Attachment 03 Drawings 2 of 13 Muskogee 623-21-700.pdf

PDF 20 MB Posted

Attached to
Y1DA--623-21-700 | Construct EHRM Infrastructure Upgrades | Jack C. Montgomery VAMC - Muskogee, OK | Samantha/Leslie
Solicitation number
36C77624R0046
Issued by

About this file

This document is a set of architectural and mechanical floor plan drawings for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma. The drawings, dated May 24, 2024, cover detailed renovation plans for multiple buildings (Buildings 1, 18, 22, 24, 52, and 53) across basement, first, second, third, fourth, and fifth floors. The plans include comprehensive demolition and new construction layouts, with a focus on mechanical system upgrades involving new HVAC mini-split systems, terminal units, heat pumps, and refrigerant line installations in various rooms such as offices, corridors, storage areas, and technical spaces.

The drawings are part of the VA's infrastructure modernization effort, with specific technical details including installation of Daikin mini-split systems ranging from 1.5 to 2.5 tons, new VAV terminal units sized for 2 air changes per hour, and precise routing of condensate piping and refrigerant lines. Each floor plan includes room-specific mechanical system configurations, demolition notes, and key technical specifications. The project involves systematic upgrades across multiple buildings, with careful attention to existing infrastructure, room function preservation, and integration of new mechanical systems to support the VA's electronic health record modernization initiative.

View the file

Other files

File Type Posted
36C77625R0046 0009.pdf PDF
Attachment 21 - Tech Questions Tracker - FINAL07162025.pdf PDF
Attachment 21 - Tech Questions Tracker - FINAL_07142025.pdf PDF
36C77625R0046 0008.pdf PDF
Attachment to Tech Questions- ASI-001 Mechanical Ductwork Drawings- 20250714.pdf PDF
36C77625R0046 0007.pdf PDF
Attachment 21 - Tech Questions Tracker - 07082025.pdf PDF
Attachment 21 - Tech Questions Tracker - 07022025.pdf PDF
36C77625R0046 0006.pdf PDF
36C77625R0046 0005.pdf PDF
Attachment 16 Muskogee County Wage Rates_06272025.pdf PDF
Attachment 20 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
36C77625R0046 0004.pdf PDF
Attachment 21 - Tech Questions Tracker - 20250623 Partial.pdf PDF
36C77625R0046 0003.pdf PDF
Attachment 19 Site Visit Sign In Sheet 62323700.pdf PDF
36C77625R0046 0002.pdf PDF
36C77625R0046 0001.pdf PDF
Attachment 05 Drawings 4 of 13 Muskogee 623-21-700.pdf PDF
Attachment 17- Limitations on Subcontracting - Muskogee EHRM.pdf PDF
Attachment 08 Drawings 7 of 13 Muskogee 623-21-700.pdf PDF
Attachment 01 - 623-21-700 - Muskogee - Updated Combined Specifications-20250501.pdf PDF
36C77625R0046_1.pdf PDF
Attachment 04 Drawings 3 of 13 Muskogee 623-21-700.pdf PDF
Attachment 18 Site Map.pdf PDF
Attachment 02 Drawings 1 of 13 Muskogee 623-21-700.pdf PDF
Attachment 16 Muskogee County Wage Rates.pdf PDF
Attachment 07 Drawings 6 of 13 Muskogee 623-21-700.pdf PDF
Attachment 06 Drawings 5 of 13 Muskogee 623-21-700.pdf PDF
Attachment 12 Drawings 11 of 13 Muskogee 623-21-700.pdf PDF
Attachment 14 Drawings 13 of 13 Muskogee 623-21-700.pdf PDF
Attachment 10 Drawings 9 of 13 Muskogee 623-21-700.pdf PDF
Attachment 13 Drawings 12 of 13 Muskogee 623-21-700.pdf PDF
Attachment 11 Drawings 10 of 13 Muskogee 623-21-700.pdf PDF
Attachment 09 Drawings 8 of 13 Muskogee 623-21-700.pdf PDF
Attachment 15- PCRA for EHRM 623-700.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

52.A 52.B 52.C

52.4

52.5

52.6

EXPOSED

CLG.

52.A 52.B 52.C

52.4

52.5

52.6

EXPOSED

CLG.

EXPOSED

CLG.

TELEPHONE

EQUIP. ROOM

201B-52

RSF-1

RB-2

PT-6

OPEN

STORAGE IT

201A1B-52

PACS/VIDEO

201A1-52

DOC SERVER

201A-52

52.A 52.B 52.C

52.4

52.5

52.6

S1

S1

S1

STORAGE IT

201A1B-52

PACS/VIDEO

201A1-52

DOC SERVER

201A-52

52.A 52.B 52.C

52.4

52.5

52.6

TELEPHONE

EQUIP. ROOM

201B-52

EXPOSED

CLG.

TELEPHONE

EQUIP. ROOM

201B-52

STORAGE IT

201A1B-52

PACS/VIDEO

201A1-52

DDC SERVER

ROOM

201A-52

UPS WORK ROOM

201A2-52

STORAGE

201A1A-52

TELEPHONE

EQUIP. ROOM

201B-52

STORAGE IT

201A1B-52

PACS/VIDEO

201A1-52

DDC SERVER

ROOM

201A-52

UPS WORK ROOM

201A2-52

STORAGE

201A1A-52

RM 201B-52

SHOWN AREA

PROJECT

NORTH

EXISTING DOOR TO REMAIN

NEW DOOR

TO DEMOLISH

EXISTING WALL TO DEMOLISH

NEW LIGHTS (SEE ELECTRICAL DETAILS)

FINISH PLAN LEGEND

OFFICE

XXXX

LVT-2

RB

PT-1

ACP-1

ROOM NAME

ROOM NUMBER

FLOOR FINISH

BASE FINISH

TYP. WALL FINISH

CEILING FINISH

1KEY NOTE

1. REFER TO VA SIGNAGE DESIGN MANUAL INTERIOR

SIGNAGE GUIDELINES SIGN IN-04.02 [PG.85].

2. REUSE EXISTING ROOM SIGNAGE IN SAME LOCATION.

3. PROVIDE NEW SIGNAGE TO MATCH EXISTING SIGNAGE

COLOR WITHIN FLOOR STANDARD.

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

Department of

Veteran Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t Dwg. of

52A-202

BUILDING 52 - LEVEL 02 - ENLARGED DEMO,

FLOOR PLANS & RCPS

SEVEN GENERATIONS ARCHITECTURE AND ENGINEERING

600 E. MICHIGAN AVE. STE B

KALAMAZOO, MI 49007

296.927.0144

JACK C. MONTGOMERY VA MEDICAL CENTER

02/12/2024 JRB SCC

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1/4" = 1'-0"

RM 201B-52 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 201B-52 - DEMO RCP

1/4" = 1'-0"

RM 201B-52 - FLOOR PLAN

1/4" = 1'-0"

RM 201B-52 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

INTERIOR SIGNAGE SCHEDULE

Sign Type

Room

B a c k e r P la te

Comments

Room:

Occupant

Name

LEVEL 02

S1 2C50-1 OFFICE No 1, 2

S1 2C50A-1 CHIEF OFFICE No 1, 3

S1 2C50B-1 TR No 1, 3

S1 201A1B-5 2 STORAGE IT No

1, 2

S1 201B-52

TELEPHONE EQUIP.

ROOM No

1, 2

S1 201B-52

TELEPHONE EQUIP.

ROOM No

1, 3

S1 205-24 TR No 1, 3

S1 205-24A CORRIDOR No 1, 2

S1 240-1 TR No 1, 2

S1 241-1 STORAGE No 1, 2

Revisions: 35% Schematic Design Date: 02/24/2023

Revisions: 65% Design Development Date: 09/21/2023

Revisions: 95% Construction Documents Date: 02/12/2024

KEY PLAN

DEMO KEY NOTES

KEY NOTES

LEGEND

REMOVE EXISTING WALL CONSTRUCTION AS SHOWN. PATCH & REPAIR

ADJACENT WALLS AS REQUIRED FOR NEW CONSTRUCTION AND/OR NEW

FINISHES.

REMOVE EXISTING DOOR(S), FRAME(S), HARDWARE, ETC. PATCH & REPAIR

ADJACENT SURFACES AS REQUIRED FOR NEW CONSTRUCTION AND/OR

NEW FINISHES.

REMOVE EXISTING FLOORING AND FLOOR FINISHES INCLUDING ALL

ADHESIVES, SETTING MATERIALS DOWN TO EXISTING SUBSTRATE. GRIND

CONCRETE FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND UNIFORM

SURFACE FOR NEW FINISHES. PATCH AND REPAIR ANY OPENINGS IN THE

EXISTING SLAB.

REMOVE EXISTING CEILING TILE AND GRID SYSTEM. TURN OVER TO VA OR

SALVAGE TILE FOR RECYCLING UNLESS DIRECTED OTHERWISE. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING GYP CEILING AND ASSOCIATED ASSEMBLIES. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING WINDOW SILL. PATCH & REPAIR ADJACENT WALLS AS

REQUIRED FOR NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING INTERIOR WINDOW SYSTEM. PROTECT DURING

DEMOLITION, SALVAGE SYSTEM, AND TURN OVER TO THE VA.

PROVIDE 4 FT X 8 FT AC GRADE ¾ IN. TRADE SIZE FIRE-RATED PLYWOOD

BACKBOARD ACROSS ENTIRE WALL, MOUNTED VERTICALLY. PAINT HIGH-

GLOSS WHITE WITH TWO COATS OF FIRE-RESISTANT PAINT FOR SERVICE

PROVIDER/SECURITY/VIDEO/IT EQUIPMENT. REFER TO ELECTRICAL,

MECHANICAL, AND LOW VOLTAGE DRAWINGS FOR BACKBOARD MOUNTED

EQUIPMENT.

PROVIDE NEW 3'-0" x 8'-0" DOOR. DOOR TO BE 3/4 HOUR FIRE RATED. REFER

TO DOOR SCHEDULE

INFILL WINDOW OPENING WITH STUD AND DRYWALL CONSTRUCTION AND

FILL ENTIRE CAVITY WITH BATT INSULATION. INSTALL WINDOW FILM ON

INTERIOR SIDE OF WINDOW. REFER TO FINISH KEY.

BACKBOARD MOUNTED EQUIPMENT; REFER TO ELECTRICAL AND LOW

VOLTAGE DRAWINGS

NEW IT RACKS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

NEW CABLE TRAYS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

WALLS TO BE FINISHED FROM CORNER TO NEXT CORRIDOR CORNER.

FLOORING DISTURBED DUE TO NEW WALLS TO BE PATCHED WITH EXISTING

FLOORING.

EXISTING CEILING GRID AND TILES TO BE TRIMMED ALONG NEW WALL.

NEW RUBBER BASE TO BE INSTALLED CORNER TO CORNER. AT ANY WALL

WHERE DOOR IS BEING INSTALLED SOLELY, ONLY PATCH BASE.

Revisions: 10% Diamond Drawings Date: 09/30/2022

Revisions: 100% Bid Documents Date: 05/24/2024

1 1

OVERHEAD DOOR TO REMAIN

BULK STORAGE

BB-100D

STORAGE

BB-100B1

RES-6

RES-6

PT

ACT-1

OFFICE

BB-107

PHARMACY

VAULT

BB-104

1 1

15' - 6"

TR

BB-100C

RSF-1

RB-2

PT-6

OPEN

INPATIENT

PHARMACY

BB-100

EXIST

RB-1

PT-1

EXIST

BB-100C

BB-100B1

6' - 3"

4' - 8"

A4

A4

A4

ALIGN

S1

S1

INPATIENT

PHARMACY

BB-100

BREAK AREA

BB-100A EXPOSED

CLG.

PHARMACY

VAULT

BB-104

OFFICE

BB-107

CORRIDOR

CB3

STORAGE

BB-100B1

TR

BB-100C

BULK STORAGE

BB-100D

AFF

ACT 2x2

9' - 2"

BULK STORAGE

BB-100D

BREAK AREA

BB-100A

STORAGE

BB-100B1

AUTOPSY

BB111A-53

WALK-IN COOLER

BB111B-53

OFFICE

BB-107

PHARMACY

VAULT

BB-104

BULK STORAGE

BB-100D

BREAK AREA

BB-100A

STORAGE

BB-100B1

OFFICE

BB-107

PHARMACY

VAULT

BB-104

BB-100B1

SHOWN AREA

PROJECT

NORTH

EXISTING DOOR TO REMAIN

NEW DOOR

TO DEMOLISH

EXISTING WALL TO DEMOLISH

NEW LIGHTS (SEE ELECTRICAL DETAILS)

FINISH PLAN LEGEND

OFFICE

XXXX

LVT-2

RB

PT-1

ACP-1

ROOM NAME

ROOM NUMBER

FLOOR FINISH

BASE FINISH

TYP. WALL FINISH

CEILING FINISH

1KEY NOTE

1. REFER TO VA SIGNAGE DESIGN MANUAL INTERIOR SIGNAGE GUIDELINES SIGN IN-04.02

[PG.85].

2. REUSE EXISTING ROOM SIGNAGE IN SAME LOCATION.

3. PROVIDE NEW SIGNAGE TO MATCH EXISTING SIGNAGE COLOR WITHIN FLOOR STANDARD.

1/4" = 1'-0"

RM BB-103 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM BB-103 - DEMO RCP

1/4" = 1'-0"

RM BB-103 - FLOOR PLAN

1/4" = 1'-0"

RM BB-103 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

Department of

Veteran Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t Dwg. of

53A-200

BUILDING 53 - LEVEL 00 - ENLARGED DEMO,

FLOOR PLANS & RCPS

SEVEN GENERATIONS ARCHITECTURE AND ENGINEERING

600 E. MICHIGAN AVE. STE B

KALAMAZOO, MI 49007

296.927.0144

JACK C. MONTGOMERY VA MEDICAL CENTER

05/24/2024 JRB SCC

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MC

623-21-700

INTERIOR SIGNAGE SCHEDULE

Sign Type

Room

B a c k e r P la te

Comments

Room:

Occupant

Name

BASEMENT

S1 B4B-24 TR No 1,3

S1 B07A-22 TR No 1,3

S1 BB-100B1 STORAGE No 1,3

S1 BB-100C TR No 1,3

KEY PLAN

DEMO KEY NOTES

KEY NOTES

LEGEND

REMOVE EXISTING WALL CONSTRUCTION AS SHOWN. PATCH & REPAIR

ADJACENT WALLS AS REQUIRED FOR NEW CONSTRUCTION AND/OR NEW

FINISHES.

REMOVE EXISTING DOOR(S), FRAME(S), HARDWARE, ETC. PATCH & REPAIR

ADJACENT SURFACES AS REQUIRED FOR NEW CONSTRUCTION AND/OR

NEW FINISHES.

REMOVE EXISTING FLOORING AND FLOOR FINISHES INCLUDING ALL

ADHESIVES, SETTING MATERIALS DOWN TO EXISTING SUBSTRATE. GRIND

CONCRETE FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND UNIFORM

SURFACE FOR NEW FINISHES.

REMOVE EXISTING CEILING TILE AND GRID SYSTEM. TURN OVER TO VA OR

SALVAGE TILE FOR RECYCLING UNLESS DIRECTED OTHERWISE. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING GYP CEILING AND ASSOCIATED ASSEMBLIES. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING WINDOW SILL [IF APPLICABLE] AND/OR WINDOW

COVERINGS. PATCH & REPAIR ADJACENT WALLS AS REQUIRED FOR NEW

CONSTRUCTION AND/OR NEW FINISHES. RETURN WINDOW COVERINGS TO

OWNER.

REMOVE EXISTING INTERIOR WINDOW SYSTEM. PROTECT DURING

DEMOLITION, SALVAGE SYSTEM, AND TURN OVER TO THE VA.

REMOVE EXISTING COUNTERTOP. SALVAGE AND STORE FOR

REINSTALLATION.

PROVIDE 4 FT X 8 FT AC GRADE ¾ IN. TRADE SIZE FIRE-RATED PLYWOOD

BACKBOARD ACROSS ENTIRE WALL, MOUNTED VERTICALLY. PAINT HIGH-

GLOSS WHITE WITH TWO COATS OF FIRE-RESISTANT PAINT FOR SERVICE

PROVIDER/SECURITY/VIDEO/IT EQUIPMENT. REFER TO ELECTRICAL,

MECHANICAL, AND LOW VOLTAGE DRAWINGS FOR BACKBOARD MOUNTED

EQUIPMENT.

PROVIDE NEW 3'-0" x 8'-0" DOOR. DOOR TO BE 3/4 HOUR FIRE RATED. REFER

TO DOOR SCHEDULE

INFILL WINDOW OPENING WITH STUD AND DRYWALL CONSTRUCTION AND

FILL ENTIRE CAVITY WITH BATT INSULATION. INSTALL WINDOW FILM ON

INTERIOR SIDE OF WINDOW. REFER TO FINISH KEY.

BACKBOARD MOUNTED EQUIPMENT; REFER TO ELECTRICAL AND LOW

VOLTAGE DRAWINGS

NEW IT RACKS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

NEW CABLE TRAYS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

WALL TO BE FINISHED FROM CORNER TO NEXT CORRIDOR CORNER.

VERIFY SPECIFIED COLOR MATCHES EXISTING WALLS. NOTIFY ARCHITECT

OF ANY DISCREPANCIES.

FLOORING DISTURBED DUE TO NEW WALLS TO BE PATCHED AS NECESSARY

WITH EXISTING FINISHES. MATCH EXISTING FLOORING.

EXISTING CEILING GRID AND TILES TO BE TRIMMED ALONG NEW WALL.

REPLACE EXISTING CORRIDOR WALL FIXTURE WITH NEW LED FIXTURE AND

INSTALL AT A HIGHER LEVEL DUE TO NEW DOOR PLACEMENT.

REINSTALL SALVAGED COUNTERTOP. MOUNT TOP OF COUNTER TOP AT 3'-0"

ABOVE FINISHED FLOOR.

DOOR SCHEDULE - BUILDING 53

MARK ROOM # ROOM NAME

DOOR SIZE

DOOR

TYPE

FRAM

E

TYPE

GLAZING

TYPE

HW

SET

MATERIAL

FIRE

RATING

SOUND

RATING COMMENTSWIDTH HT THK DOOR FRAME

BB-100B1 BB-100 INPATIENT PHARMACY 3' - 0" 7' - 0" 0' - 2" A 1 - 201C WD HM - -

BB-100C CB3 CORRIDOR 3' - 0" 8' - 0" 0' - 2" A 1 - CE201T WD HM 45 MIN - CARD READER

Revisions: 35% Schematic Design Date: 02/24/2023

Revisions: 65% Design Development Date: 09/21/2023

Revisions: 95% Construction Documents Date: 02/12/2024

Revisions: 10% Diamond Drawings Date: 09/30/2022

WAP

53.D 53.E

53.6

53.7

53.6

53.7

53.D 53.E

53.6

53.7

LOBBY

1A-100

OFFICE

1B-104

OFFICE

1B-101

OFFICE

1B-102

OFFICE

1B-118

OFFICE

1B-119

OFFICE

1B-1019A

OFFICE

1B-119B

ELEV LOBBY

1A-100A

1 2

OFFICE

1B-104

OFFICE

1B-101

OFFICE

1B-102

OFFICE

1B-118

OFFICE

1B-119

OFFICE

1B-1019A

OFFICE

1B-119B

ELEV LOBBY

1A-100A

RM 1B-119B

SHOWN AREA

PROJECT

NORTH

EXISTING DOOR TO REMAIN

NEW DOOR

TO DEMOLISH

EXISTING DOOR TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

EXISTING WALL TO DEMOLISH

NEW LIGHTS (SEE ELECTRICAL DRAWINGS)

53.D 53.E

53.6

53.7

TR

1B-119B

RSF-1

RB-2

PT-6

OPEN

OFFICE

1B-102

OFFICE

1B-101

OFFICE

1B-104

OFFICE

1B-119

OFFICE

1B-118

53.D 53.E

53.6

53.7

ALIGN

4 4

1B-119B

A4

A4

A4

EXISTING COLUMN

OFFICE

10' - 7"

ELEV LOBBY

1A-100A M.E.

M.E.

PT-1

EX.

LOBBY

1A-100 M.E.

M.E.

PT-1

EX.

S1

53.D 53.E

53.6

53.7

191 SF

TR

1B-119B

193 SF

OFFICE

1B-119

185 SF

OFFICE

1B-118

150 SF

OFFICE

1B-102

100 SF

OFFICE

1B-101

438 SF

OFFICE

1B-104

358 SF

CORRIDOR

C12

601 SF

ELEV LOBBY

1A-100A

1303 SF

LOBBY

1A-100

EXPOSED

CLG.

53.D 53.E

53.6

53.7

116 SF

OFFICE

FINISH PLAN LEGEND

OFFICE

XXXX

LVT-2

RB

PT-1

ACP-1

ROOM NAME

ROOM NUMBER

FLOOR FINISH

BASE FINISH

TYP. WALL FINISH

CEILING FINISH

1KEY NOTE

1. REFER TO VA SIGNAGE DESIGN MANUAL INTERIOR SIGNAGE

GUIDELINES SIGN IN-04.02 [PG.85].

2. REUSE EXISTING ROOM SIGNAGE IN SAME LOCATION.

3. PROVIDE NEW SIGNAGE TO MATCH EXISTING SIGNAGE COLOR WITHIN

FLOOR STANDARD.

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

Department of

Veteran Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t Dwg. of

53A-201

BUILDING 53 - LEVEL 01 - ENLARGED DEMO,

FLOOR PLANS & RCPS

SEVEN GENERATIONS ARCHITECTURE AND ENGINEERING

600 E. MICHIGAN AVE. STE B

KALAMAZOO, MI 49007

296.927.0144

JACK C. MONTGOMERY VA MEDICAL CENTER

02/12/2024 JRB SCC

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1/4" = 1'-0"

RM 1B-119B - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 1B-119B - DEMO RCP

PROJECT

NORTH

PROJECT

NORTH

1/4" = 1'-0"

RM 1B-119B - FLOOR PLAN

PROJECT

NORTH

1/4" = 1'-0"

RM 1B-119B - RCP

PROJECT

NORTH

INTERIOR SIGNAGE SCHEDULE

Sign Type

Room

B a c k e r P la te

Comments Room: Occupant

Name

BUILDING 01/22/24/53 - LEVEL 01 - OVERALL

S1 1B-119B TR No 1,2

S1 1C168B-1 STORAGE No 1,2

S1 101-1 TR No 1,3

S1 101B-1 STORAGE No 1,2

S1 104A-22 TR No 1,3

S1 112-24 TR No 1,2

S1 C100M1A-1 TR No 1,3

DOOR SCHEDULE - BUILDING 53

MARK ROOM # ROOM NAME

DOOR SIZE DOOR

TYPE

FRAME

TYPE

GLAZING

TYPE

HW

SET

MATERIAL FIRE

RATING

SOUND

RATING COMMENTSWIDTH HT THK DOOR FRAME

1B-119B 1A-100A ELEV LOBBY 3' - 0" 8' - 0" 0' - 2" A 1 - CE201T WD HM 45 MIN. - CARD READER

Revisions: 35% Schematic Design Date: 02/24/2023

Revisions: 65% Design Development Date: 09/21/2023

Revisions: 95% Construction Documents Date: 02/12/2024

KEY PLAN

DEMO KEY NOTES

KEY NOTES

LEGEND

REMOVE EXISTING WALL CONSTRUCTION AS SHOWN. PATCH & REPAIR

ADJACENT WALLS AND FLOOR AS REQUIRED FOR NEW CONSTRUCTION

AND/OR NEW FINISHES.

REMOVE EXISTING DOOR(S), FRAME(S), HARDWARE, ETC. PATCH & REPAIR

ADJACENT SURFACES AS REQUIRED FOR NEW CONSTRUCTION AND/OR

NEW FINISHES.

REMOVE EXISTING FLOORING AND FLOOR FINISHES INCLUDING ALL

ADHESIVES, SETTING MATERIALS DOWN TO EXISTING SUBSTRATE. GRIND

CONCRETE FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND UNIFORM

SURFACE FOR NEW FINISHES. PATCH AND REPAIR ANY OPENINGS IN THE

EXISTING SLAB.

REMOVE EXISTING CEILING TILE AND GRID SYSTEM. TURN OVER TO VA OR

SALVAGE TILE FOR RECYCLING UNLESS DIRECTED OTHERWISE. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING GYP CEILING AND ASSOCIATED ASSEMBLIES. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING WINDOW SILL. PATCH & REPAIR ADJACENT WALLS AS

REQUIRED FOR NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING INTERIOR WINDOW SYSTEM. PROTECT DURING

DEMOLITION, SALVAGE SYSTEM, AND TURN OVER TO THE VA.

PROVIDE 4 FT X 8 FT AC GRADE ¾ IN. TRADE SIZE FIRE-RATED PLYWOOD

BACKBOARD ACROSS ENTIRE WALL, MOUNTED VERTICALLY. PAINT HIGH-

GLOSS WHITE WITH TWO COATS OF FIRE-RESISTANT PAINT FOR SERVICE

PROVIDER/SECURITY/VIDEO/IT EQUIPMENT. REFER TO ELECTRICAL,

MECHANICAL, AND LOW VOLTAGE DRAWINGS FOR BACKBOARD MOUNTED

EQUIPMENT.

PROVIDE NEW 3'-0" x 8'-0" DOOR. DOOR TO BE 3/4 HOUR FIRE RATED. REFER

TO DOOR SCHEDULE

INFILL WINDOW OPENING WITH STUD AND DRYWALL CONSTRUCTION AND

FILL ENTIRE CAVITY WITH BATT INSULATION. INSTALL WINDOW FILM ON

INTERIOR SIDE OF WINDOW. REFER TO FINISH KEY.

BACKBOARD MOUNTED EQUIPMENT; REFER TO ELECTRICAL AND LOW

VOLTAGE DRAWINGS

NEW IT RACKS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

NEW CABLE TRAYS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

WALLS TO BE FINISHED TO MATCH ADJACENT WALLS.

FLOORING DISTURBED DUE TO NEW WALLS TO BE PATCHED WITH EXISTING

CUT CARPET TILES.

EXISTING CEILING GRID AND TILES TO BE TRIMMED ALONG NEW WALL.

Revisions: 10% Diamond Drawings Date: 09/30/2022

SHOWN AREA

PROJECT

NORTH

EXISTING DOOR TO REMAIN

NEW DOOR

TO DEMOLISH

EXISTING DOOR TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

EXISTING WALL TO DEMOLISH

NEW LIGHTS (SEE ELECTRICAL DRAWINGS)

53.C

53.6

53.C

53.6

TR

3B-100

RSF-1

RB-2

PT-6

OPEN

FAMILY WAITING

3A-105

CORRIDOR

C 3 2

3B-100

A4

A4

S1

53.C

53.6

53.C

53.6

FAMILY WAITING

3A-105

TR

3B-100

CORRIDOR

C 3 2

EXPOSED

CLG.

OFFICE

3B-102

101 SF

OFFICE

3B-100

CORRIDOR

C 3 2

RM 3B-100

OFFICE

3B-102

OFFICE

3B-100

CORRIDOR

C 3 2

FINISH PLAN LEGEND

OFFICE

XXXX

LVT-2

RB

PT-1

ACP-1

ROOM NAME

ROOM NUMBER

FLOOR FINISH

BASE FINISH

TYP. WALL FINISH

CEILING FINISH

1KEY NOTE

1. REFER TO VA SIGNAGE DESIGN MANUAL INTERIOR SIGNAGE

GUIDELINES SIGN IN-04.02 [PG.85].

2. REUSE EXISTING ROOM SIGNAGE IN SAME LOCATION.

3. PROVIDE NEW SIGNAGE TO MATCH EXISTING SIGNAGE COLOR

WITHIN FLOOR STANDARD.

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

Department of

Veteran Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t Dwg. of

53A-203

BUILDING 53 - LEVEL 03 - ENLARGED DEMO,

FLOOR PLAN & RCPS

SEVEN GENERATIONS ARCHITECTURE AND ENGINEERING

600 E. MICHIGAN AVE. STE B

KALAMAZOO, MI 49007

296.927.0144

JACK C. MONTGOMERY VA MEDICAL CENTER

02/12/2024 JRB SCC

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1/4" = 1'-0"

RM 3B-100 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 3B-100 - FLOOR PLAN

1/4" = 1'-0"

RM 3B-100 - DEMO RCP

1/4" = 1'-0"

RM 3B-100 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

INTERIOR SIGNAGE SCHEDULE

Sign Type

Room

B a c k e r P la te Text

Comments

Room:

Occupant

Name LINE 1

LEVEL 3

S1 3B-100 TR No 1, 3

S1 302-1 TR No 1, 2

KEY PLAN

DEMO KEY NOTES

KEY NOTES

LEGEND

REMOVE EXISTING WALL CONSTRUCTION AS SHOWN. PATCH & REPAIR

ADJACENT WALLS AS REQUIRED FOR NEW CONSTRUCTION AND/OR NEW

FINISHES.

REMOVE EXISTING DOOR(S), FRAME(S), HARDWARE, ETC. PATCH & REPAIR

ADJACENT SURFACES AS REQUIRED FOR NEW CONSTRUCTION AND/OR

NEW FINISHES.

REMOVE EXISTING FLOORING AND FLOOR FINISHES INCLUDING ALL

ADHESIVES, SETTING MATERIALS DOWN TO EXISTING SUBSTRATE. GRIND

CONCRETE FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND UNIFORM

SURFACE FOR NEW FINISHES. PATCH AND REPAIR AND OPENINGS IN THE

SLAB.

REMOVE EXISTING CEILING TILE AND GRID SYSTEM. TURN OVER TO VA OR

SALVAGE TILE FOR RECYCLING UNLESS DIRECTED OTHERWISE. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING GYP CEILING AND ASSOCIATED ASSEMBLIES. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING WINDOW SILL. PATCH & REPAIR ADJACENT WALLS AS

REQUIRED FOR NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING INTERIOR WINDOW SYSTEM. PROTECT DURING

DEMOLITION, SALVAGE SYSTEM, AND TURN OVER TO THE VA.

PROVIDE 4 FT X 8 FT AC GRADE ¾ IN. TRADE SIZE FIRE-RATED PLYWOOD

BACKBOARD ACROSS ENTIRE WALL, MOUNTED VERTICALLY. PAINT HIGH-

GLOSS WHITE WITH TWO COATS OF FIRE-RESISTANT PAINT FOR SERVICE

PROVIDER/SECURITY/VIDEO/IT EQUIPMENT. REFER TO ELECTRICAL,

MECHANICAL, AND LOW VOLTAGE DRAWINGS FOR BACKBOARD MOUNTED

EQUIPMENT.

PROVIDE NEW 3'-0" x 8'-0" DOOR. DOOR TO BE 3/4 HOUR FIRE RATED. REFER

TO DOOR SCHEDULE

INFILL WINDOW OPENING WITH STUD AND DRYWALL CONSTRUCTION AND

FILL ENTIRE CAVITY WITH BATT INSULATION. INSTALL WINDOW FILM ON

INTERIOR SIDE OF WINDOW. REFER TO FINISH KEY.

BACKBOARD MOUNTED EQUIPMENT; REFER TO ELECTRICAL AND LOW

VOLTAGE DRAWINGS

NEW IT RACKS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

NEW CABLE TRAYS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

WALL TO BE FINISHED TO MATCH ADJCENT WALLS.

FLOORING DISTURBED DUE TO SLIGHT DEMOLISHMENT OF EXISTING

FINISHES TO BE PATCHED TO MATCHING EXISTING. ARCHITECT TO BE

NOTIFIED IF FINISHES HAVE BEEN DISCONTINUED FOR ADDITIONAL

OPTIONS.

EXISTING CEILING GRID AND TILES TO BE TRIMMED AND REUSED IN SPACE

FOR NEW TR WALL LOCATION

DOOR SCHEDULE - BUILDING 53

MARK ROOM # ROOM NAME

DOOR SIZE DOOR

TYPE

FRAME

TYPE

GLAZING

TYPE

HW

SET

MATERIAL FIRE

RATING

SOUND

RATING COMMENTSWIDTH HT THK DOOR FRAME

3B-100 C 3 2 CORRIDOR 3' - 0" 8' - 0" 0' - 2" A 1 - CE201T WD HM 45 MIN -

Revisions: 35% Schematic Design Date: 02/24/2023

Revisions: 65% Design Development Date: 09/21/2023

Revisions: 95% Construction Documents Date: 02/12/2024

Revisions: 10% Diamond Drawings Date: 09/30/2022

EXISTING DOOR TO REMAIN

NEW DOOR

TO DEMOLISH

EXISTING DOOR TO DEMOLISH

EXISTING LIGHTS TO DEMOLISH

EXISTING WALL TO DEMOLISH

NEW LIGHTS (SEE ELECTRICAL DRAWINGS)

SHOWN AREA

PROJECT

NORTH

53.B 53.C

53.5

53.6

53.B 53.C

53.5

53.6

53.B

53.C

53.D

53.5

53.6

TR

4A-109

RSF-1

RB-2

PT-6

OPEN

130 SF

OFFICE

4A 105

OFFICE

4B 103

LVT-1

RB-1

PT-1

ACT-1

CORRIDOR

C 4 1

53.D

4 4

4A-109

A4 7A4 8

FOOD CART

STOR

4B 102

LINEN CHUTE

4B 104

EQUIP STORAGE

4B-106

CORRIDOR

C 4 3

DUMB WAITER

4B103A

S1

ALIGN

ALIGN

53.B 53.C

53.5

53.6

TR

4A-109

OFFICE

4A 105

OFFICE

4B 103

CORRIDOR

C 4 1

EXPOSED

CLG.

AFF

ACT 2x2

8' - 0" FOOD CART

STOR

4B 102

CORRIDOR

C 4 3

EQUIP STORAGE

4B-106

LINEN CHUTE

4B 104

DUMB WAITER

4B103A

BREAK

4A-109

OFFICE

4A 105

OFFICE

4B 103

TRASH CART

STOR

4B 101

CORRIDOR

C 4 1

FOOD CART

STOR

4B 102

CORRIDOR

C 4 3

LINEN CHUTE

4B 104

EQUIP STORAGE

4B-106

DUMB WAITER

4B103A

BREAK

4A-109

OFFICE

4A 105

OFFICE

4B 103

TRASH CART

STOR

4B 101

1300 SF

CORRIDOR

C 4 1

FOOD CART

STOR

4B 102

DUMB WAITER

4B103A

LINEN CHUTE

4B 104

EQUIP STORAGE

4B-106

CORRIDOR

C 4 3

RM 4A-109

FINISH PLAN LEGEND

OFFICE

XXXX

LVT-2

RB

PT-1

ACP-1

ROOM NAME

ROOM NUMBER

FLOOR FINISH

BASE FINISH

TYP. WALL FINISH

CEILING FINISH

KEY NOTE #

1KEY NOTE

1. REFER TO VA SIGNAGE DESIGN MANUAL INTERIOR SIGNAGE

GUIDELINES SIGN IN-04.02 [PG.85].

2. REUSE EXISTING ROOM SIGNAGE IN SAME LOCATION.

3. PROVIDE NEW SIGNAGE TO MATCH EXISTING SIGNAGE COLOR

WITHIN FLOOR STANDARD.

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

Department of

Veteran Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t Dwg. of

53A-204

BUILDING 53 - LEVEL 04 - DEMO, FLOOR PLANS

& RCPS

SEVEN GENERATIONS ARCHITECTURE AND ENGINEERING

600 E. MICHIGAN AVE. STE B

KALAMAZOO, MI 49007

296.927.0144

JACK C. MONTGOMERY VA MEDICAL CENTER

02/12/2024 JRB SCC

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1/4" = 1'-0"

RM 4A-109 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 4A-109 - DEMO RCP

1/4" = 1'-0"

RM 4A-109 - FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

1/4" = 1'-0"

RM 4A-109 - RCP

PROJECT

NORTH

PROJECT

NORTH

INTERIOR SIGNAGE SCHEDULE

Sign Type

Room

B a c k e r P la te Text

Comments

Room:

Occupant

Name LINE 1

LEVEL 4

S1 4A-109 TR No 1, 2

S1 403-1 TR No 1, 2

DOOR SCHEDULE - BUILDING 53

MARK ROOM # ROOM NAME

DOOR SIZE DOOR

TYPE

FRAME

TYPE

GLAZING

TYPE

HW

SET

MATERIAL FIRE

RATING

SOUND

RATING COMMENTSWIDTH HT THK DOOR FRAME

4A-109 C 4 1 CORRIDOR 3' - 0" 8' - 0" 0' - 2" A 1 - CE201T WD HM 45 MIN - CARD READER

Revisions: 35% Schematic Design Date: 02/24/2023

Revisions: 65% Design Development Date: 09/21/2023

Revisions: 95% Construction Documents Date: 02/12/2024

KEY PLAN

DEMO KEY NOTES

KEY NOTES

LEGEND

REMOVE EXISTING WALL CONSTRUCTION AS SHOWN. PATCH & REPAIR

ADJACENT WALLS AS REQUIRED FOR NEW CONSTRUCTION AND/OR NEW

FINISHES.

REMOVE EXISTING DOOR(S), FRAME(S), HARDWARE, ETC. PATCH & REPAIR

ADJACENT SURFACES AS REQUIRED FOR NEW CONSTRUCTION AND/OR

NEW FINISHES.

REMOVE EXISTING FLOORING AND FLOOR FINISHES INCLUDING ALL

ADHESIVES, SETTING MATERIALS DOWN TO EXISTING SUBSTRATE. GRIND

CONCRETE FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND UNIFORM

SURFACE FOR NEW FINISHES. PATCH AND REPAIR ANY OPENINGS IN THE

EXISTING SLAB.

REMOVE EXISTING CEILING TILE AND GRID SYSTEM. TURN OVER TO VA OR

SALVAGE TILE FOR RECYCLING UNLESS DIRECTED OTHERWISE. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING GYP CEILING AND ASSOCIATED ASSEMBLIES. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING WINDOW SILL [IF APPLICABLE] AND/OR WINDOW

COVERINGS. PATCH & REPAIR ADJACENT WALLS AS REQUIRED FOR NEW

CONSTRUCTION AND/OR NEW FINISHES. RETURN WINDOW COVERINGS TO

OWNER.

REMOVE EXISTING INTERIOR WINDOW SYSTEM. PROTECT DURING

DEMOLITION, SALVAGE SYSTEM, AND TURN OVER TO THE VA.

PROVIDE 4 FT X 8 FT AC GRADE ¾ IN. TRADE SIZE FIRE-RATED PLYWOOD

BACKBOARD ACROSS ENTIRE WALL, MOUNTED VERTICALLY. PAINT HIGH-

GLOSS WHITE WITH TWO COATS OF FIRE-RESISTANT PAINT FOR SERVICE

PROVIDER/SECURITY/VIDEO/IT EQUIPMENT. REFER TO ELECTRICAL,

MECHANICAL, AND LOW VOLTAGE DRAWINGS FOR BACKBOARD MOUNTED

EQUIPMENT.

PROVIDE NEW 3'-0" x 8'-0" DOOR. DOOR TO BE 3/4 HOUR FIRE RATED. REFER

TO DOOR SCHEDULE

INFILL WINDOW OPENING WITH STUD AND DRYWALL CONSTRUCTION AND

FILL ENTIRE CAVITY WITH BATT INSULATION. INSTALL WINDOW FILM ON

INTERIOR SIDE OF WINDOW. REFER TO FINISH KEY.

BACKBOARD MOUNTED EQUIPMENT; REFER TO ELECTRICAL AND LOW

VOLTAGE DRAWINGS

NEW IT RACKS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

NEW CABLE TRAYS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

WALL TO BE FINISHED FROM CORNER TO NEXT CORRIDOR CORNER.

VERIFY SPECIFIED COLOR MATCHES EXISTING WALLS. NOTIFY ARCHITECT

OF ANY DISCREPANCIES.

FLOORING DISTURBED DUE TO NEW WALLS TO BE PATCHED AS NECESSARY

WITH EXISTING FINISHES. MATCH EXISTING FLOORING.

EXISTING CEILING GRID AND TILES TO BE TRIMMED ALONG NEW WALL.

Revisions: 10% Diamond Drawings Date: 09/30/2022

C

C

SHOWN AREA

PROJECT

NORTH

EXISTING DOOR TO REMAIN

NEW DOOR

TO DEMOLISH

EXISTING WALL TO DEMOLISH

NEW LIGHTS (SEE ELECTRICAL DETAILS)

49 SF

FOOD CART

STOR

5B-102

53.C 53.D

53.6

53.C 53.D

53.6

525 SF

CORRIDOR

C 5 2

129 SF

OFFICE

5A-105

TR

5A-109

RSF-1

RB-2

PT-6

OPEN

EQUIP

STORAGE

5B-103B

RES-6

RES-6

PT

ACT 49 SF

FOOD CART

STOR

5B-102

53.C 53.D

53.6

4 4

5A-109

A4

A4

7 8

S1

53.C 53.D

53.6

236 SF

TR

5A-109

35 SF

EQUIP STORAGE

5B-103B

129 SF

OFFICE

5A-105

525 SF

CORRIDOR

C 5 2

EXPOSED

CLG.

49 SF

FOOD CART

STOR

5B-102

525 SF

CORRIDOR

C 5 2

129 SF

OFFICE

5A-105

123 SF

OFFICE

5A-109

49 SF

FOOD CART

STOR

5B-102

78 SF

EQUIP STORAGE

5B-103B

64 SF

TRASH CART

5B-101

525 SF

CORRIDOR

C 5 2

129 SF

OFFICE

5A-105

123 SF

OFFICE

5A-109

78 SF

EQUIP STORAGE

5B-103B

64 SF

TRASH CART

5B-101

49 SF

FOOD CART

STOR

5B-102

RM 5A-109

FINISH PLAN LEGEND

OFFICE

XXXX

LVT-2

RB

PT-1

ACP-1

ROOM NAME

ROOM NUMBER

FLOOR FINISH

BASE FINISH

TYP. WALL FINISH

CEILING FINISH

KEY NOTE #

1KEY NOTE

1. REFER TO VA SIGNAGE DESIGN MANUAL INTERIOR SIGNAGE

GUIDELINES SIGN IN-04.02 [PG.85].

2. REUSE EXISTING ROOM SIGNAGE IN SAME LOCATION.

3. PROVIDE NEW SIGNAGE TO MATCH EXISTING SIGNAGE COLOR

WITHIN FLOOR STANDARD.

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

Department of

Veteran Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:

A/E:

STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t Dwg. of

53A-205

BUILDING 53 - LEVEL 05 - ENLARGED DEMO,

FLOOR PLAN & RCPS

SEVEN GENERATIONS ARCHITECTURE AND ENGINEERING

600 E. MICHIGAN AVE. STE B

KALAMAZOO, MI 49007

296.927.0144

JACK C. MONTGOMERY VA MEDICAL CENTER

02/12/2024 JRB SCC

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1/4" = 1'-0"

RM 5A-109 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 5A-109 - DEMO RCP

1/4" = 1'-0"

RM 5A-109 - FLOOR PLAN

1/4" = 1'-0"

RM 5A-109 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

INTERIOR SIGNAGE SCHEDULE

Sign Type

Room

B a c k e r P la te Text

Comments

Room:

Occupant

Name LINE 1

LEVEL 5

S1 No 1, 2

S1 5A04-1 TR No 1, 2

S1 5A-109 TR No 1, 2

DOOR SCHEDULE - BUILDING 53

MARK ROOM # ROOM NAME

DOOR SIZE DOOR

TYPE

FRAME

TYPE

GLAZING

TYPE

HW

SET

MATERIAL FIRE

RATING

SOUND

RATING COMMENTSWIDTH HT THK DOOR FRAME

5A-109 C 5 2 CORRIDOR 3' - 0" 8' - 0" 0' - 2" A 1 - CE201T WD HM 45 MIN - CARD READER

Revisions: 35% Schematic Design Date: 02/24/2023

Revisions: 65% Design Development Date: 09/21/2023

Revisions: 95% Construction Documents Date: 02/12/2024

KEY PLAN

DEMO KEY NOTES

KEY NOTES

LEGEND

REMOVE EXISTING WALL CONSTRUCTION AS SHOWN. PATCH & REPAIR

ADJACENT WALLS AS REQUIRED FOR NEW CONSTRUCTION AND/OR NEW

FINISHES.

REMOVE EXISTING DOOR(S), FRAME(S), HARDWARE, ETC. PATCH & REPAIR

ADJACENT SURFACES AS REQUIRED FOR NEW CONSTRUCTION AND/OR

NEW FINISHES.

REMOVE EXISTING FLOORING AND FLOOR FINISHES INCLUDING ALL

ADHESIVES, SETTING MATERIALS DOWN TO EXISTING SUBSTRATE. GRIND

CONCRETE FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND UNIFORM

SURFACE FOR NEW FINISHES. PATCH AND REPAIR ANY OPENINGS IN THE

EXISTING SLAB.

REMOVE EXISTING CEILING TILE AND GRID SYSTEM. TURN OVER TO VA OR

SALVAGE TILE FOR RECYCLING UNLESS DIRECTED OTHERWISE. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING GYP CEILING AND ASSOCIATED ASSEMBLIES. REMOVE

EXISTING DIFFUSERS AND LIGHT FIXTURES; REFER TO MECHANICAL,

PLUMBING & ELECTRICAL DEMOLITION PLANS FOR FURTHER INFORMATION.

REMOVE EXISTING WINDOW SILL. PATCH & REPAIR ADJACENT WALLS AS

REQUIRED FOR NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING INTERIOR WINDOW SYSTEM. PROTECT DURING

DEMOLITION, SALVAGE SYSTEM, AND TURN OVER TO THE VA.

PROVIDE 4 FT X 8 FT AC GRADE ¾ IN. TRADE SIZE FIRE-RATED PLYWOOD

BACKBOARD ACROSS ENTIRE WALL, MOUNTED VERTICALLY. PAINT HIGH-

GLOSS WHITE WITH TWO COATS OF FIRE-RESISTANT PAINT FOR SERVICE

PROVIDER/SECURITY/VIDEO/IT EQUIPMENT. REFER TO ELECTRICAL,

MECHANICAL, AND LOW VOLTAGE DRAWINGS FOR BACKBOARD MOUNTED

EQUIPMENT.

PROVIDE NEW 3'-0" x 8'-0" DOOR. DOOR TO BE 3/4 HOUR FIRE RATED. REFER

TO DOOR SCHEDULE

INFILL WINDOW OPENING WITH STUD AND DRYWALL CONSTRUCTION AND

FILL ENTIRE CAVITY WITH BATT INSULATION. INSTALL WINDOW FILM ON

INTERIOR SIDE OF WINDOW. REFER TO FINISH KEY.

BACKBOARD MOUNTED EQUIPMENT; REFER TO ELECTRICAL AND LOW

VOLTAGE DRAWINGS

NEW IT RACKS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

NEW CABLE TRAYS; REFER TO ELECTRICAL AND LOW VOLTAGE DRAWINGS

WALL TO BE FINISHED FROM CLOSET CORNER MATCH ADJCENT WALLS.

FLOORING DISTURBED DUE TO SLIGHT DEMOLISHMENT OF EXISTING

FINISHES TO BE PATCHED TO MATCHING EXISTING. ARCHITECT TO BE

NOTIFIED IF FINISHES HAVE BEEN DISCONTINUED FOR ADDITIONAL

OPTIONS.

EXISTING CEILING GRID AND TILES TO BE TRIMMED AND REUSED IN SPACE

FOR NEW TR WALL LOCATION

Revisions: 10% Diamond Drawings Date: 09/30/2022

1.G

1.3

1.4

1.G

1.3

1.4

EXPOSED

TR

101-1

LOBBY

100A-1

CORRIDOR

100C-1

IT

100A2-1

STORAGE

101B-1

1.G

1.3

1.4

TR

101-1

CORRIDOR

100C-1

LOBBY

100A-1

STORAGE

101B-1

IT

100A2-1

1.G

1.3

1.4

101-1 & 101A-1

SHOWN AREA

PROJECT

NORTH

MED STOR

101A-1

PSA

101-1

IT

100A2-1

BREAK

101B-1

CORRIDOR

100C-1

LOBBY

100A-1

MED STOR

101A-1

PSA

101-1

IT

100A2-1

BREAK

101B-1

CORRIDOR

100C-1

LOBBY

100A-1

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01F-101a

BUILDING 01 - LEVEL 01 - DEMO, FLOOR PLANS

& RCPS

JACK C MONTGOMERY VAMC

05/24/2024 MGH/JW NH/CY/EA/JJ/MA

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

29141 ofDwg.

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:

A) PROTECTING, COVERING AND SEALING EXISTING EQUIPMENT AND

SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.

B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION.

C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.

D) IMMEDIATELY REPAIRING DAMAGED PROPERTY TO ITS CONDITION BEFORE BEING

DAMAGED.

E) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

3. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS.

4. IF RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END OF THE

WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE

INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

5. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

1. ALL TELECOM ROOMS WITH EXISTING QUICK RESPONSE SPRINKLERS SHALL HAVE

THE QUICK RESPONSE SPRINKLER HEAD REPLACED WITH STANDARD

RESPONSE SPRINKLER HEADS.

2. ROOMS THAT DO NOT HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER HEAD UPRIGHT. PROVIDE

SPRINKLER PROTECTION CAGE.

3. MODIFIED ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS

ADJUSTED AS NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA

13.

4. TELECOM ROOMS ARE CONSIDERED ORDINARY HAZARD GROUP 1 FOR SPRINKLER

HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

KEYNOTES #

1/4" = 1'-0"

RM 101-1 AND RM 101A-1 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 101-1 AND RM 101A-1 - RCP

1/4" = 1'-0"

RM 101-1 AND RM 101A-1 - FLOOR PLAN

1/4" = 1'-0"

RM 101-1 AND RM 101A-1 - DEMO RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

DEMO EXISTING QUICK RESPONSE PENDENT SPRINKLER.

EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE. ALL NEW SPRINKLER

PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW STANDARD RESPONSE

SPRINKLER IN UPRIGHT POSITION.

PIPING SYMBOLS

FIRE SPRINKLER SYMBOLS

PIPE UP

PIPE DOWN

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH

GUARD

5/24/2024

C100M1A-1

PROJECT

NORTH

1.T

OFFICE

1C168B-1

MAIN CORRIDOR

C100M-1

WHEELCHAIR

STO

C100M1A-1

IT

C100M1B-1

EXPOSED

1.T

OFFICE

1C168B-1

MAIN CORRIDOR

C100M-1

WHEELCHAIR

STO

C100M1A-1

IT

C100M1B-1

1.T

TR

C100M1A-1

ENTRANCE

C100M1-1

MAIN CORRIDOR

C100M-1

1.T

TR

C100M1A-1

ENTRANCE

C100M1-1

MAIN CORRIDOR

C100M-1

EXPOSED

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01F-101b

BUILDING 01 - LEVEL 01 - DEMO, FLOOR PLANS

& RCPS

JACK C MONTGOMERY VAMC

05/24/2024 MGH/JW NH/CY/EA/JJ/MA

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

29142 of

1/4" = 1'-0"

RM C100M1A-1 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM C100M1A-1 - DEMO RCP

1/4" = 1'-0"

RM C100M1A-1 - FLOOR PLAN

1/4" = 1'-0"

RM C100M1A-1 - RCP

DEMO EXISTING QUICK RESPONSE UPRIGHT SPRINKLER. DEMO SPRINKLER

BRANCH PIPE BACK TO MAIN.

DEMO EXISTING QUICK RESPONSE UPRIGHT SPRINKLER.

EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE. ALL NEW SPRINKLER

PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW STANDARD RESPONSE

SPRINKLER IN UPRIGHT POSITION.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:

A) PROTECTING, COVERING AND SEALING EXISTING EQUIPMENT AND

SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.

B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION.

C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.

D) IMMEDIATELY REPAIRING DAMAGED PROPERTY TO ITS CONDITION BEFORE BEING

DAMAGED.

E) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

3. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS.

4. IF RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END OF THE

WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE

INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

5. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

1. ALL TELECOM ROOMS WITH EXISTING QUICK RESPONSE SPRINKLERS SHALL HAVE

THE QUICK RESPONSE SPRINKLER HEAD REPLACED WITH STANDARD

RESPONSE SPRINKLER HEADS.

2. ROOMS THAT DO NOT HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER HEAD UPRIGHT. PROVIDE

SPRINKLER PROTECTION CAGE.

3. MODIFIED ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS

ADJUSTED AS NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA

13.

4. TELECOM ROOMS ARE CONSIDERED ORDINARY HAZARD GROUP 1 FOR SPRINKLER

HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

KEYNOTES #

PIPING SYMBOLS

FIRE SPRINKLER SYMBOLS

PIPE UP

PIPE DOWN

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH

NORTH

240-1

1.F

1.G

1.3

1.4

TR

240-1

CORRIDOR

200-1

STORAGE

241-1

OFFICE

239B-1

1.F

1.G

1.3

1.4

TR

240-1STORAGE

241-1

CORRIDOR

200-1

WAITING

239-1

OFFICE

239B-1

1.F

1.G

1.3

1.4

OFFICE

240-1

OFFICE

241-1

CORRIDOR

200-1

WAITING

239-1

OFFICE

239B-1

1.F

1.G

1.3

1.4

OFFICE

240-1

OFFICE

241-1

CORRIDOR

200-1

OFFICE

239B-1

WAITING

239-1

IT

239A-1

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01F-102a

BUILDING 01 - LEVEL 02- DEMO, FLOOR PLANS

& RCPS

JACK C MONTGOMERY VAMC

05/24/2024 MGH/JW NH/CY/EA/JJ/MA

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

29143 of

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:

A) PROTECTING, COVERING AND SEALING EXISTING EQUIPMENT AND

SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.

B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION.

C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.

D) IMMEDIATELY REPAIRING DAMAGED PROPERTY TO ITS CONDITION BEFORE BEING

DAMAGED.

E) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

3. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS.

4. IF RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END OF THE

WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE

INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

5. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

1. ALL TELECOM ROOMS WITH EXISTING QUICK RESPONSE SPRINKLERS SHALL HAVE

THE QUICK RESPONSE SPRINKLER HEAD REPLACED WITH STANDARD

RESPONSE SPRINKLER HEADS.

2. ROOMS THAT DO NOT HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER HEAD UPRIGHT. PROVIDE

SPRINKLER PROTECTION CAGE.

3. MODIFIED ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS

ADJUSTED AS NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA

13.

4. TELECOM ROOMS ARE CONSIDERED ORDINARY HAZARD GROUP 1 FOR SPRINKLER

HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

KEYNOTES #

1/4" = 1'-0"

RM 240-1 - FLOOR PLAN

1/4" = 1'-0"

RM 240-1 - RCP

1/4" = 1'-0"

RM 240-1 DEMO RCP

1/4" = 1'-0"

RM 240-1 - DEMO FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

DEMO EXISTING QUICK RESPONSE PENDENT SPRINKLER.

ALL NEW SPRINKLER PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW

STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION.

PIPING SYMBOLS

FIRE SPRINKLER SYMBOLS

PIPE UP

PIPE DOWN

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH

NORTH

2C50A-1

1.X

1.1

1.2

1.1a

TR

2C50B-1

CHIEF OFFICE

2C50A-1

LAB STORAGE

IN2A-107

CORRIDOR

2CC45A-1

1.X

1.1

1.2

1.1a

CHIEF OFFICE

2C50A-1

CHIEF OFFICE

2C50A-1

OFFICE

2C50-1

CORRIDOR

2CC45A-1

LAB STORAGE

IN2A-107

CORRIDOR

CIN2-1

1.X

1.1

1.2

1.1a

TR

2C50B-1

LAB STORAGE

IN2A-107

CORRIDOR

2CC45A-12

CHIEF OFFICE

2C50A-1

1.X

1.1

1.2

1.1a

1 1

CHIEF OFFICE

2C50A-1

OFFICE

2C50-1

LAB STORAGE

IN2A-107

CORRIDOR

2CC45A-1

CORRIDOR

2CC45A-1

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01F-102b

BUILDING 01 - LEVEL 02- DEMO, FLOOR PLANS

& RCPS

JACK C MONTGOMERY VAMC

05/24/2024 MGH/JW NH/CY/EA/JJ/MA

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

29144 of

1/4" = 1'-0"

RM 2C50B-1- FLOOR PLAN

1/4" = 1'-0"

RM 2C50A-1 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 2C50B-1 - RCP

1/4" = 1'-0"

RM 2C50A-1 - DEMO RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

DEMO EXISTING QUICK RESPONSE PENDENT SPRINKLER.

EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE. ALL NEW SPRINKLER

PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW STANDARD RESPONSE

SPRINKLER IN UPRIGHT POSITION.

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:

A) PROTECTING, COVERING AND SEALING EXISTING EQUIPMENT AND

SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.

B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION.

C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.

D) IMMEDIATELY REPAIRING DAMAGED PROPERTY TO ITS CONDITION BEFORE BEING

DAMAGED.

E) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

3. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS.

4. IF RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END OF THE

WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE

INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

5. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

1. ALL TELECOM ROOMS WITH EXISTING QUICK RESPONSE SPRINKLERS SHALL HAVE

THE QUICK RESPONSE SPRINKLER HEAD REPLACED WITH STANDARD

RESPONSE SPRINKLER HEADS.

2. ROOMS THAT DO NOT HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER HEAD UPRIGHT. PROVIDE

SPRINKLER PROTECTION CAGE.

3. MODIFIED ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS

ADJUSTED AS NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA

13.

4. TELECOM ROOMS ARE CONSIDERED ORDINARY HAZARD GROUP 1 FOR SPRINKLER

HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

KEYNOTES #

PIPING SYMBOLS

FIRE SPRINKLER SYMBOLS

PIPE UP

PIPE DOWN

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH

NORTH

1.G

1.3

1.4

1.G

1.3

1.4

OFFICE

302-1

EXAM

303-1

SURGERY

WAITING

301-1

CORRIDOR

300A-1

IT

302A-1

OFFICE

302-1

EXAM

303-1

SURGERY

WAITING

301-1

CORRIDOR

300A-1

1.G

1.3

1.4

TR

302-1

EXAM

303-1

CORRIDOR

300A-1

1.G

1.3

TR

302-1

EXAM

303-1

SURGERY

WAITING

301-1

CORRIDOR

300A-1

EXPOSED

2 2

302A-1

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01F-103

BUILDING 01 - LEVEL 03 - DEMO, FLOOR PLANS

& RCPS

JACK C MONTGOMERY VAMC

05/24/2024 MGH/JW NH/CY/EA/JJ/MA

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

29145 of

1/4" = 1'-0"

RM 302A-1 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 302A-1 - DEMO RCP

1/4" = 1'-0"

RM 302A-1 - FLOOR PLAN

1/4" = 1'-0"

RM 302A-1 - RCP

DEMO EXISTING QUICK RESPONSE PENDENT SPRINKLER.

ALL NEW SPRINKLER PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW

STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:

A) PROTECTING, COVERING AND SEALING EXISTING EQUIPMENT AND

SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.

B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION.

C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.

D) IMMEDIATELY REPAIRING DAMAGED PROPERTY TO ITS CONDITION BEFORE BEING

DAMAGED.

E) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

3. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

P…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .