Attachment 06 - Drawings - Fire Protection.pdf

PDF 3 MB Posted

Attached to
506-334 – Construct Private In-Patient Rooms and Primary Clinics
Solicitation number
36C25024B0031_1
Issued by

About this file

This document is a set of drawings for the fire suppression system for a federal contract opportunity to construct private in-patient rooms and primary clinics in Ann Arbor, Michigan. The key details include:

The drawings provide the design for a wet-pipe fire suppression sprinkler system to cover the renovation areas, including the sprinkler layout, pipe sizing, and hazard classifications. The system will be hydraulically calculated to meet NFPA 13 requirements, including a 100 GPM hose allowance for light hazard areas and 250 GPM for ordinary hazard areas. The drawings indicate the system will tie into the existing fire suppression system and include provisions to maintain the existing system during construction. The drawings also include details on pipe hangers, penetrations through fire-rated assemblies, and requirements for quick-response sprinklers. Four bid deduct alternates are shown that would remove certain areas of work.

View the file

Other files

File Type Posted
Attachment 14 - Wage Determination Rev 6 - Washtenaw County - 7-26-24.pdf PDF
506-334 Solicitation Amendment 005 - 36C25024B0031 0005.docx DOCX document
Plumbing Drawings - Write Up.pdf PDF
506-334 Solicitation Amendment 004 36C25024B0031 0004.docx DOCX document
Round 2 Technical Questions - Ann Arbor - 506-334 - FINAL - 7-22-24.pdf PDF
Amended Drawings - 7-22-24.pdf PDF
506-334 Solicitation Amendment 003 - 36C25024B0031 0003.docx DOCX document
506-334 Solicitation Amendment 0002 -36C25024B0031 0002.docx DOCX document
5 West hallway renovation 506-334-100.pdf PDF
New building 5th floor ICRA 506-334-100.pdf PDF
New building west side 3rd floor ICRA 506-334-100.pdf PDF
221300 Sanitary and Vent.pdf PDF
New building west side 4th floor 506-334-100.pdf PDF
Amended Drawings.pdf PDF
Technical Questions - Ann Arbor - 506-334 - FINAL - 7-16-24.pdf PDF
506-334 - Solicitation Amendment 0001 - 36C25024B0031_1 0001.docx DOCX document
506-334 Construct Private In-Patient Beds - sign in sheet 20240701.pdf PDF
Attachment 08 - Drawings - Mechanical.pdf PDF
Attachment 10 - Drawings - Structural.pdf PDF
Attachment 11 - Drawings - Telecommunications.pdf PDF
Attachment 02 - Specifications Vol 2.pdf PDF
Attachment 14 - Wage Determination - Washtenaw County - 4-5-24.pdf PDF
S02 - 36C25024B0031_1.docx DOCX document
Attachment 13 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 01 - Specifications Vol 1.pdf PDF
Attachment 12 - Brand Name JA - Ann Arbor - 506-334 - FINAL.pdf PDF
Attachment 05 - Drawings - Electrical.pdf PDF
Attachment 09 - Drawings - Plumbing.pdf PDF
Attachment 04 - Drawings - Architectural - Vol 2.pdf PDF
Attachment 15 - Site Visit Instructions - Ann Arbor.docx DOCX document
Attachment 03 - Drawings - Architectural - Vol 1.pdf PDF
Attachment 07 - Drawings - General - Civil.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

AC - AIR COMPRESSOR

ACC - ACCESS

AD - ACCESS DOOR

ADB - ACID DILUTION BASIN

ADJ - ADJUSTABLE

AFF - ABOVE FINISHED FLOOR

AFG - ABOVE FINISHED GRADE

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

BFP - BACKFLOW PREVENTER

BLDG - BUILDING

BOB - BOTTOM OF BEAM

BOD - BOTTOM OF DUCT

BOE - BOTTOM OF EQUIPMENT

BOF - BOTTOM OF FOOTING

BOG - BOTTOM OF GRILLE

BOP - BOTTOM OF PIPE

BOT - BOTTOM

BTWN - BETWEEN

CA - COMPRESSED AIR

CFCI - CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

CLG - CEILING

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

COR - CONTRACTING OFFICER'S REPRESENTATIVE

CORR - CORRIDOR

CTR - CENTER

CWS - COMBINATION WATER SERVICE

D - DEPTH

DET - DETAIL

DIA - DIAMETER

DIM - DIMENSION

DN - DOWN

DS - SPRINKLER (DRY)

DWG - DRAWING

EA - EACH

EC - ELECTRICAL (DIVISION 26)

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATOR

EQ - EQUAL

EQUIP - EQUIPMENT

ETR - EXISTING TO REMAIN

EQS - EQUIPMENT SUPPLIER

EXP - EXPANSION

EXT - EXTERIOR

EX - EXISTING

F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER MAIN)

FCE - FIRE CONTROL EQUIPMENT

FCO - FLOOR CLEANOUT

FD - FLOOR DRAIN

FDC - FIRE DEPARTMENT CONNECTION

FDV - FIRE DEPARTMENT VALVE

FF - FINISHED FLOOR ELEVATION

FHC - FIRE HOSE CABINET

FLR - FLOOR

FPM - FEET PER MINUTE

FR - FIRE RISER

FS - FIRE SERVICE

FSC - FIRE SUPPRESSION (DIVISION 21)

FT - FEET

FTG - FOOTING

GA - GAUGE

GAL - GALLON

GALV - GALVANIZED

GC - GENERAL TRADES (DIVISION 01)

GPM - GALLONS PER MINUTE

HC - HVAC (DIVISION 23)

HD - HUB DRAIN

HP - HORSEPOWER OR HIGH POINT

HR - HOSE REEL

HT - HEAT TRACE

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

ID - INSIDE DIAMETER

INV - INVERT ELEVATION

IN - INCHES

JS - JANITOR SINK

L - LENGTH

LBS - POUNDS

MAX - MAXIMUM

MB - MOP BASIN

MC - MECHANICAL (DIVISION 23)

MEZZ - MEZZANINE

MFR - MANUFACTURER

MIN - MINIMUM

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

N/C - NORMALLY CLOSED

NIC - NOT IN CONTRACT

N/O - NORMALLY OPEN

NOM - NOMINAL

NPT - NATIONAL PIPE THREAD

NTS - NOT TO SCALE

OA - OUTDOOR AIR

OD - OUTSIDE DIAMETER

OFCI - OWNER FURNISHED CONTRACTOR

INSTALLED

OFOI - OWNER FURNISHED OWNER INSTALLED

PC - PLUMBING (DIVISION 22)

OR PUMPED CONDENSATE RETURN

PIV - POST INDICATOR VALVE

PLBG - PLUMBING

PS - PRE-ACTION/DELUGE SPRINKLER

PRESS - PRESSURE

PRV - PRESSURE REGULATING VALVE

PSF - POUNDS PER SQUARE FOOT

PSI - POUNDS PER SQUARE INCH

PSV - PRESSURE SUSTAINING VALVE

PSIG - POUNDS PER SQUARE INCH GAUGE

RAD - RADIUS

REC - RECESSED

REQD - REQUIRED

RI - ROUGH IN

RPM - REVOLUTIONS PER MINUTE

S - SPRINKLER (WET)

SCH - SCHEDULE

SD - SPRINKLER DRAIN

SHT - SHEET

SK - SINK

SPEC - SPECIFICATIONS

SQ - SQUARE

STD - STANDARD

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TEMP - TEMPERATURE

TOB - TOP OF BEAM

TOD - TOP OF DUCT

TOE - TOP OF EQUIPMENT

TOF - TOP OF FOOTING

TOJ - TOP OF JOIST

TOP - TOP OF PIPE

TOS - TOP OF SLAB OR TOP OF STEEL

TYP - TYPICAL

UNO - UNLESS NOTED OTHERWISE

VEL - VELOCITY

VIB - VALVE IN BOX

VOL - VOLUME

W/ - WITH

W/O - WITHOUT

WIV - WALL INDICATOR VALVE

WS - WATER SERVICE

VALVES AND FITTINGS

T

P

FOB

FOT

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

GAUGE - PRESSURE

GAUGE - TEMPERATURE OR THERMOMETER

UNION

CLEANOUT

STRAINER

STRAINER - WITH A BLOW DOWN VALVE AND HOSE

CONNECTION

VALVE - DRAIN WITH HOSE END CONNECTION

VALVE - PRESSURE REGULATING

VALVE - SAFETY RELIEF. PIPE DISCHARGE AIR

GAPPED TO FLOOR DRAIN UNLESS NOTED

OTHERWISE.

PLUG - PRESSURE AND TEMPERATURE TEST

TRAP PRIMER

GAUGE - VACUUM WITH STOP

CLEANOUT - TO GRADE OR FINISHED FLOOR

END CAP

MIXING FAUCET

PLUG

HOSE BIB

WALL HYDRANT

VALVE - PLUG

VALVE - SHUTOFF AND BOX

VALVE - SHUTOFF ON RISER

V

VB

TP

CO

VALVE - SOLENOID

S

P/T VALVE - PRESSURE AND TEMPERATURE SAFETY

RELIEF. PIPE DISCHARGE AIR GAPPED TO

FLOOR DRAIN UNLESS NOTED OTHERWISE.

VALVE - CHECK

VALVE - SHUTOFF: BALL, GATE, BUTTERFLY VALVE

(REFER TO SPECIFICATIONS FOR REQUIRED TYPE

BASED ON APPLICATIONS)

AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN

AND OUT

VALVE - COMBINATION SHUTOFF AND

BALANCING (REFER TO SPECIFICATIONS FOR

REQUIRED TYPE BASED ON APPLICATIONS)

A1

P1 P1OR

A1

OH

P2

B

P2

GENERAL FLOOR PLAN NOTES

RISER OR STACK NUMBER

DETAIL: B = DETAIL DESIGNATION

P2 = SHEET WHERE DETAIL IS LOCATED

FIRE SUPPRESSION HAZARD CLASSIFICATION AND

HAZARD CLASSIFICATION GROUP

SECTION: 1 = SECTION DESIGNATION

P2 = SHEET WHERE DETAIL IS LOCATED

EQUIPMENT REFERENCE. LETTER DESIGNATION

VARIES. REFER TO SCHEDULES.

EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK.

LETTER DESIGNATIONS REFER TO SCHEDULES.

CONNECT TO EXISTING

PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH

IT IS SHOWN UNLESS NOTED OTHERWISE.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)

EXISTING PIPE TO REMAIN

EXISTING PIPE TO BE REMOVED

EXPANSION JOINT

WATER METERM

PIPING SYMBOLS

BOTTOM CONNECTION (45°)

BRANCH TEE CONNECTION (NOTE:

BULLHEAD TEE'S ARE NOT PERMITTED)

DIRECTION OF PITCH

DROP

ELBOW DOWN

ELBOW UP

FLOW DIRECTION DESIGNATION

PUMP

RISE

TOP CONNECTION (45°)

TOP CONNECTION (90°)

BOTTOM CONNECTION (90°)

D

R

PIPE RISER

BC

TC

FLEX PIPING

FIRE SUPPRESSION SYMBOLS

PIPING DESIGNATIONS

FS

PIV

S

CONCEALED PENDENT SPRINKLER

FIRE HYDRANT

FLOW SWITCH

GATE VALVE OS&Y

INSTITUTIONAL PENDENT SPRINKLER

PENDENT SPRINKLER

POST INDICATOR VALVE

RECESSED PENDENT SPRINKLER

SIDE WALL SPRINKLER

SUPERVISED VALVE

UPRIGHT SPRINKLER

FIRE DEPARTMENT VALVE

SPRINKLER PIPE (DRY)

FIRE SUPPRESSION (STANDPIPE/

SPRINKLER MAIN)

FIRE SERVICE

PRE-ACTION / DELUGE SPRINKLER PIPE

SPRINKLER PIPE (WET)

SPRINKLER DRAIN PIPE

DS

F

FS

PS

S

SD

COMMMMBINATION FIRE SUPPRESSION &

DOMESTIC WATER SERVICE

CWS

DEMOLISH TO POINT INDICATED

A PROVIDE A COMPLETE FIRE SUPPRESSION SPRINKLER SYSTEM IN THE

RENOVATED AREA. MAINTAIN AND RESTORE, IF INTERRUPTED,

THE AUTOMATIC SPRINKLER SYSTEM SERVING AN UNDISTURBED AREA.

B COORDINATE WORK WITH VAMC, PHASING PLAN AND OTHER TRADES. OFFSET

AND/ OR RELOCATE EXISTING SERVICES TO ACCOMMODATE NEW WORK OF

OTHER TRADES. MAINTAIN AND RESTORE IF INTERRUPTED, THE DOMESTIC

WATER DISTRIBUTION, MEDICAL GAS AND SANITARY & VENT PIPING SYSTEMS

TO EXISTING FIXTURES LOCATED IN UNDISTURBED AREAS.

C DESIGN SERVICES SHALL FOLLOW ALL VA STANDARD DESIGN PRACTICES,

DETAILS, SPECIFICATIONS AND SITE SPECIFIC COR REQUIREMENTS AS WELL AS

WORK SHOWN ON THESE DOCUMENTS.

REFERENCE VA FIRE PROTECTION DESIGN MANUAL.

ALL DEVIATIONS FROM AFOREMENTIONED REQUIREMENTS SHALL BE APPROVED

BY THE COR.

D MAKE NECESSARY FLOW TESTS (SPECIFICATIONS 21 13 13), LAYOUT SYSTEMS,

OBTAIN APPROVALS FROM THE AUTHORITIES HAVING JURISDICTION PRIOR TO

BEGINNING ANY FABRICATION OR INSTALLATION WORK.

E VERIFY THAT THERE IS ADEQUATE SPACE TO INSTALL ALL NEW PIPING

REQUIRED TO COMPLETE THIS WORK.

F ALL SPRINKLER PIPING IS LOCATED ABOVE THE CEILING (AT THE BOTTOM OF

STRUCTURE IN EXPOSED STRUCTURAL AREAS), UNLESS OTHERWISE INDICATED.

G THE BASIS OF DESIGN OF SPACING AND SIZING FOR THE COMPLETE FIRE

SUPPRESSION SPRINKLER SYSTEM SHALL BE FOR A WET PIPE SYSTEM

HYDRAULICALLY CALCULATED FOR A:

1 LIGHT HAZARD AREA LIMITED TO A MAXIMUM OF 225 SQ. FT. PER SPRINKLER

WITH THE DENSITY OF 0.10 GPM/SQ. FT. PROVIDE AN ADDITION OF 100 GPM

HOSE ALLOWANCE.

2 ALL MECHANICAL, ELECTRICAL AND SIMILAR SPACE AREAS SHALL BE

ORDINARY HAZARD (GROUP 1) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER

SPRINKLER WITH A DENSITY OF 0.15 GPM/SQ. FT. PROVIDE AN ADDITION OF

250 GPM HOSE ALLOWANCE.

3 ALL STORAGE, TRASH, FILE STORAGE AND SIMILAR SPACE AREAS SHALL BE

ORDINARY HAZARD (GROUP 2) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER

SPRINKLER WITH A DENSITY OF 0.20 GPM/ SQ. FT. PROVIDE AN ADDITION OF

250 GPM HOSE ALLOWANCE.

NOTE: ALL AREAS ARE LIGHT HAZARD UNLESS OTHERWISE NOTED.

H PROVIDE SPRINKLER LOCATIONS, PIPING LAYOUTS AND SIZING. SPRINKLER

PIPING SHALL BE MINIMUM 1" SIZE. PROVIDE HYDRAULIC CALCULATIONS AND

STAMPED DRAWINGS PER SPECIFICATION REQUIREMENTS.

I ALL SPRINKLER LOCATIONS MUST BE COORDINATED WITH ALL EQUIPMENT

KINDRED TO OTHER TRADES. SPRINKLER LOCATIONS MUST BE APPROVED BY

THE ARCHITECT BEFORE WORK COMMENCES. ALL PENDENT TYPE SPRINKLERS

LOCATED IN SUSPENDED CEILING TILE AREAS SHALL BE LOCATED IN THE CENTER

OF THE CEILING TILE. REFER TO THE ARCHITECTURAL DRAWINGS REFLECTIVE

CEILING PLANS FOR ADDITIONAL INFORMATION ON ALL CEILING TYPES, HEIGHTS

AND OTHER ARCHITECTURAL FEATURES.

J SPRINKLERS SHALL BE "QUICK RESPONSE" TYPE IN ALL AREAS EXCEPT HIGH

TEMPERATURE AREAS, TELECOMMUNICATION, ELECTRICAL SWITCHGEAR,

ELEVATOR EQUIPMENT ROOMS AND ELEVATOR SHAFTS.

SPRINKLERS (UNLESS OTHERWISE NOTED):

EXPOSED AREAS - UPRIGHT OR PENDENT TYPE - STANDARD BRASS

CEILING AREAS - RECESSED PENDENT TYPE

CONCEALED SPRINKLERS ARE NOT PERMITTED

ALL HEADS SHALL BE UL LISTED AND FM APPROVED.

K SPRINKLER SYSTEM PIPING AND FITTINGS SHALL BE IN ACCORDANCE WITH

NFPA 13.

1 PIPING SIZES 2" AND SMALLER SHALL BE BLACK STEEL SCHEDULE 40

WITH THREADED END CONNECTIONS.

2 PIPING SIZES 2.5" AND LARGER SHALL BE BLACK STEEL SCHEDULE 10

WITH GROOVED CONNECTIONS. GROOVES IN SCHEDULE 10 PIPING SHALL BE

ROLLED GROOVED ONLY.

L ACOUSTICAL CEILINGS ACCESS IDENTIFICATION MARKERS: COLORED MARKERS

WITH PRESSURE SENSITIVE ADHESIVE ON ONE SIDE, PAPER OR PLASTIC, 6 TO

9 MM (1/4 TO 3/8 INCH) DIAMETER.

REFER TO SPECIFICATION 09 51 00 SECTION 2.6.C.

1. COLOR CODE: PROVIDE THE FOLLOWING COLOR MARKERS FOR

SERVICE IDENTIFICATION:

• RED - SPRINKLER SYSTEM: VALVES AND CONTROLS.

M ANNULAR SPACE AT PIPE AND OTHER SIMILAR PENETRATION OF FIRE RATED

ASSEMBLIES SHALL BE FIRE STOPPED. IN ADDITION, PENETRATIONS THROUGH

0-HOUR RATED WALLS & FLOOR SHALL BE SEALED TO RETARD THE PASSAGE

OF SMOKE. REFER TO SPECIFICATIONS FOR FIRESTOPPING.

N REFER TO ARCHITECTURAL DRAWINGS FOR SMOKE COMPARTMENTS, SMOKE

PARTITIONS, FIRE BARRIERS, LOCATIONS AND FIRE RATINGS OF NEW AND

EXISTING WALL ASSEMBLIES. ALL PENETRATIONS THROUGH FIRE RATED

ASSEMBLIES SHALL BE PROTECTED AND/ OR FIRE STOPPED AS REQUIRED TO

MAINTAIN FIRE RATINGS INDICATED. COORDINATE WITH ALL TRADES TO ENSURE

FIRE RATED PENETRATION REQUIREMENTS AND DETAILS ARE MET.

ALLSPRINKLER ZONES SHALL MATCH SMOKE COMPARTMENTS.

O ALL REMOVED MATERIAL AND EQUIPMENT SO DESIGNATED BY THE COR,

SHALL BE TURNED OVER AND PLACED WHERE DIRECTED. ALL MATERIAL AND

EQUIPMENT, WHICH THE OWNER DOES NOT WISH TO RETAIN, SHALL BECOME

THE PROPERTY OF THE CONTRACTOR RESPONSIBLE FOR THE REMOVAL

P ANY RENOVATION WORK REQUIRED "OUTSIDE" OF THE BOUNDARIES/ EXTENTS

OF A SPECIFIC PHASE OF WORK (OR TEMPORARY CONSTRUCTION WALLS

SHALL BE BID AS "NIGHT WORK" AND SHALL BE AS DIRECTED BY THE COR.

Q ALL CORE DRILLS AND PIPE EXTENSIONS THRU THE EXISTING STRUCTURAL

FLOOR SLAB OR STRUCTURAL WALL SHALL BE X-RAYED TO DETERMINE THE

EXACT LOCATION OF THE "REBAR" IN THE STRUCTURAL SLAB. DO NOT CUT

THE LOWER (BOTTOM REBAR) IN THE STRUCTURAL FLOOR SLAB.

R WORK IN EXISTING AREAS WITH NO/ LIMITED ARCHITECTURAL SCOPE, THE

CONTRACTOR SHALL PROVIDE ALL REQUIRED FLOOR/ WALL PROTECTION (AS

REQUIRED) AND REPLACE ANY DAMAGED CEILING TILES WITH NEW. RETURN

AREA BACK TO ORIGINAL CONDITION UPON COMPLETION OF WORK.

S PHASING: REFER TO ARCHITECTURAL DRAWINGS FOR AN OUTLINE OF PROJECT

PHASING. ADDITIONAL NOTES DESCRIBING PHASING DETAILS MAY BE INCLUDED

THROUGHOUT THIS DRAWING SET. INCLUDE ALL LABOR AND MATERIAL TO

ACCOMMODATE PHASING.

T BID ITEMS: REFER TO ARCHITECTURAL DRAWING AND SPECIFICATION SECTION

01 00 00 FOR AN OUTLINE OF BID ITEMS. ADDITIONAL NOTES DESCRIBING BID

ITEM DETAILS MAY BE INCLUDED THROUGHOUT THIS DRAWING SET.

FIRE SUPPRESSION DESIGN NOTES

HANGER ROD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9 PSF MIN.

DENSITY) UNDER INSULATION SHIELD

INSULATION SHEILD

AT HANGER

WELD

SADDLE

ADJUSTABLE CLEVIS HANGER TYPE 1 -

SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER TYPE 43 -

SEE SPECIFICATIONS

PROVIDE INSULATION SHEILD

& INSERT FOR ALL PIPING

(200mm [8"] MIN.)

15mm [½"] DIA.

HANGER RODS WITH

900mm [36"] MAX.

SPACING ON EACH

CHANNEL

BAND

43mm [1-⅝"] 12 GAUGE CHANNEL OR 50x50x6.4mm [2"x2"x¼"] ANGLE m m [1

M

A X

SIDE VIEW TRAPEZE HANGER FOR UP TO

453KG [1000lb.] UNIFORM LOAD

[1]

[1¼]

THRU 20

[THRU ¾]

[1½]

[2½]

[2]

[3]

[4]

[5]

[6]

[10]

[10]

[12]

[14]

[16]

[18]

[20]

[24]NOM. SIZE

[7]

[7]

[7]

[9]

[11]

[10]

[12]

[14]

[16]

[17]

[19]

[22]

[23]

[25]

[27]

[28]

[30]

[32]PIPE

[6]

[7]

[5]

[8]

[9]

[8]

[10]

[12]

[13]

[14]

[16]

-TUBING

mm

[IN]

mm

[FT]

mm

[FT]

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE:

SEE SPECIFER FOR DETAILED HANGER REQUIREMENTS

6" [1 m m

1" [2

5m m

6" [1 m m

INSULATE

PIPE OR DUCT

PIPE SLEEVE

WHERE SPECIFIED

FLOOR

WELD

1/4" [6.4mm]

ANCHOR ROD FOR

NEW CONSTRUCTION

FIRESTOP MATERIAL

3/4" [19mm]

APPROVED FIRESTOP

INSULATION WITH

VAPOR BARRIER

3/4" [19mm] APPROVED

FIRESTOP INSULATION WITH

VAPOR BARRIER 6"

[150mm]

MASONRY

PARTITION INSULATED

PIPE OR

DUCT

6" [150mm]

FIRESTOP

MATERIAL

DRYWALL PARTITION

PARTITION SUPPORT

FLOOR OR DECK PENETRATION

6" [150mm]

6" [150mm]

PARTITION OR CHASE PENETRATION

NOTE:

1. APPLICABLE TO PENETRATIONS OF

ALL FIRE RATED MEMBRANES, IN

ACCORDANCE WITH NRPA 101.

REFER TO SPECIFICATIONS SECTION

07 84 00, FIRE STOPPING

SYSTEMS.

MOUNTING PLATE

REFER TO MANUFACTURER'S

MINIMUM EXPOSURE

DIMENSION TO OBTAIN FM

APPROVED QUICK RESPONSE

LISTING.

1" [2

5.

4m m

1/

4" [3

1.

8m m

1/ 8"

[3 m m

MOUNTING

SURFACE

ADJUSTABLE OUTER

CUP/ ESCUTCHEON

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:0

:4

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

ABBREVIATIONS, SYMBOLS &

INDEX OF DRAWINGS

F001

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

INDEX OF DRAWINGS - FIRE SUPPRESSION

SHEET NUMBER SHEET NAME

F001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS

F002 BID DEDUCT ALTERNATE 01 & 02

F003 BID DEDUCT ALTERNATE 03 & 04

FX103 PARTIAL THIRD FLOOR PLAN

FX104 PARTIAL FOURTH FLOOR PLAN

FX105 PARTIAL FIFTH FLOOR PLAN

SCALE: NONE

PIPE HANGERS

A

SCALE: NONE

PIPE/ DUCT PENETRATION OF SMOKE/ FIRE BARRIERS

B

SCALE: NONE

SEMI-RECESSED PENDENT SPRINKLER (QR)

C

Revisions Date

C3-B-2

CORRIDOR-2

01 - DEDUCT ALTERNATE 01:

OMIT ALL NEW WORK RELATED TO THE

OPEN OFFICES AND CHAPEL.

SPACE WILL BE UNFINISHED STORAGE.

H.A.C.

CLOSET

OH

CHAPEL

OPEN

OFFICE

OPEN

OFFICE

OPEN

OFFICE

LOBBY

SPACE

HEALTHY

TEACHING

KITCHEN

02 - DEDUCT ALTERNATE 02:

OMIT ALL NEW WORK RELATED TO THE

ELECTRICAL SHOP.

SPACE WILL BE UNFINISHED STORAGE.

OH

MECHANICAL

ROOM

ELECTRICAL

SHOP

401A

OFFICE

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:0

:4

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

BID DEDUCT ALTERNATE 01 & 02

F002

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

Scale: 1/8" = 1'-0"1

BID DEDUCT 01 - REMOVE THIRD FLOOR OFFICES AND

CHAPEL

Scale: 1/8" = 1'-0"2

BID DEDUCT 02 - REMOVE FOURTH FLOOR

ELECTRICAL SHOP

03 - DEDUCT ALTERNATE 03:

OMIT ALL NEW WORK RELATED TO THE

TEACHING KITCHEN.

EXISTING OFFICE CONSTRUCTION

TO REMAIN.

SPACE WILL BE UNFINISHED STORAGE.

OH

04 - DEDUCT ALTERNATE 04:

OMIT ALL NEW WORK RELATED TO THE

NEW LOUNGE AND LOCKER ROOMS.

EXISTING LOCKERS, HAC, SOILED

UTILITY AND OFFICE TO REMAIN.

04 - DEDUCT ALTERNATE 04:

EXISTING OFFICE TO BECOME CLEAN

LINEN ROOM.

OH

524A

BATH

1 BR

PATIENT

ROOM #8 525

1 BR

PATIENT

ROOM #9

525A

BATH

C5-52

CORRIDOR

1 BR

PATIENT

ROOM #7

523A

BATH

NS-502

NURSE

STATION

NS-503

NURSE

STATION

LOUNGE

1BR

PATIENT

ROOM #6

519A

BATH

517A

BATH

1BR

PATIENT

ROOM #5

C5-50

CORRIDOR

SPACE

1BR

PATIENT

ROOM #4

515A

BATH

1BR

PATIENT

ROOM #2

507A

BATH

NS-501

NURSE

STATION

MED ROOM

CLEAN

UTILITY

C5-51

CORRIDOR

SOILED

HOLD

505A

BATH

1BR

ISOLATION

ROOM #1

A513

2BR

505B

ANTE

OFFICE

EQUIPMENT

ALCOVE

NS-500

NURSE

STATION

NUTRITION

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:0

:5

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

BID DEDUCT ALTERNATE 03 & 04

F003

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

Scale: 1/8" = 1'-0"1

BID DEDUCT 03 - REMOVE THIRD FLOOR TEACHING

KITCHEN

Scale: 1/8" = 1'-0"2

BID DEDUCT 04 - RETAIN EXISTING FIFTH FLOOR

LOCKERS AND RESTROOMS

F S

S

F S

S

FS S

B01W

B01E

A C

F G I J LE

OH

STAIR #1

STANDPIPE

1EXISTING ZONE

CONTROL VALVE

EXISTING ZONE

CONTROL VALVE

1-3-4

EXISTING ZONE

CONTROL VALVE

1-3-2

EXISTING ZONE

CONTROL VALVE

1-3-1

STAIR #2

STAIR #3

OH

ELEC

A311

DATA

A370

ELEC

A335

ELEC

A373

LAV

A372

LAV

A371

DATA

B310B

ELEC

B312

ELEC

B303

CORRIDOR

C3-2A

CORRIDOR

C3-304

CORRIDOR

C3-305

OPEN OFFICE

LOBBY

B314

CHAPEL

OPEN OFFICE

CORRIDOR

C3-B

CORRIDOR

C3-B

HAC

OH

OH

STORAGE

307A

A. REFER TO SHEET F001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. EXISTING CORRIDORS AND/ OR ROOMS TO REMAIN OPERATIONAL AT ALL TIMES

DURING BUSINESS HOURS. AUTOMATIC SPRINKLER SYSTEM(S) SHALL BE MAINTAINED

IN FULLY OPERATIONAL CONDITION (PER NFPA 241, SPRINKLER SYSTEMS WILL BE

OPERATIONAL, BUT IMPAIRED WHILE CEILINGS ARE REMOVED). SPRINKLER SYSTEM

MAY BE TAKEN OFF-LINE FOR UP TO 8 HOURS, AS REQUIRED, TO MAKE MODIFICATIONS/

CONNECTIONS TO EXISTING SYSTEM.

C. WHEN CEILINGS ARE REMOVED DURING RENOVATION OF AN EXISTING SPACE OR

STRUCTURE, THE SPRINKLERS SYSTEM SHALL BE MAINTAINED BY INSTALLING

UPRIGHT SPRINKLERS TO PROVIDE SUFFICIENT COVERAGE AND A QUICKER

RESPONSE TIME.

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:0

:5

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL THIRD FLOOR PLAN

FX103

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTIAL THIRD FLOOR PLAN

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. LIMITS OF RENOVATED AREA REQUIRING EXISTING SPRINKLER SYSTEM

MODIFICATIONS. MODIFICATIONS INCLUDE, BUT ARE NOT LIMITED TO, REPLACING

ALL SPRINKLERS, PIPE BRANCHES, AND PIPE MAINS TO CONFORM TO NEW

ARCHITECTURAL LAYOUTS AND NEW MEPT UTILITIES AS NECESSARY.

3. HARD CEILING IN THIS LOCATION (GYPSUM BOARD/ PLASTER/ WOOD). REFER TO

ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

4. PROVIDE NEW WET-PIPE FIRE SUPPRESSION SPRINKLER SYSTEM (PER HYDRAULIC

CALCULATIONS) TO CONFORM TO NEW LAYOUT INSIDE INDICATED AREA.

KEYPLAN

S

F S

S

FS S

B01W

B01E

A C

F G I J LE

OH

OH

2 2

1EXISTING ZONE

CONTROL VALVE

1-4-2

EXISTING ZONE

CONTROL VALVE

1-4-1 1

EXISTING ZONE

CONTROL VALVE

1-4-4

STAIR #1

STAIR #2

STAIR #3

HAC

A477

VEST

B400A

DATA

A470

ELEC

A433

ELEC

VEST

A410

MECHANICAL

ROOM

ELECTRICAL

SHOP

401A

OFFICE

GENERAL NOTES

A. REFER TO SHEET F001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. EXISTING CORRIDORS AND/ OR ROOMS TO REMAIN OPERATIONAL AT ALL TIMES

DURING BUSINESS HOURS. AUTOMATIC SPRINKLER SYSTEM(S) SHALL BE MAINTAINED

IN FULLY OPERATIONAL CONDITION (PER NFPA 241, SPRINKLER SYSTEMS WILL BE

OPERATIONAL, BUT IMPAIRED WHILE CEILINGS ARE REMOVED). SPRINKLER SYSTEM

MAY BE TAKEN OFF-LINE FOR UP TO 8 HOURS, AS REQUIRED, TO MAKE MODIFICATIONS/

CONNECTIONS TO EXISTING SYSTEM.

C. WHEN CEILINGS ARE REMOVED DURING RENOVATION OF AN EXISTING SPACE OR

STRUCTURE, THE SPRINKLERS SYSTEM SHALL BE MAINTAINED BY INSTALLING

UPRIGHT SPRINKLERS TO PROVIDE SUFFICIENT COVERAGE AND A QUICKER

RESPONSE TIME.

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:0

:0

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL FOURTH FLOOR PLAN

FX104

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTIAL FOURTH FLOOR PLAN

KEYPLAN

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. PROVIDE NEW WET-PIPE FIRE SUPPRESSION SPRINKLER SYSTEM (PER HYDRAULIC

CALCULATIONS) TO CONFORM TO NEW LAYOUT INSIDE INDICATED AREA.

S

F S

S

FS S

B01W

B01E

A C

F G I J LE

OH

OH

OH

4 4

EXISTING ZONE

CONTROL VALVE

1-5-2

EXISTING ZONE

CONTROL VALVE

1-5-1 1

EXISTING ZONE

CONTROL VALVE

1-5-4

STAIR #1

STAIR #2

STAIR #3

OH

ELECTRICAL

A578

DATA

A575

LAV

A576

LAV

A577

ELEC

A527

ELEC

A511

FEC

A510

FEC

A574

FEC

A541

MED

B521A

LAV

B523

DATA

B525A

DATA

B525

ELEC

B520

4 4

524A

BATH

1 BR

PATIENT

ROOM #8

1 BR

PATIENT

ROOM #9

525A

BATH

C5-52

CORRIDOR

1 BR

PATIENT

ROOM #7

523A

BATH

NS-502

NURSE

STATION

NS-503

NURSE

STATION

LOUNGE

1BR

PATIENT

ROOM #6

519A

BATH

517A

BATH

1BR

PATIENT

ROOM #5

C5-50

CORRIDOR

SPACE

STAFF

LOUNGE

522C

LOCKERS

522A

LOCKERS

522D

FEMALE

LAV

522B

MALE LAV

1BR

PATIENT

ROOM #4

515A

BATH

1BR

PATIENT

ROOM #2

507A

BATH

NS-501

NURSE

STATION

MED ROOM

CLEAN

UTILITY

CLEAN

LINEN

C5-51

CORRIDOR

SOILED

HOLD

505A

BATH

1BR

ISOLATION

ROOM #1

A513

2BR

505B

ANTE

OFFICE

EQUIPMENT

ALCOVE

NS-500

NURSE

STATION

NUTRITION

BATH

509A

GENERAL NOTES

A. REFER TO SHEET F001 FOR ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS.

B. EXISTING CORRIDORS AND/ OR ROOMS TO REMAIN OPERATIONAL AT ALL TIMES

DURING BUSINESS HOURS. AUTOMATIC SPRINKLER SYSTEM(S) SHALL BE MAINTAINED

IN FULLY OPERATIONAL CONDITION (PER NFPA 241, SPRINKLER SYSTEMS WILL BE

OPERATIONAL, BUT IMPAIRED WHILE CEILINGS ARE REMOVED). SPRINKLER SYSTEM

MAY BE TAKEN OFF-LINE FOR UP TO 8 HOURS, AS REQUIRED, TO MAKE MODIFICATIONS/

CONNECTIONS TO EXISTING SYSTEM.

C. WHEN CEILINGS ARE REMOVED DURING RENOVATION OF AN EXISTING SPACE OR

STRUCTURE, THE SPRINKLERS SYSTEM SHALL BE MAINTAINED BY INSTALLING

UPRIGHT SPRINKLERS TO PROVIDE SUFFICIENT COVERAGE AND A QUICKER

RESPONSE TIME.

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

Project Schedule Date

Schematic Design 15% 02.16.2021

Schematic Design 35% 04.16.2021

Design Development 65% 09.24.2021

Construction Documents 95% 10.26.2023

Bid Documents 100% 12.15.2023

Design Development 65% (Re-submittal) 11.15.2021

/1 /2

:0

:0

P M

Construct Private In-Patient Rooms & Primary Clinics

12/15/2023

PARTIAL FIFTH FLOOR PLAN

FX105

RLCEWL

506-334

Ann Arbor, Michigan (506)

B01W

JEFF MEANS

BID DOCUMENTS 100%

20014.00

N Scale: 1/8" = 1'-0"

PARTIAL FIFTH FLOOR PLAN

PLAN NOTES

1. EXISTING AREA, PIPING OR PIECE OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.

2. LIMITS OF RENOVATED AREA REQUIRING EXISTING SPRINKLER SYSTEM

MODIFICATIONS. MODIFICATIONS INCLUDE, BUT ARE NOT LIMITED TO, REPLACING

ALL SPRINKLERS, PIPE BRANCHES, AND PIPE MAINS TO CONFORM TO NEW

ARCHITECTURAL LAYOUTS AND NEW MEPT UTILITIES AS NECESSARY.

3. LOCATION OF PATIENT LIFT. NO SPRINKLERS SHALL BE LOCATED BETWEEN SIDE

RAILS, BELOW MOVEABLE LIFT RAIL OR MOTOR.

4. HARD CEILING IN THIS LOCATION (GYPSUM BOARD/ PLASTER/ WOOD). REFER TO

ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

5. NEGATIVELY PRESSURIZED SPACE. SEAL ALL PENETRATIONS IN WALL AND/ OR

CEILING AS REQUIRED TO MAINTAIN PRESSURIZATION.

6. PROVIDE NEW WET-PIPE FIRE SUPPRESSION SPRINKLER SYSTEM (PER HYDRAULIC

CALCULATIONS) TO CONFORM TO NEW LAYOUT INSIDE INDICATED AREA.

7. ALL RENOVATION WORK IN THIS AREA TO BE COMPLETED AFTER THE NEW FIFTH

FLOOR WORK IS COMPLETE AND TURNED OVER TO THE VA.

KEYPLAN

File details come from the government source that posted it. Updated .