This document includes a screening information request and federal contract opportunity for aviation building restroom renovations. The Federal Aviation Administration is seeking to renovate restrooms on four floors of the Aviation Records Building at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma. The base bid involves bringing the restrooms up to ADA compliance with new fixtures and finishes. There are also five options that include wall paneling, ceiling and lighting upgrades, and floor logos. The estimated price range is $1 million to $4 million. The solicitation is open only to 8(a) small businesses and is set aside on the NAICS code 236220 with a size standard of $39.5 million. A pre-proposal teleconference was held on April 29th and site visits were available. Proposals were due by May 12th to the contracting officer via email.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment No. 13 – Revision 3 ARB Restroom Renovation SIR/RFO 6973GH-20-R-00087 May 13, 2020 Work Order 18-021538
Attachment No. 13 is Questions and Answers and will not be part of a resultant contract.
*NOTE: The answer to question 52 has been updated in this revision.*
1. QUESTION: Will an approved Mentor Protégé Teaming Agreement be allowed? If so, will the past performance qualifications of the Mentor or Teaming Partner be accepted?
ANSWER: The Small Business Administration (SBA) approves Mentor Protégé arrangements. If the SBA approves/certifies a company as an 8(a) JV and the company is registered in SAM, they would be eligible to compete. The JV would have to be in place at the time of award. The prime submitting an offer for the 8(a) set-aside will be responsible for submitting the past performance information and comply with clause 3.1.6-7 Limitations on Subcontracting.
2. QUESTION: Does the original bid bond need submitted, or can the bid bond be submitted with the proposal electronically?
ANSWER: The bid bond can be submitted with the proposal electronically.
3. QUESTION: The conference call is at 9:00 AM. Which time zone?
ANSWER: The pre-proposal conference call is at 9:00 AM Central time zone.
4. QUESTION: Will there be any chance that SDVOSB companies will be added for this opportunity as well?
ANSWER: This requirement has been set-aside for 8(a) businesses.
5. QUESTION: Are there any restrictions in what 8(a) companies can bid this project?
ANSWER: There are no restrictions in what 8(a) companies can bid this project.
6. QUESTION: Is this project still 100% 8(a) set aside?
ANSWER: This Screening Information Request (SIR) is an 8(a) set-aside.
7. QUESTION: Do SDVOSB concerns meet the requirements to bid on this job?
ANSWER: This SIR is an 8(a) set-aside.
8. QUESTION: The time period for RFQ has passed. Can we submit RFQ up until the Pre-bid meeting?
ANSWER: This is a Request for Proposal (RFP). The date to submit a proposal has not passed. Page 60 of the SIR/RFP 6973GH-20-R-00087 states “a pre-proposal teleconference will be held on April 29, 2020 at 9:00 a.m. In accordance with page 1 and 61 of SIR/RFP 6973GH-20-R-00087, proposals are due May 12, 2020 2:00 PM central time.
9. QUESTION: Can you provide a download link for the Plans and Specifications or advise how these may be obtained?
ANSWER: The Drawings and Specifications can be found on https://beta.sam.gov/; Keyword: 6973GH- 20-R-00087. The Drawings and Specifications are listed in the Attachments.
10. QUESTION: I would like to receive registration information for the Pre-Bid Teleconference.
ANSWER: In accordance with the SIR 6973GH-20-R-00087, page 60, Section L.5; A pre-proposal teleconference will be held on April 29, 2020 at 9:00 a.m. A teleconference number will be set up.
Please advise the Contracting Officer (Stephanie Riddle, stephanie.riddle@faa.gov) in writing of your intent to attend by 5:00 p.m., April 27, 2020. Telephone requests will NOT count as notification of attendance. Your request should include the name of attendee, title of attendee, name of company, and contact information to include phone number and email address. The Contracting Officer will send out the meeting number no later than April 28, 2020.
11. QUESTION: Can you confirm that this pursuit is unrestricted?
ANSWER: This SIR is an 8(a) set-aside.
12. QUESTION: Can you confirm this project is tax exempt?
ANSWER: This project is exempt from paying sales tax.
13. QUESTION: Would the FAA please consider extending the RFI deadline to 5/1/20, two days after the site visit/teleconference, to allow Offerors time to submit RFIs that may come up after the site visit/teleconference.
ANSWER: Section L.1 Submission of Questions Prior to Proposal has been revised in amendment 0002.
14. QUESTION: Can we have pictures of the space for those who can’t attend the walk tomorrow?
ANSWER: Refer to attachment “A”.
15. QUESTION: The documents call for flushing and testing of the water lines. Since the work and therefore the plumbing is in phases, will each phase (floor) have to be flushed and tested? If so, won’t the subsequent phase contaminate the completed phases and the un-started phases? Or will there be one flush and test when the project is complete?
ANSWER: The entire building will need to be flushed and tested at each phase. FAA will conduct the testing.
16. QUESTION: There is an mention of the contractor providing temporary toilets for the floor that is being worked on. Will those toilets be set on the ground outside the building to avoid smells in the building?
How many toilets will be required at a time? The same as the count of the toilets and urinals?
https://beta.sam.gov/ mailto:stephanie.riddle@faa.gov
ANSWER: Provide temporary toilets for FAA personnel only per Attachment “D”. Contractor needs to provide separate Contractor portable toilets in their laydown area.
17. QUESTION: Will you be providing artwork in a particular format for the floor logo? (ai, eps, svg?) Or will the contractor have to reproduce it from the drawing?
ANSWER: The FAA will provide the art work.
18. QUESTION: Will the floor logo be just black and white or will there be some color requirements?
ANSWER: The specifications call for a two-color logo (Section 010300). Colors to be selected by the
FAA.
19. QUESTION: How clean do the corridors need to be each morning? Broom Clean or final clean clean?
ANSWER: Clean corridors “final clean” each morning.
20. QUESTION: Would you be able to provide a plan holder’s list or tell me where to find one?
ANSWER: A pre-proposal teleconference attendee list was posted with Amendment 0003 to the BetaSAM website.
21. QUESTION: The Past Performance Survey (PPS) states it is due to the Contracting Officer on May 1 by 2:00 pm. Can the PPS be sent to the Contracting Officer by the bid opening date and time?
ANSWER: Amendment 0003 was issued to revise Attachment 11 Past Performance Survey.
22. QUESTION: Most all of the restroom walls of the bathrooms are clay tile or clay block (Masonry). The general notes that refer to these walls calls them out as Gypsum Board Partitions. Please note this as it will require a different method of demolition.
ANSWER: Existing restroom walls to be demoed are as follows for each floor:
a. Basement and Ground Floors: Restroom walls to be demoed are all 4” structural clay tile per original 1960’s drawings received from FAA.
b. 2nd and 3rd Floors: Per 2007 renovation drawings of 2nd and 3rd floor restrooms the restroom walls to be demoed as part of this project are ½” cement board over metal studs at 16” O.C. maximum Refer to attachment “B”.
23. QUESTION: There are several cracks telegraphing through the existing VCT and some unevenness in some areas. Should we include floor repair and or leveling in the corridors?
ANSWER: Yes, floors need to have cracks sealed and leveled. Refer to “Part 3 – EXECUTION” section for each floor finish. Requirements for preparation of substrates, including the existing concrete floor, are included in each specification.
24. QUESTION: In the corridors where we are to “patch, repair and paint” (Base Bid) the walls are covered in a vinyl wall covering. Are we to paint over this wall covering if the Options are not taken or remove it and then patch, repair and paint it (if the Options are not taken).
ANSWER: Vinyl wall covering to be removed per keyed note #1 on A-100. For Bid Options One and Two, vinyl wall covering may remain and only the portions of vinyl wall covering exposed to view will need to be removed.
25. QUESTION: It was stated at the walk through that the temporary toilets for the Owner’s use are to be trailer mounted units and heated and cooled. Please confirm. How many temporary toilets are we to supply?
ANSWER: Provide temporary toilets for FAA personnel only per Attachment “D”. Contractor needs to provide separate Contractor portable toilets in their laydown area.
26. QUESTION: On the ground floor we are to put a moisture floor barrier down under the floor covering.
Does that barrier go under the floor logo if it is an applique? If it is terrazzo? If not how does that detail?
ANSWER: The moisture barrier may be omitted in the logo area regardless of the system selected.
27. QUESTION: Spec section 221316 Sanitary waste and vent piping Cast pipe and fittings are listed as materials to be used for waste and vent piping. The plan sheets P-101, P- 102, P-103, P-104, P-106 indicate all of the waste and vent piping is PVC sch 40. Also, P-402 Materials schedule lists PVC 40 but PVC is not listed as an approved material in the spec section. Please clarify.
ANSWER: PVC piping for the sanitary and vent system is acceptable in any areas that are not used for return air plenums.
28. QUESTION: Will options be awarded concurrently with the base bid? If not, how long after Base Bid award can options be awarded?
ANSWER: If Bid Options are awarded, it will be concurrently with the Base Bid.
29. QUESTION: The location where temporary toilets are to be placed is not available as an existing masonry structure occupies that footprint. Please define a space we are to place temporary toilet facilities.
ANSWER: The area indicated on the drawings will be expanded toward the northwest.
30. QUESTION: In Spec Section 221116-305 D&E, there is a reference for vinyl-coated hangers. Will the complete hanger need to be covered or just the surface touching the CPVC, PVC, or the PEX?
ANSWER: Just the area supporting the piping.
31. QUESTION: Does the vinyl-coated hanger need to be used that was referenced in 221116-3.5, if insulation is used?
ANSWER: Yes.
32. QUESTION: In Spec Section 221116-3.8, who has the authority of jurisdiction to do the plumbing inspections, this job will be performed during non-normal working hours , 6pm-6am?
ANSWER: We anticipate the inspections will be conducted during normal business hours.
33. QUESTION: Are there accessible domestic water shut off valves for the restrooms that hold and shut down the entire restroom?
ANSWER: No, there are not existing isolation valves. New full size isolation valves shall be provided in the new domestic cold and hot water piping at each floor. Also not that the existing sewer and vent piping will have to be bypassed as needed to keep existing restrooms operational during phased construction.
34. QUESTION: There are several references to spec section 220719, “Plumbing Piping Insulation”. I cannot find this spec section in this document. Will one be issued?
ANSWER: Yes, the 220719 spec section is included as Attachment “C”.
35. QUESTION: What are the requirements for domestic water insulation?
ANSWER: 220719 spec section is included as Attachment “C”.
36. QUESTION: Spec Section 221316-3.11, Sanitary Waste & Vent Piping Schedule only reference service class & hub less cast iron piping, but the print references PVC piping. There is not a spec section addressing PVC piping. Which material is to be used? Is the return air ducted for the use of PVC piping?
ANSWER: The use of PVC piping is acceptable for the sanitary piping in areas that are not return plenums. Any PVC piping used shall meet the following requirements. Pipe and fittings shall be manufactured from virgin rigid PVC (polyvinyl chloride) vinyl compounds with a cell class of 12454 as identified in ATSM D 1784. PVC Schedule 40 pipe shall be Iron Pipe Size (IPS) conforming to ASTM D 1785. Injection molded PVC Schedule 40 fittings shall conform to ASTM D 2466. Pipe and fittings shall be manufactured as a system and be the product of one manufacturer. All pipe and fittings shall be manufactured in the United States. Pipe and fittings shall conform to NSF International Standard 61 and the health –effects portion of NSF Standard 14.
37. QUESTION: Will additional site visits be permitted for subcontractors to visit the site? If so, please provide contact information in order to send requests.
ANSWER: No additional site visits have been scheduled. Pictures have been provided per Attachment “A”.
38. QUESTION: Please confirm electronic proposals are acceptable and no hard copies are required.
ANSWER: In accordance with 3.2.23-20 Offers (Jan 2018) (a) The offeror (you) must submit responses to this SIR by the following electronic means email. Your offer must arrive at the place and by the time specified in the SIR. In accordance with 3.2.2.3-20 Offers (Jan 2018) Alternate I (Oct 2019) (d) you can “send your offer to stephanie.riddle@faa.gov”.
39. QUESTION: RFP Section L, paragraph L.3(g) states electronic copies shall be submitted in a format readable by MS Word 2007, MS Excel 2007, MS Project 2007, and MS Power Point 2007 as applicable. Is it permissible for proposal to be submitted in searchable, bookmarked, Adobe PDF?
ANSWER: Yes, Adobe PDF is acceptable.
40. QUESTION: Will a City of OKC building permit be required for this project? If so, is Contractor responsible for submitting? If so, is Contractor responsible for payment to City of OKC?
ANSWER: Yes, City of Oklahoma City permit will be required for this project. The permit is ready for pickup by the contractor and the contractor is responsible for payment to the City of Oklahoma City as noted in the specifications. Payment is $5,931.50.
41. QUESTION: General Note V on sheet G-002 states “portable mens and womens toilets are to be brought in to account for the number of toilets that are down at any given time”. This would be 8 to 10 temporary toilets for each floor. However, Specification Section 015900, paragraph 3.4.A states to provide a “high-quality toilet trailer near the south entrance to the building for FAA personnel use only. The trailer shall include one male restroom plus one ADA stall furnished with a sink, toilet, and urinal, one femal restroom and one unisex ADA restroom, each with a sink and toilet. Please advise the number of toilets (and ADA stalls) required to be provided in the completely, self-contained portable toilet trailer during each phase of construction.
ANSWER: Refer to Attachment “D” for revised toilet trailer specifications.
42. QUESTION: General Note W on sheet F-002 states “paint/fume work and odor producing work shall occur on weekends only”. Since the project work hours are designated from 6:00 PM to 6:00 AM, can painting be performed during these times in lieu of weekends only?
ANSWER: Painting will occur on weekends and holidays to allow for drying and air out.
43. QUESTION: Will the Contractor be permitted to use the loading dock located at B22?
ANSWER: Yes the loading dock can be used as long as it does not conflict with the FAA employees during normal business hours.
44. QUESTION: Sheet A-100 Note 1 states to remove vinyl wall paper. There was discussion at the site visit about painting over the vinyl wall paper. Please clarify.
mailto:stephanie.riddle@faa.gov
ANSWER: Vinyl wall covering is to be removed per keyed note #1 on A-100. For Bid Options One and Two, vinyl wall covering may remain and only the portions of vinyl wall covering exposed to view will need to be removed.
45. QUESTION: Sheet A-100 Note 1 states to remove vinyl wall paper covering in the corridors of the ground floor. Wall panel options 1, 2, & 3 state to patch/repair and paint above panelings. Does the wall paper need to be removed above the paneling in the Options?
ANSWER: Yes, vinyl wall covering will be removed where it is exposed to view.
46. QUESTION: Please confirm existing fire suppression is to remain in place for reuse. Please confirm there is no fire suppression scope of work in this project.
ANSWER: Confirmed. If the contractor damages anything related to the fire suppression system during construction, they will then be responsible for repairing any damages.
47. QUESTION: There is no mention of fire alarm modifications in the plans or specs. Please confirm there is no fire alarm modifications/additions required for this project.
ANSWER: Confirmed. If the contractor damages anything related to the fire alarm system during construction, they will then be responsible for repairing any damages.
48. QUESTION: Please confirm FAA is responsible for final record drawings and that Contractor is to provide redlines only.
ANSWER: Confirmed. Contractor shall provide AE with redlines and then provide them to the AE. AE will produce the final “as-built” drawings.
49. QUESTION: Bid Option 5 is a floor applied logo in the corridor on the ground floor. What will this logo be applied to? Concrete? Tile?
ANSWER: Remove existing vinyl tile and prepare existing structural concrete for new finishes. Refer to the basis of design listed in Specification Section 010300 for additional information.
50. QUESTION: Does the FAA have a vector file for the artwork shown for Bid Option 5 for the floor applied logo, or will this artwork need to be provided/designed by the Contractor/Vendor?
ANSWER: FAA will provide the artwork.
51. QUESTION: Considering the current environment and not knowing when the COVID pandemic will cease, please confirm that FAR 52.249-14 will be incorporated into this contract.
ANSWER: The FAA is not regulated by FAR and does not use FAR clauses.
52. QUESTION: Please confirm that potential options to be awarded will be done so at the time of base bid award and not at a later date. If later, please indicate the time period for which options can be awarded.
ANSWER: If Bid Options are awarded, it will be concurrently with the Base Bid.
53. QUESTION: With a significant number of RFI’s, and the due date a week away, will the owner please consider extending the bid date two weeks to allow time to answer the RFIs and time for offerors to adjust pricing based on the RFI answers?
ANSWER: The RFP closing date was extended per Amendment 0003.
54. QUESTION: Regarding the testing, inspection, and walk-throughs with the owners or owner representatives, will those activities require scheduling during normal/standard working hours or will those be scheduled during the hours stated in the SIR/RFP?
ANSWER: Follow the requirements of the SIR.
55. QUESTION: Since photos were not permitted during the site visit, would it be possible for the FAA to provide photos of the existing conditions?
ANSWER: Refer to Attachment “A”.
56. QUESTION: Is the Loading Dock area available for Contractor’s use?
ANSWER: Yes the loading dock can be used as long as it does not conflict with the FAA employees during normal business hours.
57. QUESTION: Is fencing/screening required around the staging /lay down areas? If yes, please provide requirements.
ANSWER: Fencing is not required, but the Contractor is responsible for keeping their materials secure and preventing pedestrians from walking through an active construction site.
58. QUESTION: Section H, paragraph H.2 states the Contractor shall secure and pay for all permits. Can the FAA advise if the project requires a permit with the City of OKC. (It seems not all FAA projects are required to procure permits with the City of OKC, so wanted to request confirmation.)
ANSWER: Yes, City of Oklahoma City permit will be required for this project. The permit is ready for pickup by the contractor and the contractor is responsible for payment to the City of Oklahoma City as noted in the specifications. Payment is $5,931.50.
59. QUESTION: SIR Document, Section H, paragraph H.4 mentions liquidated damages. What is the daily rate for the liquidated damages?
ANSWER: Clause 3.2.2.8-5 Liquidated Damages – Construction (October 2019) has been added to amendment 0005. The daily rate of liquidated damages is $831.63.
60. QUESTION: Revised Q&A, question #12 states the project is exempt from paying sales tax. Will the FAA be proving a sales tax exemption letter for the Contractor’s use regarding the subject project?
ANSWER: Yes, a letter will be provided.
61. QUESTION: Spec 01 01 00, paragraphs 1.4 and 1.5 state the project is to be phased. Does the Contractor need to allow a certain number of days between phases for FAA coordination with the Users?
ANSWER: Allow two weeks between phases for inspection and testing.
62. QUESTION: Spec 01 01 00, paragraph 1.5(D) states, “Restrooms renovations will be phased to permit only one restroom closure at one time.” Is “one restroom” referring to a pair of restrooms on the floor (i.e., both the men’s and women’s restrooms on the 3rd floor) or only one restroom (i.e., 3rd floor men’s restroom only) at a time?
ANSWER: Refer to demolition notes on Plumbing Demo drawings “CONTRACTOR SHALL
DEMOLISH PLUMBING IN PHASES, ONE FLOOR AT A TIME PER OWNER APPROVED
SCHEDULE FOR DEMOTION.” Each phase will be by floor, thus each phase will include 1 Men’s and 1 Women’s restroom.
63. QUESTION: Section 02 41 19, paragraph 1.10(D)(1) states a partial hazardous material report has been prepared and available for review. Can the FAA provide a copy of this report?
ANSWER: The successful bidder will be provided those details if needed.
64. QUESTION: Section 01 01 00, paragraph 1.4(a) states, “The contractor shall be responsible for providing temporary service to the facility throughout the entire project.” Besides the portable restroom requirements, what temporary services will be required by the contractor?
ANSWER: See SECTION 015000 – CONSTRUCTION FACILTIES AND TEMPORARY CONTROLS and other requirements in the plans and specs plus anything required by the Contractor to perform the work.
65. QUESTION: Please confirm that, per Section 01 65 00, paragraph 1.5, the owner is responsible for all Testing, Adjusting, and Balancing (TAB) requirements on this project.
ANSWER: Revise paragraph to read, “contractor” in lieu of “owner”.
66. QUESTION: Section 02 41 10, paragraph 1.7, includes, “Historic items, relics, antiques and similar objects including but not limited to cornerstones and their contents, commemorative plaques and tablets, and other items of internet or value to the Owner that may be uncovered during demolition remain the property of the Owner”. The specs state to carefully salvage this material to return to the owner. Please provide a detailed list indicating what items are to be removed and returned so Offerors clearly understand what items are to be salvaged and what items are to be demolished.
ANSWER: No artifacts are anticipated to be uncovered.
67. QUESTION: Section 02 41 10, paragraph 1.8(F) asks for Offerors to provide warranty information documenting that existing warranties are still in effect after completion of selective demolition. What items are Offerors supposed to provide this documentation for? Who are the manufacturer’s? And, please provide timeline of warranty period prior to Offerors commencing with selective demolition. Paragraph
1.11 within the same section only references the existing Modified Bitumen Membrane Roofing System.
ANSWER: The roof is currently the only system under warranty. The successful bidder will be provided with those details if needed.
68. QUESTION: Section 02 41 10, paragraph 3.3(C) states to provide temporary shoring. As a fully-designed project, please identify where temporary shoring will be required so all Offerors bid the same conditions.
ANSWER: Currently we do not know of any areas requiring shoring. If discovered during construction it should be brought to the attention of the Contracting Officer.
69. QUESTION: Section 02 41 10, paragraph 3.4 (C) includes requirements for cleaning, packing, itemizing/labeling and storing salvaged material. Can the Owner please include a list of all items expected to be salvaged? The required effort is costly and, in order to completely price this requirement, Offerors need to understand how many items are anticipated to be salvaged.
ANSWER: Section 024119, Items removed and returned to the Owner should be turned over shortly after being removed in a “as-is” condition. Refer to specific drawing notes for such items.
70. QUESTION: In an effort to reduce cost, would the owner please consider removing the requirements for Engineering Judgements found in Section 07 84 13, paragraph 1.2(B)(1)?
ANSWER: This requirement will remain. Please note that SECTION 012100 – ALLOWANCES, Allowance No. 1 was provided to cover theses unforeseen.
71. QUESTION: In an effort to minimize costs, would the owner please consider allowing applicable trades to install firestopping as needed when their trade penetrates a fire-rated wall? Most trades are well-experienced with fire-caulking their own penetrations. Requiring specialized installers to caulk every penetration, as required by Section 07 84 13, paragraph 1.5, adds significant cost to the project.
ANSWER: It was the intent that a fire stopping contractor be utilized in lieu of each trade since there may be other wall and floor penetration that were not part of this contracted work. These other opening are required to be stopped in order to restore the existing fire rated walls and floors to the original design intent per the building department. This work is in Section 012100 – ALLOWANCES, Allowance No. 1 and needs to be part of the bid. If individual trades do their own fire stopping work there is no good way to account for the allowance.
72. QUESTION: Please confirm that the owner will provide all testing and inspections require for Section 07
84 13.
ANSWER: This is correct.
73. QUESTION: Can the owner please provide more detail on the signage requirement found in Section 07 84 13, paragraph 3.2? What type of material, size, etc., does this fire barrier sign/identification require?
ANSWER: The signage under this section is simply a stencil or label as required by code and the spec.
74. QUESTION: Please confirm that the owner requires a two (2) year installer’s warranty and five (5) year manufacturer’s warranty for items provided under Section 07 92 00.
ANSWER: Correct.
75. QUESTION: Please provide information regarding current holder of the roof warranty.
ANSWER: The Oklahoma City Airport Trust.
76. QUESTION: Sheets AD-102, 103, 104, and 105, Keyed Note #1 states, “Remove gypsum board partition and associated construction in its entirety.” During the site visit, it appeared the wall ceramic tile was installed on top of clay tile and not on gypsum board in some areas. Can the FAA provide record drawings so that the Contractor can bid accordingly?
ANSWER: Existing walls to be demoed are as follows for each floor:
a. Basement and Ground Floors: Restroom walls to be demoed are all 4” structural clay tile per original 1960’s drawings received from the FAA.
b. 2nd and 3rd Floors: Per 2007 renovation drawings of 2nd and 3rd floor restrooms the restroom walls to be demoed as part of this project are ½” cement board over metal studs at 16” O.C. maximum.
Drawings have been updated to reflect this and are included as Attachment “B”.
77. QUESTION: On the demo sheets it appears there are some walls with both dashed and solid lines:
It does not appear these walls are identified in the legend:
Presume the intent is to demolish these walls as well. Please advise accordingly.
ANSWER: The lines noted in this question are two dashed lines on top of each other and are intended to represent the walls being demoed.
78. QUESTION: Sheets AD-102, 103, 104, and 105, Keyed Note #6 states, “The ceramic tile in the restrooms may contain lead in the glaze.” Has the tile been tested for hazardous materials or should the Contractor include testing in the bid?
ANSWER: The FAA has tested the tile. Any additional testing will be by the FAA.
79. QUESTION: Spec 22 11 16, paragraph 3.05 (D) & (E) identify a requirement for vinyl-coated hangers.
Will the complete hanger need to be covered or just the surface touching the CPVC, PVC, or PEX?
ANSWER: Just the area supporting the piping.
80. QUESTION: Are vinyl-coated hangers required if insulation is used on the piping?
81. QUESTION: In reference to the plumbing inspections, who is the authority of jurisdiction? Will the inspections need to be scheduled for normal/standard work hours?
ANSWER: Inspections will be during normal business hours.
82. QUESTION: Are there accessible and working domestic shut-off valves for each of the restrooms? If yes, do the valves shut down just the applicable restroom or more?
ANSWER: No, there are not existing isolation valves. New full-size isolation valves shall be provided in the new domestic cold and hot water piping at each floor. Also note that the existing sewer and vent piping will have to be bypassed as needed to keep existing restrooms operational during phased construction.
83. QUESTION: What are the requirements for domestic water insulation?
ANSWER: See 220719 spec section provided as Attachment “C”.
84. QUESTION: There are references to spec section 22 07 19 Plumbing Piping Insulation. It does not appear the referenced section is included in the specs. Please advise accordingly.
ANSWER: See 220719 spec section provided as Attachment “C”.
85. QUESTION: Spec 22 13 16, paragraph 3.11 appears to only reference service class and hubless cast iron for the sanitary waste and vent piping. The drawings reference PVC piping. Is there a spec for PVC sanitary waste and vent piping? Also, is the return air ducted for the use of PVC piping?
ANSWER: The use of PVC piping is acceptable for the sanitary piping in areas that are not return plenums. Any PVC piping used shall meet the following requirements. Pipe and fittings shall be manufactured from virgin rigid PVC (polyvinyl chloride) vinyl compounds with a cell class of 12454 as identified in ASTM D 1784. PVC Schedule 40 pipe shall be Iron Pipe Size (IPS) conforming to ASTM D 1785. Injection molded PVC Schedule 40 fittings shall conform to ASTM D 2466. Pipe and fittings shall be manufactured as a system and be the product of one manufacturer. All pipe and fittings shall be manufactured in the United States. Pipe and fittings shall conform to NSF International Standard 61 and the health-effects portion of NSF Standard 14.
86. QUESTION: Are the current smoke detectors, security cameras and speakers in the renovated areas, which are to be protected and reinstalled, currently working properly?
ANSWER: Yes they are currently working.
87. QUESTION: Please confirm that no programing is anticipated for the reinstalling the existing security cameras or speakers.
ANSWER: No programming is anticipated.
88. QUESTION: Please confirm that the existing TV and TV mounts in the corridors are to be demolished, and not salvaged or returned to owner.
ANSWER: Confirmed.
89. QUESTION: Please confirm existing underfloor/underslab plumbing lines are to remain in place and reused (i.e., there is no saw cutting of slab required for this project).
ANSWER: Correct.
90. QUESTION: Optional pricing has nothing to do with the base bid scope of work. These are mostly added luxuries in epoxy floor logos and architectural wall panels. Are these work items evaluated the same?
These have nothing to do with the base bid, so how are evaluations being looked at on these 5 options or so?
ANSWER: The options are evaluated under 3.2.4-31 Evaluation of Options (APR 1996).
91. QUESTION: Do you have a list of the bidding or prequalified general contractors for the Aviation Building Restroom Renovation at the Mike Monroney Aeronautics building?
ANSWER: The pre-proposal teleconference attendee list has been added to the BetaSAM website.
92. QUESTION: Could you provide the contact information for the Roofing Contractor that is currently warranting the roof?
ANSWER: The Oklahoma City Airport Trust has the warranty.
93. QUESTION: I would like to view an interested vendor list on BetaSam. I don’t see an IVL on the advertisement there.
ANSWER: The Interested Vendors List has been turned on in BetaSAM.
94. QUESTION: Would an additional site visit be possible?
ANSWER: No additional site visits have been scheduled. Pictures have been provided per Attachment “A”.
95. QUESTION: Are the two weeks between phases for each floor (Q&A #61) included in the 400 day period of performance?