ATTACHMENT 2 - FINAL DRAWINGS - EHRM TASS MARION IL - V2 - 07-11-2023.pdf

PDF 18 MB Posted

Attached to
Y1AB--657A5-21-702 EHRM Training and Admin Space Support Construction - Marion, IL VAMC Federal contract opportunity
Solicitation number
36C77623B0060
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This file attachment relates to a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0060 for the EHRM Training and Admin Space Support Construction project at the Marion, Illinois Veterans Affairs Medical Center. The opportunity is for construction and related services to support expansion and renovations of existing training and administrative spaces. The 18MB PDF file contains final construction drawings for the project. Proposals were due by July 11, 2023, and award is anticipated to be made shortly thereafter to allow for work to commence in late 2023 or early 2024.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION

GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)

(HTTP://WWW.CFM.VA.GOV/TIL/).

• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• NFPA 70 NATIONAL ELECTRIC CODE

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR

STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS

SECTION 011000 OF THE VA MASTER CONSTRUCTION SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2022.

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2022.

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.).

VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW

DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY

CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS

REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY

(THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

1. BID ITEM 1 - GENERAL CONSTRUCTION: WORK INCLUDES GENERAL CONSTRUCTION, ALTERATIONS, WALKS, GRADING, DRAINAGE, NECESSARY REMOVAL OF EXISTING STRUCTURES AND CONSTRUCTION AND CERTAIN OTHER ITEMS. PERIOD OF PERFORMANCE IS 12 MONTHS.

2. BID ITEM 2 - ALL WORK IN BID ITEM I EXCEPT ALL ITEMS ASSOCIATED WITH THE CANOPY COVERING THE SIDEWALK. PERIOD OF PERFORMANCE IS 12

MONTHS.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/1

/2

:2

:3

P M

C U s e rs \l b y rd

\D o c u m e n ts

\A

-2

-V A

M a ri o n -E

H R

M lb y rd

V D

E K

F .r v t

G-001

COVER

1 4LBB

EHRM – TRAINING AND

ADMIN SPACE SUPPORT

MARION VAMC

2401 W. MAIN ST.

MARION, IL 62959 MAY 4, 2023

BID DOCUMENTS

657A5-21-70221-221

EHRM – TRAINING AND ADMIN SPACE SUPPORT

MARION VAMC

2401 W. MAIN ST.

MARION, IL 62959

VA PROJECT #: 657A5-21-702

JAB

CODE STANDARDS AND EXECUTIVE ORDERS

DRAWING LIST

GENERAL

G-001 COVER 1 4

G-002 GENERAL INFORMATION 2 4

G-003 ICRA INFORMATION AND DETAILS 3 4

LS100 BASEMENT FLOOR OVERALL LIFE SAFETY PLAN 4 4

CIVIL

CD101 DEMOLITION PLAN 1 4

CG101 GRADING & DRAINAGE AND UTILITY PLAN 2 4

CG102 UTILITY PROFILES 3 4

CS501 CONSTRUCTION DETAILS 4 4

STRUCTURAL

S-001 GENERAL NOTES 1 4

S-100 FOUNDATION PLAN 2 4

S-300 CONCRETE DETAILS 3 4

S-301 CONCRETE TUNNEL DETAILS 4 4

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 10

A-002 SITE PLAN AND TEMPORARY CONDITIONS PLAN 2 10

AD100 EXIST. CONDITIONS, BASEMENT FLOOR DEMO. PLAN AND REFLECTED CEILING DEMO. PLAN 3 10

A-100 BASEMENT FLOOR PLAN AND REFLECTED CEILING PLAN 4 10

A-200 BUILDING ELEVATIONS AND SECTIONS 5 10

A-300 WALL SECTIONS 6 10

A-400 DETAILS 7 10

A-401 CANOPY DETAILS 8 10

A-501 PARTITION TYPES 9 10

A-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 10 10

INTERIORS

I-001 GENERAL NOTES, ABBREVIATIONS AND ROOM FINISH SCHEDULE 1 5

I-101 BASEMENT FINISH, WALL PROTECTION, AND SIGNAGE PLAN AND FLOOR PATTERN PLAN 2 5

I-201 CASEWORK AND WALL PROTECTION ELEVATIONS AND DETAILS 3 5

I-411 BASEMENT OVERALL EQUIPMENT PLAN AND ENLARGED BASEMENT EQUIPMENT PLAN 4 5

I-431 ENLARGED TOILET PLANS, EQUIPMENT ELEVATIONS, AND EQUIPMENT SCHEDULES 5 5

FIRE SUPPRESSION

FX001 FIRE SUPRESSION GENERAL INFORMATION 1 2

FX101 BASEMENT FLOOR FIRE PROTECTION PLANS 2 2

MECHANICAL

MP001 MECHANICAL GENERAL INFORMATION 1 8

MP002 PLUMBING GENERAL INFORMATION 2 8

MD101 BASEMENT FLOOR MECHANICAL AND PLUMBING DEMOLITION PLANS 3 8

MP101 BASEMENT FLOOR MECHANICAL AND PLUMBING PLANS 4 8

MP401 ENLARGED MECHANICAL AND PLUMBING PLANS AND SECTIONS 5 8

M-501 MECHANICAL AND PLUMBING DETAILS 6 8

M-502 MECHANICAL CONTROLS 7 8

M-601 MECHANICAL SCHEDULES 8 8

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 10

ED101 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN 2 10

EL101 BASEMENT FLOOR LIGHTING PLAN 3 10

EM101 BASEMENT AND GROUND FLOOR MECHANICAL POWER PLANS 4 10

EP101 BASEMENT AND GROUND FLOOR POWER PLANS AND ENLARGED TR 108 POWER ENLARGEMENT 5 10

E-501 ELECTRICAL DETAILS 6 10

E-502 ELECTRICAL DETAILS 7 10

E-503 ELECTRICAL DETAILS 8 10

E-601 PARTIAL ELECTRICAL SINGLE LINES 9 10

E-602 ELECTRICAL SCHEDULES 10 10

TECHNOLOGY

T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 5

T-101 BASEMENT FLOOR TECHNOLOGY PLAN AND ENLARGEMENTS 2 5

T-501 TECHNOLOGY DETAILS 3 5

T-502 TECHNOLOGY DETAILS 4 5

T-601 FIBER RISER DIAGRAM, FIBER ROUTING PLAN, AND AREA OF REFUGE CABLE ROUTING PLANS 5 5

FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 2

FA101 BASEMENT FLOOR FIRE ALARM PLAN 2 2

SITE

PROJECT

SITE

BID ALTERNATES

DocuSign Envelope ID: 47A8321A-92F4-4BC5-8644-4BB9F0E65A1C

5/1/2023

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

LEVER OPERATING

CONTROLLED

SOAP DISPENSER

NOTE: SINKS IN COUNTERS TO BE

MOUNTED WITH RIM NO MORE

THAN 2'-10" HIGH AND WITH AT

LEAST 2'-3" KNEE CLEARANCE.

TYPICAL ACCESSIBLE

CLEARANCE AT LAVATORY

TYPICAL ACCESSIBLE

LAVATORY AND MIRROR

M

IN

M A

X

M

A X6

A

.F .F

M

IN

M

IN

M A

X

17" MIN

FIRE ALARM

CHIME WITH

VISUAL

ALARM LIGHT

FIRE ALARM

PULL STATION

FIRE ALARM

ANNUNCIATOR

FIRE ALARM

DOUBLE DRINKING

FOUNTAIN WITH BOTTLE

FILLER

WHEELCHAIR ACCESSIBLE

(CANTILEVERED STYLE)

17" - 19"

8" MIN

9" MIN

6" MAX

M

IN

T O

P O

F S

P O

U T

' M

A X

T O

B O

T T

O M

O F

R

E F

L E

C T

IV

S

U R

F A

C E

O F

M

IR

R

O R

4'-0" MAX TO

HIGHEST OPERABLE

POINT - IF FIRE

EXTINGUISHER

OVER 40 LBS

3'-6" MAX HT.

FIRE EXTINGUISHER

CABINET

ELECTRICAL CABINET

DUPLEX

OUTLET

SWITCH

THERMOSTAT

TELEPHONE

OR DATA

OUTLET

FIRE ALARM

PULL

INTERCOM

STATION

DUPLEX

OUTLET

COMPUTER

TERMINAL

MISC. WALL DEVICES

CLOCKCLOCK OUTLET

TELEVISION

OUTLET

WALL MOUNTED TVCLOCK

S T

A N

D

IN

G

O

.C

MOP BASIN

MOP SHELF

TYPICAL JANITORS CLOSET

PAPER TOWEL

DISPENSER

2'-0" AT SIDEWALLS

AT COUNTER SINKS

1'-6" AT SIDEWALLS

AT LAVATORY

BLOCKING

1-1/2"

DIAMETER

GRAB BAR

TOILET

TISSUE

DISPENSER

SANITARY

NAPKIN

DISPOSAL

TOILET

FIXTURE

TOILET

FIXTURE

TOILET

TISSUE

DISPENSER

1-1/2"

DIAMETER

GRAB BAR

ACCESSIBLE TOILET

1'-6"

5'-0" CLEAR

3'-0" 6"

3'-0"

" 3

1'-0" 3'-6"

2'-4"

5'-0" CLEAR

/4

GARMET HOOK

(1 PER RESTROOM

74.5" W

.1

T

(2) 85" TV

N.I.C.

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO

PARTICIPATE IN VOLUNTARY STANDARD BODIES.

GENERAL - BASED ON THE VA PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES, THIS PROJECT HAS BEEN DESIGNED TO, AND CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING CODES AND GUIDELINES:

(AS OF EFFECTIVE PROJECT DESIGN CONTRACT DATE, 09/07/2022)

1. VA Sustainable Design Manual, August 2017

2. VA Parking Design Manual, November 2016

3. VA Site Development Design Manual February 2013

4. VA VHA Directive 1061, February 2021

5. VA Fire Protection Design Manual, 2021

6. VA Plumbing Design Manual, May 2021

7. VA HVAC Design Manual, March 2022

8. VA Physical Security and Resiliency Design Manual, 2020

9. VA Lighting Design Manual, December 2022

10. VA Electrical Design Manual, December 2019

11. VA Interior Design Manual, November 2020

12. VA Office of Information & Technology Design Guide, February 2019

13. VA Infrastructure Standard for Telecommunications Spaces, v3.1, July 2021

14. PG 18-13 VA Barrier Free Design Standard, February 2022

15. PG 18-4 VA Standard Details and Specifications

16. NFPA 101, Life Safety Code, 2021

17. NFPA 99, Health Care Facilities Code, 2021

18. NFPA 90A, Installation of Air Conditioning and Ventilating Systems, 2021

19. NFPA 72, National Fire Alarm Code, 2019

20. NFPA 70, National Electrical Code, 2020

21. NFPA 13, Installation of Sprinkler Systems, 2019

22. ADA Standards for Accessible Design 2010,

23. ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES 2017 OF ILLINOIS

24. International Building Code, 2021

25. International Mechanical Code, 2021

26. International Plumbing Code, 2015

27. International Fuel Gas Code, 2021

28. Illuminating Engineering Society (IES) Lighting Handbook, 10th Edition

29. Facilities Guidelines Institute: Guidelines for the Design and Construction of Hospitals 2022

30. ASME B31.9, Building Services Piping

31. ASHRAE Standard 170, Ventilation for Health Care Facilities, 2021

32. ASHRAE Handbooks, 2017 Fundamentals, 2019 HVAC Applications, 2020 HVAC Systems and Equipment

33. ASHRAE 90.1 – 2019 Energy Standard for Buildings Except Low-Rise Residential Buildings

34. SMACNA, HVAC Duct Construction Standards, Metal and Flexible

35. SMACNA, HVAC Air Duct Leakage Test Manual

36. ANSI/TIA/EIA 568-2019 Commercial Building Cabling Standards

37. ANSI/TIA/EIA 569-C-2015 Commercial Building Standards for Telecommunications Pathways and Spaces

38. ANSI/TIA-1179-2017, Telecommunications Spaces for Healthcare Facilities

39. BICSI, Telecommunications Distribution Methods Manual, 2014

40. Federal Information Processing Standards-FIBS-201-1: Personal Identity Verification (PIV) of Federal Employees and Contractors

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION

FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY

HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:5

:5

P

M C

U s e rs \l b y rd

\D o c u m e n ts

\A

-2

-V A

M a ri o n -E

H R

M lb y rd

V D

E K

F .r v t

G-002

GENERAL INFORMATION

2 4LBB

EHRM – TRAINING AND

ADMIN SPACE SUPPORT

MARION VAMC

2401 W. MAIN ST.

MARION, IL 62959 MAY 4, 2023

BID DOCUMENTS

657A5-21-70221-221

JAB

GENERAL SYMBOL LEGEND

Scale: 3/8" = 1'-0"

STANDARD MOUNTING HEIGHTS

PROJECT REFERENCE CODES

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

5"

5/8" GYPSUM BOARD - BOTH

SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

/2

5"

3 5/8" 16 GAUGE METAL

STUDS @ 16" O.C. WALL TO

EXTEND TO UNDERSIDE OF

DECK

A B

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. (2) LAYERS 5/8"

GYPSUM BOARD EACH SIDE.

WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

6 1/4"

C

FIRE RESISTANT SEALANT,

BOTH SIDES

FIRE RESISTANT SEALANT,

BOTH SIDES

SEALANT, BOTH SIDES

1-HR RATED

U.L. DESIGN NO. U419

NON RATED 2-HR RATED

U.L. DESIGN NO. U419

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY MATS

(CHANGED END OF

SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

ISOLATE AND COVER ALL

SUPPLY DIFFUSERS NOT

IN OPERATION DURING

PROJECT - COORDINATE

W/ COR

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL STATION

WITH AUDIO /

VISUAL

EXISTING WALL

BARRIER

NOTE:

A. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL

VERIFY LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE

FROM EXHAUST. VERIFY LOCAL JURISDICATION CODE AND VA

REQUIREMENTS FOR DISTANCE PRIOR TO STARTING WORK.

EXHAUST LOCATION

(SOUTH EXTERIOR DOOR)

- SEE NOTE A

G-003

FLEX DUCT

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

[MARION EHRM - TRAINING AND ADMIN SPACE SUPPORT]

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS

PROJECT IS LEVEL III FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL

ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON

THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK

AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.

2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE

A STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES -

CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA

AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE

MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL

BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON

COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED

CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE

TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.

[AFTER EACH PHASE, PERFORM TASKS STATED IN CONTAMINATION OF PATIENT ROOMS,

SUPPLIES, EQUIPMENT AND RELATED AREAS NOTE 2.

3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE SPACES

(CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT

THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.

4. DO NOT DEMOLISH THE EXIST. INNER TUNNEL WALL UNTIL ABSOLUTELY REQUIRED TO

MINIMIZE DUST AND DEBRIS FROM ENTERING THE EXISTING TUNNEL/WALKWAY.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

1. USE NORTH EXTERIOR DOOR AS PRIMARY CONSTRUCTION ACCESS.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS

PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING

SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER

THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE

CONSTRUCTION AREA AND MATERIALS.

3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT

OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED

BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.

4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF

ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE

USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED

NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN

NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF

THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-

CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.

5. EXTERIOR DOORS: DOORS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY

ADJACENT EXCAVATION DEBRIS.

VENTILATION AND ENVIRONMENTAL CONTROLS

1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE

CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE

ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR

MUST FLOW FROM CLEAN TO DIRTY AREAS.

2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE

WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF

ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE

TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER

CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-

CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST

TO PREVENT CONTAMINATION OF THE DUCTS.

3. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE

VERIFIED DAILY.

4. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL

VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY

AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE

CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE

PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.

CONTAMINATION OF CORRIDORS, SUPPLIES, EQUIPMENT AND RELATED AREAS

1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL

AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT

WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE

USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE

APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR

CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT,

TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE

MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR

REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL

CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL

CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE

CLEANING.

ICRA NOTES

IIILOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework or other building components.

• New drywall placement.

• Renovation work in a single room.

• Nonexisting cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

• Physical Therapy

• Radiology departments

• All patient waiting rooms

• All outpatient clinics

• Research Areas

• Respiratory Therapy

• Office areas (non-clinical)

• FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

• Emergency Room

• Clinical Laboratories (specimen)

• Same Day Surgery

• Pharmacy

• Nutrition and Food

Service/Canteen

• Procedural Areas (GI)

• Inpatient Mental Health

• Any area caring for immunocompromised patients

• Cardiac Cath Lab/IR

• Central Sterile Supply

• Sterile Processing Service

• Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IV or control procedures are necessary.

C

LA

S S

IV

During Construction Project Upon Completion of Project

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

14. Contain all trash and debris in the work area.

15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

16. Worker clothing must be clean and free of visible dust before leaving the work area.

HEPA vacuuming of clothing or use of cover suites is acceptable.

17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

• Medical/Surgical Units

• Negative pressure isolation rooms

• Outpatient Chemotherapy

Areas

• Operating rooms

• Post Anesthesia Care Unit

• Dialysis

• Dental

C

LA

S S

V

1. Includes all activities required by Class IV

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

7. Personnel will be required to wear coveralls at all times during Class V work activities.

Coveralls must be removed before leaving the anteroom.

8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

15. Contain all trash and debris in the work area.

16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).

Damaged shoe covers must be immediately changed.

19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project

C

LA

S S

I

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activities in areas that are not directly occupied with patients.

4. Perform noninvasive work activity in a manner that does not create dust.

5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

C

LA

S S

II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Includes all activities required by Class I

2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

4. This Class of Precautions must never be used for construction or renovation activities.

5. Provide active means to prevent airborne dust from dispersing into atmosphere.

6. Water mist work surfaces to control dust while cutting.

7. Seal unused doors with duct tape.

8. Block off and seal air vents.

9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:

1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.

2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.

4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

C

LA

S S

II

I

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Provide active means to prevent airborne dust dispersion into the occupied areas.

4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

7. If work area is contained, then it must be neutrally to negatively pressurized at all times.

8. Seal all doors with tape that will not leave residue.

9. Contain all trash and debris in the work area.

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.

For Type C activities, follow procedures for Class IV.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

A

.F .F

A P

P R

O X

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

PLASTIC

WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L

H

IG

H T

HEPA NEGATIVE

AIR UNIT

EXISTING

WALL

EXISTING

CEILING

FLEX DUCT

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:5

:5

P

M C

U s e rs \l b y rd

\D o c u m e n ts

\A

-2

-V A

M a ri o n -E

H R

M lb y rd

V D

E K

F .r v t

G-003

ICRA INFORMATION AND DETAILS

3 4LBB

EHRM – TRAINING AND

ADMIN SPACE SUPPORT

MARION VAMC

2401 W. MAIN ST.

MARION, IL 62959 MAY 4, 2023

BID DOCUMENTS

657A5-21-70221-221

JAB

Scale: 3/4" = 1'-0"

ICRA BARRIER WALL TYPE1

Scale: 1/4" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE1

Scale: 1/4" = 1'-0"

ICRA ROOM ELEVATION

Scale: 1/4" = 1'-0"

ICRA MOBILE CONTAINMENT CART

DN

EGRESS PATH

EGRESS PATH TAG

EGRESS PATH TAG - COMMON PATH

EGRESS IDENTIFICATION

AREA OF REFUGE

HAZARDOUS LOCATION

CA

DE

KB

XXX

XXX

FEB

FEC

FBC

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS CAPACITY

FIRE EXTINGUISHER BRACKET

FIRE EXTINGUISHER CABINET

FIRE BLANKET CABINET

EMERGENCY RESPONSE REFERENCE

CONTROLLED ACCESS - ALWAYS

UNLOCKED IN DIRECTION OF EGRESS

KNOX BOX

DELAYED EGRESS W/ ALARM

AREA OF REFUGE 30" X 48"

A

2 3 4 5 6

B

2.1

A.2

A.6

14.8

14.5

12.1

10.1

8.1

Y.01 Z.5 Z.8Z.3Y.8 Z.1Y.5

ECSB002

TUNNEL

ACCESS

ECSB003

EXISTING

TUNNEL

UNFINISHED

BASEMENT

ESB005

TEMPORARY

CORRIDOR

CAPACITYCLR

EXIT

68" 340

CAPACITYCLR

EXIT

34" 170

A

B

EXISTING RAMP DOWN

EXISTING TUNNEL TO BLDG 43

BLDG

CAPACITYCLR

EXIT

34" 170

OCCUPANCY: 49

TRAINING

ROOM

STAIR

A/V

STORAGE

STORAGE

WOMEN

RR

MEN RR

T.R.

ELEC

MECH

RM.

HALL

BREAK

SUITE

FOYER

TUNNEL

ACCESS

HAC

107A

TUNNEL

AREA OF REFUGE

30" X 48"

76' D

IA

G

IO

N A L D

IS

T A N

C E

25'-4'' - 1/3 D

IA

G

IO

N

A L D

IS

T A

N C

E

FEC

FEC

B

2.5

ECSB005

UP

UP

CAPACITYCLR

EXIT

34" 170

TELEPHONE TO

SECURITY OFFICE

OR FD

CAPACITYCLR

EXIT

68" 340

F.D. F.D.

SUMP

PUMP

EXISTING SIDEWALK

CANOPY ABOVE

GC TO APPLY SPRAY ON

FIREPROOFING TO THE

UNDERSIDE OF THE

STRUCTURE IN THE TUNNEL

ACCESS SPACE TO OBTAIN

A 2 HR HORIZ. FIRE RATING.

8'-11 1/2"

EJ

EJ

CJ, TYP.

AREA NOT IN SCOPE

TEMPORARY TUNNEL, TO

BE REMOVED

TUNNEL ACCESS

A. SEE SHEET A-001 FOR SYMBOLS AND

ABBREVIATIONS.

B. REFER TO PLUMBING DRAWINGS FOR

INFORMATION CONCERNING PLUMBING FIXTURES

AND PIPING SYSTEM(S).

C. REFER TO MECHANICAL DRAWINGS FOR

INFORMATION CONCERNING HVAC SYSTEM(S).

D. REFER TO ELECTRICAL DRAWINGS FOR

INFORMATION CONCERNING POWER, LIGHTING

AND TELECOMMUNICATION SYSTEM(S).

E. REFER TO FIRE ALARM DRAWINGS AND (E)

ELECTRICAL DRAWINGS FOR FIRE ALARM

NOTIFICATION AND EMERGENCY EGRESS

LIGHTING LOCATIONS.

F. REFER TO PARTITION TYPES FOR FURTHER FIRE

SEPARATION REQUIREMENTS.

G. CONTRACTOR TO PROVIDE ALL ADDITIONAL

FRAMING NECESSARY FOR ALL OPENINGS AND

SUPPLEMENTAL FRAMING ABOVE PARTITIONS.

H. ALL FIRE RATED ASSEMBLIES SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH

TESTED ASSEMBLIES INDICATED.

I. EXTEND FIRE RATED PARTITIONS, BARRIERS,

AND OTHER SEPARATIONS TO BOTTOM OF

ROOF/FLOOR DECK ABOVE (OR AS DIRECTED BY

UL ASSEMBLY) AND TO EXTERIOR WALL. SEAL

JOINT BETWEEN EDGES OF PARTITION WITH FIRE

RATED SEALANT AND/OR INTUMESCENT

ASSEMBLY.

J. ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES

SHALL BE FIRE-SEALED IN ACCORDANCE WITH

APPROVED MANUFACTURER'S DETAIL FOR

LOCATION, TYPE OF CONSTRUCTION,

PENETRATING ITEM AND RATING REQUIRED.

K. ALL DUCTWORK, DIFFUSERS AND GRILLES

PENETRATING FIRE-RATED WALLS, CEILINGS AND

FLOORS SHALL HAVE THE APPROPRIATE TYPE OF

FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE

TYPE OF CONSTRUCTION BEING PENETRATED

AND THE FIRE/SMOKE RATING REQUIRED.

L. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES

PENETRATING FIRE-RATED ASSEMBLIES SHALL

BE UL-LISTED FOR INSTALLATION IN THE

ASSEMBLY OR SHALL BE INSTALLED SUCH THAT

THE FIRE-RATING IS NOT COMPROMISED.

M. SMOKE RESISTANT CONSTRUCTION SHALL MEET

THE REQUIREMENTS OF ALL APPLICABLE CODES.

AREA SHALL BE SEPARATED FROM THE

REMAINDER OF THE BUILDING BY

CONSTRUCTION CAPABLE OF RESISTING THE

PASSAGE OF SMOKE. DOORS SHALL BE SELF OR

AUTOMATIC CLOSING. DOORS SHALL NOT HAVE

AIR TRANSFER OPENINGS AND SHALL NOT BE

UNDERCUT IN EXCESS OF CLEARANCE

PERMITTED WITH ACCORDANCE TO NFPA 80.

N. STORAGE OF ANY STORAGE OF ANY MATERIAL,

INCLUDING FLAMMABLE OR COMBUSTIBLE

LIQUIDS, IS TO BE IN COMPLIANCE WITH ALL

APPLICABLE CODES AND AUTHORITIES HAVING

JURISDICTION. STORAGE OF ANY MATERIAL IS

TO BE IN COMPLIANCE WITH ALL APPLICABLE

CODES AND AUTHORITIES HAVING JURISDICTION.

O. GC TO PROVIDE SIGNAGE INDICATING "MAXIMUM

OCCUPANCY OF THIS ROOM SHALL BE 49

OCCUPANTS OR LESS" AND PLACE NEAR

ENTRANCE OF CHAPEL

LIFE SAFETY GENERAL NOTES

PROJECT NAME:EHRM - TRAINING AND ADMIN SPACE SUPPORT

PROJECT ADDRESS: MARION VA MEDICAL CENTER

2401 W. MAIN ST. MARION, IL 62959

OWNER OR AGENT: MARION VAMC

OWNED BY: VAMC

PROPOSED USE: PROVIDE CLASSROOMS AND ADVINISTRATIVE

SPACE FOR EHRM PROJECT.

CODE ENFORCEMENT JURISDICTION: VAMC

APPLICABLE CODES: SEE SHEET G-002.

GENERAL CODE INFORMATION:

CONSTRUCTION TYPE: II (222)

OCCUPANCY: BUSINESS

-RENOVATION (EXISTING BUILDING)

-SPRINKLERED

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2

/2

:5

:0

P

M C

U s e rs \l b y rd

\D o c u m e n ts

\A

-2

-V A

M a ri o n -E

H R

M lb y rd

V D

E K

F .r v t

LS100

BASEMENT FLOOR OVERALL LIFE

SAFETY PLAN

4 4LBB

EHRM – TRAINING AND

ADMIN SPACE SUPPORT

MARION VAMC

2401 W. MAIN ST.

MARION, IL 62959 MAY 4, 2023

BID DOCUMENTS

657A5-21-70221-221

JAB

NORTH

0 4 8 16

LIFE SAFETY LEGEND

Scale: 1/8" = 1'-0"

BASEMENT FLOOR OVERALL LIFE SAFETY PLAN

LEGEND

EGRESS PATH "A"

PATH ID LENGTH

A 54' - 1 13/16"

TOTAL PATH LENGTH 54' - 1 13/16"

EGRESS PATH "B"

PATH ID LENGTH

B 228' - 6 27/32"

TOTAL PATH LENGTH 228' - 6 27/32"

CODE INFORMATION

UG/EUG/E

UG/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

W

W

W

W

WATER SERVICE LINE (QL-D)

WATER SERVICE LINE (QL-D)

W W

W W

W W

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

LOW VOLTAGE ELECTRIC DUCTBANK (QL-B)

LOW VOLTAGE ELECTRIC DUCTBANK (QL-B)

ELECTRIC

MANHOLE

ID# EMH-2

TOP=462.98

ELECTRIC LINE (QL-B)

EL

EC

TR

IC

D U

C

TB

AN

K

(Q L-

B)

ELECTRIC

DUCTBANK

(QL-B)

LOW VOLTAGE

ELECTRIC

DUCTBANK (QL-B)

ABOVE GROUND ELECTRIC BOX

LOW VOLTAGE ELECTRIC (QL-B)

LOW VOLTAGE ELECTRIC (QL-B)

ABOVE GROUND

ELECTRIC BOX

ABOVE GROUND

ELECTRIC BOX

LOW VOLTAGE ELECTRIC (QL-B)

CLEANOUT (QL-D)

CO

CLEANOUT (QL-D)

CO

SS

SS

SS

SS

SANITARY PIPE (QL-D)

ELECTRIC MANHOLE

ID# EMH-1

TOP=467.59

CLEANOUT (QL-D)

CO

CLEANOUT (QL-D)

CO

CLEANOUT (QL-D)

CO

CLEANOUT (QL-D)

CO

UG/EU

G/

EUG/E

ELECTRIC

DUCTBANK (QL-B)

ELECTRIC MANHOLE

ID# EMH-3

TOP=467.36

UG/E

UG/E

EMPTY ELECTRIC

DUCTBANK (QL-C)

SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS

4"CPP (QL-D)4"CPP (QL-D)

UG/E

CONCRETE

RETAINING WALL

DOOR

F.F=468.85

DOOR

F.F=468.88

DOOR

F.F=459.84

DOOR

F.F=459.83

OVERHANG

CANOPY

6"VERT.

CONC.

CURB

CONCRETE H.C. RAMP

C O

N C

. S

ID

EW

AL

K

CONC. SIDEWALK

G R

A V

E L

LA

N

D S

C A

P E

B E

D

CONC. CURB & GUTTER

CONC. STEPS

CONC. C

URB

GUTT

ER

HANDRAIL

EXISTING BUILDING 42

CONC. SIDEWALK

GRAVEL LANDSCAPE BED

GRVL.

6" V

E R

T.

C

O N

C . C

U R

B

CONC. STEPS

CONC. STEPS

CONCRETE

PAVEMENT

CONCRETE

PAVEMENT

ASPHALT

PAVEMENT

CONC. CURB & GUTTER

ASPHALT

PAVEMENT

CONC.

PVMT.

CONC. PAD FOR

ABOVE GROUND

SIGNAGE

PLANTER

PLANTER

MODULAR BLOCK

RETAINING WALL

GRVL.

GRAVEL LANDSCAPE BED

GRAVEL L

ANDSCAPE BED

CONC.

PAVEMENT

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS

CLEANOUT

ID# CO-4

TOP=469.70

DEPTH=462.50

(AT FIRST BEND)

CLEANOUT

ID# CO-5

TOP=469.07

DEPTH=466.77

(AT FIRST BEND)

CLEANOUT

ID# CO-6

TOP=469.13

DEPTH=465.13

(AT FIRST BEND)

ROUND GRATED INLET

ID# RGI-1

TOP=459.81

DEPTH=458.41

(AT FIRST BEND)

ROUND GRATED INLET

ID# RGI-2

TOP=459.79

DEPTH=458.59

(AT FIRST BEND)

8"

PV

C

GRATE INLET

ID#

TOP=467.61

FL=460.36 12"RCP OUT (N)

4"CPP

6"CPP

GRATE INLET

ID# GI-1

TOP=459.84

FL=458.04 12"VCP IN (S)

FL=457.84 12"VCP OUT (NE)

GRATE INLET

ID# GI-3

TOP=459.86

FL=457.26 12"VCP OUT (N)

GRATE INLET

ID# GI-2

TOP=459.20

FL=457.20 12"VCP IN (SW)

FL=457.10 12"VCP OUT (NE)

"V

CP

"V

CP

(Q

L- C)

"V

C P

"V

CP

SANITARY MANHOLE

ID# SMH-3

TOP=460.42

FL=452.72 6"PVC DROP IN (SW)

FL=451.02 8"PVC IN (SE)

FL=450.72 12"HDPE IN (NW)

FL=450.57 12"PVC OUT (E)

SANITARY MANHOLE

ID# SMH-2

TOP=463.20

FL=453.80 12"PVC IN (N)

FL=453.60 12"HDPE OUT (SE)

SANITARY MANHOLE

ID# SMH-1

TOP=462.61

FL=458.81 8"PVC IN (SW)

FL=458.61 6"PVC IN (W)

FL=458.51 12"PVC OUT (S)

SS SS SS SS SS SS SS SS SS

6"

PVC

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS SS SS

SS

SS

SS

SS

SS

SS

"P

V C

"P

V C

12"HDPE

12"HDPE

6"

PVC

8"PVC

12"PVC

6"PVC

SS

SS

4" C

P P

4"CPP

4" C

P P

3"PVC

3"PVC

SUMP PIT

(INSIDE OF BLDG)

ID# SP-1

TOP=454.88

FL=454.00 6"CPP IN (S)

FL=455.20 2"PVC OUT (E)

BTM. OF STRUC.=452.34

(2"PVC OUT TROUGH

TOP OF STRUCTURE)

2"PVC

ELECTRIC MANHOLE

ID# EMH-2

TOP=462.98

POW

PO

W

POW

PO

W

POW

POW

PO

W

POW

POW

PO

W

DECON TANK

ID# DT-1

TOP=468.91

ABOVE GROUND ELECTRIC BOX

ABOVE GROUND 3"PVC

ABOVE GROUND

ELECTRIC BOX

ABOVE GROUND

ELECTRIC BOX

PIPE BECOME ABOVE

GROUND AT THIS

POINT AND CHANGES

TO 3"PVC

SS

SS

(2) 4"PVC

END OF PIPE

FL=461.84 3"PVC

6"PVC

LIGHTED BOLLARD (TYP.)

EXISTING EXPOSED

CONCRETE FOOTINGS

(TO REMAIN)

UG

/C

UG/C

COMMUNICATION MANHOLE

ID# CMH-1

TOP=467.36

UG

/C

UG

/C

CLEANOUT

ID# CO-7

TOP=460.91

DEPTH=458.81

(AT FIRST BEND)

15"CANOPY COLUMN

24"CANOPY COLUMN

EXISTING TUNNEL

F.F.=457.91

EXIS

TIN

G TUNNEL

DOOR

F.F=460.66

CONCRETE RETAINING

WALL

EXISTING TUNNEL

F.F.=457.92

POW

PO

W

POW

PO

W

CLEANOUT

ID# CO-8

TOP=460.47

DEPTH=458.67

(AT FIRST BEND)

SSSSSSSSSSSS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .