

1C151C-1

(32) 126 SQ. FT./

NURSING WORK AREA

1C149H-1

(32) 126 SQ. FT.

C O

R R

ID

O

R C

0E

-1 (3

2)

SQ

. F T.

EXAM

1C149A-1

(32) 121 SQ. FT.

PATIENT TOILET

1C148B-1

(32) 62 SQ. FT.

EXAM

1C149C-1

(32) 121 SQ. FT.

PA

TI

EN

T

TO

IL

ET

1C

9E

1-

(3 2)

S

Q . F

T.

ST

O

R

AG

E 1C

9D

-1 (3

2)

S Q

. F T.

SPECIAL PROCEDURE

1C149E-1

(32) 193 SQ. FT.

WHEELCHAIR STOR

C100M1A-1

(43) 80 SQ. FT.

OFFICE

1C167-1

(43) 113 SQ. FT.

EQUIP STOR

1C147-1

(43) 52 SQ. FT.

N

IT

R O

X

ST

O R

1C

3B -1

(3 8)

S

Q . F

T.

OFFICE

1C04-1

(20) 127 SQ. FT.

OFFICE

1C05-1

(20) 193 SQ. FT.

OFFICE

1C06-1

(20) 192 SQ. FT.

PHARMACY VAULT

1C02B-1

(30) 707 SQ. FT.

OFFICE

1C02A-1

(30) 145 SQ. FT.

OUTPATIENT PHARMACY

1C02-1

(30) 3270 SQ. FT.

COUNSEL OFFICE

1C03A-1

(30) 133 SQ. FT. /

WAITING

C100A1-1

(30) 271 SQ. FT.

OUTPATIENT LOBBY

1C03-1

(30) 357 SQ. FT.

D

IS

PE

N

SI

N

G 1C

C

-1 (3

0)

S Q

. F T.

CONFERENCE

1C02G-1

(30) 250 SQ. FT.

/H

AC

1C

-1 (3

0)

S Q

. F T.

IT

1C

-1

(3 0)

S

Q . F

T.

SE

C

R

ET

AR

Y

O

FF

IC

E

1C

F-

(3 0)

SQ

. F

T.

CHIEF OFFICE

1C02E-1

(30) 225 SQ. FT./

M

ED

IC

AT

IO

N

P R

EP

1C

D

-1 (3

0)

SQ

. F T.

STAFF TOILET

1C02C-1

(30) 97 SQ. FT.

112 SQ. FT.

OFFICE

1C169-1

(19) 99 SQ. FT.

OFFICE

1C168-1

(6) 138 SQ. FT. /

OFFICE

1C168A-1

(6) 111 SQ. FT. /

OFFICE

1C168B-1

(5) 146 SQ. FT. /

OFFICE

1C166-1

(5) 148 SQ. FT.

OFFICE

1C163-1

(5) 124 SQ. FT. /

OFFICE

1C162-1

(5) 132 SQ. FT.

ARMORY

1D125A1A-1

(31) 61 SQ. FT.

SAFE ROOM

1D125A1-1

(31) 47 SQ. FT.

ARMORY ENTRANCE

1D125A-1

(31) 51 SQ. FT.

ENTRANCE

C100L1-1

(11) ###########

CORRIDOR

C100L-1

(11) ###########

MAIN CORRIDOR

C100M-1

(11) ############

TOILET W

1C152-1

(11) ###########

TOILET M

1C153-1

(11) ###########

ELEVATOR

1CP5-1

(11) ###########

CORRIDOR

C100G-1

(11) ###########

ELEV EQUIP

1C154-1

(11) ##########

STAIRWAY

1CS9-1

(11) ###########

ELEC

1C155-1

(11) ##########

CORRIDOR

C100C-1

(11) ###########

CRAWL SPACE

1C143-1

(11) #########

ELECTRICAL

1C145-1

(11) ###########

CORRIDOR

C100D-1

(11) ###########

CORRIDOR

C100A-1

(11) ###########

CORRIDOR

C100-1

(11) ###########

STAIRWELL

1CS6-1

(11) ###########

ELEC

1C10B-1

(11) ##########

C O

R R

ID

O

R

(1 1)

LOBBY

1C10C-1

(11) ##########

ELEVATOR

1CP3-1

(11) ##########

/EL

EC

1C

A-

(1 1)

ENTRANCE

C100M1-1

(11) ###########

COUNSEL OFFICE

1C03B-1

(30) 133 SQ. FT.

RTLS

WAP

1D

IP CAMERA

1D

IP CAMERA

1D

WAP

1D

IP CAMERA

1D

WAP

1D

WAP

1D

TELEMETRY

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

IP CAMERA

1D

WAP

1D

WAP

1D

RTLS

1D

RTLS

1D

IP CAMERA

1D

IP CAMERA

1D

TELEMETRY

1D

RTLS

1D

IP CAMERA

1D

WAP

1D

WAP

1D

IP CAMERA

1D

IP CAMERA

1D

IP CAMERA

1D

IP CAMERA

1D

WAP

1D

IP CAMERA

1D

WAP

1D

WAP

1D

IP CAMERA

1D

IP CAMERA

1D

WAP

1D

WAP

1D

IP CAMERA

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D WAP

1D

WAP

1D

IP CAMERA

1D

IP CAMERA

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

TELEMETRY

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

ENTRANCE

EMERGENCY

BED ICU

SERVING ZONE: 1C08-1SERVING ZONE: 1C08-1

TN-20

BUILDING 1 - FIRST FLOOR - AREA B - DEMOLITION

SCALE: 1/8" = 1'-0"

TN-22

TN

-21

TN

-20

TN

-21

TN

-20

TN

-19

TN-46

TN-46

Department of Veteran Affairs

TN-23

TN

-19

A B C

D E F

G

KEY PLAN

DRAWING NOTES

EXISTING LADDER TO BELOW FOR CONTRACTOR

TO USE FOR ACCESS INTO CRAWL SPACE.

EXISTING UNDER FLOOR PENETRATION BETWEEN

BUILDING 1 AND BUILDING 52. REFER TO DRAWING

TN-18 FOR MORE INFORMATION.

(6) EXISTING 4" COUNDUITS EXTENDING TO

OUTSIDE PLANT CONDUIT SYSTEM. CONTRACTOR

TO MAINTAIN HIGH PAIR COPPER AND MULTI-MODE

FIBER OPTIC CABLING EXTENDING TO BUILDING 6 /

COTTAGES.

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS.

ARMORY ENTRANCE

51 SQ. FT.

WHOLE BUILDING

B53

(44) #############

O&P PATIENT

1D-159

(32) 163 SQ. FT.

/U

TI

LI

TY

1D -1

D

(3 5)

S

Q . F

T.

PHY THER ADMIN

1D-142C

(35) 155 SQ. FT.

C THER ADMIN

1D-142B

(35) 148 SQ. FT.

SPECIAL TREATMENT

1D-142A

(35) 125 SQ. FT.

EMG

1D-141

(35) 154 SQ. FT.

COVID TESTING

1D-140B

(11) ###########

COVID TESTING

1D-140A

(11) ###########

COVID TESTING

1D-140

(11) ###########

ENTRY VESTIBULE

1D-120

(11) ###########

/O

FF

IC

E

1D -1

(3

S Q

. F T.

CORRIDOR

C 1 10

(11) ###########

ER WAITING

1D-132

(3) 489 SQ. FT.

COVID TESTING

1D-139

(11) 31 SQ. FT.

/EL

EC

1D -1

(3

5)

S Q

. F T.

TREATMENT

1D-142

(35) 1705 SQ. FT.

TOILET

1D-146D

(35) 58 SQ. FT. /

TOILET

1D-145

(35) 57 SQ. FT.

TREATMENT

1D-144

(35) 417 SQ. FT.

OFFICE

(35) 86 SQ. FT.

OFFICE

(35) 160 SQ. FT.

OFFICE

(35) 176 SQ. FT.

C O

R R

ID

O

R

(3 5)

SQ

. F

T.

OFFICE

(35) 88 SQ. FT.

STORAGE

1D-143

(35) 86 SQ. FT.

IT

1C-102A

(11) ##########

MECHANICAL

1C-102

(11) ############

EQUIPMENT

1D-157A1

(33) 232 SQ. FT./

TOILET

1D-154A

(3) 190 SQ. FT.

TOILET

1D-156A

(3) 190 SQ. FT.

HAC

1D-156B

(3) 63 SQ. FT.

VESTIBULE

1D-156

(3) 51 SQ. FT.

VESTIBULE

1D-154

(3) 49 SQ. FT.

WORK

1D-157A

(33) 229 SQ. FT.

ORTHOTIC LAB

1D-157

(33) 185 SQ. FT.

/(11) ############

COFFEE SHOP

1D-106

(7) 145 SQ. FT.

STORAGE

1D-106A

(7) 65 SQ. FT.

1A-100A1

(11) ##########

TOILET

1A-101

(11) ########## /TE

LE

1A -1

(3

4)

S Q

. F T.

OMNICELL

1D-110

(3) 110 SQ. FT.

CORRIDOR

1D-100B1

(3) 287 SQ. FT.

EXAM 3

1D-112

(3) 133 SQ. FT.

EXAM 4

1D-113

(3) 132 SQ. FT.

EXAM 5

1D-114

(3) 132 SQ. FT. /

EXAM 6

1D-115

(3) 205 SQ. FT.

CORRIDOR

1D-100B2

(3) 316 SQ. FT.

SOILED

1D-116

(3) 63 SQ. FT.

EXAM 7

1D-117

(3) 125 SQ. FT.

EXAM 8

1D-118

(3) 125 SQ. FT.

EXAM 9

1D-119

(3) 136 SQ. FT.

CORRIDOR

1D-100B3

(3) 172 SQ. FT.

NURSE STATION

1D-111

(3) 330 SQ. FT.

CORRIDOR

1D-100B

(3) 220 SQ. FT.

EXAM 1

1D-108

(3) 142 SQ. FT.

EXAM 2

1D-109

(3) 136 SQ. FT.

OBSERVATION

1D-107

(3) 244 SQ. FT.

ISOLATION

1D-121

(3) 140 SQ. FT. /

EXAM 10

1D-120

(3) 140 SQ. FT.

STAFF LOUNGE

1D-125

(3) 153 SQ. FT.

SPD STORAGE

1D-126

(3) 41 SQ. FT.

/O N

-C

AL

L 1D

-1

(2 8)

C O

R R

ID

O

R 1D

-1

C

(3

S

Q . F

T./

SPD STORAGE

1D-124

(3) 82 SQ. FT.

CORRIDOR

1D-100C

(3) 103 SQ. FT.

PA

TI

EN

T

TO

IL

ET

1D

-1

(3

S

Q . F

T.

ST

AF

F

TO

IL

ET

1D -1

(3

S Q

. F T.

CORRIDOR

1D-100

(3) 315 SQ. FT.

AOD/CHECK-IN

1D-129

(3) 154 SQ. FT. /

OFFICE

1D-130

(3) 74 SQ. FT.

ON-CALL TOILET

1D-127A

(28) ##########

VA POLICE OPERATIONS

1D-134

(31) 310 SQ. FT.

HOLDING

1D-134A

(31) 48 SQ. FT.

OFFICE

1D-137

(31) 394 SQ. FT.

/TO

IL

ET

1D

-1

(1 1)

/TO

IL

ET

1D

-1

(1 1)

TRIAGE

1D-133

(3) 94 SQ. FT.

CORRIDOR

C 1 11

(11) ###########

/VA

C

AN

T

1D -1

(3

S Q

. F T.

OFFICE

1D-102

(3) 56 SQ. FT./

OFFICE

1D-103

(3) 78 SQ. FT.

D O

C U

M

ED

1D -1

(3

S Q

. F T.

CORRIDOR

1D-100A

(3) 119 SQ. FT.

OFFICE

1D-105

(3) 68 SQ. FT.

SECLUSION BH

1D-106

(3) 129 SQ. FT.

CORRIDOR

C 1 9

(11) ############

HAC

1D-128

(3) 25 SQ. FT.

107-60

(34) 27 SQ. FT.

DRESSING 1

109-60

(34) 45 SQ. FT.

RESTROOM

108-60

(9) 52 SQ. FT.

EGRESS CORRIDOR

103-60

(11) ###########

M R

I A C

C

ES

S C

O R

R

ID

O R

RTLS

1D

IP CAMERA

1D

WAP

1D

RTLS

1D

WAP

1D

IP CAMERA

1D

IP CAMERA

1D

WAP

1D

TELEMETRY

1D

RTLS

1D

IP CAMERA

1D

IP CAMERA

1D

IP CAMERA

1D

WAP

1D

WAP

1D

TELEMETRY

1D

WAP

1D

TELEMETRY

1D

RTLS

1D

TELEMETRY

1D

TELEMETRY

1D

IP CAMERA

1D

IP CAMERA

1D

IP CAMERA

1D

IP CAMERA

1D

RTLS

1D

IP CAMERA

1D

WAP

1D

WAP

1D

WAP

1D

TELEMETRY

1D

RTLS

1D

IP CAMERA

1D

TELEMETRY

1D

TELEMETRY

1D

WAP

1D

IP CAMERAS

2D

ENTRANCE

EMERGENCY

ON-CALL

POLICE/SECURITY

REHAB

BED ICU

SERVING ZONE 1C-102A-53

SERVING ZONE 1C-102A-53

Department of Veteran Affairs

TN-21

BUILDING 53 - FIRST FLOOR - AREA C - DEMOLITION

SCALE: 1/8" = 1'-0"

TN-47

TN-22

TN-22

TN

-21

TN

-20

TN

-20

TN-21

DRAWING NOTES

IP CAMERAS SERVED BY THE TERMINATIONS

SHOWN ARE LOCATED UNDER AWNING ON THE

EXTERIOR OF THE ENTRANCE. CABLES ENTER

FACILITY THROUGH ENTRY VESTIBULE 1D-120.

A B C

D E F

G

KEY PLAN

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS.

ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg

MULTIMEDIA

(15) 30 SQ. FT.

OFFICE

1C146A4-1

(32) 143 SQ. FT. OFFICE

O&P PATIENT

1D-159

(32) 163 SQ. FT.

OFFICE

EQUIPMENT

1D-157A1

(33) 232 SQ. FT./

TOILET

1D-154A

(3) 190 SQ. FT.

TOILET

1D-156A

(3) 190 SQ. FT.

HAC

1D-156B

(3) 63 SQ. FT.

VESTIBULE

1D-156

(3) 51 SQ. FT.

VESTIBULE

1D-154

(3) 49 SQ. FT.

WORK

1D-157A

(33) 229 SQ. FT.

ORTHOTIC LAB

1D-157

(33) 185 SQ. FT.

EGRESS CORRIDOR

102-60

(11) ###########

LOBBY

1A-100

(11) ############

COFFEE SHOP

1D-106

(7) 145 SQ. FT.

STORAGE

1D-106A

(7) 65 SQ. FT.

ELEV LOBBY

1A-100A

(11) ###########

PASS ELEV

1A-100A2

(11) ##########

PASS ELEV

1A-100A1

(11) ##########

STAIRWELL

1A-ST1

(11) ###########

TOILET

1A-102

(11) ##########

CORRIDOR

C 1 1

(11) ###########

TOILET

1A-101

(11) ########## /TE

LE

1A -1

(3

4)

S Q

. F T.

VESTIBULE

1A-103

(11) ##########

SERVICE ELEV

1A-100B1

(11) ###########

ELEV LOBBY

1A-100B

(11) ###########

SERVICE ELEV

1A-100B2

(11) ###########

SERVICE ELEV

1A-100B3

(11) ###########

VA POLICE PIV

1A-104

(31) 233 SQ. FT. /

CORRIDOR

C 1 2

(11) ###########

HAC

1A-106

(11) ########## /

ELEC

1A-107

(11) ##########

OMNICELL

1D-110

(3) 110 SQ. FT.

CORRIDOR

1D-100B1

(3) 287 SQ. FT.

EXAM 3

1D-112

(3) 133 SQ. FT.

EXAM 4

1D-113

(3) 132 SQ. FT.

EXAM 5

1D-114

(3) 132 SQ. FT. /

EXAM 6

1D-115

(3) 205 SQ. FT.

SOILED

1D-116

(3) 63 SQ. FT.

OFFICE

1B-119

(31) 208 SQ. FT./

OFFICE

1B-119A

(15) 128 SQ. FT.

OFFICE

1B-119B

(15) 128 SQ. FT.

ENTRY

(31) 62 SQ. FT.

C O

R R

ID

O

R C

(1 5)

SQ

. F

T.

CONFERENCE

1B-120

(15) 534 SQ. FT.

COFFEE

1B-120A

(15) 63 SQ. FT.

STORAGE

1B-120B

(15) 79 SQ. FT.

EV

ID

EN

C

E

LO

C

KE

R 1B

-1

(3 1)

S

Q . F

T.

OFFICE

1B-118

(31) 197 SQ. FT.

OFFICE

1B-102

(21) 160 SQ. FT.

OFFICE

1B-101

(21) 109 SQ. FT.

OFFICE

1B-100

(21) 97 SQ. FT.

OFFICE

1B-104

(21) 462 SQ. FT.

OFFICE

1B-107

(21) 430 SQ. FT.

OFFICE

1B-106

(21) 143 SQ. FT.

STORAGE

1B-108

(21) 13 SQ. FT. /

COAT

1B-111

(21) 25 SQ. FT.

OFFICE

1B-103

(21) 89 SQ. FT.

OFFICE

1B-113

(21) 114 SQ. FT. /

OFFICE

1B-114

(21) 114 SQ. FT.

OFFICE

1B-116

(21) 120 SQ. FT.

OFFICE

1B-112

(21) 748 SQ. FT.

OFFICE

1B-112A

(21) 989 SQ. FT.

OFFICE

1B-127

(15) 129 SQ. FT.

CLERICAL

1B-126

(15) 380 SQ. FT.

FILE/WORK

1B-128

(15) 98 SQ. FT.

OFFICE

1B-129

(15) 160 SQ. FT.

KITCHEN

1B-124

(15) 80 SQ. FT.

OFFICE

1B-131

(15) 231 SQ. FT.

/EL

EC

1B -1

(1

5)

S Q

. F T.

C

LE

R

IC

AL

1B

-1

(1 5)

S

Q . F

T.

TOILET

1B-134A

(15) 54 SQ. FT.

OFFICE

1B-134

(15) 375 SQ. FT.

OFFICE

1B-136

(15) 231 SQ. FT.

CORRIDOR

C 1 5

(15) 760 SQ. FT.

CONFERENCE

1B-122

(15) 323 SQ. FT.

COPY

1B-144

(15) 80 SQ. FT.

CLERICAL

1B-142

(15) 379 SQ. FT.

ST

O

R

AG

E 1B

-1

D (1

5)

S Q

. F T.

C O

R R

ID

O

R C

(1 5)

SQ

. F

T.

STORAGE

1B-146

(15) 63 SQ. FT.

OFFICE

1B-121C

(15) 154 SQ. FT. /

OFFICE

1B-121A

(15) 135 SQ. FT.

STORAGE

1B-121B

(15) 60 SQ. FT./

STORAGE

1B-121C1

(15) 68 SQ. FT.

C O

R R

ID

O

R C

(1 5)

SQ

. F

T.

STORAGE

1B-126A

(15) 64 SQ. FT.

CORRIDOR

1B-121

(15) 276 SQ. FT.

C O

R R

ID

O

R C

(1 5)

SQ

. F

T.

STORAGE

1A-109

(33) 140 SQ. FT.

STORAGE

1B-159

(33) 110 SQ. FT.

WAITING

1B-166

(33) 506 SQ. FT.

TOILET

1B-162

(33) 39 SQ. FT.

OFFICE

1B-157A

(33) 135 SQ. FT.

STORAGE

1B-157

(33) 127 SQ. FT.

STORAGE

1B-158

(33) 157 SQ. FT. /

STORAGE

1B-158A

(33) 28 SQ. FT.

STORAGE

1B-164A

(33) 32 SQ. FT.

OFFICE

1B-164

(33) 137 SQ. FT. /

OFFICE

1B-163

(33) 171 SQ. FT.

MECHANICAL

1C-100

(11) ############

IT/PHONE

1C-100A

(11) ##########

FILE/LOUNGE

1B-149

(25) 333 SQ. FT.

OFFICE

1B-148

(25) 130 SQ. FT.

CORRIDOR

C 1 7

(25) 435 SQ. FT.

OFFICE

1B-156

(25) 143 SQ. FT.

OFFICE

1B-154

(25) 96 SQ. FT.

OFFICE

1B-147

(25) 91 SQ. FT.

OFFICE

1B-153

(15) 164 SQ. FT.

TOILET

1B-151

(25) 73 SQ. FT.

OFFICE/CONF

1B-152

(25) 339 SQ. FT.

STORAGE

1B-152A

(25) 62 SQ. FT.

OFFICE

1B-153A

(15) 155 SQ. FT.

OFFICE

1B-139

(15) 130 SQ. FT.

FILE/WORK

1B-138

(15) 98 SQ. FT.

OFFICE

1B-137

(15) 160 SQ. FT.

INFORMATION

1A-110

(15) 164 SQ. FT.

WHOLE BUILDING

B60

(44) ############

MRI SHELL SPACE

123-60

(34) 507 SQ. FT.

EQ

U

IP

R

O O

M S

H

EL

L

4-

(3 4)

SQ

. F

T.

CONTROL ROOM

120-60

(34) 396 SQ. FT.

MRI EQUIP ROOM

122-60

(34) 240 SQ. FT.

MRI SCAN ROOM 1

121-60

(34) 480 SQ. FT.

RESTROOM

119-60

(9) 53 SQ. FT./

RADIOLOGIST

118-60

(34) 88 SQ. FT.

HAC

116-60

(17) ##########

RECEPTION

114-60

(34) 188 SQ. FT.

INPATIENT HOLDING

117-60

(34) 104 SQ. FT.

LOBBY/WAITING

105-60

(34) 368 SQ. FT.

FERRO QUARANTINE

107-60

(34) 27 SQ. FT.

STO

R

AG

E

115-60 (34)

29 SQ

. FT.

O U

TP

AT

IE

N

T

SC

R

EE

N

IN

G

6-

(3 4)

SQ

. F

T.

INPATIENT TRANSFER

113-60

(34) 178 SQ. FT.

STAFF

112-60

(34) 58 SQ. FT.

DRESSING 3

111-60

(34) 45 SQ. FT.

DRESSING 2

110-60

(34) 45 SQ. FT.

DRESSING 1

109-60

(34) 45 SQ. FT.

RESTROOM

108-60

(9) 52 SQ. FT.

ENTRANCE

104-60

(11) ##########

EGRESS CORRIDOR

103-60

(11) ###########

EG

R

ES

S

C O

R R

ID

O

R

2-

(1 1)

M R

I A C

C

ES

S C

O R

R

ID

O R

1-

(1

1)

CORRIDOR

(11) ###########

STORAGE

(33) 159 SQ. FT.

OFFICE

(33) 87 SQ. FT.

OFFICE

(33) 43 SQ. FT.

OFFICE

(21) 71 SQ. FT.

WM

RTLS

WAP

1D

WAP

1D

TELEMETRY

1D

WAP

1D

WM

WAP

1D

WAP

1D

TELEMETRY

1D

RTLS

1D

IP CAMERA

1D

IP CAMERA

1D

WAP

1D

WAP

1D

IP CAMERA

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

IP CAMERA

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

IP CAMERA

1D

WAP

1D

WAP

1D

F.E.C.

T

ST

O

R

AG

E

PFV

4.

D M

LL

R

KC

^9

1^

ST

O

R

AG

E

P FV

4.

D M

LL

R

KC

^9

1^

F.E.C.

F.E.C.

F.E.C.

EMS

SERVING ZONE: 1C-102A-53

SERVING ZONE: 1C-100A-53

SERVING ZONE: 1C-100A-53

Department of Veteran Affairs

TN-47

TN-21

TN-22

TN-22

BUILDINGS 53, 60 - FIRST FLOOR - AREA D - DEMOLITION

SCALE: 1/8" = 1'-0"

TN-21

TN-22

SERVING ZONE: 1C-102A-53

A B C

D E F

G

KEY PLAN

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS.

DRAWING NOTES

EXISTING 12"X6" CABLE TRAY SYSTEM.1

ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg ftp://image.autodesk.com/drawing/SEWING_MACHINE.dwg

ELECTRICAL

1E10-1

(18) 585 SQ. FT.

ELECTRICAL

1E09-1

(18) 278 SQ. FT.

ELEV EQUIP

1E11-1

(18) 60 SQ. FT.

LINEN PREP

1E06A-1

(24) 154 SQ. FT.

STORAGE

1E06B-1

(24) 126 SQ. FT.

/H

AC

1E

-1 (2

4)

S Q

. F T.

ST

ER

IL

E

PR

O

C

ES

SI

N

G S

ER

VI

C E

STERILE PROCESSING SERVICE

1E01-1

(37) 1153 SQ. FT.

ELEC

1E01A-1

(37) 44 SQ. FT.

CLEAN UTILITY

1E08-1

(37) 1111 SQ. FT.

/H

AC

1E

B-

(3 7)

S

Q . F

T.

/EL

EC

1E

C -1

(3 7)

S

Q . F

T.

SOILED UTILITY

1E03-1

(37) 214 SQ. FT.

C O

R R

ID

O

R

(3 7)

SQ

. F

T.

STAFF TOILET

1E04-1

(37) 149 SQ. FT.

STAFF TOILET

1E05-1

(37) 147 SQ. FT.

GENERAL STORAGE

1E06-1

(37) 3003 SQ. FT.

D U

M

BW

AI

TE

R

S

Q . F

T.STAIRWELL

C O

R R

ID

O

R 1E

C

-1 (1

1)

CORRIDOR

1EC10A-1

(11) ###########

RETAIL

1EC11-1

(7) 303 SQ. FT.

STAIRWELL

152-24

(11) ###########

ELEVATOR

1BP6-1

(11) ########### /

ELEVATOR

1BSE2-1

(11) ##########

ELEVATOR

1BSE3-1

(11) ##########

LOBBY

1B100B-1

(11) ###########

CORRIDOR

1EC6-1

(11) ###########

DISHWASHER

101-24

(7) 118 SQ. FT.

CANTEEN STORAGE

114-24

(7) 179 SQ. FT.

CORRIDOR

100-24

(11) ########### / 113-24

(9) 92 SQ. FT.

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

RTLS

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

TELEMETRY

1D

SPS

SURGERY

PRIMARY

CARE

ENGINEERING

ENGINEERING

SERVING ZONE: 1C08-1

SERVING ZONE: 112-24

TN-23

BUILDING 1 - FIRST FLOOR - AREA E - DEMOLITION

SCALE: 1/8" = 1'-0"

TN-24

TN-24

TN

-22

TN

-23

TN

-22

TN

-23

TN

-19

TN-20

TN

-19

Department of Veteran Affairs

TN

-23

TN-20

SERVING ZONE: 1C08-1

A B C

D E F

G

KEY PLAN

DRAWING NOTES

EXISTING UNDER FLOOR PENETRATION BETWEEN

BUILDING 1 AND BUILDING 52. REFER TO DRAWING

TN-18 FOR MORE INFORMATION.

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS.

ELECTRICAL

1E09-1

(18) 278 SQ. FT.

LINEN PREP

1E06A-1

(24) 154 SQ. FT.

STORAGE

1E06B-1

(24) 126 SQ. FT.

S

Q . F

T.

S

Q . F

T.

RETAIL

1EC11-1

(7) 303 SQ. FT.

STAIRWELL

152-24

(11) ###########

ELECTRICAL

B26

271 SQ. FT.

WHOLE FLOOR

B26

(44) ###########

WHOLE BUILDING

B24

(44) ############

/ST

AI

R S

1S 3-

(1

1)

DINING AREA

103-24

(7) 1646 SQ. FT.

FOOD SERVICE AREA

103B-24

(7) 272 SQ. FT.

FOOD PREP AREA

103A-24

(7) 376 SQ. FT.

KITCHEN

102-24

(7) 278 SQ. FT.

DISHWASHER

101-24

(7) 118 SQ. FT.

CANTEEN STORAGE

114-24

(7) 179 SQ. FT.

CORRIDOR

100-24

(11) ########### /

W PUBLIC RESTROOM

113-24

(9) 92 SQ. FT.

OFFICE

108-24

(7) 299 SQ. FT.

IRM

112-24

(7) 34 SQ. FT.

CORRIDOR

100A-24

(11) ###########

DRY FOOD STORAGE

104-24

(7) 270 SQ. FT.

/H

AC

0-

(1

7)

/EL

EC

9-

(1

1)

SERVICE ELEV

1SE-24

(11) ##########

STAIRS

1S4-24

(11) ###########

RETAIL STORAGE

105-24

(7) 660 SQ. FT.

VESTIBULE

106-24

(7) 62 SQ. FT.

CORRIDOR

100A1-24

(11) ###########

RETAIL STORE

107-24

(7) 1396 SQ. FT.

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

TELEMETRY

1D

WAP

1D

IP CAMERA

1D

WAP

1D

WAP

1D

WAP

1D

IP CAMERA

1DTELEMETRY

1D

IP CAMERA

1D

IP CAMERA

1D

WAP

1D

ENGINEERING

SERVING ZONE: 1C08-1

SERVING ZONE: 112-24

SERVING ZONE: 112-24

Department of Veteran Affairs

TN-24

BUILDING 24 - FIRST FLOOR - AREA F - DEMOLITION

SCALE: 1/8" = 1'-0"

TN-23

TN-24

TN-23

TN-24

TN-47

A B C

D E F

G

KEY PLAN

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

B22

(44) ############

STAIRWELL

1S5-22

(11) ###########

COMPUTER LAB

(16) 595 SQ. FT.

LIBRARY

104-22

(16) 956 SQ. FT.

WORK AREA

(16) 234 SQ. FT.

/TE

LE

4E

-2

(1 6)

S

Q . F

T.

OFFICE, CHIEF

104A1-22

(16) 153 SQ. FT.

OFFICE

104A-22

(16) 248 SQ. FT.

OFFICE

104A2-22

(16) 211 SQ. FT.

TRAINING ROOM

102-22

(16) 373 SQ. FT.

STORAGE

101A-22

(16) 150 SQ. FT.

STORAGE

101-22

(16) 136 SQ. FT.

C O

R R

ID

O

R 1C

1-

(1 1)

/M

EC

H

7B -2

(1

6)

S Q

. F T.

IT

107A-22

(11) ##########/

MECH

107-22

(11) ##########

CORRIDOR

1C2-22

(11) ###########

COMPUTER ROOM

106-22

(23) 661 SQ. FT.

OFFICE

105-22

(23) 202 SQ. FT.

ELEVATOR

1P6-22

(11) ##########

TOILET M

104C-22

(16) 108 SQ. FT.

TOILET F

104B-22

(16) 28 SQ. FT.

COMPUTER LAB

(16) 283 SQ. FT.

STAIRWELL

1S1-22

(11) ###########

ST

AI

R W

EL

L

1S 2-

(1

1)

ST

AI

R W

EL

L

1S 3-

(1

1)

# /H

AC

4C

1-

(1 6)

S

Q . F

T.

WAP

1D

WAP

1D

SERVING ZONE: 104E-22

OFFICE

105-22

(23) ###########

SERVING ZONE: 104E-22

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

Department of Veteran Affairs

TN-25

BUILDING 22 - FIRST FLOOR - AREA G - DEMOLITION

SCALE: 1/8" = 1'-0"

TN-47

TN-48

TN-19

TN-25

TN

-25

TN

-24

A B C

D E F

G

KEY PLAN

DRAWING NOTES

(2) EXISTING 4" CONDUITS EACH WITH (2) 1.25"

INNERDUCTS.

(2) EXISTING 4" FLEX CONDUITS EXTENDING FROM

106-22 TO 107A-22

(2) EXISTING 4" CONDUIT SLEEVES LOCATED AT

FLOOR LEVEL.

EXISTING 9" W x 6" D CABLE TRAY ABOVE LAY-IN

CEILING. APPROXIMATELY 27" OF CLEARANCE

ABOVE LAY-IN CEILING TILE.

CONTRACTOR TO INCLUDE REMOVAL AND

REPLACEMENT OF (18) ADDITIONAL CATEGORY

CABLES IN SERVING ZONE, NOT SHOWN ON

DRAWINGS. CABLING HAS PURPLE JACKET,

INSTALLATION HAD NOT BEEN COMPLETE AT TIME

OF DRAWING.

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS.

B1

(44) 46658 SQ. FT.

STAIRWELL

2BS5-1

(11) ###########

TOILET

2B38-1

(34) 66 SQ. FT.

CORRIDOR

2BC4F-1

(34) 113 SQ. FT.

CAMERA TWO

2B37-1

(34) 449 SQ. FT.

WAITING

(34) 90 SQ. FT.

HOUSEKEEPING

MECHANICAL

2B39-1

(34) 121 SQ. FT. /

CAMERA ONE

2B36-1

(34) 327 SQ. FT.

INJECTION

2B40-1

(34) 135 SQ. FT.

HOT LAB

2B40A-1

(34) 150 SQ. FT.

C O

R R

ID

O

R 2B

C 4E

-1 (3

4)

SQ

. F T.

SERVICE CHIEF

2B35-1

(34) 158 SQ. FT.

OFFICE

2B34-1

(34) 164 SQ. FT.

MULTIPURPOSE

2B41-1

(34) 150 SQ. FT.

TOILET M

2B49-1

(11) ###########

C O

R R

ID

O

R 2B

C 4A

-1 (1

1)

STAIRWELL

2BS4-1

(11) ###########

(34)

DOWNING

2B54-1

(15) 1259 SQ. FT.

CLOSET

2B54B-1

(15) 38 SQ. FT.

OFFICE

2B53-1

(38) 241 SQ. FT.

C O

R R

ID

O

R 2B

C

-1 (1

1)

CLOSET

2B54A-1

(15) 54 SQ. FT.

OFFICE

2B50-1

(25) 311 SQ. FT./

OFFICE

2B51-1

(25) 166 SQ. FT. /

C O

R R

ID

O

R 2B

C

A-

(1 1)

CORRIDOR

2BC4B-1

(11) ###########

CORRIDOR

2BC4D-1

(11) ###########

WAITING

2B33-1

(34) 144 SQ. FT./

LOBBY

2BC4C-1

(11) ###########

ELEVATOR

2BP6-1

(11) ###########

ELEVATOR

2BSE3-1

(11) ##########

ELEVATOR

2BSE2-1

(11) ##########

D

IR

. R

ES

ER

VE

2B C

4C -1

(1 1)

OFFICE

2B32-1

(25) 284 SQ. FT./

OFFICE

2B31-1

(25) 148 SQ. FT./

OFFICE

2B30-1

(25) 128 SQ. FT./O

FF

IC

E

2B

-1 (1

0)

S Q

. F T.

STAIRWELL

2BS3-1

(11) ###########

ELEVATOR

2BP2-1

(11) ##########

ELEVATOR

2BP1-1

(11) ##########

CORRIDOR

200C-1

(11) ###########

ELEC EQUIP

238-1

(11) ##########

OFFICE

239B1-1

(42) 168 SQ. FT.

OFFICE

2B52-1

(38) 236 SQ. FT.

OFFICE

239B-1

(42) 121 SQ. FT.

WAITING

239-1

(11) ###########

IT

9A -1

(1 1)

OFFICE

240-1

(42) 135 SQ. FT./

OFFICE

241-1

(42) 154 SQ. FT./

OFFICE

241A-1

(42) 144 SQ. FT.

CORRIDOR

(11) ###########

IS

O

O

FF

IC

E

7-

(3

9)

SQ

. F T.

PU

BL

IC

T

O

IL

ET

F

6-

(1

1)

PU

BL

IC

T

O

IL

ET

M

5-

(1

1)

C H

AP

LA

IN

O

FF

IC

E

4-

(1 0)

SQ

. F

T.

DENTAL WAITING

243-1

(12) 199 SQ. FT.

SECRETARY OFFICE

242T-1

(12) 204 SQ. FT.

CHIEF OFFICE

242S-1

(12) 172 SQ. FT.

DENTAL HYGIENE

242R-1

(12) 430 SQ. FT.

CORRIDOR

200A1-1

(12) 380 SQ. FT.

OPERATORY 1

242A-1

(12) 130 SQ. FT./

OPERATORY 2

242B-1

(12) 133 SQ. FT.

ORAL SURGERY

242C-1

(12) 174 SQ. FT.

SOILED UTILITY

242E-1

(12) 52 SQ. FT.

CLEAN

242F-1

(12) 63 SQ. FT.

242G-1

(12) 67 SQ. FT.

SUPPLY

242H-1

(12) 117 SQ. FT.

STAIRWELL

2AS1-1

(11) ###########/

CORRIDOR

200A2-1

(12) 675 SQ. FT./

DENTAL LAB

242N-1

(12) 384 SQ. FT.

TOILET F

242O-1

(12) 104 SQ. FT.

HAC

242P-1

(12) 44 SQ. FT.

STAIRWELL

2AS2-1

(11) ###########

OPERATORY 3

242I-1

(12) 133 SQ. FT.

OPERATORY 4

242J-1

(12) 127 SQ. FT.

OFFICE

242K-1

(12) 149 SQ. FT.

AO OFFICE

242L-1

(12) 72 SQ. FT.

HYGENE OPERATORY

242L1-1

(12) 131 SQ. FT.

X-RAY

242M-1

(12) 103 SQ. FT.

STORAGE

(12) 49 SQ. FT.

WM

WM

WM

WM WM

WM

WM

SERVING ZONE: 239A-1

WAP

1D

WAP

1D

WAP

1D

TELEMETRY

1D

WAP

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

PP

WAP

1D

RTLS

1D

WAP

1D WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

RTLS

1D

RTLS

1D

TELEMETRY

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

TELEMETRY

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

SERVING ZONE: 239A-1 SERVING ZONE: 2C25-1

TN-26

BUILDING 1 - SECOND FLOOR - AREA A - DEMOLITION

SCALE: 1/8" = 1'-0"

TN-26

TN-31TN-31

TN

-27

TN

-26

TN

-27

Department of Veteran Affairs

TN-48

TN-26

A B C

DE

F

KEY PLAN

DRAWING NOTES

EXISTING 12" "I" BEAM TYPE CABLE SUPPORT

SYSTEM ABOVE DROP CEILING.

(4) EXISTING 4" CABLING SLEEVES THOUGH WALL.

EXISTING MIX OF 9" W CABLE TRAY, J-HOOK, AND

I-BEAM CABLING SUPPORT SYSTEMS ROUTED

THOUGH HALLWAY ABOVE LAY-IN CEILING.

(4) EXISTING 4" CABLING SLEEVE THOUGH WALL

ABOVE LAY-IN CEILING.

(4) EXISTING 4" CONDUITS CONTAINING BACKBONE

COPPER CABLING.

(4) EXISTING 4" SLEEVES THROUGH FLOOR.

REMOVE EXISTING CATEGORY CABLE SERVING

EXTERIOR MOUNTED VIDEO SURVEILLANCE

CAMERA. REUSE PATHWAY FOR INSTALLATION OF

NEW CATEGORY 6A CABLE SHOWN ON NEW WORK

PLANS.

EXISTING (NEW) 12" x 6" CABLE TRAY SYSTEM.

(8) EXISTING (New) 1-1/2" EMT CONDUITS TIED INTO

THE CABLE TRAY SYSTEM.

(1) EXISTING (New) 1-1/2" EMT CONDUIT TIED INTO

THE CABLE TRAY SYSTEM.

EXISTING EXTERIOR IP CAMERA LOCATED ON SIDE

OF THE BUILDING AT THE TOP OF THE WINDOW

(COMMUNICATIONS CABLING ROUTED IN FLEX

DUCT AND EMT CONDUIT. CONTRACTOR TO REUSE

EXISTING CABLE PATH FOR NEW CABLE

INSTALLATION.).

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS.

B. DUE TO LIMITED/CONGESTED ABOVE CEILING

SPACE IN THIS AREA, IT IS RECOMMENDED THE

CONTRACTOR REMOVE CABLING SHOWN ON

DEMOLITION PLANS FROM EXISTING CABLE TRAY

SYSTEM TO SUPPORT NEW CABLE INSTALLATION.

9 9

EF

F

VF

D OF

LR

HOUSEKEEPING

2C17-1

(34) 57 SQ. FT.

ELEC

2C25A-1

(34) 49 SQ. FT.

C O

R R

ID

O

R 2C

C

A-

(1 1)

TELE

2C25-1

(34) 58 SQ. FT.

PR

IV

AC

Y

O

FF

IC

ER

2C

B-

(1 5)

SQ

. F

T.

OPHTHALMOLOGY WAITING AREA

2C28-1

(32) 250 SQ. FT.

M

EC

H

AN

IC

AL

2C

-1 (3

4)

S Q

. F T.

C O

R R

ID

O

R 2C

C

A-

(3 4)

SQ

. F

T.

/O

FF

IC

E

2C

-1 (3

4)

SQ

. F T.

BREAK

2C21-1

(34) 128 SQ. FT.

FI

LE

S

TO

R

AG

E 2C

-1

(3 4)

S

Q . F

T.

X- R

AY

S

TO

R

AG

E

(3

4)

SQ

. F T. /

MECHANICAL

2C20-1

(34) 86 SQ. FT.

PACS

2C19-1

(18) 95 SQ. FT.

OFFICE

(34) 55 SQ. FT.

OFFICE

2C18-1

(34) 149 SQ. FT.

OFFICE

2C16-1

(34) 131 SQ. FT.

GEN STORAGE

2C15-1

(34) 137 SQ. FT. /

KITCHEN

2C14A-1

(34) 137 SQ. FT.

CORRIDOR

2CC15A-1

(34) 867 SQ. FT.

C O

R R

ID

O

R 2C

A-

(3

4)

S Q

. F T.

OFFICE

2C12-1

(34) 136 SQ. FT.

PACS CONTROL

2C19A-1

(18) 379 SQ. FT.

X-RAY

2C13-1

(34) 258 SQ. FT.

EXAM/TREATMENT

2C14-1

(34) 216 SQ. FT.

X-RAY

2C31-1

(34) 256 SQ. FT.

TOILET M

2C31B-1

(34) 38 SQ. FT.

CONTROL

2C30B-1

(34) 238 SQ. FT.

C O

R R

ID

O

R 2C

C

A-

(3 4)

SQ

. F

T.

CORRIDOR

2CC36-1

(34) 732 SQ. FT.

CT SCAN #2

2C38-1

(34) 333 SQ. FT. /

CT SCAN #1

2C39-1

(34) 416 SQ. FT.

DRESSING

2C32A-1

(34) 67 SQ. FT.

/TO

IL

ET

2C

A-

(3

4)

S Q

. F T.

D R

ES

SI

N G

2C

A-

(3 4)

S

Q . F

T.

C O

R R

ID

O

R 2C

C

B-

(3 4)

S

Q . F

T.

TOILET M

2C32-1

(34) 49 SQ. FT. /

TO

IL

ET

M

2C

-1 (3

4)

S Q

. F T.

DRESSING

2C33A-1

(34) 42 SQ. FT.

CORRIDOR

2CC36C-1

(34) 160 SQ. FT.

DRESSING

2C34A-1

(34) 51 SQ. FT.

TOILET F

2C34-1

(34) 71 SQ. FT. /

TOILET F

2C35-1

(34) 62 SQ. FT.

DRESSING

2C35A-1

(34) 44 SQ. FT.

C O

R R

ID

O

R 2C

C

E-

(3 4)

SQ

. F

T. /

DRESSING

2C04C-1

(34) 46 SQ. FT.

DRESSING

2C04B-1

(34) 46 SQ. FT.

DRESSING

2C04A-1

(34) 45 SQ. FT.

CONFERENCE

2C02-1

(34) 401 SQ. FT.

C O

R R

ID

O

R 2C

C 1A

-1 (3

4)

SQ

. F T.

X-RAY

2C04-1

(34) 302 SQ. FT./

X-RAY

2C06-1

(34) 365 SQ. FT.

X-RAY

2C09-1

(34) 377 SQ. FT./

X-RAY

2C11-1

(34) 350 SQ. FT.

CORRIDOR

2C10A-1

(34) 128 SQ. FT.

PLATE READER

2C10-1

(34) 44 SQ. FT.

STORAGE

2C08-1

(34) 92 SQ. FT.

OFFICE

2C07-1

(34) 256 SQ. FT.

CORRIDOR

2CC3A-1

(34) 232 SQ. FT.

OFFICE

2C03-1

(34) 260 SQ. FT. /

OFFICE

2C02A-1

(34) 161 SQ. FT.

LAB STORAGE

2C01-1

(34) 691 SQ. FT.

OFFICE

2C58B-1

(29) 95 SQ. FT.

OFFICE

2C52I-1

(29) 130 SQ. FT. /

LAB

2C52H-1

(29) 300 SQ. FT. /

OFFICE

2C52G-1

(29) 128 SQ. FT. /

BREAK

2C52F-1

(29) 215 SQ. FT. /

LAB

2C52E-1

(29) 326 SQ. FT.

CORRIDOR

2CC58A-1

(29) 470 SQ. FT.

LAB

2C52K-1

(29) 937 SQ. FT.

LAB

2C52-1

(29) 2136 SQ. FT.

LAB

2C55J-1

(29) 119 SQ. FT.

LAB

2C55A2-1

(29) 96 SQ. FT.

HOUSEKEEPING

2C58-1

(29) 25 SQ. FT.

U N

IS

EX

T O

IL

ET

2C

-1 (2

9)

S Q

. F T.

U N

IS

EX

T O

IL

ET

2C

-1 (2

9)

S Q

. F T.

WAITING

2C56A-1

(29) 600 SQ. FT.

FILE

2C01-1

(34) 744 SQ. FT.

CORRIDOR

2CC36D-1

(34) 440 SQ. FT.

CONTROL

2C43-1

(34) 137 SQ. FT.

WAITING

2C43A-1

(34) 264 SQ. FT.

C O

R R

ID

O

R 2C

C

B-

(1 1)

FILE STORAGE

2C45-1

(34) 305 SQ. FT.

ELEVATOR

2CP5-1

(11) ###########

C O

R R

ID

O

R 2C

C

A-

(1 1)

STAIRWELL

2CS9-1

(11) ###########

ELEC

2C54-1

(29) 65 SQ. FT.

LAB

2C53A-1

(29) 127 SQ. FT.

LAB

2C53-1

(29) 415 SQ. FT.

LAB

2C55A1-1

(29) 79 SQ. FT.

LAB

2C55A-1

(29) 265 SQ. FT.

LAB

2C55-1

(29) 135 SQ. FT.

C O

R R

ID

O

R 2C

C

A-

(1 1)

OFFICE

2C52A-1

(29) 188 SQ. FT.

AUTOCLAVE

2C52D-1

(29) 173 SQ. FT.

LAB SUPPLY

2C60-1

(29) 125 SQ. FT.

CONFERENCE

2C61-1

(29) 268 SQ. FT./

CHIEF OFFICE

2C50A-1

(29) 254 SQ. FT./

OFFICE

2C50-1

(29) 230 SQ. FT./

OFFICE

2C49-1

(29) 174 SQ. FT./

OFFICE

2C48-1

(29) 154 SQ. FT./

TELEHEALTH OFFICE

2C47-1

(32) 228 SQ. FT.

CORRIDOR

2CC45A-1

(11) ###########

TE

LE

H

EA

LT

H

O

FF

IC

E

2C

-1 (3

2)

SQ

. F T.

OFFICE

2C45-1

(32) 139 SQ. FT./

EXAM

2C44A-1

(34) 150 SQ. FT.

OFFICE

2C44-1

(34) 160 SQ. FT.

TO

IL

ET

M

2C

-1 (1

1)

DUMBWAITER

2CDW-1

(38) 54 SQ. FT.

ELEVATOR

2CP3-1

(11) ##########

STAIRWELL

2CS6-1

(11) ###########

CORRIDOR

2CC45-1

(11) ############

UNISEX TOILET

2C40-1

(11) ########## /

STORAGE

2C41-1

(43) 38 SQ. FT./

ELEV LOBBY

2CP3A-1

(11) ##########

OFFICE

2C37-1

(32) 122 SQ. FT./

OFFICE

2C30-1

(32) 134 SQ. FT.

EQUIP STORAGE

2EC26A-1

(23) 307 SQ. FT./

EQUIP STORAGE

2EC26-1

(17) 255 SQ. FT.

C&P 2C29A-1

(32) 169 SQ. FT.

C&P 2C27-1

(32) 243 SQ. FT.

C&P 2C26-1

(32) 169 SQ. FT.

MECHANICAL

2E01-1

(11) ###########

OFFICE

2C52B-1

(29) 157 SQ. FT.

OFFICE

2C52C-1

(29) 148 SQ. FT.

CORRIDOR

(29) 51 SQ. FT.

C O

R R

ID

O

R

(2 9)

S

Q . F

T.

ENTRY

2C52E1-1

(29) 21 SQ. FT.

OFFICE

2C52G-1

(29) 148 SQ. FT.

DUMBWAITER

2CDW-1

(37) ##########

CORRIDOR

C IN2 1

(11) ###########

SERVICE ELEV LOBBY

IN2A-100

(11) ###########

LAB STORAGE

IN2A-107

(29) 119 SQ. FT.

SERVICE ELEV

IN2A-100A

(11) ###########

SERVICE ELEV

IN2A-100B

(11) ###########

IN2A-100C

(11) ###########

STAIR

IN2A-ST1

(11) ###########

ELEV

(11) ##########

ELEV

(11) ##########

TOILET

IN2A-102

(11) ##########

TOILET

IN2A-101

(11) ##########

EL

EC

TR

IC

AL

(3 4)

S

Q . F

T.

STORAGE

(29) 29 SQ. FT.

CORRIDOR

(11) ###########

SERVING ZONE: 2C25-1

WAP

WAP

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D WAP

1D

WAP

1D

TELEMETRY

1D

TELEMETRY

1D

RTLS

1D

TELEMETRY

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

RTLS

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

RTLS

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

WAP

1D

TELEMETRY

1D

WAP

1D

WAP

1D

TELEMETRY

1D

RTLS

1D

WAP

1D

IP CAMERA

1D

IP CAMERA

1D

TELEMETRY

1D

IP CAMERA

1D

RTLS

1D

TELEMETRY

1D

WAP

1D

SERVING ZONE: 206A-24

SERVING ZONE: 2C25-1

3 2

WAP

1D

TN-27

BUILDING 1 - SECOND FLOOR - AREA B - DEMOLITION

SCALE: 1/8" = 1'-0"

TN-30TN-30

TN

-28

TN

-27

TN

-28

TN

-27

TN

-26

Department of Veteran Affairs

TN-48

TN

-26 TN-27TN-27

DRAWING NOTES

EXISTING 12" WIDE CABLE TRAY ABOVE LAY-IN

CEILING.

EXISTING 12" WIDE CABLE TRAY BELOW LAY-IN

CEILING.

EXISTING CABLING SLEEVES THOUGH WALL.

EXISTING 9" W CABLE TRAY & J-HOOK SYSTEM

ROUTED THOUGH HALLWAY ABOVE LAY-IN CEILING.

EXISTING I-BEAM SUPPORT & J-HOOK SYSTEM

ROUTED THROUGH HALLWAY ABOVE LAY-IN

CEILING.

EXISTING CABLE PATHWAY THROUGH FIREWALL

LOCATED ABOVE LAY-IN CEILING

MAINTAIN EXISTING 24-STRAND OM4 MULTI-MODE

AND OM1 MULTI-MODE BACKBONE FIBER OPTIC

CABLES FROM THIS SPACE TO SOURCE.

COORDINATE WITH OWNER PRIOR TO ANY

MODIFICATION OF FIBER OR COPPER CABLING

EXTENDING TO/FROM THIS THIS SPACE AS

CRITICAL SURGERY EQUIPMENT IS SERVED FROM

THIS LOCATION.

EXISTING 12" X 6" CABLE TRAY SYSTEM.

(3) EXISTING 1-1/2" EMT CONDUITS TIED INTO THE

CABLE TRAY SYSTEM. CONTRACTOR IS TO

REMOVE A PART OF THE (3) 1-1/2" EMT CONDUITS,

FOR TIE IN TO THE NEW CABLE TRAY SYSTEM

BEING INSTALLED SEE DRAWING # TN-88.

A B C

DE

F

KEY PLAN

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

NOT EXCEED 40% FILL ON EXISTING OR NEW

PATHWAYS.

8 8

SIGNAL CLOSET

IN2C-102

(11) ###########

MECH

IN2D-101

(11) ###########

INTERSTITIAL SPACE

IN2D-100

(11) #############

ALL CABLING IN THIS ZONE

SERVED BY 2C25-1

Department of Veteran Affairs

TN-28

BUILDING 53 - SECOND FLOOR - AREA C - DEMOLITION

SCALE: 1/8" = 1'-0"

TN-29

TN-28

TN-29

TN

-28

TN

-27

TN

-27

A B C

DE

F

KEY PLAN

B53

(44) 41890 SQ. FT.

SIGNAL CLOSET

IN2C-100

(11) ###########

INTERSTITIAL SPACE

IN2B-100

(11) #############

INTERSTITIAL LANDING

IN2C-101

(11) ###########

STAIR

IN2C-ST2

(11) ###########

CORRIDOR

C IN2 1

(11) ###########

SERVICE ELEV LOBBY

IN2A-100

(11) ###########

LAB STORAGE

IN2A-107

(29) 119 SQ. FT.

SERVICE ELEV

IN2A-100A

(11) ###########

SERVICE ELEV

IN2A-100B

(11) ###########

SERVICE ELEV

IN2A-100C

(11) ###########

VOL TRANSPORT

1N2A-103

(43) 250 SQ. FT.

HAC

IN2A-106

(11) ##########

ELEC

IN2A-104A

(11) ##########

INTERSTITIAL ENTRANCE

IN2A-104

(11) ##########

STAIR

IN2A-ST1

(11) ###########

ELEV

(11) ##########

ELEV

(11) ##########

TOILET

IN2A-102

(11) ##########

TOILET

IN2A-101

(11) ##########

STORAGE

(11) 53 SQ. FT.

INTERSTITIAL ENTRANCE

(11) 223 SQ. FT.

IP CAMERA

1D

WAP

1D

WAP

1D

RTLS

1D

TELEMETRY

1D

WAP

1D

ALL CABLING IN THIS ZONE

SERVED BY 2C25-1

Department of Veteran Affairs

TN-29

BUILDING 53 - SECOND FLOOR - AREA D - DEMOLITION

SCALE: 1/8" = 1'-0"

TN-28

TN-29

TN-28

TN-29

A B C

DE

F

KEY PLAN

DRAWING NOTES

LOCATION OF ACCESS TO INTERSTITIAL SPACE.1

GENERAL NOTES

A. CONTRACTOR SHALL REUSE EXISTING CONDUIT

PATHWAY TO THE EXTENT POSSIBLE FOLLOWING

REMOVAL OF EXISTING COMMUNICATIONS CABLING

TO SUPPORT NEW CABLING. CONTRACTOR MUST

EMS

WHOLE BUILDING

B24

(44) 7897 SQ. FT.

CHEMICAL STORAGE

226-24

(27) 89 SQ. FT.

KITCHEN

225-24

(27) 1110 SQ. FT.

FOOD PREP

227-24

(27) 436 SQ. FT.

/H

AC

8-

(1

7)

S Q

. F T.

OFFICE

230-24

(27) 136 SQ. FT.

CORRIDOR

2C22

(27) 235 SQ. FT.

OFFICE

221-24

(27) 206 SQ. FT.

STORAGE

220-24

(27) 23 SQ. FT.

OFFICE

219-24

(27) 219 SQ. FT.

WALK-IN REF

229-24

(27) 152 SQ. FT.

CORRIDOR

2C22

(27) 164 SQ. FT.

CORRIDOR

2C18

(11) ###########/

STAIR

2S2-24

(11) ###########

VACANT

217-24

(27) 94 SQ. FT.

DISH MACHINE

214-24

(27) 710 SQ. FT.

TRAINING

206-24

(27) 298 SQ. FT.

PH

206A-24

(27) 34 SQ. FT.

BREAKR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .