Attachment_0097_Modeling_and_Simulation_Analyses_and_Reports.docx

DOCX document 43 KB Posted

Attached to
Optionally Manned Fighting Vehicle (OMFV) Draft Request for Proposal (RFP) W56HZV-22-R-0026
Solicitation number
W56HZV-22-R-0026
Issued by

About this file

This document contains a draft request for proposal for an optionally manned fighting vehicle program. The draft RFP solicits proposals for the detailed design, prototype build, and test phase. It identifies classified and controlled unclassified information attachments and provides instructions for requesting these documents. Interested offerors must submit any comments on the draft RFP, including the program's objective architecture performance specification and common infrastructure architecture, by May 2nd using the provided comment resolution matrix templates. The document also outlines procedures for requesting classified and controlled unclassified information attachments, requiring verification of facility clearances and security certifications. The Department of the Army Materiel Command Life Cycle Management Command is the issuing agency.

View the file

Other files

File Type Posted
(Blank)_CRM_for_OMFV_PSPEC_Rev004.xlsx XLSX spreadsheet
Attachment_0042_ATPD_2232.pdf PDF
Attachment_0091_Digital_System_Model_OTD.docx DOCX document
Attachment_0059_NRMM_Data_Sheet_Wheeled_Tracked.xlsx XLSX spreadsheet
Attachment_0035_System_Support_Package_Component_Listing.xlsx XLSX spreadsheet
Attachment_0058_AFES_Analysis_Information_Request.docx DOCX document
Attachment_0013_Special_License_Requirements.docx DOCX document
Attachment_0017_Request_for_Use_of_Prohibited_Material.doc DOC document
Attachment_0047_Advanced_Manufacturing_Candidate_Parts_List.xlsx XLSX spreadsheet
Attachment_0057_Active_Protection_Data.xlsx XLSX spreadsheet
Attachment_0012_Technical_Data_and_Assertions.xlsx XLSX spreadsheet
Attachment_0060_Vehicle_Data_Package_for_Propulsion_System.xlsx XLSX spreadsheet
OMFV_Draft_CDRLs_W56HZV-22-R-0026_15APR_v2.docx DOCX document
Attachment_0034_Critical_Task_List.pdf PDF
Attachment_0090_CoSite_Data_Instructions.docx DOCX document
Attachment_0061_Tracked_Vehicle_Dynamics_Datasheet.xlsx XLSX spreadsheet
Attachment_0078_Items_Requiring_IUID.xlsx XLSX spreadsheet
OMFV_Draft_RFP_W56HZV-22-R-0026_15APR.docx DOCX document
Attachment_0048_IUID_Sample_Data_Plate.docx DOCX document
(Blank)_CRM_for_OMFV_PSPEC_Rev003.xlsx XLSX spreadsheet
Attachment_0025_HMMR_Template.xlsx XLSX spreadsheet
Attachment_0016_Small_Business_Participation_Factor_Workbook.xlsx XLSX spreadsheet
Attachment_0042_ATPD_2232.pdf PDF
Attachment_0083_Logistics_Schedule.xlsx XLSX spreadsheet
Attachment_0001_CSDR_Plan.xls XLS spreadsheet
Attachment_0075_OMFV_Program_Schedule_Rev001.docx DOCX document
Attachment_0072_DD_Form_254_Rev001.pdf PDF
Attachment_0043_After_Action_Report_Sample.docx DOCX document
Attachment_0049_IUID_Validation_and_Verification_Report_Sample.xlsx XLSX spreadsheet
Attachment_0100_ATTLA_Universal_Data_Sheet.xlsx XLSX spreadsheet
Attachment_0099_Data_Architecture_Artifacts_OTD.docx DOCX document
Attachment_0084_Raw_Scan_Report_Sample.docx DOCX document
Attachment_0087_Product_Level_TDP_Instruction.docx DOCX document
Attachment_0019_Small_Business_Participation_Factor_Workbook_Instructions.docx DOCX document
Attachment_0039_Master_Task_Data_List.xlsx XLSX spreadsheet
Attachment_0011_Developmental_Level_TDP_Instructions.docx DOCX document
Attachment_0002_Resource_Distro_Table.xlsx XLSX spreadsheet
Attachment_0022_Small_Business_Certification_Form_for_Proposed_Subcontractors.docx DOCX document
Attachment_0024_RMF_Package_Deliverables_Instructions.docx DOCX document
(Blank)_CRM_for_GCIA_Rev002.xlsx XLSX spreadsheet
Attachment_0096_RMF_One_Time_DID.docx DOCX document
Attachment_0064_JackTM_Model_Format.docx DOCX document
Attachment_0077_Prognostics_Predictive_Maintenance_System_Information.docx DOCX document
Attachment_0045_PPMx_Characteristics.xlsx XLSX spreadsheet
(Blank)_CRM_for_OMFV_DRAFT_RFP.xlsx XLSX spreadsheet
Attachment_0086_SAVE_Interface_Description_Document.docx DOCX document
Attachment_0055_Vehicle_Vulnerability_Data_Instructions.docx DOCX document
Attachment_0033_TM_Crosswalk_Template.xlsx XLSX spreadsheet
Attachment_0088_OMFV_Bill_of_Materials_(BOM).xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0097 – Modeling and Simulation Analyses and Reports Solicitation No.: W56HZV-22-R-0026

Attachment 0097 Modeling and Simulation Analyses and Reports

Solicitation No.: W56HZV-22-R-0026 Date: 29 March 2022

Distribution Statement A: Approved for public release; distribution is unlimited.

1. Modeling, Simulation, and Analysis

The contractor shall leverage Modeling & Simulation to reduce the risk of physical test and evaluation, and efficiently expedite and improve the detailed design process. The contractor shall apply M&S techniques to demonstrate compliance to P-SPEC Requirements.

1.1. Modeling and Simulation Tools

To provide flexibility and innovation to the vendors, the US Government will not specify the different M&S tools to be used by the vendor. The vendor will have complete authority to select an M&S tool best suited for the type of analysis as defined by the identified P-SPEC requirements and risk reduction efforts.

1.2. M&S Analysis

The following subsections detail the different types of Modeling & Simulation expected to be executed and delivered from the vendor. Each subsection will detail:

1. Type of Analysis

2. Requirements Targeted

3. Verification and Validation Efforts

4. Results Expectation

5. M&S Deliverables

1.2.1. Verification and Validation

1.2.1.1. Contractor’s Developed MS&A Models

1. Purpose of M&S

2. M&S Overview

3. Limitations & Assumptions

4. Acceptability Criteria:

Criterion 1. Verification. Has verification been performed adequately to support accreditation?

Criterion 2. Validation. Has validation been performed adequately to support accreditation?

Criterion 3. Configuration Management. Is there a documented Configuration Management (CM) process in place and is there evidence that it is being followed so that there is accurate knowledge of the configuration used for constructive modeling and evaluative analysis?

Criterion 4. Input. Are the input parameters appropriate for the intended use? Are the target and threat in an appropriate configuration for the situation being evaluated?

Criterion 5. Output. Is the output generated adequate for determining overall system performance?

1.2.1.2. Contractor’s Commercial Off The Shelf (COTS) MS&A Models

1. Input Validation: Provide all M&S inputs with pedigree/origin/source of input data.

2. Output Validation: Provide analysis of output validated against either live test data, comparison to another tool of similar function, SME face validation, or other accepted means as reference in MIL-STD 3022.

1.2.2. Results Expectation

As part of this analysis, the vendor shall provide the following results:

1. Executive summary of simulation results demonstrating P-SPEC Requirement compliance/incompliance.

2. P-SPEC Requirement Verification Status.

3. Executive summary of model correlation and validation to confirm that model is representative of real-physical system.

1.2.3. M&S Deliverables

The vendor shall also provide the following M&S artifacts and data:

1. Native M&S Model input and executable files to run the model.

2. All M&S model result output files.

3. FMU Compliant

1.3. Functional Mockup Unit

Due to the high volume of different M&S tools that may be used by the vendor, the US Government will be requiring the vendor to provide Functional Mockup Units (FMU) of the vendor model(s) for any model that is built using an FMU compatible tool as noted in Attachment XYZ FMU Compatible Tools. https://fmi-standard.org/tools/

The purpose of the FMU delivery is to allow the US Government the flexibility to execute vendor models in a tool agnostic environment.

Each FMU shall have exposed the key parameters and variables needed to analyze the associated P-SPEC requirements.

1.4. Delivery Format

All associated M&S deliverables shall be provided in context of the MBSE model.

image1.png

File details come from the government source that posted it. Updated .