This document is a set of electrical engineering drawings for the EHRM Infrastructure Upgrades project at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma. The drawings detail electrical plans for multiple building levels, including demolition and new electrical configurations for telecommunications rooms (TR) across different floors. The plans specify power distribution, rack placement, lighting modifications, and power supply details for various rooms such as offices, storage areas, and equipment rooms.
The drawings provide comprehensive electrical layouts showing power sources, panelboards, data racks, junction boxes, and power distribution units. They include specific technical specifications for power connections, such as 208V rack PDUs, zone PDU units, and uninterruptible power supplies (UPS). The plans cover electrical work for Buildings 01, 18, 11, 22, 24, 52, and 53, with detailed schematics for power elevations, receptacle configurations, and equipment mounting, indicating a comprehensive infrastructure upgrade across multiple buildings at the VA medical facility.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
b Mo
Mo a
Mo
J J
360°
J
C
X
W
S
X
W
1.T
TYP.
AREA OF WORK
1.T
L5 b 01-C100M1A-1B-10
TR
C100M1A-1
188 SF
L5 a 01-C100M1A-1A-10
L5 a 01-C100M1A-1A-10
L5 b 01-C100M1A-1B-10
DATA RACK,
TYP.
01-C100M1A-1B
01-C100M1A-1A
STORAGE
1C168B-1
55 SF
L6
TYP.
EP507
TYP.
EP507
TYP.
EP507
1.T
DATA RACK,
TYP.
JUNCTION BOX
CORNING CONNECTOR
PANEL
TYP.
(3) POWER
DISTRIBUTION UNIT
FIBER OPTIC
PATCH PANEL
1.T
EP503
DATA RACK,
TYP.
01-C100M1A-1A-2
01-C100M1A-1B-2
01-C100M1A-1B-2
RELOCATED
JUNCTION BOX
01-C100M1A-1B 3
01-C100M1A-1B-2
EP505
01-C100M1A-1A-2
01-C100M1A-1A-2
01-C100M1A-1A-2
01-C100M1A-1B-2
REFER TO
SHEET 01EP101 REFER TO
SHEET 01EP101
TR
C100M1A-1
188 SF
01-C100M1A-1A
MS-C100M1A-1-1
P-TR-3A
01-P-10
P-TR-3B
P-TR-1B
P-TR-1A C
CU-C100M1A-1-2
CU-C100M1A-1-1
YY
STORAGE
1C168B-1
55 SF
TU-C100M1A
01-ACP-C100M1A
01-P-0201-C100M1A-1A-16
MS-C100M1A-1-2
01-P-17
01-P-16
01-C100M1A-1A-13
57 SF
WHEELCHAIR
STOR
C100M1A-1
139 SF
OFFICE
1C168B-1
57 SF
WHEELCHAIR
STOR
C100M1A-1
139 SF
OFFICE
1C168B-1
01-C100M1A-1
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
01EP401a
BLDG 01 - LEVEL 01 - ENLARGED ELECTRICAL
PLANS
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 18 of 77
1/2" = 1'-0"01EP101
3 RM C100M1A-1 & C100M1B-1 - DEMOLITION LIGHTING PLAN
PROJECT
NORTH
1/2" = 1'-0"01EP101
4 RM 01-C100M1A-1 - LIGHTING PLAN
1/2" = 1'-0"01EP101
1 RM C100M1A-1 & C100M1B-1 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"01EP101
2 RM 01-C100M1A-1 - ELECTRICAL PLAN
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
SOURCE A POWER PANELBOARD "01-C100M1B-1A".
SOURCE B POWER PANELBOARD "01-C100M1B-1B".
PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO
TECHNOLOGY PLANS.
MS-C100M1A-1-1 & MS-C100M1A-1-2 POWERED FROM CU-C100M1A-1-1 & CU-
C100M1A-1-2, PROVIDE CONDUIT AND WIRE PER MANUFACTURER'S REQUIREMENT.
COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
CIRCUIT LIGHTING AND SWITCH TO THE EXISTING PANEL POWERING
DEMOLISHED LIGHT SHOWN IN KEYNOTE 1, DETAIL '3' OF THIS SHEET.
PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY
EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,
PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE
AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00 - PHYSICAL
ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL EQUIPMENT SHALL
MATCH INSTALLED BASE
KEY NOTES
1'0 2' 4' 1'0 2' 4'
1'0 2' 4'
GENERAL NOTES
KEY PLAN
1'0 2' 4'
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
01-P-16
UTILIZE ACCES CONTROL PANEL POWER CIRCUIT.
J J
360°
J
S X
C
W
X
Mo a
Mo b
Mo
AREA OF WORK
1.F 1.G
1.3
1.4
TYP.
1.E
1.F 1.G
1.3
1.4
01-DP-TRB3 01-DP-TRA 2
01-DP-TRA-13
01-DP-TRB-12
DATA RACK,
TYP.
EP503
01-DP-TRA-13
01-DP-TRB-12
01-DP-TRA-13
01-DP-TRB-12 01-DP-TRA-13
01-DP-TRB-12
EP505
TR
101-1
210 SF
MS-101-1-1 (ABOVE)
MS-101-1-2 (BELOW)
P-TR-1B
P-TR-3B
P-TR-3A
P-TR-1A
01-P-07
01-P-06
01-P-05
01-P-04 01-P-15
01-P-14
01-P-13
01-P-12
C
CU-101-1-1
72 SF
BREAK
101B-1
TU-101-1
YY
13131313
CU-101-1-2CU-240-1-1
CU-302-1-2
01-P-1801-P-19
01-ACP-10111
01-101-1A-16
CU-302-1-1
CU-240-1-2
01-P-03
01-P-02
01-P-10
01-P-11 W
01-P-22
01-P-2301-P-24
01-P-25
01-P-01
01-P-09
01-DP-TRA-12
1.F 1.G
1.3
1.4
TYP.
1.F 1.G
1.3
1.4
L3 b
01-101-1B-10
L3 b
01-101-1B-10
01-DP-TRA
L3 a 01-101-1A-10
L3 a 01-101-1A-10
TR
101-1
210 SF
01-DP-TRB
DATA RACK,
TYP.
72 SF
BREAK
101B-1
L6
EP507
TYP.
EP507
TYP.
EP507
101-1
MED STOR
101A-1
38 SF
PSA
101-1
109 SF
BREAK
101B-1
133 SF
BREAK
101B-1
133 SF
MED STOR
101A-1
38 SF
PSA
101-1
109 SF
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
01EP401b
BLDG 01 - LEVEL 01 - ENLARGED ELECTRICAL
PLANS
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 19 of 82
PROJECT
NORTH
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
SOURCE A POWER PANELBOARD "01-DP-TRA".
SOURCE B POWER PANELBOARD "01-DP-TRB".
PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO
TECHNOLOGY PLANS.
MS-101-1-1 & MS-101-1-2 POWERED FROM CU-101-1-1 & CU-101-1-2, PROVIDE CONDUIT
AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
CIRCUIT LIGHTING AND SWITCH TO THE EXISTING PANEL POWERING
DEMOLISHED LIGHT SHOWN IN KEYNOTE 1, DETAIL '3' OF THIS SHEET.
PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY
EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,
PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE
AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00 - PHYSICAL
ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL EQUIPMENT SHALL
MATCH INSTALLED BASE
CONDUITS ROUTE VERTICALLY TO NEXT FLOOR. REFERENCE SHEET 01EP402b FOR
FEEDER ROUTE INFORMATION.
PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTION. COORDINATE WITH MECHANICAL
CONTRACTORS AS REQUIRED.
KEY NOTES
GENERAL NOTES
KEY PLAN
1/4" = 1'-0"01EP101
1 RM 101-1 & 101A-1 - DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"01EP101
2 RM 101-1 - ELECTRICAL PLAN
1/4" = 1'-0"01EP101
3 RM 101-1 & 101A-1 - DEMOLITION LIGHTING PLAN
1/4" = 1'-0"01EP101
4 RM 101-1 - LIGHTING PLAN
2'0 4' 8' 2'0 4' 8'
2'0 4' 8' 2'0 4' 8'
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
-24
-23
22 1918
J
0°
W
S
X
X
WC
Mo b a Mo
MoMo
1.W 1.X
1.1
53.A52.D 52.E
TYP.
238 SF
CHIEF OFFICE
2C50A-1
215 SF
OFFICE
2C50-1
1.W 1.X
1.1
53.A52.D 52.E
01-2C50B-1B-2 01-2C50B-1A-2
DATA RACK,
TYP.
EP503
01-2C50B-1B
01-2C50B-1A
EP505
01-2C50B-1B-2
01-2C50B-1A-2
01-2C50B-1B-2
01-2C50B-1A-2
01-2C50B-1B-2
01-2C50B-1A-2
TR
2C50B-1
221 SF
MS-2C50B-1-1 (ABOVE)
MS-2C50B-1-2 (BELOW)
P-TR-3A
P-TR-1AP-TR-1B
P-TR-3B
C
01-P-03
OFFICE
2C50-1
109 SF
118 SF
OFFICE
2C50-1
TU-2C50B-1
Y Y
01-2C50B-1A-16
01-ACP-2C50B 12
01-P-11
01-2C50B-1A-13
1.W 1.X53.A52.D 52.E
TYP.
1.W 1.X
1.1
53.A 52.D
52.E
L1 a 01-2C50B-1A-10
TR
2C50B-1
221 SF
L1 b 01-2C50B-1B-10
L1 a 01-2C50B-1A-10
01-2C50B-1B
L1 b 01-2C50B-1B-10
DATA RACK,
TYP.
01-2C50B-1A
OFFICE
2C50-1
109 SF 118 SF
OFFICE
2C50-1
L6
L6
TYP.
EP507
TYP.
EP507 TYP.
EP507
2C50B-12C50-1
AREA SHOWN
238 SF
CHIEF OFFICE
2C50A-1
215 SF
OFFICE
2C50-1
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
A SIDE POWER
B SIDE POWER
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
01EP402a
BLDG 01 - LEVEL 02 - ENLARGED ELECTRICAL
PLANS
JACK C. MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
1011 HONOR HEIGHTS DR., MUSKOGEE, OK 74401
Dwg. 20 of 77
- 3/8" = 1'-0"
1 RM 2C50A-1 - DEMOLITION ELECTRICAL PLAN
- 3/8" = 1'-0"
2 RM 2C50B-1 - ELECTRICAL PLAN
- 3/8" = 1'-0"
3 RM 2C50A-1 - DEMOLITION LIGHTING PLAN
- 3/8" = 1'-0"
4 RM 2C50B-1 - LIGHTING PLAN
KEY PLAN
2'0 4' 6'
GENERAL NOTES
KEY NOTES
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE
SHALL BE DEMOLISHED BACK TO SOURCE.
SOURCE A POWER PANELBOARD "01-2C50B-1A".
SOURCE B POWER PANELBOARD "01-2C50B-1B".
PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE
ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER
SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY
SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS
REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH
ARCHITECT AND DOOR INSTALLER.
PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO
TECHNOLOGY PLANS.
MS-2C50B-1-1 AND MS-2C50B-1-2 POWERED FROM CU-2C50B-1-1 AND CU-2C50B-1-2
PROVIDE CONDUCTORS AND WIRE PER MANUFACTURE'S REQUIREMENT.
COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
EXTEND EXISTING LIGHTING CIRCUITRY AS REQUIRED TO POWER EXISTING
LUMIAIRES AND PROVIDED SWITCH AS REQUIRED. REFERENCE KEYNOTE 1, DETAIL
'3' OF THIS SHEET FOR ADDITIONAL INFORMATION.
EXTEND EXISTING LIGHTING CIRCUITRY AS REQUIRED TO POWER PROVIDED
LUMINAIRES AND SWITCH AS REQUIRED. REFERENCE KEYNOTE 1, DETAIL '3' OF
THIS SHEET FOR ADDITIONAL INFORMATION.
PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY
EQUIPMENT FOR THE TR ROOM. PROVIDE ALL REQUIED CONNECTIONS,
PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE
AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00" -
PHYSICAL ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL
EQUIPMENT SHALL MATCH INSTALLED BASE.
PROJECT
NORTH
PROJECT
NORTH
2'0 4' 6'
PROJECT
NORTH
2'0 4' 6'
PROJECT
NORTH
2'0 4' 6'
PROJECT
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
01-P-21 01-P-20
JJ
W
X
S W
X
C
Mo b a Mo
Mo
AREA SHOWN
22.A 22.B1.F 1.G
1.4
22.A 22.B1.F 1.G
1.4
01-240-1B-2 01-240-1A-2
01-240-1B3
01-240-1A 2
EP505
DATA RACK,
TYP.
EP503
01-240-1B-2
01-240-1A-2
01-240-1B-201-240-1A-2
01-240-1B-2
01-240-1A-2
MS-240-1-1 (ABOVE)
MS-240-1-2 (BELOW)
P-TR-3B
P-TR-3A
01-P-07
01-P-06
01-P-05
01-P-04
01-P-15
01-P-14
01-P-13
01-P-12
C
TR
240-1
210 SF
STORAGE
241-1
63 SF
TU-240-1
YY
P-TR-1B
P-TR-1A
1101-240-1A-16
01-ACP-240
01-240-1A-13
22.A 22.B1.F 1.G
1.4
TYP.
22.A 22.B1.F 1.G
1.4
L3 a 01-240-1A-10
L3 b 01-240-1B-10
TR
240-1
210 SF
L3 a 01-240-1A-10
L3 b 01-240-1B-10
01-240-1B 01-240-1A
L6
DATA RACK,
TYP.
TYP.
EP507
EP507
TYP.
EP507
241-1 240-1
128 SF
OFFICE
240-1140 SF
OFFICE
241-1
128 SF
OFFICE
240-1
140 SF
OFFICE
241-1
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
A SIDE POWER
B SIDE POWER
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
01EP402b
BLDG 01 - LEVEL 02 - ENLARGED ELECTRICAL
PLANS
JACK C. MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
1011 HONOR HEIGHTS DR., MUSKOGEE, OK 74401
Dwg. 21 of 77
KEY PLAN
GENERAL NOTES
KEY NOTES
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
SOURCE A POWER PANELBOARD "01-240-1A"
SOURCE B POWER PANELBOARD "01-240-1B"
PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO
TECHNOLOGY PLANS.
MS-240-1-1 & MS-240-1-2 POWERED FROM CU-240-1-1 & CU-240-1-2, PROVIDE CONDUIT
AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
EXTEND EXISTING LIGHTING CIRCUITRY AS REQUIRED TO POWER PROVIDED
LUMINAIRES AND SWITCH AS REQUIRED. REFERENCE KEYNOTE 1, DETAIL '3' OF THIS
SHEET FOR ADDITIONAL REFERENCE.
PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY
EQUIPMENT FOR THE TR ROOM. PROVIDE ALL REQUIED CONNECTIONS,
PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE
AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00" - PHYSICAL
ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL EQUIPMENT SHALL
MATCH INSTALLED BASE.
CONDUITS ROUTE VERTICALLY TO NEXT FLOOR. REFERENCE SHEET 01EP403 FOR
FEEDER ROUTE INFORMATION.
- 3/8" = 1'-0"
1 RM 240-1 - DEMOLITION ELECTRICAL PLAN
- 3/8" = 1'-0"
2 RM 240-1 - ELECTRICAL PLAN
- 3/8" = 1'-0"
3 RM 240-1 - DEMOLITION LIGHTING PLAN
- 3/8" = 1'-0"
4 RM 240-1 - LIGHTING PLAN
1'0 2' 4'
PROJECT
NORTH
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
JJ
0°
W
J
W
X X
S
C
Mo a
Mo b
1.G
1.3
TYP.
TELEPHONE
BOARD TERMINAL
OFFICE
302-1
116 SF
IT
302A-1
11 SF
1.G
1.3
1.4
TR
302-1
216 SF
01-302-1A-2
01-302-1A-2
01-302-1A-2 01-302-1B-2
01-302-1B-2
01-302-1A-2
01-302-1B-2
01-302-1B
01-302-1A 2
DATA RACK,
TYP.
EP503
EP505
01-302-1B-2
MS-302-1-1(ABOVE)
MS-302-1-2 (BELOW)
P-TR-3AP-TR-3B
01-P-07
01-P-06
01-P-05
01-P-15
01-P-14
01-P-13
C
TU-302-1
01-302-1A-16
01-ACP-302
1.G
1.3
TYP.
OFFICE
302-1
116 SF
IT
302A-1
11 SF
1.G
1.3
TR
302-1
216 SF
L3 a
01-302-1A-10
L3 a 01-302-1A-10
L3 b
01-302-1B-10
L3 b 01-302-1B-10
DATA RACK,
TYP.
01-302-1B 01-302-1A
TYP.
EP507
TYP.
EP507
302-1
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
AREA OF WORK
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
01EP403
BLDG 01 - LEVEL 03 - ENLARGED ELECTRICAL
PLANS
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
1011 HONOR HEIGHTS DR., MUSKOGEE, OK 74401
Dwg. 22 of 77
KEY PLAN
GENERAL NOTES
KEY NOTES
- 3/8" = 1'-0"
1 RM 302-1 - DEMOLITION ELECTRICAL PLAN 2'0 4' 6'
- 3/8" = 1'-0"
2 RM 302-1 - ELECTRICAL PLAN
- 3/8" = 1'-0"
3 RM 302-1 - DEMOLITION LIGHTING PLAN
- 3/8" = 1'-0"
4 RM 302-1 - LIGHTING PLAN
PROJECT
NORTH
2'0 4' 6'
PROJECT
NORTH
2'0 4' 6'
PROJECT
NORTH
2'0 4' 6'
PROJECT
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
SOURCE A POWER PANELBOARD "01-302-1A".
SOURCE B POWER PANELBOARD "01-302-1B".
PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.
OVERHEAD TR RACK SOURCE A AND SOURCE B JUNCTION BOXES.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO
TECHNOLOGY PLANS.
MS-302-1-1 & MS-302-1-2 POWERED FROM CU-302-1-1 & CU-302-1-2, PROVIDE CONDUIT
AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY
EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,
PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE
AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 00 13 - PHYSICAL
ACCESS CONTROL SYSTEM" FOR ADDITONAL INFORMATION. ALL EQUIPMENT SHALL
MATCH INSTALLED BASE.
CONDUITS ROUTE VERTICALLY TO NEXT FLOOR. REFERENCE SHEET 01EP404 FOR
FEEDER ROUTE INFORMATION.
PROJECT
NORTH
01-302-1A-13
UTILIZE ACCES CONTROL PANEL POWER CIRCUIT.
0°
W
X
C
S X a Mo b Mo
AREA SHOWN
1.G
1.3
1.4
TYP.
FIBER OPTIC
PANEL
TELEPHONE
TERMINAL BOARD
DATA RACK
1.G
1.3
1.4
01-403-1A-2
01-403-1B-2 01-403-1A-2
01-403-1B-2
01-403-1B-2
01-403-1A-2
01-403-1B-2
01-403-1A-2
01-403-1B
01-403-1A
EP505
DATA RACK,
TYP.
EP503
RELOCATED
FIBER OPTIC
PANEL
TR
403-1
218 SF
5MS-403-1-1 (ABOVE)
MS-403-1-2 (BELOW)
P-TR-3B
P-TR-3A
01-P-07
01-P-06
01-P-14
01-P-15
C
RELOCATED
TELEPHONE
TERMINAL BOARD
TU-403-1
01-ACP-403 9
01-403-1A-16
W
01-403-1A-13
403-1
1.G
1.3
1.4
TYP.
1.G
1.3
1.4
L4 a 01-403-1A-10
L4 a 01-403-1A-10
DATA RACK,
TYP.
TR
403-1
218 SF
L4 b 01-403-1B-10
L4 b 01-403-1B-10
01-403-1B
01-403-1A
EP507
TYP. TYP.
EP507
117 SF
OFFICE
403-1
12 SF
PH
403A-1
117 SF
OFFICE
403-1
12 SF
PH
403A-1
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
01EP404
BLDG 01 - LEVEL 04 - ENLARGED ELECTRICAL
PLANS
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
1011 HONOR HEIGHTS DR., MUSKOGEE, OK 74401
Dwg. 23 of 77
GENERAL NOTES
- 3/8" = 1'-0"
1 RM 403-1 - DEMOLITION ELECTRICAL PLAN
- 3/8" = 1'-0"
2 RM 403-1 - ELECTRICAL PLAN1'0 2' 4'
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
SOURCE A POWER PANELBOARD "01-403-1A".
SOURCE B POWER PANELBOARD "01-403-1B".
PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.
OVERHEAD TR RACK SOURCE A AND SOURCE B JUNCTION BOXES.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE
ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER
SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE
DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS
REQUIRED. SEE EQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH
ARCHITECT AND DOOR INSTALLER.
PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO
TECHNOLOGY PLANS.
MS-403-1-1 & MS-403-1-2 POWERED FROM CU-1-403-1-1 & CU-1-403-1-2, PROVIDE
CONDUIT AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE WITH
MECHANICAL CONTRACTOR AS REQUIRED.
PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY
EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,
PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE
AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00 - PHYSICAL
ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL EQUIPMENT SHALL
MATCH INSTALLED BASE.
CONDUITS ROUTE VERTICALLY TO NEXT FLOOR. REFERENCE SHEET 01EP405 FOR
FEEDER ROUTE INFORMATION.
KEY NOTES
- 3/8" = 1'-0"
3 RM 403-1 DEMOLITION LIGHTING PLAN
- 3/8" = 1'-0"
4 RM 403-1 LIGHTING PLAN
PROJECT
NORTH
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
KEY PLAN
P/D
J J
360°
W
X
C
W
X
S a Mo b Mo
AREA OF WORK
5A04-1
1.F
1.3
TYP.
1.F 1.G
1.3
TR
5A04-1
174 SF
01-5A04-1B-2
01-5A04-1A-2
01-5A04-1B-2
01-5A04-1A-2
01-5A04-1B-2
01-5A04-1A-2
01-5A04-1B-2
01-5A04-1A-2
DATA RACK,
TYP.
EP503
01-5A04-1B3 01-5A04-1A 2
EP505
MS-5A04-1-1 (ABOVE)
MS-5A04-1-2 (BELOW)
P-TR-3B
P-TR-3A
01-P-07
C
OFFICE
5A03-1
110 SF
TU-5A04-1
01-5A04-1A-16
01-P-29
01-P-15
01-P-29
01-P-28
01-P-27
01-P-26
01-5A04-1A-13
01-ACP-5A04
1.F 1.G
1.3
TYP.
1.F 1.G
1.3
TR
5A04-1
174 SF
L2 a
01-5A04-1A-10
L2 a
01-5A04-1A-10
L2 b 01-5A04-1B-10
L2 b 01-5A04-1B-10
DATA RACK,
TYP.
OFFICE
5A03-1
110 SF
01-5A04-1B
01-5A04-1A
TYP.
EP507
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
127 SF
AUDIOLOGY
CHECK-IN
5A03-1
155 SF
AUDIOLOGY
BOOTH
5A04-1
127 SF
AUDIOLOGY
CHECK-IN
5A03-1
155 SF
AUDIOLOGY
BOOTH
5A04-1
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
01EP405
BLDG 01 - LEVEL 05 - ENLARGED ELECTRICAL
PLANS
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 24 of 77
GENERAL NOTES
PROJECT
NORTH
- 1/2" = 1'-0"
1 RM 5A04-1 - DEMOLITION ELECTRICAL PLAN
- 1/2" = 1'-0"
2 RM 5A04-1 - ELECTRICAL PLAN
- 1/2" = 1'-0"
3 RM 5A04-1 - DEMOLITION LIGHTING PLAN
- 1/2" = 1'-0"
4 RM 5A04-1 - LIGHTING PLAN
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
KEY PLAN
KEY NOTES
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
SOURCE A POWER PANELBOARD "01-5A04-1A".
SOURCE B POWER PANELBOARD "01-5A04-1B".
PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO
TECHNOLOGY PLANS.
MS-5A04-1-1 & MS-5A04-1-2 POWERED FROM CU-5A04-1-1 & CU-5A04-1-2, PROVIDE
CONDUIT AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE WITH
MECHANICAL CONTRACTOR AS REQUIRED.
PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY
EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,
PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE
AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 00 13 - PHYSICAL
ACCESS CONTROL SYSTEM" FOR ADDITONAL INFORMATION. ALL EQUIPMENT SHALL
MATCH INSTALLED BASE.
CONDUITS ROUTE VERTICALLY TO NEXT FLOOR. CONDUIT ROUTING IS
DIAGRAMMATICAL, ROUTE CONDUIT TO AVOID WINDOW. REFERENCE SHEET
01EP406 FOR FEEDER ROUTE INFORMATION.
TYP.
EP507
UTILIZE ACCES CONTROL PANEL POWER CIRCUIT.
-28
-26
AREA OF WORK
1.F 1.G
1.3
1.4
1 1 1 1
CU-403-1-2CU-403-1-1CU-5A04-1-2CU-5A04-1-1
01-P-29 01-P-28 01-P-27 01-P-26
01-5A04-1B-2
WP/WIU
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
A SIDE POWER
B SIDE POWER
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
01EP406
BLDG 01 - ROOF - ENLARGED ELECTRICAL
PLAN
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 25 of 77
KEY PLAN
GENERAL NOTES
KEY NOTES
PROJECT
NORTH
- 1/2" = 1'-0"
1 BLDG 01 - ROOF - ENLARGED ELECTRICAL PLAN
PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT
AS REQUIRED PER MANUFACTURER'S INSTRUCTION. COORDINATE WITH
MECHANICAL CONTRACTORS AS REQUIRED.
CONDUITS ROUTE VERTICALLY FROM FLOOR BELOW. REFERENCE SHEET 01EP405
FOR FEEDER ROUTE INFORMATION.
1'0 2' 4'
PROJECT
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
-28 -29 -26 27
W
C
X
W
S
X
Mo a b Mo
AREA OF WORK
TYP.
TR
106-11
124 SF
EP505
11-106-11B3
11-106-11A2
11-106-11B-2
11-106-11B-2
11-106-11A-2
11-106-11A-2
11-106-11B-2 11-106-11A-2
11-106-11B-2
11-106-11A-2
DATA RACK,
TYP.
EP502
MS-11-106-11-1 (ABOVE)
MS-11-106-11-2 (BELOW)
CONTINUE TO
SHEET 18&11EP101
CONTINUE TO
SHEET 18&11EP101
11-P-01
P-TR-2B
P-TR-2A
11-P-02
C
RR
TU-106-11
11-106-11A-16
11-ACP-106 9
CONTINUE TO "CU-11-106-11-1" AND
"CU-11-106-11-2", REFERENCE SHEET
18&11EP101
11-P-04 11-P-03
11-106-11A-13
TYP.
TR
106-11
124 SF
11-106-11B
11-106-11A
DATA RACK,
TYP.
L1 a
11-106-11A-4
L1 b
11-106-11B-4
L1 a
11-106-11A-4
L1 b
11-106-11B-4
EP507
TYP.
TYP.
EP507
106-11
110 SF
OFFICE
106-11
110 SF
OFFICE
106-11
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
18&11EP401
BLDG 18&11 - LEVEL 01 - ENLARGED
ELECTRICAL PLANS
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
0118 & 11
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 26 of 77
KEY PLAN
GENERAL NOTES
PROJECT
NORTH
1/2" = 1'-0"18&11EP101
1 RM 106-11 - ELECTRICAL DEMOLITION PLAN
1/2" = 1'-0"18&11EP101
2 RM 106-11 - ELECTRICAL PLAN
1/2" = 1'-0"18&11EP101
3 RM 106-11 - DEMOLITION LIGHTING PLAN
1/2" = 1'-0"18&11EP101
4 RM 106-11 - LIGHTING PLAN
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
PROJECT
NORTH
1'0 2' 4'
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
9. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
KEY NOTES
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE
SHALL BE DEMOLISHED BACK TO SOURCE.
SOURCE POWER PANELBOARD "18-106-11A".
SOURCE POWER PANELBOARD "18-106-11B".
PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE
ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) OWER
SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE
DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS
REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH
ARCHITECT AND DOOR INSTALLER.
PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO
TECHNOLOGY PLANS.
MS-11-106-11-1 AND MS-11-106-11-2 POWERED FROM CU-11-106-11-1 AND
CU-11-106-11-2 PROVIDE CONDUCTORS AND WIRE PER MANUFACTURE'S
REQUIREMENT. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY
EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,
PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE
AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00 -
PHYSICAL ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL
EQUIPMENT SHALL MATCH INSTALLED BASE.
100% ISSUED FOR BID 05/24/2024
UTILIZE ACCES CONTROL PANEL POWER CIRCUIT.
CONTINUE TO "CU-11-106-11-1" AND
"CU-11-106-11-2", REFERENCE SHEET
18&11EP101
0°
W
X
C
X
S
J
Mo a
Mo b
AREA SHOWN
22.D 22.E 22.F
22.1
22.2
TYP.
22.D 22.E 22.F
22.1
22.2
22-B07A-22A-2
22-B07A-22B-2
22-B07A-22A-2
22-B07A-22B-2
22-B07A-22A-2
22-B07A-22B-2
22-B07A-22A-2 22-B07A-22B-2
22-B07A-22B 3
22-B07A-22A2
DATA RACK,
TYP.
EP502
EP505
TR
B07A-22
149 SF
CONTINUE TO
SHEET 22EP100B
22-P-05
P-TR-2A
P-TR-2B
C
MS-B07A-22-1 (ABOVE)
MS-B07A-22-2 (BELOW)
RR
OFFICE
B07-22
136 SF
CORRIDOR
BC1-22
727 SF
TU-B07A-22
22-B07A-22A-16
22-P-06
22-P-08
22-P-02
22-ACP-B07A 9
CONTINUE TO "CU-B07A-22-1"
AND "CU-B07A-22-2",
REFERENCE SHEET 22EP101
OFFICE
B06-22
180 SF
STORAGE
B06B-22
20 SF
CONTINUE TO
SHEET 22EP100B
22-B07A-22A-13
W
22.D 22.E 22.F
22.1
22.2
TYP.
22.D 22.E 22.F
22.1
22.2
DATA RACK,
TYP.
L2 a 22-B07A-22B-4
L2 b 22-B07A-22A-4
L2 a
22-B07A-22A-4
TR
B07A-22
149 SF
L2 b
22-B07A-22A-4
22-B07A-22B
22-B07A-22A
OFFICE
B07-22
136 SF
OFFICE
B06-22
180 SF
STORAGE
B06B-22
20 SF
TYP.
EP507
TYP.
EP507
B07A-22
B07-22
B06-22
B06B-22
OFFICE
B07A-22
61 SF
OFFICE
B07-22
138 SF
OFFICE
B06-22
181 SF
STORAGE
B06B-22
20 SF
OFFICE
B07B-22
77 SF
77 SF
OFFICE
B07A-22
OFFICE
B07A-22
61 SF
138 SF
OFFICE
B07-22
181 SF
OFFICE
B06-22
20 SF
STORAGE
B06B-22
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
22EP400B
BLDG 22 - LEVEL 00B - ENLARGED ELECTRICAL
PLANS
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
00B22
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 27 of 77
KEY PLAN
GENERAL NOTES
PROJECT
NORTH
KEY NOTES
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
SOURCE A POWER PANELBOARD "22-B07A-22A".
SOURCE B POWER PANELBOARD "22-B07A-22B".
PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM ON SHEET EG601 FOR ADDITIONAL INFORMATION.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATE SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
PRELIMINARY TELECOM RACK PLACEMENT. FOR EXACT PLACEMENT REFER TO
TECHNOLOGY PLANS.
MS-B07A-22-1 AND MS-B07A-22-2 POWERED FROM CU-B07A-22-1 AND CU-B07A-22-2,
PROVIDE CONDUIT AND WIRE PER MANUFACTURER'S REQUIREMENT. COORDINATE
WITH MECHANICAL CONTRACTOR AS REQUIRED.
PROVIDE (2)-CARD ACCESS CONTROL PANEL TO SERVE ALL PACS DOOR SECURITY
EQUIPMENT FOR THIS TR ROOM. PROVIDE ALL REQUIRED CONNECTIONS,
PROGRAMMING, POWER SUPPLIES, AND COMPONENTS TO PROVIDE A COMPLETE
AND FULLY FUNCTIONAL SYSTEM. REFERENCE SPECIFICATION "28 13 00 - PHYSICAL
ACCESS CONTROL SYSTEM" FOR ADDITIONAL INFORMATION. ALL EQUIPMENT SHALL
MATCH INSTALLED BASE.
3/8" = 1'-0"22EP100B
1 RM B07A-22 - DEMOLITION ELECTRICAL PLAN
3/8" = 1'-0"22EP100B
2 RM B07A-22 - ELECTRICAL PLAN
3/8" = 1'-0"22EP100B
3 RM B07A-22 - DEMOLITION LIGHTING PLAN
3/8" = 1'-0"22EP100B
4 RM B07A-22 - LIGHTING PLAN
2'0 4' 6'
PROJECT
NORTH
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
9. CONTRACTOR SHALL PROVIDE UPDATED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .