Amended Drawings.pdf
PDF 32 MB Posted
- Solicitation number
- 36C25024B0031_1
About this file
This document appears to be amended drawings related to a federal contract opportunity from the Department of Veterans Affairs Technology Acquisition Center Austin to construct private in-patient rooms and primary clinics in Ann Arbor, MI.
The solicitation number is 36C25024B0031_1 and the contract opportunity name is "506-334 – Construct Private In-Patient Rooms and Primary Clinics". The amended drawings likely provide updated design specifications or architectural plans for the construction project. Key details around the required products and services, response dates, award information, pricing, set-asides, or other salient contract terms are not included in this document, as it appears to only contain the amended drawings rather than the full solicitation package.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X
X
XX.X-X
X
X
1/A101
X
A101 SIM.
EXP.X
TOILET ACCESSORY TAGX SIGNAGE TAG
A101
SIM
X
FULLER COURT
F U
L L E
R R
O A
D
GLAZIER W
AY
FULLER COURT
B E
A L
A V
E N
U E
FULLER ROAD
B O
N
IS
T E
E L
B L V
D
1W
1E
37 15 31 22 T09
H
J
G B
A
D
VA MEDICAL CIRCLE
PROJECT LOCATION
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Department of Veterans Affairs Medical Center
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
937.461.0260 F
RDC / JOHN POE ARCHITECTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
HEAPY ENGINEERING
1400 WEST DOROTHY LANE
DAYTON, OH 45409
937.224.0861 P
937.224.5777 F
TTL ASSOCIATES, INC.
1915 NORTH 12 STREET
TOLEDO, OH 43604
419.324.2222 P
419.241.1808 F
ENVIRONMENTAL ENGINEERING
ARCHITECTURE | PLANNING | INTERIOR DESIGN
MECHANICAL | ELECTRICAL | PLUMBING
THP LIMITED, INC.
100 E. EIGHTH STREET, SUITE 300
CINCINNATI, OH 45202
513.241.3222 P
513.241.2981 F
STRUCTURAL ENGINEERING
MIDWESTERN CONSULTING
3815 PLAZA DRIVE
ANN ARBOR, MI 48108
734.995.0200 P
734.995.0599 F
CIVIL ENGINEERING
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:4
:4
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
COVER SHEET
G001
RWTH
506-334
Ann Arbor, Michigan (506)
B01W
Construct Private In-Patient Rooms & Primary Clinics
2215 Fuller Road Ann Arbor, MI 48105 PROJECT #: 506-334
JEFF MEANS
100% BID DOCUMENTS
20014.00
GENERAL CONSTRUCTION NOTES
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,
INTERNATIONAL BUILDING CODE, AND OTHER CODES AS IDENTIFIED IN VHA
PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE
ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND
DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13
WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT
EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH
ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT
ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF
NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO
REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT
SURFACES TO REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW
MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO
BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE
SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT
THROUGH FINISHED OPENINGS.
DRAWING INDEX
GRAPHIC SYMBOLS
N Scale: 1" = 160'-0"
SITE PLAN
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,
HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS
AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT
DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL
WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS
SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A
PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS
INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL
SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE
THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR
SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED
WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF
THE WALL.
12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO
AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER
RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS
RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS
IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY
FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
13. CONTRACTOR SHALL COORDINATE DESIGNATED OUTSIDE LAYDOWN AREA &
ANY ROOMS INSIDE THE FACILITY FOR MATERIAL STORAGE WITH C.O.R.
PRIOR TO COMMENCEMENT OF WORK
GENERAL
G001 COVER SHEET
G100 CODE PLANS
G200 SEQUENCE OF CONSTRUCTION
G301 BID DEDUCT ALTERNATE 01 & 02
G302 BID DEDUCT ALTERNATE 03 & 04
CIVIL
C001 EXISTING CONDITIONS AND SITE PREP
STRUCTURAL
S001 GENERAL STRUCTURAL NOTES
S002 TYPICAL DETAILS
S003 TYPICAL DETAILS
S104 THIRD AND FOURTH FLOORS FRAMING PLANS
S105 FIFTH FLOOR AND ROOF FRAMING PLANS
S106 EXISTING ROOF FRAMING PLAN
S201 FRAMING DETAILS
S301 TRUSS ELEVATION AND DETAILS
S401 STEEL COLUMN SCHEDULE AND DETAILS
S501 WEST ELEVATION SUPPLEMENTAL FRAMING
ARCHITECTURAL
AD102 SECOND FLOOR - DEMOLITION PLAN
AD103 THIRD FLOOR / SECOND FLOOR ROOF - DEMOLITION PLAN
AD104 FOURTH FLOOR - DEMOLITION PLAN
AD105 FIFTH FLOOR - DEMOLITION PLAN
AD106 SIXTH FLOOR - DEMOLITION PLAN
AD122 SECOND FLOOR REFLECTED CEILING - DEMOLITION PLAN
AD201 EXTERIOR DEMOLITION ELEVATIONS
AD202 EXTERIOR DEMOLITION ELEVATIONS & DETAILS
A103-D THIRD FLOOR DIMENSION PLAN
A103-N THIRD FLOOR NOTE PLAN
A104-D FOURTH FLOOR DIMENSION PLAN
A104-N FOURTH FLOOR NOTE PLAN
A105-D FIFTH FLOOR DIMENSION PLAN
A105-N FIFTH FLOOR NOTE PLAN
A106 SIXTH FLOOR / ROOF PLAN
A122 SECOND FLOOR - REFLECTED CEILING PLAN
A123 THIRD FLOOR - REFLECTED CEILING PLAN
A124 FOURTH FLOOR - REFLECTED CEILING PLAN
A125 FIFTH FLOOR - REFLECTED CEILING PLAN
A126 CEILING DETAILS
A201 EXTERIOR ELEVATIONS
A202 EXTERIOR ELEVATIONS
A300 WALL TYPES
A301 BUILDING SECTIONS
A311 WALL SECTIONS
A321 DETAILS
A322 DETAILS
A401 INTERIOR ELEVATIONS
A402 INTERIOR ELEVATIONS
A403 INTERIOR ELEVATIONS
A404 INTERIOR ELEVATIONS
A407 RESTROOM INTERIOR ELEVATIONS
A511 CASEWORK SECTIONS & DETAILS
A601 DOOR SCHEDULE & DETAILS
A611 WINDOW & STOREFRONT
A612 WINDOW DETAILS
IF001 FINISH LEGEND
IF301 THIRD FLOOR - FLOOR FINISH PLAN
IF302 THIRD FLOOR - WALL FINISH PLAN
IF303 THIRD FLOOR - WALL PROTECTION PLAN
IF401 FOURTH FLOOR - FLOOR FINISH PLAN
IF402 FOURTH FLOOR - WALL FINISH PLAN
IF403 FOURTH FLOOR - WALL PROTECTION PLAN
IF501 FIFTH FLOOR - FLOOR FINISH PLAN
IF502 FIFTH FLOOR - WALL FINISH PLAN
IF503 FIFTH FLOOR - WALL PROTECTION PLAN
IS301 THIRD FLOOR - SIGNAGE PLAN
IS401 FOURTH FLOOR - SIGNAGE PLAN
IS501 FIFTH FLOOR - SIGNAGE PLAN
IS600 SIGNAGE DETAILS
QH103 THIRD FLOOR - FURNITURE & EQUIPMENT PLAN
QH104 FOURTH FLOOR - FURNITURE & EQUIPMENT PLAN
QH105 FIFTH FLOOR - FURNITURE & EQUIPMENT PLAN
FIRE SUPPRESSION
F001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS
F002 BID DEDUCT ALTERNATE 01 & 02
F003 BID DEDUCT ALTERNATE 03 & 04
FX103 PARTIAL THIRD FLOOR PLAN
FX104 PARTIAL FOURTH FLOOR PLAN
FX105 PARTIAL FIFTH FLOOR PLAN
PLUMBING
P001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS
P002 BID DEDUCT ALTERNATE 01 & 02
P003 BID DEDUCT ALTERNATE 03 & 04
PD102 PARTIAL SECOND FLOOR PLAN - REMOVALS
PD103 PARTIAL THIRD FLOOR PLAN - REMOVALS
PD104 PARTIAL FOURTH FLOOR PLAN - REMOVALS
PD105 PARTIAL FIFTH FLOOR PLAN - REMOVALS
PL102 PARTIAL SECOND FLOOR PLAN - DRAINAGE
PL103 PARTIAL THIRD FLOOR PLAN - DRAINAGE
PL104 PARTIAL FOURTH FLOOR PLAN - DRAINAGE
PL105 PARTIAL FIFTH FLOOR PLAN - DRAINAGE
PL106 PARTIAL SIXTH FLOOR PLAN - DRAINAGE
PP103 PARTIAL THIRD FLOOR PLAN - DISTRIBUTION
PP104 PARTIAL FOURTH FLOOR PLAN - DISTRIBUTION
PP105 PARTIAL FIFTH FLOOR PLAN - DISTRIBUTION
PG105 PARTIAL FIFTH FLOOR PLAN - MEDICAL GAS
P401 ENLARGED PLAN
P601 SCHEDULES & DIAGRAMS
P901 SANITARY WASTE AND VENT DIAGRAM
P902 DOMESTIC WATER DIAGRAM
P903 MEDICAL GAS DIAGRAM
P904 STORM & SECONDARY OVERFLOW DIAGRAM
MECHANICAL
M001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS
M002 BID DEDUCT ALTERNATES
M003 BID DEDUCT ALTERNATES
MD102 PARTIAL SECOND FLOOR PLAN - REMOVALS
MD103 PARTIAL THIRD FLOOR PLAN - REMOVALS
MD104 PARTIAL FOURTH FLOOR PLAN - REMOVALS
MD105 PARTIAL FIFTH FLOOR PLAN - REMOVALS
MH101 PARTIAL FIRST FLOOR PLAN - TEMPORARY AIR HANDLING UNIT
MH102 PARTIAL SECOND FLOOR PLAN - DUCTWORK
MH103 PARTIAL THIRD FLOOR PLAN - DUCTWORK
MH104 PARTIAL FOURTH FLOOR PLAN - DUCTWORK
MH105 PARTIAL FIFTH FLOOR PLAN - DUCTWORK
MH106 PARTIAL SIXTH FLOOR PLAN - DUCTWORK
MP103 PARTIAL THIRD FLOOR PLAN - PIPING
MP104 PARTIAL FOURTH FLOOR PLAN - PIPING
MP105 PARTIAL FIFTH FLOOR PLAN - PIPING
MP106 PARTIAL SIXTH FLOOR PLAN - PIPING
M401 ENLARGED PLANS
M402 ENLARGED PLAN
M403 ENLARGED PLANS
M501 DETAILS
M502 DETAILS
M503 DETAILS
M504 DETAILS
M505 AIRFLOW SCHEMATICS
M601 SCHEDULES
M602 SCHEDULES
M901 CONTROLS
M902 CONTROLS
M903 CONTROLS
M904 CONTROLS
ELECTRICAL
E001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS
E002 BID DEDUCT ALTERNATES
ED103 PARTIAL THIRD FLOOR PLAN - REMOVALS
ED105 PARTIAL FIFTH FLOOR PLAN - REMOVALS
EL103 PARTIAL THIRD FLOOR PLAN - LIGHTING
EL104 PARTIAL FOURTH FLOOR PLAN - LIGHTING
EL105 PARTIAL FIFTH FLOOR PLAN - LIGHTING
EP101 PARTIAL FIRST FLOOR PLAN - POWER
EP103 PARTIAL THIRD FLOOR PLAN - POWER
EP104 PARTIAL FOURTH FLOOR PLAN - POWER
EP105 PARTIAL FIFTH FLOOR PLAN - POWER
EP106 PARTIAL SIXTH FLOOR & ROOF PLAN - POWER
E401 ENLARGED PLANS
E501 SCHEDULES & DETAILS
E502 PANEL SCHEDULES
E503 PANEL SCHEDULES
E601 PARTIAL SINGLE LINE DIAGRAM
E602 PARTIAL SINGLE LINE DIAGRAM
E603 PARTIAL SINGLE LINE DIAGRAM
E604 PARTIAL SINGLE LINE DIAGRAM
TELECOMMUNICATIONS
T001 ABBREVIATION, SYMBOLS & INDEX OF DRAWINGS
T002 BID DEDUCT ALTERNATES 01 & 02
T003 BID DEDUCT ALTERNATES 03 & 04
TD103 PARTIAL THIRD FLOOR PLAN - REMOVALS
TD104 PARTIAL FOURTH FLOOR PLAN - REMOVALS
TD105 PARTIAL FIFTH FLOOR PLAN - REMOVALS
TA103 PARTIAL THIRD FLOOR PLAN - TECHNOLOGY
TA104 PARTIAL FOURTH FLOOR PLAN - TECHNOLOGY
TA105 PARTIAL FIFTH FLOOR PLAN - TECHNOLOGY
TA106 FIRST FLOOR PLAN BUILDING 28 - TECHNOLOGY
TY103 PARTIAL THIRD FLOOR PLAN - TECHNOLOGY SECURITY
TY104 PARTIAL FOURTH FLOOR PLAN - TECHNOLOGY SECURITY
TY105 PARTIAL FIFTH FLOOR PLAN - TECHNOLOGY SECURITY
Revisions Date
2 Addendum #2 7/16/2024
CORE WORK HOURS ARE WITHIN 7AM – 4 PM.
ANY WORK THAT REQUIRES CRANE LIFTS FOR STRUCTURAL STEEL OR OTHER
WORK THAT WILL REQUIRE SHUTDOWN OF THE PHARMACY ON THE FIRST
FLOOR WILL NOT BE COMPLETED BETWEEN 1:00 PM AND 8:00 PM.
0-HR Smoke Partition: NFPA 101 - 8.4
1-HR Smoke Barrier: NFPA 101 - 8.5
2-HR Smoke Barrier: NFPA 101 - 8.5
1-HR Fire Barrier: NFPA 101 - 8.3
2-HR Fire Barrier: NFPA 101 - 8.3
Means of Egress
Egress Capacity
Existing Wall to Remain
New Wall
Area of New Work
No Architectural Work this Area
Suite Designation
Fire Extinguisher
TOTAL TRAVEL DISTANCE= 180'
(MAXIMUM= 200')
TOTAL TRAVEL DISTANCE= 183
(MAXIMUM= 200')
Common Path of Travel= 90'
(MAXIMUM= 100' )
COMPARTMENT ZONE 3
7,200 SF
COMPARTMENT ZONE 2
22,590 SF
COMPARTMENT ZONE 1
12,194 SF
Common Path of Travel= 100'
(MAXIMUM= 100' )
TOTAL TRAVEL DISTANCE= 212'
(MAXIMUM= 200' )
TOTAL TRAVEL DISTANCE= 149'
(MAXIMUM= 200' )
TOTAL TRAVEL DISTANCE= 95'
(MAXIMUM= 200' )
SUITE
9,117 SF
Common Path of Travel= 42'
(MAXIMUM= 100')
SUITE EXIT= 100'
(MAXIMUM= 100')
TOTAL TRAVEL DISTANCE= 148'
(MAXIMUM= 200')
SUITE EXIT= 98'
(MAXIMUM= 100')
TOTAL TRAVEL DISTANCE= 141'
(MAXIMUM= 200')
COMPARTMENT ZONE 4
7,316 SF
COMPARTMENT ZONE 3
20,260 SF
COMPARTMENT ZONE 2
6,539 SF
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:4
:5
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
CODE PLANS
G100
RWTH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
CODE LEGEND
N Scale: 1/16" = 1'-0"
THIRD FLOOR - CODE PLAN
N
Scale: 1/16" = 1'-0"
FOURTH FLOOR - CODE PLAN
N Scale: 1/16" = 1'-0"
FIFTH FLOOR - CODE PLAN
Project Data Project Name: AE Construct In-Patient Rooms Project Number: VA# 506-334 / RDCJPA# 20014.00 Project Address: VA Ann Arbor Healthcare System
Building 1W 2215 Fuller Road, Ann Arbor, MI 48105
Project Description: 3 story vertical addition on the west side of Building 1 and associated interior remodeling of spaces adjacent to addition. Addition to accommodate future 6th thru 9th floors.
Applicable Building Codes Authority Having Jurisdiction Ann Arbor – Veterans Affairs Medical Center Building Code: NFPA 101, Life Safety Code, 2021 Edition
NFPA 96, Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations, 2021 Edition
International Building Code, 2021 Edition Accessibility Code: VA Barrier Free Design Standard, PG-18-13/ABAAS, January 1, 2017
(revised October 1, 2023) Structural Code: International Building Code, 2021 Edition Elevator Code: N/A Energy Code: ASHRAE 90.1-2021 (target 30% better than baseline) Mechanical Code: 2021 International Mechanical Code Plumbing Code: 2021 International Plumbing Code
2021 NFPA 54 National Gas Fuel Code Electrical Code: 2020 NFPA 70 National Electrical Code Fire Code: 2019 NFPA 72 National Fire Alarm Code
2019 NFPA 13, 13D & 13R
Life Safety Summary Occupancy: Third Floor: Ambulatory
Fourth Floor: Business Fifth Floor: Healthcare
Stair Width: 3rd floor stair width (Maximum Occupants per floor):
99,800 sf x 150 sf per occupant = 666 occupants 666 occupants x 0.3" = 199.8" required width 199.8"/8 stairways - 24.975" required per stairway All stairways exceed 36" in accordance with Table 7.2.2.2.1.1 (b), Existing Stairs
Construction Type: II (222) Actual Height: 61’-5” Actual Area: Third Floor: Infill: 5,311 SF | Renovation: 2,102 SF
Fourth Floor:Infill: 5,311 SF | Renovation: 1,056 SF Fifth Floor: Infill: 5,311 SF | Renovation: 3,800 SF Total: Infill: 15,933 SF | Renovation: 6,958 SF
Hazard of Content: Ordinary Hazard Contents Sprinkler System: Fully suppressed (NFPA 13) Fire Resistance Ratings: Structural Frame: 2 hour
Exterior Bearing Walls: 2 hour Interior Bearing Walls: 2 hour Exterior Non-Bearing Walls: 0 hour Interior Non-Bearing Walls: 0 hour Columns: 2 hour Floor Construction: 2 hour Roof Construction: 1 hour
Smoke Compartment: Third Floor (Max 40,000 sf) Compartment Zone 1 12,194 s.f.
Compartment Zone 2 22,590 s.f.
Compartment Zone 3 7,200 s.f.
Fourth Floor Compartment Compartment Zone 2 33,838 s.f.
Fifth Floor (Max 22,500 sf) Compartment Zone 2 6,539 s.f.
Compartment Zone 3 20,260 s.f.
Compartment Zone 4 7,316 s.f.
Suite: Maximum SF (10,000 sf) 9,117 s.f.
Direct visual supervision provided.
Total coverage automatic smoke detection.
Required Separations: Storage Rooms > 100 sf: 1 HR Fire Barrier (Healthcare Only)
Boiler/Furnace Rooms: 1 HR Fire Barrier Electrical Rooms: 1 HR Fire Barrier Stairs: Existing Shafts: 1 HR Connecting <4 stories
2 HR Connecting >4 stories Corridors: 0 HR Smoke Partition
(Heathcare only) Travel Distance Restrictions:
Dead-End Corridor Limit: 30 ft. Health Care 50 ft. Ambulatory 50 ft. Business
Common Path of Travel: 100 ft. Health Care, Ambulatory, & Business Travel Distance to Suite Exit: 100 ft. Health Care Travel Distance to Exits: 200 ft. Health Care and Ambulatory
300 ft Business Travel Distance from Room: 50 ft. Health Care
150 ft Ambulatory 300 ft Business
Revisions Date
2 Addendum #2 7/16/2024
ALL RENOVATION WORK IN THIS
AREA TO BE COMPLETED AFTER
REMAINDER OF FLOOR HAS
BEEN TURNED OVER TO THE VA
LOUNGE
NURSE
STATION
NS-503
STAFF
LOUNGE
OFFICE
SOILED
HOLD
1BR
ISOLATION
ROOM #1
BATH
505A
BATH
507A
1BR
PATIENT
ROOM #2
FEMALE
LAV
522D
MALE LAV
522B
CLEAN
UTILITY
EQUIPMENT
ALCOVE
ANTE
505B OFFICE
CLEAN
LINEN
LOCKERS
522A
LOCKERS
522C
NURSE
STATION
NS-500
SPACE
WHEEL
CHAIR/
STRETCHER
MED ROOM
1BR
PATIENT
ROOM #3
BATH
509A
1BR
PATIENT
ROOM #4
BATH
515A
BATH
517A
BATH
519A
NURSE
STATION
NS-501
NUTRITION
1 BR
PATIENT
ROOM #7
1 BR
PATIENT
ROOM #8
BATH
524A
1 BR
PATIENT
ROOM #9
BATH
525A
BATH
523A
ALCOVE
1BR
PATIENT
ROOM #5
1BR
PATIENT
ROOM #6
NURSE
STATION
NS-502
CORRIDOR
C5-51
STAFF
LOUNGE
B511
STAFF
LOUNGE
B509
ELECTRICAL
A511
ELECTRICAL
A578
DATA
A575
DATA
A525
CORRIDOR
C5-50
CORRIDOR
C5-52
CORRIDOR
C5-07
CORRIDOR
C5-09
CORRIDOR
C5-13
ALL NEW WORKIN THIS AREA
TO BE COMPLETED PRIOR TO
THE HATCHED REGION
STAGING AREA
-CRANE LOCATION
-DUMPSTERS
-JOB TRAILER
CONFIRM WITH VA COR LOCATION OF
CONTRACTOR PARKING AND FENCING
SUBCONTRACTOR PARKING OFFSITE
PROJECT LOCATION
7 FT HIGH CHAIN LINK FENCING
A321
3 HEALTHY
TEACHING
KITCHEN
OPEN OFFICE
CHAPEL
OPEN OFFICE
OPEN OFFICE
A321
1. EXTERIOR ENVELOPE AND NEW
STRUCTURE TO BE COMPLETED
PRIOR TO REMOVING EXISTING
WINDOWS SCHEDULED TO BE
DEMOLISHED
3. EXISTING OFFICES TO BE
RENOVATED AFTER NEW
STRUCTURAL SYSTEM AND
EXTERIOR WALL IS COMPLETED.
3. EXISTING OFFICES TO BE
RENOVATED AFTER NEW
STRUCTURAL SYSTEM AND
EXTERIOR WALL IS COMPLETED.
2. EXISTING WINDOWS WITHIN
THIS AREA TO BE REMOVED
AFTER NEW ADDITION IS
ENCLOSED
2. EXISTING WINDOWS WITHIN
THIS AREA TO BE REMOVED
AFTER NEW ADDITION IS
ENCLOSED
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:4
:0
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
SEQUENCE OF CONSTRUCTION
G200
RWTH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
Scale: 1/16" = 1'-0"3
FIFTH FLOOR SEQUENCE OF CONSTRUCTION
Scale: 1" = 10'-0"1
STAGING PLAN
Revisions Date
2 Addendum #2 7/16/2024
Scale: 1/16" = 1'-0"2
THIRD FLOOR SEQUENCE OF CONSTRUCTION
A. For temporay partition locations see Demolition Plans. Temporary partitions are suggested locations. Coordinate final location in field with C.O.R.
B. Verify all conditions in the field prior to fabrication, erection and construction.
C. All asbestos containing material (ACM) must be abated per the direction of the C.O.R. and project specification 017419 and local state and federal regulations. Abatement if required is to be scheduled in appropriate sequence with demolition, new construction and project phasing.
D. Coordinate phase completion and start-up with requirements as set forth by the C.O.R. to maintain daily operations to near as normal as possible.
E. Coordinate location of job dumpster with the C.O.R. so as to disrupt daily operations as little as possible.
F. Coordinate access to all phases of construction, deliveries, and debris removal with the C.O.R. See General Requirements.
G
Temporary door locations and sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with the C.O.R.
H. Existing HVAC, medical gases, sprinklers and water supply to be maintained throughout as required during each phase of construction.Coordinate phasing with Mechanical and Plumbing contractor. Support and protect all lines during each phase of construction. See MEP Drawings.
J. Provide and maintain negative air pressure at all construction.
Coordinate with HVAC contractor. See HVAC plans for temporary venting requirements and duct locations.
K. Temporary partition to structural deck above. See A601 for temporary partition type.
L. Existing power must be maintained throughout as required during each phase of construction.Coordinate phasing with Electrical Contractor. Coordinate power turnover with requirements as dictated by the C.O.R. See Electrical Drawings.
M
Coordinate sequence construction with C.O.R. so that only one side of any corridor in use is obstructed at any one time.
N. Coordinate all work involving the generation of excessive noise so as to occur during non-peak operating hours, 1000 to 1600 daily.
Activities to occur during this time include, but are not limited to saw cutting, jack hammering, hammer drilling and core drilling. If there is any question as to whether an operation should occur during this time the Contractor will contact the C.O.R.
GENERAL PHASING NOTES
15 15
13 13
12 12
11 11
E.8
F G H IE
A301
A301
A301
2.71
2.10
2.70
2.71
2.72
2.692.69
2.10
2.692.69
2.70
2.69
2.10
6'-3"
1'-10 1/8"
Wall Demo
Extent of
6'-0" 2'-8"
Wall Demo
Extent of
W a ll
D e m o
E x te n t o f
2.23
T1.0
T1.0
2.83
2.69
2.70
2.70
2.69
2.69
2.70
A511
B01W
B01E
LEGEND
Wall to be Demolished
Existing Wall to Remain
New Wall
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:4
:4
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FOURTH FLOOR - DEMOLITION
PLAN
AD104
RWTH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
FOURTH FLOOR - DEMOLITION PLAN
KEY PLAN
A. Remove all existing construction shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Salvage existing door hardware at doors to be demolished, box, label and turn over to Owner.
C. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
D. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process unless otherwise noted.
Coordinate any required changes to these systems with the C.O.R.
E. Remove all abandoned cables and/or wiring, piping, tubing, etc.
serving other areas and functions located above ceiling.
F. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.
G. Prepare walls and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
H. Remove existing corner guards in areas to be remodeled.
I. Salvage existing toilet accessiories at rooms to be demolished, box, label and turn over to Owner.
J. Salvage existing whiteboards, shelving, cabinets and suport brackets to be demolished, box, label and turn over to Owner.
K. Salvage existing signage and artwork in corridors, box, label and turn over to Owner.
L. Existing column concrete wraps to remain. If damged, repair as needed.
GENERAL DEMOLITION NOTES
2.10 Remove existing window, sill and wall below for new door.
Prepare opening for new construction and weatherproof until infill can be completed. See sequence of construction notes and lead paint abatement specification. See plans for new door location.
2.23 Remove and salvage metal gate. Turnover to owner.
2.69 Remove existing louver. Prepare opening for new
construction and weatherproof until infill can be completed. See sequence of construction notes and Lead Paint Abatement specification.
2.70 Remove existing window & sill. Prepare opening for new
construction and weatherproof until infill can be completed. See sequence of construction notes and Lead Paint Abatement specification.
2.71 Remove indicated portion of exterior masonry wall cmu up to bottom of concrete above and brick to existing ledge angle.
2.72 Existing mechanical equipment/ductwork to be
demolished, and/or relocated. See Mechanical Drawings for extent of demolition, new work and sequence of construction to maintain mechanical services to basement, first and second floor.
2.83 All work in this area to occur in one room at a time. All demolition and new work shall be completed in a single room prior to beginning work in the next room. Coordinate access to rooms with COR. Coordinate with sequence of construction notes.
PLAN NOTES
Revisions Date
2 Addendum #2 7/16/2024
305B
C3-A
307B
OPEN
OFFICE
CHAPEL
COMMON
SPACE
STORAGE
307A
OPEN
OFFICE
HEALTHY
TEACHING
KITCHEN
LOBBY
SPACE
OPEN
OFFICE
A301
A301
A301
7.01
7.02
TYP
7.06
TYP
7.06 9.08
9.08 9.08
S2.0
S2.0
S1.1A
S1.1A
S1.1A
S1.1A
S3.0
S2.0
S2.0S2.0 S2.0
S2.0
16'-8 5/8"
/4
/4
13'-0"
6'-9 7/8"
6'-1 1/8" 2'-6 1/4"
/4
/4
22'-1 3/4"6'-9 7/8"29'-9 7/8"
6'-1 1/2"
2'-1 1/2"
/8
/4
13'-6 1/2"
2'-1 1/2"
10'-11 1/4"
1'-10 1/8" 1'-3"
/4
S7.0-F
9.09ELECTRICAL
A311
DATA
A306C
DATA
A37026.02
STORAGE
A317A
7.06
307A
A321
C
2/A201
10.41
S7.0-F
S7.0-F
10.41
10.41
S1.1A
S3.0S2.0
S1.1AS2.0
S2.0
A4
/8
S2.3 S2.3
B
CORRIDOR
C3-B
E1.0
E1.0
E1.0
E1.0
E1.0
T1.0
T1.0
T1.0
T1.0T1.0
S2.0
S2.0
S2.0
S1.1-F2
S1.0-S S1.0-S
S1.0-S S1.0-S
S1.1-F2
307C
S1.0-SS1.0-SS1.0-SS1.0-SS1.0-SS1.0-S
A404
A
A404
C
S2.0
S2.0
S1.0E1.0
H.A.C.
305A
S2.3
S7.0-F
9.10
9.10
CLOSET
A401
A404
B
A401
A401
A
A401
A
9.109.10
9.109.10
9.10
9.10
9.10
9.10
D
E
A322
SIM
A511
B01W
B01E
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X
X
XX.X-X
X
X
1/A101
X
A101 SIM.
EXP.X
TOILET ACCESSORY TAGX SIGNAGE TAG
A101
SIM
X
0-HR Smoke Partition: NFPA 101 - 8.4
1-HR Smoke Barrier: NFPA 101 - 8.5
2-HR Smoke Barrier: NFPA 101 - 8.5
1-HR Fire Barrier: NFPA 101 - 8.3
2-HR Fire Barrier: NFPA 101 - 8.3 S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:5
:3
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
THIRD FLOOR NOTE PLAN
A103-N
RWTH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. Install fire retardent blocking at all wall mounted equipment, accessories, casework and wall mounted door stops..
D. Verify all conditions in the field prior to fabrication, erection and construction.
E. Coordinate access for all construction, deliveries, and debris removal with the COR. See General Requirements.
F. Maintain rating at all existing rated construction. Repair all damage to existing rated walls.
G. All new structural steel is to be protected with Type 2 applied fireproofing unless noted otherwise. Provide 2 hour rating for all columns, griders and beams unless noted otherwise.
H. Refer to series A400 sheets for interior elevations and accessory schedule.
I. All wall types to be S1.0 unless noted otherwise.
J. All column enclosures to be S2.3 unless noted otherwise.
K. All column enclosures at existing columns to have size verified in field.
GENERAL NOTES
N Scale: 1/8" = 1'-0"
THIRD FLOOR NOTE PLAN
KEY PLAN
GRAPHIC SYMBOLS
FIRE WALL LEGEND
7.01 Expansion joint type I-1: Interior floor to floor, 2 hour rated.
7.02 Expansion joint type I-2: Interior wall to wall.
7.06 Expansion joint type E-2: Exterior wall to floor, 2 hour rated.
9.08 Finish face of drywall to be flush with original interior plane of demoed window. See detail.
9.09 Replace 2" wall system as needed to infill door removal.
Match existing.
9.10 Infill wall opening with noted wall type. Provide a smooth finish to match adjacent wall surfaces. Match adjacent textures. Paint entire wall to match existing. Provide control joints where new meets existing.
10.41 Semi-recessed fire extinguisher cabinet.
26.02 New electrical panels or switchboards shall be served from existing locations. See Electrical Drawings.
PLAN NOTES
1/ A
MECHANICAL
ROOM
ELECTRICAL
SHOP
S-01-4A
400A
A301
A301
A301
M3.0
S2.0
S2.0
8.068.06
5.10
8.05
3.013.01
3.023.02
30'-7"
/4
/8
15'-8 3/4"
31'-6" 20'-7 1/2"
4.01
7.06
7.01
7.02
7.06 7.06 7.017.05
BELOW RAISED SLAB
BELOW RAISED SLAB
ELECTRICAL
A474
DATA
A470
DATA
A432A
1/ A
OFFICE
401A
3.023.02
A321
SIM
A321
S2.0
S7.0-FS7.0-F
/8
/2
/8
S7.0-FS7.0-F
6'-0 5/8"
2/A201
4/ A
M3.0
S2.0
S2.0
S2.3S2.3
S2.3S2.3
S1.2A
S1.2A
S1.2B
S1.2B
401A
A
S7.0-F
S7.0-F
S1.1-F2
S1.1B
A322
SIM
A511
B01W
B01E
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X
X
XX.X-X
X
X
1/A101
X
A101 SIM.
EXP.X
TOILET ACCESSORY TAGX SIGNAGE TAG
A101
SIM
X
0-HR Smoke Partition: NFPA 101 - 8.4
1-HR Smoke Barrier: NFPA 101 - 8.5
2-HR Smoke Barrier: NFPA 101 - 8.5
1-HR Fire Barrier: NFPA 101 - 8.3
2-HR Fire Barrier: NFPA 101 - 8.3 S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:4
:4
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FOURTH FLOOR NOTE PLAN
A104-N
RWTH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
FOURTH FLOOR NOTE PLAN
KEY PLAN
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. Install fire retardent blocking at all wall mounted equipment, accessories, casework and wall mounted door stops..
D. Verify all conditions in the field prior to fabrication, erection and construction.
E. Coordinate access for all construction, deliveries, and debris removal with the COR. See General Requirements.
F. Maintain rating at all existing rated construction. Repair all damage to existing rated walls.
G. All new structural steel is to be protected with Type 2 applied fireproofing unless noted otherwise. Provide 2 hour rating for all columns, griders and beams unless noted otherwise.
H. Refer to series A400 sheets for interior elevations and accessory schedule.
I. All wall types to be S1.0 unless noted otherwise.
J. All column enclosures to be S2.3 unless noted otherwise.
K. All column enclosures at existing columns to have size verified in field.
GENERAL NOTES
PLAN NOTES
3.01 Elevated concrete slab - See Structural Drawings.
3.02 Elevated concrete mechanical pad. See Structural
Drawings.
4.01 Brick veneer. Match existing, provide sample for approval.
5.10 Structural steel truss. See Structural Drawings.
7.01 Expansion joint type I-1: Interior floor to floor, 2 hour rated.
7.02 Expansion joint type I-2: Interior wall to wall.
7.05 Expansion joint type E-1: Exterior wall to wall/soffit.
7.06 Expansion joint type E-2: Exterior wall to floor, 2 hour rated.
8.05 Masonry hollow metal framed opening.See detail 3/A323.
8.06 Install metal frame into opening.
GRAPHIC SYMBOLS
FIRE WALL LEGEND
522A
C5-50B
522F
522B
505B
505C
523A
522D
515A
507A
505A
C5-51A
522C
519A
C5-50A
LOUNGE
NURSE
STATION
NS-503
STAFF
LOUNGE
OFFICE
SOILED
HOLD
1BR
ISOLATION
ROOM #1
BATH
505A
BATH
507A
1BR
PATIENT
ROOM #2
FEMALE
LAV
522D
MALE LAV
522B
CLEAN
UTILITY
EQUIPMENT
ALCOVE
ANTE
505B
OFFICE
CLEAN
LINEN
LOCKERS
522A
LOCKERS
522C
NURSE
STATION
NS-500
SPACE
WHEEL
CHAIR/
STRETCHER
MED ROOM
1BR
PATIENT
ROOM #3
BATH
509A
1BR
PATIENT
ROOM #4
BATH
515A
BATH
517A
BATH
519A
NURSE
STATION
NS-501
NUTRITION
1 BR
PATIENT
ROOM #7
1 BR
PATIENT
ROOM #8
BATH
524A
1 BR
PATIENT
ROOM #9
BATH
525A
BATH
523A
ALCOVE
1BR
PATIENT
ROOM #5
1BR
PATIENT
ROOM #6
NURSE
STATION
NS-502
CORRIDOR
C5-51
STAFF
LOUNGE
B511
STAFF
LOUNGE
B509
524A 525A
A301
A301
A301
510B
510A
A407
D
A407
C
A407
E
A407
E
A407
D
M1.2S1.0-S
S1.1-F2
S1.0-S
S1.0-FS3.0
S1.1-F2
S1.0-S
S1.0-S
S1.0-S
S3.0
S2.0
7.06
7.027.02
7.01
S2.0
S2.0
7.06
S1.0
10.41
C5-51B
10.417.06
7.06
7.01
7.04
S1.0-S S1.0-S
S2.0
S1.0-S
S1.0-S
10.21
S1.0
S1.0
S1.0-FS1.0-FS1.0-F
S1.0-F
S7.0-F
S1.0-F
S7.0-F
S1.0-F
9.109.10
9.30
9.109.10
9.30
9.109.10
S2.0
ELECTRICAL
A511
ELECTRICAL
A578
DATA
A575
DATA
A525 27.01
S1.1A
F
G
H
I
J
K
S1.1A
S1.1A
S1.1A
S1.1A
S1.1A
524 525
CORRIDOR
C5-07
CORRIDOR
C5-09
CORRIDOR
C5-13
S1.0-N
S1.0-N
S1.0-N
S1.0-N
S1.0-NS1.0-N S1.0-N
A
A
A402
A
S2.3
S2.3
S2.3
S2.3
S2.3
S2.3
A
A
A401
A401
A401
A
A
A
509A
517A
522E
A403
7.08
7.08
S1.0-N
2/A201
10.41
E1.0
E1.0
E1.0
E1.0
E1.0
14.05
A403 Sim
A403 Sim
A403
A403 Sim
A403 Sim
A403
A403 Sim
A403 Sim
A403 Sim
A403 Sim
A403 Sim
A403 Sim
A403
A403
A
A403 Sim
A
S im
A
A
A402
A
A
A407
B
ELEC
B520
DATA
B525A
S1.1-F2
S1.0-S
S2.3
S2.0
A407
A
A407
B Sim
A407
B Sim
9.10
9.10
S2.3
S2.0
S2.3 S2.0S2.0
9.10
9.10
9.10
S2.0
S2.0
S2.0 S2.3
S1.0
A511
B A511
C
A511
A
A511
A Sim
A511
A Sim
A
A
A402
CORRIDOR
C5-52
CORRIDOR
C5-50
A407
B Sim
S2.0
A402
A322
SIM
6'-11 3/4"
8.148.14
B01W
B01E
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X
X
XX.X-X
X
X
1/A101
X
A101 SIM.
EXP.X
TOILET ACCESSORY TAGX SIGNAGE TAG
A101
SIM
X
0-HR Smoke Partition: NFPA 101 - 8.4
1-HR Smoke Barrier: NFPA 101 - 8.5
2-HR Smoke Barrier: NFPA 101 - 8.5
1-HR Fire Barrier: NFPA 101 - 8.3
2-HR Fire Barrier: NFPA 101 - 8.3
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:5
:1
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FIFTH FLOOR NOTE PLAN
A105-N
RWTH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
FIFTH FLOOR NOTE PLAN
KEY PLAN
7.01 Expansion joint type I-1: Interior floor to floor, 2 hour rated.
7.02 Expansion joint type I-2: Interior wall to wall.
7.04 Expansion joint type I-4: Interior ceiling to ceiling/soffit.
7.06 Expansion joint type E-2: Exterior wall to floor, 2 hour rated.
7.08 Control Joint, see structural drawings.
8.14 Provide frosted window film to existing window. Refer to specifications for details.
9.10 Infill wall opening with noted wall type. Provide a smooth finish to match adjacent wall surfaces. Match adjacent textures. Paint entire wall to match existing. Provide control joints where new meets existing.
9.30 Patch plaster wall at hvac convector unit removal. Match existing adjacent surfaces.
10.21 Impact resistant handrail and crash rail.
10.41 Semi-recessed fire extinguisher cabinet.
14.05 New location of pneumatic tube system recessed station.
27.01 New data and devices shall be served from existing
locations. See Technology Drawings.
PLAN NOTES
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. Install fire retardent blocking at all wall mounted equipment, accessories, casework and wall mounted door stops..
D. Verify all conditions in the field prior to fabrication, erection and construction.
E. Coordinate access for all construction, deliveries, and debris removal with the COR. See General Requirements.
F. Maintain rating at all existing rated construction. Repair all damage to existing rated walls.
G. All new structural steel is to be protected with Type 2 applied fireproofing unless noted otherwise. Provide 2 hour rating for all columns, griders and beams unless noted otherwise.
H. Refer to series A400 sheets for interior elevations and accessory schedule.
I. All wall types to be S1.0 unless noted otherwise.
J. All column enclosures to be S2.3 unless noted otherwise.
K. All column enclosures at existing columns to have size verified in field.
GENERAL NOTES
GRAPHIC SYMBOLS
FIRE WALL LEGEND
Revisions Date
2 Addendum #2 7/16/2024
2 2
8'-0"
8'-0"
ACT-1
ACT-1
8'-0"
ACT-1
CORRIDOR
C3-B
7'-11"
ACT-1
8'-7"
ACT-1
8'-0"
ACT-2 309
8'-0"
C3-B
CLOSET
7'-8"
A126
EXPOSED
CEILING
8'-0"
A123
A123
ACT-2
ACT-2
EXPOSED
CEILING
EXPOSED
CEILING
ACT-1
REFLECTED CEILING PLAN LEGEND
Recessed downlight fixture
Supply Air Diffuser
Return Air Grille2' x 4' light fixture
2' x 2' acoustical tile ceiling
Gypsum board / portland cement plaster ceiling / soffit - painted
Access panel 2' x 2' light fixture
2' x 2' acoustical tile ceiling, special coating
Exhaust Grille
Radiant Panel
Exit Light
Cubicle Curtain Track
A612
A1264
3' - 6"
11'-8"
ACT-1
10'-6" 8'-0"
13'-0"
2' - 0"
3' - 0"
R
R 3' - 6 5/8"
' - 4
R
6' - 0" 6' - 0" 6' - 0" 6' - 0"
8'-0"
A511
A612
A126
Sim
A126
Sim
A126
Sim
8'-0" 8'-0"
7'-8"
8'-0"
/4
8'-0"
ACT-2
ACT-2
9.29
9.29 9.29
2' - 10" 3' - 2 3/4" + - 4' - 0" 10' - 0" 4' - 0" 3' - 10 1/2" + - 2' - 10"
/4
9.29
7' - 2 3/4" 10' - 0" 7' - 10 1/2"
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:5
:4
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
THIRD FLOOR - REFLECTED
CEILING PLAN
A123
RWTH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
THIRD FLOOR - REFLECTED CEILING PLAN
A. All wood blocking shall be fire retardant.
B. Light fixtures, sprinkler heads, speakers, and HVAC devices shall be located as close as possible to the center of acoustical ceiling panels. Confirm any deviation from this with the Project Engineer.
C. See P, M, E and FP drawings for additional information regarding final information and quantites of fixtures/devices to be installed in ceiling.
D. See Electrical Drawings for lighting specifications.
9.29 Paint face of bulkhead (p-6), paint underside (p-5).
PLAN NOTES
GENERAL NOTES
Scale: 1/4" = 1'-0"2 Enlarged Ceiling Plan - 308 Chapel
Scale: 1/4" = 1'-0"1 Enlarged Ceiling Plan - Kitchen
Revisions Date
2 Addendum #2 7/16/2024
524524A
525A
523A NS-502
NS-503
519A
517A
515A
522C 522A
522B522D
C5-51
511510
509A
507A
505A
NS-500
505B
9'-0"
8'-0"
9'-0"
8'-0" 8'-0"
8'-0"8'-0"
8'-0" 8'-0"
8'-0"
9'-0"
8'-0"
8'-0"
9'-0"9'-0"
9'-0"
9'-0"
ACT-1
ACT-1ACT-1
ACT-2
ACT-2
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-2
ACT-1
8'-0"
8'-0"
9'-0"
ACT-1
ACT-1
ACT-1
9'-0"
ACT-1
8'-6"
8'-6"
9'-0"
9'-0"
C5-50
12.03
A125
ACT-1
14.05
12.03 12.03 12.03 12.03
6"
9'-0"
ACT-1
3' - 0"
3' - 0"
3' - 0"
ACT-1
9'-0"
ACT-1
NS-501
C5-52
ACT-1
9'-0"
8'-6"
9.193
9.19
A125
Sim
A125
A125
A125
A125
Sim
A125
9'-0"
ACT-1
EQ EQ
EQ EQ
EQ EQ
E Q
E
QEQ EQ
C5-50
7' - 8"
3' - 8"
" 6
A126
A126
Sim
A126
Sim
A125
Sim
11.01
11.01
11.01
11.01
11.01
11.01
11.01 11.01
A125
Sim
9.19
11.02
12.03
12.03
12.03
12.03
12.03
12.03
7'-8"
REFLECTED CEILING PLAN LEGEND
Recessed downlight fixture
Supply Air Diffuser
Return Air Grille2' x 4' light fixture
2' x 2' acoustical tile ceiling
Gypsum board / portland cement plaster ceiling / soffit - painted
Access panel 2' x 2' light fixture
2' x 2' acoustical tile ceiling, special coating
Exhaust Grille
Radiant Panel
Exit Light
Cubicle Curtain Track
515A
9'-0"
9'-0"
12.03
11.02
ACT-2
8'-6"
/2
8'-8"
10' - 0" 3' - 0"
E Q
E Q
2' - 8"
CL-1
3' - 0" 3' - 0"
E Q
E Q
EQ EQ
E Q
E Q
EQ EQ
EQ EQ
/2
1' - 5 3/8"
5' - 8"
/2
A126
F
9.24
10.282
10' - 0" 3' - 0"
3' - 0" 3' - 0"
E Q
8'-8"CL-1
ACT-2
9'-0"
5' - 0" 2' - 4"
E Q
E Q
/8
EQ EQ
E Q
E Q
EQ EQ
EQ EQ
1' - 6 1/2"
9'-0"
BATH
507A
11.0111.01
8'-6"
A126
Sim
F 9.24
12.03
10.28
A126
Sim
/4
524A
9'-0"
8'-6"
9'-0"
ACT-2
CL-1
8'-6"
EQ EQ
E Q
E Q
E Q
E Q
E Q
E Q
11.0111.01
2' - 4"4' - 0"
/4
/4
F
9.24
12.03 12.03 12.03
8'-6"
EQ EQ
10.28
/8
EQ EQ
F
9'-0"
9.24
12.03
9'-0"
505A
8'-6"
10.28
11.02
4' - 7 7/8" 10' - 0" 4' - 0"
3' - 0" 3' - 0"
E Q
E Q
3' - 0"
EQ EQ
EQ EQF
523A
9'-0"
CL-1
8'-8"
8'-6" 9.24
9'-0"
ACT-2
11.0111.01
" 10.28
A126
Sim
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:0
:0
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
FIFTH FLOOR - REFLECTED
CEILING PLAN
A125
RWTH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
N Scale: 1/8" = 1'-0"
FIFTH FLOOR - REFLECTED CEILING PLAN
A. All wood blocking shall be fire retardant.
B. Light fixtures, sprinkler heads, speakers, and HVAC devices shall be located as close as possible to the center of acoustical ceiling panels. Confirm any deviation from this with the Project Engineer.
C. See P, M, E and FP drawings for additional information regarding final information and quantites of fixtures/devices to be installed in ceiling.
D. See Electrical Drawings for lighting specifications.
9.19 Paint faces and underside of bulkhead (P-4).
9.24 Paint face of bulkhead (p-3) and underside of bulkhead (p-5).
10.28 Privacy curtain and track (pc-1) provided/installed by
contractor. Refer to finish legend for curtain details.
11.01 New patient lift system.
11.02 New bariatric patient lift system.
12.03 Motorized double roller window shade (rs-1). Refer to finish legend for details.
14.05 New location of pneumatic tube system recessed station.
PLAN NOTES
GENERAL NOTES
Scale: 1/4" = 1'-0"2
PATIENT BEDROOM - ENLARGED PLAN
Scale: 1/4" = 1'-0"3
PATIENT BEDROOM - ENLARGED PLAN
Scale: 1/4" = 1'-0"4
PATIENT BEDROOM - ENLARGED PLAN
Scale: 1/4" = 1'-0"5
PATIENT BEDROOM - ENLARGED PLAN
Scale: 1/4" = 1'-0"6
PATIENT BEDROOM - ENLARGED PLAN
Revisions Date
2 Addendum #2 7/16/2024
10' - 0"
3' - 0" 3' - 0"
9.41
6.29
9.02
6.29
9.02
6.36
11.02
6.36
9.41
26.01 26.01
V A
R
IE
S
V A
R
IE
S
VARIES
9.31
9.41
9.42
9.02
V A
R
IE
S
V A
R
IE
S
4 7/8"
9.42
9.319.31
9.41
9.28
9.43
9.41
9.43
9.02
26.01
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:0
:0
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
CEILING DETAILS
A126
RWTH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
6.29 Plastic laminate over 3/4" substrate.
6.36 Clear anodized extruded aluminum millwork reveal l-angle.
Basis of design: manufacturer - fry reglet #mwrl.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.27 Gypsum board soffit.
9.28 Gypsum board ceiling.
9.31 5/8" Type X gypsum board.
9.41 Suspended acoustic ceiling tile/grid.
9.42 Suspension wire.
9.43 16"h extruded aluminum curved transition trim. Color shall be white.
11.02 New bariatric patient lift system.
26.01 Light fixture. See Electrical Drawings.
KEYNOTES
Scale: 1 1/2" = 1'-0"5 Ceiling Detail
Scale: 1 1/2" = 1'-0"2 Ceiling Detail
Scale: 1 1/2" = 1'-0"3 Ceiling Detail
Scale: 1 1/2" = 1'-0"4 Ceiling Detail
Revisions Date
2 Addendum #2 7/16/2024
04 - FOURTH FLOOR
133'-11"
E.8
2"
8.01 10.20
7.02
7.01
9.60
3.01
S2.0
5.01
E
S2.3
S2.3
S2.3
S2.3
E
2'-2"
1'-1" 1'-1"
7.73
8.01
7.01
10.207.06
/2
S2.0
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:4
:4
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
DETAILS
A321
RWTH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
Scale: 1 1/2" = 1'-0"2
NEW-EXG @ EXPANSION JOINT
Scale: 1 1/2" = 1'-0"3
COLUMN ENCLOSURE (TYP)
Scale: 1 1/2" = 1'-0"1
NEW-EXG @ EXPANSION JOINT
Revisions Date
2 Addendum #2 7/16/2024
3.01 Elevated concrete slab - See Structural Drawings.
5.01 Structural steel frame. See Structural Drawings.
7.01 Expansion joint type I-1: Interior floor to floor, 2 hour rated.
7.02 Expansion joint type I-2: Interior wall to wall.
7.06 Expansion joint type E-2: Exterior wall to floor, 2 hour rated.
7.73 Spray applied fireproofing.
8.01 Hollow metal door.
9.60 Resilient base. Refer to finish legend for details.
10.20 Flush mounted solid surface corner guard
SECTION NOTES
X
X
Toilet Accessory
Equipment
Signage
Keynote
Material Finish
SYMBOL LEGEND
1 5/8" 3' - 0" 2' - 2" 3' - 0" 2' - 10" 2' - 10" 2' - 10" 2' - 10" 2' - 10" 3' - 0" 2' - 2" 3' - 0" 1 5/8"
B1 21 21 B3 B3 B3 21 21 B1 T2
55 T2
W6 W1 W4 W4 W4 W4 W4 W1 W6
JJ
1 5/8" 3' - 0" 2' - 2" 3' - 0" 2' - 0"
1"
2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0"
1"
2' - 0" 3' - 0" 2' - 2" 3' - 0"
1 5/8"
PL-1
PT-5
P-6
/4
H H
/4
PL-2
QTZ-1
PL-2
CG-2
RB-1
P-1
P-1
2'-6" 2'-6" 1'-4" 3'-0"
J
H
PT-5
2'-6" 2'-6" 1'-4"
W4 W1 W1 W6
B1 B1
307A
PT-4P-6
P-1
CG-2
RB-1
P-1
PL-2
PL-2QTZ-1
B3
3' - 0" 2' - 6" 2' - 6" 2' - 6"
3' - 0" 2' - 6" 2' - 6" 2' - 6"
W3 W3 W3
B1 B1 B8
PL-1
RB-1
P-1
SS-1
PL-1
J
H
P-1
10.51
10.53
Typ.
1' - 3"
P-1
RB-1
3' - 0" 3' - 0"
W1 W1
B1
P-1
522E
1"
3' - 0" 3' - 0" 3' - 0"
B1
PL-1
SS-1
PL-1
2" 2' - 6" 2' - 6" 3' - 0"
2' - 8" 2' - 6" 3' - 0" 1"
B1 B1
W4 W2 W1
B8
P-1
522F
RB-1
J
" 1
H
PL-1
SS-1
PL-1
B1
W1
2" 3' - 6"
RB-1
2" 3' - 6" 3' - 0"
1"
1"
C1
P-1
PL-1
PL-1
SS-1
J
W4 W1W1
B5 B1 B8
1" 2' - 6" 2' - 6" 2' - 8"
2' - 6" 2' - 6" 2' - 6" 2"
PL-1
SS-1
PL-1
RB-1
P-1
HJH
P-1
RB-1
P-1
2' - 6" 2' - 6" 2"
W1 W1
B1B1B1
CG-1
1" 2' - 6" 2' - 6" 2' - 6" 2"
RB-1
P-1
PL-1
SS-1
PL-1
B8
W4 W1 W1
P-1
2" 2' - 6" 2' - 6" 2' - 6" 1' - 6" 1 1/8"
2' - 8" 2' - 6" 2' - 6" 1' - 6" 1 1/8"
B1 B1 B1
W1
H J
PL-1
PL-1
SS-1
PT-6
P-1
PL-1
P-1
RB-1
P-1
CG-1
RB-1
P-1
P-1
RB-1
P-1
PL-1
CG-1
P-1
A511
J
H
W1
2' - 6" 2"
P-1
WP-1
RB-1
PL-1
S
TA
TE
OF MICH
IG
A
L
IC
E
N S
ED ARC
H
IT
E C T
N
MICHAEL
DUKE
1301072431
No.
ARCHITECT
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
Project Schedule Date
Schematic Design 15% 02.16.2021
Schematic Design 35% 04.16.2021
Design Development 65% 09.24.2021
Construction Documents 95% 10.26.2023
Bid Documents 100% 12.15.2023
Design Development 65% (Re-submittal) 11.15.2021
/1
/2
:0
:5
P
M
Construct Private In-Patient Rooms & Primary Clinics
12.15.2023
INTERIOR ELEVATIONS
A401
KETH
506-334
Ann Arbor, Michigan (506)
B01W
JEFF MEANS
100% BID DOCUMENTS
20014.00
10.51 Metal lockers
10.53 Sloped top by locker manufacturer.
ELEVATION NOTES
TOILET ACCESSORIES SCHEDULE
MARK ITEM Manufacturer PRODUCT #
PROVIDED
BY
INSTALLED
BY
O W
N E
R
C O
N T
R A
C T
O R
O W
N E
R
C O
N T
R A
C T
O R
A Grab Bar - 18" Length, slip resistant finish Bobrick B-6806 X 18 X X
B Grab Bar - 36" Length Bobrick B-6806 X 36 X X
C Grab Bar - 42" Length Bobrick B-6806 X 42 X X
D Grab Bar, Flip Up,slip resistant finish. Bobrick B-4998 X X
E MOP & BROOM HOLDER BOBRICK B-239 X X
F Shower Curtain Rod with concealed mounting Bobrick B-207 X X
G Shower Curtain TBD TBD X X
H Automatic paper towel dispenser -- -- X X
I Mirror, 24" x 36" B-290 2436 X X
J Wall-Mounted Soap Dispenser -- -- X X
L Surface-Mounted Double Roll Toilet Tissue Dispenser with Hoods. Bobrick B-69997 X X
M Surface- mounted Double Robe Hook Bobrick B-6727 X X
N Reversible ADA Folding Shower Seat Bobrick B-5181 X X
O Wall-Mounted Hand Sanitizer Dispenser -- X X
P…
This is the start of the file's text. The full file is on GovTribe.