About this file

This solicitation seeks proposals for a construction project to renovate restrooms in the Aviation Records Building at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma. The Federal Aviation Administration requires base bid work to renovate restrooms on four floors to comply with ADA standards, including new fixtures and finishes. Optional work includes wall paneling, ceiling and lighting demolition and replacement in basement corridors, and logo floor installations on the first floor. Proposals are due May 12, 2020 and the contract is anticipated to be a firm-fixed-price type between $1 million and $4 million. The NAICS code is 236220 and it is reserved for 8(a) small businesses under $39.5 million in size. A pre-proposal teleconference will be held on April 29 and site visits by appointment are available with COVID-19 precautions.

View the file

Other files

File Type Posted
Attachment 13 Revision 5-Questions and Answers.pdf PDF
6973GH-20-R-00087-0008.pdf PDF
Attachment 13 Revision 4-Questions and Answers.pdf PDF
6973GH-20-R-00087-0007.pdf PDF
Attachment 13 Revision 3-Questions and Answers.pdf PDF
6973GH-20-R-00087-0006.pdf PDF
6973GH-20-R-00087-0005.pdf PDF
Attachment 13 Revisions 2 -Questions and Answers.pdf PDF
Attachment B - Arch Drawings.pdf PDF
Attachment D- 015900 .pdf PDF
Attachment C- Plumbing Piping Insulation.pdf PDF
Attachment 11 - Revision 2_Past Performance Survey.doc DOC document
6973GH-20-R-00087-0004.pdf PDF
PreProposal Teleconference Attendees April 29.pdf PDF
Attachment 11 - Revised_Past Performance Survey.doc DOC document
6973GH-20-R-00087-0003.pdf PDF
Attachment 13 - Revised Questions and Answers.pdf PDF
Attachment 14 - AMP-400 Construction Safety Poster.pdf PDF
6973GH-20-R-00087-0002.pdf PDF
Attachment 15 - MMAC EOSH Policy.pdf PDF
Attachment 13 Questions and Answers.pdf PDF
6973GH-20-R-00087-0001.pdf PDF
Attachment 06 - SF25A - Payment Bond.doc DOC document
Attachment 03 - ARB_IFC Drawings.pdf PDF
Attachment 04 - Chapter_33-Construction Safety.pdf PDF
Attachment 05 - SF 25 Performance Bond.pdf PDF
Attachment 10 - Past Performance Experience Form.doc DOC document
Attachment 09 - Wage Rate Decision - General Decision No OK170049 - Construction Type - Building.pdf PDF
Attachment 11 - Past Performance Survey.doc DOC document
Attachment 07 - Contractors Release.doc DOC document
Attachment 02 - ARB_IFC_Specifications.pdf PDF
Attachment 01 - Section B - Supplies or Services-Prices.xlsx XLSX spreadsheet
6973GH-20-R-00087.pdf PDF
Attachment 08 - Operational Control Documents.pdf PDF
Attachment 12 - Client Authorization Letter.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basement Doors to Demo. Basement asbestos floor tile. Location of new doors.

Basement asbestos floor tile. Option 3 walls & ceiling. Basement loading dock.

ARB Restroom Renovations - 5/5/2020

Typical basement Restroom - Mens. Typical interior chase wall at basement.

Typical basement Restroom - Mens. Typical basement Restroom - Womens.

Basement Womens Restroom - Sink removed. 1st Floor Corridor - Location of Bid Option 4 & 5 Logo.

1st Floor Corridor tile to be abated. Option 2 walls. 1st Floor Corridor tile to be abated. Option 1 walls.

1st Floor Corridor tile to be abated. Option 1 walls. 1st Floor Restroom to convert to Storage Room.

1st Floor Restroom to convert to Storage Room-Womens. 1st Floor Restroom to convert to Storage Room-Womens.

1st Floor Restroom to convert to Storage Room-Womens. 1st Floor Restroom to convert to Storage Room-Chase.

1st Floor Restroom to convert to Storage Room-Mens. 1st Floor Restroom to convert to Storage Room-Mens.

1st Floor Restroom to convert to Storage Room-Mens. 1st Floor Womens Restroom - Powder Area.

1st Floor Womens Restroom. 1st Floor Corridor - Location of Bid Option 4 & 5 Logo.

1st Floor Drinking Fountain. 1st Floor Mens Restroom.

1st Floor Mens Restroom. 2nd Floor Corridor Door Hold-opens.

2nd Floor Mens Restroom. 2nd Floor Mens Restroom.

2nd Floor Womens Restroom. 2nd Floor Womens Restroom.

2nd Floor Womens Restroom. 3rd Floor Mens Restroom.

3rd Floor Mens Restroom. 3rd Floor Mens Restroom.

3rd Floor Womens Restroom - Powder Area. 3rd Floor Womens Restroom.

3rd Floor Womens Restroom. 3rd Floor Drinking Fountain.

File details come from the government source that posted it. Updated .