ATTACHMENT 10 - 852.219-75 SIGNATURE PAGE.pdf

VAAR Clause PDF 185 KB Posted

Attached to
Y1AB--657A5-21-702 EHRM Training and Admin Space Support Construction - Marion, IL VAMC
Solicitation number
36C77623B0060
Issued by

About this file

This document is a signature page for a limitations on subcontracting certification related to federal contract opportunity 36C77623B0060 for EHRM Training and Admin Space Support Construction services at the Marion, IL Veterans Affairs Medical Center. Smith Hafeli, Inc. certified that if awarded the contract, it will comply with limitations on subcontracting and that the signee is authorized to execute the certification on behalf of the company. The signature and certification were provided by Aaron R. Smith as Vice President of Smith Hafeli, Inc. on August 17, 2023. The opportunity is an award notice from the Department of Veterans Affairs Technology Acquisition Center Austin for construction services at the named location.

View the file

Other versions and copies of VAAR 852.219-75

File Revision Posted Attached to
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx Jan 2023 Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx Jan 2023 Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT
VAAR 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction.docx Revision not stated Radiant Heating Panel Replacement
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated F108--620-26-206 Asbestos Abatement
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated Z2NZ--Manhole Repairs at Montrose VAMC
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--528A5-27-504 Seal and Stripe Parking Lots
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--528A5-27-504 Seal and Stripe Parking Lots
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC
S02 852.219-75 Limitation on Subcontracting.pdf Revision not stated Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B
S06 0001 36C25227R0001 Att9_S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx Revision not stated Z2DA--FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 550-25-108, Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville IL.
Attachment II - VAAR 852.219-75.pdf Revision not stated H941--Chemical Hoods & HEPA PM
FAR 852.219-75-Limitation on Subcontracting.pdf Revision not stated W038--Rental & Support Services for Wheeled Loaders w/3yard bucket
VAAR 852.219-75 VA Notice of Limitations on Subcontracting_Certificate.docx Revision not stated R706--FCC Medical Cache Maintenance
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated Z2DA--561-26-104 Repair Operating Room (OR) & Bathroom Leaks
852.219-75 VA NOTICE OF LIMIT ON SUBCONTRACTING.pdf Revision not stated J012-- Fire Alarm Suppression Maintenance & Repair Services
REVISED 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx Revision not stated 657-24-111JC FCA-Renovate Ambassador Suite & Main Lobby B1
S02 Atch E VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance - 2 pages.pdf Revision not stated Replace Operating Room 5 Flooring
Attachment 2 - VAAR 852.219-75.pdf Revision not stated Y1DA | 521-24-102 | Renovate Wards 2K and 2B for Optometry/Ophthalmology Clinical Use
S02 - ATT E - VAAR 852.219-75_REQUIRED.pdf Revision not stated Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295
VAAR 852.219-75 corrected.docx Revision not stated Z1DA--VANJHCS Demolition and Abatement IDIQ East Orange and Lyons
Show all 20

Who attaches VAAR 852.219-75

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

Certification:

I hereby certify that if awarded the contract, Smith Hafeli, Inc. will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of Smith Hafeli, Inc.

Printed Name of Signee: ___________________________________

Printed Title of Signee: ____________________________________

Signature: ____________________________

Date: ____________

Company Name and Address:

Aaron R. Smith

Vice President

August 17, 2023

Smith Hafeli, Inc.

1825 W. Main St.

Marion, IL 62959

File details come from the government source that posted it. Updated .