Attachment 01 - Section B - Supplies or Services-Prices.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- CONSTRUCTION: ARB Restroom Renovation at the Mike Monroney Aeronautical Center, Oklahoma City, OK
- Solicitation number
- 6973GH-20-R-00087
About this file
This document includes an attachment and solicitation for a construction project. The Federal Aviation Administration is seeking a contractor to renovate restrooms in the Aviation Records Building at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma. Work includes a base offer to renovate restrooms on all four floors to ADA compliance with new fixtures and finishes. There are also five options that can be awarded which include installing new wall paneling, demolishing and replacing ceiling systems, and providing floor logos. The total estimated value is between $1-4 million. The solicitation is set aside for 8(a) businesses under NAICS code 236220. A pre-proposal teleconference will be held on April 29th and an optional site visit is available. Proposals are due by 2:00pm CT on May 12th and shall be submitted electronically to the contracting officer.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 The contractor shall furnish all labor, tools, materials, equipment, and supplies necessary to accomplish the construction project; ARB Restroom Renovation, at the Mike Monroney Aeronautical Center, Oklahoma City, OK set forth below in accordance with the attached project manual, drawings, and the other terms, conditions, and provisions set forth herein.
| CLIN | Description | Total Amount |
| BASE OFFER | ||
| 00001 | Base Offer: ARB Restroom Renovation Construction for the renovation of the restrooms on all four (4) floors of the ARB building to bring the restrooms to ADA code compliance including new fixtures and finishes. | $ |
| OPTIONAL ITEMS | ||
| 00002 | Option No. 1: Provide and install new wall paneling at designated corridor walls. | $ |
| 00003 | Option No. 2: Provide and install new wall paneling at additional designated corridor walls. | $ |
| 00004 | Option No. 3: Demolish ceiling tiles and grid system, HVAC diffusers, light fixtures and temporarily remove ceiling mounted fire and safety fixtures at designated basement corridors. Provide new ceiling panels and grid system with new HVAC diffusers. | $ |
| 00005 | Option No. 4: Provide an 8 foot diameter epoxy terrazzo floor logo (compass rose with aircraft linework) within the approximate 8-foot by 8-foot first floor corridor central area. | $ |
| 00006 | Option No. 5: Provide a floor applied logo (compass rose with aircraft image) within the 8-foot by 8-foot first floor corridor central area. | $ |
| TOTAL ESTIMATED POTENTIAL VALUE | $ |
File details come from the government source that posted it. Updated .