Attachment 09 - Drawings - Plumbing.pdf

PDF 10 MB Posted

Attached to
506-334 – Construct Private In-Patient Rooms and Primary Clinics
Solicitation number
36C25024B0031_1
Issued by

About this file

This document appears to be Attachment 09 - Drawings - Plumbing related to the federal contract opportunity 506-334 – Construct Private In-Patient Rooms and Primary Clinics solicited by the Department of Veterans Affairs Technology Acquisition Center in Ann Arbor, MI. The solicitation number is 36C25024B0031_1. This attachment provides detailed plumbing drawings for the construction project, which involves building private in-patient rooms and primary clinics. The drawings outline the plumbing system requirements and specifications for the facility. No further details about the services or pricing are included in this attachment, as it appears to be solely technical drawings rather than a performance work statement or other contracting document.

View the file

Other files

File Type Posted
Attachment 14 - Wage Determination Rev 6 - Washtenaw County - 7-26-24.pdf PDF
506-334 Solicitation Amendment 005 - 36C25024B0031 0005.docx DOCX document
Plumbing Drawings - Write Up.pdf PDF
506-334 Solicitation Amendment 004 36C25024B0031 0004.docx DOCX document
Round 2 Technical Questions - Ann Arbor - 506-334 - FINAL - 7-22-24.pdf PDF
Amended Drawings - 7-22-24.pdf PDF
506-334 Solicitation Amendment 003 - 36C25024B0031 0003.docx DOCX document
506-334 Solicitation Amendment 0002 -36C25024B0031 0002.docx DOCX document
5 West hallway renovation 506-334-100.pdf PDF
New building 5th floor ICRA 506-334-100.pdf PDF
New building west side 3rd floor ICRA 506-334-100.pdf PDF
221300 Sanitary and Vent.pdf PDF
New building west side 4th floor 506-334-100.pdf PDF
Amended Drawings.pdf PDF
Technical Questions - Ann Arbor - 506-334 - FINAL - 7-16-24.pdf PDF
506-334 - Solicitation Amendment 0001 - 36C25024B0031_1 0001.docx DOCX document
506-334 Construct Private In-Patient Beds - sign in sheet 20240701.pdf PDF
Attachment 08 - Drawings - Mechanical.pdf PDF
Attachment 10 - Drawings - Structural.pdf PDF
Attachment 11 - Drawings - Telecommunications.pdf PDF
Attachment 02 - Specifications Vol 2.pdf PDF
Attachment 14 - Wage Determination - Washtenaw County - 4-5-24.pdf PDF
S02 - 36C25024B0031_1.docx DOCX document
Attachment 06 - Drawings - Fire Protection.pdf PDF
Attachment 13 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 01 - Specifications Vol 1.pdf PDF
Attachment 12 - Brand Name JA - Ann Arbor - 506-334 - FINAL.pdf PDF
Attachment 05 - Drawings - Electrical.pdf PDF
Attachment 04 - Drawings - Architectural - Vol 2.pdf PDF
Attachment 15 - Site Visit Instructions - Ann Arbor.docx DOCX document
Attachment 03 - Drawings - Architectural - Vol 1.pdf PDF
Attachment 07 - Drawings - General - Civil.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A1

P1 P1OR

A1

OH

P2

B

P2

GENERAL FLOOR PLAN NOTES

RISER OR STACK NUMBER

DETAIL: B = DETAIL DESIGNATION

P2 = SHEET WHERE DETAIL IS LOCATED

FIRE SUPPRESSION HAZARD CLASSIFICATION AND

HAZARD CLASSIFICATION GROUP

SECTION: 1 = SECTION DESIGNATION

P2 = SHEET WHERE DETAIL IS LOCATED

EQUIPMENT REFERENCE. LETTER DESIGNATION

VARIES. REFER TO SCHEDULES.

EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK.

LETTER DESIGNATIONS REFER TO SCHEDULES.

CONNECT TO EXISTING

PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH

IT IS SHOWN UNLESS NOTED OTHERWISE.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)

SPECIALTY GAS SYMBOLS

AIR OUTLET - LAB TYPE

VC

VC

NATURAL GAS OUTLET - LAB TYPE

VACUUM OUTLET - LAB TYPE

VACUUM CLEANING STATION - WALL

VACUUM CLEANING STATION - FLOOR

PIPING DESIGNATIONS

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

EXISTING PIPE TO REMAIN

EXISTING PIPE TO BE REMOVED

HOT WATER PIPE (140 DEGS. F.)

HOT WATER RETURN PIPE (140 DEGS. F.)

HOT WATER RETURN PIPE (180 DEGS. F.)

140R

180R

EXPANSION JOINT

WATER METERM

PIPING SYMBOLS

BOTTOM CONNECTION (45°)

BRANCH TEE CONNECTION (NOTE:

BULLHEAD TEE'S ARE NOT PERMITTED)

DIRECTION OF PITCH

DROP

ELBOW DOWN

ELBOW UP

FLOW DIRECTION DESIGNATION

PUMP

RISE

TOP CONNECTION (45°)

TOP CONNECTION (90°)

BOTTOM CONNECTION (90°)

D

R

PIPE RISER

HOT WATER PIPE (180 DEGS. F.)

ARGON PIPE

COMPRESSED AIR PIPE

GARAGE DRAINAGE PIPE

HYDROGEN PIPE

HELIUM PIPE

KITCHEN WASTE PIPE

LABORATORY COMPRESSED AIR PIPE

LABORATORY VENT PIPE

LABORATORY VACUUM PIPE

LABORATORY WASTE PIPE

NON-POTABLE

(OVERFLOW) SECONDARY STORM DRAINAGE PIPE

PUMP DISCHARGE PIPE

PURE WATER PIPE

SANITARY DRAINAGE PIPE

SOFT COLD WATER

STORM DRAINAGE PIPE

TRAP PRIMER DISCHARGE PIPE

TEMPERED WATER PIPE

SANITARY SEWER VENT

WATER SERVICE

LV

AR

CA

GD

H2

HE

IV

IW

LA

LV

LW

NPW

OD

PD

PW

SAN

SCW

STM

TP

TW

V

WS

INDIRECT VENT PIPE

INDIRECT WASTE PIPE

K

ACID VENT PIPEAV

ACID WASTE PIPEAW

BC

TC

COMBINATION FIRE SUPPRESSION &

DOMESTIC WATER SERVICE

CWS

FLEX PIPING

CARBON DIOXIDE OUTLET - HOSPITAL TYPE

MEDICAL AIR OUTLET - HOSPITAL TYPE

MEDICAL VACUUM INLET - HOSPITAL TYPE

NITROGEN OUTLET - HOSPITAL TYPE

NITROUS OXIDE OUTLET - HOSPITAL TYPE

OXYGEN OUTLET - HOSPITAL TYPE

WAGD INLET - HOSPITAL TYPE

MEDICAL INSTRUMENT AIR PIPE

MEDICAL NITROGEN PIPE

MEDICAL COMPRESSED AIR PIPE

DENTAL VACUUM-EXHAUST PIPE

MEDICAL NITROUS OXIDE PIPE

MEDICAL OXYGEN PIPE

WASTE ANESTHESIA GAS DISPOSAL PIPE

IA

N2

MA

MV

NO

O2

WAGD

MEDICAL CARBON DIOXIDE PIPECO2

MEDICAL SURGICAL VACUUM PIPE

DENTAL AIR-INTAKE PIPEDAI

DVX

VALVES AND FITTINGS

T

P

FOB

FOT

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

GAUGE - PRESSURE

GAUGE - TEMPERATURE OR THERMOMETER

UNION

CLEANOUT

STRAINER

STRAINER - WITH A BLOW DOWN VALVE AND HOSE

CONNECTION

VALVE - DRAIN WITH HOSE END CONNECTION

VALVE - PRESSURE REGULATING

VALVE - SAFETY RELIEF. PIPE DISCHARGE AIR

GAPPED TO FLOOR DRAIN UNLESS NOTED

OTHERWISE.

PLUG - PRESSURE AND TEMPERATURE TEST

TRAP PRIMER

GAUGE - VACUUM WITH STOP

CLEANOUT - TO GRADE OR FINISHED FLOOR

END CAP

MIXING FAUCET

PLUG

HOSE BIB

WALL HYDRANT

VALVE - PLUG

VALVE - SHUTOFF AND BOX

VALVE - SHUTOFF ON RISER

V

VB

TP

CO

VALVE - SOLENOID

S

P/T VALVE - PRESSURE AND TEMPERATURE SAFETY

RELIEF. PIPE DISCHARGE AIR GAPPED TO

FLOOR DRAIN UNLESS NOTED OTHERWISE.

VALVE - CHECK

VALVE - SHUTOFF: BALL, GATE, BUTTERFLY VALVE

(REFER TO SPECIFICATIONS FOR REQUIRED TYPE

BASED ON APPLICATIONS)

AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN

AND OUT

VALVE - COMBINATION SHUTOFF AND

BALANCING (REFER TO SPECIFICATIONS FOR

REQUIRED TYPE BASED ON APPLICATIONS)

ABBREVIATIONS

AAP - AREA ALARM PANEL (MEDICAL GAS)

AC - AIR COMPRESSOR OR AIR CONDITIONER

ACC - ACCESS

ACCU - AIR COOLED CONDENSING UNIT

AD - ACCESS DOOR OR AREA DRAIN

ADB - ACID DILUTION BASIN

ADJ - ADJUSTABLE

AFF - ABOVE FINISHED FLOOR

AFG - ABOVE FINISHED GRADE

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

AR - AIR RECEIVER OR ARGON

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

AV - ACID VENT

AW - ACID WASTE

BDD - BACK DRAFT DAMPER

BFP - BACKFLOW PREVENTER

BLDG - BUILDING

BOB - BOTTOM OF BEAM

BOD - BOTTOM OF DUCT

BOE - BOTTOM OF EQUIPMENT

BOF - BOTTOM OF FOOTING

BOG - BOTTOM OF GRILLE

BOP - BOTTOM OF PIPE

BOT - BOTTOM

BT - BATHTUB

BTU - BRITISH THERMAL UNIT

BTUH - BRITISH THERMAL UNIT PER HOUR

BTWN - BETWEEN

CA - COMPRESSED AIR

CB - CATCH BASIN

CBD - COUNTER BALANCED BACKDRAFT DAMPER

CFCI - CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

CFM - CUBIC FEET PER MINUTE

CHS - CHILLED WATER SUPPLY

CHR - CHILLED WATER RETURN

CI - CAST IRON

CK - CLINICAL SINK

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CO - CLEAN OUT

CO2 - MEDICAL CARBON DIOXIDE

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

COR - CONTRACTING OFFICER'S REPRESENTATIVE

CORR - CORRIDOR

CRP - CORROSION RESISTANT PIPE

CRV - CORROSION RESISTENT VENT PIPE

CS - CLINICAL SINK OR COLD SOFT WATER

CTR - CENTER

CU - COPPER

CW - COLD WATER

CWS - COMBINATION WATER SERVICE

OR CONDENSER WATER SUPPLY

CWR - CONDENSER WATER RETURN

D - DEPTH OR DRAIN LINE

DB - DIALYSIS BOX

DD - DECK DRAIN

DET - DETAIL

DF - DRINKING FOUNTAIN OR WATER COOLER

OR DIESEL FUEL

DFU - DRAINAGE FIXTURE UNIT

DI - DEIONIZED WATER

DIA - DIAMETER

DIM - DIMENSION

DN - DOWN

DS - DOWN SPOUT OR SPRINKLER (DRY)

DT - PERFORATED DRAIN TILE

DWG - DRAWING

EA - EACH

EC - ELECTRICAL (DIVISION 26)

EEW - EMERGENCY EYE WASH

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATOR

EQ - EQUAL

EQUIP - EQUIPMENT

ET - EXPANSION TANK

ETR - EXISTING TO REMAIN

ES - EMERGENCY SHOWER

EQS - EQUIPMENT SUPPLIER

EWC - ELECTRICAL WATER COOLER

EXH - EXHAUST AIR

EXP - EXPANSION

EXT - EXTERIOR

EX - EXISTING

F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER

MAIN)

FCE - FIRE CONTROL EQUIPMENT

FCO - FLOOR CLEANOUT

FD - FLOOR DRAIN

FDC - FIRE DEPARTMENT CONNECTION

FDV - FIRE DEPARTMENT VALVE

FF - FINISHED FLOOR ELEVATION

FHC - FIRE HOSE CABINET

FLR - FLOOR

FM - FORCE MAIN

FOB - FLAT ON BOTTOM

FOF - FUEL OIL FLOW

FOG - FUEL OIL GAUGE

FOR - FUEL OIL RETURN

FOS - FUEL OIL SUPPLY

FOT - FLAT ON TOP

FPM - FEET PER MINUTE

FR - FIRE RISER

FS - FLOOR SINK OR FIRE SERVICE

FSC - FIRE SUPPRESSION (DIVISION 21)

FT - FEET

FTG - FOOTING

G - GAS OR NATURAL GAS

GA - GAUGE

GAL - GALLON

GALV - GALVANIZED

GC - GENERAL TRADES (DIVISION 01)

GD - GARAGE DRAINAGE

GPM - GALLONS PER MINUTE

GS - GAS SERVICE

GW - GREASE WASTE

H2 - HYDROGEN

HB - HOSE BIBB

HC - HVAC (DIVISION 23)

HD - HUB DRAIN

HE - HELIUM

HG - REFRIGERANT HOT GAS

HP - HORSEPOWER OR HIGH POINT

HPC - HIGH PRESSURE CONDENSATE RETURN

HPS - HIGH PRESSURE STEAM SUPPLY

HPW - HIGH PURITY WATER

HPWR - HIGH PURITY WATER RETURN

HR - HOSE REEL

HT - HEAT TRACE

HTR - HEATER

HVAC - HEATING, VENTILATING, AND AIR

CONDITIONING

HW - HOT WATER

HWR - HEATING HOT WATER RETURN

HWS - HEATING HOT WATER SUPPLY

IA - MEDICAL INSTRUMENT AIR

ID - INSIDE DIAMETER

INV - INVERT ELEVATION

IN - INCHES

IV - INDIRECT VENT

IW - INDIRECT WASTE

JS - JANITOR SINK

K - KITCHEN WASTE

KEC - KITCHEN EQUIPMENT

L - LENGTH

LA - LABORATORY COMPRESSED AIR

LAV - LAVATORY

LBS - POUNDS

LCW - LABORATORY COLD WATER

LEC - LABORATORY EQUIPMENT

LHW - LABORATORY HOT WATER

LHWR - LABORATORY HOT WATER RETURN

LPC - LOW PRESSURE CONDENSATE RETURN

LPS - LOW PRESSURE STEAM SUPPLY

LV - LABORATORY VACUUM OR LABORATORY

VENT

LW - LABORATORY WASTE

MA - MEDICAL COMPRESSED AIR

MAP - MASTER ALARM PANEL (MEDICAL GAS)

MAX - MAXIMUM

MB - MOP BASIN

MC - MECHANICAL (DIVISION 23)

MEZZ - MEZZANINE

MFR - MANUFACTURER

MH - MANHOLE

MIN - MINIMUM OR MINUTE

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

MPC - MEDIUM PRESSURE CONDENSATE RETURN

MPS - MEDIUM PRESSURE STEAM SUPPLY

MU - WATER MAKE-UP

MV - MEDICAL SURGICAL VACUUM

N2 - MEDICAL NITROGEN

N/C - NORMALLY CLOSED

NG - GASOLINE (NON-LEAD)

NIC - NOT IN CONTRACT

N/O - NORMALLY OPEN

NO - MEDICAL NITROUS OXIDE

NOM - NOMINAL

NPW - NON-POTABLE WATER

NPT - NATIONAL PIPE THREAD

NTS - NOT TO SCALE

O2 - MEDICAL OXYGEN

OA - OUTDOOR AIR

OD - OUTSIDE DIAMETER OR OVERFLOW

DRAIN

OFCI - OWNER FURNISHED CONTRACTOR

INSTALLED

OFOI - OWNER FURNISHED OWNER INSTALLED

P - PROPANE GAS

PC - PLUMBING (DIVISION 22) OR PUMPED

CONDENSATE RETURN

PD - PUMP DISCHARGE OR PARAPET DRAIN

PIV - POST INDICATOR VALVE

PLBG - PLUMBING

PS - PRE-ACTION/DELUGE SPRINKLER

PRESS - PRESSURE

PRV - PRESSURE REGULATING VALVE

PSF - POUNDS PER SQUARE FOOT

PSI - POUNDS PER SQUARE INCH

PSV - PRESSURE SUSTAINING VALVE

PSIG - POUNDS PER SQUARE INCH GAUGE

PW - PURE WATER

RA - RETURN AIR

RAD - RADIUS

RCP - REINFORCED CONCRETE PIPE

RD - ROOF DRAIN

REC - RECESSED

REQD - REQUIRED

RI - ROUGH IN

RL - REFRIGERANT LIQUID

ROS - REVERSE OSMOSIS WATER SUPPLY

ROR - REVERSE OSMOSIS WATER RETURN

RPM - REVOLUTIONS PER MINUTE

RS - REFRIGERANT SUCTION

RV - RELIEF VALVE

S - SPRINKLER (WET)

SA - SHOCK ARRESTOR OR SUPPLY AIR

SAN - SANITARY OR SANITARY DRAIN

SCH - SCHEDULE

SCW - SOFT COLD WATER

SD - SPRINKLER DRAIN OR SUBSOIL DRAIN

SH - SHOWER

SHT - SHEET

SK - SINK

SPEC - SPECIFICATIONS

SQ - SQUARE

SR - SUPPLY RISER

SS - SANITARY STACK (SOIL OR WASTE) OR

STAINLESS STEEL

STD - STANDARD

STM - STORM OR STORM DRAINAGE

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

T - FUEL TANK VENT

TD - TRENCH DRAIN

TEMP - TEMPERATURE

TOB - TOP OF BEAM

TOD - TOP OF DUCT

TOE - TOP OF EQUIPMENT

TOF - TOP OF FOOTING

TOJ - TOP OF JOIST

TOP - TOP OF PIPE

TOS - TOP OF SLAB OR TOP OF STEEL

TF - TRAP FILLER

TP - TRAP PRIMER OR TRAP PRIMER

DISCHARGE

TW - TEMPERED WATER

TYP - TYPICAL

UR - URINAL

UNO - UNLESS NOTED OTHERWISE

V - VENT OR SANITARY SEWER VENT

VAC - VACUUM

VC - VACUUM CLEANING

VCV - VACUUM CLEANING VALVE

VE - VACUUM EXHAUST

VEL - VELOCITY

VIB - VALVE IN BOX

VOL - VOLUME

VP - VACUUM PUMP

VS - VENT STACK

VTR - VENT THROUGH ROOF

VR - VENT RISER

W/ - WITH

W/O - WITHOUT

W - WASTE

WAGD - WASTE ANESTHESIA GAS DISPOSAL

WC - WATER CLOSET

WCO - WALL CLEANOUT

WH - WALL HYDRANT OR WATER HEATER

WIV - WALL INDICATOR VALVE

WS - WATER SERVICE

YCO - YARD CLEANOUT

ZVC - ZONE VALVE CABINET

DEMOLISH TO POINT INDICATED

GENERAL NOTES

A ALL NEW PIPING IS ABOVE THE CEILING (AT THE UNDERSIDE OF STRUCTURE IN

EXPOSED STRUCTURE AREAS), UNLESS OTHERWISE NOTED.

ABOVE CEILING UTILITY SPACE IS LIMITED. COORDINATION WITH ALL TRADES IS

CRITICAL, PRIOR TO INSTALLATION OF ANY WORK.

B REFER TO SCHEDULES, DETAILS AND DIAGRAMS FOR PIPING, PIPE SIZES AND

PIPELINE DEVICES NOT INDICATED ON THE FLOOR PLAN.

C LOCATIONS AND SIZES OF EXISTING PIPING HAVE BEEN DETERMINED FROM A

REVIEW OF EXISTING DRAWINGS AND/ OR SITE INSPECTION, WHERE POSSIBLE.

FIELD VERIFICATION OF EXACT LOCATIONS, ELEVATIONS, INVERTS, SIZES,

DIRECTION OF FLOW, ETC. SHALL BE REQUIRED PRIOR TO BEGINNING NEW

WORK.

D ALL DOMESTIC WATER PIPING SHOWN TO BE DEMOLISHED SHALL BE REMOVED

BACK TO WITHIN TWO PIPE DIAMETERS OF ACTIVE MAINS AND CAPPED, OR

REMOVED BACK TO POINTS OF CONNECTION OF NEW WORK. INACCESSIBLE

PIPING, WHERE SO NOTED, TO BE ABANDONED SHALL BE DISCONNECTED

FROM ACTIVE MAINS AND CAPPED IN CONCEALED LOCATIONS.

E ABANDONED PIPING DISCOVERED DURING DEMOLITION/ RENOVATION

SHALL BE REMOVED. DOMESTIC WATER DISTRIBUTION PIPING DISCOVERED

DURING DEMOLITION/ RENOVATION SHALL BE REMOVED BACK TO WITH-IN

2 PIPE DIAMETERS OF THE ACTIVE MAIN AND CAPPED.

F NEW CONNECTIONS TO EXISTING PIPING SHALL BE WITH THE SAME SIZE AS THE

EXISTING PIPING UNLESS OTHERWISE NOTED.

G ALL REMOVED MATERIAL AND EQUIPMENT SO DESIGNATED BY THE COR,

SHALL BE TURNED OVER AND PLACED WHERE DIRECTED. ALL MATERIAL AND

EQUIPMENT, WHICH THE OWNER DOES NOT WISH TO RETAIN, SHALL BECOME

THE PROPERTY OF THE CONTRACTOR RESPONSIBLE FOR THE REMOVAL.

H ANY RENOVATION WORK REQUIRED "OUTSIDE" OF THE BOUNDARIES/ EXTENTS

OF A SPECIFIC PHASE OF WORK (OR TEMPORARY CONSTRUCTION WALLS

SHALL BE BID AS "NIGHT WORK" AND SHALL BE AS DIRECTED BY THE COR.

I ALL CORE DRILLS AND PIPE EXTENSIONS THRU THE EXISTING STRUCTURAL

FLOOR SLAB OR STRUCTURAL WALL SHALL BE X-RAYED TO DETERMINE THE

EXACT LOCATION OF THE "REBARS" IN THE STRUCTURAL SLAB. DO NOT CUT

THE LOWER (BOTTOM REBARS) IN THE FLOOR SLAB.

J WORK IN EXISTING AREAS WITH NO/ LIMITED ARCHITECTURAL SCOPE, THE

CONTRACTOR SHALL PROVIDE ALL REQUIRED FLOOR/ WALL PROTECTION (AS

REQUIRED) AND REPLACE ANY DAMAGED CEILING TILES WITH NEW. RETURN

AREA BACK TO ORIGINAL CONDITION UPON COMPLETION OF WORK.

K REFER TO ARCHITECTURAL FIRE RATED PARTITION PLAN(S) FOR LOCATIONS

AND FIRE RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL

PENETRATIONS THROUGH FIRE RATED ASSEMBLIES SHALL BE PROTECTED

AND/ OR FIRE STOPPED AS REQUIRED TO MAINTAIN FIRE RATINGS INDICATED.

COORDINATE WITH ALL TRADES TO ENSURE FIRE RATED PENETRATION

REQUIREMENTS AND DETAILS ARE MET.

L ANNULAR SPACE OF ALL PIPE & OTHER SIMILAR PENETRATIONS OF FIRE RATED

ASSEMBLIES SHALL BE FIRE STOPPED. IN ADDITION, PENETRATIONS THROUGH

0-HOUR RATED WALLS & FLOOR SHALL BE SEALED TO RETARD THE PASSAGE

OF SMOKE.

M DOMESTIC WATER PIPING SYSTEM MODIFIED BY THIS PROJECT SHALL BE

DISINFECTED AND TESTED IN ITS ENTIRETY. DISINFECTION AND TESTING

PROCEDURES SHALL FOLLOW VA WATER SAFETY PLAN (IF AVAILABLE), VA

DESIGN MANUAL, VA SPECIFICATIONS, AND LOCAL REQUIREMENTS.

N ACOUSTICAL CEILINGS ACCESS IDENTIFICATION MARKERS: COLORED MARKERS

WITH PRESSURE SENSITIVE ADHESIVE ON ONE SIDE, PAPER OR PLASTIC, 6 TO

9 MM (1/4 TO 3/8 INCH) DIAMETER.

REFER TO SPECIFICATION 09 51 00 SECTION 2.6.C.

1. COLOR CODE: PROVIDE THE FOLLOWING COLOR MARKERS FOR

SERVICE IDENTIFICATION:

• RED - SPRINKLER SYSTEM: VALVES AND CONTROLS.

• GREEN - DOMESTIC WATER: VALVES AND CONTROLS.

• BLACK - GAS: LABORATORY, MEDICAL, AIR AND VACUUM.

O BID ITEMS: REFER TO ARCHITECTURAL DRAWING AND SPECIFICATION SECTION

01 00 00 FOR AN OUTLINE OF BID ITEMS. ADDITIONAL NOTES DESCRIBING BID

ITEM DETAILS MAY BE INCLUDED THROUGHOUT THIS DRAWING SET.

P OXYGEN AND MEDICAL AIR PIPING SHALL BE MINIMUM 0.5" SIZE. MEDICAL VACUUM

PIPING SHALL BE MINIMUM 0.75" SIZE.

Q ALL MEDICAL GAS SYSTEM INSTALLERS SHALL BE CERTIFIED TO THE

REQUIREMENTS OF ASSE 6010. ALL MEDICAL GAS SYSTEM VERIFIERS SHALL BE

CERTIFIED TO THE REQUIREMENTS OF ASSE 6030.

R MEDICAL GAS AND VACUUM SYSTEM INSTALLATION AND VERIFICATION SHALL

COMPLY WITH THE REQUIREMENTS OF NFPA 99, GAS AND VACUUM SYSTEMS.

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:2

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

ABBREVIATIONS, SYMBOLS &

INDEX OF DRAWINGS

P001

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

INDEX OF DRAWINGS - PLUMBING

SHEET NUMBER SHEET NAME

P001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS

P002 BID DEDUCT ALTERNATE 01 & 02

P003 BID DEDUCT ALTERNATE 03 & 04

PD102 PARTIAL SECOND FLOOR PLAN - REMOVALS

PD103 PARTIAL THIRD FLOOR PLAN - REMOVALS

PD104 PARTIAL FOURTH FLOOR PLAN - REMOVALS

PD105 PARTIAL FIFTH FLOOR PLAN - REMOVALS

PL102 PARTIAL SECOND FLOOR PLAN - DRAINAGE

PL103 PARTIAL THIRD FLOOR PLAN - DRAINAGE

PL104 PARTIAL FOURTH FLOOR PLAN - DRAINAGE

PL105 PARTIAL FIFTH FLOOR PLAN - DRAINAGE

PL106 PARTIAL SIXTH FLOOR PLAN - DRAINAGE

PP103 PARTIAL THIRD FLOOR PLAN - DISTRIBUTION

PP104 PARTIAL FOURTH FLOOR PLAN - DISTRIBUTION

PP105 PARTIAL FIFTH FLOOR PLAN - DISTRIBUTION

PG105 PARTIAL FIFTH FLOOR PLAN - MEDICAL GAS

P401 ENLARGED PLAN

P601 SCHEDULES & DIAGRAMS

P901 SANITARY WASTE AND VENT DIAGRAM

P902 DOMESTIC WATER DIAGRAM

P903 MEDICAL GAS DIAGRAM

P904 STORM & SECONDARY OVERFLOW DIAGRAM

Revisions Date

01 - DEDUCT ALTERNATE 01:

OMIT ALL NEW WORK RELATED TO THE

OPEN OFFICES AND CHAPEL.

SPACE WILL BE UNFINISHED STORAGE.

C3-B-2

CORRIDOR-2

H.A.C.

CLOSET

CHAPEL

OPEN

OFFICE

OPEN

OFFICE

OPEN

OFFICE

LOBBY

SPACE

HEALTHY

TEACHING

KITCHEN

02 - DEDUCT ALTERNATE 02:

OMIT ALL NEW WORK RELATED TO THE

ELECTRICAL SHOP.

SPACE WILL BE UNFINISHED STORAGE.

MECHANICAL

ROOM

ELECTRICAL

SHOP

401A

OFFICE

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:3

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

BID DEDUCT ALTERNATE 01 & 02

P002

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

Scale: 1/8" = 1'-0"1

BID DEDUCT 01 - REMOVE THIRD FLOOR OFFICES AND

CHAPEL

Scale: 1/8" = 1'-0"2

BID DEDUCT 02 - REMOVE FOURTH FLOOR

ELECTRICAL SHOP

03 - DEDUCT ALTERNATE 03:

OMIT ALL NEW WORK RELATED TO THE

TEACHING KITCHEN.

EXISTING OFFICE CONSTRUCTION

TO REMAIN.

SPACE WILL BE UNFINISHED STORAGE.

04 - DEDUCT ALTERNATE 04:

OMIT ALL NEW WORK RELATED TO THE

NEW LOUNGE AND LOCKER ROOMS.

EXISTING LOCKERS, HAC, SOILED

UTILITY AND OFFICE TO REMAIN.

04 - DEDUCT ALTERNATE 04:

EXISTING OFFICE TO BECOME CLEAN

LINEN ROOM.

524A

BATH

1 BR

PATIENT

ROOM #8 525

1 BR

PATIENT

ROOM #9

525A

BATH

C5-52

CORRIDOR

1 BR

PATIENT

ROOM #7

523A

BATH

NS-502

NURSE

STATION

NS-503

NURSE

STATION

LOUNGE

1BR

PATIENT

ROOM #6

519A

BATH

517A

BATH

1BR

PATIENT

ROOM #5

C5-50

CORRIDOR

SPACE

STAFF

LOUNGE

522C

LOCKERS

522A

LOCKERS

522D

FEMALE

LAV

522B

MALE LAV

1BR

PATIENT

ROOM #4

515A

BATH

1BR

PATIENT

ROOM #2

507A

BATH

NS-501

NURSE

STATION

MED ROOM

CLEAN

UTILITY

CLEAN

LINEN

C5-51

CORRIDOR

SOILED

HOLD

505A

BATH

1BR

ISOLATION

ROOM #1

A513

2BR

505B

ANTE

OFFICE

EQUIPMENT

ALCOVE

NS-500

NURSE

STATION

NUTRITION

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:3

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

BID DEDUCT ALTERNATE 03 & 04

P003

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

Scale: 1/8" = 1'-0"1

BID DEDUCT 03 - REMOVE THIRD FLOOR TEACHING

KITCHEN

Scale: 1/8" = 1'-0"2

BID DEDUCT 04 - RETAIN EXISTING FIFTH FLOOR

LOCKERS AND RESTROOMS

A C

F G I J LE

VTR

RD

RD

RD6" DS 1

6" DS

3" DS

2 3" DS

DENTAL INTAKES &

EXHAUST VENTS

VTR 4

MALE TLT RM

A273

DR. OFFICE

A276A

FEMALE TLT RM

A273

STAIR #1

MENTOR'S OFFICE

A276

TOILET

A217

DRIVING SIM

A215TELE MED

A211

TOILET

A281

ELEC

A209

STAIR #2

TEL CLST

A270

HAC

A276B

PT/OT STORAGE

A282

SOILED UTILITY

A283

CLEAN UTILITY

A277

CAST ROOM

A278

EXAM 5

A284

EXAM 4

A285

ELEC

A275

OFFICE

A201

EXAM 6

A279

OFFICE

A202

EXAM 3

A286

PAT. TLT

A296

EXAM 2

A287

GENERAL X-RAY

A295

EXAM 1

A288

PATIENT ED.

A289

CORRIDOR

A280A

LEAD TECH

A294

ORTHO CHECK-IN

A292B ORTHO CHECK-OUT

A292A

4" - SAN

2" - V 4" - V

4" - SAN

4" - STM

UP & DN1.5" MV

UP & DN1" DHWR

UP & DN2.5" DCW

UP & DN2" DHW

CORRIDOR

C205

4" - SAN

4" - STM

3" - STM

4" - SAN

4" - SAN

4" - V

4" - SAN

4" - SAN

4" - V

UP & DN2" DCW

UP & DN1" DHW

SAN

CORRIDOR

C205

STAIR #3

STM

V

STM

ROOM

B240A

CHIEF DENTAL SURGERY

B239

BREAKROOM

B237

PAN X-RAY

B235

OR 8

B233

OR 9

B234

OR 10

B236

OFFICE

B238

NURSES CONFERENCE

B240

ELEC

C232

DATA

B231

DECON

B224A HAC

B226

INSTRUMENT CLEAN

B224B

CORRIDOR

A280B

4" - STM

B01W

B01E

GENERAL NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. REMOVE ALL ABANDONED DOMESTIC WATER SUPPLY PIPING, MEDICAL GAS &

VACUUM PIPING AND SANITARY DRAIN & VENT PIPING. REMOVE ALL DOMESTIC

WATER DEAD LEG PIPING BACK TO WITH-IN TWO (2) PIPE DIAMETERS OF

ACTIVE MAIN AND CAP.

C. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL

GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING

FIXTURES LOCATED IN AN UNDISTURBED AREA.

D. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,

SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/

MISSING LABELS AND/ OR FLOW ARROWS.

REFER TO SPECIFICATIONS 22 05 11 SECTION 1.3.B. ASME A13.1 SCHEME

FOR THE IDENTIFICATION OF PIPING SYSTEMS.

S T

M

STM

CAP

CAP

H

I J

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:3

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL SECOND FLOOR PLAN -

REMOVALS

PD102

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTIAL SECOND FLOOR PLAN - REMOVALS

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. REMOVE EXISTING SANITARY, VENT OR STORM PIPING BACK TO POINT OF NEW

CONNECTION. REFER TO DRAINAGE PLANS FOR NEW WORK.

3. REMOVE 3" DOWNSPOUT TO ABOVE 2ND FLOOR CEILING, CAP AND ABANDON IN PLACE.

REMOVE HORIZONTAL STORM PIPING IN PIPE BASEMENT BACK TO ACTIVE MAIN AND

CAP. CAP 3" DOWNSPOUT AT BASE AND ABANDON IN PLACE.

CAP PIPING IN WALLS WHERE WALLS ARE TO REMAIN OR ABOVE CEILING OR BELOW

FLOOR SLAB WHERE WALLS ARE TO BE REMOVED. NO PIPE STUBS SHALL REMAIN

VISIBLE IN FINISHED AREAS.

4. EXTEND TEMPORARY 4" SANITARY VENT PIPING ABOVE ROOF TO OUTSIDE FUTURE

BUILDING WALL, TO FACILITATE VENTING OF CONSTRUCTION AREA. SUPPORT

TEMPORARY PIPING FROM ROOF.

KEY PLAN

N.T.S.Scale:

PIPE-BASEMENT

B01W

B01E

A C

F G I J LE

2 2

RD

VTR

RD

RD

VTR RD

2" - V

3" - STM

STAIR #1

STAIR #2

STAIR #3

CANTEEN VENDING

B306B

CANTEEN VENDING

B306A

VENDING

B306

ELEC

B312

DATA

B310B

CORRDIOR

C3-2A

OFFICE

B304

OFFICE

B312A

OFFICE

B304

OFFICE

B302

OFFICE

B300

ELEC

A373

WOMEN'S TLT

A372

MEN'S TLT

A371

DATA

A370

ELEC

A335

ELEC

A311

4" - SAN

4" - V1

4" - SAN 4" - V

UP & DN2" DCW

UP & DN1" DHW

5" - STM

4" - STM

UP & DN1.5" MV

UP & DN0.75" DHWR

UP & DN2.5" DHW

UP & DN3" DCW

4" - SAN4" - SAN4" - SAN

4" - SAN

4" - SAN

4" - SAN

OFFICE

A317A

OFFICE

A317

OFFICE

A315

OFFICE

A314

GENERAL NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. REMOVE ALL ABANDONED DOMESTIC WATER SUPPLY PIPING, MEDICAL GAS &

VACUUM PIPING AND SANITARY DRAIN & VENT PIPING. REMOVE ALL DOMESTIC

WATER DEAD LEG PIPING BACK TO WITH-IN TWO (2) PIPE DIAMETERS OF

ACTIVE MAIN AND CAP.

C. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL

GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING

FIXTURES LOCATED IN AN UNDISTURBED AREA.

D. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,

SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/

MISSING LABELS AND/ OR FLOW ARROWS.

REFER TO SPECIFICATIONS 22 05 11 SECTION 1.3.B. ASME A13.1 SCHEME

FOR THE IDENTIFICATION OF PIPING SYSTEMS.

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:3

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL THIRD FLOOR PLAN -

REMOVALS

PD103

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTAIL THIRD FLOOR PLAN - REMOVALS

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. REMOVE EXISTING ROOF/ OVERFLOW DRAINS. MAKE PROVISIONS TO REMOVE

WATER FROM THE AREA DURING THE CONSTRUCTION PERIOD.

3. REMOVE EXISTING VENT THRU ROOF AND ALL EXTRANEOUS PIPING BACK TO POINT

OF NEW CONNECTION. REFER TO DRAINAGE PLANS FOR NEW WORK.

4. EXTEND TEMPORARY 4" SANITARY VENT PIPING ABOVE ROOF TO OUTSIDE FUTURE

BUILDING WALL, TO FACILITATE VENTING OF CONSTRUCTION AREA. SUPPORT

TEMPORARY PIPING FROM ROOF.

5. EXISTING DENTAL INTAKE & EXHAUST PIPING TO BE RELOCATED/ EXTENDED. REFER

TO DRAINAGE PLANS FOR NEW WORK.

KEYPLAN

GENERAL NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. REMOVE ALL ABANDONED DOMESTIC WATER SUPPLY PIPING, MEDICAL GAS &

VACUUM PIPING AND SANITARY DRAIN & VENT PIPING. REMOVE ALL DOMESTIC

WATER DEAD LEG PIPING BACK TO WITH-IN TWO (2) PIPE DIAMETERS OF

ACTIVE MAIN AND CAP.

C. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL

GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING

FIXTURES LOCATED IN AN UNDISTURBED AREA.

D. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,

SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/

MISSING LABELS AND/ OR FLOW ARROWS.

REFER TO SPECIFICATIONS 22 05 11 SECTION 1.3.B. ASME A13.1 SCHEME

FOR THE IDENTIFICATION OF PIPING SYSTEMS.

A C

F G I J LE

STAIR #1

STAIR #2

STAIR #3

ELEC

VEST

A410

ROOM

S-4-4

ELEC

A433

DATA

A470

VEST

B400A

HAC

A477

ELEC

A474

DATA

A432A

ELEC

B434

ROOM

B424

FM STORAGE

B425

ELEC

B423

4" - V

4" - V

4" - V 4" - V

4" - STM

UP & DN0.75" MA

UP & DN1" O2

UP & DN3" DCW

UP & DN2.5" DHW

UP & DN0.75" DHWR

UP & DN1.5" MV

4" - SAN

4" - V

2" - V

4" - SAN

5" - STM

1" - DHW

2" - DCW

4" - V

4" - SAN

4" - SAN

4" - V

4" - V

4" - SAN

WC

LAV

SH

LAV

SHSH

LAV

LAV

SH SH

LAV

LAV

WC WC

LAV

4" - STMLAV

SHSH

LAV

S A

N

1.5"

4"

4"

S A

N

1.5"2"

3"

S A

N

2" 2"

3"

S A

N

WCWCLAV LAV

CO

CO

3" - STM

2 TYP.

2 TYP.

2 TYP.

2 TYP.

2 TYP.

SAN CO

1.5"

CO SAN

4" - SAN1

2 TYP.

2" 4"

4"

UP & DN0.75"

UP & DN2"

4" - V

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:4

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL FOURTH FLOOR PLAN -

REMOVALS

PD104

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. REMOVE ALL EXTRANEOUS SANITARY DRAIN AND VENT PIPING BACK TO POINT OF

NEW CONNECTION OR BACK TO ACTIVE MAIN AND CAP. CAP PIPING IN WALLS WHERE

WALLS ARE TO REMAIN, OR ABOVE CEILING OR BELOW FLOOR SLAB WHERE WALLS

ARE TO BE REMOVED. NO PIPE STUBS SHALL BE VISIBLE IN FINISHED AREAS.

3. ALL RENOVATION WORK IN THIS AREA TO BE COMPLETED AFTER THE NEW FIFTH

FLOOR WORK IS COMPLETE AND TURNED OVER TO THE VA.

4. REMOVE EXISTING 2" DCW & .075" DHW PIPING BACK TO WITH-IN TWO (2) PIPE

DIAMETERS OF ACTIVE MAIN AND CAP.

N Scale: 1/8" = 1'-0"

PARTIAL FOURTH FLOOR PLAN - REMOVALS

A C

F G I J LE

2 2

2 2

WCLAV

WC

LAV

2 2

SK

LAVSK

LAV

WCWC

LAV

SK

SH SH

FDFD

LAV LAV

LAV LAV

2 2

22 SKSK

SKSK

SH SH

SHSH

SH

2 2

3FDFD FD

FDFD

STAIR #1

STAIR #2

STAIR #3

1BR

B531

1BR

B530

1BR

B529

1BR

B528

STORAGE

B527

1BR

B526

4" - SAN

4" - V

4" - SAN

4" - V

4" - SAN

4" - STM

UP & DN3" DCW

UP & DN3" DHW

UP & DN1.5" MV

4" - SAN

DATA

B525A

ELEC

B520 STAFF TLT

B523

MED

B521A

NURSES STATION

B521

NOURISH

B517

CORRIDOR

C5-07

AAP

OFFICE

B512

OFFICE

B510

4" - SAN

4" - SAN

4" - V

HAC

B508

SOILED UTILITY

B508A

MEN'S TLT

B500C

WOMEN'S TLT

B500B

LOCKERS

B500A

ELEC

A578

WOMEN'S TLT

A577

MEN'S TLT

A576

DATA

A575

ELEC

A527

ELEC

A511

STAFF LOUNGE

B500

ANTE RM

A517

1BR ISOLATION

A515

2BR

A513

CORRIDOR

C5-09

UP & DN0.75" DHWR

ZVC1

LAV

0.5" 0.5" 0.75"

MV

MA

O2

MV

MA

O2

0.75" 0.5"

0.5"

0.5"

V

1.5"

D C

W D

H W

ZVC

1.5"

0.75"

DCW

DHW

MV

O2

O

M V

0.5"

0.75"

ZVC

ZVC

4" - SAN

2SK

5 5

5 5

O2

MA

MV

4" - SAN

0.75" 2" 9

D C

W D

H W

RISERS

WC WC

WC WC WC

GENERAL NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. REMOVE ALL ABANDONED DOMESTIC WATER SUPPLY PIPING, MEDICAL GAS &

VACUUM PIPING AND SANITARY DRAIN & VENT PIPING. REMOVE ALL DOMESTIC

WATER DEAD LEG PIPING BACK TO WITH-IN TWO (2) PIPE DIAMETERS OF

ACTIVE MAIN AND CAP.

C. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL

GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING

FIXTURES LOCATED IN AN UNDISTURBED AREA.

D. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,

SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/

MISSING LABELS AND/ OR FLOW ARROWS.

REFER TO SPECIFICATIONS 22 05 11 SECTION 1.3.B. ASME A13.1 SCHEME

FOR THE IDENTIFICATION OF PIPING SYSTEMS.

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:5

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL FIFTH FLOOR PLAN -

REMOVALS

PD105

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTIAL FIFTH FLOOR PLAN - REMOVALS

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. REMOVE EXISTING FIXTURE OR ITEM OF EQUIPMENT (TYPE AS INDICATED) AND ALL

EXTRANEOUS DOMESTIC WATER PIPING BACK TO POINT OF NEW CONNECTION OR

WITH-IN TWO (2) PIPE DIAMETERS OF ACTIVE MAIN. REMOVE ALL EXTRANEOUS

SANITARY DRAIN AND VENT PIPING BACK TO POINT OF NEW CONNECTION OR BACK

TO ACTIVE MAIN AND CAP. CAP PIPING IN WALLS WHERE WALLS ARE TO REMAIN

OR ABOVE CEILING OR BELOW FLOOR SLAB WHERE WALLS ARE TO BE REMOVED.

NO PIPE STUBS SHALL REMAIN VISIBLE IN FINISHED AREAS.

3. REMOVE EXISTING FLOOR DRAIN GRATE AND STRAINER, AND FILL WITH

CONCRETE TO FLUSH WITH EXISTING FLOOR SLAB. REMOVE EXISTING PIPING

SERVING FLOOR DRAIN BACK TO ACTIVE MAIN AND CAP OR POINT

OF NEW CONNECTION.

4. REMOVE THE ZONE VALVE CABINET (ZVC) SERVING ROOMS B526 THRU B531.

5. REMOVE EXISTING MEDICAL GAS AND/ OR VACUUM OUTLETS/ INLETS AND

ASSOCIATED PIPING BACK TO ACTIVE MAIN AND CAP. REFER TO NEW WORK PLANS.

6. DOMESTIC WATER RISERS FROM FOURTH FLOOR TO REMAIN.

7. ALL RENOVATION WORK IN THIS AREA TO BE COMPLETED AFTER THE NEW FIFTH

FLOOR WORK IS COMPLETE AND TURNED OVER TO THE VA.

8. REMOVE MEDICAL GAS INLETS/ OUTLETS AND PIPING BACK TO ACTIVE MAIN AND CAP.

9. REMOVE EXISTING DOMESTIC WATER PIPING BACK TO POINT OF NEW CONNECTION

OR WITH-IN TWO (2) PIPE DIAMETERS OF ACTIVE MAIN AND CAP.

A C

F G I J LE

UP4" SAN

3" - STM

2" - V

4" - SAN

4" - V

4" - SAN

4" - STM

4" - SAN

UP6" STM

UP6" STM

4" - STM

SAN

SAN

SAN

4" - SAN

4" - V

1 1

4" - SAN

CORRDIOR

A280B

ELEC

A209

TELE MED

A213

DRIVING SIM

A215

TOILET

A217

TOILET

A281

MALE TLT RM

A273

DR. OFFICE

A276A

FEMALE TLT RM

A273

MENTOR'S OFFICE

A276

HAC

A276B

PT/OT STORAGE

A282

SOILED UTILITY

A283

CLEAN UTILITY

A277

CAST ROOM

A278

EXAM 5

A284

EXAM 4

A285

ELEC

A275OFFICE

A201

EXAM 6

A279

OFFICE

A202

EXAM 3

A286

EXAM 2

A287

GENERAL X-RAY

A295

EXAM 1

A288

PATIENT ED.

A289

CORRIDOR

A290A

LEAD TECH

A294

ORTHO CHECK-IN

A292B ORTHO CHECK-OUT

A292A

CORRDIOR

A280A

ROOM

B240A

CHIEF DENTAL SURGERY

B239

BREAKROOM

B237

PAN X-RAY

B235

OR 8

B233

OR 9

B234

OR 10

B236

OFFICE

B238

NURSES CONFERENCE

B240

ELEC

C232

DATA

B231

DECON

B224A

HAC

B226

INSTRUMENT CLEAN

B224B

4" - STM

3" - STM

DN4" SAN

DN4" SAN

V

UP4" SAN

S A

N

STAIR #1

STAIR #2

STAIR #3

P-502

1.5" VR

UP3" V 4

P-528

DVX

DVX

DAI

DAI

CO

CO

CO

CO

P-530

CO

CAP

CAP

3" - STM

2" VR

CSS

P-528

P-528

P-528 2

DP-1

DW-1 DW-1(2) (2)

GI-1

FD2

GENERAL NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL

GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING

FIXTURES LOCATED IN AN UNDISTURBED AREA.

C. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,

SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/

MISSING LABELS AND/ OR FLOW ARROWS.

REFER TO SPECIFICATIONS 22 05 11 SECTION 1.3.B. ASME A13.1 SCHEME

FOR THE IDENTIFICATION OF PIPING SYSTEMS.

D. ALL SANITARY DRAIN, STORM AND DISTRIBUTION PIPING RUN OVER HVAC,

ELECTRICAL EQUIPMENT OR PANELS OR MEDICAL EQUIPMENT SHALL HAVE

SPILL/ LEAK PROTECTION AND LEAK DETECTING SENSORS.

E. ABOVE CEILING UTILITY SPACE IS LIMITED. COORDINATION WITH ALL TRADES IS

CRITICAL, PRIOR TO INSTALLATION OF ANY WORK.

B01W

B01E

FE

UP3" SAN

LAV

WCFD

MS

UP4" SAN

STAFF TLT.

A164

STAFF LOUNGE

A165

HAC

A162F

A162A

PHARMACY

WORKROOM

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:0

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL SECOND FLOOR PLAN -

DRAINAGE

PL102

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTIAL SECOND FLOOR PLAN - DRAINAGE

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. FIXTURE SHALL BE VENTED BY A COMBINATION WASTE AND VENT SYSTEM.

MAXIMUM SLOPE SHALL BE 1/2" PER FOOT BETWEEN FIXTURE AND VENT

CONNECTION OF SYSTEM.

3. EXISTING DENTAL INTAKE AND EXHAUST PIPING. EXTEND PIPING UP TO ROOF.

4. ABANDONED 3" STORM DOWNSPOUT IN COLUMN.

5. CONNECT 4" SANITARY FROM SECOND FLOOR TO 4" CARRIER CONNECTION.

6. 0.3 - DEDUCT ALTERNATE 03: OMIT ALL WORK RELATED TO THE TEACHING KITCHEN.

REFER TO SHEET P002 AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

KEY PLAN

SCALE: 1/8" = 1'-0"

PARTIAL FIRST FLOOR PLAN

A C

F G I J LE

OPEN OFFICE

HEALTHY

TEACHING

KITCHEN

3" - STM

5" - STM

2" - V

4" - STM

P-528 P-528 P-528 P-528

6" - STM

UP & DN4" SAN

UP & DN3" V

6" - STM

FD3

UP & DN4" SAN

CANTEEN VENDING

B306B

CANTEEN VENDING

B306A

VENDING

B306

4" - SAN4" - SAN4" - SAN

4" - SAN

1 1 1

4" - STM

CORRDIOR

C3-2A

LOBBY

B314

ELEC

A373

WOMEN'S TLT

A372

MEN'S TLT

A371

DATA

A370

ELEC

A335

ELEC

A311

OPEN OFFICE

OPEN OFFICE

CHAPEL

V

2" VR

FD3

4" - SAN

4" - SAN

4" - V

S A

N

V

V

4" - SAN

STAIR #1

STAIR #2

STAIR #3

P-530

P-527

S A

N

P-529

P-502

1.5" VR

V

UP & DN4" SAN

CO

CO

CO

CO

CO

CO

FD2

FD2

2" VR

SAN

S A

N

FD2

S A

N

FD2

2" VR

CO

CO

OFFICE

A317A

OFFICE

A317300

COMMON

SPACE

OFFICE

A314

2" VR

4" - V

4" - V

4" - V 4" - V

P401

GENERAL NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL

GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING

FIXTURES LOCATED IN AN UNDISTURBED AREA.

C. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,

SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/

MISSING LABELS AND/ OR FLOW ARROWS.

REFER TO SPECIFICATIONS 22 05 11 SECTION 1.3.B. ASME A13.1 SCHEME

FOR THE IDENTIFICATION OF PIPING SYSTEMS.

D. ALL SANITARY DRAIN, STORM AND DISTRIBUTION PIPING RUN OVER HVAC,

ELECTRICAL EQUIPMENT OR PANELS OR MEDICAL EQUIPMENT SHALL HAVE

SPILL/ LEAK PROTECTION AND LEAK DETECTING SENSORS.

E. ABOVE CEILING UTILITY SPACE IS LIMITED. COORDINATION WITH ALL TRADES IS

CRITICAL, PRIOR TO INSTALLATION OF ANY WORK.

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:1

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL THIRD FLOOR PLAN -

DRAINAGE

PL103

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTIAL THIRD FLOOR PLAN - DRAINAGE

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. DENTAL INTAKE AND EXHAUST PIPING. MATCH EXISTING SIZE AND MATERIAL EXTEND

PIPING UP THROUGH SIXTH FLOOR. REFER TO SIXTH FLOOR DRAINAGE PL106.

3. PROVIDE EXPANSION JOINT AT THIS LOCATION. REFER TO SPECIFICATIONS.

4. 01 DEDUCT ALTERNATE 01: OMIT ALL NEW WORK RELATED TO THE OPEN OFFICES AND

CHAPEL. REFER TO SHEET P002 AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

5. 03 DEDUCT ALTERNATE 03: OMIT ALL NEW WORK RELATED TO THE TEACHING KITCHEN.

EXISTING OFFICE CONSTRUCTION TO REMAIN.

REFER TO SHEET P003 AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

A C

F G I J LE

P-527

P-104 P-104

FD1

FD1

FD1

FD1

FD1

FD1 FD1

5" - STM

4" - STM

4" - V

4" - V

4" - V

4" - STM

2" - V

4" - V

4" - SAN

4" - V

P-419

(2)

P-418 (2)

P-527

UP & DN6" STM

DN4" SAN

UP & DN4" V

DN4" SAN

P-419

1.5" VR

P-418 P-418

SAN

SAN

S A

N

1 1

SAN

S A

N

FD3

1.5" VR

S A

N S

A N

UP & DN4" SAN UP & DN4" V

P-418

P-419

P-419 (2)

P-418

P-527

P-419

6" - OD

UP6" OD

6" - OD

4" - SAN

4" - V

ELEC

A474

HAC

A477

VEST

B400A

DATA

B470

ELEC

A433

VEST

A410

ELEC

V

A

P601

FD1

(2)

1.5" VR

STAIR #1

STAIR #2

STAIR #3

FD1

FD1

P-104

FD1

1.5" VR

FD1

FD1 FD1

1.5" VR

2" VR

CAP

CO

CAP

UP4" SAN

V

S A

N

2" VR

CO

S A

N

P-418

SAN

O D

UP & DN6" STM

P-809

P-809

P-809P-809

P-809

P-809

P-809P-809

CRP

C R

P

FD1

FD1

CRP

C R

P

P-104

1.5" VR

P-101

2" VR

1.5" VR

1.5" VR

C R

P

P-101

P-527

UP & DN4" V

CO

P-418

1.5" VR

FD1

FD2

FD2

FD2

FD2

2" VR

FD1

2" VR

P-101

2" VR

P-809

P-419

4" - SAN

SAN

SAN

P-418

SAN

P-418

1.5" VR

P-419

SAN

CRP

C R

P

CO

CO

ELECTRICAL

SHOP

401A

OFFICE

MECHANICAL

ROOM

P-418

SAN

S A

N

SAN

P-101

2" VR

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

COCO

CO

CO

FD2

1.5" VR

1.5" VR

FD2

FOURTH FLOOR

2" VR

BOP: 9' - 4 23/32"

4" - SAN

4" - SAN 4" - SAN 4" - SAN

1.5" VRP-101

2" VR

1.5" VR

6" (100 GPM)

6" (216 GPM)

6" (316 GPM)

1/4" SLOPE

FD3

4" - SAN

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:2

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL FOURTH FLOOR PLAN -

DRAINAGE

PL104

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTIAL FOURTH FLOOR PLAN - DRAINAGE

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. DENTAL INTAKE AND EXHAUST PIPING. MATCH EXISTING SIZE AND MATERIAL EXTEND

PIPING UP.

3. CONNECT 1.5" VENT INTO EXISTING VENT PIPING IN HAC RM A477.

4. PROVIDE EXPANSION JOINT AT THIS LOCATION. REFER TO SPECIFICATIONS.

5. ALL RENOVATION WORK IN THIS AREA TO BE COMPLETED AFTER THE NEW FIFTH

FLOOR WORK IS COMPLETE AND TURNED OVER TO THE VA.

6. 02 DEDUCT ALTERNATE 02: OMIT ALL NEW WORK RELATED TO THE ELECTRICAL SHOP.

REFER TO SHEET P002 AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

7. 04 DEDUCT ALTERNATE 04: OMIT ALL NEW WORK RELATED TO THE NEW LOUNGE

AND LOCKER ROOMS.

REFER TO SHEET P003 AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

KEYPLAN

A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL

GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING

FIXTURES LOCATED IN AN UNDISTURBED AREA.

C. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,

SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/

MISSING LABELS AND/ OR FLOW ARROWS.

REFER TO SPECIFICATIONS 22 05 11 SECTION 1.3.B. ASME A13.1 SCHEME

FOR THE IDENTIFICATION OF PIPING SYSTEMS.

D. ALL SANITARY DRAIN, STORM AND DISTRIBUTION PIPING RUN OVER HVAC,

ELECTRICAL EQUIPMENT OR PANELS OR MEDICAL EQUIPMENT SHALL HAVE

SPILL/ LEAK PROTECTION AND LEAK DETECTING SENSORS.

E. ROUTE SANITARY, VENT AND STORM PIPING TIGHT TO STRUCTURE.

ABOVE CEILING UTILITY SPACE IS LIMITED. COORDINATION WITH ALL TRADES IS

CRITICAL, PRIOR TO INSTALLATION OF ANY WORK.

GENERAL NOTES

A C

F G I J LE

P-527

P-107

P-418 P-418

P-527

P-418

P-104

P-418

P-418

P-811

P-527

P-418

P-418

P-418

P-418

P-418

DN6" STM

VTR

DN6" STM

P-418

2 3

V

4" - SAN 4" - SAN

V

P-104

4" - SAN

V

FD1

FD1 FD1

V

VP-104

V

UP & DN4" VUP & DN4" SAN

RD2

OD2

RD2

P-419P-419

P-419

P-419

P-419

P-419

P-419

P-419

P-418

S T

M

V

4" - SAN

4" - V

4" - SAN

V

V

V

V

STAIR #1

STAIR #2

STAIR #3

FD1

FD1

FD1

FD1

FD1

FD1

VR

VR

VR

VR

FD1

FD1

FD1

FD1 VR

VR

VR

P-701

FD1

P-107

O D

DN6" OD

4" - SAN

P-809P-809

CRV

CRV

C R

V

C R

V

P-809 3" VTR

C R

V

P-809

P-809

VR

FD1

VR

VR

VR

FD1

P-809

DN6" OD

4" - SAN

ELECTRICAL

A578

DATA

A575

ELEC

A527

ELEC

A511

LAV

A576

LAV

A577

MED

B521A

LAV

B523

DATA

B525A

DATA

B525

ELEC

B520

OFFICE

VR

P-104

4" SAN DN

V

V

P-101

P-101

P-809

P-809

P-418

P-418

FD1

FD1

P-418P-101

1BR

ISOLATION

ROOM #1

505B

ANTE

OFFICE

EQUIPMENT

ALCOVE

NS-500

NURSE

STATION

SOILED

HOLD

NUTRITION

1BR

PATIENT

ROOM #2

505A

BATH

507A

BATH

515A

BATH

1BR

PATIENT

ROOM #4

1BR

PATIENT

ROOM #5

517A

BATH

519A

BATH

1BR

PATIENT

ROOM #6

C5-50

CORRIDOR

C5-50

CORRIDOR

NS-501

NURSE

STATION

CLEAN

LINEN

CLEAN

UTILITY

MED ROOM

SPACE

522A

LOCKERS

522C

LOCKERS

522B

MALE LAV

522D

FEMALE

LAV

STAFF

LOUNGE

LOUNGE

NS-503

NURSE

STATION

NS-502

NURSE

STATION

523A

BATH

1 BR

PATIENT

ROOM #7

1 BR

PATIENT

ROOM #8

1 BR

PATIENT

ROOM #9

524A

BATH

525A

BATH

C5-51

CORRIDOR

P-809

VR

VTR

VTR

VR

V

V

V

VR

P-101

V

V

C5-52

CORRIDOR

CORRIDOR

C5-07

CORRIDOR

C5-09

CO

FD2FD2

CO

CO

CO

CO

CO

CO

COCO

CO

CO

CO

CO

CO

1BR

PATIENT

ROOM #3

CO

CO

1.5" VR

1.5" VR

CO

4" - V4" - V4" - V

4" - V

P-419

P-101

6" (131 GPM)

4" (85 GPM)

6" (100 GPM)

6" (131 GPM)

RD1

OD1

OD2

6" (100 GPM)

6" (100 GPM)

6" (216 GPM)

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:2

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL FIFTH FLOOR PLAN -

DRAINAGE

PL105

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTIAL FIFTH FLOOR PLAN - DRAINAGE

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. PIPING LOCATED IN CHASE/ WALL ABOVE FLOOR SLAB.

3. CONNECT TO EXISTING APPROPRIATELY SIZED VENT PIPING IN THIS AREA.

4. DENTAL INTAKE AND EXHAUST PIPING. MATCH EXISTING SIZE AND MATERIAL EXTEND

PIPING UP.

5. NEGATIVELY PRESSURIZED SPACE. SEAL ALL PENETRATIONS IN WALL AND/ OR

CEILING AS REQUIRED TO MAINTAIN PRESSURIZATION.

6 PROVIDE EXPANSION JOINT AT THIS LOCATION. REFER TO SPECIFICATIONS.

7. LOCATE STORM CLEANOUT AT 24" AFF.

8. ALL RENOVATION WORK IN THIS AREA TO BE COMPLETED AFTER THE NEW FIFTH

FLOOR WORK IS COMPLETE AND TURNED OVER TO THE VA.

9. DROP SUPPLY PIPING IN WALL AT THIS LOCATION. ROUTE IN WALL BELOW

WINDOW TO FIXTURE.

10. 04 DEDUCT ALTERNATE 04: OMIT ALL NEW WORK RELATED TO THE NEW LOUNGE

AND LOCKER ROOMS.

EXISTING LOCKERS, HAC, SOILED UTILITY AND OFFICE CONSTRUCTION TO REMAIN.

EXISTING OFFICE TO BECOME CLEAN LINEN ROOM.

REFER TO SHEET P003 AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

KEYPLAN

A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL

GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING

FIXTURES LOCATED IN AN UNDISTURBED AREA.

C. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,

SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/

MISSING LABELS AND/ OR FLOW ARROWS.

REFER TO SPECIFICATIONS 22 05 11 SECTION 1.3.B. ASME A13.1 SCHEME

FOR THE IDENTIFICATION OF PIPING SYSTEMS.

D. ALL SANITARY DRAIN, STORM AND DISTRIBUTION PIPING RUN OVER HVAC,

ELECTRICAL EQUIPMENT OR PANELS OR MEDICAL EQUIPMENT SHALL HAVE

SPILL/ LEAK PROTECTION AND LEAK DETECTING SENSORS.

E. ROUTE VENT AND STORM PIPING TIGHT TO STRUCTURE.

ABOVE CEILING UTILITY SPACE IS LIMITED. COORDINATION WITH ALL TRADES IS

CRITICAL, PRIOR TO INSTALLATION OF ANY WORK.

GENERAL NOTES

A C

F G I J LE

RD2OD2

RD1OD1

RD2OD2

STAIR #1

STAIR #2

STAIR #3

VTR

VTR

VTR

VTR

(100 GPM)

(85 GPM)

(131 GPM)

GENERAL NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL

GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING

FIXTURES LOCATED IN AN UNDISTURBED AREA.

C. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,

SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/

MISSING LABELS AND/ OR FLOW ARROWS.

REFER TO SPECIFICATIONS 22 05 11 SECTION 1.3.B. ASME A13.1 SCHEME

FOR THE IDENTIFICATION OF PIPING SYSTEMS.

D. ALL SANITARY DRAIN, STORM AND DISTRIBUTION PIPING RUN OVER HVAC,

ELECTRICAL EQUIPMENT OR PANELS OR MEDICAL EQUIPMENT SHALL HAVE

SPILL/ LEAK PROTECTION AND LEAK DETECTING SENSORS.

E. ABOVE CEILING UTILITY SPACE IS LIMITED. COORDINATION WITH ALL TRADES IS

CRITICAL, PRIOR TO INSTALLATION OF ANY WORK.

H.2

G

NINTH FLOOR ROOFEIGHTH FLOOR ROOF

DAIDVX

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:3

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL SIXTH FLOOR PLAN -

DRAINAGE

PL106

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTIAL SIXTH FLOOR PLAN - DRAINAGE

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. DENTAL INTAKE AND EXHAUST PIPING. MATCH EXISTING SIZE AND MATERIAL, ROUTE

PIPING OVER TO WALL, EXTEND INTAKE PIPING TO ABOVE NINTH FLOOR ROOF

PARAPET, TERMINATE WITH GOOSENECK AND PROVIDE BIRD SCREEN.

EXTEND EXHAUST PIPING TO ABOVE EIGHTH FLOOR ROOF PARAPET, TERMINATE WITH

GOOSENECK AND PROVIDE BIRD SCREEN.

KEYPLAN

SCALE: 1/8" = 1'-0"

NINTH FLOOR ROOF PLAN

B F

P

B01W

B01E

A C

F G I J LE

P-530

P-528

P-528

P-528

P-528

0.5"

STAIR #1

STAIR #2

STAIR #3

ELEC

A311

DATA

A370

ELEC

A335

ELEC

A373

LAV

A372

LAV

A371

OPEN OFFICE

LOBBY

OPEN OFFICE

OPEN OFFICE

CHAPEL

P-527

0.75"

0.75"

P-811

0.75"

P-811

P-502

HEALTHY

TEACHING

KITCHEN

HAC

OFFICE

A317A

OFFICE

A317300

COMMON

SPACE

OFFICE

A314

0.75"

P-529

1" - DHWR

1.5" - DHW

2.5" - DCW1.5"

0.75"

1 RISERS

P401

0.5"0.75"0.5"

TP-2

0.75"

1"

GENERAL NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL

GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING

FIXTURES LOCATED IN AN UNDISTURBED AREA.

C. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,

SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/

MISSING LABELS AND/ OR FLOW ARROWS.

REFER TO SPECIFICATIONS 22 05 11 SECTION 1.3.B. ASME A13.1 SCHEME

FOR THE IDENTIFICATION OF PIPING SYSTEMS.

D. ALL SANITARY DRAIN, STORM AND DISTRIBUTION PIPING RUN OVER HVAC,

ELECTRICAL EQUIPMENT OR PANELS OR MEDICAL EQUIPMENT SHALL HAVE

SPILL/ LEAK PROTECTION AND LEAK DETECTING SENSORS.

E. ABOVE CEILING UTILITY SPACE IS LIMITED. COORDINATION WITH ALL TRADES IS

CRITICAL, PRIOR TO INSTALLATION OF ANY WORK.

H.2 I J

0.75"

0.5" P-528

P-528

0.5" 0.75"

0.5"

1" - DHWR

1.5" - DHW

2.5" - DCW

0.75"

1 RISERS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:2

:4

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL THIRD FLOOR PLAN -

DISTRIBUTION

PP103

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTIAL THIRD FLOOR PLAN - DISTRIBUTION

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. EXTEND DOMESTIC WATER PIPING UP TO SERVE ISLAND SINK FIXTURES ON

THIRD FLOOR.

3. FIXTURES SERVED FROM FLOOR BELOW.

4. PROVIDE EXPANSION JOINT AT THIS LOCATION. REFER TO SPECIFICATIONS.

5. PROVIDE THERMOSTATIC BALANCING VALVEPER SPECIFICATION 22 05 23. REFER

TO DETAIL H/P601.

6. 02 DEDUCT ALTERNATE 02: OMIT ALL NEW WORK RELATED TO THE ELECTRICAL SHOP.

REFER TO SHEET P002 AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

7. 0.3 DEDUCT ALTERNATE 03: OMIT ALL WORK RELATED TO THE TEACHING KITCHEN.

REFER TO SHEET P002 AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

Scale: 1/8" = 1'-0"2

PARTIAL SECOND FLOOR PLAN - DISTRIBUTION

A C

F G I J LE

P-802

0.75"

STAIR #1

STAIR #2

STAIR #3

ELEC

A474

HAC

A477

VEST

B400A

DATA

B470

ELEC

A433

VEST

A410

ELEC

P-527

P-811

4 6

MECHANICAL

ROOM

ELECTRICAL

SHOP

0.5"

1.5" - DHW

1" - DHWR

2.5" - DCW

1 RISERS

401A

OFFICE

TP-1

0.5"

GENERAL NOTES

A. REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. MAINTAIN AND RESTORE, IF INTERRUPTED, DOMESTIC WATER SUPPLY, MEDICAL

GAS & VACUUM SYSTEMS AND SANITARY & VENT SYSTEMS TO EXISTING

FIXTURES LOCATED IN AN UNDISTURBED AREA.

C. IN THE RENOVATION AREA, CORRECT ANY DOMESTIC WATER, MEDICAL GAS,

SANITARY & VENT PIPE LABELING ON EXISTING PIPING THAT IS MISLABELED/

MISSING LABELS AND/ OR FLOW…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .