Attachment 07 - Drawings - General - Civil.pdf

PDF 13 MB Posted

Attached to
506-334 – Construct Private In-Patient Rooms and Primary Clinics
Solicitation number
36C25024B0031_1
Issued by

About this file

This document appears to be Attachment 07 - Drawings - General - Civil.pdf, which contains civil engineering drawings related to Solicitation Number 36C25024B0031_1 for the construction of private in-patient rooms and primary clinics at the Ann Arbor, MI facility of the Department of Veterans Affairs Technology Acquisition Center Austin.

The solicitation is for the construction project 506-334, with the objective to construct private in-patient rooms and primary clinics. The Department of Veterans Affairs is the federal agency issuing this solicitation. This document does not contain details on the specific products, services, response dates, pricing terms, set asides, or other salient information related to the contract opportunity. It appears to be a technical drawing attachment provided as part of the overall solicitation package.

View the file

Other files

File Type Posted
Attachment 14 - Wage Determination Rev 6 - Washtenaw County - 7-26-24.pdf PDF
506-334 Solicitation Amendment 005 - 36C25024B0031 0005.docx DOCX document
Plumbing Drawings - Write Up.pdf PDF
506-334 Solicitation Amendment 004 36C25024B0031 0004.docx DOCX document
Round 2 Technical Questions - Ann Arbor - 506-334 - FINAL - 7-22-24.pdf PDF
Amended Drawings - 7-22-24.pdf PDF
506-334 Solicitation Amendment 003 - 36C25024B0031 0003.docx DOCX document
506-334 Solicitation Amendment 0002 -36C25024B0031 0002.docx DOCX document
5 West hallway renovation 506-334-100.pdf PDF
New building 5th floor ICRA 506-334-100.pdf PDF
New building west side 3rd floor ICRA 506-334-100.pdf PDF
221300 Sanitary and Vent.pdf PDF
New building west side 4th floor 506-334-100.pdf PDF
Amended Drawings.pdf PDF
Technical Questions - Ann Arbor - 506-334 - FINAL - 7-16-24.pdf PDF
506-334 - Solicitation Amendment 0001 - 36C25024B0031_1 0001.docx DOCX document
506-334 Construct Private In-Patient Beds - sign in sheet 20240701.pdf PDF
Attachment 08 - Drawings - Mechanical.pdf PDF
Attachment 10 - Drawings - Structural.pdf PDF
Attachment 11 - Drawings - Telecommunications.pdf PDF
Attachment 02 - Specifications Vol 2.pdf PDF
Attachment 14 - Wage Determination - Washtenaw County - 4-5-24.pdf PDF
S02 - 36C25024B0031_1.docx DOCX document
Attachment 06 - Drawings - Fire Protection.pdf PDF
Attachment 13 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 01 - Specifications Vol 1.pdf PDF
Attachment 12 - Brand Name JA - Ann Arbor - 506-334 - FINAL.pdf PDF
Attachment 05 - Drawings - Electrical.pdf PDF
Attachment 09 - Drawings - Plumbing.pdf PDF
Attachment 04 - Drawings - Architectural - Vol 2.pdf PDF
Attachment 15 - Site Visit Instructions - Ann Arbor.docx DOCX document
Attachment 03 - Drawings - Architectural - Vol 1.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXTERIOR ELEVATION

INTERIOR ELEVATION

SECTION/DETAIL NUMBER

DRAWING NUMBER

EQUIPMENT TAG

COLUMN GRID

NOTE

WINDOW OPENING

DOOR OPENING

ROOM NAME

ROOM NUMBER

WALL TYPE

CEILING HEIGHT

FINISH DESIGNATION

X

10'-8"

X

X

XX.X-X

X

X

1/A101

X

A101 SIM.

EXP.X

TOILET ACCESSORY TAGX SIGNAGE TAG

A101

SIM

X

FULLER COURT

F U

L L E

R R

O A

D

GLAZIER W

AY

FULLER COURT

B E

A L

A V

E N

U E

FULLER ROAD

B O

N

IS

T E

E L

B L V

D

1W

1E

37 15 31 22 T09

H

J

G B

A

D

VA MEDICAL CIRCLE

PROJECT LOCATION

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Department of Veterans Affairs Medical Center

524 FERNWOOD AVENUE

ALTAMONTE SPRINGS, FLORIDA 32701

407.830.6522 P

937.461.0260 F

RDC / JOHN POE ARCHITECTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

HEAPY ENGINEERING

1400 WEST DOROTHY LANE

DAYTON, OH 45409

937.224.0861 P

937.224.5777 F

TTL ASSOCIATES, INC.

1915 NORTH 12 STREET

TOLEDO, OH 43604

419.324.2222 P

419.241.1808 F

ENVIRONMENTAL ENGINEERING

ARCHITECTURE | PLANNING | INTERIOR DESIGN

MECHANICAL | ELECTRICAL | PLUMBING

THP LIMITED, INC.

100 E. EIGHTH STREET, SUITE 300

CINCINNATI, OH 45202

513.241.3222 P

513.241.2981 F

STRUCTURAL ENGINEERING

MIDWESTERN CONSULTING

3815 PLAZA DRIVE

ANN ARBOR, MI 48108

734.995.0200 P

734.995.0599 F

CIVIL ENGINEERING

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:0

:0

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

COVER SHEET

G001

RWTH

506-334

Ann Arbor, Michigan (506)

B01W

Construct Private In-Patient Rooms & Primary Clinics

2215 Fuller Road Ann Arbor, MI 48105 PROJECT #: 506-334

JEFF MEANS

100% BID DOCUMENTS

20014.00

GENERAL CONSTRUCTION NOTES

* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE

CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).

1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,

INTERNATIONAL BUILDING CODE, AND OTHER CODES AS IDENTIFIED IN VHA

PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE

ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,

TECHNICAL INFORMATION LIBRRARY WEBSITE.

2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND

DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13

WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS

TECHNICAL INFORMATION LIBRARY WEBSITE.

3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT

EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED

WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH

ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT

ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.

5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF

NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO

REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT

SURFACES TO REMAIN.

6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND

DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW

MATERIALS.

7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO

BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE

SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT

THROUGH FINISHED OPENINGS.

DRAWING INDEX

GRAPHIC SYMBOLS

N Scale: 1" = 160'-0"

SITE PLAN

8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,

HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS

AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT

DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL

WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.

9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS

SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A

PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS

INDICATED AT SIMILAR CONDITIONS.

10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL

SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE

THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE

NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR

SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.

11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED

WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF

THE WALL.

12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO

AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER

RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS

RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS

IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY

FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.

13. CONTRACTOR SHALL COORDINATE DESIGNATED OUTSIDE LAYDOWN AREA &

ANY ROOMS INSIDE THE FACILITY FOR MATERIAL STORAGE WITH C.O.R.

PRIOR TO COMMENCEMENT OF WORK

GENERAL

G001 COVER SHEET

G100 CODE PLANS

G200 SEQUENCE OF CONSTRUCTION

G301 BID DEDUCT ALTERNATE 01 & 02

G302 BID DEDUCT ALTERNATE 03 & 04

CIVIL

C001 EXISTING CONDITIONS AND SITE PREP

STRUCTURAL

S001 GENERAL STRUCTURAL NOTES

S002 TYPICAL DETAILS

S003 TYPICAL DETAILS

S104 THIRD AND FOURTH FLOORS FRAMING PLANS

S105 FIFTH FLOOR AND ROOF FRAMING PLANS

S106 EXISTING ROOF FRAMING PLAN

S201 FRAMING DETAILS

S301 TRUSS ELEVATION AND DETAILS

S401 STEEL COLUMN SCHEDULE AND DETAILS

S501 WEST ELEVATION SUPPLEMENTAL FRAMING

ARCHITECTURAL

AD102 SECOND FLOOR - DEMOLITION PLAN

AD103 THIRD FLOOR / SECOND FLOOR ROOF - DEMOLITION PLAN

AD104 FOURTH FLOOR - DEMOLITION PLAN

AD105 FIFTH FLOOR - DEMOLITION PLAN

AD106 SIXTH FLOOR - DEMOLITION PLAN

AD122 SECOND FLOOR REFLECTED CEILING - DEMOLITION PLAN

AD201 EXTERIOR DEMOLITION ELEVATIONS

AD202 EXTERIOR DEMOLITION ELEVATIONS & DETAILS

A103-D THIRD FLOOR DIMENSION PLAN

A103-N THIRD FLOOR NOTE PLAN

A104-D FOURTH FLOOR DIMENSION PLAN

A104-N FOURTH FLOOR NOTE PLAN

A105-D FIFTH FLOOR DIMENSION PLAN

A105-N FIFTH FLOOR NOTE PLAN

A106 SIXTH FLOOR / ROOF PLAN

A122 SECOND FLOOR - REFLECTED CEILING PLAN

A123 THIRD FLOOR - REFLECTED CEILING PLAN

A124 FOURTH FLOOR - REFLECTED CEILING PLAN

A125 FIFTH FLOOR - REFLECTED CEILING PLAN

A126 CEILING DETAILS

A201 EXTERIOR ELEVATIONS

A202 EXTERIOR ELEVATIONS

A300 WALL TYPES

A301 BUILDING SECTIONS

A311 WALL SECTIONS

A321 DETAILS

A322 DETAILS

A401 INTERIOR ELEVATIONS

A402 INTERIOR ELEVATIONS

A403 INTERIOR ELEVATIONS

A404 INTERIOR ELEVATIONS

A407 RESTROOM INTERIOR ELEVATIONS

A511 CASEWORK SECTIONS & DETAILS

A601 DOOR SCHEDULE & DETAILS

A611 WINDOW & STOREFRONT

A612 WINDOW DETAILS

IF001 FINISH LEGEND

IF301 THIRD FLOOR - FLOOR FINISH PLAN

IF302 THIRD FLOOR - WALL FINISH PLAN

IF303 THIRD FLOOR - WALL PROTECTION PLAN

IF401 FOURTH FLOOR - FLOOR FINISH PLAN

IF402 FOURTH FLOOR - WALL FINISH PLAN

IF403 FOURTH FLOOR - WALL PROTECTION PLAN

IF501 FIFTH FLOOR - FLOOR FINISH PLAN

IF502 FIFTH FLOOR - WALL FINISH PLAN

IF503 FIFTH FLOOR - WALL PROTECTION PLAN

IS301 THIRD FLOOR - SIGNAGE PLAN

IS401 FOURTH FLOOR - SIGNAGE PLAN

IS501 FIFTH FLOOR - SIGNAGE PLAN

IS600 SIGNAGE DETAILS

QH103 THIRD FLOOR - FURNITURE & EQUIPMENT PLAN

QH104 FOURTH FLOOR - FURNITURE & EQUIPMENT PLAN

QH105 FIFTH FLOOR - FURNITURE & EQUIPMENT PLAN

FIRE SUPPRESSION

F001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS

F002 BID DEDUCT ALTERNATE 01 & 02

F003 BID DEDUCT ALTERNATE 03 & 04

FX103 PARTIAL THIRD FLOOR PLAN

FX104 PARTIAL FOURTH FLOOR PLAN

FX105 PARTIAL FIFTH FLOOR PLAN

PLUMBING

P001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS

P002 BID DEDUCT ALTERNATE 01 & 02

P003 BID DEDUCT ALTERNATE 03 & 04

PD102 PARTIAL SECOND FLOOR PLAN - REMOVALS

PD103 PARTIAL THIRD FLOOR PLAN - REMOVALS

PD104 PARTIAL FOURTH FLOOR PLAN - REMOVALS

PD105 PARTIAL FIFTH FLOOR PLAN - REMOVALS

PL102 PARTIAL SECOND FLOOR PLAN - DRAINAGE

PL103 PARTIAL THIRD FLOOR PLAN - DRAINAGE

PL104 PARTIAL FOURTH FLOOR PLAN - DRAINAGE

PL105 PARTIAL FIFTH FLOOR PLAN - DRAINAGE

PL106 PARTIAL SIXTH FLOOR PLAN - DRAINAGE

PP103 PARTIAL THIRD FLOOR PLAN - DISTRIBUTION

PP104 PARTIAL FOURTH FLOOR PLAN - DISTRIBUTION

PP105 PARTIAL FIFTH FLOOR PLAN - DISTRIBUTION

PG105 PARTIAL FIFTH FLOOR PLAN - MEDICAL GAS

P401 ENLARGED PLAN

P601 SCHEDULES & DIAGRAMS

P901 SANITARY WASTE AND VENT DIAGRAM

P902 DOMESTIC WATER DIAGRAM

P903 MEDICAL GAS DIAGRAM

P904 STORM & SECONDARY OVERFLOW DIAGRAM

MECHANICAL

M001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS

M002 BID DEDUCT ALTERNATES

M003 BID DEDUCT ALTERNATES

MD102 PARTIAL SECOND FLOOR PLAN - REMOVALS

MD103 PARTIAL THIRD FLOOR PLAN - REMOVALS

MD104 PARTIAL FOURTH FLOOR PLAN - REMOVALS

MD105 PARTIAL FIFTH FLOOR PLAN - REMOVALS

MH101 PARTIAL FIRST FLOOR PLAN - TEMPORARY AIR HANDLING UNIT

MH102 PARTIAL SECOND FLOOR PLAN - DUCTWORK

MH103 PARTIAL THIRD FLOOR PLAN - DUCTWORK

MH104 PARTIAL FOURTH FLOOR PLAN - DUCTWORK

MH105 PARTIAL FIFTH FLOOR PLAN - DUCTWORK

MH106 PARTIAL SIXTH FLOOR PLAN - DUCTWORK

MP103 PARTIAL THIRD FLOOR PLAN - PIPING

MP104 PARTIAL FOURTH FLOOR PLAN - PIPING

MP105 PARTIAL FIFTH FLOOR PLAN - PIPING

MP106 PARTIAL SIXTH FLOOR PLAN - PIPING

M401 ENLARGED PLANS

M402 ENLARGED PLAN

M403 ENLARGED PLANS

M501 DETAILS

M502 DETAILS

M503 DETAILS

M504 DETAILS

M505 AIRFLOW SCHEMATICS

M601 SCHEDULES

M602 SCHEDULES

M901 CONTROLS

M902 CONTROLS

M903 CONTROLS

M904 CONTROLS

ELECTRICAL

E001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS

E002 BID DEDUCT ALTERNATES

ED103 PARTIAL THIRD FLOOR PLAN - REMOVALS

ED105 PARTIAL FIFTH FLOOR PLAN - REMOVALS

EL103 PARTIAL THIRD FLOOR PLAN - LIGHTING

EL104 PARTIAL FOURTH FLOOR PLAN - LIGHTING

EL105 PARTIAL FIFTH FLOOR PLAN - LIGHTING

EP101 PARTIAL FIRST FLOOR PLAN - POWER

EP103 PARTIAL THIRD FLOOR PLAN - POWER

EP104 PARTIAL FOURTH FLOOR PLAN - POWER

EP105 PARTIAL FIFTH FLOOR PLAN - POWER

EP106 PARTIAL SIXTH FLOOR & ROOF PLAN - POWER

E401 ENLARGED PLANS

E501 SCHEDULES & DETAILS

E502 PANEL SCHEDULES

E503 PANEL SCHEDULES

E601 PARTIAL SINGLE LINE DIAGRAM

E602 PARTIAL SINGLE LINE DIAGRAM

E603 PARTIAL SINGLE LINE DIAGRAM

E604 PARTIAL SINGLE LINE DIAGRAM

TELECOMMUNICATIONS

T001 ABBREVIATION, SYMBOLS & INDEX OF DRAWINGS

T002 BID DEDUCT ALTERNATES 01 & 02

T003 BID DEDUCT ALTERNATES 03 & 04

TD103 PARTIAL THIRD FLOOR PLAN - REMOVALS

TD104 PARTIAL FOURTH FLOOR PLAN - REMOVALS

TD105 PARTIAL FIFTH FLOOR PLAN - REMOVALS

TA103 PARTIAL THIRD FLOOR PLAN - TECHNOLOGY

TA104 PARTIAL FOURTH FLOOR PLAN - TECHNOLOGY

TA105 PARTIAL FIFTH FLOOR PLAN - TECHNOLOGY

TA106 FIRST FLOOR PLAN BUILDING 28 - TECHNOLOGY

TY103 PARTIAL THIRD FLOOR PLAN - TECHNOLOGY SECURITY

TY104 PARTIAL FOURTH FLOOR PLAN - TECHNOLOGY SECURITY

TY105 PARTIAL FIFTH FLOOR PLAN - TECHNOLOGY SECURITY

Revisions Date

0-HR Smoke Partition: NFPA 101 - 8.4

1-HR Smoke Barrier: NFPA 101 - 8.5

2-HR Smoke Barrier: NFPA 101 - 8.5

1-HR Fire Barrier: NFPA 101 - 8.3

2-HR Fire Barrier: NFPA 101 - 8.3

Means of Egress

Egress Capacity

Existing Wall to Remain

New Wall

Area of New Work

No Architectural Work this Area

Suite Designation

Area Open to Corridor

Fire Extinguisher

TOTAL TRAVEL DISTANCE= 180'

(MAXIMUM= 200')

TOTAL TRAVEL DISTANCE= 183

(MAXIMUM= 200')

Common Path of Travel= 90'

(MAXIMUM= 100' )

COMPARTMENT ZONE 3

7,200 SF

COMPARTMENT ZONE 2

14,200 SF

COMPARTMENT ZONE 1

12,194 SF

Common Path of Travel= 75'

(MAXIMUM= 100' )

TOTAL TRAVEL DISTANCE= 172'

(MAXIMUM= 200' )

TOTAL TRAVEL DISTANCE= 142'

(MAXIMUM= 200' )

TOTAL TRAVEL DISTANCE= 95'

(MAXIMUM= 200' )

SUITE

9,117 SF

Common Path of Travel= 42'

(MAXIMUM= 100')

SUITE EXIT= 100'

(MAXIMUM= 100')

TOTAL TRAVEL DISTANCE= 148'

(MAXIMUM= 200')

SUITE EXIT= 98'

(MAXIMUM= 100')

TOTAL TRAVEL DISTANCE= 141'

(MAXIMUM= 200')

COMPARTMENT ZONE 4

7,316 SF

COMPARTMENT ZONE 3

20,260 SF

COMPARTMENT ZONE 2

6,539 SF

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:5

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

CODE PLANS

G100

RWTH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

CODE LEGEND

N Scale: 1/16" = 1'-0"

THIRD FLOOR - CODE PLAN

N

Scale: 1/16" = 1'-0"

FOURTH FLOOR - CODE PLAN

N Scale: 1/16" = 1'-0"

FIFTH FLOOR - CODE PLAN

Project Data Project Name: AE Construct In-Patient Rooms Project Number: VA# 506-334 / RDCJPA# 20014.00 Project Address: VA Ann Arbor Healthcare System

Building 1W 2215 Fuller Road, Ann Arbor, MI 48105

Project Description: 3 story vertical addition on the west side of Building 1 and associated interior remodeling of spaces adjacent to addition. Addition to accommodate future 6th thru 9th floors.

Applicable Building Codes Authority Having Jurisdiction Ann Arbor – Veterans Affairs Medical Center Building Code: NFPA 101, Life Safety Code, 2021 Edition

NFPA 96, Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations, 2021 Edition International Building Code, 2021 Edition

Accessibility Code: VA Barrier Free Design Standard, PG-18-13/ABAAS, January 1, 2017 (revised October 1, 2023)

Structural Code: International Building Code, 2021 Edition Elevator Code: N/A Energy Code: ASHRAE 90.1-2021 (target 30% better than baseline) Mechanical Code: 2021 International Mechanical Code Plumbing Code: 2021 International Plumbing Code

2021 NFPA 54 National Gas Fuel Code Electrical Code: 2020 NFPA 70 National Electrical Code Fire Code: 2019 NFPA 72 National Fire Alarm Code

2019 NFPA 13, 13D & 13R

Life Safety Summary Occupancy: Third Floor: Ambulatory

Fourth Floor: Business Fifth Floor: Healthcare

Construction Type: II (222) (NFPA 5000, Table 7.4.1) Actual Height: 61’-5” Allowable Area: Unlimited (NFPA 5000, Table 7.4.1) Actual Area: Third Floor: Infill: 5,311 SF | Renovation: 2,102 SF

Fourth Floor:Infill: 5,311 SF | Renovation: 1,056 SF Fifth Floor: Infill: 5,311 SF | Renovation: 3,800 SF Total: Infill: 15,933 SF | Renovation: 6,958 SF

Hazard of Content: Ordinary Hazard Contents Sprinkler System: Fully suppressed (NFPA 13) Seismic Design Category: Category A Fire Resistance Ratings: Structural Frame: 2 hour

Exterior Bearing Walls: 2 hour Interior Bearing Walls: 2 hour Exterior Non-Bearing Walls: 0 hour Interior Non-Bearing Walls: 0 hour Columns: 2 hour Floor Construction: 2 hour Roof Construction: 1 hour

Smoke Compartment: Third Floor (Max 40,000 sf) Compartment Zone 1 12,194 s.f.

Compartment Zone 2 13,969 s.f.

Compartment Zone 3 8,170s.f.

Fourth Floor Compartment Compartment Zone 2 33,838 s.f.

Fifth Floor (Max 22,500 sf) Compartment Zone 2 6,539 s.f.

Compartment Zone 3 20,260 s.f.

Compartment Zone 4 7,316 s.f.

Suite: Maximum SF (10,000 sf) 9,021 s.f.

Direct visual supervision provided.

Total coverage automatic smoke detection.

Required Separations: Storage Rooms > 100 sf: 1 HR Fire Barrier (Healthcare Only)

Boiler/Furnace Rooms: 1 HR Fire Barrier Electrical Rooms: 1 HR Fire Barrier Stairs: Existing Shafts: 1 HR Connecting >4 stories

2 HR Connecting <4 stories Corridors: 0HR Smoke Partition

(Heathcare only) Travel Distance Restrictions:

Dead-End Corridor Limit: 30 ft. Health Care 50 ft. Ambulatory 50 ft. Business

Common Path of Travel: 100 ft.

Travel Distance to Suite Exit: 100 ft.

Travel Distance to Exits: 200 ft.

300 ft Business Travel Distance from Room: 50 ft. Health Care

150 ft Ambulatory 300 ft Business

ALL RENOVATION WORK IN THIS

AREA TO BE COMPLETED AFTER

REMAINDER OF FLOOR HAS

BEEN TURNED OVER TO THE VA

LOUNGE

NURSE

STATION

NS-503

STAFF

LOUNGE

OFFICE

SOILED

HOLD

1BR

ISOLATION

ROOM #1

BATH

505A

BATH

507A

1BR

PATIENT

ROOM #2

FEMALE

LAV

522D

MALE LAV

522B

CLEAN

UTILITY

EQUIPMENT

ALCOVE

ANTE

505B

OFFICE

CLEAN

LINEN

LOCKERS

522A

LOCKERS

522C

NURSE

STATION

NS-500

SPACE

WHEEL

CHAIR/

STRETCHER

MED ROOM

1BR

PATIENT

ROOM #3

BATH

509A

1BR

PATIENT

ROOM #4

BATH

515A

BATH

517A

BATH

519A

NURSE

STATION

NS-501

NUTRITION

1 BR

PATIENT

ROOM #7

1 BR

PATIENT

ROOM #8

BATH

524A

1 BR

PATIENT

ROOM #9

BATH

525A

BATH

523A

ALCOVE

1BR

PATIENT

ROOM #5

1BR

PATIENT

ROOM #6

NURSE

STATION

NS-502

CORRIDOR

C5-51

STAFF

LOUNGE

B511

STAFF

LOUNGE

B509

ELECTRICAL

A511

ELECTRICAL

A578

DATA

A575

DATA

A525

CORRIDOR

C5-50

CORRIDOR

C5-52

CORRIDOR

C5-07

CORRIDOR

C5-09

CORRIDOR

C5-13

STAGING AREA

-CRANE LOCATION

-DUMPSTERS

-JOB TRAILER

CONFIRM WITH VA COR LOCATION OF

CONTRACTOR PARKING AND FENCING

SUBCONTRACTOR PARKING OFFSITE

PROJECT LOCATION

6 FT HIGH CHAIN LINK FENCING

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:5

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

SEQUENCE OF CONSTRUCTION

G200

RWTH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

N.T.S.Scale:

FIFTH FLOOR SEQUENCE OF CONSTRUCTION

N.T.S.Scale:

STAGING PLAN

2/A201

C3-A

307B

OPEN

OFFICE

COMMON

SPACE

STORAGE

307A

HEALTHY

TEACHING

KITCHEN

LOBBY

SPACE

CORRIDOR

C3-A

ELECTRICAL

A311

DATA

A370

STORAGE

A317A

307A

C

B

307C

OMIT ALL WORK RELATED TO

THE OPEN OFFICES AND

CHAPEL, INCLUDING

FINISHES, CEILINGS, AND

COLUMN WRAPS. REFER TO

MEP DRAWINGS FOR

MODIFICATIONS TO LIGHTING,

POWER AND HVAC WORK.

SPACE WILL BE UNFINISHED

STORAGE.

01 - DEDUCT ALTERNATE 01:

A401

A401

EXTERIOR ELEVATION

INTERIOR ELEVATION

SECTION/DETAIL NUMBER

DRAWING NUMBER

EQUIPMENT TAG

COLUMN GRID

NOTE

WINDOW OPENING

DOOR OPENING

ROOM NAME

ROOM NUMBER

WALL TYPE

CEILING HEIGHT

FINISH DESIGNATION

X

10'-8"

X

X

XX.X-X

X

X

1/A101

X

A101 SIM.

EXP.X

TOILET ACCESSORY TAGX SIGNAGE TAG

A101

SIM

X

0-HR Smoke Partition: NFPA 101 - 8.4

1-HR Smoke Barrier: NFPA 101 - 8.5

2-HR Smoke Barrier: NFPA 101 - 8.5

1-HR Fire Barrier: NFPA 101 - 8.3

2-HR Fire Barrier: NFPA 101 - 8.3

MECHANICAL

ROOM

ELECTRICAL

SHOP

S-01-4A

400A

30'-7"

/4

15'-8 3/4"

31'-6" 20'-7 1/2"

6'-0"

6'-0 5/8"

OMIT ALL WORK RELATED TO

THE ELECTRICAL SHOP

INCLUDING FINISHES,

CEILINGS, AND COLUMN

WRAPS. REFER TO MEP

DRAWINGS FOR

MODIFICATIONS TO LIGHTING,

POWER AND HVAC WORK.

SPACE WILL BE UNFINISHED

STORAGE.

02 - DEDUCT ALTERNATE 02:

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:0

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

BID DEDUCT ALTERNATE 01 & 02

G301

RWTH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

Scale: 1/8" = 1'-0"1

BID DEDUCT 01 - REMOVE THIRD FLOOR OFFICES AND

CHAPEL

A. All dimensions are taken to face of gypsum wallboard or unit masonry.

B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.

C. Install fire retardent blocking at all wall mounted equipment, accessories, casework and wall mounted door stops..

D. Verify all conditions in the field prior to fabrication, erection and construction.

E. Coordinate access for all construction, deliveries, and debris removal with the COR. See General Requirements.

F. Maintain rating at all existing rated construction. Repair all damage to existing rated walls.

G. All new structural steel is to be protected with Type 2 applied fireproofing unless noted otherwise. Provide 2 hour rating for all columns, griders and beams unless noted otherwise.

H. Refer to series A400 sheets for interior elevations and accessory schedule.

I. All wall types to be S1.0 unless noted otherwise.

J. All column enclosures to be S2.3 unless noted otherwise.

K. All column enclosures at existing columns to have size verified in field.

GENERAL NOTES

GRAPHIC SYMBOLS

FIRE WALL LEGEND

Scale: 1/8" = 1'-0"2

BID DEDUCT 02 - REMOVE FOURTH FLOOR

ELECTRICAL SHOP

PLAN NOTES

EXTERIOR ELEVATION

INTERIOR ELEVATION

SECTION/DETAIL NUMBER

DRAWING NUMBER

EQUIPMENT TAG

COLUMN GRID

NOTE

WINDOW OPENING

DOOR OPENING

ROOM NAME

ROOM NUMBER

WALL TYPE

CEILING HEIGHT

FINISH DESIGNATION

X

10'-8"

X

X

XX.X-X

X

X

1/A101

X

A101 SIM.

EXP.X

TOILET ACCESSORY TAGX SIGNAGE TAG

A101

SIM

X

0-HR Smoke Partition: NFPA 101 - 8.4

1-HR Smoke Barrier: NFPA 101 - 8.5

2-HR Smoke Barrier: NFPA 101 - 8.5

1-HR Fire Barrier: NFPA 101 - 8.3

2-HR Fire Barrier: NFPA 101 - 8.3

C3-A

OMIT ALL WORK RELATED TO THE

TEACHING KITCHEN, INCLUDING

FINISHES, CEILINGS, AND COLUMN

WRAPS. REFER TO MEP DRAWINGS

FOR MODIFICATIONS TO LIGHTING,

POWER AND HVAC WORK. SPACE WILL

BE UNFINISHED STORAGE. EXISTING

OFFICE CONSTRUCTION TO REMAIN.

03 - DEDUCT ALTERNATE 03:

OFFICE

B304

OFFICE

B312A

OFFICE

B303

OFFICE

B302

OFFICE

B300

LOUNGE

NURSE

STATION

NS-503

OFFICE

SOILED

HOLD

1BR

ISOLATION

ROOM #1

BATH

505A

BATH

507A

1BR

PATIENT

ROOM #2

CLEAN

UTILITY

EQUIPMENT

ALCOVE

ANTE

505B

OFFICE

NURSE

STATION

NS-500

SPACE

WHEEL

CHAIR/

STRETCHER

MED ROOM

1BR

PATIENT

ROOM #3

BATH

509A

1BR

PATIENT

ROOM #4

BATH

515A

BATH

517A

BATH

519A

NURSE

STATION

NS-501

NUTRITION

1 BR

PATIENT

ROOM #7

1 BR

PATIENT

ROOM #8

BATH

524A

1 BR

PATIENT

ROOM #9

BATH

525A

BATH

523A

ALCOVE

1BR

PATIENT

ROOM #5

1BR

PATIENT

ROOM #6

NURSE

STATION

NS-502

CORRIDOR

C5-51

ELECTRICAL

A511

ELECTRICAL

A578

DATA

A575

DATA

A525

CORRIDOR

C5-07

CORRIDOR

C5-09

ELEC

B520

DATA

B525A

OMIT WORK TO CONSTRUCT NEW

LOUNGE AND LOCKER ROOMS.

RETAIN EXISTING LOCKERS,

RESTROOMS, H.A.C, SOILED

UTILITY AND OFFICE. EXISTING

OFFICE TO BECOME CLEAN LINEN

ROOM.

522F

04 - DEDUCT ALTERNATE 04:

A

A

A

A402

A402

OFFICE

B512

OFFICE

B510

SOILED

UTILITY

B508A

H.A.C.

B508

LAV

B500C

LAV

B500B

LOCKERS

B500A

CLEAN LINEN

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:1

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

BID DEDUCT ALTERNATE 03 & 04

G302

RWTH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

A. All dimensions are taken to face of gypsum wallboard or unit masonry.

B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.

C. Install fire retardent blocking at all wall mounted equipment, accessories, casework and wall mounted door stops..

D. Verify all conditions in the field prior to fabrication, erection and construction.

E. Coordinate access for all construction, deliveries, and debris removal with the COR. See General Requirements.

F. Maintain rating at all existing rated construction. Repair all damage to existing rated walls.

G. All new structural steel is to be protected with Type 2 applied fireproofing unless noted otherwise. Provide 2 hour rating for all columns, griders and beams unless noted otherwise.

H. Refer to series A400 sheets for interior elevations and accessory schedule.

I. All wall types to be S1.0 unless noted otherwise.

J. All column enclosures to be S2.3 unless noted otherwise.

K. All column enclosures at existing columns to have size verified in field.

GENERAL NOTES

GRAPHIC SYMBOLS

FIRE WALL LEGEND

Scale: 1/8" = 1'-0"1

BID DEDUCT 03 - REMOVE THIRD FLOOR TEACHING

KITCHEN

Scale: 1/8" = 1'-0"2

BID DEDUCT 04 - KEEP EXISTING FIFTH FLOOR

LOCKERS AND RESTROOMS

Construct Private In-Patient Rooms & Primary Clinics

12.14.2023

EXISTING CONDITIONS

AND SITE PREP

C001

ACTSCD

PROGRESS PRINT

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

Revisions Date

VA Project No.

RDC/JPA Project No.

506-334

Ann Arbor, Michigan (506)

B01W

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

JEFF MEANS

100% CONSTRUCTION

DOCUMENTS

20014.00

Project Schedule Date Schematic Design 35% 04.16.2021 Design Development 65% 09.24.2021

11.15.2021Design Development 65% (Re-submittal) 10.26.2023Construction Documents 95% 12.14.2023Construction Documents 100%

File details come from the government source that posted it. Updated .