Attachment 07 - Contractors Release.doc

DOC document 39 KB Posted

Attached to
CONSTRUCTION: ARB Restroom Renovation at the Mike Monroney Aeronautical Center, Oklahoma City, OK
Solicitation number
6973GH-20-R-00087
Issued by

About this file

This solicitation is for construction services to renovate restrooms in the Aviation Records Building at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma. The base bid includes renovating restrooms on four floors to comply with ADA standards, including new fixtures and finishes. There are five options related to additional wall paneling, ceiling and lighting work, and logo installation. The estimated price range for the project is $1 million to $4 million. The contract to be awarded will be firm-fixed-price. The solicitation includes instructions for proposal preparation and submission. Offerors must provide past performance surveys from previous construction customers. This requirement is 100% set aside for 8(a) small businesses with a NAICS code of 236220 and $39.5 million size standard. A pre-proposal teleconference will be held on April 29 and a site visit arranged. Proposals are due by 2:00pm Central time on May 12 and shall be submitted electronically to the Federal Aviation Administration contracting officer.

View the file

Other files

File Type Posted
Attachment 13 Revision 5-Questions and Answers.pdf PDF
6973GH-20-R-00087-0008.pdf PDF
Attachment 13 Revision 4-Questions and Answers.pdf PDF
6973GH-20-R-00087-0007.pdf PDF
Attachment 13 Revision 3-Questions and Answers.pdf PDF
6973GH-20-R-00087-0006.pdf PDF
6973GH-20-R-00087-0005.pdf PDF
Attachment 13 Revisions 2 -Questions and Answers.pdf PDF
Attachment A- Pictures.pdf PDF
Attachment B - Arch Drawings.pdf PDF
Attachment D- 015900 .pdf PDF
Attachment C- Plumbing Piping Insulation.pdf PDF
Attachment 11 - Revision 2_Past Performance Survey.doc DOC document
6973GH-20-R-00087-0004.pdf PDF
PreProposal Teleconference Attendees April 29.pdf PDF
Attachment 11 - Revised_Past Performance Survey.doc DOC document
6973GH-20-R-00087-0003.pdf PDF
Attachment 13 - Revised Questions and Answers.pdf PDF
Attachment 14 - AMP-400 Construction Safety Poster.pdf PDF
6973GH-20-R-00087-0002.pdf PDF
Attachment 15 - MMAC EOSH Policy.pdf PDF
Attachment 13 Questions and Answers.pdf PDF
6973GH-20-R-00087-0001.pdf PDF
Attachment 06 - SF25A - Payment Bond.doc DOC document
Attachment 03 - ARB_IFC Drawings.pdf PDF
Attachment 04 - Chapter_33-Construction Safety.pdf PDF
Attachment 05 - SF 25 Performance Bond.pdf PDF
Attachment 10 - Past Performance Experience Form.doc DOC document
Attachment 09 - Wage Rate Decision - General Decision No OK170049 - Construction Type - Building.pdf PDF
Attachment 11 - Past Performance Survey.doc DOC document
Attachment 02 - ARB_IFC_Specifications.pdf PDF
Attachment 01 - Section B - Supplies or Services-Prices.xlsx XLSX spreadsheet
6973GH-20-R-00087.pdf PDF
Attachment 08 - Operational Control Documents.pdf PDF
Attachment 12 - Client Authorization Letter.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF TRANSPORTATION

CONTRACTOR'S RELEASE

CONTRACTOR (Name and Address)

CONTRACT NO.

ENTER SUM OF TOTAL OF AMOUNTS PAID AND PAYABLE

Pursuant to the terms of the above numbered contract and in consideration of the sum stated above, which has been paid or is to be paid to the Contractor, or its assignees, the Contractor, upon payment of the said sum by the UNITED STATES OF AMERICA (hereinafter called the Government), does remise, release, and discharge the Government, its officers, agents, and employees, of and from all liabilities, obligations, claims, and demands whatsoever under or arising from the said contract, except:

1. Specified claims in stated amounts or in estimated amounts where the amounts are not susceptible of exact statement by the Contractor, as follows: (or state "None")

2. Claims, together with reasonable expenses incidental thereto, based upon the liabilities of the Contractor to third parties arising out of the performance of this contract, which are not known to the Contractor on the date of the execution of this release and of which the Contractor gives notice in writing to the Contracting Officer within the period specified in the said contract; and

3. Claims for reimbursement of costs (other than expenses of the Contractor by reason of his indemnification of the Government against patent liability) including reasonable expenses incidental thereto, incurred by the Contractor under any provisions of the said contract relating to patents.

The Contractor agrees, in connection with patent matters and with claims which are not released as set forth above, that it will comply with all provisions of the said contract, provisions of the said contract, including without limitation those provisions relating to notification to the Contracting Officer and relating to the defense or prosecution of litigation.

IN WITNESSES WHEREOF, this release has been executed this _______ day of ___________________, 19 ___.

WITNESSES
_______________________

(Contractor)

BY
_______________________
____________________________________
TITLE
_______________________

NOTE: In the case of a corporation, witnesses are not required but the below statement must be completed.

I, _________________________________, am the _______________________ secretary of the corporation named as Contractor in the foregoing release; that _____________________ who signed said release on behalf of the Contractor was then _______________________ of said corporation; release was duly signed for and in behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.

Signature

Form DOT F 4220.4 (Rev. 5/05) (word)

PREVIOUS EDITION OBSOLETE

AUTHORIZED FOR LOCAL REPRODUCTION

File details come from the government source that posted it. Updated .