Attachment_0083_Logistics_Schedule.xlsx
XLSX spreadsheet 55 KB Posted
- Attached to
- Optionally Manned Fighting Vehicle (OMFV) Draft Request for Proposal (RFP) W56HZV-22-R-0026
- Solicitation number
- W56HZV-22-R-0026
About this file
This document is a draft request for proposal for an optionally manned fighting vehicle program. The U.S. Army is soliciting feedback on the draft RFP by May 2nd, 2022 to procure the detailed design, prototype build, and test phase of the program. Interested parties must request unclassified controlled or classified attachments by providing company information and facility clearance documentation. The selected contractor will be responsible for vehicle prototype build and integration, logistics training support, modeling and simulation, and testing through 2027.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
| Attachment 0083 | ||
| Logistics Schedule | ||
| Solicitation No. W56HZV-22-R-0026 | ||
| Revision 000 | ||
| 29-Mar-2022 |
Distribution Statement A: Approved for public release; distribution is unlimited.
Change Log
| Revision # | Date | Change Description |
| 000 | 3/29/22 | a. Base Document w. CUI Markings |
(add additional rows as necessary)
Logistics Schedule
| FY 23 | FY 24 | FY 25 | FY 26 | FY 27 | ||||||||||||||
| Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Note: | |
| Soldier touchpoints |
PSM-IPTs conducted quarterly until CDR, monthly after CDR
Prototype Build / Integrate 12 per Contractor Phase III Phase IV Logistics Training Support Package * Vehicle Test(PPT) ACAT 1B Program of Record M&S / Sub System Testing TADSS Study TADSS Development Middle Tier Acquisition (Section 804) Logistics Analysis
PTM 3
MA
NET
* Contractor shall determine schedule.
Acronyms
Acronym Meaning
| ADP | Advanced Diagnostics and Prognostics |
| AMCPL | Advanced Manufacturing Candidate Parts List |
| APSA | Analysis of Product Support Alternatives |
| ATC | Aberdeen Test Center |
| Auth | Authentication |
| AWCF | Army Working Capital Fund |
| BCA | Business Case Analysis |
| BN | Battalion |
| CAP | Corrective Action Period |
| CDD | Capability Development Document |
| CDR | Critical Design Review |
| Cert | Certification |
| CPD | Capability Production Document |
| DEV or Dev | Development |
| DI | Data Interchange |
| DLA | Defense Logistics Agency |
| DMSMS | Diminishing Manufacturing Sources and Material Shortages |
| DP | Decision Point |
| DT | Developmental Testing |
| ECP | Engineering Change Proposal |
| ETC | Embedded Training Concept |
| FLT | Fault |
| FM | Field Maintenance |
| FRC | Final Reproducible Copy |
| FRP | Full-Rate Production |
| FUE | First Unit Equipped |
| ICR | Initial Concept Review |
| IKPT | Instructor and Key Personnel Training |
| Inc | Incurment |
| Ins | Isolation |
| Instr | Instructor |
| IOT | Initial Operational Test |
| IOTE | Initial Operational Test and Evaluation |
| KTR | Contractor |
| LCSP | Life-Cycle Sustainment Plan |
| LOG | Logistics |
| LORA | Level of Repair Analysis |
| LP | Limited Production |
| LPD | Logistics Product Data |
| LRIP | Low-Rate Initial Production |
| LUT | Limited User Test |
| M&S | Modeling and Simulation |
| MAC | Maintenance Allocation Chart |
| Mat'l | Material |
| MCR | Maintainability Concept Review |
| MERR | Maintainability Evaluation Readiness Review |
| MR | Material Release |
| MS | Milestone |
| MTA | Maintenance Task Analysis |
| MTA RFP | Middle Tier Acquisition Request for Proposal |
| NET | New Equipment Training |
| NMWR | National Maintenance Work Requirements |
| OP | Operator |
| PDR | Preliminary Design Review |
| PPT | Production prove-out test |
| PQT | Production Quality Testing |
| PSA | Product Support Analysis |
| P-SPEC | Performance Specification |
| PSM-IPT | Product Support Manager Integrated Product Team |
| PTM | Preliminary Technical Manual |
| Req | Requirement |
| RFP | Request for Proposal |
| RTC | Redstone Test Center |
| SA | Supportability Assessment |
| SFR | System Functional Review |
| SRR | System Requirements Review |
| SSEB | Source Selection Evaluation Board |
| SSP | System Support Package |
| SOWM | Start of Work Meeting |
| TADSS | Training Aids, Devices, Simulators, and Simulations |
| TC | Type Classification |
| TM | Technical Manual |
| TSP | Test Support Package |
| Val | Validation |
| VEH | Vehicle |
| Ver | Verification |
| WSMR | White Sands Missile Range |
| YTC | Yakima Training Center |