This document is a set of electrical engineering drawings for the EHRM Infrastructure Upgrades project at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma. The drawings detail electrical plans for multiple building levels, including demolition and new electrical configurations for telecommunications rooms (TR) across different floors. The plans specify power distribution, rack placement, lighting modifications, and power supply details for various rooms such as offices, storage areas, and equipment rooms.

The drawings provide comprehensive electrical layouts showing power sources, panelboards, data racks, junction boxes, and power distribution units. They include specific technical specifications for power connections, such as 208V rack PDUs, zone PDU units, and uninterruptible power supplies (UPS). The plans cover electrical work for Buildings 01, 18, 11, 22, 24, 52, and 53, with detailed schematics for power elevations, receptacle configurations, and equipment mounting, indicating a comprehensive infrastructure upgrade across multiple buildings at the VA medical facility.

View the file

Other files

File Type Posted
36C77625R0046 0009.pdf PDF
Attachment 21 - Tech Questions Tracker - FINAL07162025.pdf PDF
Attachment 21 - Tech Questions Tracker - FINAL_07142025.pdf PDF
36C77625R0046 0008.pdf PDF
Attachment to Tech Questions- ASI-001 Mechanical Ductwork Drawings- 20250714.pdf PDF
36C77625R0046 0007.pdf PDF
Attachment 21 - Tech Questions Tracker - 07082025.pdf PDF
Attachment 21 - Tech Questions Tracker - 07022025.pdf PDF
36C77625R0046 0006.pdf PDF
36C77625R0046 0005.pdf PDF
Attachment 16 Muskogee County Wage Rates_06272025.pdf PDF
Attachment 20 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
36C77625R0046 0004.pdf PDF
Attachment 21 - Tech Questions Tracker - 20250623 Partial.pdf PDF
36C77625R0046 0003.pdf PDF
Attachment 19 Site Visit Sign In Sheet 62323700.pdf PDF
36C77625R0046 0002.pdf PDF
36C77625R0046 0001.pdf PDF
Attachment 17- Limitations on Subcontracting - Muskogee EHRM.pdf PDF
Attachment 08 Drawings 7 of 13 Muskogee 623-21-700.pdf PDF
Attachment 01 - 623-21-700 - Muskogee - Updated Combined Specifications-20250501.pdf PDF
Attachment 03 Drawings 2 of 13 Muskogee 623-21-700.pdf PDF
36C77625R0046_1.pdf PDF
Attachment 04 Drawings 3 of 13 Muskogee 623-21-700.pdf PDF
Attachment 18 Site Map.pdf PDF
Attachment 02 Drawings 1 of 13 Muskogee 623-21-700.pdf PDF
Attachment 16 Muskogee County Wage Rates.pdf PDF
Attachment 07 Drawings 6 of 13 Muskogee 623-21-700.pdf PDF
Attachment 06 Drawings 5 of 13 Muskogee 623-21-700.pdf PDF
Attachment 12 Drawings 11 of 13 Muskogee 623-21-700.pdf PDF
Attachment 14 Drawings 13 of 13 Muskogee 623-21-700.pdf PDF
Attachment 10 Drawings 9 of 13 Muskogee 623-21-700.pdf PDF
Attachment 13 Drawings 12 of 13 Muskogee 623-21-700.pdf PDF
Attachment 11 Drawings 10 of 13 Muskogee 623-21-700.pdf PDF
Attachment 09 Drawings 8 of 13 Muskogee 623-21-700.pdf PDF
Attachment 15- PCRA for EHRM 623-700.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

b Mo

Mo a

Mo

J J

360°

J

C

X

W

S

X

W

1.T

TYP.

AREA OF WORK

1.T

L5 b 01-C100M1A-1B-10

TR

C100M1A-1

188 SF

L5 a 01-C100M1A-1A-10

L5 a 01-C100M1A-1A-10

L5 b 01-C100M1A-1B-10

DATA RACK,

TYP.

01-C100M1A-1B

01-C100M1A-1A

STORAGE

1C168B-1

55 SF

L6

TYP.

EP507

TYP.

EP507

TYP.

EP507

1.T

DATA RACK,

TYP.

JUNCTION BOX

CORNING CONNECTOR

PANEL

TYP.

(3) POWER

DISTRIBUTION UNIT

FIBER OPTIC

PATCH PANEL

1.T

EP503

DATA RACK,

TYP.

01-C100M1A-1A-2

01-C100M1A-1B-2

01-C100M1A-1B-2

RELOCATED

JUNCTION BOX

01-C100M1A-1B 3

01-C100M1A-1B-2

EP505

01-C100M1A-1A-2

01-C100M1A-1A-2

01-C100M1A-1A-2

01-C100M1A-1B-2

REFER TO

SHEET 01EP101 REFER TO

SHEET 01EP101

TR

C100M1A-1

188 SF

01-C100M1A-1A

MS-C100M1A-1-1

P-TR-3A

01-P-10

P-TR-3B

P-TR-1B

P-TR-1A C

CU-C100M1A-1-2

CU-C100M1A-1-1

YY

STORAGE

1C168B-1

55 SF

TU-C100M1A

01-ACP-C100M1A

01-P-0201-C100M1A-1A-16

MS-C100M1A-1-2

01-P-17

01-P-16

01-C100M1A-1A-13

57 SF

WHEELCHAIR

STOR

C100M1A-1

139 SF

OFFICE

1C168B-1

57 SF

WHEELCHAIR

STOR

C100M1A-1

139 SF

OFFICE

1C168B-1

01-C100M1A-1

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01EP401a

BLDG 01 - LEVEL 01 - ENLARGED ELECTRICAL

PLANS

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 18 of 77

1/2" = 1'-0"01EP101

3 RM C100M1A-1 & C100M1B-1 - DEMOLITION LIGHTING PLAN

PROJECT

NORTH

1/2" = 1'-0"01EP101

4 RM 01-C100M1A-1 - LIGHTING PLAN

1/2" = 1'-0"01EP101

1 RM C100M1A-1 & C100M1B-1 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"01EP101

2 RM 01-C100M1A-1 - ELECTRICAL PLAN

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

SOURCE A POWER PANELBOARD "01-C100M1B-1A".

SOURCE B POWER PANELBOARD "01-C100M1B-1B".

PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS

BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO

TECHNOLOGY PLANS.

MS-C100M1A-1-1 & MS-C100M1A-1-2 POWERED FROM CU-C100M1A-1-1 & CU-

C100M1A-1-2, PROVIDE CONDUIT AND WIRE PER MANUFACTURER'S REQUIREMENT.

COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.

CIRCUIT LIGHTING AND SWITCH TO THE EXISTING PANEL POWERING

DEMOLISHED LIGHT SHOWN IN KEYNOTE 1, DETAIL '3' OF THIS SHEET.

PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY

EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,

PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE

AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00 - PHYSICAL

ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL EQUIPMENT SHALL

MATCH INSTALLED BASE

KEY NOTES

1'0 2' 4' 1'0 2' 4'

1'0 2' 4'

GENERAL NOTES

KEY PLAN

1'0 2' 4'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

01-P-16

UTILIZE ACCES CONTROL PANEL POWER CIRCUIT.

J J

360°

J

S X

C

W

X

Mo a

Mo b

Mo

AREA OF WORK

1.F 1.G

1.3

1.4

TYP.

1.E

1.F 1.G

1.3

1.4

01-DP-TRB3 01-DP-TRA 2

01-DP-TRA-13

01-DP-TRB-12

DATA RACK,

TYP.

EP503

01-DP-TRA-13

01-DP-TRB-12

01-DP-TRA-13

01-DP-TRB-12 01-DP-TRA-13

01-DP-TRB-12

EP505

TR

101-1

210 SF

MS-101-1-1 (ABOVE)

MS-101-1-2 (BELOW)

P-TR-1B

P-TR-3B

P-TR-3A

P-TR-1A

01-P-07

01-P-06

01-P-05

01-P-04 01-P-15

01-P-14

01-P-13

01-P-12

C

CU-101-1-1

72 SF

BREAK

101B-1

TU-101-1

YY

13131313

CU-101-1-2CU-240-1-1

CU-302-1-2

01-P-1801-P-19

01-ACP-10111

01-101-1A-16

CU-302-1-1

CU-240-1-2

01-P-03

01-P-02

01-P-10

01-P-11 W

01-P-22

01-P-2301-P-24

01-P-25

01-P-01

01-P-09

01-DP-TRA-12

1.F 1.G

1.3

1.4

TYP.

1.F 1.G

1.3

1.4

L3 b

01-101-1B-10

L3 b

01-101-1B-10

01-DP-TRA

L3 a 01-101-1A-10

L3 a 01-101-1A-10

TR

101-1

210 SF

01-DP-TRB

DATA RACK,

TYP.

72 SF

BREAK

101B-1

L6

EP507

TYP.

EP507

TYP.

EP507

101-1

MED STOR

101A-1

38 SF

PSA

101-1

109 SF

BREAK

101B-1

133 SF

BREAK

101B-1

133 SF

MED STOR

101A-1

38 SF

PSA

101-1

109 SF

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01EP401b

BLDG 01 - LEVEL 01 - ENLARGED ELECTRICAL

PLANS

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 19 of 82

PROJECT

NORTH

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

SOURCE A POWER PANELBOARD "01-DP-TRA".

SOURCE B POWER PANELBOARD "01-DP-TRB".

PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS

BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO

TECHNOLOGY PLANS.

MS-101-1-1 & MS-101-1-2 POWERED FROM CU-101-1-1 & CU-101-1-2, PROVIDE CONDUIT

AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

CIRCUIT LIGHTING AND SWITCH TO THE EXISTING PANEL POWERING

DEMOLISHED LIGHT SHOWN IN KEYNOTE 1, DETAIL '3' OF THIS SHEET.

PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY

EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,

PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE

AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00 - PHYSICAL

ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL EQUIPMENT SHALL

MATCH INSTALLED BASE

CONDUITS ROUTE VERTICALLY TO NEXT FLOOR. REFERENCE SHEET 01EP402b FOR

FEEDER ROUTE INFORMATION.

PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS

REQUIRED PER MANUFACTURER'S INSTRUCTION. COORDINATE WITH MECHANICAL

CONTRACTORS AS REQUIRED.

KEY NOTES

GENERAL NOTES

KEY PLAN

1/4" = 1'-0"01EP101

1 RM 101-1 & 101A-1 - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"01EP101

2 RM 101-1 - ELECTRICAL PLAN

1/4" = 1'-0"01EP101

3 RM 101-1 & 101A-1 - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"01EP101

4 RM 101-1 - LIGHTING PLAN

2'0 4' 8' 2'0 4' 8'

2'0 4' 8' 2'0 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

-24

-23

22 1918

J

0°

W

S

X

X

WC

Mo b a Mo

MoMo

1.W 1.X

1.1

53.A52.D 52.E

TYP.

238 SF

CHIEF OFFICE

2C50A-1

215 SF

OFFICE

2C50-1

1.W 1.X

1.1

53.A52.D 52.E

01-2C50B-1B-2 01-2C50B-1A-2

DATA RACK,

TYP.

EP503

01-2C50B-1B

01-2C50B-1A

EP505

01-2C50B-1B-2

01-2C50B-1A-2

01-2C50B-1B-2

01-2C50B-1A-2

01-2C50B-1B-2

01-2C50B-1A-2

TR

2C50B-1

221 SF

MS-2C50B-1-1 (ABOVE)

MS-2C50B-1-2 (BELOW)

P-TR-3A

P-TR-1AP-TR-1B

P-TR-3B

C

01-P-03

OFFICE

2C50-1

109 SF

118 SF

OFFICE

2C50-1

TU-2C50B-1

Y Y

01-2C50B-1A-16

01-ACP-2C50B 12

01-P-11

01-2C50B-1A-13

1.W 1.X53.A52.D 52.E

TYP.

1.W 1.X

1.1

53.A 52.D

52.E

L1 a 01-2C50B-1A-10

TR

2C50B-1

221 SF

L1 b 01-2C50B-1B-10

L1 a 01-2C50B-1A-10

01-2C50B-1B

L1 b 01-2C50B-1B-10

DATA RACK,

TYP.

01-2C50B-1A

OFFICE

2C50-1

109 SF 118 SF

OFFICE

2C50-1

L6

L6

TYP.

EP507

TYP.

EP507 TYP.

EP507

2C50B-12C50-1

AREA SHOWN

238 SF

CHIEF OFFICE

2C50A-1

215 SF

OFFICE

2C50-1

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

A SIDE POWER

B SIDE POWER

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01EP402a

BLDG 01 - LEVEL 02 - ENLARGED ELECTRICAL

PLANS

JACK C. MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR., MUSKOGEE, OK 74401

Dwg. 20 of 77

- 3/8" = 1'-0"

1 RM 2C50A-1 - DEMOLITION ELECTRICAL PLAN

- 3/8" = 1'-0"

2 RM 2C50B-1 - ELECTRICAL PLAN

- 3/8" = 1'-0"

3 RM 2C50A-1 - DEMOLITION LIGHTING PLAN

- 3/8" = 1'-0"

4 RM 2C50B-1 - LIGHTING PLAN

KEY PLAN

2'0 4' 6'

GENERAL NOTES

KEY NOTES

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

SOURCE A POWER PANELBOARD "01-2C50B-1A".

SOURCE B POWER PANELBOARD "01-2C50B-1B".

PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS

BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER

SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY

SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS

REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH

ARCHITECT AND DOOR INSTALLER.

PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO

TECHNOLOGY PLANS.

MS-2C50B-1-1 AND MS-2C50B-1-2 POWERED FROM CU-2C50B-1-1 AND CU-2C50B-1-2

PROVIDE CONDUCTORS AND WIRE PER MANUFACTURE'S REQUIREMENT.

COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.

EXTEND EXISTING LIGHTING CIRCUITRY AS REQUIRED TO POWER EXISTING

LUMIAIRES AND PROVIDED SWITCH AS REQUIRED. REFERENCE KEYNOTE 1, DETAIL

'3' OF THIS SHEET FOR ADDITIONAL INFORMATION.

EXTEND EXISTING LIGHTING CIRCUITRY AS REQUIRED TO POWER PROVIDED

LUMINAIRES AND SWITCH AS REQUIRED. REFERENCE KEYNOTE 1, DETAIL '3' OF

THIS SHEET FOR ADDITIONAL INFORMATION.

PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY

EQUIPMENT FOR THE TR ROOM. PROVIDE ALL REQUIED CONNECTIONS,

PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE

AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00" -

PHYSICAL ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL

EQUIPMENT SHALL MATCH INSTALLED BASE.

PROJECT

NORTH

PROJECT

NORTH

2'0 4' 6'

PROJECT

NORTH

2'0 4' 6'

PROJECT

NORTH

2'0 4' 6'

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

01-P-21 01-P-20

JJ

W

X

S W

X

C

Mo b a Mo

Mo

AREA SHOWN

22.A 22.B1.F 1.G

1.4

22.A 22.B1.F 1.G

1.4

01-240-1B-2 01-240-1A-2

01-240-1B3

01-240-1A 2

EP505

DATA RACK,

TYP.

EP503

01-240-1B-2

01-240-1A-2

01-240-1B-201-240-1A-2

01-240-1B-2

01-240-1A-2

MS-240-1-1 (ABOVE)

MS-240-1-2 (BELOW)

P-TR-3B

P-TR-3A

01-P-07

01-P-06

01-P-05

01-P-04

01-P-15

01-P-14

01-P-13

01-P-12

C

TR

240-1

210 SF

STORAGE

241-1

63 SF

TU-240-1

YY

P-TR-1B

P-TR-1A

1101-240-1A-16

01-ACP-240

01-240-1A-13

22.A 22.B1.F 1.G

1.4

TYP.

22.A 22.B1.F 1.G

1.4

L3 a 01-240-1A-10

L3 b 01-240-1B-10

TR

240-1

210 SF

L3 a 01-240-1A-10

L3 b 01-240-1B-10

01-240-1B 01-240-1A

L6

DATA RACK,

TYP.

TYP.

EP507

EP507

TYP.

EP507

241-1 240-1

128 SF

OFFICE

240-1140 SF

OFFICE

241-1

128 SF

OFFICE

240-1

140 SF

OFFICE

241-1

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

A SIDE POWER

B SIDE POWER

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01EP402b

BLDG 01 - LEVEL 02 - ENLARGED ELECTRICAL

PLANS

JACK C. MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR., MUSKOGEE, OK 74401

Dwg. 21 of 77

KEY PLAN

GENERAL NOTES

KEY NOTES

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

SOURCE A POWER PANELBOARD "01-240-1A"

SOURCE B POWER PANELBOARD "01-240-1B"

PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS

BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO

TECHNOLOGY PLANS.

MS-240-1-1 & MS-240-1-2 POWERED FROM CU-240-1-1 & CU-240-1-2, PROVIDE CONDUIT

AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

EXTEND EXISTING LIGHTING CIRCUITRY AS REQUIRED TO POWER PROVIDED

LUMINAIRES AND SWITCH AS REQUIRED. REFERENCE KEYNOTE 1, DETAIL '3' OF THIS

SHEET FOR ADDITIONAL REFERENCE.

PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY

EQUIPMENT FOR THE TR ROOM. PROVIDE ALL REQUIED CONNECTIONS,

PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE

AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00" - PHYSICAL

ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL EQUIPMENT SHALL

MATCH INSTALLED BASE.

CONDUITS ROUTE VERTICALLY TO NEXT FLOOR. REFERENCE SHEET 01EP403 FOR

FEEDER ROUTE INFORMATION.

- 3/8" = 1'-0"

1 RM 240-1 - DEMOLITION ELECTRICAL PLAN

- 3/8" = 1'-0"

2 RM 240-1 - ELECTRICAL PLAN

- 3/8" = 1'-0"

3 RM 240-1 - DEMOLITION LIGHTING PLAN

- 3/8" = 1'-0"

4 RM 240-1 - LIGHTING PLAN

1'0 2' 4'

PROJECT

NORTH

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

JJ

0°

W

J

W

X X

S

C

Mo a

Mo b

1.G

1.3

TYP.

TELEPHONE

BOARD TERMINAL

OFFICE

302-1

116 SF

IT

302A-1

11 SF

1.G

1.3

1.4

TR

302-1

216 SF

01-302-1A-2

01-302-1A-2

01-302-1A-2 01-302-1B-2

01-302-1B-2

01-302-1A-2

01-302-1B-2

01-302-1B

01-302-1A 2

DATA RACK,

TYP.

EP503

EP505

01-302-1B-2

MS-302-1-1(ABOVE)

MS-302-1-2 (BELOW)

P-TR-3AP-TR-3B

01-P-07

01-P-06

01-P-05

01-P-15

01-P-14

01-P-13

C

TU-302-1

01-302-1A-16

01-ACP-302

1.G

1.3

TYP.

OFFICE

302-1

116 SF

IT

302A-1

11 SF

1.G

1.3

TR

302-1

216 SF

L3 a

01-302-1A-10

L3 a 01-302-1A-10

L3 b

01-302-1B-10

L3 b 01-302-1B-10

DATA RACK,

TYP.

01-302-1B 01-302-1A

TYP.

EP507

TYP.

EP507

302-1

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

AREA OF WORK

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01EP403

BLDG 01 - LEVEL 03 - ENLARGED ELECTRICAL

PLANS

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR., MUSKOGEE, OK 74401

Dwg. 22 of 77

KEY PLAN

GENERAL NOTES

KEY NOTES

- 3/8" = 1'-0"

1 RM 302-1 - DEMOLITION ELECTRICAL PLAN 2'0 4' 6'

- 3/8" = 1'-0"

2 RM 302-1 - ELECTRICAL PLAN

- 3/8" = 1'-0"

3 RM 302-1 - DEMOLITION LIGHTING PLAN

- 3/8" = 1'-0"

4 RM 302-1 - LIGHTING PLAN

PROJECT

NORTH

2'0 4' 6'

PROJECT

NORTH

2'0 4' 6'

PROJECT

NORTH

2'0 4' 6'

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

SOURCE A POWER PANELBOARD "01-302-1A".

SOURCE B POWER PANELBOARD "01-302-1B".

PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS

BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.

OVERHEAD TR RACK SOURCE A AND SOURCE B JUNCTION BOXES.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO

TECHNOLOGY PLANS.

MS-302-1-1 & MS-302-1-2 POWERED FROM CU-302-1-1 & CU-302-1-2, PROVIDE CONDUIT

AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY

EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,

PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE

AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 00 13 - PHYSICAL

ACCESS CONTROL SYSTEM" FOR ADDITONAL INFORMATION. ALL EQUIPMENT SHALL

MATCH INSTALLED BASE.

CONDUITS ROUTE VERTICALLY TO NEXT FLOOR. REFERENCE SHEET 01EP404 FOR

FEEDER ROUTE INFORMATION.

PROJECT

NORTH

01-302-1A-13

UTILIZE ACCES CONTROL PANEL POWER CIRCUIT.

0°

W

X

C

S X a Mo b Mo

AREA SHOWN

1.G

1.3

1.4

TYP.

FIBER OPTIC

PANEL

TELEPHONE

TERMINAL BOARD

DATA RACK

1.G

1.3

1.4

01-403-1A-2

01-403-1B-2 01-403-1A-2

01-403-1B-2

01-403-1B-2

01-403-1A-2

01-403-1B-2

01-403-1A-2

01-403-1B

01-403-1A

EP505

DATA RACK,

TYP.

EP503

RELOCATED

FIBER OPTIC

PANEL

TR

403-1

218 SF

5MS-403-1-1 (ABOVE)

MS-403-1-2 (BELOW)

P-TR-3B

P-TR-3A

01-P-07

01-P-06

01-P-14

01-P-15

C

RELOCATED

TELEPHONE

TERMINAL BOARD

TU-403-1

01-ACP-403 9

01-403-1A-16

W

01-403-1A-13

403-1

1.G

1.3

1.4

TYP.

1.G

1.3

1.4

L4 a 01-403-1A-10

L4 a 01-403-1A-10

DATA RACK,

TYP.

TR

403-1

218 SF

L4 b 01-403-1B-10

L4 b 01-403-1B-10

01-403-1B

01-403-1A

EP507

TYP. TYP.

EP507

117 SF

OFFICE

403-1

12 SF

PH

403A-1

117 SF

OFFICE

403-1

12 SF

PH

403A-1

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01EP404

BLDG 01 - LEVEL 04 - ENLARGED ELECTRICAL

PLANS

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR., MUSKOGEE, OK 74401

Dwg. 23 of 77

GENERAL NOTES

- 3/8" = 1'-0"

1 RM 403-1 - DEMOLITION ELECTRICAL PLAN

- 3/8" = 1'-0"

2 RM 403-1 - ELECTRICAL PLAN1'0 2' 4'

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

SOURCE A POWER PANELBOARD "01-403-1A".

SOURCE B POWER PANELBOARD "01-403-1B".

PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS

BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.

OVERHEAD TR RACK SOURCE A AND SOURCE B JUNCTION BOXES.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER

SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE

DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS

REQUIRED. SEE EQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH

ARCHITECT AND DOOR INSTALLER.

PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO

TECHNOLOGY PLANS.

MS-403-1-1 & MS-403-1-2 POWERED FROM CU-1-403-1-1 & CU-1-403-1-2, PROVIDE

CONDUIT AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE WITH

MECHANICAL CONTRACTOR AS REQUIRED.

PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY

EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,

PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE

AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00 - PHYSICAL

ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL EQUIPMENT SHALL

MATCH INSTALLED BASE.

CONDUITS ROUTE VERTICALLY TO NEXT FLOOR. REFERENCE SHEET 01EP405 FOR

FEEDER ROUTE INFORMATION.

KEY NOTES

- 3/8" = 1'-0"

3 RM 403-1 DEMOLITION LIGHTING PLAN

- 3/8" = 1'-0"

4 RM 403-1 LIGHTING PLAN

PROJECT

NORTH

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

KEY PLAN

P/D

J J

360°

W

X

C

W

X

S a Mo b Mo

AREA OF WORK

5A04-1

1.F

1.3

TYP.

1.F 1.G

1.3

TR

5A04-1

174 SF

01-5A04-1B-2

01-5A04-1A-2

01-5A04-1B-2

01-5A04-1A-2

01-5A04-1B-2

01-5A04-1A-2

01-5A04-1B-2

01-5A04-1A-2

DATA RACK,

TYP.

EP503

01-5A04-1B3 01-5A04-1A 2

EP505

MS-5A04-1-1 (ABOVE)

MS-5A04-1-2 (BELOW)

P-TR-3B

P-TR-3A

01-P-07

C

OFFICE

5A03-1

110 SF

TU-5A04-1

01-5A04-1A-16

01-P-29

01-P-15

01-P-29

01-P-28

01-P-27

01-P-26

01-5A04-1A-13

01-ACP-5A04

1.F 1.G

1.3

TYP.

1.F 1.G

1.3

TR

5A04-1

174 SF

L2 a

01-5A04-1A-10

L2 a

01-5A04-1A-10

L2 b 01-5A04-1B-10

L2 b 01-5A04-1B-10

DATA RACK,

TYP.

OFFICE

5A03-1

110 SF

01-5A04-1B

01-5A04-1A

TYP.

EP507

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

127 SF

AUDIOLOGY

CHECK-IN

5A03-1

155 SF

AUDIOLOGY

BOOTH

5A04-1

127 SF

AUDIOLOGY

CHECK-IN

5A03-1

155 SF

AUDIOLOGY

BOOTH

5A04-1

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01EP405

BLDG 01 - LEVEL 05 - ENLARGED ELECTRICAL

PLANS

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 24 of 77

GENERAL NOTES

PROJECT

NORTH

- 1/2" = 1'-0"

1 RM 5A04-1 - DEMOLITION ELECTRICAL PLAN

- 1/2" = 1'-0"

2 RM 5A04-1 - ELECTRICAL PLAN

- 1/2" = 1'-0"

3 RM 5A04-1 - DEMOLITION LIGHTING PLAN

- 1/2" = 1'-0"

4 RM 5A04-1 - LIGHTING PLAN

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

KEY PLAN

KEY NOTES

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

SOURCE A POWER PANELBOARD "01-5A04-1A".

SOURCE B POWER PANELBOARD "01-5A04-1B".

PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS

BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO

TECHNOLOGY PLANS.

MS-5A04-1-1 & MS-5A04-1-2 POWERED FROM CU-5A04-1-1 & CU-5A04-1-2, PROVIDE

CONDUIT AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE WITH

MECHANICAL CONTRACTOR AS REQUIRED.

PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY

EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,

PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE

AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 00 13 - PHYSICAL

ACCESS CONTROL SYSTEM" FOR ADDITONAL INFORMATION. ALL EQUIPMENT SHALL

MATCH INSTALLED BASE.

CONDUITS ROUTE VERTICALLY TO NEXT FLOOR. CONDUIT ROUTING IS

DIAGRAMMATICAL, ROUTE CONDUIT TO AVOID WINDOW. REFERENCE SHEET

01EP406 FOR FEEDER ROUTE INFORMATION.

TYP.

EP507

UTILIZE ACCES CONTROL PANEL POWER CIRCUIT.

-28

-26

AREA OF WORK

1.F 1.G

1.3

1.4

1 1 1 1

CU-403-1-2CU-403-1-1CU-5A04-1-2CU-5A04-1-1

01-P-29 01-P-28 01-P-27 01-P-26

01-5A04-1B-2

WP/WIU

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

A SIDE POWER

B SIDE POWER

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

01EP406

BLDG 01 - ROOF - ENLARGED ELECTRICAL

PLAN

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 25 of 77

KEY PLAN

GENERAL NOTES

KEY NOTES

PROJECT

NORTH

- 1/2" = 1'-0"

1 BLDG 01 - ROOF - ENLARGED ELECTRICAL PLAN

PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT

AS REQUIRED PER MANUFACTURER'S INSTRUCTION. COORDINATE WITH

MECHANICAL CONTRACTORS AS REQUIRED.

CONDUITS ROUTE VERTICALLY FROM FLOOR BELOW. REFERENCE SHEET 01EP405

FOR FEEDER ROUTE INFORMATION.

1'0 2' 4'

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

-28 -29 -26 27

W

C

X

W

S

X

Mo a b Mo

AREA OF WORK

TYP.

TR

106-11

124 SF

EP505

11-106-11B3

11-106-11A2

11-106-11B-2

11-106-11B-2

11-106-11A-2

11-106-11A-2

11-106-11B-2 11-106-11A-2

11-106-11B-2

11-106-11A-2

DATA RACK,

TYP.

EP502

MS-11-106-11-1 (ABOVE)

MS-11-106-11-2 (BELOW)

CONTINUE TO

SHEET 18&11EP101

CONTINUE TO

SHEET 18&11EP101

11-P-01

P-TR-2B

P-TR-2A

11-P-02

C

RR

TU-106-11

11-106-11A-16

11-ACP-106 9

CONTINUE TO "CU-11-106-11-1" AND

"CU-11-106-11-2", REFERENCE SHEET

18&11EP101

11-P-04 11-P-03

11-106-11A-13

TYP.

TR

106-11

124 SF

11-106-11B

11-106-11A

DATA RACK,

TYP.

L1 a

11-106-11A-4

L1 b

11-106-11B-4

L1 a

11-106-11A-4

L1 b

11-106-11B-4

EP507

TYP.

TYP.

EP507

106-11

110 SF

OFFICE

106-11

110 SF

OFFICE

106-11

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

18&11EP401

BLDG 18&11 - LEVEL 01 - ENLARGED

ELECTRICAL PLANS

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

0118 & 11

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 26 of 77

KEY PLAN

GENERAL NOTES

PROJECT

NORTH

1/2" = 1'-0"18&11EP101

1 RM 106-11 - ELECTRICAL DEMOLITION PLAN

1/2" = 1'-0"18&11EP101

2 RM 106-11 - ELECTRICAL PLAN

1/2" = 1'-0"18&11EP101

3 RM 106-11 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"18&11EP101

4 RM 106-11 - LIGHTING PLAN

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

PROJECT

NORTH

1'0 2' 4'

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

KEY NOTES

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

SOURCE POWER PANELBOARD "18-106-11A".

SOURCE POWER PANELBOARD "18-106-11B".

PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS

BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) OWER

SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE

DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS

REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH

ARCHITECT AND DOOR INSTALLER.

PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO

TECHNOLOGY PLANS.

MS-11-106-11-1 AND MS-11-106-11-2 POWERED FROM CU-11-106-11-1 AND

CU-11-106-11-2 PROVIDE CONDUCTORS AND WIRE PER MANUFACTURE'S

REQUIREMENT. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.

PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY

EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,

PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE

AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00 -

PHYSICAL ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL

EQUIPMENT SHALL MATCH INSTALLED BASE.

100% ISSUED FOR BID 05/24/2024

UTILIZE ACCES CONTROL PANEL POWER CIRCUIT.

CONTINUE TO "CU-11-106-11-1" AND

"CU-11-106-11-2", REFERENCE SHEET

18&11EP101

0°

W

X

C

X

S

J

Mo a

Mo b

AREA SHOWN

22.D 22.E 22.F

22.1

22.2

TYP.

22.D 22.E 22.F

22.1

22.2

22-B07A-22A-2

22-B07A-22B-2

22-B07A-22A-2

22-B07A-22B-2

22-B07A-22A-2

22-B07A-22B-2

22-B07A-22A-2 22-B07A-22B-2

22-B07A-22B 3

22-B07A-22A2

DATA RACK,

TYP.

EP502

EP505

TR

B07A-22

149 SF

CONTINUE TO

SHEET 22EP100B

22-P-05

P-TR-2A

P-TR-2B

C

MS-B07A-22-1 (ABOVE)

MS-B07A-22-2 (BELOW)

RR

OFFICE

B07-22

136 SF

CORRIDOR

BC1-22

727 SF

TU-B07A-22

22-B07A-22A-16

22-P-06

22-P-08

22-P-02

22-ACP-B07A 9

CONTINUE TO "CU-B07A-22-1"

AND "CU-B07A-22-2",

REFERENCE SHEET 22EP101

OFFICE

B06-22

180 SF

STORAGE

B06B-22

20 SF

CONTINUE TO

SHEET 22EP100B

22-B07A-22A-13

W

22.D 22.E 22.F

22.1

22.2

TYP.

22.D 22.E 22.F

22.1

22.2

DATA RACK,

TYP.

L2 a 22-B07A-22B-4

L2 b 22-B07A-22A-4

L2 a

22-B07A-22A-4

TR

B07A-22

149 SF

L2 b

22-B07A-22A-4

22-B07A-22B

22-B07A-22A

OFFICE

B07-22

136 SF

OFFICE

B06-22

180 SF

STORAGE

B06B-22

20 SF

TYP.

EP507

TYP.

EP507

B07A-22

B07-22

B06-22

B06B-22

OFFICE

B07A-22

61 SF

OFFICE

B07-22

138 SF

OFFICE

B06-22

181 SF

STORAGE

B06B-22

20 SF

OFFICE

B07B-22

77 SF

77 SF

OFFICE

B07A-22

OFFICE

B07A-22

61 SF

138 SF

OFFICE

B07-22

181 SF

OFFICE

B06-22

20 SF

STORAGE

B06B-22

A SIDE POWER

B SIDE POWER

SHEET SHALL BE PRINTED

IN COLOR TO PROVIDE

ALL INFORMATION.

LEGEND:

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

22EP400B

BLDG 22 - LEVEL 00B - ENLARGED ELECTRICAL

PLANS

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

00B22

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 27 of 77

KEY PLAN

GENERAL NOTES

PROJECT

NORTH

KEY NOTES

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

SOURCE A POWER PANELBOARD "22-B07A-22A".

SOURCE B POWER PANELBOARD "22-B07A-22B".

PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS

BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO

TECHNOLOGY PLANS.

MS-B07A-22-1 AND MS-B07A-22-2 POWERED FROM CU-B07A-22-1 AND CU-B07A-22-2,

PROVIDE CONDUIT AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE

WITH MECHANICAL CONTRACTOR AS REQUIRED.

PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY

EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,

PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE

AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00 - PHYSICAL

ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL EQUIPMENT SHALL

MATCH INSTALLED BASE.

3/8" = 1'-0"22EP100B

1 RM B07A-22 - DEMOLITION ELECTRICAL PLAN

3/8" = 1'-0"22EP100B

2 RM B07A-22 - ELECTRICAL PLAN

3/8" = 1'-0"22EP100B

3 RM B07A-22 - DEMOLITION LIGHTING PLAN

3/8" = 1'-0"22EP100B

4 RM B07A-22 - LIGHTING PLAN

2'0 4' 6'

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

9. CONTRACTOR SHALL PROVIDE UPDATED…