This document contains electrical one-line diagrams and equipment schedules for the EHRM Infrastructure Upgrades project at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma. The drawings detail electrical infrastructure modifications for Buildings 52 and 53, including demolition and replacement of existing electrical distribution equipment, transformers, switchboards, and associated circuits.
The electrical schedules provide comprehensive details on mechanical and lighting equipment, including ductless split cooling units, VAV air terminal units, and LED lighting fixtures. The generator and equipment metering schedules document existing electrical load capacities, with notes indicating the project involves load additions and removals across multiple buildings. The drawings are part of a detailed electrical infrastructure upgrade, dated May 24, 2024, prepared by Spees Design Build for the Department of Veterans Affairs, with DAV Energy Solutions as the consultant.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
125A
225A
101-F52
EQLCP
52-CRP-10
20A
COND.
TRANSFER
UNIT
52-
AD-1
52-
AD-2
AIR DRYER
25A
52-CP-1
HOT
WATER
RETURN
CIRCULATION
PUMP
20A
-DWP
-1
-DWP
-2
-DWP
-3
125A
-VP
-1
52-AC-152
-VP
-2 HEATING WATER PUMPS
DOMESTIC COLD
WATER PUMPS
BACKUP MED
VAC PUMPS
80A 40A
VFD
175A
52-P-9
VFD
175A
52-P-10
VFD
175A
52-P-11 52
-AC
-1
52-CRP-152
-AC
-2
MEDICAL
AIR COMPR
80A 80A
LARGE
BACKUP
AIR COMPR.
COND
RETURN
PUMPS
MCC-EQB 101F-52
FROM
ATS-EQB
101F-52 101F-52
TO EDP
ATS-EQB
800A
4-POLE
ATS-ECB
225A
4-POLE
60A 100A
125A
101F-52
EWH24
TEQCP
75KVA CONTROL
PANEL
800A BUS
TO SUB 6
3 3
5 5
20 20 20 20 20 10 10 40 40 40 40 40 1/2 1/2
TELCO
UPS
CORE
UPS
TEL PNL
ECP
L1EB
E101 TELCO
UPS
100AS
30A
30A30A
100A
100A
100A
225A
TECP
75KVA
XXX
TO
SEWAGE
PUMP
BLDG 53
101F-52
EHCP
225A 3P 480V
DOLPHIN-1
1P SPARE
(x21)
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
52EP602
BLDG 52 - PARTIAL ONE-LINE DIAGRAM -
DEMOLITION
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
-52
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 55 of 77
- NTS
1 BLDG 52 - PARTIAL ONE-LINE DIAGRAM - DEMOLITION
KEY NOTES
GENERAL NOTES
METERING NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT
UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY
POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND
APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL
EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING
CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
EXISTING EQUIPMENT "ATS-ECB" AND ASSOCIATED INCOMING FEEDERS TO BE
DEMOLISHED AND REPLACED. REFERENCE REVISED ONE-LINE DIAGRAM SHEET
52EP612 FOR ADDITIONAL INFORMATION.
EXISTING EQUIPMENT "ECHCP" AND ASSOCIATED INCOMING FEEDERS TO BE
DEMOLISHED AND REPLACED. PRESERVE AND PROTECT EXISTING BRANCH CIRCUITS
FOR RE-TERMINATION. REFERENCE REVISED ONE-LINE DIAGRAM SHEET 52EP612 FOR
ADDITIONAL INFORMATION.
ECHCP
101F-52
PANEL
LCT-T2
100 100
250AF
200AT
LSIG
MCC-1
600A BUS
101F-52
CHILLED
WATER
PUMP #1
VFD
SECONDARY
CHILLED
WATER
PUMP
(BLUE)
CHILLER
#1
100A
SIZE
225A 50A
SIZE
200A
SIZE
100A
SIZE
2 SPD
7A
SIZE
3A
SIZE
7A
SIZE
7A
SIZE
COND
PUMP
CHILLER
#1
COOLING
TOWER
#1
FAN
CELL #1
EF2CP EF3CP AHU-1CP EF1CP
SPARE
30A
LUGS
SPARE
30A
SIZE
SPARE
20A
LUGS
SPARE
50A
SIZE
SPARE
3A
SIZE
52-AHU-2
VFD ROOM
3A
SIZE
COLING
TOWER #1
FAN CELL
#2
70A
COOLING
TOWER
SEPARATER
CONTROL
PANEL
COOLING
TOWER #1
BASIN 2
40A
LUGS
40A
LUGS
COOLING
TOWER #1
BASIN 2
1200AF
2000AT
LSIG
600AS
600AS
125E
T-L
1000KVA
12.5K/480/ 277V
600AS
600AS
101F-52
125E
T-K
1000KVA
12.5KV/
4.16KV
600AS
600AS
101F-52
65E
T-P
1000KVA
12.5K/480/ 277V
200E
200AS
SUB 2
RVSS
CHILLER
#1
101-52
1600AF
1200AT
LSIG
800AF
800AT
SPARE
800AF
800AT
SPARE
1200AF
1200AT
SPARE
800AF
800AT
SPARE
800AF
800AT
400AF
200AT
XXX
PDP-
52HT
SUB 4 SUB 3
600AS
600AS
101D-52
100E
T-J
1500KVA
12.5KV/
4.6KV
1600AF
1200AT
LSIG
1200AF
1200AT
1200AF
1200AT
G
GENERATOR 52-G-1
1250KW, 12.5KV
ATS-SA
1200A 3P,3W
BLDG 52
600AF
600AT
LSIG
CHILLER
#2
800AF
600AT
LSIG
CHILLER
#3
101-52101-52
52-EF-5
15A
SIZE
52-EF-6
15A
SIZE
SF-1
25A
SIZE
EF7
7A
SIZE
52-P-3
PRI CHWP
PLATE &
FRAME
100A
SIZE
52-P-2
PRI CHWP
(CHILLER
#2)
100A
SIZE
400A
SIZE
52-P-8
COND
WATER
PUMP
CHILLER
#2
7A
SIZE
7A
SIZE
SPARE
7A
SIZE
SPARE
7A
SIZE
SPARE
7A
SIZE
SPARE
300A
SPARE
100A
SIZE 3
2SPD
COOLIG
TOWER
CELL #4
100A
SIZE 3
2SPD
COOLING
TOWER #2
CELL #3
SIZE
52-P-12
PRI CHILL
WATER
PUMP
(CHILLER
#3)
250A
SIZE
52-P-13
COND
WATER
PUMP
(CHILLER
#3)
100A
SIZE 3
2SPD
COOLING
TOWER
CELL #5
(CHILLER
#3)
40A
LUGS
COOLING
TOWER #2
BASIN #4
40A
LUGS
COOLING
TOWER
BASIN #3
40A
LUGS
COOLING
TOWER #3
CELL #5
BASIN
HEATERS
VFD
52-P-6
XFMR
SEC
CHWP
EAST
300A
52-P-5
SEC CHWP
300A
MCC-2
800A BUS
101F-52
TO MEDIUM
VOLTAGE
EQUIPMENT
RVSS
T-ELCP
75KVA
480/208Y/120
101F-52
PANEL
LCT-L
101F-52
PANEL
HCT
225A BUS
101F-52
PANEL
DP1C
225A BUS
101F-52
VFD
RVSS
10050 30 2 2 2 1/2 2 30 25
5 5 100 10 1 20 40 50 50 30
125125
3P SPACE(x5)
20A, 3P
20A, 3P1P
SPACE
(x7)
UNKNOWN
800AF
600AT
LSIG
125AT
3P LSIG
52-XFMR-TRA
75kVA XFMR
PRI: 480/277V
SEC:208/120V
52-201B-52A
225A MCB
400A BUS
208/120V
3PH 4W
TO GSHBA
SHEET 53EP611
SUBSTATION 1
480V, 1200A
3PH, 4W
Isc 28355 A 3P
52-ATS-TRA
480V 125A
W/ MAINTENANCE
BYPASS
52-P-0252-P-01
52-P-03
52-P-04
DPM
SPD
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
52EP611
BLDG 52 - ONE-LINE DIAGRAM - PART 1 OF 2
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
-52
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 56 of 77
KEY NOTES
GENERAL NOTES
- NTS
1 BLDG 52 - ONE-LINE DIAGRAM - PART 1 OF 2
UTILIZE EXISTING 3P SPACE TO PROVIDE CIRCUIT BREAKER IN EXISTING POWER
DISTRIBUTION EQUIPMENT TO SUPPLY LOAD AS INDICATED.
REFER TO PANEL SCHEDULES ON 52EP701 FOR ADDITIONAL INFORMATION.
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT
UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY
POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND
APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL
EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING
CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
METERING NOTES
01 METERING POINT: REFERENCE ''METERING AND LOAD INFORMATION SCHEDULE
ON SHEET EP702 FOR ADDITIONAL INFORMATION.
200A 4P
200A 3P
LSIG3P
W/ MAINTENANCE
BYPASS
200A/4P
125A
225A
101-F52
EQLCP
52-CRP-10
20A
COND.
TRANSFER
UNIT
52-
AD-1
52-
AD-2
AIR DRYER
25A
52-CP-1
HOT
WATER
RETURN
CIRCULATION
PUMP
20A
-DWP
-1
-DWP
-2
-DWP
-3
125A
-VP
-1
52-AC-152
-VP
-2 HEATING WATER PUMPS
DOMESTIC COLD
WATER PUMPS
BACKUP MED
VAC PUMPS
80A 40A
VFD
175A
52-P-9
VFD
175A
52-P-10
VFD
175A
52-P-11 52
-AC
-1
52-CRP-152
-AC
-2
MEDICAL
AIR COMPR
80A 80A
LARGE
BACKUP
AIR COMPR.
COND
RETURN
PUMPS
MCC-EQB 101F-52
FROM
ATS-EQB
101F-52
ECHCP
600A 3P 480V
60A 100A
125A
TO
SEWAGE
PUMP
BLDG 53
101F-52
EWH24
TEQCP
75KVA CONTROL
PANEL
800A BUS
3 3
5 5
20 20 20 20 20 10 10 40 40 40 40 40 1/2 1/2
TELCO
UPS
CORE
UPS
TEL PNL
ECP
L1EB
E101 TELCO
UPS
100AS
30A
30A30A
100A
100A
100A
225A
TECP
75KVA
XXX
101F-52 101F-52
TO EDP,
SEE 53EP611
ATS-EQB
800A
4-POLE
ATS-ECB
600A
4-POLE
WITH
BYPASS
TO SUB 6,
SEE 53EP612
DOLPHIN-1
1P SPARE
(x21)
125A
52-P-08
52-XFMR-TRB
75kVA XFMR
PRI: 480
SEC: 208/120V
52-P-09
52-201B-52B
225A MCB
225A BUS
208/120V
3PH 4W
DPM
SPD
52-P-05 52-P-06
52-P-07
TYP.
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
52EP612
BLDG 52 - ONE-LINE DIAGRAM - PART 2 OF 2 -
REVISED
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
-52
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 57 of 77
- NTS
1 BLDG 52 - ONE-LINE DIAGRAM - PART 2 OF 2 - REVISED
KEY NOTES
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT
UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY
POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND
APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL
EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING
CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
PROVIDE EQUIPMENT AS INDICATED.
RE-TERMINATE EXISTING BRANCH CIRCUITS TO ADDED EQUIPMENT. PROVIDE
JUNCTION BOX AND EXTEND CONDUIT AND WIRE AS REQUIRED.
2 RE-TERMINATE EXISTING CIRCUITS TO REPLACEMENT PANELBOARD "ECHCP".
PROVIDE JUNCTION BOX AND EXTEND CONDUIT AND WIRE AS REQUIRED.
600A 3P
LSI
, 4W
400A
NORMAL
DP-2
100A 100A 200A 17A 125A 70A
100A 150A 100A
200A200A
TB
112.5KVA
3C-108A
100A
1C102 3C-108A 4C-108A 3C-108A
H1B H3B H4B L3B
H5B L4B
5B-108 4C-108A 4C-108A
L4B
SEC. 1 SEC. 2
250A
L1B
1C102
250A
L5B
5B-108
SEC. 1
L5B
5B-108
SEC. 2
TE1
75KVA
3D-14
TE2
45KVA
3D-111
4C-108A
100A150A
225A
3D-14
125A
3D-111
L3E2
250A
L4E
4D-118
SEC. 1
225A
L4E
4D-118
SEC. 2
L5E
5D-118
SEC. 1
L5E
5D-118
SEC. 2
100A
L1E
1D13B-53
SEC. 1
L1E
1D13B-53
SEC. 2
100A
1C102-53
800A
400AT
SWBD EDP
480/277V
2500A BUS, 3P 4W
101B-53
1C102-53
600A BUS
800AT
BUILDING 56 GENERATORS
1600AF
1200AT
1600AF
1200AT
3200AF
1500AT
3200AF
1500AT
3200AF
1500AT
52-LB/PG
SPARE
52-D1
TO G1HA
TO G4HA
56G1 750kW / 937.5kVA 480/277V
56G2 750kW / 937.5kVA 480/277V
TO ATS-EQB
TO ATS-ECB
GG
400AT
250AT
600AT
400AT
1200AT
800AT
250AT
SPACE
(X6)
225AT
250AT
SPARE
(X2)
SPARE
TO SUB 6
TO ATS-ELA
TO ATS-EQC
TO ATS-EQD
TO ATS-ECA
TO ATS-EQF
TO ATS-EQA
LSI
SPACE
(X8)
SPARESPARESPARE
(X2)
SPARESPARE
(X2)
SPARE
(X2)
800A/3P 100%
RATED
1200A/3P 100%
RATED
800A/3P 250A/3P 150A/3P 100A/3P
SWBD GSBHA
480/277V
2500A BUS, 3P 4W
BLDG 56 GENERATOR SWITCHGEAR
1600A, 480/277V, 3PH, 4W
20A
SPARE
20A
SPARE
20A
SPARE
20A
SPARE
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
53EP601
BLDG 53 - PARTIAL ONE-LINE DIAGRAM -
DEMOLITION
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
-53
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 58 of 77
- NTS
1 BLDG 53 - PARTIAL ONE-LINE DIAGRAM - DEMOLITION
KEY NOTES
GENERAL NOTES
METERING NOTES
(1) EXISTING SPACE TO BE USED TO FEED ADDED LOAD IN BUILDING 52. REFERENCE
ONE-LINE DIAGRAM SHEET 52EP611 AND SHEET 53EP611 FOR ADDITIONAL
INFORMATION.
DEMOLISH EXISTING OVERCURRENT PROTECTIVE DEVICE, CONDUIT, AND WIRE AS
INDICATED.
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT
UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY
POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND
APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL
EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING
CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
INDICATED. REFERENCE ONE-LINE DIAGRAM SHEET 53EP611 FOR ADDITIONAL
INFORMATION.
TO MEDIUM
VOLTAGE EQUIPMENT
TO MEDIUM
VOLTAGE EQUIPMENT
TO MEDIUM
VOLTAGE EQUIPMENT
TO SOLAR PANEL
T-M
1000KVA
12.5K/480 /277V
SPARE
SUB 5
800AF
800AT
LSIG
800AF
800AT
LSIG
1200AF
1200AT
LSIG
400AF
225AT
LSIG
1600AF
1600AT
LSIG
101B-53
ATS'S-EQA
1200A
4-POLE
ATS'S-EQF
100A
3-POLE
ATS'S-ECA
600A
4-POLE
ATS'S-EQD
225A
4-POLE
101B-53
6A100
6A100
ATS'S-EQC
600A
4-POLE
1200AT
LSIG
800AF
800AT
LSIG
800AF
800AT
LSIG
800AF
600AT
LSIG
800AF
600AT
LSIG
1600AF
1600AT
LSIG
T-N
1000KVA
12.5K/480
/277VSUB 6
T-O
750KVA
12.5K/480
/277VSUB 7
1200AF
1200AT
LSIG
400AF
200AT
LSIG
800AF
800AT
LSIG
800AF
800AT
LSIG
800AF
800AT
LSIG
800AF
400AT
LSIG
SPARE
800A 800A
101B-53
ATS'S-ELA
400A
4-POLE
100A
100A
6A100
PANEL
EQD
175A
175A
175A
175A
175A
6A100
PANEL
EQC
FIRE
PUMP
(362LRA)
ELEV
P-7
ELEV
P-8
ELEV
S4
ELEV
S5
ELEV
S6
BLDG 53
NORTH BANK
ELEVATORS
BLDG 53
SOUTH BANK
SERVICE ELEVATORS
TO MCC-H6
TO MDB-EL
TO MDB-EC
TO DP-1
TO DP-EQA
TO ATS'S-EQB
TO ATS'S-ECB
40 40 75 40 75
TO EDP, 800AT
TO EDP, 400AT
TO EDP, 250AT
TO EDP, 600AT
TO EDP, 400AT
TO EDP, 1200AT
TO DP-2 ENCLOSED
CIRCUIT BREAKER
SPARE SPACE
(X7)
SPACE
(X4)
SPACE
(X6)
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
53EP602
BLDG 53 - PARTIAL ONE-LINE DIAGRAM -
DEMOLITION
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
-53
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 59 of 77
- NTS
1 BLDG 53 - PARTIAL ONE-LINE DIAGRAM - DEMOLITION
KEY NOTES
GENERAL NOTES
METERING NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT
UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY
POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND
APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL
EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING
CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
DEMOLISH EXISTING CONDUIT AND WIRE AS INDICATED. 1
01 METERING POINT: REFERENCE ''METERING AND LOAD INFORMATION SCHEDULE
ON SHEET EP702 FOR ADDITIONAL INFORMATION.
DEMOLISH EXISTING CONDUIT AND WIRE AS INDICATED. REFERENCE ONE-LINE
DIAGRAM SHEET 53EP612 FOR ADDITIONAL INFORMATION.
DP-2
100A 100A 200A 17A 20A 125A 70A
SPARE
100A 150A 100A
200A200A
TB
112.5KVA
3C-108A
100A
1C102 3C-108A 4C-108A 3C-108A
H1B H3B H4B L3B
H5B L4B
5B-108 4C-108A 4C-108A
L4B
SEC. 1 SEC. 2
250A
L1B
1C102
250A
L5B
5B-108
SEC. 1
L5B
5B-108
SEC. 2
TE1
75KVA
3D-14
TE2
45KVA
3D-111
4C-108A
100A150A
225A
3D-14
125A
3D-111
L3E2
250A
L4E
4D-118
SEC. 1
225A
L4E
4D-118
SEC. 2
L5E
5D-118
SEC. 1
L5E
5D-118
SEC. 2
100A
L1E
1D13B-53
SEC. 1
L1E
1D13B-53
SEC. 2
100A
1C102-53
800A
101B-53
1C102-53
600A BUS
TO G1HA,
SHEET 01EP614
TO G4HA,
SHEET 01EP613
TO ATS-EQB, SEE 52EP612
TO ATS-ECB, SEE 52EP612
400AT
SWBD EDP
480/277V
2500A BUS, 3P 4W
SEE SHEET 53EP612
800AT
400AT
250AT
600AT
400AT
1200AT
800AT
800AF
600AT
SPACE
(X5)
225AT
250AT
SPARE
(X2)
SPARE
TO SUB 6
TO ATS-ELA
TO ATS-EQC
TO ATS-EQD
TO ATS-ECA
TO ATS-EQF
TO ATS-EQA
LSI
SPACE
(X7)
SPARESPARESPARE
(X2)
SPARESPARE
(X2)
SPARE
(X2)
800A/3P 100%
RATED
1200A/3P 100%
RATED
800A/3P 250A/3P 150A/3P 100A/3P
SWBD GSBHA
480/277V
2500A BUS, 3P 4W
BUILDING 56 GENERATORS
1600AF
1200AT
1600AF
1200AT
3200AF
1500AT
3200AF
1500AT
3200AF
1500AT
52-LB/PG
SPARE
52-D1
56G1 750kW / 937.5kVA 480/277V
56G2 750kW / 937.5kVA 480/277V
GG
BLDG 56 GENERATOR SWITCHGEAR
1600A, 480/277V, 3PH, 4W
150A/3P
TO 52-ATS-TRA,
SHEET 52EP611
20A
SPARE
20A
SPARE
20A
SPARE
52-P-01
52-P-05
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
53EP611
BLDG 53 - ONE-LINE DIAGRAM - PART 1 OF 6
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
-53
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 60 of 77
- NTS
1 BLDG 53 - ONE-LINE DIAGRAM - PART 1 OF 6
KEY NOTES
GENERAL NOTES
EXISTING DISTRIBUTION EQUIPMENT TO BE MODIFIED; PROVIDE OVERCURRENT
PROTECTIVE DEVICE TO SUPPY LOAD AS SHOWN.
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT
UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY
POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND
APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL
EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING
CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
200A 3P
LSI
101B-53
ATS-EQA
1200A
4-POLE
ATS-EQF
100A
3-POLE
ATS-ECA
600A
4-POLE
ATS-EQD
225A
4-POLE
101B-53
6A100
6A100
ATS-EQC
600A
4-POLE
800A 800A
101B-53
ATS-ELA
400A
4-POLE
100A
100A
6A100
PANEL
EQD
175A
175A
175A
175A
175A
6A100
PANEL
EQC
FIRE
PUMP
(362LRA)
ELEV
P-7
ELEV
P-8
ELEV
S4
ELEV
S5
ELEV
S6
BLDG 53
NORTH BANK
ELEVATORS
BLDG 53
SOUTH BANK
SERVICE ELEVATORS
TO MCC-H6, SHEET 53EP616
TO MDB-EL, SHEET 53EP616
TO MDB-EC, SHEET 53EP613
TO DP-1, SHEET 53EP616
TO DP-EQA, SHEET 53EP615
TO ATS-EQB,
SHEET 52EP612
TO ATS-ECB,
SHEET 52EP612
40 40 75 40 75
TO EDP, 400AT
TO EDP, 400AT
TO EDP, 250AT
TO EDP, 600AT
TO EDP, 400AT
TO EDP, 1200AT
TO MEDIUM
VOLTAGE EQUIPMENT
TO MEDIUM
VOLTAGE EQUIPMENT
TO MEDIUM
VOLTAGE EQUIPMENT
TO SOLAR PANEL
T-M
1000KVA
12.5K/480 /277V
SPARE
SUB 5
800AF
800AT
LSIG
800AF
800AT
LSIG
1200AF
1200AT
LSIG
400AF
225AT
LSIG
1600AF
1600AT
LSIG
1200AT
LSIG
800AF
800AT
LSIG
800AF
600AT
LSIG
800AF
600AT
LSIG
1600AF
1600AT
LSIG
T-N
1000KVA
12.5K/480
/277VSUB 6
T-O
750KVA
12.5K/480
/277VSUB 7
1200AF
1200AT
LSIG
400AF
200AT
LSIG
800AF
800AT
LSIG
800AF
800AT
LSIG
800AF
800AT
LSIG
800AF
400AT
LSIG
SPARESPARE SPACE
(X7)
SPACE
(X4)
SPACE
(X6)
TO EDP, 53EP611
TO DP-2 ENCLOSED
CIRCUIT BREAKER
800AF
600AT
LSIG
52-P-06
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
53EP612
BLDG 53 - ONE-LINE DIAGRAM - PART 2 OF 6
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
-53
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 61 of 77
- NTS
1 BLDG 53 - ONE-LINE DIAGRAM - PART 2 OF 6
KEY NOTES
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT
UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY
POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND
APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL
EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING
CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
EXISTING DISTRIBUTION EQUIPMENT TO BE MODIFIED; PROVIDE OVERCURRENT
PROTECTIVE DEVICE TO SUPPY LOAD AS SHOWN.
CRITICAL BRANCH
MDB-EC
480/277V
800A BUS
101B-53
800A-BUS
125A 70A 200A 125A 125A 100A 70A 200A 100A 100A 125A 70A
TCC
75KVA
480/ 208Y N2A-104A
TCD1
45KVA
BB108
TCD2
75KVA
BB108
TCE
75KVA
3D014
TC1B
45KVA
TC3A
75KVA
3C-100A
TCBA
45KVA
100-53150A
1C102
ECH1B
150A225A 100A
100A
3A-107
ECL3C
150A
250A
150A
150A 150A
250A
150A
150A
1A107-53
ECL1C
4A-107
ECL4C
5A-10
ECL5C
6A-100
ECL7C
BB108
ECLBD
1B132-53
ECL1D
4B-17
ECL4D
5B-117
ECL5D
100A
3B-114
ECL3D
200A
100A
225A
3D-14
ECL3E
10138
ECL1E
4C-108A
ECH4B
3C-108A
ECL3B
1C-102
ECL1B
3C-105A
ECH3B
4D-118
ECL4E
5D-118
ECL5E
5C-108
ECH5B
4C-108A
ECL4B
5C-108
ECL5B
5C-100
ECH5A
4C-100A
ECH4A
3C-100A
ECH3A
3B-114
ECH1A
100-53
ECHBA
XXX
ECL3A
100-53
ECLBA
1C500-53
ECL1A
4C-100A
ECL4A
5C-100
ECL5A
150A 150A
100A
100A
150A 150A
150A
150A 175A
150A
150A 150A 150A
150A
125A 100A
100A
100A
PHARM
AHU'S
225A 100A
100A
150A
150A
150A
TO ATS-ECA,
SHEET 53EP612
250A, 3P
LSI
53-XFMR-C-TRA
PRI: 480/277V
SEC: 208/120V
200kVA
125A, 3P
53-BB-100CA
208/120V 125A/3P, 4W
200A, 3P
53-1B-119BA
208/120V 125A/3P, 4W
125A, 3P
53-3B-100A 208/120V 125A/3P, 4W
125A, 3P
53-4A-109A 208/120V 125A/3P, 4W
150A, 3P
53-5A-109A 208/120V 125A/3P, 4W
600A, 3P
LSI
53-DP-TRA
208/120V 600A/3P, 4W
100A 200A 225A
53-P-03 53-P-04 53-P-05 53-P-06 53-P-07
53-P-02
53-P-01
20A, 3P 20A, 3P
SPARE
SPACE
(X8) SPARE SPARE SPARE
DPM
SPD
DPM
SPD
DPM
SPD
DPM
SPD
DPM
SPD
DPMSPD
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
53EP613
BLDG 53 - ONE-LINE DIAGRAM - PART 3 OF 6
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
-53
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 62 of 77
- NTS
1 BLDG 53 - ONE-LINE DIAGRAM - PART 3 OF 6
KEY NOTES
EXISTING DISTRIBUTION EQUIPMENT TO BE MODIFIED; PROVIDE OVERCURRENT
PROTECTIVE DEVICE TO SUPPY LOAD AS SHOWN.
REFER TO PANEL SCHEDULES ON 53EP701 FOR ADDITIONAL INFORMATION.
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT
UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY
POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND
APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL
EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING
CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
METERING NOTES
01 METERING POINT: REFERENCE ''METERING AND LOAD INFORMATION SCHEDULE
ON SHEET EP702 FOR ADDITIONAL INFORMATION.
200A 150A 150A
150A
53-P-01
DISC-53-XFMR-C-TRA
400A, 3P
150A 20A 20A 80A 100A 150A 150A 150A 20A 20A 30A 30A 20A
VSD VSD VSD VSD VSD VSD VSD VSD VSD VSD VSD VSD
53AHU
-4W
53RF
-4W
JOCKEY
PUMP
53EF-2 53AHU
-ER
53RF
-ER
53AHU
-BW
53RF
-BW
53AHU
-1W
53RF
-1W
53AHU
-3W
53RF
-3W
53AHU
-5W
53RF
-5W
53EF-1 53SF-1 53AC-3
20.6 FLA
53AC-3
20.6 FLA
MORGUE
REFRIG
EQUIPMENT BRANCH
DP-EQA
1200A BUS
BASEMENT 1ST FLOOR 3RD FLOOR 5TH FLOOR
RISER "A" AHU'S
SEE SHEET 53EP615
7.530 40 15 40 15 40 15 2 5
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
53EP614
BLDG 53 - ONE-LINE DIAGRAM - PART 4 OF 6
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
-53
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 63 of 77
- NTS
1 BLDG 53 - ONE-LINE DIAGRAM - PART 4 OF 6
KEY NOTES
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT
UPGRADES. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS. TEMPORARY
POWER PLANS, AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND
APPROVAL PRIOR TO COMMENCING WORK. POWER TO ALL EXISTING ESSENTIAL
EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING
CONSTRUCTION: BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA STANDARDS.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
100A 175A 20A 30A 30A 300A 20A 20A 400A 20A 20A 100A 20A 175A 150A 150A 175A 20A 20A20A 20A 20A 20A 20A
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
LIGHTS IN
ROOM
1B-134
15KVA
TQA
TO WATER
STORAGE
TANK
PUMPS
225A 40A
EQAH-1
1C100-53
EQAL-1
XXX
AHU4.2
MRI
CHILLER
AHU-BA 53CRP-BA 53CRP-1E 53CRP-BW
100A
EQHG
100A
50A
TQG
30KVA
53CRP-ER
VSD VSD VSD VSD VSD VSD VSD VSD
53AHU
-1E
53RF
-1E
53AHU
-3E
53RF
-3E
53AHU
-4E
53RF
-4E
53AHU
-5E
53RF
-5E
EF-20
SP-1
1ST FLOOR 3RD FLOOR 4TH FLOOR 5TH FLOOR
RISER "B" AHU'S
TSP
EQUIPMENT BRANCH
MCC-EQH6
400A BUS
6A-103
20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A
SPARE SPARE SPARE
53EF-13 53AHU-P 53EF-17 53EF-18 53AHU-P 53EF-1 53EF-21 53EF-4
EQUIPMENT BRANCH
DP-EQA
1200A BUS
TO ATS-EQA,
SHEET 53EP612
SEE SHEET 53EP614
5 3/4 3/4 3/4 3/4 3/4 3/4 3/4 3/4 50 20 40 20 40 20 50 20 5 3/4
5 3 5 5 5 5 5 5
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
53EP615
BLDG 53 - ONE-LINE DIAGRAM - PART 5 OF 6
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
-53
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 64 of 77
- NTS
1 BLDG 53 - ONE-LINE DIAGRAM - PART 5 OF 6
KEY NOTES
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT
UPGRADES. CONTRACTORS SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY
POWER PLANS AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL
PRIOR TO COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW
30 DAYS PRIOR TO IMPLEMENTATION . POWER TO ALL EXISTING ESSENTIAL
EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING
CONSTRUCTION; BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA
STANDARDS.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
DP-1
480/277V
800A BUS
101-53
800A BUS
225A 100A 100A 100A 200A 175A 175A 100A 100A 25A 25A 175A
250A/3P
LSI
90A
50A
XXX
HG
100A
100-53
HBA
TA
112.5KVA
480/208Y /120V100-53
TG
30KVA
480/208Y /120V
90A
XXX
LG
150A
1C00-53 H1A
150A
3C-100A H3A
150A
4C-100A H4A
150A
5C-100 H5A
TA
112.5KVA
480/208Y /120V
100-53
300A
200A200A
200A200A
200A100A
100-53
PANEL
LA
250A
3C-100A L3A
250A
4C-100A L4A
250A
1C100-53 L1A
200A
100-53
LBA
250A
5C-100 L5A
SEC. 1
L5A
SEC. 2
200A
200A
300A
XXX
BB108
PANEL
LBD
SEC.1
LBD
SEC. 2
200A
TC
112.5KVA
480/208Y /120V
2NA-104A
EUH-2
15KW
EUH-1
15KW
EUH-3
15KW
70A
100A
150A
200A
3A-107
PANEL
H3C
250A
4C-100A L4A
250A
1B152-53 L1D
SEC. 1
5C-100 1B152-53 L1D
SEC. 2
4B-17 L4D
SEC. 1
4B-17 L4D
SEC. 2
200A
5B-117 L5D
SEC. 1
5B-117 L5D
SEC. 2
200A 150A
5A-10 H5C
150A
4A-107 H4C
150A
1A107-53 H1C
200A
300A
200A
3A-107
PANEL
LC
250A
5A-10 L5C
250A
4A-107 L4C
200A
3A-107 L3C
200A
1A107-53 L1C
SEC. 1
1A107-53 L1C
SEC. 2
T-L2C
15KVA
480/208Y /120V
2NA-104A
40A
40A
3A-107
ELL3C
XXX
ELL7C
40A
LIFE SAFETY
MDB-EL
101-53
30A 100A 100A 100A 100A 100A 50A
SPARESPARE SPARE
3C-108A
ELH3B
150A
1C100-53
ELH1A
150A
1C-102
ELH1B
150A
100-53
ELHBA
150A
4C-108A
ELH4B
150A
3C-100A
ELH3A
150A
XXX
ELHG
100A
4C-100A
ELH4A
150A
5B-108
ELH5B
150A
5C-100
ELH5A
150A
XXX
ELLG
90A
TLG
30KVA
480/208Y /120V
50A
53EF-15 53EF-7 53EF-8 53EF-9 53EF-10 53EF-11 53EF-12 53EF-19 53EF-3 53EF-16 53EF-6
20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A
FROM
SUB 5
NORMAL
MCC-H6
6A-103
400A BUS
TO SUB 5,
SHEET 53EP612
TO ATS-ELA,
SHEET 53EP612
TO SUB 7,
SHEET 53EP612
2 .5 .5 3/4 1.5 1.5 1.5 2 1.5 1.5 1
SPACE
(X5)
53-XFMR-C-TRB
PRI: 480/277V
SEC: 208/120V
200kVA
600A, 3P
LSI
53-BB-100CA
208/120V 125A/3P, 4W
53-1B-1196B 208/120V 125A/3P, 4W
53-3B-100B 208/120V 125A/3P, 4W
53-4A-109B 208/120V 125A/3P, 4W
53-5A-109B 208/120V 125A/3P, 4W
125A/3P
53-DP-TRB
208/120V
600A , 4W
20A
SPARE
20A
SPARE 1
20A/3P 20A/3P
125A/3P 125A/3P 125A/3P 125A/3P
53-P-10 53-P-11 53-P-12 53-P-13 53-P-14
53-P-09
53-P-08
DPM
SPD
DPM
SPD
DPM
SPD
DPM
SPD
DPM
SPD
DPMSPD
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
53EP616
BLDG 53 - ONE-LINE DIAGRAM - PART 6 OF 6
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
-53
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 65 of 77
- NTS
1 BLDG 53 - ONE-LINE DIAGRAM - PART 6 OF 6
KEY NOTES
EXISTING DISTRIBUTION EQUIPMENT TO BE MODIFIED; PROVIDE OVERCURRENT
PROTECTIVE DEVICE TO SUPPY LOAD AS SHOWN.
REFER TO PANEL SCHEDULES ON 53EP701 FOR ADDITIONAL INFORMATION.
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH VA PRIOR TO PERFORMING REQUIRED EQUIPMENT
UPGRADES. CONTRACTORS SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY
POWER PLANS AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL
PRIOR TO COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW
30 DAYS PRIOR TO IMPLEMENTATION . POWER TO ALL EXISTING ESSENTIAL
EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN ACTIVE DURING
CONSTRUCTION; BACKUP POWER AND TIE-IN SHALL CONFORM WITH VA
STANDARDS.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
METERING NOTES
01 METERING POINT: REFERENCE ''METERING AND LOAD INFORMATION SCHEDULE
ON SHEET EP702 FOR ADDITIONAL INFORMATION.
B
53-P-08
DISC-53-XFMR-C-TRB
400A, 3P
53-P-09
53-XFMR-C-TRB
PRI: 480/277V
SEC: 208/120V
200kVA
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
EP701
ELECTRICAL SCHEDULES
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 66 of 77
TAG BUILDING NUMBER DESCRIPTION VOLTAGE PHASE AMP NOTES
MS-01-C100M1A-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-C100M1A-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-101-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-101-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-2C50B-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-2C50B-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-240-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-240-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-302-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-302-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-403-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-403-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-5A04-1-1 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-01-5A04-1-2 01 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-18-106-11-1 18 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-18-106-11-2 18 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-22-B07A-22-1 22 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-22-B07A-22-2 22 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-22-104A-22-1 22 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-22-104A-22-2 22 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-24-B4B-24-1 24 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-24-112-24-1 24 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-24-112-24-2 24 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-24-205-24-1 24 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-24-205-24-2 24 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-52-201B-52-1 52 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-52-201B-52-2 52 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-52-201B-52-3 52 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-52-201B-52-4 52 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-BB-100C-1 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-BB-100C-2 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-53-1B-119B-1 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-53-1B-119B-2 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-53-3B-100-1 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-53-3B-100-2 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-53-4A-109-1 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-53-4A-109-2 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-53-5A-109-1 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MS-53-5A-109-2 53 DUCTLESS SPLIT - COOLING UNIT 208V 1 0.39 1, 2
MECHANICAL EQUIPMENT SCHEDULE (1 OF 3)
1. INDOOR UNIT POWERED BY OUTDOOR UNIT. PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS REQUIRED PER MANUFACTURER'S
INSTRUCTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
NOTES:
2. CONTRACTOR SHALL COORDINATE WITH MANUFACTURER TO PROVIDE OVERCURRENT PROTECTION AS REQUIRED. ANY DEVIATION FROM BASIS OF DESIGN EQUIPMENT
INCLUDING BUT NOT LIMITED CONDUIT AND WIRE, OVERCURRENT PROTECTION DEVICE RATING AND QUANTITY SHALL BE PROVIDED AT THE EXPENSIVE OF THE CONTRACTOR.
TAG BUILDING NUMBER DESCRIPTION VOLTAGE PHASE AMP NOTES
CU-01-C100M1A-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-C100M1A-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-101-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-101-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-2C50B-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-2C50B-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-2C30B-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-2C30B-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-240-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-240-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-302-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-302-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-403-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-403-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-5A04-1-1 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-01-5A04-1-2 01 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-18-106-11-1 18 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-18-106-11-2 18 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-22-B07A-22-1 22 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-22-B07A-22-2 22 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-22-104A-22-1 22 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-22-104A-22-2 22 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-24-B4B-24-1 24 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-24-112-24-1 24 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-24-112-24-2 24 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-24-205-24-1 24 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-24-205-24-2 24 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-52-201B-52-1 52 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-52-201B-52-2 52 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-52-201B-52-3 52 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-52-201B-52-4 52 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-53-BB-103-1 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-53-BB-103-2 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-53-1B-119B-1 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-53-1B-119B-2 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-53-3B-100-1 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-53-3B-100-2 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-53-4A-109-1 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-53-4A-109-2 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-53-5A-109-1 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
CU-53-5A-109-2 53 DUCTLESS SPLIT COOLING UNIT - OUTDOOR UNIT 208V 1 13.55 1, 2, 3, 4
MECHANICAL EQUIPMENT SCHEDULE - (2 OF 3)
NOTES:
1. MECHANICAL UNIT SHALL BE PROVIDED WITH A SINGLE POINT OF POWER CONNECTION. PROVIDE ALL OCPDs, DISCONNECTS, PANELS, AND CONNECTIONS PER
MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
2. ALL MECHANICAL EQUIPMENT SHALL BE FED FROM A HACR RATED BREAKER.
3. REFERENCE CONDUIT AND WIRE SCHEDULE ON EP700 SERIES SHEET FOR EACH BUILDING FOR ADDITIONAL INFORMATION.
4. CONTRACTOR SHALL COORDINATE WITH MANUFACTURER TO PROVIDE OVERCURRENT PROTECTION AS REQUIRED. ANY DEVIATION FROM BASIS OF DESIGN EQUIPMENT
INCLUDING BUT NOT LIMITED CONDUIT AND WIRE, OVERCURRENT PROTECTION DEVICE RATING AND QUANTITY SHALL BE PROVIDED AT THE EXPENSIVE OF THE CONTRACTOR.
TAG BUILDING NUMBER DESCRIPTION VOLTAGE PHASE AMP NOTES
TU-C100M1A-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-101-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-2C50B-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-240-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-302-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-403-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-5A04-1 01 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-106-11 18 & 11 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-B07A-22 22 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-104A-22 22 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-B4B-24 24 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-112-24A 24 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-205-24 24 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-201B-52 52 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-1B-119B 53 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-3B-100 53 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-4A-409A 53 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
TU-5A-109 53 VAV / AIR TERMINAL UNIT 120V 1 4.00 1, 2, 3
MECHANICAL EQUIPMENT SCHEDULE - (3 OF 3)
NOTES:
1. PROVIDE 120V TO 24V TRANSFORMER FOR VAV UNIT. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
2. PROVIDE CONDUIT AND WIRE AS INDICATED ON PLANS; REFERENCE SHEET EPG002 FOR ADDITIONAL CIRCUITING INFORMATION.
3. CONTRACTOR SHALL COORDINATE WITH MANUFACTURER TO PROVIDE OVERCURRENT PROTECTION AS REQUIRED. ANY DEVIATION FROM BASIS OF DESIGN EQUIPMENT
INCLUDING BUT NOT LIMITED CONDUIT AND WIRE, OVERCURRENT PROTECTION DEVICE RATING AND QUANTITY SHALL BE PROVIDED AT THE EXPENSIVE OF THE CONTRACTOR.
TYPE DESCRIPTION LAMPS DRIVER WATTS VOLTS MFGR CATALOGUE # LENS/DIFFUSER FINISH COMMENTS
L1 4' STRIP LED ELECTRONIC 35 120/277V METALUX, OR APPROVED EQUAL 4SNX-51SL-LW-UNV-L840-CD FROSTED HIGH-IMPACT DIFFUSER WHITE -
L2 4' STRIP LED ELECTRONIC 42 120/277V METALUX, OR APPROVED EQUAL 4SNX-60SL-LW-UNV-L840-CD FROSTED HIGH-IMPACT DIFFUSER WHITE -
L3 4' STRIP LED ELECTRONIC 32.1 120/277V METALUX, OR APPROVED EQUAL 4SNX-48SL-LW-UNV-L840-CD FROSTED HIGH-IMPACT DIFFUSER WHITE -
L4 4' STRIP LED ELECTRONIC 47.9 120/277V METALUX, OR APPROVED EQUAL 4SNX-67SL-LW-UNV-L840-CD FROSTED HIGH-IMPACT DIFFUSER WHITE -
L5 4' STRIP LED ELECTRONIC 39.7 120/277V METALUX, OR APPROVED EQUAL 4SNX-57SL-LW-UNV-L840-CD FROSTED HIGH-IMPACT DIFFUSER WHITE -
L6 2' X 4' TROFFER LED ELECTRONIC 22.6 120/277V METALUX, OR APPROVED EQUAL BAA-24SR-LD2-39-C-UNV-L835-CDI-U INDIRECT/DIRECT WHITE
PROVIDE WITH GRID CEILING OR GYPSUM
MOUNTING HARDWARE AS REQUIRED.
LUMINAIRE SCHEDULE
1. REFER TO TR ROOM LUMINAIRE MOUNTING SCHEDULE ON SHEET EP704 FOR LUMINAIRE MOUNTING INFORMATION.
GENERAL NOTES:
Building No.
Drawing Number
Project Number
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Title
ARCHITECT/ENGINEERS:STAMP:CONSULTANTS:
321 4 5 6 7 8 9 10
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
WWW.DAVENERGY.COM
Floor No.
th re e i n c h e s o n e fo o t o n e i n c h o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t th re e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th i n c h o n e fo o t DateRevisions:
05/24/2024100% ISSUED FOR BID
A/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
Department of Veteran Affairs
EP702
ELECTRICAL SCHEDULES
JACK C MONTGOMERY VAMC
05/24/2024 WNM/SJM RTS/BCL
EHRM INFRASTRUCTURE UPGRADES -
JACK C. MONTGOMERY VA MEDICAL
CENTER
623-21-700
1011 HONOR HEIGHTS DR. MUSKOGEE, OK 74401
Dwg. 67 of 77
BUILDING EQUIPMENT NAME
EQUIPMENT
VOLTAGE (V) EQUIPMENT PHASE
EQUIPMENT AMP
RATING (A)
MAIN DISCONNECT
AMP RATING (A) METERING DATE
METERED
DEMAND (kW) PF ADJUST
SEASONAL
ADJUSTMENT
FACTOR
NEC DEMAND
FACTOR
DEMAND Kva
(w/ NEC
FACTOR)
ADDED
LOAD
(kVA)
REMOVED
TR LOAD
(kVA)
(NOTE 7)
TOTAL
DEMAND
LOAD (kVA)
TOTAL
DEMAND
AMPERAGE
TOTAL LOAD <= 80% OF
EQUIPMENT RATING NOTES
FSG 208 3PH 1000 1000 January 17, 2024 102.57 0.9 1 1.25 142.46 139.9 -65.0 217.4 603.3 YES 1
ASG 208 3PH 1000 1000 January 17, 2024 168.03 0.9 1 1.25 233.37 139.9 -65.0 308.3 855.7 YES 1
I 480 3PH 2000 2000 April 19, 2023 228.00 0.9 1 1.25 316.67 190.6 -65.0 442.3 532.0 YES 2
ABEQ 208 3PH 600 - January 8, 2024 47.45 0.9 1 1.25 65.90 37.7 -10.0 93.6 259.8 YES -
S1HA 480 3PH 600 600 March 20, 2024 187.06 0.9 1 1.25 259.81 190.6 -65.0 385.4 463.6 YES 3
18MDP 208 3PH 1200 1200 January 16, 2024 85.13 0.9 1 1.25 118.24 11.4 -5.0 124.6 346.0 YES 2
18EQDP 208 3PH 800 800 August 25, 2022 51.88 0.9 1 1.25 72.05 19.3 -5.0 86.4 239.7 YES 4
22 MSB22 208 3PH 400 400 January 17, 2024 63.59 0.9 1 1.25 88.32 23.4 -10.0 101.7 282.3 YES 2
24MDP 208 3PH 800 - January 12, 2024 78.18 0.9 1 1.25 108.58 29.8 -12.5 125.9 349.4 YES 2
24BE 208 3PH 400 300 January 9, 2024 53.86 0.9 1 1.25 74.81 49.2 -12.5 111.5 309.5 YES 2
SUBSTATION 1 480 3PH 1200 1200 April 17, 2024 329.23 0.9 1 1.25 457.26 60.2 -12.0 505.46 608.0 YES -
ATS-ECB 480 3PH 225 800 March 30,2024 281.01 0.9 1 1.25 390.29 46.7 -12.0 425.0 511.2 YES 5
DP-1 480 3PH 800 - April 19, 2023 198.00 0.9 1 1.25 275.00 139.8 -47.5 367.3 441.8 YES 6
MDB-EC 480 3PH 800 - January 17, 2024 39.91 0.9 1 1.25 55.4 102.8 -47.5 110.7 133.2 YES -
7. TELECOM RACKS DE-RATED FROM 5000VA TO 2500VA PER VA WHITE PAPER "POWER CAPACITY PLANNING FOR TRS" (JULY 2021).
EQUIPMENT METERING AND LOAD INFORMATION SCHEDULE
NOTES:
1. MAIN CIRCUIT BREAKER IS 100% FULLY RATED SO IS EVALUATED AS "TOTAL LOAD <= 100% EQUIPMENT RATING".
2. DATA OBTAINED FROM INTEGRAL EQUIPMENT METER ON SWITCHBOARD "I".
4. PEAK DEMAND DATA FOR GENERATOR 18 UTILIZED FOR DEMAND DATA ON INDIVIDUAL DISTRIBUTION PANEL "18EQDP".
5. DATA OBTAINED FROM INTEGRAL EQUIPMENT METER ON SUBSTATION 6 FEEDING EQUIPMENT ATS-ECB. NOTE THAT "TOTAL LOAD <= 80% OF EQUIPMENT RATING" COLUMN IS BASED OFF THE "MAIN DISCONNECT AMP RATING (A)" COLUMN AND REPLACEMENT ATS-ECB INDICATED ON ONE-LINE DIAGRAM SHEETS 52EP602 AND 52EP612.
6. DATA OBTAINED FROM INTEGRAL EQUIPMENT METER ON SUBSTATION 7 FEEDING EQUIPMENT DP-1.
3. DATA OBTAINED FROM INTEGRAL EQUIPMENT METER ON SWITCHBOARD "I" FEEDING EQUIPMENT ATS-S1A.
GENERATOR NAME
GENERATOR
RATING (KW)
PARALLEL
RATING (KW)
TEST REPORT
DATE
PEAK
RECORDED
DEMAND (kW)
SEASONAL
ADJUSTMENT
FACTOR
NEC
DEMAND
FACTOR
DEMAND
Kw (w/
NEC
FACTOR)
ADDED
LOAD
(kW)
REMOVED
TR LOAD
(kVA)
(NOTE 6)
TOTAL
DEMAND
LOAD (kW)
ESTIMATED GENERATOR
PERCENT LOADING (%) NOTES
Generator 18 225 - Aug-22 51.88 1 1.25 64.85 19.3 -5.0 79.15 35.2% 1
Generator 46A 350
Generator 46B 350
Generator 56-1 750
Generator 56-2 750
6. TELECOM RACKS DE-RATED FROM 2500VA PER VA WHITE PAPER "POWER CAPACITY PLANNING FOR TRS" (JULY 2021).
2, 3, 4
1500 Aug-22 655.13 1 -
156.72 86.9 221.12 31.6%
2, 4, 5-124.5
-22.5
5. ADDED LOAD IS COMPRISED OF BUILDINGS: 1, 52, AND 53.
4. GENERATORS ARE EMERGENCY STANDBY RATED AND PROVIDED POWER TO THE ESSENTIAL ELECTRICAL SYSTEM (EES). PER NEC 517.31.D, ADDITIONAL 25% DEMAND FACTOR IS NOT APPLIED TO DETERMINE
MAXIMUM ACTUAL DEMAND SEEN BY GENERATORS.
925.30 61.7%
1 -
GENERATOR CAPACITY AND LOAD INFORMATION SCHEDULE
NOTES:
1. ADDED LOAD IS COMPRISED OF BUILDINGS: 11 AND 18
2. GENERATORS POWER A COMMON BUS ALLOWING PARALLEL OPERATION. THE COMBINED CAPACITY OF EACH GENERATOR IS USED TO EVALUATE ADDED EHRM LOAD IN PARALLEL OPERATION. THE PEAK DEMAND OF
EACH GENERATOR FROM THE GENERATOR MONTHLY TEST REPORT DATE OF WAS USED FOR ANALYSIS.
3. ADDED LOAD IS COMPRISED OF BUILDINGS: 22, 24
700 Nov-22 156.72