This document appears to be Attachment 04 - Drawings - Architectural - Vol 2.pdf associated with the federal contract opportunity 506-334 – Construct Private In-Patient Rooms and Primary Clinics, solicitation number 36C25024B0031_1, issued by the Department of Veterans Affairs Technology Acquisition Center Austin.
The drawings provide architectural plans and specifications for the construction of private in-patient rooms and primary clinics at a location in Ann Arbor, MI. The drawings cover various aspects of the construction project, including floor plans, elevations, sections, and details. This document does not contain information on the specific products, services, response dates, award dates, pricing terms, set asides, or other key details of the contract opportunity. It appears to be a technical attachment providing the necessary design information for the construction project.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
.F .F
T
O T
O P
HANDRAIL
WALL TILE TO PAINTED GYP.
WALL TILE TO FLOOR TILE
TILE OUTSIDE CORNER
WALL TILE
SATIN ANODIZED
ALUMINUM TRIM,
SCHLUTER-RONDEC
WALL TILE
WALL TILE
WALL TILE
SATIN ANODIZED
ALUMINUM TRIM,
SCHLUTER-SCHIENE
FLOOR TILE
WALL TILE
SATIN ANODIZED
ALUMINUM TRIM,
SCHLUTER- DILEX
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:1
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FINISH LEGEND
IF001
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
FINISH LEGEND
CODE FINISH TYPE MANUFACTURER PRODUCT / COLOR
06 41 16 PLASTIC LAMINATE CLAD ARCHITECTURAL CABINETS
CL-1 Compact Laminate Wilsonart Walnut Heights
PL-1 Plastic Laminate Wilsonart Walnut Heights 7965K-12
PL-2 Plastic Laminate Wilsonart Sap Walnut 8221-38
09 30 13 CERAMIC PORCELAIN TILING
PT-1 Porcelain Tile Atlas Concorde USA Cove, Breeze, 12" X 24", Install: monolithic, Grout: Tec power grout, Grout color: TBD
PT-2 Porcelain Tile Atlas Concorde USA Fray, Pearl, 12" X 24"
PT-3 Porcelain Tile Atlas Concorde USA Cove, Breeze dart mosaic, 30cm x 30cm
PT-4 Porcelain Tile Fireclay Tile Custom mosaic blend, tusk, wrought iron, Caspian Sea, Cardamom, 2" x 8"
PT-5 Porcelain Tile Fireclay Tile Tusk, 2"x8"
PT-6 Porcelain Tile American Olean Ideology, Carrara White IL10, Polished, Install: monolithic, Grout: Tec power grout, Grout color: TBD
PT-7 Porcelain Tile Atlas Concorde USA Cove, Breeze, 2" x 2", Install: monolithic, Grout: Tec power grout, Grout color: TBD
09 51 00 ACOUSTICAL CEILINGS
ACT-1 Acoustical Ceiling Tile Armstrong Ceiling Solutions Ultima, Square Lay-In, 24"x24", 15/16" Grid
ACT-2 Acoustical Ceiling Tile Armstrong Ceiling Solutions Ultima Health Zone, Square Lay-In, 24"x24", 15/16" Grid
09 65 13 RESILIENT BASE AND ACCESSORIES
RB-1 Rubber Base Tarkett/Johnsonite Rubber wall base, Traditional with toe, 4"H, Fawn 80
09 65 16 RESILIENT SHEET FLOORING
WSF-1 Welded Sheet Flooring Mannington Commercial Paradigm II, Intersect, Foundation
WSF-2 Welded Sheet Flooring Mannington Commercial Discovery, Reveal, Fortuity
WSF-3 Welded Sheet Flooring Mannington Commercial Bloom,Meander, Tranquility
09 65 19 RESILIENT TILE FLOORING
LVT-1 Luxury Vinyl Tile Patcraft Energize, Intention,9" x 36", Install: Stagger
LVT-2 Luxury Vinyl Tile Mannington Commercial Energize, Refine, 9" x 36", Install: Stagger
09 67 23 RESINOUS FLOORING SYSTEM
RES-1 Resinous Epoxy Flooring Stonehard Stone-Tec - decorative flake flooring ERF system, Color: Santa Cruz, Flake size: 1/4", Top coat grit finish: Orange Peel
09 68 00 CARPETING
CPT-1 Carpet Tile Shaw Contract Handstitch, Vintage gold, 9" x 36", Install: Stagger
09 91 00 PAINTING
EP-1 Two-Component Epoxy and Binder Resin Sherwin Williams Resuflor 3746, Clear
P-1 Paint (Field) - To Match Sherwin-Williams, Nuance SW7049
P-2 Paint (Hollow Metal doors/ Frames) - To Match Sherwin-Williams, Loggia SW7506
P-3 Paint (Accent) - To Match Sherwin-Williams,Softened green SW6177
P-4 Paint (Accent) - To Match Sherwin-Williams, Dutch Tile Blue SW0031
P-5 Paint (Ceilings, Typ.) - To Match Sherwin-Williams, High Reflective White SW7757
P-6 Paint (Accent) - To Match Sherwin-Williams, Bunglehouse Blue SW0048
10 26 00 WALL AND DOOR PROTECTION
CG-1 Corner Guard Construction Specialties Acrovyn corner/end guard, surface-mounted, SM Series, Mushroom 305, Full height
CG-2 Corner Guard Construction Specialties Stainless steel corner/end guard, CO Series, half height
HR-1 Handrail/Crash Rail Construction Specialties HRBW-10CN, 373 Amber Cherry, 378 Brushed Nickel, 102 Desert Sand
HR-2 Handrail/Crash Rail Construction Specialties HRBW-10CM, Mushroom 305
WP-1 Rigid Wall Protection Construction Specialties Palladium Rigid Sheet Wall Protection,4' x 8', 0.060" thick, 4'Height, Mushroom
WP-2 Rigid Wall Protection Construction Specialties Palladium Rigid Sheet Wall Protection,4' x 8', 0.060" thick, Full Height, Mushroom
12 36 00 COUNTERTOPS
QTZ-1 Quartz Agglomerate (Healthy Teaching Kitchen) Wilsonart Fossa Falls Q4065
SS-1 Solid Surface (Countertops/ WIndow Sills) Wilsonart White Stone 9208CS
SS-2 Solid Surface (Nurse Station Transaction) Wilsonart Golden Sail 9234SS
MISC.
PC-1 Privacy curtain Arc-Com Pattern: Mori, Color: Spring
RS-1 Rollershades (double shade) Mechoshade Shade cloth: Eurotwill reversible broken weave, Color: Silver birch 6456, Backout Shade Cloth: Classic blackout, Color: White 0701, Single closure mount: White, Support hardware: white, Brackets: Double Shade #15
A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.
B. All gypsum ceilings to be painted (P-4); unless noted otherwise.
Refer to reflected ceiling plan for details.
C. All walls to be painted (P-1), unless noted otherwise.
D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.
E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.
F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.
G. Handrails shall be installed 6" off the door frame where doors swing into the space.
H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.
I. All restrooms shall receive epoxy finish paint.
J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.
K. All millwork/casework shall be field measured before fabrication.
L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.
M. Solid surface window sills to be SS-1.
N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.
O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood
S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.
T. Provide metal transtion trim for 6"H resinous integral wall base
(RES-1).
U. Transition between vinyl products should be seamless weld with weldrod specified.
V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.
GENERAL INTERIOR FINISHES NOTES
N.T.S.Scale:
HANDRAIL SECTION DETAIL
N.T.S.Scale:
TILE TRANSITIONS
NOTE: Manufacturers’trade names and numbers are provided in Finish Legend to identify design intent. Equivalent products from other manufacturers that meet requirements of technical specifications will be acceptable upon approval in writing by contracting officer.
Revisions Date
CHAPEL
OPEN OFFICE
LOBBY SPACE
HEALTHY
TEACHING
KITCHEN
STORAGE
307A
OPEN OFFICE
OPEN OFFICE
COMMON
SPACE
CORRIDOR
C3-B
CPT-1
LVT-1
LVT-2 LVT-2
LVT-1
RB-1
RB-1
RB-1
RB-1
RB-1
CORRIDOR
C3-B
LVT-1
RB-1
LVT-2
LVT-1
CLOSET
1' - 6"
CPT-2
RB-1
CPT-2
RB-1
CPT-2
RB-1
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:1
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
THIRD FLOOR - FLOOR FINISH
PLAN
IF301
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
THIRD FLOOR - FLOOR FINISH PLAN
A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.
B. All gypsum ceilings to be painted (P-4); unless noted otherwise.
Refer to reflected ceiling plan for details.
C. All walls to be painted (P-1), unless noted otherwise.
D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.
E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.
F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.
G. Handrails shall be installed 6" off the door frame where doors swing into the space.
H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.
I. All restrooms shall receive epoxy finish paint.
J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.
K. All millwork/casework shall be field measured before fabrication.
L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.
M. Solid surface window sills to be SS-1.
N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.
O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood
S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.
T. Provide metal transtion trim for 6"H resinous integral wall base
(RES-1).
U. Transition between vinyl products should be seamless weld with weldrod specified.
V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.
GENERAL INTERIOR FINISHES NOTES
OPEN
OFFICE
COMMON
SPACE
STORAGE
A317A
OPEN
OFFICE
HEALTHY
TEACHING
KITCHEN
OPEN
OFFICE
LOBBY
SPACE
STORAGE
307A
PT-5
P-2 P-2
PT-4PT-5
P-1
P-1
P-1
P-1
P-1
P-1
CLOSET
H.A.C.
CORRIDOR
C3-B
P-1
PT-6
PL-1
P-3
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:1
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
THIRD FLOOR - WALL FINISH PLAN
IF302
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
THIRD FLOOR - WALL FINISH PLAN
A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.
B. All gypsum ceilings to be painted (P-4); unless noted otherwise.
Refer to reflected ceiling plan for details.
C. All walls to be painted (P-1), unless noted otherwise.
D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.
E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.
F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.
G. Handrails shall be installed 6" off the door frame where doors swing into the space.
H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.
I. All restrooms shall receive epoxy finish paint.
J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.
K. All millwork/casework shall be field measured before fabrication.
L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.
M. Solid surface window sills to be SS-1.
N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.
O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood
S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.
T. Provide metal transtion trim for 6"H resinous integral wall base
(RES-1).
U. Transition between vinyl products should be seamless weld with weldrod specified.
V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.
COMMON
SPACE
OPEN OFFICE
OPEN OFFICE
HEALTHY
TEACHING
KITCHEN
OPEN OFFICE
LOBBY SPACE
CHAPEL
CG-1
CG-1
CG-1
CG-1
CG-1CG-1
GWBCG-1
CG-1CG-1
HR-1
HR-1 HR-1
HR-1 CG-1
CG-1
?CG-2
CG-2CG-2
CG-2
CG-2
STORAGE
307A
STORAGE
A317A
CG-1
HR-1
HR-1
HR-1
HR-1
CG-1
CG-1
CG-2
CG-2
CG-2
HR-1CG-1
WP-2 WP-2
CG-1
H.A.C.
CLOSET
9.18
CG-1
CG-1
CG-1
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:1
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
THIRD FLOOR - WALL PROTECTION
PLAN
IF303
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
9.18 Provide 4'h wall protection (rwp-1) on all walls; unless noted otherwise.
N Scale: 1/8" = 1'-0"
THIRD FLOOR - WALL PROTECTION PLAN
A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.
B. All gypsum ceilings to be painted (P-4); unless noted otherwise.
Refer to reflected ceiling plan for details.
C. All walls to be painted (P-1), unless noted otherwise.
D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.
E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.
F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.
G. Handrails shall be installed 6" off the door frame where doors swing into the space.
H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.
I. All restrooms shall receive epoxy finish paint.
J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.
K. All millwork/casework shall be field measured before fabrication.
L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.
M. Solid surface window sills to be SS-1.
N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.
O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood
S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.
T. Provide metal transtion trim for 6"H resinous integral wall base
(RES-1).
U. Transition between vinyl products should be seamless weld with weldrod specified.
V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.
GENERAL INTERIOR FINISHES NOTES
PLAN NOTES
MECHANICAL
ROOM
ELECTRICAL
SHOP
EP-1
EP-1
LVT-1
OFFICE
401A
RB-1
RB-1
RB-1
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:2
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FOURTH FLOOR - FLOOR FINISH
PLAN
IF401
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
FOURTH FLOOR - FLOOR FINISH PLAN
A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.
B. All gypsum ceilings to be painted (P-4); unless noted otherwise.
Refer to reflected ceiling plan for details.
C. All walls to be painted (P-1), unless noted otherwise.
D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.
E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.
F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.
G. Handrails shall be installed 6" off the door frame where doors swing into the space.
H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.
I. All restrooms shall receive epoxy finish paint.
J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.
K. All millwork/casework shall be field measured before fabrication.
L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.
M. Solid surface window sills to be SS-1.
N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.
O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood
S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.
T. Provide metal transtion trim for 6"H resinous integral wall base
(RES-1).
U. Transition between vinyl products should be seamless weld with weldrod specified.
V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.
ELECTRICAL
SHOP
OFFICE
401A
P-1
P-1
P-1
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:2
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FOURTH FLOOR - WALL FINISH
PLAN
IF402
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
FOURTH FLOOR - WALL FINISH PLAN
A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.
B. All gypsum ceilings to be painted (P-4); unless noted otherwise.
Refer to reflected ceiling plan for details.
C. All walls to be painted (P-1), unless noted otherwise.
D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.
E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.
F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.
G. Handrails shall be installed 6" off the door frame where doors swing into the space.
H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.
I. All restrooms shall receive epoxy finish paint.
J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.
K. All millwork/casework shall be field measured before fabrication.
L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.
M. Solid surface window sills to be SS-1.
N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.
O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood
S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.
T. Provide metal transtion trim for 6"H resinous integral wall base
(RES-1).
U. Transition between vinyl products should be seamless weld with weldrod specified.
V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.
ELECTRICAL
SHOP
OFFICE
401A
CG-2
CG-2
CG-2
CG-2
?CG-2
CG-2
?CG-2
CG-2
?CG-2
?CG-2
?CG-2
?CG-2
?CG-2
?CG-2
?CG-1CG-2
CG-2
?CG-2
CG-2CG-2
9.18
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:2
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FOURTH FLOOR - WALL
PROTECTION PLAN
IF403
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
9.18 Provide 4'h wall protection (rwp-1) on all walls; unless noted otherwise.
N Scale: 1/8" = 1'-0"
FOURTH FLOOR - WALL PROTECTION PLAN
A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.
B. All gypsum ceilings to be painted (P-4); unless noted otherwise.
Refer to reflected ceiling plan for details.
C. All walls to be painted (P-1), unless noted otherwise.
D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.
E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.
F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.
G. Handrails shall be installed 6" off the door frame where doors swing into the space.
H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.
I. All restrooms shall receive epoxy finish paint.
J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.
K. All millwork/casework shall be field measured before fabrication.
L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.
M. Solid surface window sills to be SS-1.
N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.
O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood
S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.
T. Provide metal transtion trim for 6"H resinous integral wall base
(RES-1).
U. Transition between vinyl products should be seamless weld with weldrod specified.
V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.
GENERAL INTERIOR FINISHES NOTES
BATH
525A
1 BR PATIENT
ROOM #9
1 BR PATIENT
ROOM #8
BATH
524A
1 BR PATIENT
ROOM #7
NURSE
STATION
NS-502
BATH
523A
NURSE
STATION
NS-503
LOUNGE
STAFF
LOUNGE
ALCOVE
SPACE
LOCKERS
522C
LOCKERS
522A
MED ROOM
NURSE
STATION
NS-501 CLEAN
UTILITY
CLEAN LINEN
MALE LAV
522B
FEMALE LAV
522D
1BR PATIENT
ROOM #6
BATH
519A
BATH
517A
1BR PATIENT
ROOM #5
1BR PATIENT
ROOM #4
BATH
515A
1BR PATIENT
ROOM #3
CORRIDOR
C5-51
WHEEL
CHAIR/
STRETCHER
SOILED HOLD
NUTRITION
EQUIPMENT
ALCOVE
NURSE
STATION
NS-500
OFFICE
ANTE
505B
OFFICE
1BR
ISOLATION
ROOM #1
1BR PATIENT
ROOM #2
507BATH
507A
BATH
505A
CORRIDOR
C5-52
CORRIDOR
C5-50
CORRIDOR
C5-09
CORRIDOR
C5-09
WSF-1
WSF-1
WSF-1
PT-1
WSF-3
WSF-1
PT-1
WSF-1
PT-1
WSF-3
WSF-1
WSF-1
WSF-1
WSF-1
LVT-1
LVT-1 LVT-1
PT-1 PT-1
WSF-3
PT-1
LVT-1
WSF-1 WSF-1
LVT-1
LVT-1WSF-1
WSF-3
WSF-1
WSF-1
WSF-1
WSF-1
WSF-1
CPT-1
WSF-1
CPT-1
LVT-1
PT-1
PT-1
PT-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1 RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
WSF-1
RB-1
CPT-1
3' - 9"
9.23
9.23
WSF-2
WSF-2
WSF-1
RB-1
2' - 6"
2' - 6"
2' - 6"
PT-7
RES-1
PT-7
PT-7
PT-7
PT-7
PT-7
PT-7 PT-7
PT-1
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:3
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FIFTH FLOOR - FLOOR FINISH PLAN
IF501
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
9.23 Provide 6"h integral sheet vinyl wall base.
N Scale: 1/8" = 1'-0"
FIFTH FLOOR - FLOOR FINISH PLAN
PLAN NOTES
A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.
B. All gypsum ceilings to be painted (P-4); unless noted otherwise.
Refer to reflected ceiling plan for details.
C. All walls to be painted (P-1), unless noted otherwise.
D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.
E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.
F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.
G. Handrails shall be installed 6" off the door frame where doors swing into the space.
H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.
I. All restrooms shall receive epoxy finish paint.
J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.
K. All millwork/casework shall be field measured before fabrication.
L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.
M. Solid surface window sills to be SS-1.
N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.
O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood
S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.
T. Provide metal transtion trim for 6"H resinous integral wall base
(RES-1).
U. Transition between vinyl products should be seamless weld with weldrod specified.
V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.
P-4
OFFICE
ANTE
505B
OFFICE
BATH
505A
1BR
ISOLATION
ROOM #1
EQUIPMENT
ALCOVE
NURSE
STATION
NS-500
1BR PATIENT
ROOM #2
BATH
507A
NUTRITION
510 SOILED HOLD
WHEEL
CHAIR/
STRETCHER
CORRIDOR
C5-51
CORRIDOR
C5-09
CORRIDOR
C5-09
BATH
509A 1BR PATIENT
ROOM #3
CLEAN
UTILITY
CLEAN LINEN
MED ROOM
FEMALE LAV
522D
MALE LAV
522B
LOCKERS
522C
LOCKERS
522A
BATH
515A
1BR PATIENT
ROOM #4
1BR PATIENT
ROOM #5
BATH
517A
NURSE
STATION
NS-501
SPACE
STAFF
LOUNGE
BATH
519A
1BR PATIENT
ROOM #6
ALCOVE
CORRIDOR
C5-50
LOUNGE
1 BR PATIENT
ROOM #7
BATH
523A
NURSE
STATION
NS-502
BATH
524A
1 BR PATIENT
ROOM #8
1 BR PATIENT
ROOM #9
CORRIDOR
C5-52
NURSE
STATION
NS-503
BATH
525A
CORRIDOR
C5-07
PT-2
PT-3PT-2
PT-3
PT-2
PT-3
PT-2
PT-3
P-3
P-3
P-3
P-3
P-3
P-3
P-3
P-3 P-3
CL-1
P-1P-1
P-1
P-1P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1 P-1
P-1
P-1
P-1 P-1
P-1
P-1 P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1 P-1
P-1
PT-2
PT-3
P-1
PT-2
PT-3
P-1
PT-2
PT-3
P-1
PT-2
PT-3
P-1
PT-2
PT-3
P-1
PT-2
PT-3
PT-2
PT-3
P-1 P-1
CL-1
CL-1
P-1
CORRIDOR
C5-50
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:3
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FIFTH FLOOR - WALL FINISH PLAN
IF502
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
FIFTH FLOOR - WALL FINISH PLAN
A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.
B. All gypsum ceilings to be painted (P-4); unless noted otherwise.
Refer to reflected ceiling plan for details.
C. All walls to be painted (P-1), unless noted otherwise.
D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.
E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.
F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.
G. Handrails shall be installed 6" off the door frame where doors swing into the space.
H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.
I. All restrooms shall receive epoxy finish paint.
J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.
K. All millwork/casework shall be field measured before fabrication.
L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.
M. Solid surface window sills to be SS-1.
N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.
O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood
S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.
T. Provide metal transtion trim for 6"H resinous integral wall base
(RES-1).
U. Transition between vinyl products should be seamless weld with weldrod specified.
V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.
1 BR PATIENT
ROOM #9
1 BR PATIENT
ROOM #8
BATH
524A BATH
525A
1 BR PATIENT
ROOM #7
NURSE
STATION
NS-502
BATH
523A
NURSE
STATION
NS-503
LOUNGE
ALCOVE
STAFF
LOUNGE
SPACE
MED ROOM
LOCKERS
522C
LOCKERS
522A
MALE LAV
522B
FEMALE LAV
522D
1BR PATIENT
ROOM #6
BATH
519A
BATH
517A
1BR PATIENT
ROOM #5
NURSE
STATION
NS-501
1BR PATIENT
ROOM #4
BATH
515A
1BR PATIENT
ROOM #3
CLEAN
UTILITY
CLEAN LINEN
WHEEL
CHAIR/
STRETCHER
CORRIDOR
C5-51
SOILED HOLD
NUTRITION
1BR PATIENT
ROOM #2
BATH
507A
1BR
ISOLATION
ROOM #1
BATH
505A
ANTE
505B
EQUIPMENT
ALCOVE
NURSE
STATION
NS-500
OFFICE
OFFICE
CG-1
CG-1CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1CG-1
CG-1
CG-1CG-1CG-1CG-1
CG-1
CG-1
CG-1CG-1CG-1CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1CG-1
CG-1
CG-1
CG-1
CG-1CG-1
CG-1
CG-1CG-1
CG-1CG-1
CG-1CG-1
CG-1
CG-1
CG-1CG-1
CG-1
CG-1CG-1
CG-1CG-1
CG-1
CG-1
CG-1
CG-1
EG-1
CG-1
CG-1
CG-1
CG-1
CG-1CG-1
CG-1
CG-1 CG-1CG-1CG-1
CG-1
CG-1CG-1
HR-2
HR-2
HR-1
CORRIDOR
C5-09
CORRIDOR
C5-07
HR-2
CG-1
CG-1CG-1
CG-1
CG-1CG-1
CG-1
CG-1
CG-1CG-1 EG-1
CG-1CG-1
CG-1
CG-1
CG-1
CG-1EG-1
9.18
9.18
9.18 9.18
9.18
9.18
9.18
9.18
9.18
9.18 9.18
9.18
9.18
9.18
CORRIDOR
C5-50
9.18
9.18
CORRIDOR
C5-52
WP-1WP-1
WP-1
WP-1
WP-1
WP-1
WP-1
CG-1
CG-1
BATH
509A
WP-1
WP-1
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:4
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FIFTH FLOOR - WALL PROTECTION
PLAN
IF503
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
9.18 Provide 4'h wall protection (rwp-1) on all walls; unless noted otherwise.
N Scale: 1/8" = 1'-0"
FIFTH FLOOR - WALL PROTECTION PLAN
A. Transition between vinyl products should be seamless weld with weldrod specified. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions. Color selected by architect from manufacturers full range of colors.
B. All gypsum ceilings to be painted (P-4); unless noted otherwise.
Refer to reflected ceiling plan for details.
C. All walls to be painted (P-1), unless noted otherwise.
D. All hollow metal doors and frames to be painted (P-2), unless noted otherwise.
E. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.
F. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.
G. Handrails shall be installed 6" off the door frame where doors swing into the space.
H. All casework shall be (PL-1); unless noted otherwise. All countertops shall be (SS-1); unless noted otherwise. Flooring shall be installed underneath all casework. Contractor to field verify all casework dimensions before fabrication. Provide rubber base (RB-1) on all base casework toe kick.
I. All restrooms shall receive epoxy finish paint.
J. Finish tag under room name denotes all walls in room receive said material. Accent surface to be noted otherwise.
K. All millwork/casework shall be field measured before fabrication.
L. Where there is porcelain tile, provide metal trim at all outside corners and at any material transitions.
M. Solid surface window sills to be SS-1.
N. Wall base finishes are tagged directly below the floor material tag on all floor finish plans.
O. Electrical devices such as plug molds, chases, panels, etc. shall be painted to match adjacent wall color. Electrical receptacle cover plates (except in wood), switch plates & toggles, telephone/data coverplates (except in wood) shall be stainless, thermostat covers shall be color: white. Any electrical devices mounted in wood paneling, wainscot or trim shall match the finish/color of the adjacent wood
S. Provide the following paint sheens: hollow metal doors/frames - semi gloss, walls - eggshell, ceilings - flat. All restrooms shall receive epoxy finish paint.
T. Provide metal transtion trim for 6"H resinous integral wall base
(RES-1).
U. Transition between vinyl products should be seamless weld with weldrod specified.
V. Electrical devices such as plug molds, chases, panels, etc. shall be painted the same color as adjacent wall. Electrical receptacle cover plates, swtich plates & toggles, telephone/ data coverplates shall be stainless steel. Thermostat covers shall be white. Any electrical device mounted in wood paneling, wainscoating, or trim shall match the finish/color.
GENERAL INTERIOR FINISHES NOTES
D
B
D
COMMON
SPACE
STORAGE
A317A
OPEN OFFICE
CORRIDOR
C3-A
LOBBY SPACE
OPEN OFFICE
HEALTHY
TEACHING
KITCHEN
OPEN OFFICE
CHAPEL
B
D
CORRIDOR
C3-B
CORRIDOR
C3-B
CORRIDOR
C3-B
D
D B
D
D
D
G
G
G
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:4
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
THIRD FLOOR - SIGNAGE PLAN
IS301
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
THIRD FLOOR - SIGNAGE PLAN
ELECTRICAL
SHOP
OFFICE
401A
B
I
D
D
G
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1 /2
:4
:4
P M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FOURTH FLOOR - SIGNAGE PLAN
IS401
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
FOURTH FLOOR - SIGNAGE PLAN
C
E
EE
E
E
E
D
D
B
D D
E E
D
F
D D
C
I
C
B
D J
B
A
A
LOUNGE
NURSE
STATION
NS-503
STAFF
LOUNGE
OFFICE
SOILED HOLD
1BR
ISOLATION
ROOM #1
BATH
505A
BATH
507A
1BR PATIENT
ROOM #2
FEMALE LAV
522D
MALE LAV
522B
CLEAN
UTILITY
EQUIPMENT
ALCOVE
ANTE
505B
OFFICE
CLEAN LINEN
LOCKERS
522A
LOCKERS
522C
NURSE
STATION
NS-500
SPACE
WHEEL
CHAIR/
STRETCHER
MED ROOM
1BR PATIENT
ROOM #4
BATH
515A
BATH
517A
BATH
519A
NURSE
STATION
NS-501
NUTRITION
1 BR PATIENT
ROOM #7
1 BR PATIENT
ROOM #8
BATH
524A
1 BR PATIENT
ROOM #9
BATH
525A
BATH
523A
ALCOVE
1BR PATIENT
ROOM #5
1BR PATIENT
ROOM #6
NURSE
STATION
NS-502
CORRIDOR
C5-51
STAFF
LOUNGE
B511
STAFF
LOUNGE
B509
ELECTRICAL
A511
ELECTRICAL
A578
DATA
A575
DATA
A525
CORRIDOR
C5-50
CORRIDOR
C5-52
CORRIDOR
C5-07
CORRIDOR
C5-09
CORRIDOR
C5-50
1BR PATIENT
ROOM #3
BATH
509A
G B
K
B
KK
B
B
K
B
K
B
K
B
K
B
K
B
K
G
D
D D
K
E
E
E
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .