ATTACHMENT 2 - FINAL DRAWINGS - EHRM TASS MARION IL - V2 - 07-11-2023.pdf
PDF 18 MB Posted
- Attached to
- Y1AB--657A5-21-702 EHRM Training and Admin Space Support Construction - Marion, IL VAMC Federal contract opportunity
- Solicitation number
- 36C77623B0060
About this file
This file attachment relates to a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0060 for the EHRM Training and Admin Space Support Construction project at the Marion, Illinois Veterans Affairs Medical Center. The opportunity is for construction and related services to support expansion and renovations of existing training and administrative spaces. The 18MB PDF file contains final construction drawings for the project. Proposals were due by July 11, 2023, and award is anticipated to be made shortly thereafter to allow for work to commence in late 2023 or early 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 10 - 852.219-75 SIGNATURE PAGE.pdf | ||
| ATTACHMENT 8 - Hydrant Flow test data.pdf | ||
| ATTACHMENT 3 - SUPPLEMENTAL SPEC DOCUMENTS - EHRM TASS MARION IL - 07-11-2023.pdf | ||
| C03 - Executed Contract 36C77623C0119 - 9-1-2023.pdf | ||
| ATTACHMENT 1 - FINAL SPECIFICATIONS - EHRM TASS MARION IL - V2 - 07-11-2023.pdf | ||
| ATTACHMENT 9 - SPRINKLER ZONE VALVE.pdf | ||
| ATTACHMENT 4 - BRAND NAME JUSTIFICATION.pdf | ||
| ATTACHMENT 7 - Technical Questions Tracking Spreadsheet.pdf | ||
| ATTACHMENT 6 - DAVIS-BACON ACT WAGE DETERMINATION WDIL20220002 MOD 18.pdf | ||
| ATTACHMENT 5 - LIMITATIONS ON SUBCONTRACTING - Signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION
GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
(HTTP://WWW.CFM.VA.GOV/TIL/).
• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• NFPA 70 NATIONAL ELECTRIC CODE
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS
SECTION 011000 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2022.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2022.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.).
VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW
DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY
CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS
REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY
(THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
1. BID ITEM 1 - GENERAL CONSTRUCTION: WORK INCLUDES GENERAL CONSTRUCTION, ALTERATIONS, WALKS, GRADING, DRAINAGE, NECESSARY REMOVAL OF EXISTING STRUCTURES AND CONSTRUCTION AND CERTAIN OTHER ITEMS. PERIOD OF PERFORMANCE IS 12 MONTHS.
2. BID ITEM 2 - ALL WORK IN BID ITEM I EXCEPT ALL ITEMS ASSOCIATED WITH THE CANOPY COVERING THE SIDEWALK. PERIOD OF PERFORMANCE IS 12
MONTHS.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/1
/2
:2
:3
P M
C U s e rs \l b y rd
\D o c u m e n ts
\A
-2
-V A
M a ri o n -E
H R
M lb y rd
V D
E K
F .r v t
G-001
COVER
1 4LBB
EHRM – TRAINING AND
ADMIN SPACE SUPPORT
MARION VAMC
2401 W. MAIN ST.
MARION, IL 62959 MAY 4, 2023
BID DOCUMENTS
657A5-21-70221-221
EHRM – TRAINING AND ADMIN SPACE SUPPORT
MARION VAMC
2401 W. MAIN ST.
MARION, IL 62959
VA PROJECT #: 657A5-21-702
JAB
CODE STANDARDS AND EXECUTIVE ORDERS
DRAWING LIST
GENERAL
G-001 COVER 1 4
G-002 GENERAL INFORMATION 2 4
G-003 ICRA INFORMATION AND DETAILS 3 4
LS100 BASEMENT FLOOR OVERALL LIFE SAFETY PLAN 4 4
CIVIL
CD101 DEMOLITION PLAN 1 4
CG101 GRADING & DRAINAGE AND UTILITY PLAN 2 4
CG102 UTILITY PROFILES 3 4
CS501 CONSTRUCTION DETAILS 4 4
STRUCTURAL
S-001 GENERAL NOTES 1 4
S-100 FOUNDATION PLAN 2 4
S-300 CONCRETE DETAILS 3 4
S-301 CONCRETE TUNNEL DETAILS 4 4
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 10
A-002 SITE PLAN AND TEMPORARY CONDITIONS PLAN 2 10
AD100 EXIST. CONDITIONS, BASEMENT FLOOR DEMO. PLAN AND REFLECTED CEILING DEMO. PLAN 3 10
A-100 BASEMENT FLOOR PLAN AND REFLECTED CEILING PLAN 4 10
A-200 BUILDING ELEVATIONS AND SECTIONS 5 10
A-300 WALL SECTIONS 6 10
A-400 DETAILS 7 10
A-401 CANOPY DETAILS 8 10
A-501 PARTITION TYPES 9 10
A-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 10 10
INTERIORS
I-001 GENERAL NOTES, ABBREVIATIONS AND ROOM FINISH SCHEDULE 1 5
I-101 BASEMENT FINISH, WALL PROTECTION, AND SIGNAGE PLAN AND FLOOR PATTERN PLAN 2 5
I-201 CASEWORK AND WALL PROTECTION ELEVATIONS AND DETAILS 3 5
I-411 BASEMENT OVERALL EQUIPMENT PLAN AND ENLARGED BASEMENT EQUIPMENT PLAN 4 5
I-431 ENLARGED TOILET PLANS, EQUIPMENT ELEVATIONS, AND EQUIPMENT SCHEDULES 5 5
FIRE SUPPRESSION
FX001 FIRE SUPRESSION GENERAL INFORMATION 1 2
FX101 BASEMENT FLOOR FIRE PROTECTION PLANS 2 2
MECHANICAL
MP001 MECHANICAL GENERAL INFORMATION 1 8
MP002 PLUMBING GENERAL INFORMATION 2 8
MD101 BASEMENT FLOOR MECHANICAL AND PLUMBING DEMOLITION PLANS 3 8
MP101 BASEMENT FLOOR MECHANICAL AND PLUMBING PLANS 4 8
MP401 ENLARGED MECHANICAL AND PLUMBING PLANS AND SECTIONS 5 8
M-501 MECHANICAL AND PLUMBING DETAILS 6 8
M-502 MECHANICAL CONTROLS 7 8
M-601 MECHANICAL SCHEDULES 8 8
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 10
ED101 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN 2 10
EL101 BASEMENT FLOOR LIGHTING PLAN 3 10
EM101 BASEMENT AND GROUND FLOOR MECHANICAL POWER PLANS 4 10
EP101 BASEMENT AND GROUND FLOOR POWER PLANS AND ENLARGED TR 108 POWER ENLARGEMENT 5 10
E-501 ELECTRICAL DETAILS 6 10
E-502 ELECTRICAL DETAILS 7 10
E-503 ELECTRICAL DETAILS 8 10
E-601 PARTIAL ELECTRICAL SINGLE LINES 9 10
E-602 ELECTRICAL SCHEDULES 10 10
TECHNOLOGY
T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 5
T-101 BASEMENT FLOOR TECHNOLOGY PLAN AND ENLARGEMENTS 2 5
T-501 TECHNOLOGY DETAILS 3 5
T-502 TECHNOLOGY DETAILS 4 5
T-601 FIBER RISER DIAGRAM, FIBER ROUTING PLAN, AND AREA OF REFUGE CABLE ROUTING PLANS 5 5
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 2
FA101 BASEMENT FLOOR FIRE ALARM PLAN 2 2
SITE
PROJECT
SITE
BID ALTERNATES
DocuSign Envelope ID: 47A8321A-92F4-4BC5-8644-4BB9F0E65A1C
5/1/2023
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
NOTE: SINKS IN COUNTERS TO BE
MOUNTED WITH RIM NO MORE
THAN 2'-10" HIGH AND WITH AT
LEAST 2'-3" KNEE CLEARANCE.
TYPICAL ACCESSIBLE
CLEARANCE AT LAVATORY
TYPICAL ACCESSIBLE
LAVATORY AND MIRROR
M
IN
M A
X
M
A X6
A
.F .F
M
IN
M
IN
M A
X
17" MIN
FIRE ALARM
CHIME WITH
VISUAL
ALARM LIGHT
FIRE ALARM
PULL STATION
FIRE ALARM
ANNUNCIATOR
FIRE ALARM
DOUBLE DRINKING
FOUNTAIN WITH BOTTLE
FILLER
WHEELCHAIR ACCESSIBLE
(CANTILEVERED STYLE)
17" - 19"
8" MIN
9" MIN
6" MAX
M
IN
T O
P O
F S
P O
U T
' M
A X
T O
B O
T T
O M
O F
R
E F
L E
C T
IV
S
U R
F A
C E
O F
M
IR
R
O R
4'-0" MAX TO
HIGHEST OPERABLE
POINT - IF FIRE
EXTINGUISHER
OVER 40 LBS
3'-6" MAX HT.
FIRE EXTINGUISHER
CABINET
ELECTRICAL CABINET
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
MISC. WALL DEVICES
CLOCKCLOCK OUTLET
TELEVISION
OUTLET
WALL MOUNTED TVCLOCK
S T
A N
D
IN
G
O
.C
MOP BASIN
MOP SHELF
TYPICAL JANITORS CLOSET
PAPER TOWEL
DISPENSER
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
BLOCKING
1-1/2"
DIAMETER
GRAB BAR
TOILET
TISSUE
DISPENSER
SANITARY
NAPKIN
DISPOSAL
TOILET
FIXTURE
TOILET
FIXTURE
TOILET
TISSUE
DISPENSER
1-1/2"
DIAMETER
GRAB BAR
ACCESSIBLE TOILET
1'-6"
5'-0" CLEAR
3'-0" 6"
3'-0"
" 3
1'-0" 3'-6"
2'-4"
5'-0" CLEAR
/4
GARMET HOOK
(1 PER RESTROOM
74.5" W
.1
T
(2) 85" TV
N.I.C.
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO
PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL - BASED ON THE VA PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES, THIS PROJECT HAS BEEN DESIGNED TO, AND CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING CODES AND GUIDELINES:
(AS OF EFFECTIVE PROJECT DESIGN CONTRACT DATE, 09/07/2022)
1. VA Sustainable Design Manual, August 2017
2. VA Parking Design Manual, November 2016
3. VA Site Development Design Manual February 2013
4. VA VHA Directive 1061, February 2021
5. VA Fire Protection Design Manual, 2021
6. VA Plumbing Design Manual, May 2021
7. VA HVAC Design Manual, March 2022
8. VA Physical Security and Resiliency Design Manual, 2020
9. VA Lighting Design Manual, December 2022
10. VA Electrical Design Manual, December 2019
11. VA Interior Design Manual, November 2020
12. VA Office of Information & Technology Design Guide, February 2019
13. VA Infrastructure Standard for Telecommunications Spaces, v3.1, July 2021
14. PG 18-13 VA Barrier Free Design Standard, February 2022
15. PG 18-4 VA Standard Details and Specifications
16. NFPA 101, Life Safety Code, 2021
17. NFPA 99, Health Care Facilities Code, 2021
18. NFPA 90A, Installation of Air Conditioning and Ventilating Systems, 2021
19. NFPA 72, National Fire Alarm Code, 2019
20. NFPA 70, National Electrical Code, 2020
21. NFPA 13, Installation of Sprinkler Systems, 2019
22. ADA Standards for Accessible Design 2010,
23. ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES 2017 OF ILLINOIS
24. International Building Code, 2021
25. International Mechanical Code, 2021
26. International Plumbing Code, 2015
27. International Fuel Gas Code, 2021
28. Illuminating Engineering Society (IES) Lighting Handbook, 10th Edition
29. Facilities Guidelines Institute: Guidelines for the Design and Construction of Hospitals 2022
30. ASME B31.9, Building Services Piping
31. ASHRAE Standard 170, Ventilation for Health Care Facilities, 2021
32. ASHRAE Handbooks, 2017 Fundamentals, 2019 HVAC Applications, 2020 HVAC Systems and Equipment
33. ASHRAE 90.1 – 2019 Energy Standard for Buildings Except Low-Rise Residential Buildings
34. SMACNA, HVAC Duct Construction Standards, Metal and Flexible
35. SMACNA, HVAC Air Duct Leakage Test Manual
36. ANSI/TIA/EIA 568-2019 Commercial Building Cabling Standards
37. ANSI/TIA/EIA 569-C-2015 Commercial Building Standards for Telecommunications Pathways and Spaces
38. ANSI/TIA-1179-2017, Telecommunications Spaces for Healthcare Facilities
39. BICSI, Telecommunications Distribution Methods Manual, 2014
40. Federal Information Processing Standards-FIBS-201-1: Personal Identity Verification (PIV) of Federal Employees and Contractors
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION
FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY
HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:5
:5
P
M C
U s e rs \l b y rd
\D o c u m e n ts
\A
-2
-V A
M a ri o n -E
H R
M lb y rd
V D
E K
F .r v t
G-002
GENERAL INFORMATION
2 4LBB
EHRM – TRAINING AND
ADMIN SPACE SUPPORT
MARION VAMC
2401 W. MAIN ST.
MARION, IL 62959 MAY 4, 2023
BID DOCUMENTS
657A5-21-70221-221
JAB
GENERAL SYMBOL LEGEND
Scale: 3/8" = 1'-0"
STANDARD MOUNTING HEIGHTS
PROJECT REFERENCE CODES
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5"
5/8" GYPSUM BOARD - BOTH
SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
5"
3 5/8" 16 GAUGE METAL
STUDS @ 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
DECK
A B
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. (2) LAYERS 5/8"
GYPSUM BOARD EACH SIDE.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/4"
C
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
SEALANT, BOTH SIDES
1-HR RATED
U.L. DESIGN NO. U419
NON RATED 2-HR RATED
U.L. DESIGN NO. U419
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY MATS
(CHANGED END OF
SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
ISOLATE AND COVER ALL
SUPPLY DIFFUSERS NOT
IN OPERATION DURING
PROJECT - COORDINATE
W/ COR
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL STATION
WITH AUDIO /
VISUAL
EXISTING WALL
BARRIER
NOTE:
A. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL
VERIFY LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE
FROM EXHAUST. VERIFY LOCAL JURISDICATION CODE AND VA
REQUIREMENTS FOR DISTANCE PRIOR TO STARTING WORK.
EXHAUST LOCATION
(SOUTH EXTERIOR DOOR)
- SEE NOTE A
G-003
FLEX DUCT
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
[MARION EHRM - TRAINING AND ADMIN SPACE SUPPORT]
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS
PROJECT IS LEVEL III FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL
ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON
THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK
AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE
A STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES -
CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA
AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL
BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON
COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED
CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
[AFTER EACH PHASE, PERFORM TASKS STATED IN CONTAMINATION OF PATIENT ROOMS,
SUPPLIES, EQUIPMENT AND RELATED AREAS NOTE 2.
3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE SPACES
(CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT
THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
4. DO NOT DEMOLISH THE EXIST. INNER TUNNEL WALL UNTIL ABSOLUTELY REQUIRED TO
MINIMIZE DUST AND DEBRIS FROM ENTERING THE EXISTING TUNNEL/WALKWAY.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE NORTH EXTERIOR DOOR AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS
PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING
SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER
THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT
OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED
BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF
ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE
USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN
NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF
THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-
CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
5. EXTERIOR DOORS: DOORS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY
ADJACENT EXCAVATION DEBRIS.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE
ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR
MUST FLOW FROM CLEAN TO DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE
WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF
ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE
TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-
CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST
TO PREVENT CONTAMINATION OF THE DUCTS.
3. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
4. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY
AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF CORRIDORS, SUPPLIES, EQUIPMENT AND RELATED AREAS
1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL
AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT
WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE
USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR
CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT,
TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE
MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL
CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL
CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE
CLEANING.
ICRA NOTES
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IV or control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
A
.F .F
A P
P R
O X
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
PLASTIC
WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L
H
IG
H T
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING
CEILING
FLEX DUCT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:5
:5
P
M C
U s e rs \l b y rd
\D o c u m e n ts
\A
-2
-V A
M a ri o n -E
H R
M lb y rd
V D
E K
F .r v t
G-003
ICRA INFORMATION AND DETAILS
3 4LBB
EHRM – TRAINING AND
ADMIN SPACE SUPPORT
MARION VAMC
2401 W. MAIN ST.
MARION, IL 62959 MAY 4, 2023
BID DOCUMENTS
657A5-21-70221-221
JAB
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE1
Scale: 1/4" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE1
Scale: 1/4" = 1'-0"
ICRA ROOM ELEVATION
Scale: 1/4" = 1'-0"
ICRA MOBILE CONTAINMENT CART
DN
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
CA
DE
KB
XXX
XXX
FEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS CAPACITY
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
AREA OF REFUGE 30" X 48"
A
2 3 4 5 6
B
2.1
A.2
A.6
14.8
14.5
12.1
10.1
8.1
Y.01 Z.5 Z.8Z.3Y.8 Z.1Y.5
ECSB002
TUNNEL
ACCESS
ECSB003
EXISTING
TUNNEL
UNFINISHED
BASEMENT
ESB005
TEMPORARY
CORRIDOR
CAPACITYCLR
EXIT
68" 340
CAPACITYCLR
EXIT
34" 170
A
B
EXISTING RAMP DOWN
EXISTING TUNNEL TO BLDG 43
BLDG
CAPACITYCLR
EXIT
34" 170
OCCUPANCY: 49
TRAINING
ROOM
STAIR
A/V
STORAGE
STORAGE
WOMEN
RR
MEN RR
T.R.
ELEC
MECH
RM.
HALL
BREAK
SUITE
FOYER
TUNNEL
ACCESS
HAC
107A
TUNNEL
AREA OF REFUGE
30" X 48"
76' D
IA
G
IO
N A L D
IS
T A N
C E
25'-4'' - 1/3 D
IA
G
IO
N
A L D
IS
T A
N C
E
FEC
FEC
B
2.5
ECSB005
UP
UP
CAPACITYCLR
EXIT
34" 170
TELEPHONE TO
SECURITY OFFICE
OR FD
CAPACITYCLR
EXIT
68" 340
F.D. F.D.
SUMP
PUMP
EXISTING SIDEWALK
CANOPY ABOVE
GC TO APPLY SPRAY ON
FIREPROOFING TO THE
UNDERSIDE OF THE
STRUCTURE IN THE TUNNEL
ACCESS SPACE TO OBTAIN
A 2 HR HORIZ. FIRE RATING.
8'-11 1/2"
EJ
EJ
CJ, TYP.
AREA NOT IN SCOPE
TEMPORARY TUNNEL, TO
BE REMOVED
TUNNEL ACCESS
A. SEE SHEET A-001 FOR SYMBOLS AND
ABBREVIATIONS.
B. REFER TO PLUMBING DRAWINGS FOR
INFORMATION CONCERNING PLUMBING FIXTURES
AND PIPING SYSTEM(S).
C. REFER TO MECHANICAL DRAWINGS FOR
INFORMATION CONCERNING HVAC SYSTEM(S).
D. REFER TO ELECTRICAL DRAWINGS FOR
INFORMATION CONCERNING POWER, LIGHTING
AND TELECOMMUNICATION SYSTEM(S).
E. REFER TO FIRE ALARM DRAWINGS AND (E)
ELECTRICAL DRAWINGS FOR FIRE ALARM
NOTIFICATION AND EMERGENCY EGRESS
LIGHTING LOCATIONS.
F. REFER TO PARTITION TYPES FOR FURTHER FIRE
SEPARATION REQUIREMENTS.
G. CONTRACTOR TO PROVIDE ALL ADDITIONAL
FRAMING NECESSARY FOR ALL OPENINGS AND
SUPPLEMENTAL FRAMING ABOVE PARTITIONS.
H. ALL FIRE RATED ASSEMBLIES SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH
TESTED ASSEMBLIES INDICATED.
I. EXTEND FIRE RATED PARTITIONS, BARRIERS,
AND OTHER SEPARATIONS TO BOTTOM OF
ROOF/FLOOR DECK ABOVE (OR AS DIRECTED BY
UL ASSEMBLY) AND TO EXTERIOR WALL. SEAL
JOINT BETWEEN EDGES OF PARTITION WITH FIRE
RATED SEALANT AND/OR INTUMESCENT
ASSEMBLY.
J. ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES
SHALL BE FIRE-SEALED IN ACCORDANCE WITH
APPROVED MANUFACTURER'S DETAIL FOR
LOCATION, TYPE OF CONSTRUCTION,
PENETRATING ITEM AND RATING REQUIRED.
K. ALL DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING FIRE-RATED WALLS, CEILINGS AND
FLOORS SHALL HAVE THE APPROPRIATE TYPE OF
FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE
TYPE OF CONSTRUCTION BEING PENETRATED
AND THE FIRE/SMOKE RATING REQUIRED.
L. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL
BE UL-LISTED FOR INSTALLATION IN THE
ASSEMBLY OR SHALL BE INSTALLED SUCH THAT
THE FIRE-RATING IS NOT COMPROMISED.
M. SMOKE RESISTANT CONSTRUCTION SHALL MEET
THE REQUIREMENTS OF ALL APPLICABLE CODES.
AREA SHALL BE SEPARATED FROM THE
REMAINDER OF THE BUILDING BY
CONSTRUCTION CAPABLE OF RESISTING THE
PASSAGE OF SMOKE. DOORS SHALL BE SELF OR
AUTOMATIC CLOSING. DOORS SHALL NOT HAVE
AIR TRANSFER OPENINGS AND SHALL NOT BE
UNDERCUT IN EXCESS OF CLEARANCE
PERMITTED WITH ACCORDANCE TO NFPA 80.
N. STORAGE OF ANY STORAGE OF ANY MATERIAL,
INCLUDING FLAMMABLE OR COMBUSTIBLE
LIQUIDS, IS TO BE IN COMPLIANCE WITH ALL
APPLICABLE CODES AND AUTHORITIES HAVING
JURISDICTION. STORAGE OF ANY MATERIAL IS
TO BE IN COMPLIANCE WITH ALL APPLICABLE
CODES AND AUTHORITIES HAVING JURISDICTION.
O. GC TO PROVIDE SIGNAGE INDICATING "MAXIMUM
OCCUPANCY OF THIS ROOM SHALL BE 49
OCCUPANTS OR LESS" AND PLACE NEAR
ENTRANCE OF CHAPEL
LIFE SAFETY GENERAL NOTES
PROJECT NAME:EHRM - TRAINING AND ADMIN SPACE SUPPORT
PROJECT ADDRESS: MARION VA MEDICAL CENTER
2401 W. MAIN ST. MARION, IL 62959
OWNER OR AGENT: MARION VAMC
OWNED BY: VAMC
PROPOSED USE: PROVIDE CLASSROOMS AND ADVINISTRATIVE
SPACE FOR EHRM PROJECT.
CODE ENFORCEMENT JURISDICTION: VAMC
APPLICABLE CODES: SEE SHEET G-002.
GENERAL CODE INFORMATION:
CONSTRUCTION TYPE: II (222)
OCCUPANCY: BUSINESS
-RENOVATION (EXISTING BUILDING)
-SPRINKLERED
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:5
:0
P
M C
U s e rs \l b y rd
\D o c u m e n ts
\A
-2
-V A
M a ri o n -E
H R
M lb y rd
V D
E K
F .r v t
LS100
BASEMENT FLOOR OVERALL LIFE
SAFETY PLAN
4 4LBB
EHRM – TRAINING AND
ADMIN SPACE SUPPORT
MARION VAMC
2401 W. MAIN ST.
MARION, IL 62959 MAY 4, 2023
BID DOCUMENTS
657A5-21-70221-221
JAB
NORTH
0 4 8 16
LIFE SAFETY LEGEND
Scale: 1/8" = 1'-0"
BASEMENT FLOOR OVERALL LIFE SAFETY PLAN
LEGEND
EGRESS PATH "A"
PATH ID LENGTH
A 54' - 1 13/16"
TOTAL PATH LENGTH 54' - 1 13/16"
EGRESS PATH "B"
PATH ID LENGTH
B 228' - 6 27/32"
TOTAL PATH LENGTH 228' - 6 27/32"
CODE INFORMATION
UG/EUG/E
UG/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
W
W
W
W
WATER SERVICE LINE (QL-D)
WATER SERVICE LINE (QL-D)
W W
W W
W W
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
LOW VOLTAGE ELECTRIC DUCTBANK (QL-B)
LOW VOLTAGE ELECTRIC DUCTBANK (QL-B)
ELECTRIC
MANHOLE
ID# EMH-2
TOP=462.98
ELECTRIC LINE (QL-B)
EL
EC
TR
IC
D U
C
TB
AN
K
(Q L-
B)
ELECTRIC
DUCTBANK
(QL-B)
LOW VOLTAGE
ELECTRIC
DUCTBANK (QL-B)
ABOVE GROUND ELECTRIC BOX
LOW VOLTAGE ELECTRIC (QL-B)
LOW VOLTAGE ELECTRIC (QL-B)
ABOVE GROUND
ELECTRIC BOX
ABOVE GROUND
ELECTRIC BOX
LOW VOLTAGE ELECTRIC (QL-B)
CLEANOUT (QL-D)
CO
CLEANOUT (QL-D)
CO
SS
SS
SS
SS
SANITARY PIPE (QL-D)
ELECTRIC MANHOLE
ID# EMH-1
TOP=467.59
CLEANOUT (QL-D)
CO
CLEANOUT (QL-D)
CO
CLEANOUT (QL-D)
CO
CLEANOUT (QL-D)
CO
UG/EU
G/
EUG/E
ELECTRIC
DUCTBANK (QL-B)
ELECTRIC MANHOLE
ID# EMH-3
TOP=467.36
UG/E
UG/E
EMPTY ELECTRIC
DUCTBANK (QL-C)
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
4"CPP (QL-D)4"CPP (QL-D)
UG/E
CONCRETE
RETAINING WALL
DOOR
F.F=468.85
DOOR
F.F=468.88
DOOR
F.F=459.84
DOOR
F.F=459.83
OVERHANG
CANOPY
6"VERT.
CONC.
CURB
CONCRETE H.C. RAMP
C O
N C
. S
ID
EW
AL
K
CONC. SIDEWALK
G R
A V
E L
LA
N
D S
C A
P E
B E
D
CONC. CURB & GUTTER
CONC. STEPS
CONC. C
URB
GUTT
ER
HANDRAIL
EXISTING BUILDING 42
CONC. SIDEWALK
GRAVEL LANDSCAPE BED
GRVL.
6" V
E R
T.
C
O N
C . C
U R
B
CONC. STEPS
CONC. STEPS
CONCRETE
PAVEMENT
CONCRETE
PAVEMENT
ASPHALT
PAVEMENT
CONC. CURB & GUTTER
ASPHALT
PAVEMENT
CONC.
PVMT.
CONC. PAD FOR
ABOVE GROUND
SIGNAGE
PLANTER
PLANTER
MODULAR BLOCK
RETAINING WALL
GRVL.
GRAVEL LANDSCAPE BED
GRAVEL L
ANDSCAPE BED
CONC.
PAVEMENT
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
CLEANOUT
ID# CO-4
TOP=469.70
DEPTH=462.50
(AT FIRST BEND)
CLEANOUT
ID# CO-5
TOP=469.07
DEPTH=466.77
(AT FIRST BEND)
CLEANOUT
ID# CO-6
TOP=469.13
DEPTH=465.13
(AT FIRST BEND)
ROUND GRATED INLET
ID# RGI-1
TOP=459.81
DEPTH=458.41
(AT FIRST BEND)
ROUND GRATED INLET
ID# RGI-2
TOP=459.79
DEPTH=458.59
(AT FIRST BEND)
8"
PV
C
GRATE INLET
ID#
TOP=467.61
FL=460.36 12"RCP OUT (N)
4"CPP
6"CPP
GRATE INLET
ID# GI-1
TOP=459.84
FL=458.04 12"VCP IN (S)
FL=457.84 12"VCP OUT (NE)
GRATE INLET
ID# GI-3
TOP=459.86
FL=457.26 12"VCP OUT (N)
GRATE INLET
ID# GI-2
TOP=459.20
FL=457.20 12"VCP IN (SW)
FL=457.10 12"VCP OUT (NE)
"V
CP
"V
CP
(Q
L- C)
"V
C P
"V
CP
SANITARY MANHOLE
ID# SMH-3
TOP=460.42
FL=452.72 6"PVC DROP IN (SW)
FL=451.02 8"PVC IN (SE)
FL=450.72 12"HDPE IN (NW)
FL=450.57 12"PVC OUT (E)
SANITARY MANHOLE
ID# SMH-2
TOP=463.20
FL=453.80 12"PVC IN (N)
FL=453.60 12"HDPE OUT (SE)
SANITARY MANHOLE
ID# SMH-1
TOP=462.61
FL=458.81 8"PVC IN (SW)
FL=458.61 6"PVC IN (W)
FL=458.51 12"PVC OUT (S)
SS SS SS SS SS SS SS SS SS
6"
PVC
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS
SS
SS
SS
SS
SS
SS
"P
V C
"P
V C
12"HDPE
12"HDPE
6"
PVC
8"PVC
12"PVC
6"PVC
SS
SS
4" C
P P
4"CPP
4" C
P P
3"PVC
3"PVC
SUMP PIT
(INSIDE OF BLDG)
ID# SP-1
TOP=454.88
FL=454.00 6"CPP IN (S)
FL=455.20 2"PVC OUT (E)
BTM. OF STRUC.=452.34
(2"PVC OUT TROUGH
TOP OF STRUCTURE)
2"PVC
ELECTRIC MANHOLE
ID# EMH-2
TOP=462.98
POW
PO
W
POW
PO
W
POW
POW
PO
W
POW
POW
PO
W
DECON TANK
ID# DT-1
TOP=468.91
ABOVE GROUND ELECTRIC BOX
ABOVE GROUND 3"PVC
ABOVE GROUND
ELECTRIC BOX
ABOVE GROUND
ELECTRIC BOX
PIPE BECOME ABOVE
GROUND AT THIS
POINT AND CHANGES
TO 3"PVC
SS
SS
(2) 4"PVC
END OF PIPE
FL=461.84 3"PVC
6"PVC
LIGHTED BOLLARD (TYP.)
EXISTING EXPOSED
CONCRETE FOOTINGS
(TO REMAIN)
UG
/C
UG/C
COMMUNICATION MANHOLE
ID# CMH-1
TOP=467.36
UG
/C
UG
/C
CLEANOUT
ID# CO-7
TOP=460.91
DEPTH=458.81
(AT FIRST BEND)
15"CANOPY COLUMN
24"CANOPY COLUMN
EXISTING TUNNEL
F.F.=457.91
EXIS
TIN
G TUNNEL
DOOR
F.F=460.66
CONCRETE RETAINING
WALL
EXISTING TUNNEL
F.F.=457.92
POW
PO
W
POW
PO
W
CLEANOUT
ID# CO-8
TOP=460.47
DEPTH=458.67
(AT FIRST BEND)
SSSSSSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .