This document appears to be a set of drawings related to the mechanical aspects of the 506-334 - Construct Private In-Patient Rooms and Primary Clinics project for the Department of Veterans Affairs Technology Acquisition Center Austin. The project involves the construction of private in-patient rooms and primary clinics at a facility in Ann Arbor, MI. The solicitation number is 36C25024B0031_1, and the federal contract opportunity ID is 86c3f49d88f34f769ef0f08cbd641801. No other details regarding the overall contract requirements, response dates, pricing terms, set asides, or award information are provided in this specific document.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE:
ALL SYMBOLS AND ABBREVIATIONS ARE
SUBJECT TO MODIFICATIONS ON OTHER
DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS MIGHT
NOT NECESSARILY BE USED ON THIS
PROJECT.
ABBREVIATIONS
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
AFMS - AIR FLOW MEASURING STATION
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
ATC - AUTOMATIC TEMPERATURE CONTROL
(SYNONYMOUS WITH BAS)
BAS - BUILDING AUTOMATION SYSTEM
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CFCI - CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CFM - CUBIC FEET PER MINUTE
CHS - CHILLED WATER SUPPLY
CHR - CHILLED WATER RETURN
CHGR - CHILLED WATER GLYCOL SOLUTION RETURN
CHGS - CHILLED WATER GLYCOL SOLUTION SUPPLY
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
CO2 - CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
CTR - CENTER
CU - COPPER
CW - COLD WATER
CWR - CONDENSER WATER RETURN
CWS - CONDENSER WATER SUPPLY
D - DRAIN LINE
DB - DRY BULB
DDC - DIRECT DIGITAL CONTROLS
DI - DEIONIZED WATER
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DWG - DRAWING
EA - EACH OR EXHAUST AIR
EAT - ENTERING AIR TEMPERATURE
EC - ELECTRICAL CONTRACTOR (DIVISION 26)
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
EQS - EQUIPMENT SUPPLIER
EWT - ENTERING WATER TEMPERATURE
EXH - EXHAUST
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
FD - FLOOR DRAIN
FF - FINISHED FLOOR ELEVATION
FLR - FLOOR
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION 21)
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES CONTRACTOR
GPM - GALLONS PER MINUTE
HB - HOSE BIBB
HC - HVAC CONTRACTOR (DIVISION 23)
HD - HUB DRAIN
HG - REFRIGERANT HOT GAS
HP - HORSEPOWER
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HR - HOUR
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
HW - HOT WATER
HWR - HEATING HOT WATER RETURN
HWS - HEATING HOT WATER SUPPLY
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
KEC - KITCHEN EQUIPMENT CONTRACTOR
L - LENGTH
LAT - LEAVING AIR TEMPERATURE
LAV - LAVATORY
LBS - POUNDS
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LWT - LEAVING WATER TEMPERATURE
MAX - MAXIMUM
MDD - MOTORIZED DAMPER
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE
RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - WATER MAKE-UP
N/C - NORMALLY CLOSED
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NOM - NOMINAL
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OA - OUTDOOR AIR
OBD - OPPOSED BLADE DAMPER
OD - OUTSIDE DIAMETER
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
P - PROPANE GAS
PC - PLUMBING CONTRACTOR (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PLBG - PLUMBING
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSIG - POUNDS PER SQUARE INCH GAUGE
RA - RETURN AIR
RAD - RADIUS
RCP - REFLECTED CEILING PLAN
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS WATER SUPPLY
ROR - REVERSE OSMOSIS WATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTION
S - SPRINKLER (WET)
SA - SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD WATER
SHT - SHEET
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SRV - SAFETY RELIEF VALVE
SS - STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TYP - TYPICAL
UNO - UNLESS NOTED OTHERWISE
V - VENT
VAC - VACUUM
VEL - VELOCITY
VIB - VALVE IN BOX
VOL - VOLUME
VTR - VENT THROUGH ROOF
VR - VENT RISER
W/ - WITH
W/O - WITHOUT
WB - WET BULB
WCO - WALL CLEANOUT
HVAC PIPING DESIGNATIONS
CHILLED WATER SUPPLY PIPECHS
CONDENSER WATER SUPPLY PIPECWS
CONDENSER WATER RETURN PIPECWR
DRAIN LINE. PITCH IN DIRECTION INDICATEDD
HEATING HOT WATER SUPPLY PIPEHWS
HEATING HOT WATER RETURN PIPEHWR
WATER MAKE-UP PIPEMU
VENT PIPEV
REFRIGERANT LIQUID LINERL
REFRIGERANT SUCTION LINERS
EXPANSION TANK PIPEET
REFRIGERANT HOT GAS LINEHG
LOW PRESSURE CONDENSATE RETURN PIPELPC
LOW PRESSURE STEAM SUPPLY PIPELPS
MEDIUM PRESSURE CONDENSATE RETURN PIPEMPC
MEDIUM PRESSURE STEAM SUPPLY PIPEMPS
PUMPED CONDENSATE RETURN PIPEPC
HIGH PRESSURE CONDENSATE RETURN PIPEHPC
HIGH PRESSURE STEAM SUPPLY PIPEHPS
STEAM SUPPLY PIPE - NUMBER INDICATES P.S.I.G.10
MISC SYMBOLS
DUCTWORK SYMBOLS
ROUND BRANCH DUCTWORKCONICAL
FITTING
ACOUSTIC
FITTING
ACOUSTIC
FITTING
ADAD
D
R R
D
RECTANGULAR BRANCH DUCTWORK
SQUARE TEE WITH TURNING VANES
NOTE: ALL SQUARE ELBOWS IN
RECTANGULAR AND ROUND / OVAL
DUCTWORK SHALL BE PROVIDED WITH
TURNING VANES. REFER TO
SPECIFICATIONS FOR ADDITIONAL DETAILS.
EXISTING DUCTWORK TO REMOVED
RETURN AIR, RELIEF AIR, OR TRANSFER AIR
DUCTWORK. (UP AND DOWN) RADIUSED
OR SQUARE WITH TURNING VANES.
SUPPLY AIR OR OUTDOOR AIR DUCTWORK.
(UP AND DOWN) RADIUSED OR SQUARE
WITH TURNING VANES.
EXHAUST AIR DUCTWORK. (UP AND DOWN)
RADIUSED OR SQUARE WITH TURNING
VANES.
RECTANGULAR AND ROUND / OVAL
DUCTWORK RISE / DROP WITH 90° RADIUSED
OR SQUARE ELBOWS AND TURNING VANES.
RADIUS ELBOW
90° SQUARE ELBOW (WITH TURNING VANES)
NOTE: ALL SQUARE ELBOWS IN
RECTANGULAR AND ROUND DUCTWORK
SHALL BE PROVIDED WITH TURNING VANES.
ACCESS DOOR OR PANEL
DUCTWORK RISE IN DIRECTION OF AIR
FLOW
DUCTWORK DROP IN DIRECTION OF AIR
FLOW
DUCTWORK WITH ACOUSTICAL LINER.
LISTED DUCT SIZES ARE INSIDE CLEAR
DIMENSIONS.
RECTANGULAR ROUND / OVAL
FLEXIBLE DUCTWORK
FLEXIBLE CONNECTION
DUCTWORK CONSTRUCTED OF SPECIAL
MATERIAL AS NOTED
DIRECTION OF PITCH
RECTANGULAR DUCTWORK DIMENSIONS
(W x H)26x20
ROUND DUCTWORK DIMENSIONS (DIA)26ø
OVAL DUCTWORK DIMENSIONS (W x H)26x20 OV
DUCTWORK DEVICE SYMBOLS
WALL OR DUCTWORK MOUNTED AIR DEVICE. SG1 = DESIGNATION (REFER
TO AIR DEVICE SCHEDULE). 20x12 = DUCT CONNECTION SIZE (IN INCHES).
300 = REQUIRED CFM. 9'-0" = MOUNTING HEIGHT FROM FLOOR TO BOTTOM
OF GRILLE.
A3 10ø
MANUAL BALANCING DAMPER WITH LOCKING DEVICE
BDD = BACK DRAFT DAMPER
CBD = COUNTER-BALANCED BACK DRAFT DAMPER
SD = SMOKE DAMPER
FS = COMBINATION FIRE - SMOKE DAMPER
MDD = MOTORIZED DAMPER
AFMS = AIR FLOW MEASURING STATION
DUCT MOUNTED SMOKE DETECTOR. COORDINATE LOCATION.
HUMIDITY SENSOR - DUCT MOUNTED
SG1
20x12
BOG: 9'-0"
XXX
A-D
XX
H
SD
SP
AIR DEVICE. A3 = DESIGNATION (REFER TO FLOOR PLANS AND AIR DEVICE
SCHEDULE FOR VARIOUS DESIGNATIONS).
10ø = NECK SIZE (IN INCHES). 300 = REQUIRED CFM. ALL AIR DEVICE
DISCHARGE 4-WAY UNLESS NOTED WITH FLOW ARROWS. AIR DEVICE
SHOWN IS 2-WAY SIDE THROW. METHOD OF IDENTIFICATION ALSO APPLIES
TO OTHER CEILING MOUNTED AIR DEVICES.
FIRE DAMPER
A = TYPE (REFER TO FLOOR PLANS AND DETAILS FOR VARIOUS TYPES)
D OR S = DYNAMIC OR STATIC
STATIC PRESSURE SENSOR - DUCT MOUNTED
C
CARBON DIOXIDE SENSOR - DUCT MOUNTED
S
TEMPERATURE SENSOR - DUCT MOUNTED
CHECK VALVE
T
P
FOB
FOT
SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR REQUIRED TYPE BASED ON
APPLICATIONS)
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
PRESSURE GAUGE
TEMPERATURE GAUGE OR THERMOMETER
VALVES AND FITTINGS
CHILLED WATER GLYCOL SOLUTION RETURN PIPECHGR
CHILLED WATER GLYCOL SOLUTION SUPPLY PIPECHGS
CHILLED WATER RETURN PIPECHR
SQUARE THROAT / RADIUS HEEL
FITTINGS NOT ACCEPTABLE
PIPING SYMBOLS
DOUBLE LINE SINGLE LINE
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REMAIN
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
DD
RR
PIPE RISER
RADIUS'D BRANCH
RADIUS'D TEE
EXISTING DUCTWORK TO REMAIN
UNLESS NOTED OTHERWISE ON DRAWINGS,
15° MAX FOR DIVERGING, 30° MAX FOR
CONVERGING TRANSITION
EMERGENCY SHUTOFF STATION. 46" MOUNTING HEIGHT UNLESS NOTED OTHERWISE.
SPACE TEMPERATURE SENSOR / THERMOSTAT. WHEN WALL MOUNTED, MOUNTING
HEIGHT 46" TO MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH
COORDINATE WITH ARCHITECT.
T
DP
DIFFERENTIAL PRESSURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO
MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
H
HUMIDITY SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.
CARBON DIOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.
C
CO
CARBON MONOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET
ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
TEMPERATURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA
REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH
ARCHITECT.
S
S TEMPERATURE SENSOR MOUNTED IN CEILING PLENUM.
STATIC PRESSURE SENSOR.SP
DRAIN VALVE WITH HOSE END CONNECTION
EXPANSION JOINT
MANUAL AIR VENT
AUTOMATIC AIR VENT
PRESSURE REDUCING VALVE
QUICK OPENING MANUAL VALVE
VACUUM BREAKER
NEEDLE VALVE
PRESSURE AND TEMPERATURE TEST PLUG
VACUUM GAUGE WITH STOP
END CAP
GLOBE VALVE
SHUTOFF VALVE AND BOX
SHUTOFF VALVE ON RISER
A
M
M
N
V
VB
SOLENOID VALVE
S
SAFETY RELIEF VALVE. FOR HYDRONIC SYSTEMS PIPE DISCHARGE AIR GAPPED TO
FLOOR DRAIN UNLESS NOTED OTHERWISE. FOR STEAM SYSTEMS PIPE DISCHARGE
TO OUTDOORS.
WATER METERM
PRESSURE GAUGE WITH COCK AND SIPHON LOOP
BI-METALIC STEAM TRAP AND DRIP ASSEMBLY
THERMOSTATIC STEAM TRAP AND DRIP ASSEMBLY
BM
TD
IB
FT
TS
FLOW METER
F
UNION
CLEANOUT
STRAINER
M
MODULATING 2 PORT AUTOMATIC CONTROL VALVE
M
MODULATING 3 PORT AUTOMATIC CONTROL VALVE
M
COMBINATION SHUTOFF AND BALANCING VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
STRAINER WITH A BLOW DOWN VALVE AND HOSE CONNECTION
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN AND OUT
2 PORT AUTOMATIC CONTROL VALVE, 2-POSITION UNLESS SPECIFIED OTHERWISE
3 PORT AUTOMATIC CONTROL VALVE, 2-POSITION UNLESS SPECIFIED OTHERWISE
AUTOMATIC PRESSURE INDEPENDENT CONTROL VALVE
THERMODYNAMIC STEAM TRAP AND DRIP ASSEMBLY
INVERTED BUCKET STEAM TRAP AND DRIP ASSEMBLY
FLOAT AND THERMOSTATIC STEAM TRAP AND DRIP ASSEMBLY
1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.
2. THE DRAWINGS AND SPECIFICATIONS SHALL BE CAREFULLY STUDIED DURING THE COURSE OF BIDDING
AND CONSTRUCTION. ANY ERRORS, OMISSIONS OR DISCREPANCIES ENCOUNTERED SHALL BE REFERRED
IMMEDIATELY TO THE ARCHITECT/ENGINEER FOR INTERPRETATION OR CORRECTION.
3. SITE VISIT(S) SHALL BE AS OUTLINED IN PROJECT SPECIFICATIONS.
4. INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO ARCHITECTURAL DRAWINGS
AND GENERAL REQUIREMENTS SECTION 01 00 00.
5. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED
IN THE PERFORMANCE OF WORK IN THIS PROJECT.
6. PROVIDE ALL ROOFING PENETRATION, REPAIR & REINFORCEMENT IN THE EXISTING BUILDING FOR WORK
INDICATED. ENGAGE A ROOFING SUBCONTRACTOR TO PERFORM THE ROOFING WORK. WHERE ROOFING WORK IS REQUIRED, THE EXISTING ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED AND RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON THE ROOF.
7. REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR DETAILS OF BUILDING
CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT FOR WORK. THE VARIOUS
DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE USED JOINTLY AT ALL TIMES.
REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS INDICATED ON THE DRAWINGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE
FOLLOWED TO EXECUTE THE WORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE
CONTRACTING OFFICERS REPRESENTATIVE (COR) THRU THE CONTRACTING OFFICER FOR CLARIFICATION
BEFORE PROCEEDING.
8. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. SEE SPECIFICATIONS FOR MORE SPECIFIC DETAILS
ON RESPONSIBILITIES.
9. ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION
OF THE EXISTING FACILITY.
10. COORDINATE ALL WORK WITH THE WORK OF OTHERS. KEEP INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE WORK OF OTHERS. COORDINATE AND EXPEDITE WORK WITH OTHERS SO THAT THE
PROGRESS OF THE TOTAL WORK SHALL BE KEPT ON SCHEDULE.
11. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING CODES AND
STANDARDS.
12. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON VISUAL OBSERVATION AND/OR AVAILABLE DRAWING INFORMATION, AND MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING
WITH THE WORK.
13. FITTING OR PLACING WORK INTO OR ON THE WORK OF OTHERS CONSTITUTES ACCEPTANCE OF THE SUITABILITY OF THE WORK IN PLACE. IF THE WORK OF OTHERS IS NOT ACCEPTABLE, NOTIFY THE CONTRACTING OFFICERS REPRESENTATIVE (COR) FOR THE WORK TO BE CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW WORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING
WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS WILL BE CONSIDERED.
14. IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE COR. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN REMOVED OR
ENCAPSULATED AND THE AREA DECLARED SAFE.
15. REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN(S) FOR LOCATIONS AND FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED AS REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. COORDINATE WITH ALL TRADES TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS ARE MET.
16. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED WALLS &
FLOORS SHALL BE SEALED TO RETARD PASSAGE OF SMOKE.
17. ALL PIPING, DUCTS, CONDUITS, ETC. IN FINISHED ROOMS, CORRIDORS, ETC. SHALL BE CONCEALED IN A
FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
18. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE
NET INSIDE DIMENSIONS.
19. PROVIDE DUCT ACCESS PANELS AS REQUIRED BY 23 31 00 FOR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, SMOKE DETECTORS, AUTOMATIC CONTROL DAMPERS, AND HUMIDIFIER DISPERSION TUBES.
REFER TO DETAIL. COORDINATE SIZES AND LOCATIONS WITH ACCESSORIES PROVIDED BY OTHER TRADES.
20. ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS SHALL BE PROVIDED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, FLOW METERS, CONTROLS, ETC. COORDINATE SIZES AND LOCATIONS WITH OTHER
TRADES.
21. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.
22. FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD
DETAILS AND PIPING SCHEMATICS.
23. DIFFUSER SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES. REGISTER AND GRILLE SIZES SHOWN ARE
FACE SIZES.
24. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
25. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER
FLOW BETWEEN WATER AND AIR.
26. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM OF
REGISTERS SEVEN INCHES ABOVE FINISHED FLOOR.
27. WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT IS TO REMAIN, PATCH
WALL/FLOOR/ROOF OPENING TO MATCH EXISTING WHERE OPENING IS NOT RE-USED.
28. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
29. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT.
REFINISH ANY SURFACE DISTURBED UNDER THIS WORK TO MATCH EXISTING.
30. IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF STRUCTURE.
31. PRIOR TO PERFORMING REMOVALS, THE CONTRACTOR SHALL MEET WITH THE VA TO DEVELOP A LIST OF
ITEMS THAT SHALL BE TURNED OVER AND A LIST OF ITEMS THAT SHALL BE DISPOSED OF PROPERLY BY THE CONTRACTOR. ANY ITEM ENCOUNTERED DURING REMOVALS THAT WAS NOT DISCUSSED IN THE PRE- DEMOLITION MEETING SHALL BE COORDINATED WITH THE COR TO DETERMINE IF IT SHALL BE DISPOSED OF
OR TURNED OVER.
32. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL
OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.
33. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND
LOCATIONS PRIOR TO PERFORMING WORK.
34. HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN
CONSTRUCTION AREAS. COORDINATE WITH GENERAL CONTRACTOR AND THE COR.
35. ALL ABANDONED EXTRANEOUS PIPING, DUCTWORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.
36. TERMINATE PIPING AND DUCTWORK BELOW FLOORS, ABOVE CEILINGS, ETC., IN CONCEALED SPACES. ALL
CUTTING AND PATCHING SHALL MATCH EXISTING FINISHES.
37. WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO MAIN AND
CAPPED; AND CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.
38. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN ON REMOVAL PLAN(S) SHALL BE
REMOVED. THE MAJORITY OF WORK TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTWORK, PIPING, ETC. THAT MAY NOT BE SHOWN BUT IS ASSOCIATED WITH THE REMOVAL
WORK.
39. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS, CONTROL DEVICES, ETC.
40. WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED ON WEEKENDS OR WEEK NIGHTS. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED WELL IN ADVANCE WITH THE COR.
41. WHEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING DUCTWORK, CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM CLEANING INSIDE AND OUTSIDE BEFORE OPERATION. CLEANING OF EXISTING DUCTWORK SHALL BE LIMITED TO THE IMMEDIATE AREA WITHIN
REACH OF THE OPEN END OF THE DUCT.
42. RUNOUT PIPING TO TERMINAL UNITS SHALL BE 0.75” SIZE UNLESS OTHERWISE NOTED. REFER TO AIR
TERMINAL UNIT SCHEDULE(S).
43. APPROXIMATE ELEVATIONS NOTED ON FLOOR PLANS ARE TO THE BOTTOM OF DUCTS AND EQUIPMENT, AND TO THE CENTER OF PIPES.
44. REFER TO ELECTRICAL DRAWINGS FOR VARIABLE SPEED MOTOR CONTROLLERS ASSOCIATED WITH
MECHANICAL EQUIPMENT.
45. ALL INSULATED DUCTWORK AND PIPING SHALL HAVE DAMPER/VALVE HANDLE EXTENSIONS.
46. PROVIDE UNIONS ON BOTH SIDES OF EVERY ISOLATION VALVE TO FACILITATE EASY REPLACEMENT.
47. ALL VALVES TO HAVE STAINLESS STEEL INTERNALS.
48. PROVIDE ACOUSTICAL CEILING ACCESS IDENTIFICATION MARKERS: COLORED MARKERS WITH PRESSURE
SENSITIVE ADHESIVE ON ONE SIDE, PAPER OR PLASTIC, 6 TO 9 MM (1/4 TO 3/8 INCH) DIAMETER. REFER TO
SPECIFICATION 09 51 00 SECTION 2.6.C.
A. COLOR CODE: PROVIDE THE FOLLOWING COLOR MARKERS FOR SERVICE IDENTIFICATION:
a. RED - SPRINKLER SYSTEM: VALVES AND CONTROLS.
b. GREEN - DOMESTIC WATER: VALVES AND CONTROLS.
c. YELLOW - CHILLED WATER AND HEATING WATER.
d. ORANGE - DUCTWORK: FIRE DAMPERS.
e. BLUE - DUCTWORK: DAMPERS AND CONTROLS.
f. BLACK - GAS: LABORATORY, MEDICAL, AIR AND VACUUM.
GENERAL NOTESGENERAL FLOOR PLAN NOTES
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN UNLESS
NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
A1
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER DESIGNATIONS
REFER TO SCHEDULES.
H1 H1OR EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO
SCHEDULES.
H2
B
H2
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
H2 = SHEET WHERE DETAIL IS LOCATED
SECTION: 1 = SECTION DESIGNATION
H2 = SHEET WHERE DETAIL IS LOCATED
A1 "UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF
EQUIPMENT, UNLESS NOTED OTHERWISE
10"
ELEV: 8' - 0"ELEV: 8' - 0"
TOD: 8' - 10"
BOD: 7' - 2"
20x20
20x20
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF
DUCTWORK, UNLESS NOTED OTHERWISE
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE OF PIPE,
UNLESS NOTED OTHERWISE
DL-1
UC-X DOOR UNDERCUT. X = HEIGHT OF UNDERCUT IN INCHES; 0.75 INCH
UNDERCUT IF NO HEIGHT IS NOTED. COORDINATE WITH GC.
DOOR LOUVER. 1 = SQUARE FEET OF LOUVER.
CONNECT TO EXISTING
10"
TOE: 3' - 0"
BOE: 0' - 6"
DEMOLISH TO POINT INDICATED
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
BUTTERFLY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:1
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
ABBREVIATIONS, SYMBOLS &
INDEX OF DRAWINGS
M001
TSADTR
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
INDEX OF DRAWINGS
SHEET NUMBER SHEET NAME
M001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS
M002 BID DEDUCT ALTERNATES
M003 BID DEDUCT ALTERNATES
MD102 PARTIAL SECOND FLOOR PLAN - REMOVALS
MD103 PARTIAL THIRD FLOOR PLAN - REMOVALS
MD104 PARTIAL FOURTH FLOOR PLAN - REMOVALS
MD105 PARTIAL FIFTH FLOOR PLAN - REMOVALS
MH101 PARTIAL FIRST FLOOR PLAN - TEMPORARY AIR HANDLING UNIT
MH102 PARTIAL SECOND FLOOR PLAN - DUCTWORK
MH103 PARTIAL THIRD FLOOR PLAN - DUCTWORK
MH104 PARTIAL FOURTH FLOOR PLAN - DUCTWORK
MH105 PARTIAL FIFTH FLOOR PLAN - DUCTWORK
MH106 PARTIAL SIXTH FLOOR PLAN - DUCTWORK
MP103 PARTIAL THIRD FLOOR PLAN - PIPING
MP104 PARTIAL FOURTH FLOOR PLAN - PIPING
MP105 PARTIAL FIFTH FLOOR PLAN - PIPING
MP106 PARTIAL SIXTH FLOOR PLAN - PIPING
M401 ENLARGED PLANS
M402 ENLARGED PLAN
M403 ENLARGED PLANS
M501 DETAILS
M502 DETAILS
M503 DETAILS
M504 DETAILS
M505 AIRFLOW SCHEMATICS
M601 SCHEDULES
M602 SCHEDULES
M901 CONTROLS
M902 CONTROLS
M903 CONTROLS
M904 CONTROLS
VALVE SYMBOLS
Revisions Date
H.2 H.7
F
F
G
G
I JE
H.2 H.7
F
F
G
G
I JE
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:2
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
BID DEDUCT ALTERNATES
M002
TSADTR
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
Scale: 1/8" = 1'-0"1
BID DEDUCT 01 - REMOVE THIRD FLOOR OFFICES AND
CHAPEL
Scale: 1/8" = 1'-0"2
BID DEDUCT 02 - REMOVE FOURTH FLOOR
ELECTRICAL SHOP
02 - DEDUCT ALTERNATE 02:
OMIT ALL NEW WORK RELATED TO THE
ELECTRICAL SHOP.
SPACE WILL BE UNFINISHED STORAGE.
01 - DEDUCT ALTERNATE 01:
OMIT ALL NEW WORK RELATED TO THE
OPEN OFFICES AND CHAPEL.
SPACE WILL BE UNFINISHED STORAGE.
H.2 H.7
F
F
G
G
I JE
H.2 H.7
F
F
G
G
I JE
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:2
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
BID DEDUCT ALTERNATES
M003 DesignerApprover
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
Scale: 1/8" = 1'-0"1
BID DEDUCT 03 - REMOVE EXISTING THIRD FLOOR
TEACHING KITCHEN
Scale: 1/8" = 1'-0"2
BID DEDUCT 04 - KEEP EXISTING FIFTH FLOOR
LOCKERS AND RR'S
04 - DEDUCT ALTERNATE 04:
EXISTING OFFICE TO BECOME CLEAN
LINEN ROOM.
03 - DEDUCT ALTERNATE 03:
OMIT ALL NEW WORK RELATED TO THE
TEACHING KITCHEN.
EXISTING OFFICE CONSTRUCTION
TO REMAIN.
SPACE WILL BE UNFINISHED STORAGE.
04 - DEDUCT ALTERNATE 04:
OMIT ALL NEW WORK RELATED TO THE
NEW LOUNGE AND LOCKER ROOMS.
EXISTING LOCKERS, HAC, SOILED
UTILITY AND OFFICE TO REMAIN.
ELEC
C232
OFFICE
B221A
EXAM
B220
CHECK-OUT
A292A
CHECK IN
A292B
GENERAL
X-RAY
A295
OFFICE
A294
OFFICE
B200
LAV
A296
EXAM
A291
ELEC
A275
LAV
A274
OFFICE
B201
LAV
A273
CORRIDOR
C205
STAIR 1
S-01
OFFICE
A276A
OFFICE
A276
CLOSET
A238
DATA
A270LAV
A217
DRIVING SIM
A215
457 SF
CORRIDOR
OFFICE
A213
CONFERENCE
A205
STAIR 7
S-07
ELEC
A209
CORRIDOR
A280B
LAV
A281
STORAGE
A282
LAV
A283
CLEAN
UTILITY
A277
CAST ROOM
A278EXAM
A284
EXAM
A285
EXAM
A286
CORRIDOR
A280A
EXAM
A287
EXAM
A288
PATIENT
EDUCATION
A289 CORRIDOR
A290A
WAITING
ALCOVE
A290C
STRETCHER
ALCOVE
A290B
WORK ROOM
B240
OFFICE
B240A
OFFICE
B239
BREAK
ROOM
B237
X-RAY
B235
OR
B233
CORRIDOR
C207
OFFICE
B238
OR
B236
OR
B234
DATA
B231
CORRIDOR
C205A
DECON
B224A
CLOSET
B226
INSTRUMENT
CLEAN
B224B
H.A.C.
A276B
DENTAL
B221C
ELEVATOR
P-1
ELEVATOR
P-2
ELEVATOR
P-3
ELEVATOR
P-4
SERVICE
ELEVATOR
SE-05
SERVICE
ELEVATOR
SE-06
STORAGE
B221B
B01W
B01E
H.2 H.7
F
F
G
G
I JE
1"
H W
R
0.
H W
S
1.25" - HWR
0.
H W
R 0.
H
W S
8x
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:3
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
PARTIAL SECOND FLOOR PLAN -
REMOVALS
MD102
TSADTR
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
N Scale: 1/8" = 1'-0"
PARTIAL SECOND FLOOR PLAN - REMOVALS
NOTES
1 REMOVE DUCT THROUGH ROOF AS INDICATED. RISER TO FLOORS
BELOW SHALL REMAIN FOR RECONNECTION IN NEW WORK. REFER TO
SHEET MH102 FOR ADDITIONAL INFORMATION.
2 PERFORM PRE-CONSTRUCTION AIR SURVEY OF EXHAUST DUCT RISER
TO FLOORS BELOW. TRAVERSE DUCT AND MEASURE AIRFLOW AND
STATIC PRESSURE.
3 REMOVE DUCTWORK AS INDICATED FOR RECONNECTION IN NEW
WORK.
KEYPLAN
T
T
T
T
B01W
B01E
H.2 H.7
F
F
G
G
I JE
AH-21
3" 3"
3" 1.5" x2 x2 x2
22x14 x1 x1
28x22 x1 x8 x8 x8 x8 x8 x8 x8
8x
8x 6 26 x8
10x10
10x10
77777
OFFICE
B304
OFFICE
B303
OFFICE
B302
OFFICE
B300
RESTROOM
A372
RESTROOM
A371
OFFICE
A317
OFFICE
B312A
ELEC
A373
OFFICE
A317A
OFFICE
A315
OFFICE
A314
OFFICE
A314A
ELEC
A311
TRIAGE
A313
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:4
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
PARTIAL THIRD FLOOR PLAN -
REMOVALS
MD103
TSADTR
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
N Scale: 1/8" = 1'-0"
PARTIAL THIRD FLOOR PLAN - REMOVALS
KEYPLAN
NOTES
1 EXISTING DUCT REHEAT COIL AND PIPING TO REMAIN.
2 REMOVE DUCT REHEAT COIL AND SAVE FOR REINSTALLTION. REMOVE
ASSOCIATED PIPING AND VALVES.
3 REMOVE EXISTING DUCT REHEAT COIL AND ALL ASSOCIATED SUPPORTS,
CONTROLS, AND PIPING CONNECTIONS AS INDICATED.
4 REMOVE EXISTING DUCTWORK AND ALL ASSOCIATED SUPPORTS AS
INDICATED. PATCH AND SEAL EXISTING TO REMAIN AIRTIGHT.
5 REMOVE EXISTING AIR DEVICE AND ALL ASSOCIATED SUPPORTS,
ACCESSORIES, AND DUCT CONNECTION AS INDICATED.
6 REMOVE EXISTING AIR TERMINAL UNIT AND ALL ASSOCIATED SUPPORTS,
CONTROLS, AND DUCT CONNECTIONS AS INDICATED.
7 MAINTAIN EXISTING FOUR PIPE FAN COIL UNIT AND PIPING.
8 REMOVE EXISTING PIPING AND ALL ASSOCIATED SUPPORTS AS INDICATED.
CAP AND SEAL EXISTING TO REMAIN WATERTIGHT.
9 PROVIDE PRECONSTRUCTION AIR SURVEY OF EXISTING TO REMAIN
DIFFUSER/GRILLE.
10 REMOVE AIR HANDLING UNIT AH-21 FOR RELOCATION IN NEW WORK. REFER
TO SHEET MH106 FOR NEW LOCATION AND ADDITIONAL INFORMATION.
11 REMOVE COIL CONNECTIONS TO AH-21 AND CAP PIPES IN THE VESTIBULE
INTERIOR. ALL PIPING SPECIALTIES, INCLUDING INLINE PUMPS, STRAINERS,
VALVES, CONTROLS DEVICES, ETC. INSIDE OF THE VESTIBULE SHALL BE
REUSED IN NEW WORK. REFER TO MH104 FOR NEW LOCATION AND
ADDITIONAL INFORMATION.
12 PERFORM PRE-CONSTRUCTION AIR SURVEY OF EXHAUST DUCT RISER TO
FLOORS BELOW. TRAVERSE DUCT AND MEASURE AIRFLOW AND STATIC
PRESSURE.
13 EXISTING DUCTS TO FLOOR BELOW SHALL REMAIN.
14 EXISTING DUCT DROP TO FLOORS BELOW TO REMAIN. DUCTS WILL BE
TEMPORARILY CONNECTED TO AHU-TEMP. REFER TO SHEET MH101 FOR
ADDITIONAL INFORMATION.
15 REMOVE EXISTING EXHAUST FAN AND ALL ASSOCIATED DUCTWORK,
CONTROLS, AND SUPPORTS.
B01W
B01E
H.2 H.7
F G
G
I JE
4" 4"
2.5" 2.5"
EX
1W-AH-6
x2
E A x1
R A x1
S A
40x20 - RA
EX
1W-AH-3
3 3
4 4 4
4 4
EX
1W-AH-1E
EX
1W-RF-7
C
H R
C
H S
6"
H W
R 6"
H
W S
6"
G
LY
C O
L- H
W R
6"
G
LY
C O
L- H
W S
6"
LP
C
6"
LP
S
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:4
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
PARTIAL FOURTH FLOOR PLAN -
REMOVALS
MD104
TSADTR
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
N Scale: 1/8" = 1'-0"
PARTIAL FOURTH FLOOR PLAN - REMOVALS
KEYPLAN
NOTES
1 REMOVE EXISTING MECHANICAL ROOM VENTILATION FAN AND ALL
ASSOCIATED SUPPORTS, CONTROLS, AND DUCT/LOUVER
CONNECTIONS.
2 REMOVE LOUVER AND CONNECTION TO EXISTING DUCT. EXISTING
DUCT TO BE REUSED IN NEW WORK. REFER TO MH104 FOR
ADDITIONAL INFORMATION.
3 REMOVE OUTDOOR AIR LOUVER, DUCTWORK, AND DAMPER.
4 PREPARE OPENING FOR NEW CONSTRUCTION AND WEATHERPROOF
UNTIL INFILL CAN BE COMPLETED.
5 REMOVE DUCTWORK AND ALL ASSOCIATED SUPPORTS AS INDICATED.
6 REMOVE EXISTING CHILLED WATER PIPING AND ALL ASSOCIATED
SUPPORTS AND ACCESSORIES BACK TO MAIN. PREPARE FOR
RECONNECTION.
7 REMOVE EXISTING STEAM AND CONDENSATE PIPING AND ALL
ASSOCIATED SUPPORTS AND ACCESSORIES BACK TO MAIN. PREPARE
FOR RECONNECTION.
8 REMOVE EXISTING PIPING FROM AHU-21 BELOW THROUGH TO
EXISTING FOURTH FLOOR MECHANICAL ROOM.
GENERAL NOTES
A. REFER TO SHEET MH101 FOR PROPOSED PHASING OF LOUVER AND DUCTWORK REMOVAL
TO MINIMIZE DOWNTIME OF EXISTING AHUS.
H.2 H.7
F G
G
I J LE
x1
R A x8
S
A x1 x1 x8 x8
R
A x8
S
A x8
S
A
18x8 x8 x8 x8
8x
14x8
14x8 - EA
20x8
1 1 1
3 3
OFFICE
CORRIDOR
C5-09
FEMALE LAV
522D
LOCKERS
522C
LOUNGE
NURSE STATION
NS-503
CORRIDOR
C5-52
1 BR PATIENT ROOM #7
BATH
523A
NURSE STATION
NS-502
1 BR PATIENT ROOM #9
1 BR PATIENT ROOM #8
BATH
524A
BATH
525A
1 1 1
10x8 - SA
3 3
CORRIDOR
C5-50
CORRIDOR
C5-50
OFFICE
STAFF LOUNGE
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:5
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
PARTIAL FIFTH FLOOR PLAN -
REMOVALS
MD105
TSADTR
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
N Scale: 1/8" = 1'-0"
PARTIAL FIFTH FLOOR PLAN - REMOVALS
KEYPLAN
NOTES
1 REMOVE EXISTING FOUR PIPE FAN COIL UNIT. CAP AND SEAL EXISTING
PIPING TO REMAIN AT FLOOR BELOW. PATCH FLOOR TO MATCH
EXISTING AND RETAIN STRUCTURAL AND FIRE RATING.
2 REMOVE EXISTING DUCTWORK AND ALL ASSOCIATED SUPPORTS AS
INDICATED. PATCH AND SEAL EXISTING TO REMAIN AIRTIGHT.
3 REMOVE EXISTING AIR DEVICE AND ALL ASSOCIATED SUPPORTS,
ACCESSORIES, AND DUCT CONNECTION AS INDICATED. PREPARE
DUCT FOR RECONNETION.
4 PROVIDE PRECONSTRUCTION AIR SURVEY OF EXISTING TO REMAIN
DIFFUSER/GRILLE.
B01E
F
13.9
E.3E F
UP40x24 SAUP40x18 RA
TEMP
AHU
x4
1 1
F
E
13.9
H.2 H.7
F
F
G
G
E
40x24 x2
28x24 x1
MH101
x2 x1
DN24x28 RA
DN40x24 SA
04 - FOURTH
FLOOR
133' - 11"
03 - THIRD FLOOR
122' - 11"
E x2 x4
24x40
24x28 x4
GENERAL NOTES
A. COORDINATE ANY REQUIRED SHUTDOWNS AND DURATIONS WITH COR.
PRE-CONSTRUCTION
1. MOUNT TEMPORARY AHU ON GRADE, REFER THE SHEET MH101.
2. ROUTE TEMPORARY DUCTWORK FROM TEMPORARY AHU UP BUILDING AND ONTO 2ND FLOOR ROOF
(FUTURE 3RD FLOOR).
a. DO NOT CONNECT TO EXISTING AHU-21 RISERS YET.
3. CONNECT POWER TO TEMPORARY AHU AND TEST/COMMISSION TEMPORARY AHU USING HEAVY DUTY, LOCKING BALANCE DAMPERS TO SIMULATE SYSTEM STATIC PRESSURE.
4. PERFORM PRE-TAB OF EXISTING AH-21 DUCT MAINS NEAR EXISTING AH-21.
5. CONNECT TEMPORARY SUPPLY AND RETURN DUCTS TO EXISTING AHU-21 DUCT RISERS. TEMPORARY AHU
WILL BE TESTED AND BALANCED AGAIN TO ENSURE THAT EXISTING FLOORS ARE PROPERLY SERVED.
6. REMOVE EXISTING AHU-21 AND ALL ASSOCIATED DUCTWORK AND PIPING FROM THE EXISTING 2ND FLOOR
ROOF AND STORE UNTIL READY TO BE REINSTALLED ON NEW 5TH FLOOR ROOF.
7. EXISTING EXHAUST FANS ON 2ND FLOOR ROOF REMAIN ACTIVE.
8. EXISTING OA AND RELIEF LOUVERS AT EXISTING 4TH FLOOR WALL REMAIN ACTIVE.
9. INSTALL CARBON FILTERS IN PRE-FILTER RACKS AND INSTALL NEEDLEPOINT BIPOLAR IONIZATION SYSTEMS
IN ALL EXISTING AHUS THAT WILL HAVE THEIR OA CONNECTIONS BACKFED IN NEW WORK.
10. INSTALL TEMPORARY FILTER MEDIA OVER EXISTING INTAKE LOUVERS.
11. TEMPORARILY DISABLE ECONOMIZER FUNCTION FROM ALL EXISTING AHUS THAT WILL HAVE THEIR OA AND
RELIEF AIR CONNECTIONS BACKFED IN NEW WORK.
START OF CONSTRUCTION
1. EXISTING AND TEMPORARY MECHANICAL SYSTEMS SHALL OPERATE WHILE STRUCTURAL STEEL IS BEING
ERECTED AND CONCRETE IS POURED FOR 4TH FLOOR.
OA AND RELIEF TEMPORARY BACKFEEDS
1. AFTER FOURTH FLOOR CONCRETE IS POURED:
a. TEMPORARY OA AND RELIEF AIR DUCTWORK SHALL BE RUN FROM THE EXISTING EXTERIOR WALL OF
THE 4TH FLOOR AND STUBBED OUT THROUGH THE NEW WEST FAÇADE LOCATION.
• REMOVE EXISTING LOUVERS FOR EXISTING OA AND RELIEF AIR CONNECTIONS AND CONSTRUCT
TEMPORARY PLENUMS AT EXISTING OA AND RELIEF AIR CONNECTIONS. TEMPORARY DUCT SHALL
BE CONNECTED TO THESE PLENUMS.
• MAINTAIN MINIMUM 25’ MINIMUM BETWEEN ANY TEMPORARY OUTSIDE AIR INTAKE POINTS AND ANY
BUILDING EXHAUST OR RELIEF.
TEMPORARY AHU DUCTWORK RELOCATION
1. AFTER 5TH FLOOR ROOF IS CONSTRUCTED
a. PERMANENT AHU-21 DUCT RISERS TO BE INSTALLED FROM 5TH FLOOR ROOF DOWN TO EXISTING DUCT
RISERS THAT SERVE THE 2ND, 1ST, AND GROUND FLOORS. DO NOT CONNECT TO EXISTING RISERS
THAT ARE BEING FED BY TEMPORARY AHU.
b. ROUTE ADDITIONAL TEMPORARY AHU-21 DUCTWORK FROM THE TEE (REFER TO SHEET MH101
TEMPORARY DUCT SECTION) TO THE 5TH FLOOR ROOF.
2. ROUTE TEMPORARY DUCTWORK TO NEW, PERMANENT AHU-21 DUCT RISERS. AVOID FOOTPRINT OF AHU-21
RELOCATION.
3. TEST AND BALANCE TEMPORARY AHU USING HEAVY DUTY, LOCKING BALANCE DAMPERS TO SIMULATE
SYSTEM STATIC PRESSURE.
4. CONNECT NEW PERMANENT AHU-21 RISERS INTO TOP OF EXISTING AHU-21 DUCT RISERS.
5. REMOVE ALL TEMPORARY DUCTWORK FROM THE 2ND FLOOR ROOF TO FACILITATE THE CONSTRUCTION OF
THE 3RD FLOOR.
FIT-OUT OF 4TH FLOOR
1. MOVE NEW AHUS (AHU-22 AND AHU-23) INTO THE FOURTH FLOOR MECHANICAL ROOM AND ROUTE PERMANENT OA, RELIEF, SUPPLY, AND RETURN DUCTWORK NEAR FINAL LOCATIONS AT FLOORS AND
EXTERIOR WALLS. REFER TO SHEET M401.
2. INSTALL PERMANENT EXHAUST DUCT RISERS TO SERVE EF-9 AND EF-10 FROM THE 4TH FLOOR MECHANICAL
ROOM TO THE EXISTING DUCT RISERS THAT SERVE THE 2ND, 1ST , AND GROUND FLOORS.
a. DO NOT CONNECT NEW PERMANENT DUCT RISERS TO EXISTING EXHAUST RISERS YET.
3. INSTALL EXHAUST FANS EF-9 AND EF-10 IN NEW 4TH FLOOR MECHANICAL ROOM AND CONNECT TO PERMANENT EXHAUST DUCT RISERS. INSTALL TEMPORARY EXHAUST DUCTWORK DOWNSTREAM OF THE
FAN TO THE WEST BUILDING FAÇADE TO DISCHARGE TO THE OUTDOORS.
a. REMOVE EXISTING EXHAUST FAN CONNECTIONS TO EXISTING EXHAUST DUCT RISERS AND TIE NEW
PERMANENT EXHAUST DUCT RISERS INTO EXISTING.
b. TEST AND BALANCE NEW EXHAUST FANS TO ENSURE PROPER FLOW ON FLOORS.
4. REMOVE EXISTING EXHAUST FANS LOCATED ON 2ND FLOOR ROOF.
5. RELOCATE/REMOVE EXISTING 4TH FLOOR MECHANICAL VENTILATION RELIEF FANS.
6. FINISH 4TH FLOOR WORK AS SHOWN IN THE DOCUMENTS.
AHU-21 RELOCATION
1. ONCE THE 5TH FLOOR ROOF IS CONSTRUCTED, HOIST EXISTING AHU-21 ONTO THE ROOF.
2. INSTALL NEW FINAL FILTER SECTION ON AHU AND MAKE ALL MODIFICATIONS TO AHU.
3. CONNECT ALL UTILITIES TO AHU AND TEST/COMMISSION AHU USING HEAVY DUTY, LOCKING BALANCE
DAMPERS TO SIMULATE SYSTEM STATIC PRESSURE.
4. ROUTE DUCTWORK ON ROOF AND REMOVE TEMPORARY DUCTS FROM PERMANENT AHU-21 DUCT RISERS
TO COMPLETE BACKFEED.
5. REMOVE TEMPORARY AHU AND ALL ASSOCIATED SUPPORTS AND DUCTWORK.
SEQUENCE OF CONSTRUCTION
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:0
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
PARTIAL FIRST FLOOR PLAN -
TEMPORARY AIR HANDLING UNIT
MH101
TSADTR
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
N Scale: 1/8" = 1'-0"
PARTIAL FIRST FLOOR - TEMPORARY AIR HANDLING
UNIT
N Scale: 1/8" = 1'-0"
PARTIAL THIRD FLOOR PLAN - TEMPORARY
DUCTWORK
1. DUCT RISE UP TO THIRD FLOOR ROOF.
2. COORDINATE AHU PAD ON GRADE DETAIL WITH STRUCTURAL.
N.T.S.Scale:
TEMPORARY DUCT SECTION
NOTES - FIRST FLOOR
1. CAP DUCT RISERS AT THIS APPROXIMATE LOCATION WHILE 4TH FLOOR IS CONSTRUCTED.
AFTER CONSTRUCTION OF 4TH FLOOR, RELOCATE TEMPORARY DUCT TIE-INS TO ROUTE
ON 4TH FLOOR TO FACILITATE CONSTRUCTION OF 3RD FLOOR.
2. PROVIDE HEAVY-DUTY, LOCKING MANUAL BALANCE DAMPERS IN THESE LOCATIONS.
3. DUCTWORK IS TO BE ATTACHED WITH ANGLE IRON BRACKETS ANCHORED TO BUILDING
STRUCTURE PER SMACNA. ALLOW FOR DUCT INSULATION.
NOTES - SECTION
KEYPLAN
Revisions Date
NOTES - THIRD FLOOR
1 DUCT FROM TEMPORARY AHU ON GRADE.
2 CONNECT TO EXISTING DUCTS SERVING BASEMENT THROUGH
SECOND FLOOR. PROVIDE NEW BALANCING DAMPER AND BALANCE TO
AIRFLOW MEASURED IN PRE-CONSTRUCTION SURVEY.
3 EXISTING EXHAUST FAN. REFER TO SEQUENCE OF CONSTRUCTION
FOR TEMPORARY EXHAUST SERVICE AND FUTURE DUCT TIE-INS.
ELEC
C232
OFFICE
B221A
EXAM
B220
CHECK-OUT
A292A
CHECK IN
A292B
GENERAL
X-RAY
A295
OFFICE
A294
OFFICE
B200
LAV
A296
EXAM
A291
ELEC
A275
LAV
A274
OFFICE
B201
LAV
A273
CORRIDOR
C205
STAIR 1
S-01
OFFICE
A276A
OFFICE
A276
CLOSET
A238
DATA
A270LAV
A217
DRIVING SIM
A215
457 SF
CORRIDOR
OFFICE
A213
CONFERENCE
A205
STAIR 7
S-07
ELEC
A209
CORRIDOR
A280B
LAV
A281
STORAGE
A282
LAV
A283
CLEAN
UTILITY
A277
CAST ROOM
A278EXAM
A284
EXAM
A285
EXAM
A286
CORRIDOR
A280A
EXAM
A287
EXAM
A288
PATIENT
EDUCATION
A289 CORRIDOR
A290A
WAITING
ALCOVE
A290C
STRETCHER
ALCOVE
A290B
WORK ROOM
B240
OFFICE
B240A
OFFICE
B239
BREAK
ROOM
B237
X-RAY
B235
OR
B233
CORRIDOR
C207
OFFICE
B238
OR
B236
OR
B234
DATA
B231
CORRIDOR
C205A
DECON
B224A
CLOSET
B226
INSTRUMENT
CLEAN
B224B
H.A.C.
A276B
DENTAL
B221C
ELEVATOR
P-1
ELEVATOR
P-2
ELEVATOR
P-3
ELEVATOR
P-4
SERVICE
ELEVATOR
SE-05
SERVICE
ELEVATOR
SE-06
STORAGE
B221B
H.2 H.7
F
F
G
G
I JE
8x6
8x
DN16x16 EA
1"
H W
R
0.
H W
S
1.25" - HWR
0.
H W
R 0.
H
W S
8x
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:0
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
PARTIAL SECOND FLOOR PLAN -
DUCTWORK
MH102
TSADTR
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
GENERAL NOTES
A. FIRE DAMPERS SHALL BE PROVIDED IN 2 HOUR RATED FIRE BARRIERS AND AT FLOOR
PENETRATIONS. SMOKE DAMPERS SHALL BE PROVIDED IN ALL RATED SMOKE
ASSEMBLIES AND SHAFT PENETRATIONS. REFER TO ARCHITECTURAL LIFE SAFETY PLANS
FOR RATED PARTITION LOCATIONS.
N Scale: 1/8" = 1'-0"
PARTIAL SECOND FLOOR PLAN - DUCTWORK
NOTES
1 RECONNECT DUCT TO EXISTING DUCT RISER THAT SERVES FIRST
FLOOR GENERAL EXHAUST.
2 ADD MANUAL BALANCE DAMPER TO EXHAUST DUCT DOWN TO FLOORS
BELOW. BALANCE TO AITFLOW MEASURED DURING
PRECONSTRUCTION SURVEY.
3 REBALANCE TO 70 CFM.
T
T
T
T
T
T
T
T
T T
T
B01W
B01E
H.2 H.7
F
F
G
G
I JE
x1
22-3-02
22-3-03 x1 x1 x1 x1 x1
22-3-01
22-3-07A
UP20x10 SA UP20x10 SA
UP10x30 RA
UP10x30 RA
UP & DN16x16 EA
UP & DN16x16 EA x8 x8 x8 x8 x8
40X12 RA DN
24X14 SA DN
x8 x8 x8
S
A 28 x8
R
A
18x8 x8
10x10
CHAPEL
C3-B
CORRIDOR
OPEN
OFFICE
OPEN
OFFICE
HEALTHY
TEACHING
KITCHEN
307A
STORAGE
A315
OFFICE
A317A
OFFICE
B312A
OFFICE
22-3-05A
22-3-06
20x1020x10
10ø S1
285 CFM
6ø S1
100 CFM
8ø S7
155 CFM
6ø S1
105 CFM
8ø R2
200 CFM
8ø R1
385 CFM
8ø S1
165 CFM
(TYP 3)
KH-2 KH-3
KH-4
KH-5
(TYP 4)
KH-6 KH-7
KH-9
KH-8
12ø R2
620 CFM
x1
S A ø
S
A
30x10 - RA x1
R A
14x10 - RA
22-3-05B
22-3-05C
TYP 8
KH-1
14x12
OPEN OFFICE
UP12x10 EA
UP8x8 EA
(TYP 4)
R
R
S4
735 CFM
12ø
R x8
24x10 16x8 x1
24x10
S4
735 CFM
12ø
(TYP 2)
(TYP 2)S4
735 CFM
12ø
(TYP 2)
22-3-07B
22-3-07C
10ø
12ø R1
1100 CFM
22-3-07R
10ø
UP20x20 SA
12x12
75 CFM
E1
14x12
10ø S1
265 CFM
10ø S1
265 CFM
8ø S1
200 CFM
(TYP 3)
(TYP 3)
(TYP 3)
12x10
10ø S1
210 CFM
10ø S1
210 CFM
8ø S1
215 CFM
x1
14x12
12ø R1
1100 CFM
12ø R1
1100 CFM
8ø R2
215 CFM
10ø R2
420 CFM
B-D 10x10
16x8
10x10
10x10
8x8
16x6 - RA
UP & DN14x22 RA
UP & DN24x24 SA
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:1
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
PARTIAL THIRD FLOOR PLAN -
DUCTWORK
MH103
TSADTR
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
N Scale: 1/8" = 1'-0"
PARTIAL THIRD FLOOR PLAN - DUCTWORK
GENERAL NOTES
A. FIRE DAMPERS SHALL BE PROVIDED IN 2 HOUR RATED FIRE BARRIERS AND AT FLOOR
PENETRATIONS. SMOKE DAMPERS SHALL BE PROVIDED IN ALL RATED SMOKE
ASSEMBLIES AND SHAFT PENETRATIONS. REFER TO ARCHITECTURAL LIFE SAFETY PLANS
FOR RATED PARTITION LOCATIONS.
KEYPLAN
NOTES
1 SUPPLY DUCTWORK FROM 1W-AHU22 ON FLOOR ABOVE.
2 RETURN DUCTWORK TO 1W-AHU22 ON FLOOR ABOVE.
3 CONNECT DUCT TO EXISTING DUCT RISERS SERVING EXISTING FLOOR
2, FLOOR 1, AND BASEMENT.
4 CONNECT DUCT TO KITCHEN HOOD PER MANUFACTURER'S
RECOMMENDATIONS. PROVIDE DUCT TRANSITIONS AS REQUIRED.
5 DUCTWORK THAT CROSSES BUILDING OR EXPANSION JOINTS SHALL
BE FITTED WITH FLEXIBLE CONNECTORS THAT WILL ACCOMMODATE
THE BUILDING MOVEMENT IN ALL DIRECTIONS.
6 INCLUDE LONG EXHAUST RUN AS INDICATED TO MINIMIZE NOISE
TRANSFER FROM DUCT MAIN. PROVIDE SELF BALANCING DAMPER
GREENHECK ABD OR SIMILAR.
7 REBALANCE EXISTING DIFFUSER/GRILLE TO CFM MEASURED DURING
PRECONSTRUCTION AIR SURVEY.
H.2 H.7F
F
G
G
I JE
M503
EX
1W-AH-3
EX
1W-AH-5
EX
1W-AH-8
EX
1W-AH-6
EX
1W-AH-1E
REFER TO ENLARGED FOURTH FLOOR
MECHANICAL ROOM PLAN ON M401.
M401
MECHANICAL ROOM
OFFICE
401A x3
O A x3
E A
ELECTRICAL SHOP
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:2
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
PARTIAL FOURTH FLOOR PLAN -
DUCTWORK
MH104
TSADTR
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
N Scale: 1/8" = 1'-0"
PARTIAL FOURTH FLOOR PLAN - DUCTWORK
GENERAL NOTES
A. FIRE DAMPERS SHALL BE PROVIDED IN 2 HOUR RATED FIRE BARRIERS AND AT FLOOR
PENETRATIONS. SMOKE DAMPERS SHALL BE PROVIDED IN ALL RATED SMOKE
ASSEMBLIES AND SHAFT PENETRATIONS. REFER TO ARCHITECTURAL LIFE SAFETY PLANS
FOR RATED PARTITION LOCATIONS.
KEYPLAN
NOTES
1 SEE SHEET M401 FOR DUCTWORK CONTINUATION.
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TT
T
B01W
B01E
H.2 H.7F
F
G
G
I JE
20x10 x1
30x16
32x16 x1
23-5-03
23-5-06
32x18 x1
23-5-11
23-5-14 x1
23-5-18
23-5-15
23-5-16
23-5-01 23-5-02
23-5-10
23-5-05
23-5-04
23-5-09
23-5-07
23-5-12 x1
22x1010x10
8x
8x8 x1
30x12 x1
23-5-08R
23-5-11R
23-5-14R
23-5-15R
23-5-18R
23-5-19R
23-5-05R
23-5-06R
23-5-03E
23-5-16R
23-5-08
UP14x16 EA
40x16 RA DN
32x16 SA DN
23-5-12R x1 x1 x8
8x8
23-5-17
23-5-13
24x16
12x8
12ø
524A
BATH
1 BR
PATIENT
ROOM #8 525
1 BR
PATIENT
ROOM #9
1 BR
PATIENT
ROOM #7
523A
BATH
C5-52
CORRIDOR
NS-502
NURSE
STATION
NS-503
NURSE
STATION
LOUNGE
1BR
PATIENT
ROOM #6
C5-50
CORRIDOR
1BR
PATIENT
ROOM #5
1BR
PATIENT
ROOM #4
525A
BATH
STAFF
LOUNGE
SPACE
522C
LOCKERS
522A
LOCKERS
522B
MALE LAV
522D
FEMALE
LAV
MED ROOM
CLEAN
UTILITY
CLEAN
LINEN
C5-51
CORRIDOR
SOILED
HOLD
WHEEL
CHAIR/
STRETCHER
NUTRITION
EQUIPMENT
ALCOVE
NS-500
NURSE
STATION
OFFICE
505B
ANTE
1BR
ISOLATION
ROOM #1
505A
BATH
507A
BATH
1BR
PATIENT
ROOM #2
1BR
PATIENT
ROOM #3
509A
BATH
515A
BATH
NS-501
NURSE
STATION
517A
BATH
519A
BATH
23-5-01R
23-5-19
23-5-04R
6ø S1
75 CFM
RHS-1
RHS-1
RHS-1
RHS-1
RHS-1
RHS-1
RHS-1
24x12
200 CFM
R3
48x24
75 CFM
E1
10ø S2
375 CFM
8ø S1
100 CFM
8ø S1
100 CFM
24x12
200 CFM
R3
400 CFM
R2 24"x12"
8ø S1
200 CFM
8ø S1
200 CFM
10ø S7
275 CFM
12x12
125 CFM
E1
6ø S3
50 CFM
8ø S2
275 CFM
24x24
860 CFM
E1
24x12
80 CFM
R3
8ø S1
175 CFM
24x24
1040 CFM
R3 6ø S1
100 CFM
8ø S1
275 CFM
8ø S1
170 CFM
10ø R4
400 CFM
6ø S3
50 CFM
12x12
125 CFM
E1
10ø S7
275 CFM
8ø S1
275 CFM 8ø S1
175 CFM
10ø R4
400 CFM
6ø S1
125 CFM
8ø S1
200 CFM
6ø R2
50 CFM
6ø S1
125 CFM
10ø S7
275 CFM
8ø S1
275 CFM
8ø S1
200 CFM
10ø R4
400 CFM
10ø S7
275 CFM
6ø S3
50 CFM
6ø S3
50 CFM
12x12
125 CFM
E1
12x12
125 CFM
E1
6ø R2
50 CFM
6ø S1
125 CFM
8ø S1
175 CFM
8ø R2
175 CFM
10ø S7
275 CFM
10ø R4
400 CFM
8ø S1
275 CFM
8ø S1
200 CFM
8ø S1
275 CFM
6ø S3
50 CFM
10ø S7
275 CFM
8ø S1
200 CFM
10ø R4
400 CFM
6ø S3
50 CFM
12x12
125 CFM
E1
12x12
125 CFM
E1
12x12
125 CFM
E1
6ø S3
50 CFM
8ø S2
200 CFM
8ø S1
275 CFM
10ø R4
400 CFM
12x12
125 CFM
E1
8ø S1
250 CFM
6ø S3
75 CFM
8ø S1
270 CFM
700 CFM
R1 24"x24"
6ø S3
75 CFM
8ø S1
250 CFM
10ø S7
250 CFM
10ø R4
350 CFM
10ø R4
350 CFM
12x12
150 CFM
E1
10ø S2
300 CFM
8ø S1
200 CFM
6ø S1
150 CFM
8ø S1
275 CFM
8ø S1
275 CFM
8ø S1
200 CFM
6ø E2
125 CFM
6ø E2
125 CFM
6ø E2
75 CFM
6ø E2
75 CFM
14x12.5
12x8
12x8
14x8
16x8 x1
12x8 x6
16x12
10ø 6ø x8
12x8 x1 x1 ø x8
8x8
8x8
6x4
6ø S3
50 CFM
6ø S3
50 CFM
10ø E2
625 CFM
16x8
12ø
8ø
10ø
6ø
8ø x1
6x
6ø
RHS-1 RHS-1
10ø S7
250 CFM
DN28x14 RA
DN36x18 SA
DN22x14 RA
UP & DN24x40 SA
DN8x8 EA
DN12x10 EA
DN12x10 EA
DN12x10 EA
DN12x10 EA
B-D
B-D
MOD
MOD
B-D B-D
UP28x14 EA
UP32x20 EA
B-D
MOD
B-D
6ø R2
150 CFM
x1
8ø
DDC
PANEL
ELEC
A578
R
OFFICE
DN16x8 SA
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:0
:3
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
PARTIAL FIFTH FLOOR PLAN -
DUCTWORK
MH105
TSADTR
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
BID DOCUMENTS 100%
20014.00
N Scale: 1/8" = 1'-0"
PARTIAL FIFTH FLOOR PLAN - DUCTWORK
GENERAL NOTES
A. FIRE DAMPERS SHALL BE PROVIDED IN 2 HOUR RATED…