This document contains electrical one-line diagrams and equipment schedules for the EHRM Infrastructure Upgrades project at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma. The drawings detail electrical infrastructure modifications for Buildings 52 and 53, including demolition and replacement of existing electrical distribution equipment, transformers, switchboards, and associated circuits.

The electrical schedules provide comprehensive details on mechanical and lighting equipment, including ductless split cooling units, VAV air terminal units, and LED lighting fixtures. The generator and equipment metering schedules document existing electrical load capacities, with notes indicating the project involves load additions and removals across multiple buildings. The drawings are part of a detailed electrical infrastructure upgrade, dated May 24, 2024, prepared by Spees Design Build for the Department of Veterans Affairs, with DAV Energy Solutions as the consultant.

View the file

Other files

File Type Posted
36C77625R0046 0009.pdf PDF
Attachment 21 - Tech Questions Tracker - FINAL07162025.pdf PDF
Attachment 21 - Tech Questions Tracker - FINAL_07142025.pdf PDF
36C77625R0046 0008.pdf PDF
Attachment to Tech Questions- ASI-001 Mechanical Ductwork Drawings- 20250714.pdf PDF
36C77625R0046 0007.pdf PDF
Attachment 21 - Tech Questions Tracker - 07082025.pdf PDF
Attachment 21 - Tech Questions Tracker - 07022025.pdf PDF
36C77625R0046 0006.pdf PDF
36C77625R0046 0005.pdf PDF
Attachment 16 Muskogee County Wage Rates_06272025.pdf PDF
Attachment 20 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
36C77625R0046 0004.pdf PDF
Attachment 21 - Tech Questions Tracker - 20250623 Partial.pdf PDF
36C77625R0046 0003.pdf PDF
Attachment 19 Site Visit Sign In Sheet 62323700.pdf PDF
36C77625R0046 0002.pdf PDF
36C77625R0046 0001.pdf PDF
Attachment 05 Drawings 4 of 13 Muskogee 623-21-700.pdf PDF
Attachment 17- Limitations on Subcontracting - Muskogee EHRM.pdf PDF
Attachment 08 Drawings 7 of 13 Muskogee 623-21-700.pdf PDF
Attachment 01 - 623-21-700 - Muskogee - Updated Combined Specifications-20250501.pdf PDF
Attachment 03 Drawings 2 of 13 Muskogee 623-21-700.pdf PDF
36C77625R0046_1.pdf PDF
Attachment 04 Drawings 3 of 13 Muskogee 623-21-700.pdf PDF
Attachment 18 Site Map.pdf PDF
Attachment 02 Drawings 1 of 13 Muskogee 623-21-700.pdf PDF
Attachment 16 Muskogee County Wage Rates.pdf PDF
Attachment 06 Drawings 5 of 13 Muskogee 623-21-700.pdf PDF
Attachment 12 Drawings 11 of 13 Muskogee 623-21-700.pdf PDF
Attachment 14 Drawings 13 of 13 Muskogee 623-21-700.pdf PDF
Attachment 10 Drawings 9 of 13 Muskogee 623-21-700.pdf PDF
Attachment 13 Drawings 12 of 13 Muskogee 623-21-700.pdf PDF
Attachment 11 Drawings 10 of 13 Muskogee 623-21-700.pdf PDF
Attachment 09 Drawings 8 of 13 Muskogee 623-21-700.pdf PDF
Attachment 15- PCRA for EHRM 623-700.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

125A

225A

101-F52

EQLCP

52-CRP-10

20A

COND.

TRANSFER

UNIT

52-

AD-1

52-

AD-2

AIR DRYER

25A

52-CP-1

HOT

WATER

RETURN

CIRCULATION

PUMP

20A

-DWP

-1

-DWP

-2

-DWP

-3

125A

-VP

-1

52-AC-152

-VP

-2 HEATING WATER PUMPS

DOMESTIC COLD

WATER PUMPS

BACKUP MED

VAC PUMPS

80A 40A

VFD

175A

52-P-9

VFD

175A

52-P-10

VFD

175A

52-P-11 52

-AC

-1

52-CRP-152

-AC

-2

MEDICAL

AIR COMPR

80A 80A

LARGE

BACKUP

AIR COMPR.

COND

RETURN

PUMPS

MCC-EQB 101F-52

FROM

ATS-EQB

101F-52 101F-52

TO EDP

ATS-EQB

800A

4-POLE

ATS-ECB

225A

4-POLE

60A 100A

125A

101F-52

EWH24

TEQCP

75KVA CONTROL

PANEL

800A BUS

TO SUB 6

3 3

5 5

20 20 20 20 20 10 10 40 40 40 40 40 1/2 1/2

TELCO

UPS

CORE

UPS

TEL PNL

ECP

L1EB

E101 TELCO

UPS

100AS

30A

30A30A

100A

100A

100A

225A

TECP

75KVA

XXX

TO

SEWAGE

PUMP

BLDG 53

101F-52

EHCP

225A 3P 480V

DOLPHIN-1

1P SPARE

(x21)

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

52EP602

BLDG 52 - PARTIAL ONE-LINE DIAGRAM -

DEMOLITION

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-52

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 55 of 77

- NTS

1 BLDG 52 - PARTIAL ONE-LINE DIAGRAM - DEMOLITION

KEY NOTES

GENERAL NOTES

METERING NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT

UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY

POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND

APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL

EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING

CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

EXISTING EQUIPMENT "ATS-ECB" AND ASSOCIATED INCOMING FEEDERS TO BE

DEMOLISHED AND REPLACED. REFERENCE REVISED ONE-LINE DIAGRAM SHEET

52EP612 FOR ADDITIONAL INFORMATION.

EXISTING EQUIPMENT "ECHCP" AND ASSOCIATED INCOMING FEEDERS TO BE

DEMOLISHED AND REPLACED. PRESERVE AND PROTECT EXISTING BRANCH CIRCUITS

FOR RE-TERMINATION. REFERENCE REVISED ONE-LINE DIAGRAM SHEET 52EP612 FOR

ADDITIONAL INFORMATION.

ECHCP

101F-52

PANEL

LCT-T2

100 100

250AF

200AT

LSIG

MCC-1

600A BUS

101F-52

CHILLED

WATER

PUMP #1

VFD

SECONDARY

CHILLED

WATER

PUMP

(BLUE)

CHILLER

#1

100A

SIZE

225A 50A

SIZE

200A

SIZE

100A

SIZE

2 SPD

7A

SIZE

3A

SIZE

7A

SIZE

7A

SIZE

COND

PUMP

CHILLER

#1

COOLING

TOWER

#1

FAN

CELL #1

EF2CP EF3CP AHU-1CP EF1CP

SPARE

30A

LUGS

SPARE

30A

SIZE

SPARE

20A

LUGS

SPARE

50A

SIZE

SPARE

3A

SIZE

52-AHU-2

VFD ROOM

3A

SIZE

COLING

TOWER #1

FAN CELL

#2

70A

COOLING

TOWER

SEPARATER

CONTROL

PANEL

COOLING

TOWER #1

BASIN 2

40A

LUGS

40A

LUGS

COOLING

TOWER #1

BASIN 2

1200AF

2000AT

LSIG

600AS

600AS

125E

T-L

1000KVA

12.5K/480/ 277V

600AS

600AS

101F-52

125E

T-K

1000KVA

12.5KV/

4.16KV

600AS

600AS

101F-52

65E

T-P

1000KVA

12.5K/480/ 277V

200E

200AS

SUB 2

RVSS

CHILLER

#1

101-52

1600AF

1200AT

LSIG

800AF

800AT

SPARE

800AF

800AT

SPARE

1200AF

1200AT

SPARE

800AF

800AT

SPARE

800AF

800AT

400AF

200AT

XXX

PDP-

52HT

SUB 4 SUB 3

600AS

600AS

101D-52

100E

T-J

1500KVA

12.5KV/

4.6KV

1600AF

1200AT

LSIG

1200AF

1200AT

1200AF

1200AT

G

GENERATOR 52-G-1

1250KW, 12.5KV

ATS-SA

1200A 3P,3W

BLDG 52

600AF

600AT

LSIG

CHILLER

#2

800AF

600AT

LSIG

CHILLER

#3

101-52101-52

52-EF-5

15A

SIZE

52-EF-6

15A

SIZE

SF-1

25A

SIZE

EF7

7A

SIZE

52-P-3

PRI CHWP

PLATE &

FRAME

100A

SIZE

52-P-2

PRI CHWP

(CHILLER

#2)

100A

SIZE

400A

SIZE

52-P-8

COND

WATER

PUMP

CHILLER

#2

7A

SIZE

7A

SIZE

SPARE

7A

SIZE

SPARE

7A

SIZE

SPARE

7A

SIZE

SPARE

300A

SPARE

100A

SIZE 3

2SPD

COOLIG

TOWER

CELL #4

100A

SIZE 3

2SPD

COOLING

TOWER #2

CELL #3

SIZE

52-P-12

PRI CHILL

WATER

PUMP

(CHILLER

#3)

250A

SIZE

52-P-13

COND

WATER

PUMP

(CHILLER

#3)

100A

SIZE 3

2SPD

COOLING

TOWER

CELL #5

(CHILLER

#3)

40A

LUGS

COOLING

TOWER #2

BASIN #4

40A

LUGS

COOLING

TOWER

BASIN #3

40A

LUGS

COOLING

TOWER #3

CELL #5

BASIN

HEATERS

VFD

52-P-6

XFMR

SEC

CHWP

EAST

300A

52-P-5

SEC CHWP

300A

MCC-2

800A BUS

101F-52

TO MEDIUM

VOLTAGE

EQUIPMENT

RVSS

T-ELCP

75KVA

480/208Y/120

101F-52

PANEL

LCT-L

101F-52

PANEL

HCT

225A BUS

101F-52

PANEL

DP1C

225A BUS

101F-52

VFD

RVSS

10050 30 2 2 2 1/2 2 30 25

5 5 100 10 1 20 40 50 50 30

125125

3P SPACE(x5)

20A, 3P

20A, 3P1P

SPACE

(x7)

UNKNOWN

800AF

600AT

LSIG

125AT

3P LSIG

52-XFMR-TRA

75kVA XFMR

PRI: 480/277V

SEC:208/120V

52-201B-52A

225A MCB

400A BUS

208/120V

3PH 4W

TO GSHBA

SHEET 53EP611

SUBSTATION 1

480V, 1200A

3PH, 4W

Isc 28355 A 3P

52-ATS-TRA

480V 125A

W/ MAINTENANCE

BYPASS

52-P-0252-P-01

52-P-03

52-P-04

DPM

SPD

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

52EP611

BLDG 52 - ONE-LINE DIAGRAM - PART 1 OF 2

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-52

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 56 of 77

KEY NOTES

GENERAL NOTES

- NTS

1 BLDG 52 - ONE-LINE DIAGRAM - PART 1 OF 2

UTILIZE EXISTING 3P SPACE TO PROVIDE CIRCUIT BREAKER IN EXISTING POWER

DISTRIBUTION EQUIPMENT TO SUPPLY LOAD AS INDICATED.

REFER TO PANEL SCHEDULES ON 52EP701 FOR ADDITIONAL INFORMATION.

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT

UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY

POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND

APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL

EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING

CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

METERING NOTES

01 METERING POINT: REFERENCE ''METERING AND LOAD INFORMATION SCHEDULE

ON SHEET EP702 FOR ADDITIONAL INFORMATION.

200A 4P

200A 3P

LSIG3P

W/ MAINTENANCE

BYPASS

200A/4P

125A

225A

101-F52

EQLCP

52-CRP-10

20A

COND.

TRANSFER

UNIT

52-

AD-1

52-

AD-2

AIR DRYER

25A

52-CP-1

HOT

WATER

RETURN

CIRCULATION

PUMP

20A

-DWP

-1

-DWP

-2

-DWP

-3

125A

-VP

-1

52-AC-152

-VP

-2 HEATING WATER PUMPS

DOMESTIC COLD

WATER PUMPS

BACKUP MED

VAC PUMPS

80A 40A

VFD

175A

52-P-9

VFD

175A

52-P-10

VFD

175A

52-P-11 52

-AC

-1

52-CRP-152

-AC

-2

MEDICAL

AIR COMPR

80A 80A

LARGE

BACKUP

AIR COMPR.

COND

RETURN

PUMPS

MCC-EQB 101F-52

FROM

ATS-EQB

101F-52

ECHCP

600A 3P 480V

60A 100A

125A

TO

SEWAGE

PUMP

BLDG 53

101F-52

EWH24

TEQCP

75KVA CONTROL

PANEL

800A BUS

3 3

5 5

20 20 20 20 20 10 10 40 40 40 40 40 1/2 1/2

TELCO

UPS

CORE

UPS

TEL PNL

ECP

L1EB

E101 TELCO

UPS

100AS

30A

30A30A

100A

100A

100A

225A

TECP

75KVA

XXX

101F-52 101F-52

TO EDP,

SEE 53EP611

ATS-EQB

800A

4-POLE

ATS-ECB

600A

4-POLE

WITH

BYPASS

TO SUB 6,

SEE 53EP612

DOLPHIN-1

1P SPARE

(x21)

125A

52-P-08

52-XFMR-TRB

75kVA XFMR

PRI: 480

SEC: 208/120V

52-P-09

52-201B-52B

225A MCB

225A BUS

208/120V

3PH 4W

DPM

SPD

52-P-05 52-P-06

52-P-07

TYP.

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

52EP612

BLDG 52 - ONE-LINE DIAGRAM - PART 2 OF 2 -

REVISED

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-52

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 57 of 77

- NTS

1 BLDG 52 - ONE-LINE DIAGRAM - PART 2 OF 2 - REVISED

KEY NOTES

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT

UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY

POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND

APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL

EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING

CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

PROVIDE EQUIPMENT AS INDICATED.

RE-TERMINATE EXISTING BRANCH CIRCUITS TO ADDED EQUIPMENT. PROVIDE

JUNCTION BOX AND EXTEND CONDUIT AND WIRE AS REQUIRED.

2 RE-TERMINATE EXISTING CIRCUITS TO REPLACEMENT PANELBOARD "ECHCP".

PROVIDE JUNCTION BOX AND EXTEND CONDUIT AND WIRE AS REQUIRED.

600A 3P

LSI

, 4W

400A

NORMAL

DP-2

100A 100A 200A 17A 125A 70A

100A 150A 100A

200A200A

TB

112.5KVA

3C-108A

100A

1C102 3C-108A 4C-108A 3C-108A

H1B H3B H4B L3B

H5B L4B

5B-108 4C-108A 4C-108A

L4B

SEC. 1 SEC. 2

250A

L1B

1C102

250A

L5B

5B-108

SEC. 1

L5B

5B-108

SEC. 2

TE1

75KVA

3D-14

TE2

45KVA

3D-111

4C-108A

100A150A

225A

3D-14

125A

3D-111

L3E2

250A

L4E

4D-118

SEC. 1

225A

L4E

4D-118

SEC. 2

L5E

5D-118

SEC. 1

L5E

5D-118

SEC. 2

100A

L1E

1D13B-53

SEC. 1

L1E

1D13B-53

SEC. 2

100A

1C102-53

800A

400AT

SWBD EDP

480/277V

2500A BUS, 3P 4W

101B-53

1C102-53

600A BUS

800AT

BUILDING 56 GENERATORS

1600AF

1200AT

1600AF

1200AT

3200AF

1500AT

3200AF

1500AT

3200AF

1500AT

52-LB/PG

SPARE

52-D1

TO G1HA

TO G4HA

56G1 750kW / 937.5kVA 480/277V

56G2 750kW / 937.5kVA 480/277V

TO ATS-EQB

TO ATS-ECB

GG

400AT

250AT

600AT

400AT

1200AT

800AT

250AT

SPACE

(X6)

225AT

250AT

SPARE

(X2)

SPARE

TO SUB 6

TO ATS-ELA

TO ATS-EQC

TO ATS-EQD

TO ATS-ECA

TO ATS-EQF

TO ATS-EQA

LSI

SPACE

(X8)

SPARESPARESPARE

(X2)

SPARESPARE

(X2)

SPARE

(X2)

800A/3P 100%

RATED

1200A/3P 100%

RATED

800A/3P 250A/3P 150A/3P 100A/3P

SWBD GSBHA

480/277V

2500A BUS, 3P 4W

BLDG 56 GENERATOR SWITCHGEAR

1600A, 480/277V, 3PH, 4W

20A

SPARE

20A

SPARE

20A

SPARE

20A

SPARE

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

53EP601

BLDG 53 - PARTIAL ONE-LINE DIAGRAM -

DEMOLITION

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-53

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 58 of 77

- NTS

1 BLDG 53 - PARTIAL ONE-LINE DIAGRAM - DEMOLITION

KEY NOTES

GENERAL NOTES

METERING NOTES

(1) EXISTING SPACE TO BE USED TO FEED ADDED LOAD IN BUILDING 52. REFERENCE

ONE-LINE DIAGRAM SHEET 52EP611 AND SHEET 53EP611 FOR ADDITIONAL

INFORMATION.

DEMOLISH EXISTING OVERCURRENT PROTECTIVE DEVICE, CONDUIT, AND WIRE AS

INDICATED.

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT

UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY

POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND

APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL

EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING

CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

INDICATED. REFERENCE ONE-LINE DIAGRAM SHEET 53EP611 FOR ADDITIONAL

INFORMATION.

TO MEDIUM

VOLTAGE EQUIPMENT

TO MEDIUM

VOLTAGE EQUIPMENT

TO MEDIUM

VOLTAGE EQUIPMENT

TO SOLAR PANEL

T-M

1000KVA

12.5K/480 /277V

SPARE

SUB 5

800AF

800AT

LSIG

800AF

800AT

LSIG

1200AF

1200AT

LSIG

400AF

225AT

LSIG

1600AF

1600AT

LSIG

101B-53

ATS'S-EQA

1200A

4-POLE

ATS'S-EQF

100A

3-POLE

ATS'S-ECA

600A

4-POLE

ATS'S-EQD

225A

4-POLE

101B-53

6A100

6A100

ATS'S-EQC

600A

4-POLE

1200AT

LSIG

800AF

800AT

LSIG

800AF

800AT

LSIG

800AF

600AT

LSIG

800AF

600AT

LSIG

1600AF

1600AT

LSIG

T-N

1000KVA

12.5K/480

/277VSUB 6

T-O

750KVA

12.5K/480

/277VSUB 7

1200AF

1200AT

LSIG

400AF

200AT

LSIG

800AF

800AT

LSIG

800AF

800AT

LSIG

800AF

800AT

LSIG

800AF

400AT

LSIG

SPARE

800A 800A

101B-53

ATS'S-ELA

400A

4-POLE

100A

100A

6A100

PANEL

EQD

175A

175A

175A

175A

175A

6A100

PANEL

EQC

FIRE

PUMP

(362LRA)

ELEV

P-7

ELEV

P-8

ELEV

S4

ELEV

S5

ELEV

S6

BLDG 53

NORTH BANK

ELEVATORS

BLDG 53

SOUTH BANK

SERVICE ELEVATORS

TO MCC-H6

TO MDB-EL

TO MDB-EC

TO DP-1

TO DP-EQA

TO ATS'S-EQB

TO ATS'S-ECB

40 40 75 40 75

TO EDP, 800AT

TO EDP, 400AT

TO EDP, 250AT

TO EDP, 600AT

TO EDP, 400AT

TO EDP, 1200AT

TO DP-2 ENCLOSED

CIRCUIT BREAKER

SPARE SPACE

(X7)

SPACE

(X4)

SPACE

(X6)

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

53EP602

BLDG 53 - PARTIAL ONE-LINE DIAGRAM -

DEMOLITION

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-53

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 59 of 77

- NTS

1 BLDG 53 - PARTIAL ONE-LINE DIAGRAM - DEMOLITION

KEY NOTES

GENERAL NOTES

METERING NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT

UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY

POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND

APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL

EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING

CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

DEMOLISH EXISTING CONDUIT AND WIRE AS INDICATED. 1

01 METERING POINT: REFERENCE ''METERING AND LOAD INFORMATION SCHEDULE

ON SHEET EP702 FOR ADDITIONAL INFORMATION.

DEMOLISH EXISTING CONDUIT AND WIRE AS INDICATED. REFERENCE ONE-LINE

DIAGRAM SHEET 53EP612 FOR ADDITIONAL INFORMATION.

DP-2

100A 100A 200A 17A 20A 125A 70A

SPARE

100A 150A 100A

200A200A

TB

112.5KVA

3C-108A

100A

1C102 3C-108A 4C-108A 3C-108A

H1B H3B H4B L3B

H5B L4B

5B-108 4C-108A 4C-108A

L4B

SEC. 1 SEC. 2

250A

L1B

1C102

250A

L5B

5B-108

SEC. 1

L5B

5B-108

SEC. 2

TE1

75KVA

3D-14

TE2

45KVA

3D-111

4C-108A

100A150A

225A

3D-14

125A

3D-111

L3E2

250A

L4E

4D-118

SEC. 1

225A

L4E

4D-118

SEC. 2

L5E

5D-118

SEC. 1

L5E

5D-118

SEC. 2

100A

L1E

1D13B-53

SEC. 1

L1E

1D13B-53

SEC. 2

100A

1C102-53

800A

101B-53

1C102-53

600A BUS

TO G1HA,

SHEET 01EP614

TO G4HA,

SHEET 01EP613

TO ATS-EQB, SEE 52EP612

TO ATS-ECB, SEE 52EP612

400AT

SWBD EDP

480/277V

2500A BUS, 3P 4W

SEE SHEET 53EP612

800AT

400AT

250AT

600AT

400AT

1200AT

800AT

800AF

600AT

SPACE

(X5)

225AT

250AT

SPARE

(X2)

SPARE

TO SUB 6

TO ATS-ELA

TO ATS-EQC

TO ATS-EQD

TO ATS-ECA

TO ATS-EQF

TO ATS-EQA

LSI

SPACE

(X7)

SPARESPARESPARE

(X2)

SPARESPARE

(X2)

SPARE

(X2)

800A/3P 100%

RATED

1200A/3P 100%

RATED

800A/3P 250A/3P 150A/3P 100A/3P

SWBD GSBHA

480/277V

2500A BUS, 3P 4W

BUILDING 56 GENERATORS

1600AF

1200AT

1600AF

1200AT

3200AF

1500AT

3200AF

1500AT

3200AF

1500AT

52-LB/PG

SPARE

52-D1

56G1 750kW / 937.5kVA 480/277V

56G2 750kW / 937.5kVA 480/277V

GG

BLDG 56 GENERATOR SWITCHGEAR

1600A, 480/277V, 3PH, 4W

150A/3P

TO 52-ATS-TRA,

SHEET 52EP611

20A

SPARE

20A

SPARE

20A

SPARE

52-P-01

52-P-05

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

53EP611

BLDG 53 - ONE-LINE DIAGRAM - PART 1 OF 6

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-53

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 60 of 77

- NTS

1 BLDG 53 - ONE-LINE DIAGRAM - PART 1 OF 6

KEY NOTES

GENERAL NOTES

EXISTING DISTRIBUTION EQUIPMENT TO BE MODIFIED; PROVIDE OVERCURRENT

PROTECTIVE DEVICE TO SUPPY LOAD AS SHOWN.

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT

UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY

POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND

APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL

EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING

CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

200A 3P

LSI

101B-53

ATS-EQA

1200A

4-POLE

ATS-EQF

100A

3-POLE

ATS-ECA

600A

4-POLE

ATS-EQD

225A

4-POLE

101B-53

6A100

6A100

ATS-EQC

600A

4-POLE

800A 800A

101B-53

ATS-ELA

400A

4-POLE

100A

100A

6A100

PANEL

EQD

175A

175A

175A

175A

175A

6A100

PANEL

EQC

FIRE

PUMP

(362LRA)

ELEV

P-7

ELEV

P-8

ELEV

S4

ELEV

S5

ELEV

S6

BLDG 53

NORTH BANK

ELEVATORS

BLDG 53

SOUTH BANK

SERVICE ELEVATORS

TO MCC-H6, SHEET 53EP616

TO MDB-EL, SHEET 53EP616

TO MDB-EC, SHEET 53EP613

TO DP-1, SHEET 53EP616

TO DP-EQA, SHEET 53EP615

TO ATS-EQB,

SHEET 52EP612

TO ATS-ECB,

SHEET 52EP612

40 40 75 40 75

TO EDP, 400AT

TO EDP, 400AT

TO EDP, 250AT

TO EDP, 600AT

TO EDP, 400AT

TO EDP, 1200AT

TO MEDIUM

VOLTAGE EQUIPMENT

TO MEDIUM

VOLTAGE EQUIPMENT

TO MEDIUM

VOLTAGE EQUIPMENT

TO SOLAR PANEL

T-M

1000KVA

12.5K/480 /277V

SPARE

SUB 5

800AF

800AT

LSIG

800AF

800AT

LSIG

1200AF

1200AT

LSIG

400AF

225AT

LSIG

1600AF

1600AT

LSIG

1200AT

LSIG

800AF

800AT

LSIG

800AF

600AT

LSIG

800AF

600AT

LSIG

1600AF

1600AT

LSIG

T-N

1000KVA

12.5K/480

/277VSUB 6

T-O

750KVA

12.5K/480

/277VSUB 7

1200AF

1200AT

LSIG

400AF

200AT

LSIG

800AF

800AT

LSIG

800AF

800AT

LSIG

800AF

800AT

LSIG

800AF

400AT

LSIG

SPARESPARE SPACE

(X7)

SPACE

(X4)

SPACE

(X6)

TO EDP, 53EP611

TO DP-2 ENCLOSED

CIRCUIT BREAKER

800AF

600AT

LSIG

52-P-06

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

53EP612

BLDG 53 - ONE-LINE DIAGRAM - PART 2 OF 6

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-53

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 61 of 77

- NTS

1 BLDG 53 - ONE-LINE DIAGRAM - PART 2 OF 6

KEY NOTES

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT

UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY

POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND

APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL

EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING

CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

EXISTING DISTRIBUTION EQUIPMENT TO BE MODIFIED; PROVIDE OVERCURRENT

PROTECTIVE DEVICE TO SUPPY LOAD AS SHOWN.

CRITICAL BRANCH

MDB-EC

480/277V

800A BUS

101B-53

800A-BUS

125A 70A 200A 125A 125A 100A 70A 200A 100A 100A 125A 70A

TCC

75KVA

480/ 208Y N2A-104A

TCD1

45KVA

BB108

TCD2

75KVA

BB108

TCE

75KVA

3D014

TC1B

45KVA

TC3A

75KVA

3C-100A

TCBA

45KVA

100-53150A

1C102

ECH1B

150A225A 100A

100A

3A-107

ECL3C

150A

250A

150A

150A 150A

250A

150A

150A

1A107-53

ECL1C

4A-107

ECL4C

5A-10

ECL5C

6A-100

ECL7C

BB108

ECLBD

1B132-53

ECL1D

4B-17

ECL4D

5B-117

ECL5D

100A

3B-114

ECL3D

200A

100A

225A

3D-14

ECL3E

10138

ECL1E

4C-108A

ECH4B

3C-108A

ECL3B

1C-102

ECL1B

3C-105A

ECH3B

4D-118

ECL4E

5D-118

ECL5E

5C-108

ECH5B

4C-108A

ECL4B

5C-108

ECL5B

5C-100

ECH5A

4C-100A

ECH4A

3C-100A

ECH3A

3B-114

ECH1A

100-53

ECHBA

XXX

ECL3A

100-53

ECLBA

1C500-53

ECL1A

4C-100A

ECL4A

5C-100

ECL5A

150A 150A

100A

100A

150A 150A

150A

150A 175A

150A

150A 150A 150A

150A

125A 100A

100A

100A

PHARM

AHU'S

225A 100A

100A

150A

150A

150A

TO ATS-ECA,

SHEET 53EP612

250A, 3P

LSI

53-XFMR-C-TRA

PRI: 480/277V

SEC: 208/120V

200kVA

125A, 3P

53-BB-100CA

208/120V 125A/3P, 4W

200A, 3P

53-1B-119BA

208/120V 125A/3P, 4W

125A, 3P

53-3B-100A 208/120V 125A/3P, 4W

125A, 3P

53-4A-109A 208/120V 125A/3P, 4W

150A, 3P

53-5A-109A 208/120V 125A/3P, 4W

600A, 3P

LSI

53-DP-TRA

208/120V 600A/3P, 4W

100A 200A 225A

53-P-03 53-P-04 53-P-05 53-P-06 53-P-07

53-P-02

53-P-01

20A, 3P 20A, 3P

SPARE

SPACE

(X8) SPARE SPARE SPARE

DPM

SPD

DPM

SPD

DPM

SPD

DPM

SPD

DPM

SPD

DPMSPD

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

53EP613

BLDG 53 - ONE-LINE DIAGRAM - PART 3 OF 6

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-53

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 62 of 77

- NTS

1 BLDG 53 - ONE-LINE DIAGRAM - PART 3 OF 6

KEY NOTES

EXISTING DISTRIBUTION EQUIPMENT TO BE MODIFIED; PROVIDE OVERCURRENT

PROTECTIVE DEVICE TO SUPPY LOAD AS SHOWN.

REFER TO PANEL SCHEDULES ON 53EP701 FOR ADDITIONAL INFORMATION.

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT

UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY

POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND

APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL

EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING

CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

METERING NOTES

01 METERING POINT: REFERENCE ''METERING AND LOAD INFORMATION SCHEDULE

ON SHEET EP702 FOR ADDITIONAL INFORMATION.

200A 150A 150A

150A

53-P-01

DISC-53-XFMR-C-TRA

400A, 3P

150A 20A 20A 80A 100A 150A 150A 150A 20A 20A 30A 30A 20A

VSD VSD VSD VSD VSD VSD VSD VSD VSD VSD VSD VSD

53AHU

-4W

53RF

-4W

JOCKEY

PUMP

53EF-2 53AHU

-ER

53RF

-ER

53AHU

-BW

53RF

-BW

53AHU

-1W

53RF

-1W

53AHU

-3W

53RF

-3W

53AHU

-5W

53RF

-5W

53EF-1 53SF-1 53AC-3

20.6 FLA

53AC-3

20.6 FLA

MORGUE

REFRIG

EQUIPMENT BRANCH

DP-EQA

1200A BUS

BASEMENT 1ST FLOOR 3RD FLOOR 5TH FLOOR

RISER "A" AHU'S

SEE SHEET 53EP615

7.530 40 15 40 15 40 15 2 5

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

53EP614

BLDG 53 - ONE-LINE DIAGRAM - PART 4 OF 6

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-53

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 63 of 77

- NTS

1 BLDG 53 - ONE-LINE DIAGRAM - PART 4 OF 6

KEY NOTES

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT

UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY

POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND

APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL

EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING

CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

100A 175A 20A 30A 30A 300A 20A 20A 400A 20A 20A 100A 20A 175A 150A 150A 175A 20A 20A20A 20A 20A 20A 20A

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

LIGHTS IN

ROOM

1B-134

15KVA

TQA

TO WATER

STORAGE

TANK

PUMPS

225A 40A

EQAH-1

1C100-53

EQAL-1

XXX

AHU4.2

MRI

CHILLER

AHU-BA 53CRP-BA 53CRP-1E 53CRP-BW

100A

EQHG

100A

50A

TQG

30KVA

53CRP-ER

VSD VSD VSD VSD VSD VSD VSD VSD

53AHU

-1E

53RF

-1E

53AHU

-3E

53RF

-3E

53AHU

-4E

53RF

-4E

53AHU

-5E

53RF

-5E

EF-20

SP-1

1ST FLOOR 3RD FLOOR 4TH FLOOR 5TH FLOOR

RISER "B" AHU'S

TSP

EQUIPMENT BRANCH

MCC-EQH6

400A BUS

6A-103

20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A

SPARE SPARE SPARE

53EF-13 53AHU-P 53EF-17 53EF-18 53AHU-P 53EF-1 53EF-21 53EF-4

EQUIPMENT BRANCH

DP-EQA

1200A BUS

TO ATS-EQA,

SHEET 53EP612

SEE SHEET 53EP614

5 3/4 3/4 3/4 3/4 3/4 3/4 3/4 3/4 50 20 40 20 40 20 50 20 5 3/4

5 3 5 5 5 5 5 5

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

53EP615

BLDG 53 - ONE-LINE DIAGRAM - PART 5 OF 6

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-53

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 64 of 77

- NTS

1 BLDG 53 - ONE-LINE DIAGRAM - PART 5 OF 6

KEY NOTES

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT

UPGRADES. CONTRACTORS SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY

POWER PLANS AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL

PRIOR TO COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW

30 DAYS PRIOR TO IMPLEMENTATION . POWER TO ALL EXISTING ESSENTIAL

EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING

CONSTRUCTION; BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA

STANDARDS.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

DP-1

480/277V

800A BUS

101-53

800A BUS

225A 100A 100A 100A 200A 175A 175A 100A 100A 25A 25A 175A

250A/3P

LSI

90A

50A

XXX

HG

100A

100-53

HBA

TA

112.5KVA

480/208Y /120V100-53

TG

30KVA

480/208Y /120V

90A

XXX

LG

150A

1C00-53 H1A

150A

3C-100A H3A

150A

4C-100A H4A

150A

5C-100 H5A

TA

112.5KVA

480/208Y /120V

100-53

300A

200A200A

200A200A

200A100A

100-53

PANEL

LA

250A

3C-100A L3A

250A

4C-100A L4A

250A

1C100-53 L1A

200A

100-53

LBA

250A

5C-100 L5A

SEC. 1

L5A

SEC. 2

200A

200A

300A

XXX

BB108

PANEL

LBD

SEC.1

LBD

SEC. 2

200A

TC

112.5KVA

480/208Y /120V

2NA-104A

EUH-2

15KW

EUH-1

15KW

EUH-3

15KW

70A

100A

150A

200A

3A-107

PANEL

H3C

250A

4C-100A L4A

250A

1B152-53 L1D

SEC. 1

5C-100 1B152-53 L1D

SEC. 2

4B-17 L4D

SEC. 1

4B-17 L4D

SEC. 2

200A

5B-117 L5D

SEC. 1

5B-117 L5D

SEC. 2

200A 150A

5A-10 H5C

150A

4A-107 H4C

150A

1A107-53 H1C

200A

300A

200A

3A-107

PANEL

LC

250A

5A-10 L5C

250A

4A-107 L4C

200A

3A-107 L3C

200A

1A107-53 L1C

SEC. 1

1A107-53 L1C

SEC. 2

T-L2C

15KVA

480/208Y /120V

2NA-104A

40A

40A

3A-107

ELL3C

XXX

ELL7C

40A

LIFE SAFETY

MDB-EL

101-53

30A 100A 100A 100A 100A 100A 50A

SPARESPARE SPARE

3C-108A

ELH3B

150A

1C100-53

ELH1A

150A

1C-102

ELH1B

150A

100-53

ELHBA

150A

4C-108A

ELH4B

150A

3C-100A

ELH3A

150A

XXX

ELHG

100A

4C-100A

ELH4A

150A

5B-108

ELH5B

150A

5C-100

ELH5A

150A

XXX

ELLG

90A

TLG

30KVA

480/208Y /120V

50A

53EF-15 53EF-7 53EF-8 53EF-9 53EF-10 53EF-11 53EF-12 53EF-19 53EF-3 53EF-16 53EF-6

20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A

FROM

SUB 5

NORMAL

MCC-H6

6A-103

400A BUS

TO SUB 5,

SHEET 53EP612

TO ATS-ELA,

SHEET 53EP612

TO SUB 7,

SHEET 53EP612

2 .5 .5 3/4 1.5 1.5 1.5 2 1.5 1.5 1

SPACE

(X5)

53-XFMR-C-TRB

PRI: 480/277V

SEC: 208/120V

200kVA

600A, 3P

LSI

53-BB-100CA

208/120V 125A/3P, 4W

53-1B-1196B 208/120V 125A/3P, 4W

53-3B-100B 208/120V 125A/3P, 4W

53-4A-109B 208/120V 125A/3P, 4W

53-5A-109B 208/120V 125A/3P, 4W

125A/3P

53-DP-TRB

208/120V

600A , 4W

20A

SPARE

20A

SPARE 1

20A/3P 20A/3P

125A/3P 125A/3P 125A/3P 125A/3P

53-P-10 53-P-11 53-P-12 53-P-13 53-P-14

53-P-09

53-P-08

DPM

SPD

DPM

SPD

DPM

SPD

DPM

SPD

DPM

SPD

DPMSPD

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

53EP616

BLDG 53 - ONE-LINE DIAGRAM - PART 6 OF 6

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

-53

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 65 of 77

- NTS

1 BLDG 53 - ONE-LINE DIAGRAM - PART 6 OF 6

KEY NOTES

EXISTING DISTRIBUTION EQUIPMENT TO BE MODIFIED; PROVIDE OVERCURRENT

PROTECTIVE DEVICE TO SUPPY LOAD AS SHOWN.

REFER TO PANEL SCHEDULES ON 53EP701 FOR ADDITIONAL INFORMATION.

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT

UPGRADES. CONTRACTORS SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY

POWER PLANS AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL

PRIOR TO COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW

30 DAYS PRIOR TO IMPLEMENTATION . POWER TO ALL EXISTING ESSENTIAL

EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING

CONSTRUCTION; BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA

STANDARDS.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

METERING NOTES

01 METERING POINT: REFERENCE ''METERING AND LOAD INFORMATION SCHEDULE

ON SHEET EP702 FOR ADDITIONAL INFORMATION.

B

53-P-08

DISC-53-XFMR-C-TRB

400A, 3P

53-P-09

53-XFMR-C-TRB

PRI: 480/277V

SEC: 208/120V

200kVA

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

EP701

ELECTRICAL SCHEDULES

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 66 of 77

TAG BUILDING NUMBER DESCRIPTION VOLTAGE PHASE AMP NOTES

MS-01-C100M1A-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-C100M1A-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-101-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-101-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-2C50B-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-2C50B-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-240-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-240-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-302-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-302-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-403-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-403-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-5A04-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-01-5A04-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-18-106-11-1 18 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-18-106-11-2 18 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-22-B07A-22-1 22 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-22-B07A-22-2 22 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-22-104A-22-1 22 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-22-104A-22-2 22 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-24-B4B-24-1 24 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-24-112-24-1 24 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-24-112-24-2 24 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-24-205-24-1 24 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-24-205-24-2 24 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-52-201B-52-1 52 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-52-201B-52-2 52 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-52-201B-52-3 52 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-52-201B-52-4 52 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-BB-100C-1 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-BB-100C-2 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-53-1B-119B-1 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-53-1B-119B-2 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-53-3B-100-1 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-53-3B-100-2 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-53-4A-109-1 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-53-4A-109-2 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-53-5A-109-1 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MS-53-5A-109-2 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2

MECHANICAL EQUIPMENT SCHEDULE (1 OF 3)

1. INDOOR UNIT POWERED BY OUTDOOR UNIT. PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS REQUIRED PER MANUFACTURER'S

INSTRUCTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.

NOTES:

2. CONTRACTOR SHALL COORDINATE WITH MANUFACTURER TO PROVIDE OVERCURRENT PROTECTION AS REQUIRED. ANY DEVIATION FROM BASIS OF DESIGN EQUIPMENT

INCLUDING BUT NOT LIMITED CONDUIT AND WIRE, OVERCURRENT PROTECTION DEVICE RATING AND QUANTITY SHALL BE PROVIDED AT THE EXPENSIVE OF THE CONTRACTOR.

TAG BUILDING NUMBER DESCRIPTION VOLTAGE PHASE AMP NOTES

CU-01-C100M1A-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-C100M1A-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-101-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-101-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-2C50B-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-2C50B-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-2C30B-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-2C30B-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-240-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-240-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-302-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-302-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-403-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-403-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-5A04-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-01-5A04-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-18-106-11-1 18 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-18-106-11-2 18 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-22-B07A-22-1 22 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-22-B07A-22-2 22 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-22-104A-22-1 22 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-22-104A-22-2 22 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-24-B4B-24-1 24 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-24-112-24-1 24 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-24-112-24-2 24 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-24-205-24-1 24 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-24-205-24-2 24 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-52-201B-52-1 52 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-52-201B-52-2 52 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-52-201B-52-3 52 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-52-201B-52-4 52 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-53-BB-103-1 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-53-BB-103-2 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-53-1B-119B-1 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-53-1B-119B-2 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-53-3B-100-1 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-53-3B-100-2 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-53-4A-109-1 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-53-4A-109-2 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-53-5A-109-1 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

CU-53-5A-109-2 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4

MECHANICAL EQUIPMENT SCHEDULE - (2 OF 3)

NOTES:

1. MECHANICAL UNIT SHALL BE PROVIDED WITH A SINGLE POINT OF POWER CONNECTION. PROVIDE ALL OCPDs, DISCONNECTS, PANELS, AND CONNECTIONS PER

MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.

2. ALL MECHANICAL EQUIPMENT SHALL BE FED FROM A HACR RATED BREAKER.

3. REFERENCE CONDUIT AND WIRE SCHEDULE ON EP700 SERIES SHEET FOR EACH BUILDING FOR ADDITIONAL INFORMATION.

4. CONTRACTOR SHALL COORDINATE WITH MANUFACTURER TO PROVIDE OVERCURRENT PROTECTION AS REQUIRED. ANY DEVIATION FROM BASIS OF DESIGN EQUIPMENT

INCLUDING BUT NOT LIMITED CONDUIT AND WIRE, OVERCURRENT PROTECTION DEVICE RATING AND QUANTITY SHALL BE PROVIDED AT THE EXPENSIVE OF THE CONTRACTOR.

TAG BUILDING NUMBER DESCRIPTION VOLTAGE PHASE AMP NOTES

TU-C100M1A-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-101-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-2C50B-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-240-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-302-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-403-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-5A04-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-106-11 18 & 11 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-B07A-22 22 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-104A-22 22 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-B4B-24 24 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-112-24A 24 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-205-24 24 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-201B-52 52 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-1B-119B 53 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-3B-100 53 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-4A-409A 53 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

TU-5A-109 53 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3

MECHANICAL EQUIPMENT SCHEDULE - (3 OF 3)

NOTES:

1. PROVIDE 120V TO 24V TRANSFORMER FOR VAV UNIT. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.

2. PROVIDE CONDUIT AND WIRE AS INDICATED ON PLANS; REFERENCE SHEET EPG002 FOR ADDITIONAL CIRCUITING INFORMATION.

3. CONTRACTOR SHALL COORDINATE WITH MANUFACTURER TO PROVIDE OVERCURRENT PROTECTION AS REQUIRED. ANY DEVIATION FROM BASIS OF DESIGN EQUIPMENT

INCLUDING BUT NOT LIMITED CONDUIT AND WIRE, OVERCURRENT PROTECTION DEVICE RATING AND QUANTITY SHALL BE PROVIDED AT THE EXPENSIVE OF THE CONTRACTOR.

TYPE DESCRIPTION LAMPS DRIVER WATTS VOLTS MFGR CATALOGUE # LENS/DIFFUSER FINISH COMMENTS

L1 4' STRIP LED ELECTRONIC 35 120/277V METALUX, OR APPROVED EQUAL 4SNX-51SL-LW-UNV-L840-CD FROSTED HIGH-IMPACT DIFFUSER WHITE -

L2 4' STRIP LED ELECTRONIC 42 120/277V METALUX, OR APPROVED EQUAL 4SNX-60SL-LW-UNV-L840-CD FROSTED HIGH-IMPACT DIFFUSER WHITE -

L3 4' STRIP LED ELECTRONIC 32.1 120/277V METALUX, OR APPROVED EQUAL 4SNX-48SL-LW-UNV-L840-CD FROSTED HIGH-IMPACT DIFFUSER WHITE -

L4 4' STRIP LED ELECTRONIC 47.9 120/277V METALUX, OR APPROVED EQUAL 4SNX-67SL-LW-UNV-L840-CD FROSTED HIGH-IMPACT DIFFUSER WHITE -

L5 4' STRIP LED ELECTRONIC 39.7 120/277V METALUX, OR APPROVED EQUAL 4SNX-57SL-LW-UNV-L840-CD FROSTED HIGH-IMPACT DIFFUSER WHITE -

L6 2' X 4' TROFFER LED ELECTRONIC 22.6 120/277V METALUX, OR APPROVED EQUAL BAA-24SR-LD2-39-C-UNV-L835-CDI-U INDIRECT/DIRECT WHITE

PROVIDE WITH GRID CEILING OR GYPSUM

MOUNTING HARDWARE AS REQUIRED.

LUMINAIRE SCHEDULE

1. REFER TO TR ROOM LUMINAIRE MOUNTING SCHEDULE ON SHEET EP704 FOR LUMINAIRE MOUNTING INFORMATION.

GENERAL NOTES:

Building No.

Drawing Number

Project Number

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Title

ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:

321 4 5 6 7 8 9 10

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

WWW.DAVENERGY.COM

Floor No.

th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:

05/24/2024100% ISSUED FOR BID

A/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

Department of Veteran Affairs

EP702

ELECTRICAL SCHEDULES

JACK C MONTGOMERY VAMC

05/24/2024 WNM/SJM RTS/BCL

EHRM INFRASTRUCTURE UPGRADES -

JACK C. MONTGOMERY VA MEDICAL

CENTER

623-21-700

1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401

Dwg. 67 of 77

BUILDING EQUIPMENT NAME

EQUIPMENT

VOLTAGE (V) EQUIPMENT PHASE

EQUIPMENT AMP

RATING (A)

MAIN DISCONNECT

AMP RATING (A) METERING DATE

METERED

DEMAND (kW) PF ADJUST

SEASONAL

ADJUSTMENT

FACTOR

NEC DEMAND

FACTOR

DEMAND Kva

(w/ NEC

FACTOR)

ADDED

LOAD

(kVA)

REMOVED

TR LOAD

(kVA)

(NOTE 7)

TOTAL

DEMAND

LOAD (kVA)

TOTAL

DEMAND

AMPERAGE

TOTAL LOAD <= 80% OF

EQUIPMENT RATING NOTES

FSG 208 3PH 1000 1000 January 17, 2024 102.57 0.9 1 1.25 142.46 139.9 -65.0 217.4 603.3 YES 1

ASG 208 3PH 1000 1000 January 17, 2024 168.03 0.9 1 1.25 233.37 139.9 -65.0 308.3 855.7 YES 1

I 480 3PH 2000 2000 April 19, 2023 228.00 0.9 1 1.25 316.67 190.6 -65.0 442.3 532.0 YES 2

ABEQ 208 3PH 600 - January 8, 2024 47.45 0.9 1 1.25 65.90 37.7 -10.0 93.6 259.8 YES -

S1HA 480 3PH 600 600 March 20, 2024 187.06 0.9 1 1.25 259.81 190.6 -65.0 385.4 463.6 YES 3

18MDP 208 3PH 1200 1200 January 16, 2024 85.13 0.9 1 1.25 118.24 11.4 -5.0 124.6 346.0 YES 2

18EQDP 208 3PH 800 800 August 25, 2022 51.88 0.9 1 1.25 72.05 19.3 -5.0 86.4 239.7 YES 4

22 MSB22 208 3PH 400 400 January 17, 2024 63.59 0.9 1 1.25 88.32 23.4 -10.0 101.7 282.3 YES 2

24MDP 208 3PH 800 - January 12, 2024 78.18 0.9 1 1.25 108.58 29.8 -12.5 125.9 349.4 YES 2

24BE 208 3PH 400 300 January 9, 2024 53.86 0.9 1 1.25 74.81 49.2 -12.5 111.5 309.5 YES 2

SUBSTATION 1 480 3PH 1200 1200 April 17, 2024 329.23 0.9 1 1.25 457.26 60.2 -12.0 505.46 608.0 YES -

ATS-ECB 480 3PH 225 800 March 30,2024 281.01 0.9 1 1.25 390.29 46.7 -12.0 425.0 511.2 YES 5

DP-1 480 3PH 800 - April 19, 2023 198.00 0.9 1 1.25 275.00 139.8 -47.5 367.3 441.8 YES 6

MDB-EC 480 3PH 800 - January 17, 2024 39.91 0.9 1 1.25 55.4 102.8 -47.5 110.7 133.2 YES -

7. TELECOM RACKS DE-RATED FROM 5000VA TO 2500VA PER VA WHITE PAPER "POWER CAPACITY PLANNING FOR TRS" (JULY 2021).

EQUIPMENT METERING AND LOAD INFORMATION SCHEDULE

NOTES:

1. MAIN CIRCUIT BREAKER IS 100% FULLY RATED SO IS EVALUATED AS "TOTAL LOAD <= 100% EQUIPMENT RATING".

2. DATA OBTAINED FROM INTEGRAL EQUIPMENT METER ON SWITCHBOARD "I".

4. PEAK DEMAND DATA FOR GENERATOR 18 UTILIZED FOR DEMAND DATA ON INDIVIDUAL DISTRIBUTION PANEL "18EQDP".

5. DATA OBTAINED FROM INTEGRAL EQUIPMENT METER ON SUBSTATION 6 FEEDING EQUIPMENT ATS-ECB. NOTE THAT "TOTAL LOAD <= 80% OF EQUIPMENT RATING" COLUMN IS BASED OFF THE "MAIN DISCONNECT AMP RATING (A)" COLUMN AND REPLACEMENT ATS-ECB INDICATED ON ONE-LINE DIAGRAM SHEETS 52EP602 AND 52EP612.

6. DATA OBTAINED FROM INTEGRAL EQUIPMENT METER ON SUBSTATION 7 FEEDING EQUIPMENT DP-1.

3. DATA OBTAINED FROM INTEGRAL EQUIPMENT METER ON SWITCHBOARD "I" FEEDING EQUIPMENT ATS-S1A.

GENERATOR NAME

GENERATOR

RATING (KW)

PARALLEL

RATING (KW)

TEST REPORT

DATE

PEAK

RECORDED

DEMAND (kW)

SEASONAL

ADJUSTMENT

FACTOR

NEC

DEMAND

FACTOR

DEMAND

Kw (w/

NEC

FACTOR)

ADDED

LOAD

(kW)

REMOVED

TR LOAD

(kVA)

(NOTE 6)

TOTAL

DEMAND

LOAD (kW)

ESTIMATED GENERATOR

PERCENT LOADING (%) NOTES

Generator 18 225 - Aug-22 51.88 1 1.25 64.85 19.3 -5.0 79.15 35.2% 1

Generator 46A 350

Generator 46B 350

Generator 56-1 750

Generator 56-2 750

6. TELECOM RACKS DE-RATED FROM 2500VA PER VA WHITE PAPER "POWER CAPACITY PLANNING FOR TRS" (JULY 2021).

2, 3, 4

1500 Aug-22 655.13 1 -

156.72 86.9 221.12 31.6%

2, 4, 5-124.5

-22.5

5. ADDED LOAD IS COMPRISED OF BUILDINGS: 1, 52, AND 53.

4. GENERATORS ARE EMERGENCY STANDBY RATED AND PROVIDED POWER TO THE ESSENTIAL ELECTRICAL SYSTEM (EES). PER NEC 517.31.D, ADDITIONAL 25% DEMAND FACTOR IS NOT APPLIED TO DETERMINE

MAXIMUM ACTUAL DEMAND SEEN BY GENERATORS.

925.30 61.7%

1 -

GENERATOR CAPACITY AND LOAD INFORMATION SCHEDULE

NOTES:

1. ADDED LOAD IS COMPRISED OF BUILDINGS: 11 AND 18

2. GENERATORS POWER A COMMON BUS ALLOWING PARALLEL OPERATION. THE COMBINED CAPACITY OF EACH GENERATOR IS USED TO EVALUATE ADDED EHRM LOAD IN PARALLEL OPERATION. THE PEAK DEMAND OF

EACH GENERATOR FROM THE GENERATOR MONTHLY TEST REPORT DATE OF WAS USED FOR ANALYSIS.

3. ADDED LOAD IS COMPRISED OF BUILDINGS: 22, 24

700 Nov-22 156.72

655.13 394.7

File details come from the government source that posted it. Updated .