Attachment 04 - Drawings - Architectural - Vol 2.pdf

PDF 12 MB Posted

Attached to
506-334 – Construct Private In-Patient Rooms and Primary Clinics
Solicitation number
36C25024B0031_1
Issued by

About this file

This document appears to be Attachment 04 - Drawings - Architectural - Vol 2.pdf associated with the federal contract opportunity 506-334 – Construct Private In-Patient Rooms and Primary Clinics, solicitation number 36C25024B0031_1, issued by the Department of Veterans Affairs Technology Acquisition Center Austin.

The drawings provide architectural plans and specifications for the construction of private in-patient rooms and primary clinics at a location in Ann Arbor, MI. The drawings cover various aspects of the construction project, including floor plans, elevations, sections, and details. This document does not contain information on the specific products, services, response dates, award dates, pricing terms, set asides, or other key details of the contract opportunity. It appears to be a technical attachment providing the necessary design information for the construction project.

View the file

Other files

File Type Posted
Attachment 14 - Wage Determination Rev 6 - Washtenaw County - 7-26-24.pdf PDF
506-334 Solicitation Amendment 005 - 36C25024B0031 0005.docx DOCX document
Plumbing Drawings - Write Up.pdf PDF
506-334 Solicitation Amendment 004 36C25024B0031 0004.docx DOCX document
Round 2 Technical Questions - Ann Arbor - 506-334 - FINAL - 7-22-24.pdf PDF
Amended Drawings - 7-22-24.pdf PDF
506-334 Solicitation Amendment 003 - 36C25024B0031 0003.docx DOCX document
506-334 Solicitation Amendment 0002 -36C25024B0031 0002.docx DOCX document
5 West hallway renovation 506-334-100.pdf PDF
New building 5th floor ICRA 506-334-100.pdf PDF
New building west side 3rd floor ICRA 506-334-100.pdf PDF
221300 Sanitary and Vent.pdf PDF
New building west side 4th floor 506-334-100.pdf PDF
Amended Drawings.pdf PDF
Technical Questions - Ann Arbor - 506-334 - FINAL - 7-16-24.pdf PDF
506-334 - Solicitation Amendment 0001 - 36C25024B0031_1 0001.docx DOCX document
506-334 Construct Private In-Patient Beds - sign in sheet 20240701.pdf PDF
Attachment 08 - Drawings - Mechanical.pdf PDF
Attachment 10 - Drawings - Structural.pdf PDF
Attachment 11 - Drawings - Telecommunications.pdf PDF
Attachment 02 - Specifications Vol 2.pdf PDF
Attachment 14 - Wage Determination - Washtenaw County - 4-5-24.pdf PDF
S02 - 36C25024B0031_1.docx DOCX document
Attachment 06 - Drawings - Fire Protection.pdf PDF
Attachment 13 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 01 - Specifications Vol 1.pdf PDF
Attachment 12 - Brand Name JA - Ann Arbor - 506-334 - FINAL.pdf PDF
Attachment 05 - Drawings - Electrical.pdf PDF
Attachment 09 - Drawings - Plumbing.pdf PDF
Attachment 15 - Site Visit Instructions - Ann Arbor.docx DOCX document
Attachment 03 - Drawings - Architectural - Vol 1.pdf PDF
Attachment 07 - Drawings - General - Civil.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

.F .F

T

O T

O P

HANDRAIL

WALL TILE TO PAINTED GYP.

WALL TILE TO FLOOR TILE

TILE OUTSIDE CORNER

WALL TILE

SATIN ANODIZED

ALUMINUM TRIM,

SCHLUTER-RONDEC

WALL TILE

WALL TILE

WALL TILE

SATIN ANODIZED

ALUMINUM TRIM,

SCHLUTER-SCHIENE

FLOOR TILE

WALL TILE

SATIN ANODIZED

ALUMINUM TRIM,

SCHLUTER- DILEX

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:1

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

FINISH LEGEND

IF001

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

FINISH LEGEND

CODE FINISH TYPE MANUFACTURER PRODUCT / COLOR

06 41 16 PLASTIC LAMINATE CLAD ARCHITECTURAL CABINETS

CL-1 Compact Laminate Wilsonart Walnut Heights

PL-1 Plastic Laminate Wilsonart Walnut Heights 7965K-12

PL-2 Plastic Laminate Wilsonart Sap Walnut 8221-38

09 30 13 CERAMIC PORCELAIN TILING

PT-1 Porcelain Tile Atlas Concorde USA Cove, Breeze, 12" X 24", Install: monolithic, Grout: Tec power grout, Grout color: TBD

PT-2 Porcelain Tile Atlas Concorde USA Fray, Pearl, 12" X 24"

PT-3 Porcelain Tile Atlas Concorde USA Cove, Breeze dart mosaic, 30cm x 30cm

PT-4 Porcelain Tile Fireclay Tile Custom mosaic blend, tusk, wrought iron, Caspian Sea, Cardamom, 2" x 8"

PT-5 Porcelain Tile Fireclay Tile Tusk, 2"x8"

PT-6 Porcelain Tile American Olean Ideology, Carrara White IL10, Polished, Install: monolithic, Grout: Tec power grout, Grout color: TBD

PT-7 Porcelain Tile Atlas Concorde USA Cove, Breeze, 2" x 2", Install: monolithic, Grout: Tec power grout, Grout color: TBD

09 51 00 ACOUSTICAL CEILINGS

ACT-1 Acoustical Ceiling Tile Armstrong Ceiling Solutions Ultima, Square Lay-In, 24"x24", 15/16" Grid

ACT-2 Acoustical Ceiling Tile Armstrong Ceiling Solutions Ultima Health Zone, Square Lay-In, 24"x24", 15/16" Grid

09 65 13 RESILIENT BASE AND ACCESSORIES

RB-1 Rubber Base Tarkett/Johnsonite Rubber wall base, Traditional with toe, 4"H, Fawn 80

09 65 16 RESILIENT SHEET FLOORING

WSF-1 Welded Sheet Flooring Mannington Commercial Paradigm II, Intersect, Foundation

WSF-2 Welded Sheet Flooring Mannington Commercial Discovery, Reveal, Fortuity

WSF-3 Welded Sheet Flooring Mannington Commercial Bloom,Meander, Tranquility

09 65 19 RESILIENT TILE FLOORING

LVT-1 Luxury Vinyl Tile Patcraft Energize, Intention,9" x 36", Install: Stagger

LVT-2 Luxury Vinyl Tile Mannington Commercial Energize, Refine, 9" x 36", Install: Stagger

09 67 23 RESINOUS FLOORING SYSTEM

RES-1 Resinous Epoxy Flooring Stonehard Stone-Tec - decorative flake flooring ERF system, Color: Santa Cruz, Flake size: 1/4", Top coat grit finish: Orange Peel

09 68 00 CARPETING

CPT-1 Carpet Tile Shaw Contract Handstitch, Vintage gold, 9" x 36", Install: Stagger

09 91 00 PAINTING

EP-1 Two-Component Epoxy and Binder Resin Sherwin Williams Resuflor 3746, Clear

P-1 Paint (Field) - To Match Sherwin-Williams, Nuance SW7049

P-2 Paint (Hollow Metal doors/ Frames) - To Match Sherwin-Williams, Loggia SW7506

P-3 Paint (Accent) - To Match Sherwin-Williams,Softened green SW6177

P-4 Paint (Accent) - To Match Sherwin-Williams, Dutch Tile Blue SW0031

P-5 Paint (Ceilings, Typ.) - To Match Sherwin-Williams, High Reflective White SW7757

P-6 Paint (Accent) - To Match Sherwin-Williams, Bunglehouse Blue SW0048

10 26 00 WALL AND DOOR PROTECTION

CG-1 Corner Guard Construction Specialties Acrovyn corner/end guard, surface-mounted, SM Series, Mushroom 305, Full height

CG-2 Corner Guard Construction Specialties Stainless steel corner/end guard, CO Series, half height

HR-1 Handrail/Crash Rail Construction Specialties HRBW-10CN, 373 Amber Cherry, 378 Brushed Nickel, 102 Desert Sand

HR-2 Handrail/Crash Rail Construction Specialties HRBW-10CM, Mushroom 305

WP-1 Rigid Wall Protection Construction Specialties Palladium Rigid Sheet Wall Protection,4' x 8', 0.060" thick, 4'Height, Mushroom

WP-2 Rigid Wall Protection Construction Specialties Palladium Rigid Sheet Wall Protection,4' x 8', 0.060" thick, Full Height, Mushroom

12 36 00 COUNTERTOPS

QTZ-1 Quartz Agglomerate (Healthy Teaching Kitchen) Wilsonart Fossa Falls Q4065

SS-1 Solid Surface (Countertops/ WIndow Sills) Wilsonart White Stone 9208CS

SS-2 Solid Surface (Nurse Station Transaction) Wilsonart Golden Sail 9234SS

MISC.

PC-1 Privacy curtain Arc-Com Pattern: Mori, Color: Spring

RS-1 Rollershades (double shade) Mechoshade Shade cloth: Eurotwill reversible broken weave, Color: Silver birch 6456, Backout Shade Cloth: Classic blackout, Color: White 0701, Single closure mount: White, Support hardware: white, Brackets: Double Shade #15

A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.

B. All gypsum ceilings to be painted (P-4); unless noted otherwise.

Refer to reflected ceiling plan for details.

C. All walls to be painted (P-1), unless noted otherwise.

D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.

E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.

F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.

G. Handrails shall be installed 6" off the door frame where doors swing into the space.

H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.

I. All restrooms shall receive epoxy finish paint.

J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.

K. All millwork/casework shall be field measured before fabrication.

L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.

M. Solid surface window sills to be SS-1.

N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.

O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood

S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.

T. Provide metal transtion trim for 6"H resinous integral wall base

(RES-1).

U. Transition between vinyl products should be seamless weld with weldrod specified.

V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.

GENERAL INTERIOR FINISHES NOTES

N.T.S.Scale:

HANDRAIL SECTION DETAIL

N.T.S.Scale:

TILE TRANSITIONS

NOTE: Manufacturers’trade names and numbers are provided in Finish Legend to identify design intent. Equivalent products from other manufacturers that meet requirements of technical specifications will be acceptable upon approval in writing by contracting officer.

Revisions Date

CHAPEL

OPEN OFFICE

LOBBY SPACE

HEALTHY

TEACHING

KITCHEN

STORAGE

307A

OPEN OFFICE

OPEN OFFICE

COMMON

SPACE

CORRIDOR

C3-B

CPT-1

LVT-1

LVT-2 LVT-2

LVT-1

RB-1

RB-1

RB-1

RB-1

RB-1

CORRIDOR

C3-B

LVT-1

RB-1

LVT-2

LVT-1

CLOSET

1' - 6"

CPT-2

RB-1

CPT-2

RB-1

CPT-2

RB-1

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:1

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

THIRD FLOOR - FLOOR FINISH

PLAN

IF301

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

N Scale: 1/8" = 1'-0"

THIRD FLOOR - FLOOR FINISH PLAN

A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.

B. All gypsum ceilings to be painted (P-4); unless noted otherwise.

Refer to reflected ceiling plan for details.

C. All walls to be painted (P-1), unless noted otherwise.

D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.

E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.

F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.

G. Handrails shall be installed 6" off the door frame where doors swing into the space.

H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.

I. All restrooms shall receive epoxy finish paint.

J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.

K. All millwork/casework shall be field measured before fabrication.

L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.

M. Solid surface window sills to be SS-1.

N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.

O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood

S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.

T. Provide metal transtion trim for 6"H resinous integral wall base

(RES-1).

U. Transition between vinyl products should be seamless weld with weldrod specified.

V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.

GENERAL INTERIOR FINISHES NOTES

OPEN

OFFICE

COMMON

SPACE

STORAGE

A317A

OPEN

OFFICE

HEALTHY

TEACHING

KITCHEN

OPEN

OFFICE

LOBBY

SPACE

STORAGE

307A

PT-5

P-2 P-2

PT-4PT-5

P-1

P-1

P-1

P-1

P-1

P-1

CLOSET

H.A.C.

CORRIDOR

C3-B

P-1

PT-6

PL-1

P-3

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:1

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

THIRD FLOOR - WALL FINISH PLAN

IF302

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

N Scale: 1/8" = 1'-0"

THIRD FLOOR - WALL FINISH PLAN

A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.

B. All gypsum ceilings to be painted (P-4); unless noted otherwise.

Refer to reflected ceiling plan for details.

C. All walls to be painted (P-1), unless noted otherwise.

D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.

E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.

F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.

G. Handrails shall be installed 6" off the door frame where doors swing into the space.

H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.

I. All restrooms shall receive epoxy finish paint.

J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.

K. All millwork/casework shall be field measured before fabrication.

L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.

M. Solid surface window sills to be SS-1.

N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.

O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood

S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.

T. Provide metal transtion trim for 6"H resinous integral wall base

(RES-1).

U. Transition between vinyl products should be seamless weld with weldrod specified.

V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.

COMMON

SPACE

OPEN OFFICE

OPEN OFFICE

HEALTHY

TEACHING

KITCHEN

OPEN OFFICE

LOBBY SPACE

CHAPEL

CG-1

CG-1

CG-1

CG-1

CG-1CG-1

GWBCG-1

CG-1CG-1

HR-1

HR-1 HR-1

HR-1 CG-1

CG-1

?CG-2

CG-2CG-2

CG-2

CG-2

STORAGE

307A

STORAGE

A317A

CG-1

HR-1

HR-1

HR-1

HR-1

CG-1

CG-1

CG-2

CG-2

CG-2

HR-1CG-1

WP-2 WP-2

CG-1

H.A.C.

CLOSET

9.18

CG-1

CG-1

CG-1

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:1

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

THIRD FLOOR - WALL PROTECTION

PLAN

IF303

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

9.18 Provide 4'h wall protection (rwp-1) on all walls; unless noted otherwise.

N Scale: 1/8" = 1'-0"

THIRD FLOOR - WALL PROTECTION PLAN

A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.

B. All gypsum ceilings to be painted (P-4); unless noted otherwise.

Refer to reflected ceiling plan for details.

C. All walls to be painted (P-1), unless noted otherwise.

D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.

E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.

F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.

G. Handrails shall be installed 6" off the door frame where doors swing into the space.

H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.

I. All restrooms shall receive epoxy finish paint.

J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.

K. All millwork/casework shall be field measured before fabrication.

L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.

M. Solid surface window sills to be SS-1.

N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.

O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood

S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.

T. Provide metal transtion trim for 6"H resinous integral wall base

(RES-1).

U. Transition between vinyl products should be seamless weld with weldrod specified.

V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.

GENERAL INTERIOR FINISHES NOTES

PLAN NOTES

MECHANICAL

ROOM

ELECTRICAL

SHOP

EP-1

EP-1

LVT-1

OFFICE

401A

RB-1

RB-1

RB-1

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:2

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

FOURTH FLOOR - FLOOR FINISH

PLAN

IF401

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

N Scale: 1/8" = 1'-0"

FOURTH FLOOR - FLOOR FINISH PLAN

A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.

B. All gypsum ceilings to be painted (P-4); unless noted otherwise.

Refer to reflected ceiling plan for details.

C. All walls to be painted (P-1), unless noted otherwise.

D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.

E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.

F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.

G. Handrails shall be installed 6" off the door frame where doors swing into the space.

H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.

I. All restrooms shall receive epoxy finish paint.

J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.

K. All millwork/casework shall be field measured before fabrication.

L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.

M. Solid surface window sills to be SS-1.

N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.

O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood

S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.

T. Provide metal transtion trim for 6"H resinous integral wall base

(RES-1).

U. Transition between vinyl products should be seamless weld with weldrod specified.

V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.

ELECTRICAL

SHOP

OFFICE

401A

P-1

P-1

P-1

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:2

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

FOURTH FLOOR - WALL FINISH

PLAN

IF402

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

N Scale: 1/8" = 1'-0"

FOURTH FLOOR - WALL FINISH PLAN

A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.

B. All gypsum ceilings to be painted (P-4); unless noted otherwise.

Refer to reflected ceiling plan for details.

C. All walls to be painted (P-1), unless noted otherwise.

D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.

E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.

F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.

G. Handrails shall be installed 6" off the door frame where doors swing into the space.

H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.

I. All restrooms shall receive epoxy finish paint.

J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.

K. All millwork/casework shall be field measured before fabrication.

L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.

M. Solid surface window sills to be SS-1.

N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.

O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood

S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.

T. Provide metal transtion trim for 6"H resinous integral wall base

(RES-1).

U. Transition between vinyl products should be seamless weld with weldrod specified.

V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.

ELECTRICAL

SHOP

OFFICE

401A

CG-2

CG-2

CG-2

CG-2

?CG-2

CG-2

?CG-2

CG-2

?CG-2

?CG-2

?CG-2

?CG-2

?CG-2

?CG-2

?CG-1CG-2

CG-2

?CG-2

CG-2CG-2

9.18

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:2

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

FOURTH FLOOR - WALL

PROTECTION PLAN

IF403

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

9.18 Provide 4'h wall protection (rwp-1) on all walls; unless noted otherwise.

N Scale: 1/8" = 1'-0"

FOURTH FLOOR - WALL PROTECTION PLAN

A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.

B. All gypsum ceilings to be painted (P-4); unless noted otherwise.

Refer to reflected ceiling plan for details.

C. All walls to be painted (P-1), unless noted otherwise.

D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.

E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.

F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.

G. Handrails shall be installed 6" off the door frame where doors swing into the space.

H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.

I. All restrooms shall receive epoxy finish paint.

J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.

K. All millwork/casework shall be field measured before fabrication.

L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.

M. Solid surface window sills to be SS-1.

N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.

O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood

S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.

T. Provide metal transtion trim for 6"H resinous integral wall base

(RES-1).

U. Transition between vinyl products should be seamless weld with weldrod specified.

V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.

GENERAL INTERIOR FINISHES NOTES

BATH

525A

1 BR PATIENT

ROOM #9

1 BR PATIENT

ROOM #8

BATH

524A

1 BR PATIENT

ROOM #7

NURSE

STATION

NS-502

BATH

523A

NURSE

STATION

NS-503

LOUNGE

STAFF

LOUNGE

ALCOVE

SPACE

LOCKERS

522C

LOCKERS

522A

MED ROOM

NURSE

STATION

NS-501 CLEAN

UTILITY

CLEAN LINEN

MALE LAV

522B

FEMALE LAV

522D

1BR PATIENT

ROOM #6

BATH

519A

BATH

517A

1BR PATIENT

ROOM #5

1BR PATIENT

ROOM #4

BATH

515A

1BR PATIENT

ROOM #3

CORRIDOR

C5-51

WHEEL

CHAIR/

STRETCHER

SOILED HOLD

NUTRITION

EQUIPMENT

ALCOVE

NURSE

STATION

NS-500

OFFICE

ANTE

505B

OFFICE

1BR

ISOLATION

ROOM #1

1BR PATIENT

ROOM #2

507BATH

507A

BATH

505A

CORRIDOR

C5-52

CORRIDOR

C5-50

CORRIDOR

C5-09

CORRIDOR

C5-09

WSF-1

WSF-1

WSF-1

PT-1

WSF-3

WSF-1

PT-1

WSF-1

PT-1

WSF-3

WSF-1

WSF-1

WSF-1

WSF-1

LVT-1

LVT-1 LVT-1

PT-1 PT-1

WSF-3

PT-1

LVT-1

WSF-1 WSF-1

LVT-1

LVT-1WSF-1

WSF-3

WSF-1

WSF-1

WSF-1

WSF-1

WSF-1

CPT-1

WSF-1

CPT-1

LVT-1

PT-1

PT-1

PT-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1 RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

RB-1

WSF-1

RB-1

CPT-1

3' - 9"

9.23

9.23

WSF-2

WSF-2

WSF-1

RB-1

2' - 6"

2' - 6"

2' - 6"

PT-7

RES-1

PT-7

PT-7

PT-7

PT-7

PT-7

PT-7 PT-7

PT-1

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:3

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

FIFTH FLOOR - FLOOR FINISH PLAN

IF501

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

9.23 Provide 6"h integral sheet vinyl wall base.

N Scale: 1/8" = 1'-0"

FIFTH FLOOR - FLOOR FINISH PLAN

PLAN NOTES

A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.

B. All gypsum ceilings to be painted (P-4); unless noted otherwise.

Refer to reflected ceiling plan for details.

C. All walls to be painted (P-1), unless noted otherwise.

D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.

E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.

F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.

G. Handrails shall be installed 6" off the door frame where doors swing into the space.

H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.

I. All restrooms shall receive epoxy finish paint.

J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.

K. All millwork/casework shall be field measured before fabrication.

L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.

M. Solid surface window sills to be SS-1.

N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.

O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood

S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.

T. Provide metal transtion trim for 6"H resinous integral wall base

(RES-1).

U. Transition between vinyl products should be seamless weld with weldrod specified.

V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.

P-4

OFFICE

ANTE

505B

OFFICE

BATH

505A

1BR

ISOLATION

ROOM #1

EQUIPMENT

ALCOVE

NURSE

STATION

NS-500

1BR PATIENT

ROOM #2

BATH

507A

NUTRITION

510 SOILED HOLD

WHEEL

CHAIR/

STRETCHER

CORRIDOR

C5-51

CORRIDOR

C5-09

CORRIDOR

C5-09

BATH

509A 1BR PATIENT

ROOM #3

CLEAN

UTILITY

CLEAN LINEN

MED ROOM

FEMALE LAV

522D

MALE LAV

522B

LOCKERS

522C

LOCKERS

522A

BATH

515A

1BR PATIENT

ROOM #4

1BR PATIENT

ROOM #5

BATH

517A

NURSE

STATION

NS-501

SPACE

STAFF

LOUNGE

BATH

519A

1BR PATIENT

ROOM #6

ALCOVE

CORRIDOR

C5-50

LOUNGE

1 BR PATIENT

ROOM #7

BATH

523A

NURSE

STATION

NS-502

BATH

524A

1 BR PATIENT

ROOM #8

1 BR PATIENT

ROOM #9

CORRIDOR

C5-52

NURSE

STATION

NS-503

BATH

525A

CORRIDOR

C5-07

PT-2

PT-3PT-2

PT-3

PT-2

PT-3

PT-2

PT-3

P-3

P-3

P-3

P-3

P-3

P-3

P-3

P-3 P-3

CL-1

P-1P-1

P-1

P-1P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1 P-1

P-1

P-1

P-1 P-1

P-1

P-1 P-1

P-1

P-1

P-1

P-1

P-1

P-1

P-1 P-1

P-1

PT-2

PT-3

P-1

PT-2

PT-3

P-1

PT-2

PT-3

P-1

PT-2

PT-3

P-1

PT-2

PT-3

P-1

PT-2

PT-3

PT-2

PT-3

P-1 P-1

CL-1

CL-1

P-1

CORRIDOR

C5-50

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:3

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

FIFTH FLOOR - WALL FINISH PLAN

IF502

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

N Scale: 1/8" = 1'-0"

FIFTH FLOOR - WALL FINISH PLAN

A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.

B. All gypsum ceilings to be painted (P-4); unless noted otherwise.

Refer to reflected ceiling plan for details.

C. All walls to be painted (P-1), unless noted otherwise.

D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.

E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.

F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.

G. Handrails shall be installed 6" off the door frame where doors swing into the space.

H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.

I. All restrooms shall receive epoxy finish paint.

J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.

K. All millwork/casework shall be field measured before fabrication.

L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.

M. Solid surface window sills to be SS-1.

N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.

O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood

S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.

T. Provide metal transtion trim for 6"H resinous integral wall base

(RES-1).

U. Transition between vinyl products should be seamless weld with weldrod specified.

V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.

1 BR PATIENT

ROOM #9

1 BR PATIENT

ROOM #8

BATH

524A BATH

525A

1 BR PATIENT

ROOM #7

NURSE

STATION

NS-502

BATH

523A

NURSE

STATION

NS-503

LOUNGE

ALCOVE

STAFF

LOUNGE

SPACE

MED ROOM

LOCKERS

522C

LOCKERS

522A

MALE LAV

522B

FEMALE LAV

522D

1BR PATIENT

ROOM #6

BATH

519A

BATH

517A

1BR PATIENT

ROOM #5

NURSE

STATION

NS-501

1BR PATIENT

ROOM #4

BATH

515A

1BR PATIENT

ROOM #3

CLEAN

UTILITY

CLEAN LINEN

WHEEL

CHAIR/

STRETCHER

CORRIDOR

C5-51

SOILED HOLD

NUTRITION

1BR PATIENT

ROOM #2

BATH

507A

1BR

ISOLATION

ROOM #1

BATH

505A

ANTE

505B

EQUIPMENT

ALCOVE

NURSE

STATION

NS-500

OFFICE

OFFICE

CG-1

CG-1CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1CG-1

CG-1

CG-1CG-1CG-1CG-1

CG-1

CG-1

CG-1CG-1CG-1CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1CG-1

CG-1

CG-1

CG-1

CG-1CG-1

CG-1

CG-1CG-1

CG-1CG-1

CG-1CG-1

CG-1

CG-1

CG-1CG-1

CG-1

CG-1CG-1

CG-1CG-1

CG-1

CG-1

CG-1

CG-1

EG-1

CG-1

CG-1

CG-1

CG-1

CG-1CG-1

CG-1

CG-1 CG-1CG-1CG-1

CG-1

CG-1CG-1

HR-2

HR-2

HR-1

CORRIDOR

C5-09

CORRIDOR

C5-07

HR-2

CG-1

CG-1CG-1

CG-1

CG-1CG-1

CG-1

CG-1

CG-1CG-1 EG-1

CG-1CG-1

CG-1

CG-1

CG-1

CG-1EG-1

9.18

9.18

9.18 9.18

9.18

9.18

9.18

9.18

9.18

9.18 9.18

9.18

9.18

9.18

CORRIDOR

C5-50

9.18

9.18

CORRIDOR

C5-52

WP-1WP-1

WP-1

WP-1

WP-1

WP-1

WP-1

CG-1

CG-1

BATH

509A

WP-1

WP-1

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:4

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

FIFTH FLOOR - WALL PROTECTION

PLAN

IF503

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

9.18 Provide 4'h wall protection (rwp-1) on all walls; unless noted otherwise.

N Scale: 1/8" = 1'-0"

FIFTH FLOOR - WALL PROTECTION PLAN

A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.

B. All gypsum ceilings to be painted (P-4); unless noted otherwise.

Refer to reflected ceiling plan for details.

C. All walls to be painted (P-1), unless noted otherwise.

D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.

E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.

F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.

G. Handrails shall be installed 6" off the door frame where doors swing into the space.

H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.

I. All restrooms shall receive epoxy finish paint.

J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.

K. All millwork/casework shall be field measured before fabrication.

L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.

M. Solid surface window sills to be SS-1.

N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.

O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood

S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.

T. Provide metal transtion trim for 6"H resinous integral wall base

(RES-1).

U. Transition between vinyl products should be seamless weld with weldrod specified.

V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.

GENERAL INTERIOR FINISHES NOTES

D

B

D

COMMON

SPACE

STORAGE

A317A

OPEN OFFICE

CORRIDOR

C3-A

LOBBY SPACE

OPEN OFFICE

HEALTHY

TEACHING

KITCHEN

OPEN OFFICE

CHAPEL

B

D

CORRIDOR

C3-B

CORRIDOR

C3-B

CORRIDOR

C3-B

D

D B

D

D

D

G

G

G

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:4

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

THIRD FLOOR - SIGNAGE PLAN

IS301

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

N Scale: 1/8" = 1'-0"

THIRD FLOOR - SIGNAGE PLAN

ELECTRICAL

SHOP

OFFICE

401A

B

I

D

D

G

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:4

:4

P M

Construct Private In-Patient Rooms & Primary Clinics

12.15.2023

FOURTH FLOOR - SIGNAGE PLAN

IS401

KETH

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

100% BID DOCUMENTS

20014.00

N Scale: 1/8" = 1'-0"

FOURTH FLOOR - SIGNAGE PLAN

C

E

EE

E

E

E

D

D

B

D D

E E

D

F

D D

C

I

C

B

D J

B

A

A

LOUNGE

NURSE

STATION

NS-503

STAFF

LOUNGE

OFFICE

SOILED HOLD

1BR

ISOLATION

ROOM #1

BATH

505A

BATH

507A

1BR PATIENT

ROOM #2

FEMALE LAV

522D

MALE LAV

522B

CLEAN

UTILITY

EQUIPMENT

ALCOVE

ANTE

505B

OFFICE

CLEAN LINEN

LOCKERS

522A

LOCKERS

522C

NURSE

STATION

NS-500

SPACE

WHEEL

CHAIR/

STRETCHER

MED ROOM

1BR PATIENT

ROOM #4

BATH

515A

BATH

517A

BATH

519A

NURSE

STATION

NS-501

NUTRITION

1 BR PATIENT

ROOM #7

1 BR PATIENT

ROOM #8

BATH

524A

1 BR PATIENT

ROOM #9

BATH

525A

BATH

523A

ALCOVE

1BR PATIENT

ROOM #5

1BR PATIENT

ROOM #6

NURSE

STATION

NS-502

CORRIDOR

C5-51

STAFF

LOUNGE

B511

STAFF

LOUNGE

B509

ELECTRICAL

A511

ELECTRICAL

A578

DATA

A575

DATA

A525

CORRIDOR

C5-50

CORRIDOR

C5-52

CORRIDOR

C5-07

CORRIDOR

C5-09

CORRIDOR

C5-50

1BR PATIENT

ROOM #3

BATH

509A

G B

K

B

KK

B

B

K

B

K

B

K

B

K

B

K

B

K

G

D

D D

K

E

E

E

S

TA

TE

OF MICH

IG

A

L

IC

E

N S

ED ARC

H

IT

E C T

N

MICHAEL

DUKE

1301072431

No.

ARCHITECT

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and…

This is the start of the file's text. The full file is on GovTribe.