Attachment 02 Drawings 1 of 13 Muskogee 623-21-700.pdf
PDF 20 MB Posted
- Solicitation number
- 36C77624R0046
About this file
This document is a set of architectural and engineering drawings for the EHRM Infrastructure Upgrades project at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma, with a project number of 623-21-700. The comprehensive drawing set, dated 05/24/2024, includes detailed floor plans, demolition plans, and phasing plans for multiple buildings (Buildings 1, 18, 22, 24, and 53) across basement and multiple floor levels. The project involves extensive infrastructure modifications, including telecommunications room (TR) upgrades, electrical system improvements, and selective demolition and reconstruction of interior spaces.
The drawings outline a three-phase construction approach with specific infection control risk assessment (ICRA) precautions for each phase. Phase 1 focuses on building out telecommunications rooms and adjacent impacted areas with Class IV precautions. Phase 2 involves pulling new cables from TR racks down main corridors during night and weekend work with Class II precautions. Phase 3 entails providing cable drops in designated rooms, also performed during night and weekend work under Class II precautions. The project team includes Seven Generations Architecture and Engineering, DAV Energy Solutions, and other specialized consultants, with the work to be performed at the VA Medical Center located at 1011 Honor Heights Dr, Muskogee, OK 74401.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
Department of
Veteran Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t Dwg. of
G-001
COVER SHEET
SEVEN GENERATIONS ARCHITECTURE AND ENGINEERING
600 E. MICHIGAN AVE. STE B
KALAMAZOO, MI 49007
296.927.0144
JACK C. MONTGOMERY VA MEDICAL CENTER
05/24/2024 JRB SCC
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MC
623-21-700
MUSKOGEE, OKLAHOMA
NORTH
LOCATION MAP
PROJECT TEAM
MECHANICAL ENGINEERING:
ARCHITECTURE:
PHONE: 269.927.0144
SEVEN GENERATIONS A+E
KALAMAZOO, MI 49007
600 E. MICHIGAN AVENUE - SUITE B
WEB: WWW.7GENAE.COM
PHONE: 619.770.8552
DAV ENERGY SOLUTIONS
SAN DIEGO, CA 92109
2207 GARNET AVE. SUITE I
623-21-700 EHRM INFRASTRUCTURE UPGRADES FOR:
1011 HONOR HEIGHTS DR, MUSKOGEE, OK 74401
JACK C. MONTGOMERY
VA MEDICAL CENTER
PROJECT SITE
ELECTRICAL/FIRE PROTECTION ENGINEERING:
PHONE: 206.590.2118
SPEES DESIGN BUILD
SEATTLE, WA 98104
625 1ST AVE, STE 301
LOW VOLTAGE:
PHONE: 585.377.1850
ECC TECHNOLOGIES
PENFIELD, NY 14526
2163 FIVE MILE LINE ROAD
Revisions: 35% Schematic Design Date: 02/24/2023
Revisions: 65% Design Development Date: 09/21/2023
Revisions: 95% Construction Documents Date: 02/12/2024
STRUCTURAL:
PHONE: 213.271.2000
SIMPSON GUMPERTZ & HEGER
LOS ANGELES, CA 90015
1150 S. OLIVE STREET, SUITE 1600
Revisions: 10% Diamond Drawings Date: 09/30/2022
Revisions: 100% Bid Documents Date: 05/24/2024
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
Department of
Veteran Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t Dwg. of
G-002
SHEET INDEX
SEVEN GENERATIONS ARCHITECTURE AND ENGINEERING
600 E. MICHIGAN AVE. STE B
KALAMAZOO, MI 49007
296.927.0144
JACK C. MONTGOMERY VA MEDICAL CENTER
05/24/2024 JRB SCC
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MC
623-21-700
DRAWING SHEET INDEX
DESCRIPTIONSHEET ISSUE DATE
TN-114 BUILDINGS 53, 56, 60 - DETAILS - NEW WORK 05/24/24
TN-115 BUILDINGS 11, 18, 38 - KEY PLAN - NEW WORK 05/24/24
TN-116 BUILDING 18 - SUB BASEMENT - NEW WORK 05/24/24
TN-117 BUILDINGS 18 - BASEMENT - NEW WORK 05/24/24
TN-118 BUILDINGS 11, 18, 38 - FIRST FLOOR - NEW WORK 05/24/24
TN-119 BUILDINGS 11, 18, 38 - DETAILS - NEW WORK 05/24/24
TN-120 NEW FIBER OPTIC RISER DIGRAM 05/24/24
TN-121 NEW COPPER RISER DIAGRAM 05/24/24
TN-122 NETWORK DETAILS 05/24/24
TN-18 BUILDING 52, 53 - MEZZANNE - DEMOLITION 05/24/24
TN-19 BUILDING 1 - FIRST FLOOR - AREA A - DEMOLITION 05/24/24
TN-20 BUILDING 1 - FIRST FLOOR - AREA B - DEMOLITION 05/24/24
TN-21 BUILDING 53 - FIRST FLOOR - AREA C - DEMOLITION 05/24/24
TN-22 BUILDING 53, 60 - FIRST FLOOR - AREA D - DEMOLITION 05/24/24
TN-23 BUILDING 1 - FIRST FLOOR - AREA E - DEMOLITION 05/24/24
TN-24 BUILDING 24 - FIRST FLOOR - AREA F - DEMOLITION 05/24/24
TN-25 BUILDING 22 - FIRST FLOOR - AREA G - DEMOLITION 05/24/24
TN-26 BUILDING 1 - SECOND FLOOR - AREA A - DEMOLITION 05/24/24
TN-27 BUILDING 1 - SECOND FLOOR - AREA B - DEMOLITION 05/24/24
TN-28 BUILDING 53 - SECOND FLOOR - AREA C - DEMOLITION 05/24/24
TN-29 BUILDING 53 - SECOND FLOOR - AREA D - DEMOLITION 05/24/24
TN-30 BUILDING 24 - SECOND FLOOR - AREA E - DEMOLITION 05/24/24
TN-31 BUILDING 22 - SECOND FLOOR - AREA F - DEMOLITION 05/24/24
TN-32 BUILDING 1 - THIRD FLOOR - AREA A - DEMOLITION 05/24/24
TN-33 BUILDING 1 - THIRD FLOOR - AREA B - DEMOLITION 05/24/24
TN-34 BUILDING 53 - THIRD FLOOR - AREA C - DEMOLITION 05/24/24
TN-35 BUILDING 53 - THIRD FLOOR - AREA D - DEMOLITION 05/24/24
TN-36 BUILDING 22,24 - THIRD FLOOR - AREA E - DEMOLITION 05/24/24
TN-37 BUILDING 1 - FOURTH FLOOR - AREA A - DEMOLITION 05/24/24
TN-38 BUILDING 53 - FOURTH FLOOR - AREA B - DEMOLITION 05/24/24
TN-39 BUILDING 53 - FOURTH FLOOR - AREA C - DEMOLITION 05/24/24
TN-40 BUILDING 1 - FIFTH FLOOR - AREA A - DEMOLITION 05/24/24
TN-41 BUILDING 53 - FIFTH FLOOR - AREA B - DEMOLITION 05/24/24
TN-42 BUILDING 53 - FIFTH FLOOR - AREA C - DEMOLITION 05/24/24
TN-43 BUILDING 1 - SIXTH FLOOR - AREA A - DEMOLITION 05/24/24
TN-44 BUILDING 53 - SIXTH FLOOR - AREA B - DEMOLITION 05/24/24
TN-45 BUILDINGS 1, 22, 24, 53 - DETAILS - DEMOLITION 05/24/24
TN-46 BUILDINGS 1, 22, 24, 53 - DETAILS - DEMOLITION 05/24/24
TN-47 BUILDINGS 1, 22, 24, 53 - DETAILS - DEMOLITION 05/24/24
TN-48 BUILDINGS 1, 22, 24, 53 - DETAILS - DEMOLITION 05/24/24
TN-49 BUILDINGS 1, 22, 24, 53 - DETAILS - DEMOLITION 05/24/24
TN-50 BUILDINGS 1, 22, 24, 53 - DETAILS - DEMOLITION 05/24/24
TN-51 BUILDINGS 1, 22, 24, 53 - DETAILS - DEMOLITION 05/24/24
TN-52 BUILDINGS 1, 22, 24, 53 - DETAILS - DEMOLITION 05/24/24
TN-53 BUILDINGS 1, 22, 24, 53 - DETAILS - DEMOLITION 05/24/24
TN-54 BUILDINGS 11, 18, 38 - KEY PLAN - DEMOLITION 05/24/24
TN-55 BUILDING 18 - SUB BASEMENT - DEMOLITION 05/24/24
TN-56 BUILDING 18 - BASEMENT- DEMOLITION 05/24/24
TN-57 BUILDINGS 11, 18, 38 - FIRST FLOOR - DEMOLITION 05/24/24
TN-58 BUILDINGS 11, 18, 38 - DETAILS - DEMOLITION 05/24/24
TN-59 EXISTING FIBER OPTIC RISER DIAGRAM 05/24/24
TN-60 EXISTING COPPER BACKBONE RISER 05/24/24
TN-61 SITE PLAN - NEW WORK 05/24/24
TN-62 BUILDINGS 56, 52, 53 - SUB BASEMENT - KEY PLAN - NEW WORK 05/24/24
TN-63 BUILDINGS 22, 24, 53 - BASEMENT - KEY PLAN - NEW WORK 05/24/24
TN-64 MEZZANINE - KEY PLAN - NEW WORK 05/24/24
TN-65 BUILDINGS 1, 22, 24, 53 - FIRST FLOOR - KEY PLAN - NEW WORK 05/24/24
TN-66 BUILDINGS 1, 22, 24, 53 - SECOND FLOOR - KEY PLAN - NEW WORK 05/24/24
TN-67 BUILDINGS 1, 22, 24, 53 - THIRD FLOOR - KEY PLAN - NEW WORK 05/24/24
TN-68 BUILDINGS 1, 22, 24, 53 - THIRD FLOOR INTERST. - KEY PLAN - NEW
WORK
05/24/24
TN-69 BUILDINGS 1, 53 - FOURTH FLOOR - KEY PLAN - NEW WORK 05/24/24
TN-70 BUILDINGS 53 - FOURTH FLOOR INTERST. - KEY PLAN - NEW WORK 05/24/24
TN-71 BUILDINGS 1, 53 - FIFTH FLOOR - KEY PLAN - NEW WORK 05/24/24
TN-72 BUILDING 53 - FIFTH FLOOR INTERST. - KEY PLAN - NEW WORK 05/24/24
TN-73 BUILDINGS 1, 53 - SIXTH FLOOR - KEY PLAN - NEW WORK 05/24/24
TN-74 BUILDING 22 - SUB BASEMENT - NEW WORK 05/24/24
TN-75 BUILDING 24 - SUB BASMENT - NEW WORK 05/24/24
TN-76 BUILDINGS 52, 53 - SUB BASMENT - NEW WORK 05/24/24
TN-77 BUILDING 22 - BASEMENT - NEW WORK 05/24/24
TN-78 BUILDING 24 - BASEMENT - NEW WORK 05/24/24
TN-79 BUILDING 53 - BASEMENT - NEW WORK 05/24/24
TN-80 MEZZANINE - NEW WORK 05/24/24
TN-81 BUILDING 1 - FIRST FLOOR - AREA A - NEW WORK 05/24/24
TN-82 BUILDING 1 - FIRST FLOOR - AREA B - NEW WORK 05/24/24
TN-83 BUILDING 53 - FIRST FLOOR - AREA C - NEW WORK 05/24/24
TN-84 BUILDING 53, 60 - FIRST FLOOR - AREA D - NEW WORK 05/24/24
TN-85 BUILDING 1 - FIRST FLOOR - AREA E - NEW WORK 05/24/24
TN-86 BUILDINGS 22, 24 - FIRST FLOOR - AREA D - NEW WORK 05/24/24
TN-87 BUILDING 1 - SECOND FLOOR - AREA A - NEW WORK 05/24/24
TN-88 BUILDING 1 -SECOND FLOOR - AREA B - NEW WORK 05/24/24
TN-89 BUILDING 53 - SECOND FLOOR - AREA C - NEW WORK 05/24/24
TN-90 BUILDING 53 - SECOND FLOOR - AREA D - NEW WORK 05/24/24
TN-91 BUILDING 24 - SECOND FLOOR - AREA E - NEW WORK 05/24/24
TN-92 BUILDING 22 - SECOND FLOOR - AREA F - NEW WORK 05/24/24
TN-93 BUILDING 1 - THIRD FLOOR - AREA A - NEW WORK 05/24/24
TN-94 BUILDINGS 1, 53 - THIRD FLOOR - AREA B - NEW WORK 05/24/24
TN-95 BUILDING 53 - THIRD FLOOR - AREA C - NEW WORK 05/24/24
TN-96 BUILDING 22, 24 - THIRD FLOOR - AREA D - NEW WORK 05/24/24
TN-97 BUILDING 53 - THIRD FLOOR INTERST. - NEW WORK 05/24/24
TN-98 BUILDING 1 - FOURTH FLOOR - AREA A - NEW WORK 05/24/24
TN-99 BUILDING 53 -FOURTH FLOOR - AREA B - NEW WORK 05/24/24
TN-100 BUILDING 53 - FOURTH FLOOR - AREA C - NEW WORK 05/24/24
TN-101 BUILDING 53 - FOURTH FLOOR INTERST. - NEW WORK 05/24/24
TN-102 BUILDING 1 - FIFTH FLOOR - AREA A - NEW WORK 05/24/24
TN-103 BUILDING 53 - FIFTH FLOOR - AREA B - NEW WORK 05/24/24
TN-104 BUILDING 53 - FIFTH FLOOR - AREA C - NEW WORK 05/24/24
TN-105 BUILDING 53 - FIFTH FLOOR INTERST. - NEW WORK 05/24/24
TN-106 BUILDING 1 - SIXTH FLOOR - AREA A - NEW WORK 05/24/24
TN-107 BUILDING 53 - SIXTH FLOOR - AREA B - NEW WORK 05/24/24
TN-108 BUILDINGS 53, 56, 60 - DETAILS - NEW WORK 05/24/24
TN-109 BUILDINGS 53, 56, 60 - DETAILS - NEW WORK 05/24/24
TN-110 BUILDINGS 53, 56, 60 - DETAILS - NEW WORK 05/24/24
TN-111 BUILDINGS 53, 56, 60 - DETAILS - NEW WORK 05/24/24
TN-112 BUILDINGS 53, 56, 60 - DETAILS - NEW WORK 05/24/24
TN-113 BUILDINGS 53, 56, 60 - DETAILS - NEW WORK 05/24/24
01EP101 BLDG 01 - LEVEL 01 - ELECTRICAL PLAN 05/24/24
18EP100B BLDG 18 - LEVEL 00B - ELECTRICAL PLAN 05/24/24
18&11EP101 BLDG 18&11 - LEVEL 01 - ELECTRICAL PLAN 05/24/24
22EP100S BLDG 22 - LEVEL 00S - ELECTRICAL PLAN 05/24/24
22EP100B BLDG 22 - LEVEL 00B - ELECTRICAL PLAN 05/24/24
22EP100B 22EP101 - BLDG 22 - LEVEL 01 - ELECTRICAL PLAN 05/24/24
24EP100B BLDG 24 - LEVEL 00B - ELECTRICAL PLAN 05/24/24
24EP101 BLDG 24 - LEVEL 01 - ELECTRICAL PLAN 05/24/24
52EP102 BLDG 52 - MEZZANINE - ELECTRICAL PLAN 05/24/24
53EP100S BLDG 53 - LEVEL 00S - ELECTRICAL PLAN 05/24/24
53EP100B BLDG 53 - LEVEL 00B - ELECTRICAL PLAN 05/24/24
53EP101 BLDG 53 - LEVEL 01 - ELECTRICAL PLAN 05/24/24
53EP102 BLDG 53 - LEVEL 02 - ELECTRICAL PLAN 05/24/24
53EP103 BLDG 53 - LEVEL 03 - ELECTRICAL PLAN 05/24/24
53EP104 BLDG 53 - ROOF - ELECTRICAL PLAN 05/24/24
01EP401a BLDG 01 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 05/24/24
01EP401b BLDG 01 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 05/24/24
01EP402a BLDG 01 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 05/24/24
01EP402b BLDG 01 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 05/24/24
01EP403 BLDG 01 - LEVEL 03 - ENLARGED ELECTRICAL PLANS 05/24/24
01EP404 BLDG 01 - LEVEL 04 - ENLARGED ELECTRICAL PLANS 05/24/24
01EP405 BLDG 01 - LEVEL 05 - ENLARGED ELECTRICAL PLANS 05/24/24
01EP406 BLDG 01 - ROOF - ENLARGED ELECTRICAL PLAN 05/24/24
01EP406 BLDG 01 - R18&11EP401 - BLDG 18&11 - LEVEL 01 - ENLARGED
ELECTRICAL PLANS
OOF - ENLARGED ELECTRICAL PLAN
05/24/24
22EP400B BLDG 22 - LEVEL 00B - ENLARGED ELECTRICAL PLANS 05/24/24
22EP401 BLDG 22 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 05/24/24
24EP400B BLDG 24 - LEVEL 00B - ENLARGED ELECTRICAL PLANS 05/24/24
24EP401 BLDG 24 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 05/24/24
24EP402 BLDG 24 - LEVEL 02 - ENLARGED ELECTRICAL PLANS 05/24/24
52EP402 BLDG 52 - MEZZANINE - ENLARGED ELECTRICAL PLANS 05/24/24
53EP400B BLDG 53 - LEVEL 00B - ENLARGED ELECTRICAL PLANS 05/24/24
53EP401 BLDG 53 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 05/24/24
53EP403 BLDG 53 - LEVEL 03 - ENLARGED ELECTRICAL PLANS 05/24/24
53EP404 BLDG 53 - LEVEL 04 - ENLARGED ELECTRICAL PLANS 05/24/24
53EP405 BLDG 53 - LEVEL 05 - ENLARGED ELECTRICAL PLANS 05/24/24
EP501 ELECTRICAL DETAILS 05/24/24
EP502 ELECTRICAL DETAILS 05/24/24
EP503 ELECTRICAL DETAILS 05/24/24
EP504 ELECTRICAL DETAILS 05/24/24
EP505 ELECTRICAL DETAILS 05/24/24
EP506 ELECTRICAL DETAILS 05/24/24
EP507 ELECTRICAL DETAILS 05/24/24
EG601 TELECOMMUNICATIONS BONDING RISER DIAGRAM 05/24/24
01EP602 BLDG 01 - PARTIAL ONE-LINE DIAGRAM - DEMOLITION 05/24/24
01EP611 BLDG 01 - ONE-LINE DIAGRAM - PART 1 OF 4 05/24/24
01EP612 BLDG 01 - ONE-LINE DIAGRAM - PART 2 OF 4 05/24/24
01EP613 BLDG 01 - ONE-LINE DIAGRAM - PART 3 OF 4 05/24/24
01EP614 BLDG 01 - ONE-LINE DIAGRAM - PART 4 OF 4 05/24/24
18&11EP611 BLDG 18&11 - ONE-LINE DIAGRAM 05/24/24
22EP611 BLDG 22 - ONE-LINE DIAGRAM 05/24/24
24EP601 BLDG 24 - ONE-LINE DIAGRAM - DEMOLITION 05/24/24
24EP611 BLDG 24 - ONE-LINE DIAGRAM 05/24/24
52EP602 BLDG 52 - PARTIAL ONE-LINE DIAGRAM - DEMOLITION 05/24/24
52EP611 BLDG 52 - ONE-LINE DIAGRAM - PART 1 OF 2 05/24/24
52EP612 BLDG 52 - ONE-LINE DIAGRAM - PART 2 OF 2
52EP612 - BLDG 52 - ONE-LINE DIAGRAM - PART 2 OF 2
05/24/24
53EP601 BLDG 53 - PARTIAL ONE-LINE DIAGRAM - DEMOLITION 05/24/24
53EP602 BLDG 53 - PARTIAL ONE-LINE DIAGRAM - DEMOLITION 05/24/24
53EP611 BLDG 53 - ONE-LINE DIAGRAM - PART 1 OF 6 05/24/24
53EP612 BLDG 53 - ONE-LINE DIAGRAM - PART 2 OF 6 05/24/24
53EP613 BLDG 53 - ONE-LINE DIAGRAM - PART 3 OF 6 05/24/24
53EP614 BLDG 53 - ONE-LINE DIAGRAM - PART 4 OF 6 05/24/24
53EP615 BLDG 53 - ONE-LINE DIAGRAM - PART 5 OF 6 05/24/24
53EP616 BLDG 53 - ONE-LINE DIAGRAM - PART 6 OF 6 05/24/24
EP701 ELECTRICAL SCHEDULES 05/24/24
EP702 ELECTRICAL SCHEDULES 05/24/24
01EP701 BLDG 01 - ELECTRICAL SCHEDULES 05/24/24
01EP70 BLDG 01 - ELECTRICAL SCHEDULES 05/24/24
01EP703 BLDG 01 - ELECTRICAL SCHEDULES 05/24/24
18&11EP701 BLDG 18 - ELECTRICAL SCHEDULES 05/24/24
22EP701 BLDG 22 - ELECTRICAL SCHEDULES 05/24/24
24EP701 BLDG 24 - ELECTRICAL SCHEDULES 05/24/24
24EP702 BLDG 24 - ELECTRICAL SCHEDULES 05/24/24
52EP701 BLDG 52 - ELECTRICAL SCHEDULES 05/24/24
53EP701 BLDG 53 - ELECTRICAL SCHEDULES 05/24/24
53EP702 BLDG 53 - ELECTRICAL SCHEDULES 05/24/24
TN-1 SYMBOLS AND ABBREVIATIONS 05/24/24
TN-2 SITE PLAN - DEMOLITION 05/24/24
TN-3 BUILDINGS 22, 24, 52, 53 - SUB BASEMENT - KEY PLAN - DEMOLITION 05/24/24
TN-4 BUILDINGS 22, 24, 52, 53 - SUB BASEMENT - KEY PLAN - DEMOLITION 05/24/24
TN-5 BUILDINGS 52, 53 - MEZZANINE - DEMOLITION 05/24/24
TN-6 BUILDINGS 1, 22, 24, 53 - FIRST FLOOR PLAN - KEY PLAN- DEMOLITION 05/24/24
TN-7 BUILDINGS 1, 22, 24, 53 - SECOND FLOOR PLAN - KEY PLAN -
DEMOLITION
05/24/24
TN-8 BUILDINGS 1, 22, 52, 53 - THIRD FLOOR PLAN - KEY PLAN - DEMOLITION 05/24/24
TN-9 BUILDINGS 1, 53 - FOURTH FLOOR - KEY PLAN - DEMOLITION 05/24/24
TN-10 BUILDINGS 1, 53 - FIFTH FLOOR - KEY PLAN - DEMOLITION 05/24/24
TN-11 BUILDINGS 1, 53 - SIXTH FLOOR - KEY PLAN - DEMOLITION 05/24/24
TN-12 BUILDING 22 - SUB BASEMENT - DEMOLITION 05/24/24
TN-13 BUILDING 24 - SUB BASEMENT - DEMOLITION 05/24/24
TN-14 BUILDING 52, 53 - SUB BASEMENT AND BUILDING 56 FIRST FLOOR -
DEMOLITION
05/24/24
TN-15 BUILDING 22 - BASEMENT - DEMOLITION 05/24/24
TN-16 BUILDING 24 - BASEMENT - DEMOLITION 05/24/24
TN-17 BUILDING 53 - BASEMENT - DEMOLITION 05/24/24
G-001 COVER & DRAWING INDEX 05/24/24
G-002 SHEET INDEX 05/24/24
G-003 ARCHITECTURAL SYMBOLS & ABBREVIATIONS 05/24/24
G-100 ICRA AND PHASING GENERAL NOTES
18G-201 BUILDING 18 - LEVEL 01 - ICRA AND PHASING PLAN 05/24/24
22G-200 BUILDING 22 - LEVEL 00 - ICRA AND PHASING PLAN 05/24/24
24G-200 BUILDNG 24 - LEVEL 00 - ICRA AND PHASING PLAN 05/24/24
53G-200 BUILDING 53 - LEVEL 00 - ICRA AND PHASING PLAN 05/24/24
G-201 BUILDING 1/22/24/53 - LEVEL 01 - ICRA AND PHASING PLAN 05/24/24
G-202 BUILDING 1/22/24/53 - ICRA AND PHASING PLAN 05/24/24
G-203 BUILDING 1/53 - LEVEL 03 - ICRA AND PHASING PLAN 05/24/24
G-204 BUILDING 1/53 - LEVEL 04 - ICRA AND PHASING PLAN 05/24/24
G-205 BUILDING 1/53 - LEVEL 05 - ICRA AND PHASING PLAN 05/24/24
S-001 STRUCTURAL GENERAL NOTES 05/24/24
S-010 STRUCTURAL TYPICAL CONCRETE DETAILS 05/24/24
S-400 STRUCTURAL CONCRETE DETAILS 05/24/24
G-300 WALL TYPES, FINISH KEY, AND DETAILS 05/24/24
18A-101 BUILDING 18 - LEVEL 01 - OVERALL 05/24/24
22A-100 BUILDING 22 - LEVEL 00 - OVERALL 05/24/24
24A-100 BUILDING 24 - LEVEL 00 - OVERALL 05/24/24
53A-100 BUILDING 53 - LEVEL 00 - OVERALL 05/24/24
A-101 BUILDING 01/22/24/53 - LEVEL 01 - OVERALL 05/24/24
A-102 BUILDING 1/22/24/53 - LEVEL 02 - OVERALL 05/24/24
A-103 BUILDING 1/53 - LEVEL 03 - OVERALL 05/24/24
A-104 BUILDING 1/53 - LEVEL 04 - OVERALL 05/24/24
A-105 BUILDING 1/53 - LEVEL 05 - OVERALL 05/24/24
01A-201 BUILDING 01 - LEVEL 01 - ENLARGED DEMO, FLOOR PLANS & RCPS 05/24/24
01A-202 BUILDING 01 - LEVEL 02- ENLARGED DEMO, FLOOR PLANS & RCPS 05/24/24
01A-203 BUILDING 01 - LEVEL 03 - ENLARGED DEMO, FLOOR PLAN & RCPS 05/24/24
01A-204 BUILDING 01 - LEVEL 04 - ENLARGED DEMO, FLOOR PLANS & RCPS 05/24/24
01A-205 BUILDING 01 - LEVEL 05 - ENLARGED DEMO, FLOOR PLAN & RCPS 05/24/24
18A-201 BUILDING 18 - LEVEL 01 - ENLARGED DEMO, FLOOR PLAN & RCPS 05/24/24
22A-200 BUILDING 22 - LEVEL 00 - ENLARGED DEMO, FLOOR PLANS, & RCPS 05/24/24
22A-201 BUILDING 22 - LEVEL 01 - ENLARGED DEMO, FLOOR PLANS, & RCPS 05/24/24
24A-200 BUILDING 24 - LEVEL 00 - ENLARGED DEMO, FLOOR PLANS & RCPS 05/24/24
24A-201 BUILDING 24 - LEVEL 01 - ENLARGED DEMO, FLOOR PLANS & RCPS 05/24/24
24A-202 BUILDING 24 - LEVEL 02 - ENLARGED DEMO, FLOOR PLANS & RCPS 05/24/24
52A-202 BUILDING 52 - LEVEL 02 - ENLARGED DEMO, FLOOR PLANS & RCPS 05/24/24
53A-200 BUILDING 53 - LEVEL 00 - ENLARGED DEMO, FLOOR PLANS & RCPS 05/24/24
53A-201 BUILDING 53 - LEVEL 01 - ENLARGED DEMO, FLOOR PLANS & RCPS 05/24/24
53A-203 BUILDING 53 - LEVEL 03 - ENLARGED DEMO, FLOOR PLAN & RCPS 05/24/24
53A-204 BUILDING 53 - LEVEL 04 - ENLARGED DEMO, FLOOR PLANS & RCPS 05/24/24
53A-205 BUILDING 53 - LEVEL 05 - ENLARGED DEMO, FLOOR PLAN & RCPS 05/24/24
01F-101a BUILDING 01 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS 05/24/24
01F-101b BUILDING 01 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS 05/24/24
01F-102a BUILDING 01 -LEVEL 02-DEMO, FLOOR PLANS & RCPS 05/24/24
01F-102b BUILDING 01 -LEVEL 02-DEMO, FLOOR PLANS & RCPS 05/24/24
01F-103 BUILDING 01 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS 05/24/24
01F-104 BUILDING 01 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS 05/24/24
01F-105 BUILDING 01 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS 05/24/24
18 & 11F-101 BUILDING 18 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS 05/24/24
22F-101a BUILDING 22 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS 05/24/24
22F-101b BUILDING 22 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS 05/24/24
22F-102 BUILDING 22 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS 05/24/24
24F-100 BUILDING 24 -LEVEL 00 -DEMO, FLOOR PLANS, & RCPS 05/24/24
24F-101 BUILDING 24 -LEVEL 01 -DEMO, FLOOR PLANS, & RCPS 05/24/24
24F-102 BUILDING 24 -LEVEL 02 -DEMO, FLOOR PLANS, & RCPS 05/24/24
52F-102 BUILDING 52 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS 05/24/24
53F-100 BUILDING 53 -LEVEL 00 -DEMO, FLOOR PLANS & RCPS 05/24/24
53F-101 BUILDING 53 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS 05/24/24
53F-103 BUILDING 53 -LEVEL 03 -DEMO, FLOOR PLANS & RCPS 05/24/24
53F-104 BUILDING 53 -LEVEL 04 -DEMO, FLOOR PLANS & RCPS 05/24/24
53F-105 BUILDING 53 -LEVEL 05 -DEMO, FLOOR PLANS & RCPS 05/24/24
M-001 MECHANICAL COVER SHEET 05/24/24
M-100 BUILDINGS 22, 24, 53 COMBINED BASEMENT LEVEL LAYOUT 05/24/24
M-100A BUILDINGS 22, 24, 53 BASEMENT FLOOR ROOM DETAILS 05/24/24
M-101 BUILDINGS 1, 22, 24, 53 COMBINED LEVEL 1 LAYOUT 05/24/24
M-101A BUILDINGS 1, 22, 24, 53 FIRST FLOOR ROOM DETAILS 05/24/24
M-101B BUILDINGS 1, 22, 24, 53 FIRST FLOOR ROOM DETAILS 05/24/24
M-101C BUILDINGS 1, 22, 24, 53 FIRST FLOOR ROOM DETAILS 05/24/24
M-101D BUILDINGS 1, 22, 24, 53 FIRST FLOOR ROOM DETAILS 05/24/24
M-102 BUILDINGS 1, 22, 24 COMBINED LEVEL 2 LAYOUT 05/24/24
M-102A BUILDINGS 1, 22, 24, 53 SECOND FLOOR ROOM DETAILS 05/24/24
M-102B BUILDINGS 1, 22, 24, 53 SECOND FLOOR ROOM DETAILS 05/24/24
M-103 BUILDINGS 1, 53 COMBINED LEVEL 3 LAYOUT 05/24/24
M-103A BUILDINGS 1, 53 THIRD FLOOR ROOM DETAILS 05/24/24
M-104 BUILDINGS 1, 53 COMBINED LEVEL 4 LAYOUT 05/24/24
M-104A BUILDINGS 1, 53 FOURTH FLOOR ROOM DETAILS 05/24/24
M-105 BUILDINGS 1, 53 COMBINED LEVEL 5 LAYOUT 05/24/24
M-105A BUILDINGS 1, 53 FIFTH FLOOR ROOM DETAILS 05/24/24
M-106 BUILDING 18 FIRST FLOOR DETAILS 05/24/24
M-107A BUILDING 1 ROOF PLAN 05/24/24
M-107B BUILDING 53 ROOF PLAN 05/24/24
M-401 MECHANICAL SCHEDULES 05/24/24
M-501 MECHANICAL DETAILS 05/24/24
M-502 MECHANICAL DETAILS 05/24/24
M-503 MECHANICAL DETAILS 05/24/24
EPG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX 05/24/24
EPG002 ELECTRICAL LEGENDS 05/24/24
Revisions: 35% Schematic Design Date: 02/24/2023
DESCRIPTIONSHEET ISSUE DATE DESCRIPTIONSHEET ISSUE DATE DESCRIPTIONSHEET ISSUE DATE
Revisions: 65% Design Development Date: 09/21/2023
Revisions: 35% Schematic Design Date: 02/24/2023
Revisions: 95% Construction Documents Date: 02/12/2024
Revisions: 10% Diamond Drawings Date: 09/30/2022Revisions: 100% Bid Documents Date: 05/24/2024
A300
A320
ARCHITECTURAL SYMBOLS & PLAN INDICATORS
ABBREVIATIONSBARRIER-FREE DESIGN INFORMATION
ROOMNAME
XXX
A
A
A
A
8'-0"
TOP OF STEEL
ELEV. 10'-0"
A200
TITLE
SCALE X" = 1'-0"
TYP. BARRIER FREE TOILET ROOM FIXTURES
SCALE: NONE
TYP. BARRIER FREE TOILET ROOM FIXTURES
SCALE: NONE
OBSTRUCTED APPROACH
UNOBSTRUCTED APPROACH
TYP. BARRIER FREE SHOWER PLAN
SCALE: NONE
TYP. BARRIER FREE TRANSFER SHOWER
SCALE: NONE
TYP. CODE REGULATED MOUNTING HEIGHTS
SCALE: NONE
TYP. EQUIPMENT MOUNTING HEIGHTS
SCALE: NONE
ELEVATION INDICATION
SHEET NO.
ELEVATION NUMBER
SECTION INDICATOR
ENLARGED PLAN OR
ELEVATION
PROPOSED SPOT
EXISTING SPOT
ELEVATION
100.57'
100.57'
STRUCTURAL SPAN
ROOF TRUSSES
FLOOR JOIST OR
RAMP
@ 16" O.C.
2 x 12
1" per 12"
SLOPE UP
REVISION TAG W/
REVISION NUMBER
KEYNOTE TAG
WINDOW TAG W/
WINDOW TYPE
INDICATOR
WALL SECTION CUT
COLUMN LINE
WALL TYPES
ELEVATION
BUILDING SECTION CUT
SHEET LOCATION
DETAIL NUMBER
TYPICAL
DIMENSIONING
SET-BACK LINE
PROPERTY LINE
EXISTING
CONTOUR
TOPOGRAPHY
CONTOUR
100'
100'
TOPOGRAPHY
PROPOSED
SECTIONS & DETAILS
TYPICAL TITLE FOR
DOOR NUMBER
DOOR TAG W/
ROOM NUMBER
ROOM NAME/
NORTH ARROW
60" DIAMETER CLEAR
WHEELCHAIR TURNING
SPACE - REFER TO PLAN
- REFER TO PLAN
AND GROUND SPACE
30" x 48" CLEAR FLOOR
CEILING HEIGHT TAG
MIRRORGRAB
BARS
TOILET PAPER
GRAB BARS
5'-0" DIA.
CLEAR FLOOR SPACE
60" WIDE BY 59" DEEP
CLEAR FLOOR AREA AT
WATER CLOSET
2'-6" x 4'-0" CLEAR
FLOOR AREA AT
LAVATORY
SEAT WALL
BACK WALL
CONTROL WALL
3'-0" x 4'-0"
CLEAR AREA
'L' SHAPE FOLDING
SHOWER SEAT SHALL
COMPLY WITH SECTION
610.3 OF ICC/ANSI A117.1
GRAB BAR TO BE
ACROSS CONTROL
AND MEASURE 18"
FROM CONTROL WALL
SHOWER SPRAY UNIT W/
59" HOSE AND 24" HEIGHT
ADJUSTABLE BAR
GRAB
BARS
CONTROLS SHALL BE
LOCATED WITHIN 15" OF
EITHER SIDE OF SHOWER SEAT
CENTER LINE. PROVIDE MAX
WATER TEMP OF 120°
ACCESSIBLE SHOWER
COMPARTMENTS SHALL
COMPLY WITH SECTION
608 OF ICC/ANSI A117.1
'L' SHAPE FOLDING SHOWER
SEAT AND SHALL COMPLY
WITH SECTION 610.3 OF
ICC/ANSI A117.1
* DIMENSION IS TO BOTTOM
OF REFLECTIVE SURFACE
RECEPTACLE
LIGHT
SWITCH
HVAC
CONTROLS
FIRE
ALARM
FEC
LESS THAN 40#
FEC
GREATER THAN 40#
TEL
PUSH PAD
RH/CH
GBX
SH1
CL
OT
SPH
CRK SND
PT
SD
HS
XR COM4 MR
CRBG
WP
TP SNR
4'-4"
TV
XXXNORTH
M A
X
M
IN
/3
" 4
" 5
M A
X
0' - 6" 3' - 0"
1' - 6 1/32"3' - 5 31/32"
MIN
1' - 3"
MIN
1' - 6"
M
A X
M
IN
M
IN
M A
X
/3
M
IN
3' - 0"
C
LR
4' - 0"
3' - 0" CLR.
1' - 6"
5' - 0"
M
IN
0' - 6" 3' - 0"
M A
X
3' - 6" 1' - 0"
M
IN
M
A X
M
IN
M
IN
M A
X
SIDE FRONT
M
A X
M
A X
20" - 25"
M
A X
FRONT
M
A X
20" MAX
SIDE
SIDE FRONT
M
IN
M
A X
M
IN
M
A X
@ AT
A/C AIR CONDITIONING/AIR CONDITIONER
ACOUS ACOUSTICAL
AD AREA DRAIN, AUTOMATIC DAMPER
ADJ ADJUST, ADJUSTABLE
ALUM ALUMINUM
AP ACCESS PANEL
ACT ACOUSTICAL CEILING
B BASE
BAR BARRIER
BD BOARD
BF BARRIER FREE
BKT BRACKET
BLDG BUILDING
BLKG BLOCKING
BOTT BOTTOM
C TO C CENTER TO CENTER
CAB CABINET
CE COLUMN ENCLOSURE
CIR CIRCLE
CIR CIRCUIT
CL CENTER LINE, CLEARANCES
CLG CEILING
CJ CONTROL JOINT
CLKG CAULKING
CLO CLOSET
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CSS CLINICAL SERVICE SINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA, D DIAMETER
DIM DIMENSION
DN DOWN
DR DRAIN
DS DOWNSPOUT
ELECT ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EP ELECTRICAL PANEL
EXH EXHAUST
EXP EXPOSED
EXIST EXISTING, EXSIST'G
EXT EXTERIOR
EW EACH WAY
FA FIRE ALARM
FD FIRE DAMPER OR FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FL, FLR FLOOR FINISH
FLG, FLRG FLOORING, FLOOR'G
FURN FURNITURE, FURNACE
FWC FABRIC WALL COVERING
FT FEET, FOOT
GALV GALVANIZE(D)
GL GLASS
GSB GYPSUM SHEATHING BOARD
GWB GYPSUM WALLBOARD
GYP. BD GYPSUM BOARD
ID INSIDE DIAMETER
INSUL INSULATION
IN INCH(ES)
JAN JANITOR'S CLOSET
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
HW HEADWALL
LAM LAMINATED
LF LINEAL FEET
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MANUF MANUFACTURED, MANUFACTURER
MIN MINIMUM
MLD'G MOLDING
MTL METAL
N NORTH
NAT NATURAL
NIC NOT IN CONTRACT
NORM NORMAL
NTS NOT TO SCALE
O.C. ON CENTER
OPN'G OPENING
O, O2 OXYGEN
PLAST PLASTIC
PNT PAINT
PREFAB PREFABRICATED
PLYWD PLYWOOD, PLYW'D
R RADIUS
RA RETURN AIR
REQ'D REQUIRED
RM ROOM
S SINK, SOUTH, SHINGLE
SA SUPPLY AIR
SAN SANITARY
SMKD SMOKE DAMPER
SECT SECTION
SHWR SHOWER
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STAINLESS STEEL
STD STANDARD
STOR STORAGE
SUSP SUSPEND(ED)
SYM SYMBOL, SYMMETRICAL
TOIL TOILET
TYP TYPICAL
UNFIN UNFINISHED
UTIL UTILITY
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
V.I.F. VERIFY IN FIELD
VT VINYL TILE
VWC VINYL WALL COVERING
W/ WITH
WC WATER CLOSET
WD WOOD
WNDW WINDOW
W. HTR WATER HEATER
W/O WITHOUT
WP WALL PROTECTION
A420
A320
M
A X
M
IN
18" MAX.
16" MIN.
IF
B A
R R
IE
R
F R
E E
M
A X
M
IN
M
IN
DRINKING FOUNTAIN REQUIREMENTS
SCALE: NONE
HIGH LOW WATER COOLER
W/ BOTTLE FILLER
FRONT
SIDE
/4
0' - 6 1/32" MIN11" MIN
0' - 9 7/32"
1' - 7"
/2
/3
/3
VERT. GRAB BAR
GENERAL NOTES:
ACCESSIBLE CONTROLS, OPERATING
MECHANISMS & HARDWARE SHALL COMPLY
WITH SECTION 1109.13 OF THE IBC AND
SECTION 309OF ICC/ANSI A117.1.
ACCESSIBLE SIGNAGE TO BE FURNISHED BY
OWNER, SHALL COMPLY WITH SECTIONS
1110 OF THE IBC AND SECTION 703 OF
ICC/ANSI A117.1.
PORTABLE FIRE EXTINGUISHERS TO BE
PROVIDED IN ACCORDANCE WITH THE 2000
ICC INTERNATIONAL FIRE CODE IBC (906.1).
REFER TO FLOOR PLAN SHEETS FOR
LOCATIONS OF FIRE EXTINGUISHER CABINETS
(FEC).
MOUNTING HEIGHT GENERAL NOTES:
1. REFER TO AI100A - AI100C FOR EQUIPMENT
ABBREVIATIONS AND LOCATIONS.
2. REFER TO INTERIOR ELEVATIONS FOR
ADDITIONAL INFORMATION.
3. ITEMS INCLUDED ON THIS SHEET ARE NOT
NECESSARILY INCLUDED IN THIS PROJECT.
4. CONTRACTOR TO VERIFY ALL EQUIPMENT
MOUNTED HEIGHTS WITH ARCHITECT AND
OWNER'S CONTRACTING OFFICER PRIOR TO
INSTALLATION.
5. REFER TO MECHANICAL/ELECTRICAL
DRAWINGS FOR DEVICE MOUNTING HEIGHTS.
FINISH FLOOR FINISH FLOOR
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
Department of
Veteran Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t Dwg. of
G-003
ARCHITECTURAL SYMBOLS & ABBREVIATIONS
SEVEN GENERATIONS ARCHITECTURE AND ENGINEERING
600 E. MICHIGAN AVE. STE B
KALAMAZOO, MI 49007
296.927.0144
JACK C. MONTGOMERY VA MEDICAL CENTER
05/24/2024 JRB SCC
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MC
623-21-700
GENERAL NOTES
1. THIS PROJECT SHALL BE CONSTRUCTED IN CONFORMANCE WITH ALL FEDERAL,
STATE AND LOCAL REGULATIONS AND BUILDING CODES. CONSTRUCTION TO
BE PERFORMED IN ACCORDANCE WITH APPLIACABLE VA DESIGN GUIDES
AND INTERNATIONAL BUILDING CODES.
2. CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL ASSOCIATED PERMITS
FOR CONSTRUCTION AND SHALL DO ALL NECESSARY ITEMS FOR
PROCUREMENT OF A CERTIFICATE OF OCCUPANCY. ANY COSTS DERIVED
FROM OBTAINING SAID PERMITS SHALL BE BORNE BY CONTRACTOR.
3. CONTRACTOR SHALL SUPPLY AND ASSIST OWNER IN APPLYING FOR ANY
UTILITIES REQUIRED FOR THE COMPLETION OF THE WORK UNLESS SPECIFIED
OTHERWISE IN WRITING. ALL COSTS ASSOCIATED WITH TEMPORARY POWER,
PHONE OR GAS SHALL BE PART OF THIS CONTRACT.
4. DRAWINGS AND SPECIFICATIONS ARE SUPPLEMENTARY. ANYTHING SHOWN
IN ONE SHALL BE CONSIDERED IN BOTH. ANY SHEET OF THE CONTRACT
DOCUMENTS IS VOID UNLESS USED IN CONJUNCTION WITH THE REST OF THE
CONTRACT DOCUMENTS.
5. IT IS THE RESPONSIBILITY OF CONTRACTOR TO COORDINATE THE WORK OF ALL
TRADES. ANY CONFLICTING WORK TO BE REPORTED TO THE OWNER'S
CONTRACTING OFFICER PRIOR TO THE INSTALLATION OF ANY WORK.
6. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY IF ANY UNFORESEEN
STRUCTURAL OR UTILITY RELATED ISSUES ARISE DURING DEMOLITION OR
EXCAVATION.
7. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN CLARIFICATION OF
ANY DISCREPANCIES FOUND ON DRAWINGS OR SPECIFICATIONS PRIOR TO
BID DATE.
8. PRIOR TO ANY EXCAVATION WORK, ALL UTILITY COMPANIES ARE TO BE
NOTIFIED TO LOCATE UTILITIES ON SITE THAT MAY CONFLICT WITH
EXCAVATION WORK.
9. CONTRACTOR(S) TO VERIFY ALL DIMENSIONS IN FIELD. ANY DISCREPANCIES
SHALL BE REPORTED TO THE OWNER'S CONTRACTING OFFICER PRIOR TO THE
INSTALLATION OF ANY WORK.
10. DO NOT SCALE DRAWINGS. USE INDICATED DIMENSIONS ONLY.
11. CONTRACTOR(S) TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH THE
EXISTING CONDITIONS TO UNDERSTAND THE NATURE AND SCOPE OF THE
WORK. THE BASE BID SHALL REFLECT MODIFICATIONS TO SYSTEMS AND
DEVICES REQUIRED BY STATE AND LOCAL CODES WHETHER INDICATED OR
NOT ON THE CONTRACT DOCUMENTS. THE SUBMISSION OF A BID WILL BE
EVIDENCE THAT SUCH AN EXAMINATION AND COMPLIANCE WITH
GOVERNING CODES/ REQUIREMENTS HAVE BEEN MADE. LATER CLAIMS FOR
LABOR, EQUIPMENT OR MATERIALS REQUIRED, OR FOR DIFFICULTIES
ENCOUNTERED WHICH COULD HAVE BEEN FORSEEN HAND AN EXAMINATION
AND CODE REQUIREMENT REVIEW WILL NOT BE ALLOWED. ALL OF THE ABOVE
SHALL BE PROVIDED AT THE CONTRACTOR’S EXPENSE.
12. ARCHITECT WILL NOT BE RESPONSIBLE FOR ANY DEVIATIONS FROM THESE
DOCUMENTS OR DEVIATIONS FOR SPECIFIED PRODUCTS, UNLESS APPROVED
BY OWNER'S CONTRACTING OFFICER.
ADA NOTE:
THIS PROJECT IS TO MEET THE ADA STANDARDS IN EFFECT AT THE TIME OF THE
PROJECT. IF A MATERIAL OR SYSTEM HAS BEEN SPECIFIED OR DRAWN THAT DOES
NOT MEET THE STANDARDS, THE ARCHITECT REQUESTS THAT THE CONTRACTOR,
SUPPLIER OR MATERIAL MANUFACTURER ADVISE AND ASSIST THE ARCHITECT TO
PROVIDE THE PRODUCT OR SYSTEM. ALL PRODUCTS OR SYSTEMS WILL NEED
ACCEPTANCE OF THE OWNER AND THE ARCHITECT.
GENERAL NOTES – SITE
1. CONTRACTOR TO REQUEST LOCATION OF ALL UTILITIES BY CONTACTING MISS
DIG.
2. ALL EXCESS/ UNSUITABLE MATERIAL SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND WHO SHALL BE RESPONSIBLE FOR THE PROPER DISPOSAL OF
MATERIAL.
3. ALL STRUCTURES LOCATED ON PROPERTY, SHOWN DASHED, TO BE REMOVED IN
ITS ENTIRETY.
4. ALL TREES SHOWN ARE TO REMAIN. ANY TREES NOT SHOWN ARE TO BE
REMOVED IN ITS ENTIRETY. CONTRACTOR TO VERIFY ALL EXISTING TREE
REMOVAL WITH OWNER AND ARCHITECT PRIOR TO EXTRACATION.
5. TREES SHALL BE PROTECTED BY THE CONTRACTOR. DAMAGED TREES SHALL BE
RESTORED TO THE ORIGINAL CONDITION AT THE CONTRACTORS EXPENSE. ALL
TREES DAMAGED BEYOND SAVING AS DETERMINED BY THE ARCHITECT SHALL BE
REMOVED AND REPLACED WITH A NURSERY GROWN TREE AS SPECIFIED BY THE
ARCHITECT.
6. CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE PREMISES AND EXISTING
CONDITIONS TO COORDINATE NEW INSTALLATIONS.
7. CAP OFF EXISTING UNDERGROUND UTILTIES BEYOND EXTENT OF NEW BUILDING
LOCATION FOR POSSIBLE RECONNECTION.
Revisions: 35% Schematic Design Date: 02/24/2023Revisions: 35% Schematic Design Date: 02/24/2023
Revisions: 65% Design Development Date: 09/21/2023
Revisions: 95% Construction Documents Date: 02/12/2024
Revisions: 10% Diamond Drawings Date: 09/30/2022
INFECTION CONTROL GENERAL NOTES
1. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS
OUTLINED BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL
INFORMATION.
2. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
3. PROJECT SHALL BE COMPLETED IN 3 PHASES.
4. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS
AND FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE
OF ABOVE CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR
PLATE OF THE PROJECT BOUNDARY.
5. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC)
BARRIER WALL CONSTRUCTION AND INFECTION CONTROL (IC)
MEASURES WITH COR AND PATIENT SAFETY/ INFECTION CONTROL
REPRESENTATIVE. TEMPORARY IC BARRIER WALL CONSTRUCTION
LOCATIONS IN DRAWINGS ARE APPROXIMATE. CONTRACTOR SHALL
PROVIDE DRAWING TO COR AND PATIENT SAFETY/ INFECTION
CONTROL REPRESENTATIVE ONCE ICRA PROTOCOLS AND PLAN IS
APPROVED.
6. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY
COR AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN.
PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE
CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED
ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.
7. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF
5:00 PM AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK
WHERE CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED
AND STORED IN A SAFE MANNER UNTIL CEILING TILES CAN BE
REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR.
8. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE
MAINTAINED DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION
FOR HOURS OF OPERATION.
9. WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE
BETWEEN THE HOURS OF 8:00 AM AND 5:00 PM. EVERY EFFORT SHALL
BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
10. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY
DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS
NECESSARY
11. PROVIDE THE VA OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
12. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP
VAC, MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON
AGGRESSIVE LIQUIDS UP TO 30 GALLONS.
13. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE
COVERED WITH 4 MIL. POLY SHEET.
14. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA
APPROVED ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH
PURPOSED WITH A LID.
15. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE
PROPERLY STORED IN DESIGNATED AREAS AND IN APPROVED
CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE
FACILITY.
16. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
CLASS OF PRECAUTIONS
PATIENT RISK GROUP
LOW: NON-PATIENT CARE AREAS
• PUBLIC HALLWAYS AND GATHERING AREAS NOT ON CLINICAL UNITS.
• OFFICE AREAS NOT ON CLINICAL UNITS.
• BREAKROOMS NOT ON CLINICAL UNITS.
• BATHROOMS OR LOCKER ROOMS NOT ON CLINICAL UNITS.
• MECHANICAL ROOMS NOT ON CLINICAL UNITS.
• EVS CLOSETS NOT ON CLINICAL UNITS.
MEDIUM: PATIENT CARE SUPPORT AREAS
• WAITING AREAS.
• CLINICAL ENGINEERING.
• MATERIALS MANAGEMENT.
• STERILE PROCESSING DEPARTMENT - DIRTY SIDE.
• KITCHEN, CAFETERIA, GIFT SHOP, COFFEE SHOP, AND FOOD KIOSKS.
HIGH: PATIENT CARE AREAS
• PATIENT CARE ROOMS AND AREAS
• ALL ACUTE CARE UNITS
• EMERGENCY DEPARTMENT
• EMPLOYEE HEALTH
• PHARMACY - GENERAL WORK ZONE
• MEDICATION ROOMS AND CLEAN UTILITY ROOMS
• IMAGING SUITES: DIAGNOSTIC IMAGING LABORATORY.
HIGHEST: INVASIVE, STERILE OR HIGHLY COMPROMISED CARE
• ALL TRANSPLANT AND INTENSIVE CARE UNITS.
• ALL ONCOLOGY UNITS.
• OR THEATERS AND RESTRICTED AREAS.
• PROCEDURAL SUITES.
• PHARMACY COMPOUNDING.
• STERILE PROCESSING DEPARTMENT - CLEAN SIDE.
• TRANSFUSION SERVICES.
• DEDICATED ISOLATION WARDS/UNITS.
• IMAGING SUITES: INVASIVE IMAGING.
TYPE OF ACTIVITY
TYPE A: NON-INVASIVE
INCLUDES BUT IS NOT LIMITED TO:
• REMOVAL OF CEILING TILE FOR VISUAL INSPECTION-LIMITED TO 1 TILE
PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME.
• LIMITED BUILDING SYSTEM MAINTENANCE (E.G., PNEUMATIC TUBE
STATION, HVAC SYSTEM, FIRE SUPPRESSION SYSTEM, ELECTRICAL AND
CARPENTRY WORK TO INCLUDE PAINTING WITHOUT SANDING) THAT
DOES NOT CREATE DUST OR DEBRIS.
• CLEAN PLUMBING ACTIVITY LIMITED IN NATURE.
TYPE B: SMALL-SCALE, SHORT DURATION
INCLUDES BUT IS NOT LIMITED TO:
• WORK CONDUCTED ABOVE THE CEILING (E.G., PROLONGED
INSPECTION OR REPAIR OF FIREWALLS AND BARRIERS, INSTALLATION OF
CONDUIT AND/OR CABLING, AND ACCESS TO MECHANICAL AND/OR
ELECTRICAL CHASE SPACES).
• FAN SHUTDOWN/STARTUP.
• INSTALLATION OF ELECTRICAL DEVICES OR NEW FLOORING THAT
PRODUCES MINIMAL DUST AND DEBRIS.
• THE REMOVAL OF DRYWALL WHERE MINIMAL DUST AND DEBRIS IS
CREATED.
• CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRY SANDING) THAT
PRODUCE MINIMAL DUST AND DEBRIS.
TYPE C: LARGE-SCALE, LONGER DURATION
INCLUDES BUT IS NOT LIMITED TO:
• REMOVAL OF PREEXISTING FLOOR COVERING, WALLS, CASEWORK OR
OTHER BUILDING COMPONENTS.
• NEW DRYWALL PLACEMENT.
• RENOVATION WORK IN A SINGLE ROOM.
• NONEXISTENT CABLE PATHWAY OR INVASIVE ELECTRICAL WORK
ABOVE CEILINGS.
• THE REMOVAL OF DRYWALL WHERE A MODERATE AMOUNT OF DUST
AND DEBRIS IS CREATED.
• DRY SANDING WHERE A MODERATE AMOUNT OF DUST AND DEBRIS IS
CREATED.
• WORK CREATING SIGNIFICANT VIBRATION AND/OR NOISE.
• ANY ACTIVITY THAT CANNOT BE COMPLETED IN A SINGLE WORK SHIFT.
TYPE D: MAJOR DEMOLITION, CONSTRUCTION
INCLUDES BUT IS NOT LIMITED TO:
• REMOVAL OR REPLACEMENT OF BUILDING SYSTEM COMPONENT(S).
• REMOVAL/INSTALLATION OF DRYWALL PARTITIONS.
• INVASIVE LARGE-SCALE NEW BUILDING CONSTRUCTION.
• RENOVATION WORK IN TWO OR MORE ROOMS.
TYPE A TYPE B TYPE C TYPE D
LOW
MEDIUM
HIGH
HIGHEST
I II II III
I II III IV
I III IV V
III IV V V
PHASE 1
BUILD OUT TR AND ADJACENT ROOMS IMPACTED AS
SHOWN IN DRAWINGS. REFER TO ARCHITECTURAL,
ELECTRICAL, MECHANICAL, AND LOW VOLTAGE
DRAWINGS FOR TR ROOM DESIGN REQUIREMENTS.
(ICRA CLASS IV PRECAUTIONS, SEE G-100)
PHASE 2
PULL NEW CABLE FROM TR RACKS DOWN MAIN
CORRIDORS. REFER TO LOW VOLTAGE DRAWINGS
FOR CABLE PATHWAYS. NOTE: ALL WORK IN THIS
PHASE TO BE NIGHT AND WEEKEND WORK. (ICRA
CLASS II PRECAUTIONS, SEE G-100)
PHASE 3
PROVIDE CABLE DROPS IN ALL ROOMS SHOWN. REFER
TO LOW VOLTAGE DRAWINGS FOR EXACT DROP
LOCATIONS. NOTE: ALL WORK IN THIS PHASE TO BE
NIGHT AND WEEKEND WORK. (ICRA CLASS II
PRECAUTIONS, SEE G-100)
PHASING LEGEND
1. PROJECT AREAS ARE TO BE OCCUPIED BY STAFF AND
VETERANS THROUGHOUT CONSTRUCTION.
2. PHASES NOTED AS AFTER HOURS: CORRIDOR WORK TO
BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00
AM. COORDINATE WITH COR. ALL WORK TO BE
COMPLETED AND OPEN FOR PUBLIC USE AT THE END
OF EACH NIGHT'S WORK.
3. CONSTRUCTION WORK BEHIND TEMPORARY
CONSTRUCTION PARTITIONS SHALL BE COMPLETED
DURING DAY SHIFTS.
4. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION
ON WORK DURATION FOR EACH PHASE AND AREA OF
WORK.
5. COORDINATE WITH MEP PHASING PLANS FOR
SIMULTANEOUS WORK TO BE COMPLETED.
INFECTION CONTROL RISK ASSESSMENT NOTES - CLASS V
1. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241
REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING
TILE IS REMOVED, TO THE DECK ABOVE.
2. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC
BARRIERS MUST BE EFFECTIVELY AFFIXED TO GROUND AND CEILING
AND SECURE FROM MOVEMENT OR DAMAGE. APPLY TAPE THAT WILL
NOT LEAVE A RESIDUE TO SEAL GAPS BETWEEN BARRIERS, CEILING OR
FLOOR.
3. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, ANTEROOM
BARRIERS, INCLUDING FLOORS AND CEILING USING APPROVED
MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
4. CONSTRUCT ANTEROOM LARGE ENOUGH FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS. THE ANTEROOM MUST BE CONSTRUCTED
ADJACENT TO ENTRANCE OF CONSTRUCTION WORK AREA.
5. PERSONNEL WILL BE REQUIRED TO WEAR COVERALLS AT ALL TIMES
DURING CLASS V WORK ACTIVITIES. COVERALLS MUST BE REMOVED
BEFORE LEAVING THE ANTEROOM.
6. REMOVE OR ISOLATE RETURN AIR DIFFUSERS TO AVOID DUST ENTERING
THE HVAC SYSTEM.
7. REMOVE OR ISOLATE THE SUPPLY AIR DIFFUSERS TO AVOID POSITIVE
PRESSURIZATION OF THE SPACE.
8. NEGATIVE AIRFLOW PATTERN MUST BE MAINTAINED FROM THE ENTRY
POINT TO THE ANTEROOM AND INTO THE CONSTRUCTION AREA. THE
AIRFLOW MUST CASCADE FROM OUTSIDE TO INSIDE THE
CONSTRUCTION AREA. THE ENTIRE CONSTRUCTION AREA MUST REMAIN
NEGATIVELY PRESSURIZED.
9. MAINTAIN NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE
USING HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS. EXHAUST
DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER
FROM ENTRANCES, AIR INTAKES AND WINDOWS DOES NOT REQUIRE
HEPA-FILTERED AIR.
10. IF EXHAUST IS DIRECTED INDOORS, THEN THE SYSTEM MUST BE HEPA
FILTERED. PRIOR TO START OF WORK, HEPA FILTRATION MUST BE
VERIFIED BY PARTICULATE MEASUREMENT AS NO LESS THAN 99.97%
EFFICIENCY AND MUST NOT ALTER OR CHANGE AIRFLOW/PRESSURE
RELATIONSHIPS IN OTHER AREAS.
11. EXHAUST INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER
SHARED EXHAUST SYSTEMS (BATHROOM EXHAUST) IS NOT ACCEPTABLE.
12. INSTALL DEVICE (DIGITAL MONITORING) ON EXTERIOR OF WORK
CONTAINMENT TO CONTINUALLY MONITOR NEGATIVE
PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE
NOT ACCEPTABLE.
13. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.
14. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD
LID) MUST BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE
CONSTRUCTION AREAS. THESE CONTAINERS MUST BE DAMP-WIPED
CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE
CONTAINED WORK AREA.
15. WORKER CLOTHING MUST BE CLEAN AND FREE OF VISIBLE DUST
BEFORE LEAVING THE WORK AREA ANTEROOM.
16. WORKERS MUST WEAR SHOE COVERS PRIOR TO ENTRY INTO THE WORK
AREA. SHOE COVERS MUST BE CHANGED PRIOR TO EXITING THE
ANTEROOM TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED
SHOE COVERS MUST BE IMMEDIATELY CHANGED.
17. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF
CONTAINED WORK AREA BASED ON FACILITY POLICY. STICKY MATS
MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.
18. IN THE EVENT THAT THERE IS A DEVIATION IN PLACE TO DISCHARGE THE
EXHAUST AIR INTO OCCUPIED SPACE (AND NOT OUTSIDE), THEN
CONSIDER PARTICULATE SAMPLING TO HELP IDENTIFY CONTAMINANTS
THAT MAY ENTER PATIENT CARE AREAS.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION
PREVENTIONIST OR DESIGNEE AND ENGINEERING REPRESENTATIVE FOR
DISCONTINUATION OR DOWNGRADING OF ICRA PRECAUTIONS.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES,
HIGH HORIZONTAL SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST
ACCUMULATION ON UPPER SURFACES AS WELL AS AIR DIFFUSER
SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK
INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND
ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY
NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN
PERFORMED.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE
FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:
3. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
4. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-
HELD HEPA VACUUM.
5. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
6. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING
OUTER HARD BARRIER.
7. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE
GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE
CONTAMINATES FROM THE WORK AREA.
2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT ALL TIMES
AND IN PLACE FOR A PERIOD AFTER COMPLETION OF DUST
CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE
WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.
3. MAINTAIN MINIMUM NEGATIVE AIR PRESSURE, 0.01 INCHES OF
WATER GAUGE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A DIGITAL
DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE
CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC
CALIBRATION, AND MONITORED.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF
HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR
EXCHANGE DESIGN SPECIFICATIONS.
INFECTION CONTROL RISK ASSESSMENT NOTES - CLASS IV
1. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241
REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING
TILE IS REMOVED, TO THE DECK ABOVE.
2. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC
BARRIERS MUST BE EFFECTIVELY AFFIXED TO GROUND AND CEILING
AND SECURE FROM MOVEMENT OR DAMAGE. APPLY TAPE THAT WILL
NOT LEAVE A RESIDUE TO SEAL GAPS BETWEEN BARRIERS, CEILING OR
FLOOR.
3. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING
FLOORS AND CEILING, USING APPROVED MATERIALS (UL SCHEDULE
FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
4. CONTAINMENT UNITS OR ENVIRONMENTAL CONTAINMENT UNITS
(ECUS) APPROVED FOR CLASS IV PRECAUTIONS IN SMALL AREAS
TOTALLY CONTAINED BY THE UNIT AND THAT HAS HEPA-FILTERED
EXHAUST AIR.
5. REMOVE OR ISOLATE RETURN AIR DIFFUSERS TO AVOID DUST ENTERING
THE HVAC SYSTEM.
6. REMOVE OR ISOLATE THE SUPPLY AIR DIFFUSERS TO AVOID POSITIVE
PRESSURIZATION OF THE SPACE.
7. NEGATIVE AIRFLOW PATTERN MUST BE MAINTAINED FROM THE ENTRY
POINT TO THE ANTEROOM AND INTO THE CONSTRUCTION AREA. THE
AIRFLOW MUST CASCADE FROM OUTSIDE TO INSIDE THE
CONSTRUCTION AREA. THE ENTIRE CONSTRUCTION AREA MUST REMAIN
NEGATIVELY PRESSURIZED.
8. MAINTAIN NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY
USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS. EXHAUST
DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER
FROM ENTRANCES, AIR INTAKES AND WINDOWS DOES NOT REQUIRE
HEPA-FILTERED AIR.
9. IF EXHAUST IS DIRECTED INDOORS, THEN THE SYSTEM MUST BE HEPA
FILTERED. PRIOR TO START OF WORK, HEPA FILTRATION MUST BE
VERIFIED BY PARTICULATE MEASUREMENT AS NO LESS THAN 99.97%
EFFICIENCY AND MUST NOT ALTER OR CHANGE AIRFLOW/PRESSURE
RELATIONSHIPS IN OTHER AREAS.
10. EXHAUST INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER
SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS NOT
ACCEPTABLE.
11. INSTALL DEVICE (DIGITAL MONITORING) ON EXTERIOR OF WORK
CONTAINMENT TO CONTINUALLY MONITOR NEGATIVE
PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE
NOT ACCEPTABLE.
12. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.
13. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD
LID) MUST BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE
CONSTRUCTION AREAS. THESE CONTAINERS MUST BE DAMP-WIPED
CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE
CONTAINED WORK AREA.
14. WORKER CLOTHING MUST BE CLEAN AND FREE OF VISIBLE DUST
BEFORE LEAVING THE WORK AREA. HEPA VACUUMING OF CLOTHING
OR USE OF COVER SUITES IS ACCEPTABLE.
15. WORKERS MUST WEAR SHOE COVERS PRIOR TO ENTRY INTO THE WORK
AREA. SHOE COVERS MUST BE CHANGED PRIOR TO EXITING THE
ANTEROOM TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED
SHOE COVERS MUST BE IMMEDIATELY CHANGED.
16. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF
CONTAINED WORK AREA BASED ON FACILITY POLICY. STICKY MATS
MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.
17. IN THE EVENT THAT THERE IS A DEVIATION IN PLACE TO DISCHARGE THE
EXHAUST AIR INTO OCCUPIED SPACE (AND NOT OUTSIDE), THEN
CONSIDER PARTICULATE SAMPLING TO HELP IDENTIFY CONTAMINANTS
THAT MAY ENTER PATIENT CARE AREAS.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION
PREVENTIONIST OR DESIGNEE AND ENGINEERING REPRESENTATIVE FOR
DISCONTINUATION OR DOWNGRADING OF ICRA PRECAUTIONS.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES,
HIGH HORIZONTAL SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST
ACCUMULATION ON UPPER SURFACES AS WELL AS AIR DIFFUSER
SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK
INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND
ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY
NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN
PERFORMED.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE
COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE
FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:
3. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
4. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-
HELD HEPA VACUUM.
5. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
6. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING
OUTER HARD BARRIER.
7. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE
GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE
CONTAMINATES FROM THE WORK AREA.
2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT ALL TIMES
AND IN PLACE FOR A PERIOD AFTER COMPLETION OF DUST
CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE
WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.
3. MAINTAIN MINIMUM NEGATIVE AIR PRESSURE, 0.01 INCHES OF
WATER GAUGE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A DIGITAL
DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE
CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC
CALIBRATION, AND MONITORED.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF
HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR
EXCHANGE DESIGN SPECIFICATIONS.
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
Department of
Veteran Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:
A/E:
STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t Dwg. of
G-100
ICRA AND PHASING GENERAL NOTES
SEVEN GENERATIONS ARCHITECTURE AND ENGINEERING
600 E. MICHIGAN AVE. STE B
KALAMAZOO, MI 49007
296.927.0144
JACK C. MONTGOMERY VA MEDICAL CENTER
05/24/2024 JRB SCC
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MC
623-21-700
Revisions: 35% Schematic Design Date: 02/24/2023
Revisions: 65% Design Development Date: 09/21/2023
Revisions: 95% Construction Documents Date: 02/12/2024
Revisions: 10% Diamond Drawings Date: 09/30/2022
PHASING LEGEND
PHASE 1
BUILD OUT TR AND ADJACENT ROOMS IMPACTED AS
SHOWN IN DRAWINGS. REFER TO ARCHITECTURAL,
ELECTRICAL, MECHANICAL, AND LOW VOLTAGE
DRAWINGS FOR TR ROOM DESIGN REQUIREMENTS.
(ICRA CLASS IV PRECAUTIONS, SEE G-100)
PHASE 2
PULL NEW CABLE FROM TR RACKS DOWN MAIN
CORRIDORS. REFER TO LOW VOLTAGE DRAWINGS
FOR CABLE PATHWAYS. NOTE: ALL WORK IN THIS
PHASE TO BE NIGHT AND WEEKEND WORK. (ICRA
CLASS II PRECAUTIONS, SEE G-100)
PHASE 3
PROVIDE CABLE DROPS IN ALL ROOMS SHOWN. REFER
TO LOW VOLTAGE DRAWINGS FOR EXACT DROP
LOCATIONS. NOTE: ALL WORK IN THIS PHASE TO BE
NIGHT AND WEEKEND WORK. (ICRA CLASS II
PRECAUTIONS, SEE G-100)
1. PROJECT AREAS ARE TO BE OCCUPIED BY STAFF AND
VETERANS THROUGHOUT CONSTRUCTION.
2. PHASES NOTED AS AFTER HOURS: CORRIDOR WORK TO
BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00
AM. COORDINATE WITH COR. ALL WORK TO BE
COMP…