This document is an electrical drawing set (Drawings 76-77 of 77) for the EHRM Infrastructure Upgrades project at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma. The drawings, dated 05/24/2024, are part of a comprehensive electrical system upgrade and include detailed electrical schedules for multiple branch panels across Building 53, featuring circuit mapping, load calculations, and power distribution specifications.

The electrical drawings provide technical details for various panels including 53-DP-TRA, 53-BB-100CA, 53-1B-119BA, 53-3B-100A, 53-4A-109A, and 53-5A-109A. Each panel schedule includes specific information such as voltage (120/208 Wye), amperage ratings, circuit breaker specifications, and detailed circuit descriptions covering equipment like server rack receptacles, cooling units, access control systems, digital power meters, and surge protection devices. The drawings are prepared by DAV Energy Solutions and Spees Design Build, with the project being managed by the Department of Veterans Affairs Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
36C77625R0046 0009.pdf PDF
Attachment 21 - Tech Questions Tracker - FINAL07162025.pdf PDF
Attachment 21 - Tech Questions Tracker - FINAL_07142025.pdf PDF
36C77625R0046 0008.pdf PDF
Attachment to Tech Questions- ASI-001 Mechanical Ductwork Drawings- 20250714.pdf PDF
36C77625R0046 0007.pdf PDF
Attachment 21 - Tech Questions Tracker - 07082025.pdf PDF
Attachment 21 - Tech Questions Tracker - 07022025.pdf PDF
36C77625R0046 0006.pdf PDF
36C77625R0046 0005.pdf PDF
Attachment 16 Muskogee County Wage Rates_06272025.pdf PDF
Attachment 20 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
36C77625R0046 0004.pdf PDF
Attachment 21 - Tech Questions Tracker - 20250623 Partial.pdf PDF
36C77625R0046 0003.pdf PDF
Attachment 19 Site Visit Sign In Sheet 62323700.pdf PDF
36C77625R0046 0002.pdf PDF
36C77625R0046 0001.pdf PDF
Attachment 05 Drawings 4 of 13 Muskogee 623-21-700.pdf PDF
Attachment 17- Limitations on Subcontracting - Muskogee EHRM.pdf PDF
Attachment 08 Drawings 7 of 13 Muskogee 623-21-700.pdf PDF
Attachment 01 - 623-21-700 - Muskogee - Updated Combined Specifications-20250501.pdf PDF
Attachment 03 Drawings 2 of 13 Muskogee 623-21-700.pdf PDF
36C77625R0046_1.pdf PDF
Attachment 04 Drawings 3 of 13 Muskogee 623-21-700.pdf PDF
Attachment 18 Site Map.pdf PDF
Attachment 02 Drawings 1 of 13 Muskogee 623-21-700.pdf PDF
Attachment 16 Muskogee County Wage Rates.pdf PDF
Attachment 07 Drawings 6 of 13 Muskogee 623-21-700.pdf PDF
Attachment 06 Drawings 5 of 13 Muskogee 623-21-700.pdf PDF
Attachment 12 Drawings 11 of 13 Muskogee 623-21-700.pdf PDF
Attachment 14 Drawings 13 of 13 Muskogee 623-21-700.pdf PDF
Attachment 13 Drawings 12 of 13 Muskogee 623-21-700.pdf PDF
Attachment 11 Drawings 10 of 13 Muskogee 623-21-700.pdf PDF
Attachment 09 Drawings 8 of 13 Muskogee 623-21-700.pdf PDF
Attachment 15- PCRA for EHRM 623-700.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

53EP701

ELECTRICAL SCHEDULES

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-53

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 76 of 77

GENERAL NOTES

KEY NOTES

1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY

ALL CHANGES: ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

2. REFERENCE SHEETS EP701 AND EP702 FOR ALL TYPICAL ELECTRICAL SCHEDULES.

3. CONTRACTOR SHALL COORDINATE WITH MANUFACTURER TO PROVIDE

OVERCURRENT PROTECTION AS REQUIRED. ANY DEVIATION FROM BASIS OF DESIGN

EQUIPMENT INCLUDING BUT NOT LIMITED CONDUIT AND WIRE, OVERCURRENT

PROTECTION DEVICE RATING AND QUANTITY SHALL BE PROVIDED AT THE EXPENSIVE

OF THE CONTRACTOR.

Location: BLDG 53, RM 1B-119B Volts: 120/208 Wye A.I.C Rating: 30k

Supply From: 53-DP-TRA Phases: 3 Bus Rating: 225A

Mounting: Surface Wires 4 Main Circuit Breaker: 200A / 3P

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 30 A 3 3333 720 1 20 A 2

3 "" "" 3333 0 1 20 A 4

5 "" "" 3333 0 1 20 A 6

7 30 A 3 3333 0 1 20 A 8

9 "" "" 3333 96 1 20 A 10

11 "" "" 3333 0 1 20 A 12

13 25 A 1 500 500 1 20 A 14

15 20 A 1 0 500 1 20 A 16

17 25 A 2 1409 0 1 20 A 18

19 "" "" 1409 0 20

21 25 A 2 1409 1409 2 25 A 22

23 "" "" 1409 1409 "" "" 24

25 25 A 2 1409 0 1 20 A 26

27 "" "" 1409 1409 2 25 A 28

29 25 A 2 1409 1409 "" "" 30

31 "" "" 1409 100 3 20 A 32

33 20 A 1 0 100 "" "" 34

35 20 A 1 0 100 "" "" 36

37 20 A 1 0 100 3 20 A 38

39 20 A 1 0 100 "" "" 40

41 20 A 1 0 100 "" "" 42

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 2818 125.00% 39827 VA

Other 1600 100.00% 40555 VA

Receptacle 720 100.00% 111 A

Lighting 96 125.00% 113 A

All other Motor 14592 100.00%

20000 100.00%

Notes:

1. DIGITAL POWER METER (DPM) AND SURGE PROTECTION DEVICE (SPD) TO BE INTEGRAL TO PANEL (FACTORY INSTALLED).

Branch Panel: 53-1B-119BA

VA PER PHASE

CIRCUIT DESCRIPTION A B C

SERVER RACK RECEPTACLE SPARE

"" LIGHTING - TR ROOM

"" SPARE

CIRCUIT DESCRIPTION

SERVER RACK RECEPTACLE RECEPTACLES - TR ROOM

"" SPARE

"" SPARE

SPLIT DUCTLESS COOLING UNIT "CU-BB-100C-2" SPLIT DUCTLESS COOLING UNIT "CU-3B-100A-1"

ACCESS CONTROL "53-ACP-1B-119B" / DOOR POWER DDC CONTROLLER

SPARE VAV / TERMINAL UNIT "TU-1B-119B"

SPLIT DUCTLESS COOLING UNIT "CU-BB-100C-1" SPARE

"" DIGITAL POWER METER

SPARE ""

SPARE ""

SPLIT DUCTLESS COOLING UNIT "CU-1B-119B-1" SPARE

"" SPLIT DUCTLESS COOLING UNIT "CU-3B-100A-2"

SPLIT DUCTLESS COOLING UNIT "CU-1B-119B-2" ""

SPARE SPD

SPARE ""

SPARE ""

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

3523 Total Conn. Power Load:

12814 13100 13913

107 109 116

Telecom Rack 20000

120 Total Est. Amperage Demand:

14592

1600 Total Est. Power Demand:

720 Total Conn. Amperage:

PROVIDE (1) 3/4" CONDUIT WITH (2) 12 AWG AND (1) 12 AWG GND TO PROVIDE POWER

TO DDC CONTROLLER. COORDINATE WITH MECHANICAL FOR EXACT LOCATION OF

DDC CONTROLLER.

Location: BLDG 53, RM 3C-100 Volts: 208/120 A.I.C Rating: 30k

Supply From: 53-TR-C-TRA Phases: 3 Bus Rating: 600A

Mounting: Surface Wires 4 Main Circuit Breaker: 600A / 3P / LSI

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 125 A 3 6420 0 1 20 A 2

3 "" "" 5770 8087 3 150 A 4

5 "" "" 5700 7462 "" "" 6

7 20 A 1 0 7367 "" "" 8

9 20 A 1 0 0 1 20 A 10

11 200 A 3 12814 11405 3 150 A 12

13 "" "" 13100 11690 "" "" "" 14

15 "" "" 13913 11094 "" "" "" 16

17 -- -- 0 0 1 20 A 18

19 PANEL 53-3B-100A 125 A 3 8087 100 3 20 A 20

21 "" "" 7462 100 "" "" 22

23 "" "" 7367 100 "" "" 24

25 20 A 1 0 100 3 20 A 26

27 20 A 1 0 100 "" "" 28

29 20 A 1 0 100 "" "" 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 2818 125.00% 138938 VA

Other 9200 100.00% 111256 VA

Receptacle 3600 100.00% 386 A

Lighting 454 125.00% 309 A

All other Motor 27866 100.00%

Telecom Rack 95000 NOTE 1

Notes:

1. TELECOM RACKS DE-RATED FROM 5000VA TO 3500VA PER VA WHITE PAPER "POWER CAPACITY PLANNING FOR TRS" (JULY 2021).

2. DIGITAL POWER METER (DPM) AND SURGE PROTECTION DEVICE (SPD) TO BE INTEGRAL TO PANEL (FACTORY INSTALLED).

3523 Total Conn. Power Load:

47063

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

46726 45148

392 389 376

27866

9200 Total Est. Power Demand:

3600 Total Conn. Amperage:

567 Total Est. Amperage Demand:

SPD

SPARE ""

SPARE

CIRCUIT DESCRIPTION

PANEL 53-BB-103A

SPARE ""

PANEL 53-1B-119BA PANEL 53-5A-109A

SPARE SPARE

SPARE

66500

"" PANEL 53-4A-109A

SPARE

SPARE ""

SPACE

DIGITAL POWER METER

Branch Panel: 53-DP-TRA

VA PER PHASE

CIRCUIT DESCRIPTION A B C

53-BB-100CA

Location: BLDG 53, RM BB-100C Volts: 120/208 Wye A.I.C Rating: 30k

Supply From: 53-DP-TRA Phases: 3 Bus Rating: 125A

Mounting: Surface Wires 4 Main Circuit Breaker: 125A / 3P

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 60 A 3 5000 720 1 20 A 2

3 "" "" 5000 0 1 20 A 4

5 "" "" 5000 500 1 20 A 6

7 20 A 1 0 0 1 20 A 8

9 20 A 1 0 70 1 20 A 10

11 20 A 1 0 0 1 20 A 12

13 20 A 1 500 0 1 20 A 14

15 20 A 1 0 500 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 20 A 1 0 100 3 20 A 20

21 20 A 1 0 100 "" "" 22

23 20 A 1 0 100 "" "" 24

25 20 A 1 0 100 3 20 A 26

27 20 A 1 0 100 "" "" 28

29 20 A 1 0 100 "" "" 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 500 125.00% 18390 VA

Other 1600 100.00% 18533 VA

Receptacle 720 100.00% 51 A

Lighting 70 125.00% 51 A

All other Motor 500 100.00%

15000 100.00%

Notes:

1. DIGITAL POWER METER (DPM) AND SURGE PROTECTION DEVICE (SPD) TO BE INTEGRAL TO PANEL (FACTORY INSTALLED).

Branch Panel: 53-BB-100CA

VA PER PHASE

CIRCUIT DESCRIPTION A B C

SPARE SPARE

SPARE LIGHTING - TR ROOM

SPARE SPARE

CIRCUIT DESCRIPTION

SERVER RACK RECEPTACLE RECEPTACLES - TR ROOM

"" SPARE

"" DDC CONTROLLER

SPARE DIGITAL POWER METER

SPARE ""

SPARE ""

ACCESS CONTROL "53-ACP-BB-103" / DOOR POWER SPARE

SPARE VAV / TERMINAL UNIT "TU-1B-119B"

SPARE SPARE

SPARE SPD

SPARE ""

SPARE ""

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

625 Total Conn. Power Load:

6420 5770 5700

53 48 47

Telecom Rack 15000

88 Total Est. Amperage Demand:

1600 Total Est. Power Demand:

720 Total Conn. Amperage:

FROM TO QTY SIZE (QTY) & SIZE

GROUND

SIZE

53-P-01 TRANSFORMER "53-XFMR-C-TRA" PRIMARY SIDE DISTRIBUTION PANEL "MDB-EC" TRANSFORMER "53-XFMR-C-TRA" PRIMARY SIDE 1 3" (3) 250 Kcmil 4 AWG 1.9% -

53-P-02 DISTRIBUTION PANEL "53-DP-TRA" TRANSFORMER "53-XFMR-C-TRA" SECONDARY SIDE DISTRIBUTION PANEL "53-DP-TRA" 2 3" (4) 350 kcmil 1 AWG 0.1% -

53-P-03 PANELBOARD "53-BB-103A" DISTRIBUTION PANEL "53-DP-TRA" PANELBOARD "53-BB-100CA" 1 3" (4) 1/0 AWG 1/0 AWG 1.8% -

53-P-04 PANELBOARD "53-1B-119BA" DISTRIBUTION PANEL "53-DP-TRA" PANELBOARD "53-1B-119BA" 1 3" (4) 4/0 AWG 4/0 AWG 1.9% -

53-P-05 PANELBOARD "53-3B-100A" DISTRIBUTION PANEL "53-DP-TRA" PANELBOARD "53-3B-100A" 1 3" (4) 1/0 AWG 1/0 AWG 1.7% -

53-P-06 PANELBOARD "53-4A-109A" DISTRIBUTION PANEL "53-DP-TRA" PANELBOARD "53-4A-109A" 1 3" (4) 1/0 AWG 1/0 AWG 1.8% -

53-P-07 PANELBOARD "53-5A-109A" DISTRIBUTION PANEL "53-DP-TRA" PANELBOARD "53-5A-109A" 1 3" (4) 3/0 AWG 3/0 AWG 1.9% -

53-P-08 TRANSFORMER "53-XFMR-C-TRB" DISTRIBUTION PANEL "DP-1" TRANSFORMER "53-XFMR-C-TRB" PRIMARY SIDE 1 3" (3) 250 kcmil 4 AWG 1.1% -

53-P-09 DISTRIBUTION PANEL "53-DP-TRB" TRANSFORMER "53-XFMR-C-TRB" SECONDARY SIDE DISTRIBUTION PANEL "53-DP-TRB" 2 3" (4) 350 AWG 1 AWG 0.1% -

53-P-10 PANELBOARD "53-BB-103B" DISTRIBUTION PANEL "53-DP-TRB" PANELBOARD "53-BB-100CB" 1 3" (4) 1/0 AWG 1/0 AWG 1.8% -

53-P-11 PANELBOARD "53-1B-119BB" DISTRIBUTION PANEL "53-DP-TRB" PANELBOARD "53-1B-119B" 1 3" (4) 2/0 AWG 2/0 AWG 1.8% -

53-P-12 PANELBOARD "53-3B-100B" DISTRIBUTION PANEL "53-DP-TRB" PANELBOARD "53-3B-100B" 1 2" (4) 1 AWG 1 AWG 1.8% -

53-P-13 PANELBOARD "53-4A-109B" DISTRIBUTION PANEL "53-DP-TRB" PANELBOARD "53-4A-109B" 1 2" (4) 1 AWG 1 AWG 1.9% -

53-P-14 PANELBOARD "53-5A-109B" DISTRIBUTION PANEL "53-DP-TRB" PANELBOARD "53-5A-109B" 1 2" (4) 1 AWG 1 AWG 2.0% -

53-P-16 CONDENSING UNIT "CU-BB-100C-1" PANELBOARD "53-1B-119BA" CONDENSING UNIT "CU-BB-100C-1" 1 3/4" (2) 8 AWG 8 AWG 4.1% -

53-P-17 CONDENSING UNIT "CU-BB-100C-2" PANELBOARD "53-1B-119BA" CONDENSING UNIT "CU-BB-100C-2" 1 3/4" (2) 8 AWG 8 AWG 4.1% -

53-P-18 CONDENSING UNIT "CU-1B-119B-1" PANELBOARD "53-1B-119BA" CONDENSING UNIT "CU-1B-119B-1" 1 3/4" (2) 8 AWG 8 AWG 3.8% -

53-P-19 CONDENSING UNIT "CU-1B-119B-2" PANELBOARD "53-1B-119BA" CONDENSING UNIT "CU-1B-119B-2" 1 3/4" (2) 8 AWG 8 AWG 3.8% -

53-P-20 CONDENSING UNIT "CU-3B-100-1" PANELBOARD "53-1B-119BA" CONDENSING UNIT "CU-3B-100-1" 1 3/4" (2) 8 AWG 8 AWG 3.5% -

53-P-21 CONDENSING UNIT "CU-3B-100-2" PANELBOARD "53-1B-119BA" CONDENSING UNIT "CU-3B-100-2" 1 3/4" (2) 8 AWG 8 AWG 3.5% -

53-P-22 CONDENSING UNIT "CU-4A-109-1" PANELBOARD "53-5A-109A" CONDENSING UNIT "CU-4A-109-1" 1 3/4" (2) 8 AWG 8 AWG 2.9% -

53-P-23 CONDENSING UNIT "CU-4A-109-2" PANELBOARD "53-5A-109A" CONDENSING UNIT "CU-4A-109-2" 1 3/4" (2) 8 AWG 8 AWG 2.9% -

53-P-24 CONDENSING UNIT "CU-5A-109-1" PANELBOARD "53-5A-109A" CONDENSING UNIT "CU-5A-109-1" 1 3/4" (2) 8 AWG 8 AWG 2.9% -

53-P-25 CONDENSING UNIT "CU-5A-109-2" PANELBOARD "53-5A-109A" CONDENSING UNIT "CU-5A-109-2" 1 3/4" (2) 8 AWG 8 AWG 2.9% -

P-TR-1A TYPICAL TELECOM ROOM DATA RACK POWER FEED (1-RACK), SIDE A TYPICAL SOURCE A TR PANELBOARD TYPICAL OVERHEAD TR RACK SOURCE A RECEPTACLE 1 3/4" (4) 10 AWG 10 AWG NEGLIGIBLE -

P-TR-2A TYPICAL TELECOM ROOM DATA RACK POWER FEED (2-RACK), SIDE A TYPICAL SOURCE A TR PANELBOARD TYPICAL OVERHEAD TR RACK SOURCE A RECEPTACLE 1 3/4" (4) 10 AWG 10 AWG NEGLIGIBLE -

P-TR-3A TYPICAL TELECOM ROOM DATA RACK POWER FEED (3-RACK), SIDE A TYPICAL SOURCE A TR PANELBOARD TYPICAL OVERHEAD TR RACK SOURCE A JUNCTION BOX 1 1" (4) 6 AWG 8 AWG NEGLIGIBLE -

P-TR-1B TYPICAL TELECOM ROOM DATA RACK POWER FEED (1-RACK), SIDE B TYPICAL SOURCE B TR PANELBOARD TYPICAL OVERHEAD TR RACK SOURCE B RECEPTACLE 1 3/4" (4) 10 AWG 10 AWG NEGLIGIBLE -

P-TR-2B TYPICAL TELECOM ROOM DATA RACK POWER FEED (2-RACK), SIDE B TYPICAL SOURCE B TR PANELBOARD TYPICAL OVERHEAD TR RACK SOURCE B RECEPTACLE 1 3/4" (4) 10 AWG 10 AWG NEGLIGIBLE -

P-TR-3B TYPICAL TELECOM ROOM DATA RACK POWER FEED (3-RACK), SIDE B TYPICAL SOURCE B TR PANELBOARD TYPICAL OVERHEAD TR RACK SOURCE B JUNCTION BOX 1 1" (4) 6 AWG 8 AWG NEGLIGIBLE -

NOTES

NOTE(S):

1. NONE

BLDG 53 - CONDUIT AND WIRE SCHEDULE - VA OK MUSKOGEE EHRM UPGRADES

CONDUIT

TAG

SERVICE

ROUTING CONDUIT CONDUCTORS

VOLTAGE

DROP

Location: BLDG 53, RM 3C-100 Volts: 208/120 A.I.C Rating: 30k

Supply From: 53-TR-C-TRA Phases: 3 Bus Rating: 400A

Mounting: Surface Wires 4 Main Circuit Breaker: 400A / 3P

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 125 A 3 5920 0 1 20 A 2

3 "" "" 5270 7587 3 125 A 4

5 "" "" 5200 6962 "" "" 6

7 20 A 1 0 6867 "" "" 8

9 20 A 1 0 0 1 20 A 10

11 125 A 3 7587 7587 3 125 A 12

13 "" "" 6931 6962 "" "" "" 14

15 "" "" 6867 6867 "" "" "" 16

17 -- -- 0 0 1 20 A 18

19 PANEL 53-3B-100B 125 A 3 7587 100 3 20 A 20

21 "" "" 6962 100 "" "" 22

23 "" "" 6867 100 "" "" 24

25 20 A 1 0 100 3 20 A 26

27 20 A 1 0 100 "" "" 28

29 20 A 1 0 100 "" "" 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 102622 VA

Other 3600 100.00% 74227 VA

Receptacle 3600 100.00% 285 A

Lighting 422 125.00% 206 A

All other Motor 0 100.00%

Telecom Rack 95000 NOTE 1

Notes:

1. TELECOM RACKS DE-RATED FROM 5000VA TO 3500VA PER VA WHITE PAPER "POWER CAPACITY PLANNING FOR TRS" (JULY 2021).

0 Total Conn. Power Load:

34467

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

33752 34402

287 281 286

3600 Total Est. Power Demand:

3600 Total Conn. Amperage:

527 Total Est. Amperage Demand:

SPD

SPARE ""

SPARE

CIRCUIT DESCRIPTION

PANEL 53-BB-103B

SPARE ""

PANEL 53-1B-119BB PANEL 53-5A-109B

SPARE SPARE

SPARE

66500

"" PANEL 53-4A-109B

SPARE

SPARE ""

SPACE

DIGITAL POWER METER

Branch Panel: 53-DP-TRB

VA PER PHASE

CIRCUIT DESCRIPTION A B C

Location: BLDG 53, RM BB-100C Volts: 120/208 Wye A.I.C Rating: 30k

Supply From: 53-DP-TRA Phases: 3 Bus Rating: 125A

Mounting: Surface Wires 4 Main Circuit Breaker: 125A / 3P

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 60 A 3 5000 720 1 20 A 2

3 "" "" 5000 0 1 20 A 4

5 "" "" 5000 0 1 20 A 6

7 20 A 1 0 0 1 20 A 8

9 20 A 1 0 70 1 20 A 10

11 20 A 1 0 0 1 20 A 12

13 20 A 1 0 0 1 20 A 14

15 20 A 1 0 0 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 20 A 1 0 100 3 20 A 20

21 20 A 1 0 100 "" "" 22

23 20 A 1 0 100 "" "" 24

25 20 A 1 0 100 3 20 A 26

27 20 A 1 0 100 "" "" 28

29 20 A 1 0 100 "" "" 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 16390 VA

Other 600 100.00% 16408 VA

Receptacle 720 100.00% 45 A

Lighting 70 125.00% 46 A

All other Motor 0 100.00%

15000 100.00%

Notes:

1. SPLIT DUCTLESS COOLING UNIT IS A REDUNDANT LOAD AND POWER CALCULATIONS ARE NOT INCLUDED AS LOAD DOES NOT OPERATE SIMULTANEOUSLY WITH OTHER COOLING UNITS.

Branch Panel: 53-BB-100CB

VA PER PHASE

CIRCUIT DESCRIPTION A B C

SPARE SPARE

SPARE LIGHTING - TR ROOM

SPARE SPARE

CIRCUIT DESCRIPTION

SERVER RACK RECEPTACLE RECEPTACLES - TR ROOM

"" SPARE

"" SPARE

SPARE DIGITAL POWER METER

SPARE ""

SPARE ""

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPD

SPARE ""

SPARE ""

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

0 Total Conn. Power Load:

5920 5270 5200

49 44 43

Telecom Rack 15000

88 Total Est. Amperage Demand:

600 Total Est. Power Demand:

720 Total Conn. Amperage:

Location: BLDG 53, RM 1B-119B Volts: 120/208 Wye A.I.C Rating: 30k

Supply From: 53-DP-TRA Phases: 3 Bus Rating: 125A

Mounting: Surface Wires 4 Main Circuit Breaker: 125A / 3P

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 30 A 3 3333 720 1 20 A 2

3 "" "" 3333 0 1 20 A 4

5 "" "" 3333 0 1 20 A 6

7 30 A 3 3333 0 1 20 A 8

9 "" "" 3333 64 1 20 A 10

11 "" "" 3333 0 1 20 A 12

13 20 A 1 0 0 1 20 A 14

15 20 A 1 0 0 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 20 A 1 0 100 3 20 A 20

21 20 A 1 0 100 "" "" 22

23 20 A 1 0 100 "" "" 24

25 20 A 1 0 100 3 20 A 26

27 20 A 1 0 100 "" "" 28

29 20 A 1 0 100 "" "" 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 21384 VA

Other 600 100.00% 21400 VA

Receptacle 720 100.00% 59 A

Lighting 64 125.00% 59 A

All other Motor 0 100.00%

20000 100.00%

Notes:

1. SPLIT DUCTLESS COOLING UNIT IS A REDUNDANT LOAD AND POWER CALCULATIONS ARE NOT INCLUDED AS LOAD DOES NOT OPERATE SIMULTANEOUSLY WITH OTHER COOLING UNITS.

Branch Panel: 53-1B-119BB

VA PER PHASE

CIRCUIT DESCRIPTION A B C

SERVER RACK RECEPTACLE SPARE

"" LIGHTING - TR ROOM

"" SPARE

CIRCUIT DESCRIPTION

SERVER RACK RECEPTACLE RECEPTACLES - TR ROOM

"" SPARE

"" SPARE

SPARE DIGITAL POWER METER

SPARE ""

SPARE ""

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPD

SPARE ""

SPARE ""

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

0 Total Conn. Power Load:

7587 6931 6867

63 58 57

Telecom Rack 20000

80 Total Est. Amperage Demand:

600 Total Est. Power Demand:

720 Total Conn. Amperage:

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

53EP702

ELECTRICAL SCHEDULES

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-53

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 77 of 77

GENERAL NOTES

KEY NOTES

1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY

ALL CHANGES: ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

2. REFERENCE SHEETS EP701 AND EP702 FOR ALL TYPICAL ELECTRICAL SCHEDULES.

3. CONTRACTOR SHALL COORDINATE WITH MANUFACTURER TO PROVIDE

OVERCURRENT PROTECTION AS REQUIRED. ANY DEVIATION FROM BASIS OF DESIGN

EQUIPMENT INCLUDING BUT NOT LIMITED CONDUIT AND WIRE, OVERCURRENT

PROTECTION DEVICE RATING AND QUANTITY SHALL BE PROVIDED AT THE EXPENSIVE

OF THE CONTRACTOR.

Location: BLDG 53, RM 5A-109 Volts: 120/208 Wye A.I.C Rating: 30k

Supply From: 53-DP-TRA Phases: 3 Bus Rating: 225A

Mounting: Surface Wires 4 Main Circuit Breaker: 150A / 3P

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 20 A 3 1667 720 1 20 A 2

3 "" "" 1667 0 1 20 A 4

5 "" "" 1667 0 1 20 A 6

7 60 A 3 5000 0 1 20 A 8

9 "" "" 5000 96 1 20 A 10

11 "" "" 5000 0 1 20 A 12

13 20 A 1 500 500 1 20 A 14

15 25 A 2 1409 500 1 20 A 16

17 "" "" 1409 0 1 20 A 18

19 25 A 2 1409 100 3 20 A 20

21 "" "" 1409 100 "" "" 22

23 25 A 2 1409 100 "" "" 24

25 "" "" 1409 100 3 20 A 26

27 25 A 2 1409 100 "" "" 28

29 "" "" 1409 100 "" "" 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 2818 125.00% 34189 VA

Other 1600 100.00% 34918 VA

Receptacle 720 100.00% 95 A

Lighting 96 125.00% 97 A

All other Motor 8955 100.00%

20000 100.00%

Notes:

1. DIGITAL POWER METER (DPM) AND SURGE PROTECTION DEVICE (SPD) TO BE INTEGRAL TO PANEL (FACTORY INSTALLED).

Branch Panel: 53-5A-109A

VA PER PHASE

CIRCUIT DESCRIPTION A B C

SERVER RACK RECEPTACLE SPARE

"" LIGHTING - TR ROOM

"" SPARE

CIRCUIT DESCRIPTION

SERVER RACK RECEPTACLE RECEPTACLES - TR ROOM

"" SPARE

"" SPARE

SPLIT DUCTLESS COOLING UNIT "CU-4A-109-2" DIGITAL POWER METER

SPLIT DUCTLESS COOLING UNIT "CU-5A-109-1" ""

ACCESS CONTROL "53-ACP-5A-109" / DOOR POWER DDC CONTROLLER

SPLIT DUCTLESS COOLING UNIT "CU-4A-109-1" VAV / TERMINAL UNIT "TU-5A-109"

"" SPARE

"" SPD

SPLIT DUCTLESS COOLING UNIT "CU-5A-109-2" ""

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

3523 Total Conn. Power Load:

11405 11690 11094

95 97 92

Telecom Rack 20000

120 Total Est. Amperage Demand:

1600 Total Est. Power Demand:

720 Total Conn. Amperage:

Location: BLDG 53, RM 4A-109 Volts: 120/208 Wye A.I.C Rating: 30k

Supply From: 53-DP-TRA Phases: 3 Bus Rating: 125A

Mounting: Surface Wires 4 Main Circuit Breaker: 125A / 3P

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 20 A 3 1667 720 1 20 A 2

3 "" "" 1667 0 1 20 A 4

5 "" "" 1667 500 1 20 A 6

7 60 A 3 5000 0 1 20 A 8

9 "" "" 5000 96 1 20 A 10

11 "" "" 5000 0 1 20 A 12

13 20 A 1 500 0 1 20 A 14

15 20 A 1 0 500 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 20 A 1 0 100 3 20 A 20

21 20 A 1 0 100 "" "" 22

23 20 A 1 0 100 "" "" 24

25 20 A 1 0 100 3 20 A 26

27 20 A 1 0 100 "" "" 28

29 20 A 1 0 100 "" "" 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 500 125.00% 23416 VA

Other 1600 100.00% 23565 VA

Receptacle 720 100.00% 65 A

Lighting 96 125.00% 65 A

All other Motor 500 100.00%

20000 100.00%

Notes:

1. DIGITAL POWER METER (DPM) AND SURGE PROTECTION DEVICE (SPD) TO BE INTEGRAL TO PANEL (FACTORY INSTALLED).

Branch Panel: 53-4A-109A

VA PER PHASE

CIRCUIT DESCRIPTION A B C

SERVER RACK RECEPTACLE SPARE

"" LIGHTING - TR ROOM

"" SPARE

CIRCUIT DESCRIPTION

SERVER RACK RECEPTACLE RECEPTACLES - TR ROOM

"" SPARE

"" DDC CONTROLLER

SPARE DIGITAL POWER METER

SPARE ""

SPARE ""

ACCESS CONTROL "53-ACP-4A-109" / DOOR POWER SPARE

SPARE VAV / TERMINAL UNIT "TU-4A-109"

SPARE SPARE

SPARE SPD

SPARE ""

SPARE ""

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

625 Total Conn. Power Load:

8087 7462 7367

67 62 61

Telecom Rack 20000

120 Total Est. Amperage Demand:

1600 Total Est. Power Demand:

720 Total Conn. Amperage:

Location: BLDG 53, RM 3B-100 Volts: 120/208 Wye A.I.C Rating: 30k

Supply From: 53-DP-TRA Phases: 3 Bus Rating: 125A

Mounting: Surface Wires 4 Main Circuit Breaker: 125A / 3P

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 20 A 3 1667 720 1 20 A 2

3 "" "" 1667 0 1 20 A 4

5 "" "" 1667 500 1 20 A 6

7 60 A 3 5000 0 1 20 A 8

9 "" "" 5000 96 1 20 A 10

11 "" "" 5000 0 1 20 A 12

13 20 A 1 500 0 1 20 A 14

15 20 A 1 0 500 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 20 A 1 0 100 3 20 A 20

21 20 A 1 0 100 "" "" 22

23 20 A 1 0 100 "" "" 24

25 20 A 1 0 100 3 20 A 26

27 20 A 1 0 100 "" "" 28

29 20 A 1 0 100 "" "" 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 500 125.00% 23416 VA

Other 1600 100.00% 23565 VA

Receptacle 720 100.00% 65 A

Lighting 96 125.00% 65 A

All other Motor 500 100.00%

20000 100.00%

Notes:

1. DIGITAL POWER METER (DPM) AND SURGE PROTECTION DEVICE (SPD) TO BE INTEGRAL TO PANEL (FACTORY INSTALLED).

Branch Panel: 53-3B-100A

VA PER PHASE

CIRCUIT DESCRIPTION A B C

SERVER RACK RECEPTACLE SPARE

"" LIGHTING - TR ROOM

"" SPARE

CIRCUIT DESCRIPTION

SERVER RACK RECEPTACLE RECEPTACLES - TR ROOM

"" SPARE

"" DDC CONTROLLER

SPARE DIGITAL POWER METER

SPARE ""

SPARE ""

ACCESS CONTROL "53-ACP-3B-100A" / DOOR POWER SPARE

SPARE VAV / TERMINAL UNIT "TU-3B-100A"

SPARE SPARE

SPARE SPD

SPARE ""

SPARE ""

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

625 Total Conn. Power Load:

8087 7462 7367

67 62 61

Telecom Rack 20000

120 Total Est. Amperage Demand:

1600 Total Est. Power Demand:

720 Total Conn. Amperage:

PROVIDE (1) 3/4" CONDUIT WITH (2) 12 AWG AND (1) 12 AWG GND TO PROVIDE POWER

TO DDC CONTROLLER. COORDINATE WITH MECHANICAL FOR EXACT LOCATION OF

DDC CONTROLLER.

Location: BLDG 53, RM 3B-100 Volts: 120/208 Wye A.I.C Rating: 30k

Supply From: 53-DP-TRA Phases: 3 Bus Rating: 125A

Mounting: Surface Wires 4 Main Circuit Breaker: 125A / 3P

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 20 A 3 1667 720 1 20 A 2

3 "" "" 1667 0 1 20 A 4

5 "" "" 1667 0 1 20 A 6

7 60 A 3 5000 0 1 20 A 8

9 "" "" 5000 96 1 20 A 10

11 "" "" 5000 0 1 20 A 12

13 20 A 1 0 0 1 20 A 14

15 20 A 1 0 0 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 20 A 1 0 100 3 20 A 20

21 20 A 1 0 100 "" "" 22

23 20 A 1 0 100 "" "" 24

25 20 A 1 0 100 3 20 A 26

27 20 A 1 0 100 "" "" 28

29 20 A 1 0 100 "" "" 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 21416 VA

Other 600 100.00% 21440 VA

Receptacle 720 100.00% 59 A

Lighting 96 125.00% 60 A

All other Motor 0 100.00%

20000 100.00%

Notes:

1. SPLIT DUCTLESS COOLING UNIT IS A REDUNDANT LOAD AND POWER CALCULATIONS ARE NOT INCLUDED AS LOAD DOES NOT OPERATE SIMULTANEOUSLY WITH OTHER COOLING UNITS.

Branch Panel: 53-3B-100B

VA PER PHASE

CIRCUIT DESCRIPTION A B C

SERVER RACK RECEPTACLE SPARE

"" LIGHTING - TR ROOM

"" SPARE

CIRCUIT DESCRIPTION

SERVER RACK RECEPTACLE RECEPTACLES - TR ROOM

"" SPARE

"" SPARE

SPARE DIGITAL POWER METER

SPARE ""

SPARE ""

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPD

SPARE ""

SPARE ""

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

0 Total Conn. Power Load:

7587 6962 6867

63 58 57

Telecom Rack 20000

120 Total Est. Amperage Demand:

600 Total Est. Power Demand:

720 Total Conn. Amperage:

Location: BLDG 53, RM 4A-109 Volts: 120/208 Wye A.I.C Rating: 30k

Supply From: 53-DP-TRA Phases: 3 Bus Rating: 125A

Mounting: Surface Wires 4 Main Circuit Breaker: 125A / 3P

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 20 A 3 1667 720 1 20 A 2

3 "" "" 1667 0 1 20 A 4

5 "" "" 1667 0 1 20 A 6

7 60 A 3 5000 0 1 20 A 8

9 "" "" 5000 96 1 20 A 10

11 "" "" 5000 0 1 20 A 12

13 20 A 1 0 0 1 20 A 14

15 20 A 1 0 0 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 20 A 1 0 100 3 20 A 20

21 20 A 1 0 100 "" "" 22

23 20 A 1 0 100 "" "" 24

25 20 A 1 0 100 3 20 A 26

27 20 A 1 0 100 "" "" 28

29 20 A 1 0 100 "" "" 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 21416 VA

Other 600 100.00% 21440 VA

Receptacle 720 100.00% 59 A

Lighting 96 125.00% 60 A

All other Motor 0 100.00%

20000 100.00%

Notes:

1. SPLIT DUCTLESS COOLING UNIT IS A REDUNDANT LOAD AND POWER CALCULATIONS ARE NOT INCLUDED AS LOAD DOES NOT OPERATE SIMULTANEOUSLY WITH OTHER COOLING UNITS.

Branch Panel: 53-4A-109B

VA PER PHASE

CIRCUIT DESCRIPTION A B C

SERVER RACK RECEPTACLE SPARE

"" LIGHTING - TR ROOM

"" SPARE

CIRCUIT DESCRIPTION

SERVER RACK RECEPTACLE RECEPTACLES - TR ROOM

"" SPARE

"" SPARE

SPARE DIGITAL POWER METER

SPARE ""

SPARE ""

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPD

SPARE ""

SPARE ""

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

0 Total Conn. Power Load:

7587 6962 6867

63 58 57

Telecom Rack 20000

120 Total Est. Amperage Demand:

600 Total Est. Power Demand:

720 Total Conn. Amperage:

Location: BLDG 53, RM 5A-109 Volts: 120/208 Wye A.I.C Rating: 30k

Supply From: 53-DP-TRA Phases: 3 Bus Rating: 125A

Mounting: Surface Wires 4 Main Circuit Breaker: 125A / 3P

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT

1 20 A 3 1667 720 1 20 A 2

3 "" "" 1667 0 1 20 A 4

5 "" "" 1667 0 1 20 A 6

7 60 A 3 5000 0 1 20 A 8

9 "" "" 5000 96 1 20 A 10

11 "" "" 5000 0 1 20 A 12

13 20 A 1 0 0 1 20 A 14

15 20 A 1 0 0 1 20 A 16

17 20 A 1 0 0 1 20 A 18

19 20 A 1 0 100 3 20 A 20

21 20 A 1 0 100 "" "" 22

23 20 A 1 0 100 "" "" 24

25 20 A 1 0 100 3 20 A 26

27 20 A 1 0 100 "" "" 28

29 20 A 1 0 100 "" "" 30

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 0 125.00% 21416 VA

Other 600 100.00% 21440 VA

Receptacle 720 100.00% 59 A

Lighting 96 125.00% 60 A

All other Motor 0 100.00%

20000 100.00%

Notes:

1. SPLIT DUCTLESS COOLING UNIT IS A REDUNDANT LOAD AND POWER CALCULATIONS ARE NOT INCLUDED AS LOAD DOES NOT OPERATE SIMULTANEOUSLY WITH OTHER COOLING UNITS.

Branch Panel: 53-5A-109B

VA PER PHASE

CIRCUIT DESCRIPTION A B C

SERVER RACK RECEPTACLE SPARE

"" LIGHTING - TR ROOM

"" SPARE

CIRCUIT DESCRIPTION

SERVER RACK RECEPTACLE RECEPTACLES - TR ROOM

"" SPARE

"" SPARE

SPARE DIGITAL POWER METER

SPARE ""

SPARE ""

SPARE SPARE

SPARE SPARE

SPARE SPARE

SPARE SPD

SPARE ""

SPARE ""

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

0 Total Conn. Power Load:

7587 6962 6867

63 58 57

Telecom Rack 20000

120 Total Est. Amperage Demand:

600 Total Est. Power Demand:

720 Total Conn. Amperage:

Department of Veteran Affairs

(RE)

(E)

(R)

DASHED AND / OR HATCHED INDICATES EXISTING

EQUIPMENT TO BE REMOVED

SOLID LIGHT INDICATES EXISTING

TO REMAIN EQUIPMENT

HEAVY & SOLID INDICATES EQUIPMENT TO BE

PROVIDED NEW

EXISTING EQUIPMENT TO REMAIN. MAINTAIN EXISTING

ELECTRICAL CONNECTIONS UNLESS OTHERWISE NOTED

EXISTING EQUIPMENT TO BE REMOVED AND RELOCATED

AS SHOWN. DISCONNECT AND REMOVE, REINSTALL

AT NEW LOCATION AND RECONNECT ITEM AS REQUIRED

EXISTING EQUIPMENT TO BE REMOVED AND REPLACED

WITH NEW.

EXISTING, NEW, REMOVAL NOTATION LEGEND

GENERAL ABBREVIATIONS

A AMPERES

ACLG ABOVE CEILING

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERE INTERRUPTING CAPACITY

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ATS AUTOMATIC TRANSFER SWITCH

BFG BELOW FINISH GRADE

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM (BY M.C.)

C CONDUIT

CB CIRCUIT BREAKER

CBM CERTIFIED BALLAST MANUFACTURERS

CLF CURRENT LIMITING FUSE

CU COPPER

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EM EMERGENCY

EMT ELECTRICAL METALLIC TUBING

ERGB ELECTRICAL ROOM GROUND BAR

EWC ELECTRIC WATER COOLER

F FUSE

FA FIRE ALARM

FDP FIBER DISTRIBUTION PANEL

FLA FULL LOAD AMPERES

FT FEET

GFCI GROUND-FAULT CIRCUIT INTERRUPTER

GFI GROUND-FAULT INTERRUPTER

GND,G GROUND OR GROUNDING

HOA HAND, OFF, AUTOMATIC SWITCH

ID INNER DIAMETER

IDF INTERMEDIATE DISTRIBUTION FRAME

IEEE INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS

IP INTERNET PROTOCOL

KCMIL THOUSAND CIRCULAR MILS

KVA KILOVOLT AMPERES

KW KILOWATTS

LTG LIGHTING

LPM LIGHTNING PROTECTION MODULE

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MCP MOTOR CIRCUIT PROTECTOR

MDF MAIN DISTRIBUTION FRAME

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MMF MULTI MODE FIBER

MTGB MAIN TELECOMMUNICATIONS GROUND BAR

NC NORMALLY CLOSED

NEC NATIONAL ELECTRIC CODE

NEMA NATIONAL ELECTRICAL MANUFACTURES ASSOCIATION

NF NON FUSED

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NORMALLY OPEN OR NUMBER

NTS NOT TO SCALE

OD OUTER DIAMETER

P POLE

PE PROTECTIVE ENCLOSURE

PH PHASE

PNL PANEL

PVC POLYVINYL CHLORIDE

PWR POWER

QTY QUANTITY

RGS RIGID GALVANIZED STEEL

SMF SINGLE MODE FIBER

SP SPARE

SS SAFETY SWITCH

ST SHUNT TRIP

SW SWITCH

SYM SYMMETRICAL

TEL TELEPHONE

TGB TELECOMMUNICATIONS GROUND BAR

TIDF TELECOMMUNICATIONS INTERMEDIATE

DISTRIBUTION FRAME

TMDF TELECOMMUNICATIONS MAIN DISTRIBUTION FRAME

TSR TELECOM SERVICE ROOM

TYP TYPICAL

UG UNDERGROUND OR UNDERGRADE

UL UNDERWRITERS LABORATORIES

UON, UNO UNLESS OTHERWISE NOTED, UNLESS NOTED OTHERWISE

V VOLT

VIF VERIFY IN FIELD

VP VANDAL PROOF

W WIRE

WG WIRE GUARD

WP WEATHER PROOF

XFMR TRANSFORMER

XP EXPLOSION PROOF

DELTA

WYE

PHASE

LAN

2 POST DATA RACK

DATA CABINET - W INDICATES WALL MOUNT

COMMUNICATIONS SYSTEMS

W

4 POST DATA RACK

COMMUNICATIONS OUTLET AND (#) NUMBER

OF NETWORK JACKS

EXISTING COMMUNICATIONS OUTLET AND (#) NUMBER

OF NETWORK JACKS

CEILING COMMUNICATIONS OUTLET AND (#) NUMBER

OF NETWORK JACKS

CEILING MOUNTED WIRELESS ACCESS POINTWAP

RTLS REAL TIME LOCATION SYSTEM

WM WIRE MOLD

A. WHEN EXISTING CONSTRUCTION, WHICH IS TO REMAIN, IS DAMAGED DURING THE COURSE OF REMOVAL AS A RESULT OF THE CONTRACTOR'S WORK, IT SHALL BE REPAIRED AND/OR REPLACED WITH SIMILAR OR LIKE MATERIALS, AS MUCH AS POSSIBLE, SUBJECT TO THE OWNERS APPROVAL. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND REPLACEMENT OF EXISTING CONSTRUCTION IN THE WAY OF NEW WORK. PROTECT BUILDING AND FURNISHINGS FROM

DAMAGE.

B. COORDINATE PHASING OF WORK WITH OWNER'S AUTHORIZED REPRESENTATIVE. IT IS THE REQUIREMENT OF THE PROJECT THAT THE CONSTRUCTION WORK BE PHASED TO FACILITATE MINIMUM IMPACT TO THE NORMAL OPERATION OF THE FACILITY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO THOROUGHLY REVIEW THE GENERAL CONDITIONS AND THE ARCHITECTURAL BID DOCUMENTS FOR THE PHASING REQUIREMENTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE FOR ALL TEMPORARY SERVICES TO FACILITY PHASING REQUIREMENTS WITHOUT INTERRUPTION OF THE COMMUNICATION AND SECURITY SYSTEMS.

C. EXISTING CONDITIONS ARE TAKEN FROM FIELD OBSERVATIONS AND PRIOR CONSTRUCTION DOCUMENTS WHEN AVAILABLE AND ARE NOT GUARANTEED. PRIOR TO SUBMITTING BID, CONTRACTOR IS TO VISIT SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT THE REMOVAL WORK. NO COMPENSATION WILL BE GRANTED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY EXPERIENCED OBSERVERS. THIS CONTRACTOR SHALL PARTICIPATE IN SURVEY OF THE EXISTING COMMUNICATION AND SECURITY SYSTEMS. THE CONTRACTOR SHALL DISCONNECT AND CAP ALL SERVICE LINES TO BE DISCONNECTED FOR THOSE SERVICES WHICH NORMALLY ARE INCLUDED IN THIS FIELD OF WORK.

PARTICULAR CARE SHALL BE TAKEN TO AVOID CREATING HAZARD OR CAUSING DISRUPTION IN ADJOINING AREAS. NOT ALL DEVICES TERMINATIONS, JUNCTION

BOXES AND WIRING HAVE BEEN SHOWN FOR DRAWING CLARITY.

D. REFER TO ALL OTHER TRADES CONTRACT DRAWINGS AND SPECIFICATIONS FOR EXACT QUANTITIES AND LOCATIONS OF ALL EQUIPMENT BEING ABANDONED OR REMOVED, WHICH WILL REQUIRE DE-ENERGIZATION, REMOVAL AND BLANK-OFF BY THE CONTRACTOR.

E. DISCONNECT AND REMOVE EXISTING COMMUNICATION AND SECURITY EQUIPMENT AND ASSOCIATED CONTROLS, BOXES, CONDUIT, WIRE, ETC. WHERE INDICATED OR WHERE LOCATED ON OR WITHIN WALLS, CEILINGS OR FLOORS TO BE REMOVED, UNLESS OTHERWISE INDICATED. REMOVE CIRCUITS BACK TO THEIR ORIGIN UNLESS OTHERWISE REQUIRED FOR EXISTING EQUIPMENT TO REMAIN. OPERATION AND CIRCUITING OF EQUIPMENT TO REMAIN SHALL NOT BE ALTERED DUE TO

THE REMOVALS.

F. MAINTAIN AND RESTORE, IF INTERRUPTED BY REMOVALS OR IN PATH OF NEW CONSTRUCTION, ALL CIRCUITS, CONDUITS AND FEEDERS PASSING THROUGH AND

SERVING UNDISTURBED AREAS (SHOWN OR NOT SHOWN).

G. ALL EXISTING CONDUITS STUBBED THROUGH FLOOR SERVING ITEMS TO BE REMOVED AND NOT SHOWN OR REQUIRED TO BE REUSED, SHALL BE SEALED WITH FIRE

STOP MATERIALS.

H. IN ANY AREA REQUIRING THE PERFORMANCE OF ANY TRADE'S WORK, CONTRACTOR SHALL CAREFULLY REMOVE AND STORE ANY OR ALL COMMUNICATION AND SECURITY ITEMS IN PATH OF WORK, REINSTALLING AND RECONNECTING SAME AS REQUIRED, IN ACCORDANCE WITH THE PLANS AND/OR AS DIRECTED AFTER

COMPLETION OF OTHER TRADE'S WORK IN THAT AREA.

I. INVENTORY MAJOR COMMUNICATION AND SECURITY ITEMS THAT ARE REMOVED AND PROVIDE A LIST TO THE OWNER FOR THEIR SELECTION OF ITEMS TO BE RETAINED. ALL ITEMS REJECTED BY THE OWNER SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE. ALL EQUIPMENT INDICATED TO BE TURNED OVER TO THE OWNER SHALL BE DISCONNECTED AND REMOVED FROM THE EXISTING SYSTEMS IN GOOD WORKING CONDITION AND DELIVERED (INCLUDING LOADING AND UNLOADING) TO A STORAGE AREA WITHIN THE BUILDING AS SELECTED BY THE OWNER. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR ANY EQUIPMENT DAMAGED DURING REMOVAL AND DELIVERY FOR STORAGE. ANY DAMAGE TO EQUIPMENT PRIOR TO DISCONNECTING SHOULD BE REPORTED TO THE OWNER'S REPRESENTATIVE. IF NOT REPORTED, THE CONTRACTOR TAKES FULL RESPONSIBILITY FOR REPAIRS TO

THE EQUIPMENT.

J. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE AND REPLACE EXISTING CEILINGS, UNLESS OTHERWISE NOTED ON THE ARCHITECTURAL DRAWINGS, FOR PERFORMING REMOVAL OR NEW WORK WITHIN THE BUILDING. THE EXISTING CEILINGS SHALL BE REMOVED IN A MANNER TO AVOID DAMAGE TO THE CEILING SYSTEMS. STORAGE OF CEILING SYSTEM COMPONENTS FOR REINSTALLATION IS THE RESPONSIBILITY OF THE CONTRACTOR. THE STORAGE OF ALL MATERIAL SHALL BE IN AREAS OR LOCATIONS APPROVED BY THE OWNER. THE STORAGE OF ALL MATERIAL IS THE RESPONSIBILITY OF THE CONTRACTOR. AFTER COMPLETION OF ALL REMOVAL OR NEW WORK, THE CONTRACTOR SHALL REINSTALL THE CEILING SYSTEMS TO MATCH THE ORIGINAL INSTALLATIONS. ANY CEILING SYSTEM COMPONENT DAMAGED DURING REMOVAL, STORAGE OR REINSTALLATION SHALL BE REPLACED WITH NEW AT NO EXPENSE TO THE OWNER.

K. UNLESS SHOWN ON THE ARCHITECTURAL DRAWINGS, IT IS THE RESPONSIBILITY OF THIS CONTRACT TO PATCH AND FINISH ALL EXISTING CONDUIT PENETRATIONS

THROUGH FLOORS AND WALLS AFTER REMOVAL.

L. EXISTING COMMUNICATION AND SECURITY EQUIPMENT, ACCESSORIES, WIRING OR CONDUIT THAT WILL NOT BE UTILIZED FOR THE INSTALLATION OR OPERATION OF THE NEW COMMUNICATION AND SECURITY SYSTEM SHALL BE DISCONNECTED AND REMOVED. NO EQUIPMENT, ACCESSORIES, WIRING OR CONDUIT SHALL BE ABANDONED IN PLACE UNLESS EXPRESSED NOTED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW, TEST AND DOCUMENT THE OPERATION OF EXISTING COMMUNICATION AND SECURITY AND SPECIAL SYSTEMS SERVING RENOVATED AREAS AND SYSTEMS THAT MIGHT EXTEND OUTSIDE OF THE RENOVATED AREA TO PREVENT THE POSSIBILITY OF DAMAGE OR INTERRUPTION OF EXISTING SYSTEMS WHILE PERFORMING REMOVAL WORK. ALL COMMUNICATION AND SECURITY SYSTEMS SHALL BE FULLY INVESTIGATED BEFORE DISCONNECTING OF SYSTEMS TO AVOID INTERRUPTING AREAS OR SYSTEMS OUTSIDE THE INTENDED SCOPE. THE CONTRACTOR SHALL REVIEW ALL SHUT DOWNS AND REMOVAL REQUIREMENTS WITH THE OWNER. AFTER RENOVATING EXISTING ELECTRICAL WORK, THE CONTRACTOR SHALL ENSURE THAT ALL REMAINING AND NEW EQUIPMENT WILL OPERATE PROPERLY.

M. ALL COMMUNICATION AND SECURITY WORK INDICATED TO REMAIN SHALL BE SUITABLY PROTECTED TO PREVENT ANY DAMAGE.

A. SLEEVE AND SEAL ALL WALL AND FLOOR PENETRATIONS. ALL FIRE RATINGS SHALL BE MAINTAINED. ALL PENETRATIONS, CONDUITS, AND CONDUIT SLEEVES MUST USE MECHANICAL/BUSHING FIRESTOPPING METHODS. USE OF FIRESTOPPING CAULK OR BARRIER PILLOWS IS NOT ALLOWED PER VA STANDARDS. BACKBONE FIBER OPTIC CABLING MUST BE ROUTED IN NEW INNERDUCTS FOR THE FROM TR TO ROOM 201B-52.

B. MAINTAIN SERVICE CLEARANCES OF ALL EQUIPMENT.

C. COORDINATE EXACT LOCATION OF ALL CONDUIT ROUTES, EQUIPMENT AND DEVICES WITH EXISTING CONDITIONS PRIOR TO CONSTRUCTION.

D. MINIMUM CONDUIT SIZE SHALL BE 1" FOR TELECOMMUNICATIONS AND 1/2" FOR ALL OTHER CIRCUITS. PROVIDE NYLON PULLSTRING IN ALL EMPTY CONDUITS.

CONDUIT SHALL NOT BE SIZED ANY LESS THAN REQUIRED TO MAINTAIN 40% FILL. THE USE OF ELECTRICAL TYPE "LB" FIXTURES IS PROHIBITED. ONLY THE USE OF A COMMUNICATIONS TYPE "SMARTLB" CONDUIT BODY (I.E. MODEL & SKU #KBLB400, OR APROVED EQUIVALENT.) IS AUTHORIZED AS MAY BE REQUIRED, IN LIMITED

CIRCUMSTANCES.

E. PROVIDE CONDUIT/WIRING (CIRCUITING) AND REQUIRED EQUIPMENT CONNECTIONS TO ALL DEVICES/EQUIPMENT. PROVIDE AS PART OF THIS PROJECT. CONNECT

TO CIRCUIT(S) AS INDICATED.

F. PROVIDE MATCHING BRANCH CIRCUITING AND FEEDERS TO RELOCATE EQUIPMENT, DEVICES, ETC., AND MAINTAIN FEED-THROUGH WIRING AND SYSTEMS TO REMAIN. PROVIDE CUTTING, PATCHING AND PAINTING TO MATCH SURROUNDING SURFACE UNLESS NOTED OTHERWISE.

G. PROVIDE INDIVIDUAL PUBLIC ADDRESS BRANCH CIRCUITING FROM EACH ROOM SPEAKER, AND ZONAL PUBLIC ADDRESS BRANCH CIRCUITING FROM EACH CORRIDOR/EXTERIOR SPEAKER TO INTERCOM & PAGING SYSTEM RACK. PROVIDE HARDWARE, PUNCH DOWN BLOCKS AND TESTING.

H. PROVIDE INDIVIDUAL TELEPHONE / DATA CONDUIT FROM EACH TELEPHONE / DATA OUTLET TO ACCESSIBLE CEILING; FIRESTOPPED AT RATED PENETRATIONS.

I. ALL WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE NFPA, THE U.S. DEPARTMENT OF VETERANS AFFAIRS AND THE OFFICE OF INFORMATION AND TECHNOLOGY. TO INCLUDE ALL LOCAL, STATE, AND FEDERAL BUILDING AND FIRE CODES, REGULATIONS, AND BE FULLY STANDARDS BASED CODE COMPLIANT PER ANY AND ALL AUTHORITIES WITH LAWFUL JURISDICTION (AHJ). APPROVED FOR INTENDED SERVICE; ALL MATERIAL AND EQUIPMENT SHALL

BE UL, NEMA, ANSI, IEEE, ADA, & CBM.

J. INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND CONDITIONS FOR WARRANTY AND GUARANTEE. PROVIDE ALL ACCESSORIES REQUIRED FOR A COMPLETE AND SATISFACTORY INSTALLATION READY FOR CONTINUOUS USE.

K. EQUIPMENT OR MATERIALS SHALL BE NEW AND FOR ANY GIVEN SYSTEM BE A PRODUCT OF THE SAME MANUFACTURER, UNLESS NOTED OTHERWISE.

L. EXISTING SYSTEMS FEEDERS AND BRANCH CIRCUITS WHICH PASS THROUGH ALTERED AREAS AND SERVE OTHER AREAS SHALL BE MAINTAINED AS REQUIRED AND AS DIRECTED BY THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND AVOIDING THESE FEEDERS AND BRANCH CIRCUITS. IF DISTURBED, THEY SHALL BE REPAIRED AND BROUGHT BACK ON-LINE AS SOON AS POSSIBLE AND AT THE CONTRACTORS EXPENSE.

M. COORDINATE ARRANGEMENT, MOUNTING AND SUPPORT OF CONDUIT TO ALLOW MAXIMUM POSSIBLE HEADROOM IN THE CEILING CAVITIES.

N. CUT AND PATCH BUILDING CONSTRUCTION AS REQUIRED. PROVIDE U.L. LISTED FIRE STOP METHODS FOR PENETRATIONS OF FIRE-RATED BUILDING COMPONENTS OR BARRIERS PER CONTRACT SPECIFICATIONS. WATERPROOF ALL EXTERIOR OUTDOOR PENETRATIONS. THIS WORK SHALL BE SUBJECT TO INSPECTION AND APPROVAL. OBTAIN WRITTEN AUTHORIZATION FROM PROJECTS' STRUCTURAL ENGINEER PRIOR TO PENETRATING OR CUTTING ANY STRUCTURAL COMPONENTS.

EXCEPT AS NOTED IN SPECIFICATIONS, ALL CUTTING AND PATCHING OF BUILDING CONSTRUCTION REQUIRED TO ACCOMMODATE THE WORK OF THIS CONTRACT

SHALL BE THE RESPONSIBILITY OF CONTRACTOR.

O. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF ANY WORK OR SHOP FABRICATION. REQUIRED CHANGES TO WORK SHOWN ON CONSTRUCTION DRAWINGS SHALL BE APPROVED BY THE ENGINEER IN WRITING, OTHER TRADES AND OWNER AS REQUIRED PRIOR

TO ANY CONSTRUCTION.

P. COORDINATE THE WORK OF THIS CONTRACT WITH THE WORK OF OTHER CONTRACTS. COORDINATE WITH THE GENERAL CONTRACTOR FOR ALL ROOF PENETRATIONS, SOFFITS, CHASES, AND PADS. COORDINATE WITH MECHANICAL AND PLUMBING CONTRACTORS, SPECIFICATIONS, AND SCHEDULES ON DRAWINGS FOR DETERMINATION OF RESPONSIBILITY TO FURNISH AND INSTALL ELECTRICAL COMPONENTS OF MECHANICAL EQUIPMENT. COORDINATE SHUTDOWN OF

EXISTING SYSTEMS WITH OWNER AND OTHER TRADES.

Q. CONTRACTOR SHALL PROVIDE NECESSARY SUPPORT FRAMING, STIFFENERS, BRACING, AND HANGERS WHETHER SHOWN OR NOT TO ENSURE A COMPLETE AND DURABLE SYSTEM. SUPPORT FRAMING CONNECTIONS SHALL BE WELDED UNLESS SPECIFICALLY SHOWN OTHERWISE. ACTUAL SUPPORTS MAY VARY FROM THOSE SHOWN IN DETAILS AND AS REQUIRED FOR EQUIPMENT TO BE FURNISHED OR FOR EXISTING FIELD CONDITIONS.

GENERAL NOTES (APPLY TO ALL DRAWINGS)

GENERAL DEMOLITION NOTES

SLEEVE OR CONDUIT WITH WITH

MECHANICAL / BUSHING FIRESTOP

SLEEVE WITH MECHANICAL / BUSHING FIRESTOP

CONDUIT WITH MECHANICAL / BUSHING FIRESTOP

NEMA RATED ENCLOSURE

COMMUNICATION HAND HOLEHH

Department of Veteran Affairs

TN-2

SITE PLAN - DEMOLITION

SCALE: 1/64" = 1'-0"

DRAWING NOTES

(6) EXISTING 4" BURIED OSP CONDUITS DUCT BANK.

(6) EXISTING 4" BURIED OSP CONDUITS DUCT BANK

STUBBED UP THOUGH FLOOR IN TR ROOM

C100M1B-1.

EXISTING NEMA RATED ENCLOSURE, MOUNTED TO

CONCRETE RETAINING WALL. (6) 4" CONDUITS

ENTER THROUGH THE BACK OF THE ENCLOSURE

AND EXIT THROUGH THE BOTTOM OF THE

ENCLOSURE.

EXISTING HAND HOLE.

(4) EXISTING 4" OSP CONDUITS EXTENDING TO

ENCLOSURE MOUNTED ON THE EXTERIOR OF

BUILDING 6.

EXISTING NEMA RATED ENCLOSURE, MOUNTED TO

THE SIDE OF BUILDING 6. (6) EXISTING 4" CONDUITS

ENTER THROUGH BOTTOM OF ENCLOSURE. (2)

EXSITING CONDUITS ENTER BUILDING 6 THROUGH

BACK OF THE ENCLOSURE.

(4) EXISTING 4" OSP CONDUITS EXTENDING TO

ENCLOSURE MOUNTED ON THE EXTERIOR OF

BUILDINGS 6 AND 7.

EXISTING NEMA RATED ENCLOSURE, MOUNTED TO

THE SIDE OF BUILDING 7.

(6) EXISTING 4" BURIED OSP CONDUITS DUCT BANK

ENTER THOUGH WEST WALL IN SUB-BASEMENT OF

BUILDING 22 IN ROOM SB02-22.

(6) EXISTING 4" BURIED OSP CONDUITS DUCT BANK

EXTENDING BETWEEN BUILDING 18 AND BUILDING

22.

EXISTING NEMA RATED ENCLOSURE, MOUNTED TO

THE SIDE OF BUILDING 18. (6) EXISTING 4"

CONDUITS ENTER THROUGH BOTTOM OF

ENCLOSURE. (2) EXSITING CONDUITS ENTER

BUILDING 18 THROUGH BACK OF THE ENCLOSURE.

CONTRACTOR SHALL USE CAUTION WHEN

WORKING IN EXISTING CONDUIT SYSTEM AS

ELECTRICAL WIRING IS PRESENT. FOLLOWING

REMOVAL OF COMMUNICAITONS CABLING THE

CONTRACTOR IS TO SEAL OFF EXISTING

COMMUNICATIONS CONDUITS AND ABANDON IN

PLACE.

LOCATION OF EXISTING SOLAR PANEL FARM. FIBER

OPTIC CABLING SERVING THIS EQUIPMENT IS

OWNED/MAINTAINTED BY SOLAR PANEL

MANUFACTURER. MAINTAIN THE FIBER OPTIC

CABLE BACK TO SOURCE. CABLE ROUTES THOUGH

BUILDING 53.

HH

3 1

GENERAL NOTES

A. CONTRACTOR TO COMPLETE ALL WORK UNDER

PERMIT OF LOCAL AHJ FOLLOWING ANY AND ALL

RESTRICTIONS.

B. ESTIMATED CONDUIT ROUTES SHOWN. EXISTING

UTILITIES ARE NOT DEPICTED. CONTRACTOR

RESPONSIBLE FOR ALL SUBSURFACE

INVESTIGATION AS MAY BE REQUIRED PRIOR TO

COMMENCEMENT OF WORK. INVESTIGATION

REQUIRED INCLUDES REVIEW OF AVAILABLE

OWNER PROVIDED DRAWINGS, FIELD SURVEY,

GROUND PENETRATING RADAR, DIG SAFE/811

UTILITY MARKOUT.

C. CONTRACTOR REQUIRED TO PROVIDE TRAFFIC

CONTROL FOR ALL DEMOLITION AND

CONSTRUCTION WORK. CONTRACTOR SHALL

PROVIDE SIGNS, BARRICADES, LIGHTING, STEEL

PLATING, AND ALL OTHER MATERIALS AS MAY BE

REQUIRED BY THE LOCAL AHJ TO PROVIDE A SAFE

WORK SITE.

WHOLE BUILDING

(44) 5006 SQ. FT.

WHOLE BUILDING

(44) 2358 SQ. FT.

CONTROL ROOM

(11) 636 SQ. FT.

GENERATOR ROOM

(11) 1525 SQ. FT.

SWITCHGEAR

(11) 2227 SQ. FT.

GENERATOR TRANSFER ROOM

(11) 1039 SQ. FT.

MECH

(18) 943 SQ. FT.

FIRE PUMP

(11) 479 SQ. FT.

WHOLE BUILDING

B24

(44) 4809 SQ. FT.

MECH SPACE

SB1-24

(11) 333 SQ. FT.

GENERAL STORAGE

SB4-24

(27) 490 SQ. FT.

W

AL

K-

IN

R

EF

G

SB

3-

(2 7)

SQ

. F

T.

MECH SPACE

SB2-24

(11) 70 SQ. FT.

WALK-IN FREEZER

SB6-24

(27) 609 SQ. FT.

GENERAL STORAGE

SB5-24

(27) 239 SQ. FT.

GENERAL STORAGE

SB7-24

(7) 218 SQ. FT.

CORRIDOR

SB8-24

(11) 78 SQ. FT. /

CORRIDOR

SBC10-24

(11) 316 SQ. FT.

ELEV EQUIP

SB9-24

(11) 90 SQ. FT. /

ELEV

SBSE4-24

(11) 72 SQ. FT.

STAIR

SB4S

(11) 140 SQ. FT.

MECH SPACE

SB7A-24

(18) 335 SQ. FT.

C O

R R

ID

O

R

SB

-2

(1

1)

SQ

. F T. /

STORAGE

SB14-24

(17) 94 SQ. FT. /

GREASE TRAP

SB15-24

(18) 144 SQ. FT.

CORRIDOR

SBC11-24

(11) 320 SQ. FT.

EMS STORAGE

SB12-24

(17) 129 SQ. FT.

AC STORAGE

SB17-24

(18) 47 SQ. FT. /

AC STORAGE

SB17A-24

(18) 50 SQ. FT.

AC STORAGE

SB16-24

(18) 214 SQ. FT.

WHOLE BUILDING

B22

(44) 1889 SQ. FT.

MECH

SB02-22

(11) 1588 SQ. FT.

UPS

SB01-22

(11) 109 SQ. FT.

C100-52

(11) 784 SQ. FT.

EM

PL

O

YE

E

TO

IL

ET

1C

-5

(1 8)

S

Q . F

T.

ST

AI

R W

EL

L

0S

-5

(1 8)

S

Q . F

T.

CONTROLER

101B-52

(18) 346 SQ. FT. /

W

AT

ER

S

AM

PL

IN

G

1A

-5

(1 8)

SQ

. F

T.

VS DRIVE

101A1-52

(18) 165 SQ. FT.

SWITCH GEAR ROOM

101F-52

(11) 1915 SQ. FT.

CHILLER ROOM

101-52

(11) ############

SWITCH GEAR ROOM

101D-52

(11) ###########

WHOLE BUILDING

(44) 10929 SQ. FT.

SERVING ZONE: B05B

SERVING ZONE: B4A-24

SERVING ZONE: 201B-52 SERVING ZONE: BC-100A-53

Department of Veteran Affairs

TN-3

BUILDINGS 22, 24, 52, 53 - SUB BASEMENT - KEY PLAN - DEMOLITION

SCALE: 1" = 20'-0"

B22

(44) 6524 SQ. FT.

CORRIDOR

BC1A-22

(11) ###########

OFFICE

B14-22

(23) 222 SQ. FT.

EL

EV

AT

O

R E

Q U

IP

B1

5-

(1 1)

OFFICE

B14A-22

(23) 189 SQ. FT.

OFFICE

B10B-22

(23) 128 SQ. FT.

TOILET F

B12-22

(9) 98 SQ. FT.

TOILET M

B13-22

(9) 125 SQ. FT.

HAC

B11-22

(17) 39 SQ. FT.

OFFICE

B10-22

(23) 87 SQ. FT.

STORAGE

B10A-22

(23) 257 SQ. FT.

CORRIDOR

B10B-22

(23) 49 SQ. FT.

OFFICE

B09-22

(23) 149 SQ. FT./

CONFERENCE

B09A-22

(23) 236 SQ. FT.

OFFICE

B08A-22

(24) 313 SQ. FT.

OFFICE

B08-22

(24) 129 SQ. FT.

OFFICE

B09B-22

(24) 119 SQ. FT.

VESTIBULE

BC1C-22

(11) 47 SQ. FT.

STAIRWELL

BS5-22

(11) 142 SQ. FT.

OFFICE

B07-22

(24) 155 SQ. FT.

OFFICE

B06-22

(39) 197 SQ. FT.

STORAGE

B06B-22

(39) 26 SQ. FT.

MECH

B05-22

(11) 410 SQ. FT.

TELE

B05B-22

(23) 11 SQ. FT.

STORAGE

B04-22

(23) 367 SQ. FT.

IRM WORK ROOM

B03-22

(23) 807 SQ. FT.

CORRIDOR

BC1B-22

(11) ##########

STAIRWELL

BS1-22

(11) ###########

C O

R R

ID

O

R

BC

1-

(1 1)

OFFICE

B07A-22

(24) 152 SQ. FT.

CENTRALIZED

STAFFING

IRM

LOGISTICS

TENANT SPACE

EMS

SERVING ZONE: B04-22

MECH

B6-24

(11) 915 SQ. FT.

MAIL ROOM

B7A-24

(24) 387 SQ. FT.

MAIL ROOM

B7-24

(24) 67 SQ. FT.

STORAGE

B8A-24

(24) 104 SQ. FT.

WAREHOUSE

B1-24

(24) 4322 SQ. FT.

CORRIDOR (TUNNEL)

100T-1

(11) 590 SQ. FT.

ELEV SHAFT

S1T-1

(11) 77 SQ. FT.

ELEV SHAFT

S2T-1

(11) 77 SQ. FT.

ST

AI

R W

EL

L

BS

3-

(1

1)

SQ

. F T.

STAIR

BS4-1

(11) 162 SQ. FT.

ELEV SHAFT

BSE4-24

(11) 65 SQ. FT.

CORRIDOR

BC7-24

(11) 147 SQ. FT.

CORRIDOR

BC7A-24

(11) 88 SQ. FT.

CANTEEN STORAGE

B4-24

(7) 575 SQ. FT.

STORAGE

B4B-24

(7) 100 SQ. FT.

TOILET

B5-24

(9) 75 SQ. FT.

TELE

B4A-24

(23) 25 SQ. FT.

WHOLE BUILDING

B24

(44) 8570 SQ. FT.

LOGISTICS

SERVING ZONE: B4A-24

WHOLE BUILDING

(44) 18552 SQ. FT.

PUMP

58-102

(11) 323 SQ. FT.

TR

EA

TM

EN

T

-1

(1 1)

S

Q . F

T.

SIGNAL

BC-100A

(11) 87 SQ. FT.

MECH

BC-100

(11) 1019 SQ. FT.

FITNESS CENTER

BB-115

(27) 1253 SQ. FT.

M TOILET/SHOWER

BB-113B

(9) 344 SQ. FT.

W LOCKER ROOM

BB-113A

(9) 363 SQ. FT.

CORRIDOR

BB-113

(9) 111 SQ. FT.

M O

R G

U E

VE

ST

IB

U

LE

BB

1-

(3

6)

SQ

. F T.

WALK-IN COOLER

BB111B-53

(36) 199 SQ. FT.

AUTOSPY

BB111A-53

(36) 392 SQ. FT.

ST

AF

F

TO

IL

ET

BB

1A 1-

(3

6)

S Q

. F T.

LOCKER/SHOWER

BB111A2-53

(36) 70 SQ. FT.

BULK STORAGE

BB-100E

(24) 269 SQ. FT.

BULK STORAGE

BB-100D

(24) 155 SQ. FT.

INPATIENT PHARMACY

BB-100

(24) 1117 SQ. FT.

OFFICE

BB-102

(24) 147 SQ. FT.

OFFICE

BB-103

(24) 133 SQ. FT.

BREAK AREA

BB-100A

(24) 193 SQ. FT./

DW-1

BB-100A1

(24) 32 SQ. FT. /

STORAGE

BB-100B1

(24) 398 SQ. FT.

VAULT

BB-101

(24) 375 SQ. FT.

STAIR

BA-ST1

(11) 209 SQ. FT.

SERVICE ELEV

BA-100A1

(11) 141 SQ. FT.

SERV ELEV LOBBY

BA-100A

(11) 849 SQ. FT.

SERVICE ELEV

BA-100A2

(11) 133 SQ. FT.

SERVICE ELEV

BA-100A3

(11) 128 SQ. FT.

SUMP PUMP RM

BA-100B

(11) 172 SQ. FT.

C O

N

TR

O L

R M

BA

-1

(1

1)

S Q

. F T.

CORRIDOR

CB1

(11) 777 SQ. FT.

CORRIDOR

CB2

(11) 348 SQ. FT.

PHARMACY VAULT

BB-104

(30) 795 SQ. FT.

CORRIDOR

CB3

(11) 1366 SQ. FT.

OFFICE

BB-107

(18) 197 SQ. FT.

ADMIN OFFICE

BB-107B

(18) 323 SQ. FT.

OFFICE

BB-107D

(18) 95 SQ. FT.

OFFICE

BB-107C

(18) 108 SQ. FT.

LINEN STORAGE

BB-106

(17) 818 SQ. FT.

CLEAN LINEN

BB-105

(17) 1138 SQ. FT.

EMERGENCY STORAGE

BB-110

(17) 122 SQ. FT.

ELECTRICAL

BB-108

(11) 86 SQ. FT.

HAC

BB-109

(17) 85 SQ. FT.

RECORDS FILE ROOM

BB-119

(21) 1270 SQ. FT.

STORAGE

BB-120

(18) 897 SQ. FT.

STORAGE

(11) 16 SQ. FT.

WHOLE BUILDING

(44)

8570 SQ. FT.

LOCKSMITH

(21) 146 SQ. FT.

DOCK OPEN

TO OUTSIDE

TO B52

SUB-BASEMENT

ENGINEERING

EMS

HEALTHCARE ADMINISTRATION

CENTRALIZED STAFF

NUTRITION/FOOD

SPECIALITY SERVICE

LOGISTICS

SERVING ZONE: BC-100

Department of Veteran Affairs

TN-4

BASEMENT - BUILDING 22 - KEY PLAN - DEMO

TN-4

BASEMENT - BUILDING 24 - KEY PLAN - DEMO

TN-4

BUILDINGS 52, 53 - SUB BASEMENT - KEY PLAN - DEMOLITION

SCALE: 1/16" = 1'-0"

SCALE: 1/16" = 1'-0"

SCALE: 1/16" = 1'-0" 5

TN-45

TN-45

TN-45

(44) 2928 SQ. FT.

S-6

S-5

S-4

P7-P8 ELEVATOR PIT

MA-102

(11) 228 SQ. FT.

STAIRWELL

1A-ST1

(11) 208 SQ. FT.

MECH SPACE

MA02

(18) 518 SQ. FT.

GIP

CMA-101

(24) 613 SQ. FT.

GIP OFFICE

MA-100

(24) 168 SQ. FT.

SERVICE ELEV

CMA-100C

(11) 139 SQ. FT.

SERVICE ELEV

CMA-100A

(11) 146 SQ. FT.

GIP

CMA-100

(24) 453 SQ. FT.

SERVICE ELEV

CMA-100B

(11) 139 SQ. FT.

ENGINEERING

LOGISTICS

WHOLE BUILDING

(44) 10951 SQ. FT.

MEZZANINE

201-52

(11) 5186 SQ. FT.

DDC SERVER ROOM

201A-52

(23) 106 SQ. FT.

UPS WORK ROOM

201A2-52

(23) 91 SQ. FT.

STORAGE IT

201A1B-52

(23) 123 SQ. FT.

PACS/VIDEO

201A1-52

(23) 124 SQ. FT.

STORAGE

201A1A-52

(23) 56 SQ. FT.

TELEPHONE EQUIP. ROOM

201B-52

(23) 806 SQ. FT.

TOILET

201C-52

(18) 80 SQ. FT.

CORRIDOR

C200-52

(11) 330 SQ. FT.

C O

R R

ID

O

R /S

TO

R

AG

E

C

1-

(1 1)

SQ

. F

T.

IRM

SERVING ZONE : B52

CMA-100

SERVING ZONE: 201B-52

TN-45

Department of Veteran Affairs

TN-5

BUILDINGS 52, 53 - MEZZANINE - DEMOLITION

SCALE: 1/16" = 1'-0"

TE

LE

H

EA

LT

H

1C

-1 (3

2)

FIRE ALARM

1C144-1

(11) ###########

WHOLE BUILDING

B1

(44) #############

ELECTRICAL

1E10-1

(18) ###########

ELECTRICAL

1E09-1

(18) ###########

ELEV EQUIP

1E11-1

(18) ##########

LINEN PREP

1E06A-1

(24) ###########

STORAGE

1E06B-1

(24) ###########

/H

AC

1E

-1 (2

4)

EMPLOYEE LOUNGE

1C11A-1

(37) ########### /

OFFICE

1C11-1

(24) ###########

OFFICE

1C10A-1

(24) ###########

STORAGE

1C12A-1

(24) ########### /

ST

ER

IL

E

PR

O

C

ES

SI

N

G S

ER

VI

C E

1C

-1 (3

7)

OFFICE

1B05-1

(37) ###########

STERILE PROCESSING SERVICE

1E01-1

(37) ############

ELEC

1E01A-1

(37) ##########

CLEAN UTILITY

1E08-1

(37) ############

/H

AC

1E

B-

(3 7)

/EL

EC

1E

C -1

(3 7)

SOILED UTILITY

1E03-1

(37) ###########

C O

R R

ID

O

R

(3 7)

STAFF TOILET

1E04-1

(37) ###########

STAFF TOILET

1E05-1

(37) ###########

GENERAL STORAGE

1E06-1

(37) ############

D U

M

BW

AI

TE

R 1C

D W

-1 (3

7)

VCS

1B28-1

(7) ###########

OFFICE

112-1

(32) ###########

PATIENT TOILET

113A-1

(32) ##########

OFFICE

113-1

(32) ###########

STORAGE

114-1

(32) ##########

PATIENT TOILET

115A-1

(32) ##########

EXAM

115-1

(32) ###########

EXAM

116-1

(32) ###########

OFFICE

117-1

(32) ##########

HAC

118-1

(32) ##########

OFFICE

119-1

(32) ###########

LIQUID NITROGEN STOR

(32) ##########

OFFICE

120-1

(32) ###########

EXAM

121-1

(32) ###########

EXAM

122-1

(32) ###########

CORRIDOR

100C-1

(32) ###########

EXAM

123-1

(32) ########### /

OFFICE

124-1

(32) ###########

OFFICE

125-1

(32) ###########

STORAGE

100D1-1

(11) ##########

PSA

101-1

(32) ###########

M

ED

S

TO

R

1A -1

(3 2)

BREAK

101B-1

(32) ###########/

EXAM

102-1

(32) ###########/

EXAM

103-1

(32) ###########/

EXAM

104-1

(32) ###########/

TOILET

105-1

(32) ###########

SOILED UTILITY

106-1

(32) ##########

OFFICE

107-1

(32) ##########

EXAM

108-1

(32) ###########

C O

R R

ID

O

R

0B -1

(3 2)

CORRIDOR

100B1-1

(32) ##########

STAFF TOILET

109-1

(32) ##########

EXAM

110-1

(32) ##########

NURSING OFFICE

111-1

(32) ###########

PATIENT TOILET

111A-1

(32) ##########

WAITING

100A1-1

(32) ###########

WAITING

1C148-1

(32) ###########

IT

C100M1B-1

(32) ##########

WAITING

1C165-1

(32) ########### /

WAITING

1C164-1

(32) ###########

MILLION VET PROGRAM

1C138-1

(32) ########### /

C

LE

AN

U

TI

LI

TY

(3 2)

SOILED UTILITY

1C139-1

(32) ##########

/H

AC

1C

0-

(3 2)

EN

TR

AN

C

E

(3 2)

C O

R R

ID

O

R C

0C

1-

(3 2)

STAFF TOILET M

1C142-1

(32) ##########

STAFF TOILET W

1C141-1

(32) ##########

OFFICE

1C146A1-1

(32) ########## /

PATIENT TOILET

1C146A2-1

(32) ########## /

WORK

1C146A3-1

(32) ###########

OFFICE

1C146A4-1

(32) ###########

OFFICE

1C146A5-1

(32) ###########

OFFICE

1C146A6-1

(32) ###########

STORAGE

1C146A7-1

(32) ##########

COR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .