Attachment_0001_CSDR_Plan.xls
XLS spreadsheet 181 KB Posted
- Attached to
- Optionally Manned Fighting Vehicle (OMFV) Draft Request for Proposal (RFP) W56HZV-22-R-0026
- Solicitation number
- W56HZV-22-R-0026
About this file
This document is a draft Request for Proposal (RFP) for the Optionally Manned Fighting Vehicle (OMFV) program. The U.S. Army is seeking industry feedback on the draft RFP by May 2nd, 2022. The RFP scope includes detailed design, prototype build and testing for the OMFV. Classified and unclassified controlled information attachments to the RFP are available to interested parties that meet security requirements. Interested parties should submit any comments on the draft RFP or associated documents using the provided Comment Resolution Matrix templates. Instructions are provided for requesting classified and unclassified controlled information attachments. The Army will send approved documents only to the data custodian listed on the requesting company's DD2345 form.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USG Attachment Coversheet
| Attachment 0001 | ||
| Cost and Software Data Reporting (CSDR) Plan | ||
| Revision No: | 000 | |
| Solicitation No. | W56HZV-22-R-0026 | |
| Date | 3/29/22 | |
| Distribution Statement A: Approved for public release; distribution is unlimited. | ||
| SECURITY NOTICE: Contractor responses to the data requirements are likely to be at the Controlled Unclassified Information (CUI) level. For security related guidance and procedures on how to mark, handle, and transmit classified information, contractors should refer to DoD 5220.22-M National Industrial Security Program Operating Manual, 28 Feb 2006, supporting DD 254, and the OMFV Security Classification Guide signed by PEO GCS on 18 February 2021. | ||
| All CUI responses should be marked with the following CUI Designation Indicator and Distribution Statement: |
Controlled by: the name of the Offeror company (not required if identified in the letterhead) Controlled by: identification of the office creating the document CUI Category: CTI, EXPT, SSEL Distribution Statement: E POC: name and phone number or email of POC
DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense Components only; Proprietary Information (DFARS Limited/Restricted Rights); Export Control; date of determination is 18 February 2021. Other requests for this document shall be referred to the attention of the PM MCS Security Manager at: Program Executive Office Ground Combat Systems (PEO GCS), ATTN: SFAE-GCS-C, 6501 E. 11 Mile Road, Detroit Arsenal, MI 48397-5000.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed -- in whole or in part -- for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of -- or in connection with -- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. Source Selection Information -- See FAR 2.101 and 3.104.
Change Log
| Mark as (CUI) when data is inputed | ||||
| This worksheet documents changes to this attachment between contract modifications (except changes to the 'Change Log' itself, which are self-evident). | ||||
| Change # | Date | MOD Number | Range Changed | Change Description |
| Mark as (CUI) when data is inputed |
DD Form 2794, Pg 1 (METADATA)
| COST AND SOFTWARE DATA REPORTING PLAN | OMB No. 0704-0188 |
| The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. |
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1a. PROGRAM NAME | |
| Next Generation Combat Vehicles - Optionally Manned Fighting Vehicle (NGCV-OMFV) | |
| 1b. PHASE/MILESTONE (check all that apply) | |
| Pre-A | |
| X | A |
| X | B |
| C-LRIP | |
| C-FRP | |
| O&S | |
| 1c. PRIME MISSION PRODUCT | |
| Optionally Manned Fighting Vehicle (OMFV) | |
| 1d. ACQUISITION CATEGORY (ACAT) | |
| X | Pre-ACAT |
| ACAT I (MDAP) | |
| ACAT IA (MAIS) | |
| ACAT II | |
| ACAT III | |
| Other | |
| 2. COMMODITY TYPE | |
| Ground Vehicle System | |
| 3. PLAN ITERATION TYPE | |
| X | INITIAL |
| REVISION | |
| 4. CURRENT SUBMISSION DATE (YYYYMMDD) | |
| 5. LAST APPROVED PLAN DATE (YYYYMMDD) | |
| 6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.) | |
| Teper, Gerald (Jerry) | |
| 6b. ADDRESS (Include ZIP Code) | |
| 6501 E 11 Mile Road |
Warren, MI 48397-5000
| 6c. TELEPHONE NUMBER (Include Area Code) | ||
| (586) 282-5056 | ||
| 6d. E-MAIL ADDRESS | ||
| gerald.e.teper.civ@army.mil | ||
| 7. PLAN TYPE | ||
| GOVERNMENT | ||
| X | CONTRACT (PRIME) | |
| CONTRACT (SUB) | ||
| 8. PLAN GOVERNMENT PREPARING ORGANIZATION | ||
| SFAE-GCS-C | ||
| 9a. CONTRACTOR NAME/ADDRESS | ||
| i. REPORTING ORGANIZATION NAME | ||
| TBD | ||
| ii. DIVISION NAME | ||
| iii. LOCATION | ||
| iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT: | ||
| X | CBDR REQUIRED FOR THIS ORGANIZATION | |
| 9b. CONTRACT NUMBER (List all that apply, separated by commas) | ||
| 9c. APPROPRIATION (check all that apply) | ||
| X | RDT&E | |
| PROCUREMENT | ||
| O&M | ||
| FMS | ||
| WCF | ||
| OTHER | ||
| 10a. APPROVED PLAN NUMBER | ||
| 10b. APPROVED PLAN REVISION NUMBER | ||
| 10c. APPROVED PLAN REQUIREMENTS | ||
| X | AT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy) | |
| X | AT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only) | |
| X | TECHNICAL DATA REQUIRED | |
| 10d. COST REPORT TYPE | ||
| X | FLEXFILE | |
| LEGACY DD 1921 SERIES | ||
| DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019 | PREVIOUS EDITION IS OBSOLETE |
DD Form 2794, Pg 2 (REPORTING)
| COST AND SOFTWARE DATA REPORTING PLAN | COST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN | |||||
| 11. WORK BREAKDOWN STRUCTURE (WBS) | 12. COST | 13. TECHNICAL DATA | ||||
| a. WBS | ||||||
| CODE | b. WBS | |||||
| LEVEL | c. WBS ELEMENT NAME | a. ACTUALS TO | ||||
| DATE (ATD) | b. LEGACY | |||||
| 1921-1 | c. LEGACY | |||||
| 1921-2 | d. LEGACY | |||||
| 1921-5 | e. EAC/FAC | |||||
| (See item 10d) | a. QUANTITY | b. SRDR | ||||
| FORMATS | c. |
MAINT. &
REPAIR
PARTS
| i. QUANTITY | ||
| DATA | ii. GFE |
QUANTITY
| 1.0 | 1 | Optionally Manned Fighting Vehicle (OMFV) | |||
| 1.1 | 2 | Family of OMFV | |||
| 1.1.1 | 3 | OMFV | |||
| 1.1.1.1 | 4 | OMFV Integration, Assembly, Test, and Checkout | |||
| 1.1.1.1.1 | 5 | Integration | X | X | X |
| 1.1.1.1.2 | 5 | Test,Checkout and Support | X | X | X |
| 1.1.1.2 | 4 | Hull/Frame/Body/Cab | |||
| 1.1.1.2.1 | 5 | Hull Structure | X | X | X |
| 1.1.1.2.2 | 5 | Hatches/Access Panels | X | X | X |
| 1.1.1.2.3 | 5 | Other Hull/Frame/Body/Cab | X | X | X |
| 1.1.1.3 | 4 | System Survivability | |||
| 1.1.1.3.1 | 5 | Chemical, Biological, Radiological, Nuclear, and Explosive Protection | X | X | X |
| 1.1.1.3.2 | 5 | Active Protection System(s) | |||
| 1.1.1.3.2.1 | 6 | Hard Kill Active Protective System | X | X | X |
| 1.1.1.3.2.2 | 6 | Soft Kill Active Protective System | X | X | X |
| 1.1.1.3.2.3 | 6 | Other Active Protection System | X | X | X |
| 1.1.1.3.3 | 5 | Laser Warning Receiver(LWR) | X | X | X |
| 1.1.1.3.4 | 5 | Roof Armor | X | X | X |
| 1.1.1.3.5 | 5 | IED Countermeasures | X | X | X |
| 1.1.1.3.6 | 5 | Sensor Subsystems | X | X | X |
| 1.1.1.3.7 | 5 | Fire Detection/Suppression | X | X | X |
| 1.1.1.3.8 | 5 | CE Armor | X | X | X |
| 1.1.1.3.9 | 5 | KE Armor | X | X | X |
| 1.1.1.3.10 | 5 | Other System Survivability | X | X | X |
| 1.1.1.4 | 4 | Turret Assembly | |||
| 1.1.1.4.1 | 5 | Turret Structure | X | X | X |
| 1.1.1.4.2 | 5 | Hatches/Access Panels | X | X | X |
| 1.1.1.4.3 | 5 | Turret Bearing | X | X | X |
| 1.1.1.4.4 | 5 | Slipring | X | X | X |
| 1.1.1.4.5 | 5 | Other Turret Assembly | X | X | X |
| 1.1.1.5 | 4 | Suspension/Steering | |||
| 1.1.1.5.1 | 5 | Track/Tire | X | X | X |
| 1.1.1.5.2 | 5 | Roadwheel/Rim | X | X | X |
| 1.1.1.5.3 | 5 | Suspension Subassembly | X | X | X |
| 1.1.1.5.4 | 5 | Other Suspension/Steering | X | X | X |
| 1.1.1.6 | 4 | Vehicle Electronics | |||
| 1.1.1.6.1 | 5 | Computers | X | X | X |
| 1.1.1.6.2 | 5 | Data Distribution & Control Subsystem | X | X | X |
| 1.1.1.6.3 | 5 | Power Distribution Hardware | X | X | X |
| 1.1.1.6.4 | 5 | Solider Displays | X | X | X |
| 1.1.1.6.5 | 5 | Vehicle Cabling | X | X | X |
| 1.1.1.6.6 | 5 | Situational Awareness | X | X | X |
| 1.1.1.6.7 | 5 | Other Vehicle Electronics | X | X | X |
| 1.1.1.7 | 4 | Power Package/Drive Train | |||
| 1.1.1.7.1 | 5 | Engine | X | X | X |
| 1.1.1.7.2 | 5 | Transmission | X | X | X |
| 1.1.1.7.3 | 5 | Final Drive/Differential | X | X | X |
| 1.1.1.7.4 | 5 | Sprocket/Driveaxle | X | X | X |
| 1.1.1.7.5 | 5 | Generator | X | X | X |
| 1.1.1.7.6 | 5 | Heat Exchangers/Cooling | X | X | X |
| 1.1.1.7.7 | 5 | Power Storage | X | X | X |
| 1.1.1.7.8 | 5 | Braking | X | X | X |
| 1.1.1.7.9 | 5 | Exhaust/Air Induction and Filtration | X | X | X |
| 1.1.1.7.10 | 5 | Drive By Wire(DBW) | X | X | X |
| 1.1.1.7.11 | 5 | Batteries | X | X | X |
| 1.1.1.7.12 | 5 | Other Power Package/Drive Train | X | X | X |
| 1.1.1.8 | 4 | Auxiliary Automotive | |||
| 1.1.1.8.1 | 5 | Lighting | X | X | X |
| 1.1.1.8.2 | 5 | Stowage | X | X | X |
| 1.1.1.8.3 | 5 | Fuel Systems | X | X | X |
| 1.1.1.8.4 | 5 | Hydraulics | X | X | X |
| 1.1.1.8.5 | 5 | Environmental Control System | X | X | X |
| 1.1.1.8.6 | 5 | CBRM | X | X | X |
| 1.1.1.8.7 | 5 | Other Auxilary Automotive | X | X | X |
| 1.1.1.9 | 4 | Fire Control | |||
| 1.1.1.9.1 | 5 | Sensors | X | X | X |
| 1.1.1.9.2 | 5 | Controls and Displays | X | X | X |
| 1.1.1.9.3 | 5 | Sights and Scopes | X | X | X |
| 1.1.1.9.4 | 5 | Gunner's Sight | X | X | X |
| 1.1.1.9.5 | 5 | Commanders Sight | X | X | X |
| 1.1.1.9.6 | 5 | Aided Target Recognition | X | X | X |
| 1.1.1.9.7 | 5 | Gunner Embedded Trainer | X | X | X |
| 1.1.1.9.8 | 5 | Other Fire Control Subsystem | X | X | X |
| 1.1.1.10 | 4 | Armament | |||
| 1.1.1.10.1 | 5 | Primary Weapon | X | X | X |
| 1.1.1.10.2 | 5 | Secondary Weapon | X | X | X |
| 1.1.1.10.3 | 5 | Commanders Weapon | X | X | X |
| 1.1.1.10.4 | 5 | Missle System | X | X | X |
| 1.1.1.10.5 | 5 | Non-Lethal Weapon(s) | X | X | X |
| 1.1.1.10.6 | 5 | Other Armament | X | X | X |
| 1.1.1.11 | 4 | Automatic Ammunition Handling | X | X | X |
| 1.1.1.12 | 4 | Navigation and Remote Piloting Systems | |||
| 1.1.1.12.1 | 5 | Navigation | X | X | X |
| 1.1.1.12.2 | 5 | Remote Piloting Systems | |||
| 1.1.1.12.2.1 | 6 | Common Control and Operation | X | X | X |
| 1.1.1.12.2.2 | 6 | Driver Control and Operation | X | X | X |
| 1.1.1.12.2.3 | 6 | Imagery Control and Operation | X | X | X |
| 1.1.1.12.2.4 | 6 | Turret Controls and Operation | X | X | X |
| 1.1.1.12.2.5 | 6 | Other Remote Piloting Systems | X | X | X |
| 1.1.1.13 | 4 | Special Equipment | X | X | X |
| 1.1.1.14 | 4 | Communications | |||
| 1.1.1.14.1 | 5 | Radios | X | X | X |
| 1.1.1.14.2 | 5 | Antennas | X | X | X |
| 1.1.1.14.3 | 5 | Communication Cabling | X | X | X |
| 1.1.1.14.4 | 5 | Mission Command | X | X | X |
| 1.1.1.14.5 | 5 | Intercom | X | X | X |
| 1.1.1.14.6 | 5 | External Communication | X | X | X |
| 1.1.1.15 | 4 | OMFV Software Release CSCI(1..n) Contractor Shall Specify | X | X | X |
| 1.1.1.16 | 4 | Other OMFV Subsystems | X | X | X |
| 1.1.2 | 3 | Variant 2...n (Specify) | X | X | X |
| 1.1.3 | 3 | Equipment Kits | |||
| 1.1.3.1 | 4 | Underbelly Protection Kit | X | X | X |
| 1.1.3.2 | 4 | Other Equipment Kits 1…n(Specify) | X | X | X |
| 1.2 | 2 | Secondary Vehicle | |||
| 1.3 | 2 | Systems Engineering | |||
| 1.3.1 | 3 | Software Systems Engineering | X | X | |
| 1.3.2 | 3 | Integrated Logistics Support (ILS) Systems Engineering | |||
| 1.3.2.1 | 4 | Maintainability Concept Review | X | X | |
| 1.3.2.2 | 4 | Maintenance Assessment | X | X | |
| 1.3.2.3 | 4 | Supportability Analysis | X | X | |
| 1.3.2.4 | 4 | RAM Engineering | X | X | |
| 1.3.2.5 | 4 | Other ILS System Engineering | X | X | |
| 1.3.3 | 3 | Cybersecurity Systems Engineering | X | X | |
| 1.3.4 | 3 | Core Systems Engineering | X | X | |
| 1.3.5 | 3 | Architecture Development Engineering | X | X | |
| 1.3.6 | 3 | Other Systems Engineering | X | X | |
| 1.4 | 2 | Program Management | |||
| 1.4.1 | 3 | Software Program Management | X | X | |
| 1.4.2 | 3 | Integrated Logistics Support (ILS) Program Management | X | X | |
| 1.4.3 | 3 | Cybersecurity Management | X | X | |
| 1.4.4 | 3 | Core Program Management | X | X | |
| 1.4.5 | 3 | Other Program Management | X | X | |
| 1.5 | 2 | System Test and Evaluation | |||
| 1.5.1 | 3 | Development Test and Evaluation | |||
| 1.5.1.1 | 4 | Cybersecurity Test and Evaluation | X | X | |
| 1.5.1.2 | 4 | Automotive Performance Test and Evaluation | X | X | |
| 1.5.1.3 | 4 | Reliability,Availability and Maintainability(RAM) Test and Evaluation | X | X | |
| 1.5.1.4 | 4 | DT System Support Package | X | X | X |
| 1.5.1.5 | 4 | Other Development Test and Evaluation | X | X | |
| 1.5.2 | 3 | Operational Test and Evaluation | |||
| 1.5.2.1 | 4 | Cybersecurity Test and Evaluation | X | X | |
| 1.5.2.2 | 4 | Limited User Test(LUT) and Evaluation | X | X | |
| 1.5.2.3 | 4 | OT System Support Package | X | X | X |
| 1.5.2.4 | 4 | Other Operational Test and Evaluation | X | X | |
| 1.5.3 | 3 | Live Fire Test and Evaluation | |||
| 1.5.3.1 | 4 | Survivability Test | |||
| 1.5.3.1.1 | 5 | Armor Coupon Test | X | X | |
| 1.5.3.1.2 | 5 | Ballastic Hull and Turret(BH&T) Test and Evaluation | X | X | |
| 1.5.3.1.3 | 5 | APS Test and Evaluation | X | X | |
| 1.5.3.1.4 | 5 | Underbelly Test and Evaluation | X | X | |
| 1.5.3.2 | 4 | Lethality Test and Evaluation | |||
| 1.5.3.2.1 | 5 | Primary Weapon Test and Evaluation | X | X | |
| 1.5.3.2.2 | 5 | Missle Test and Evaluation | X | X | |
| 1.5.3.2.3 | 5 | System Support Package | X | X | |
| 1.5.3.3 | 4 | Other Live Fire Test and Evaluation | X | X | |
| 1.5.4 | 3 | Mock-ups/System Integration Labs (SILs) | X | X | |
| 1.5.5 | 3 | Test and Evaluation Support | X | X | |
| 1.5.6 | 3 | Test Facilities | X | X | |
| 1.6 | 2 | Training | |||
| 1.6.1 | 3 | Equipment | |||
| 1.6.1.1 | 4 | Operator Instructional Equipment | X | X | |
| 1.6.1.2 | 4 | Maintainer Instructional Equipment | X | X | |
| 1.6.2 | 3 | Services | |||
| 1.6.2.1 | 4 | Operator Instructional Services | X | X | |
| 1.6.2.2 | 4 | Maintainer Instructional Services | X | X | |
| 1.6.3 | 3 | Facilities | X | X | |
| 1.6.4 | 3 | Training Software | X | X | |
| 1.7 | 2 | Data | |||
| 1.7.1 | 3 | Data Deliverables | X | X | |
| 1.7.2 | 3 | Data Repository | X | X | |
| 1.7.3 | 3 | Data Rights | X | X | |
| 1.8 | 2 | Peculiar Support Equipment | |||
| 1.8.1 | 3 | Test and Measurement Equipment | X | X | |
| 1.8.2 | 3 | Support and Handling Equipment | X | X | |
| 1.9 | 2 | Common Support Equipment | |||
| 1.9.1 | 3 | Test and Measurement Equipment | X | X | |
| 1.9.2 | 3 | Support and Handling Equipment | X | X | |
| 1.10 | 2 | Operational/Site Activation by Site | |||
| 1.10.1 | 3 | System Assembly, Installation, and Checkout on Site | X | X | |
| 1.10.2 | 3 | Contractor Technical Support | X | X | |
| 1.10.3 | 3 | Site Construction | X | X | |
| 1.10.4 | 3 | Site/Ship/Vehicle Conversion | X | X | |
| 1.10.5 | 3 | Interim Contractor Support (ICS) | X | X | |
| 1.11 | 2 | Contractor Logistics Support (CLS) | X | X | |
| 1.12 | 2 | Industrial Facilities | |||
| 1.12.1 | 3 | Construction/Conversion/Expansion | X | X | |
| 1.12.2 | 3 | Equipment Acquisition or Modernization | X | X | |
| 1.12.3 | 3 | Maintenance (Industrial Facilities) | X | X | |
| 1.13 | 2 | Initial Spares and Repair Parts | X | X | X |
| 1.14 | 2 | Ballistic Hull & Turret (BH&T) Asset(s) | X | X | X |
| Subtotal Cost | X | X | |||
| Reporting Contractor G&A | X | X | |||
| Reporting Contractor Undistributed Budget | X | X | |||
| Reporting Contractor Management Reserve | X | X | |||
| Reporting Contractor FCCM | X | X | |||
| Total Cost | X | X | |||
| Reporting Contractor Profit/Loss or Fee | X | X | |||
| Total Price | X | X | |||
| DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019 |
DD Form 2794, Pg 3 (EVENTS)
| COST AND SOFTWARE DATA REPORTING PLAN | |||||||
| 14. CSDR SUBMISSION EVENTS | |||||||
| a. | |||||||
| EVENT ID | b. | ||||||
| DATA REPORT(S) | c. | ||||||
| SUBMISSION EVENT NAME | d. | ||||||
| REPORT CYCLE | e. AS OF DATE | f. DUE DATE | |||||
| (YYYYMMDD) | (YYYYMMDD) | ||||||
| 1 | Cost and Hour Report (FlexFile), Quantity Data Report | Contract Award | Initial | 20230420 | 20230620 | ||
| 2 | Technical Data Report | Contract Award | Initial | 20230420 | 20230620 | ||
| 3 | SRDR Development | Contract Award | Initial | 20230420 | 20230620 | ||
| 4 | Cost and Hour Report (FlexFile), Quantity Data Report | Preliminary Design Review(PDR) | Interim | 20240420 | 20240620 | ||
| 5 | Technical Data Report | Preliminary Design Review(PDR) | Interim | 20240420 | 20240620 | ||
| 6 | SRDR Development | Preliminary Design Review(PDR) | Interim | 20240420 | 20240620 | ||
| 7 | Cost and Hour Report (FlexFile), Quantity Data Report | Critical Design Review(CDR) | Interim | 20250420 | 20250620 | ||
| 8 | Technical Data Report | Critical Design Review(CDR) | Interim | 20250420 | 20250620 | ||
| 9 | SRDR Development | Critical Design Review(CDR) | Interim | 20250420 | 20250620 | ||
| 11 | Cost and Hour Report (FlexFile), Quantity Data Report | Prototype Delivery | Final | 20260420 | 20260620 | ||
| 12 | Technical Data Report | Prototype Delivery | Final | 20260420 | 20260620 | ||
| 13 | SRDR Development | Prototype Delivery | Final | 20260420 | 20260620 | ||
| DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019 | PREVIOUS EDITION IS OBSOLETE |
DD Form 2794, Pg 4 (REMARKS)
| COST AND SOFTWARE DATA REPORTING PLAN |
| 15. REMARKS |
| 15. REMARKS |
| a. CSDR Planning Approach & Preparation Instructions |
1. In addition to the direction provided in the associated CSDR Data Item Descriptions (DIDs) and the CSDR Manual (DoDM 5000.04), the following instructions, requirements, and considerations found on this page/worksheet shall be utilized when collecting data and preparing CSDR submissions.
2. This CSDR Contract plan is intended to capture costs associated with the contract number(s) listed in block 9.b. The contractor shall capture and report any and all costs incurred in order to perform the scopes of work on the Contract irrespective of contract type (e.g., firm-fixed price, cost-plus fixed fee) or funding source (i.e., via contract, via contractor internal research & development funds).
3. Costs reported against this CSDR Plan shall be cumulative in nature (i.e., each submission shall report any and all costs incurred on and prior to the submission’s “AS OF DATE” (block 14.e)).
4. Other than the Resource Distribution Table, submission events associated with this CSDR Plan are classified as either "Initial", "Interim", or "Final" submissions as identified in block 14.d of this CSDR Plan.
i. Submission events marked "Initial" shall report the Contractor's total anticipated contract cost and resulting price using the maximum allowable contractor quantities, hours, or options (as applicable). For sealed bid contracts (i.e., contracts awarded under FAR Part 14) the reported FAC/EAC shall equal the value of the Contractor's sealed bid (using the maximum allowable contractor quantities, hours, or options (as applicable)). For negotiated contracts (i.e., contracts award under FAR Part 15) the reported FAC/EAC shall be equal in overall value to the Contractor's best and final offer (and consistent in distribution with any supporting cost and pricing data (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). For all other contracts, the reported FAC/EAC shall be equal in overall value to the Contractor's final proposal and consistent in distribution with any supporting data provided to substantiate the contract's value, reasonableness, and/or realism (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). No ATD costs are anticipated to reported on an "Initial" submission except for any certified precontract costs incurred prior to or on the date of contract award.
ii. "Interim" report submissions are any report that is not either an "Initial" or "Final" report. Reported ATD, EAC/FAC, and quantities on "Interim" submissions shall be prepared reflecting only the value of work, quantities, hours, or options (as applicable) awarded on the report's "As Of Date" (do not include costs for anticipated but not awarded scopes of work, quantities, hours, or options).
iii. Reported ATD, EAC/FAC, and quantities on "Final" submissions shall be prepared reflecting the value of work, quantities, hours, and options (as applicable) anticipated to be awarded on a contract and meet the conditions listed in block 15.c.i.4.
5. Regarding the WBS Structure (block 11): This CSDR Plan utilizes MIL-STD-881E as the baseline for its WBS which has been extended to provide additional insight into system(s) or subsystem(s) which the Government believes to be high-risk or high-technical-interest in accordance with DoD Manual 5000.04.
i. WBS Element Names (block 11.c) Ending with "1...n (Contractor Shall Specify)": The contractor shall extend and specify (i.e., include additional WBS elements determined by the contractor) in order to provide additional insight into the contractor's technical approach or design. The additional WBS elements shall be developed in accordance with the WBS guidelines included in MIL-STD-881E and DoD Manual 5000.04.
ii. The contractor may extend any WBS element to allow the contractor to provide additional insight into its technical solution. Any and all extensions or tailoring of the WBS shall be in accordance with guidelines included in MIL-STD-881E and DoD Manual 5000.04.
iii. If changes to the contract scope, hours, or options (as applicable) necessitate the need to revise or add additional WBS elements to remain in compliance with MIL-STD-881E and DoD Manual 5000.04, any associated contract cost/price changes related to the updated CSDR Plan or submission of revised CSDR deliverables, shall be included within the contract modification that awards the changed scope of work, hours, or options (as applicable).
b. Resource Distribution Table
1. Submissions of the Resource Distriubtion Table (RDT) are required under the following conditions:
i. An RDT shall be delivered seven calendar days before the “Cost and Software Data Reporting Readiness Review”. Prepare this submission of the RDT at FAC/EAC value and utilizing the instructions at Block15.a.4.i.This copy of the RDT will be used during the “Cost and Software Data Reporting Readiness Review” in order to finalize which subcontractors will be required to provide CSDR reporting via electronic submission of deliverables directly to the Defense Cost and Resource Center (DCARC) and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.
ii. An RDT shall be delivered within thirty calendar days of the contractor identifying that a subcontractor who, at the time of initial subcontractor award, was not anticipated to qualify for direct subcontractor CSDR reporting via electronic submission of deliverables directly to the DCARC but is subsequently anticipated to meet the CSDR direct reporting subcontractor threshold value due to changes to scopes of work, end-item design, subcontractor/supplier, or subcontract price changes since initial contract award (unless the newly identified subcontractor has already been issued a subcontractor reporting waiver associated with this contract).
c. Submission Dates
1. All CSDR deliverable “AS OF DATE[S]” and “DUE DATE[S]” listed in blocks 14.e and 14.f are identified for planning purposes only. Submission dates are subject to change and are determined in accordance with the event drivers as identified below:
i. Except for the initial submission, all “DUE DATE” requirements are equal to the “AS OF DATE” plus 60 calendar days. The initial submission's"DUE DATE" shall be 90 days after the identified "AS OF DATE". If the calculated “Due Date” does not fall on a regular business day, the “Due Date” will be the next regular business day on the contractor’s accounting calendar.
ii. Initial Submission: Submission events marked as an "Initial" submission in block 14.d. shall have an “AS OF DATE” as of the date of contract award.
iii. Interim Submission(s): Submission events marked as an "Interim" submission in block 14.d shall have an "AS OF DATE" based on the submission event name in block 14.c. For example, if the submission event name was "Contract Award Plus 24 Months" then the submission's "AS OF DATE" is the contract award date plus 24 calendar months. If the submission event name was "Complete Delivery of First Article Test Assets" then the submission's "AS OF DATE" would be the date the final First Artical Test Asset was delivered.
"iv. Final Submission(s): Submission events marked as ""Final"" submission in block 14.d shall have an ""AS OF DATE"" when the following conditions have been met:
1. Condition 1: All end items anticipated to be procured on the contract have been delivered and accepted by the government (e.g., as evidenced by a completed DD Form 250) or higher tier contractor in the case of a subcontractor.
2. Condition 2: 95% or more of all ATD total costs have been incurred relative to all costs the reporting entity expects to incur for each and every Order/Lot (defined in Data Group B, Item 4 of the approved FlexFile DID)."
d. Cost and Hour Report (FlexFile)
1. The contractor shall utilize the following mappings from its accounting system when preparing and submitting FlexFile Actual Cost-Hour Data:
i. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system}
ii. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system}
iii. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system}
...n. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system}
2. The contractor shall utilize and include the following mappings from its accounting system to the Actual Cost-Hour Data tags:
i. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system} = Tag1
ii. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system} = Tag2
iii. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system} = Tag3
xxv. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system} = Tag25
3. Order Lot Scope: Block 16 of this CSDR Plan is meant to capture the discrete Delivery Orders/Task Orders (as applicable) exercised on the contract. If a Delivery Order/Task Order (as applicable) is exercised on the contract but is not listed in block 16, the contractor shall submit the dollars and hours in the Cost and Hour Report (FlexFile) and the quantity information in the Quantity Report tagged using the name of the Delivery Order/Task Order (as applicable) utilized on the contract. The CSDR Plan will be updated to include the appropriate Delivery Order/Task Order (as applicable) name in block 16, after report submission, if required.
4. End Item Scope: Block 17 of this CSDR Plan is meant to capture the discrete hardware end items that are DD-250'ed, ordered, procured, or exercised (as applicable) on the contract. If an End Item is DD-250'ed, ordered, procured, or exercised (as applicable) on the contract but is not listed in block 17, the contractor shall submit the dollars and hours in the Cost and Hour Report (FlexFile) and the quantity information in the Quantity Report tagged using the name of the End Item utilized on the contract. The CSDR Plan will be updated to include the appropriate End Item name in block 17, after reprot submission, if required.
i. End Item ID 1: The "Common" end item tag shall be used to report costs and hours which are not incurred or directly attributable to an individual end item. For example, overarching program management costs and hours that are required, independent of the type or quantity of end items on contract would be tagged against the “Common” end item. Common hardware (i.e., identical/homogeneous part numbers) procured and integrated into multiple end items shall utilize the end item tag for the prime product they were integrated onto and shall not be tagged with the “Common” end item.
ii. End Item ID shall be reported against WBS with associated costs and hours attributed to the lowest level children WBS elements found beneath it.
"n. End Item ID n: Costs and hours attributed to the ""Spares Package(s)"" shall be reported against WBS 1.13 (Initial Spares and Repair Parts).
The contractor shall provide the following within the WBS Element Remarks (or via a supporting Excel or CSV file) for WBS Element 1.13 (Initial Spares and Repair Parts):
- Spares Package Nomenclature: Identify the nomenclature/title of the initial spares and repair parts package (e.g., Authorized Stoackage List 1, System Support Package for Test & Evaluation Support, FY21 Spares Order).
- Part Number: Include a listing of all contractor part numbers included within each Spares Package.
- Part Nomenclature: Include the contractor part nomenclature, for each contractor part number.
- National Stock Number (NSN) or National Item Identification Number (NIIN): Include the NSN or NIIN for each contractor part number. If a NSN or NIIN have not been assigned to a part number, utilize ""N/A"".
- Part Quantity: Report the quantity of parts included in each Spares Package(s), by contractor part number."
5. The contractor shall provide unit reporting for any given Order/Lot and End Item name as outlined in block 18 of this CSDR Plan. If Unit Reporting is selected in block18.c (Unit Reporting), it is expected that all touch labor costs and hours that are associated with the discrete units or sublots be tagged as Touch Manufacturing or Touch Maintenance as defined in DI-FNCL-82162, Data Group E, Item 7.
6. The contractor shall provide a description of the type and timing of all impacts to program schedule, incurred actual costs, and forecasted at complete costs, in process quantities, and delivered quantities which are directly attributable to the COVID-19 pandemic: provide general impacts within the Summary Remark; provide impacts to specific WBS Elements or Functional Elements within the WBS Element Definitions and Remarks by DD FORM 2794 WBS Element. If applicable, the contractor shall provide an explanation of any new charge codes, work packages, control accounts, pricing categories, or other methods explicitly utilized to capture impacts of COVID-19. Note any relevant information that could be used in the interpretation of the data. If applicable, the contractor shall utilize a “Tag” or the “Additional Data Field” referenced in Section B of the FlexFile DID (DI-FNCL-82162) to identify COVID-19 related data.
e. Period Of Performance & Additional Scope Of Work
1. If the Contract period of performance is extended by more than six months, or if the scope of work is modified to include work not otherwise covered by the CSDR Plan, the government may modify the CSDR Plan to require additional submission events and add additional WBS elements in order to ensure the accurate and complete collection of cost data associated with the modified contract. Depending on the scope and complexity of the contract modification, the contractor may be required to host or attend an additional Post-Award Cost and Software Data Reporting Conference to review the CSDR Plan changes and the contractor’s plan to collect and report costs associated with the additional scope of work.
f. Cost Accounting Standards (CAS) Disclosure Statement Differences
1. The contractor shall follow the accounting procedures specified in its latest approved CAS Disclosure Statement and with any clauses or requirements included in the contract. As part of the Cost and Software Data Reporting Readiness Review, the contractor shall identify any aspect(s) of its latest approved CAS Disclosure Statement which preclude or inhibit compliance with this CSDR Plan and DoD 5000.04 (CSDR Manual). The contractor shall identify any deviations from its CAS disclosure statement it intends to utilize to prepare CSDR submissions.
g. Nonrecurring/Recurring Segregation
1. The contractor shall utilize the specific definitions and requirements in the CSDR Manual (DoDM 5000.04) and the definitions in the DID for the Cost and Hour Report (FlexFile) report (DI-FNCL-82162) to segregate Recurring and Nonrecurring costs discretely and not as an aggregate.
h. 1921-3 CONTRACTOR BUSINESS DATA REPORT i.The Contractor Business Data Report shall be prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting and defending Forward Pricing Rate Agreement (FPRA) with the government. Data for Future Years should be reflective of the number of years contained in the most current document (i.e., the FPRP or the FPRA). If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates shall be provided for three future years.
i. The Contractor Business Data Report shall be prepared by and for the contractor's business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the Government.
ii. A 1921-3 report shall be submitted annually at the end of the contractor's fiscal year.
iii. Data for Future Years shall be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates shall be provided for three future years.
i. COVID-19 Reporting
"1. The contractor shall provide a description of the type and timing of all impacts to program schedule, incurred actual costs, forecasted at complete costs, in process quantities, and delivered quantities, which are directly attributable to the COVID-19 pandemic.
Per the DIDs, note any relevant information that could be used in the interpretation of the data. Provide general or, if available, quantifiable contract impacts within the Summary Remarks. Provide impacts to specific WBS Elements or Functional Elements within the Remarks by DD FORM 2794 WBS Element. Provide impacts to the business unit within the Remarks of each 1921-3 submission. Organize impacts under a heading in the remarks that refers to “COVID-19 impacts”, or similar language, that segments this information from the rest of the remarks.
If applicable, the contractor shall provide an explanation of any new charge codes, work packages, control accounts, pricing categories, or other methods explicitly utilized to capture impacts of COVID-19.
If there are no impacts to report, then report there are no impacts in the Summary Remarks of each FlexFile and the Remarks of each 1921-3 submission."
2. Additional Data Fields #1-#12 (FlexFile)
i. If applicable, the contractor shall utilize a “Tag” or the “Additional Data Field” referenced in Section B of the FlexFile DID (DI-FNCL-82162) to identify COVID-19 related data.
i. WBS Configuration Management
"1. The WBS Dictionary is a living document and must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The dictionary shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. The dictionary shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element.
The reporting entity must maintain and update the WBS Dictionary throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the “As of Date” of the submitted FlexFile report and indicate the changes to the WBS Index and Dictionary Definitions.
For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in the dictionary that “This CSDR WBS element is not associated with this contract’s scope of work”, and zero costs will be associated for ATD and FAC for these WBS elements."
DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE
DD Form 2794, Pg 5 (SCOPE DEF)
| COST AND SOFTWARE DATA REPORTING PLAN | |||||
| INTRA-CONTRACT SCOPE REPORTING DEFINITION | |||||
| 16. ORDERS/LOTS | |||||
| a. ID | b. NAME | c. PHASE/MILESTONE | |||
| 1 | Order Year 1 | B | |||
| 17. END ITEMS | |||||
| a. ID | b. NAME | ||||
| 1 | Optionally Manned Fighting Vehicle (OMFV) Prototypes | ||||
| 2 | Ballastic Hull and Turret | ||||
| 18. OPTIONAL REQUIREMENTS | |||||
| a. ORDER/LOT ID | b. END ITEM ID | c. UNIT REPORTING | |||
| (X if applicable) | d. SEQUENCING |
(X if applicable)
DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019
DD Form 2794, Pg 6 (SRDR DEV)
| COST AND SOFTWARE DATA REPORTING PLAN - SRDR DEVELOPMENT | ||||||
| 19. RELEASES | ||||||
| a. ID | b. NAME | c. DATE | ||||
| 1 | OMFV Software Release 1...n (Contractor Shall Specify) | |||||
| 20. CSCI'S | ||||||
| a. ID | b. NAME | |||||
| 21. PRODUCT SIZE REPORTING ELEMENTS | ||||||
| a. CODE | b. NAME | c. RELEASE ID | d. CSCI ID | |||
| 22. PRODUCT SIZE SUBMISSIONS | c. RELEASE ID: | |||||
| a. NUMBER | b. NAME | Included? | Included? | Included? | ||
| DRAFT DD FORM 2794 (PAGE 6), SRDR DEVELOPMENT, JANUARY 2019 |
DD Form 2794, Pg 8 (TECH RQTS)
| COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS | |||||||
| 26. WBS ELEMENT CODE | 27. WBS ELEMENT NAME | 28. ITEM TYPE | 29. TECHNICAL PARAMETER | ||||
| a. PARAMETER NAME | b. UNIT OF MEASURE | c. UNIT OF MEASURE QUALIFIER | d. REPEATABLE | e. REMARKS | |||
| 1.1.1 | OMFV | length | inches | per vehicle | |||
| 1.1.1 | OMFV | width | inches | per vehicle | |||
| 1.1.1 | OMFV | height | inches | per vehicle | |||
| 1.1.1 | OMFV | gross vehicle weight | pounds | per vehicle | |||
| 1.1.1 | OMFV | curb weight | pounds | per vehicle | |||
| 1.1.1 | OMFV | empty weight | pounds | per vehicle | |||
| 1.1.1 | OMFV | top speed | miles | per hour | |||
| 1.1.1 | OMFV | vehicle cone index | vehicle cone index | per vehicle | |||
| 1.1.1 | OMFV | fuel capacity | gallons | per fuel tank | |||
| 1.1.1 | OMFV | fuel economy | miles | per gallon | |||
| 1.1.1 | OMFV | cruise range | miles | per vehicle, per fuel tank | |||
| 1.1.1 | OMFV | crew | quantity | per vehicle | |||
| 1.1.1 | OMFV | passengers | quantity | per vehicle | |||
| 1.1.1 | OMFV | ground clearance | inches | per vehicle | |||
| 1.1.1 | OMFV | fording depth | inches | per vehicle | |||
| 1.1.1 | OMFV | gap crossing | inches | per vehicle | |||
| 1.1.1 | OMFV | capacity | pounds | per vehicle | |||
| 1.1.1.2 | Hull/Frame/Body/Cab | hull length | inches | per vehicle | |||
| 1.1.1.2 | Hull/Frame/Body/Cab | hull width | inches | per vehicle | |||
| 1.1.1.2 | Hull/Frame/Body/Cab | hull height | inches | per vehicle | |||
| 1.1.1.2 | Hull/Frame/Body/Cab | hull weight | inches | per vehicle | |||
| 1.1.1.3.2.1 | Hard Kill Active Protective System | title | nomenclature | per round type | For each [type] Active Protection System, identify the types of rounds/missiles associated with the Contractor's OMFV solution (live/inert). | ||
| 1.1.1.3.2.1 | Hard Kill Active Protective System | rounds | quantity | per vehicle | For each Hard Kill Active Protection System listed, identify the combat load associated with each live countermeasure(s). | ||
| 1.1.1.3.2.2 | Soft Kill Active Protective System | title | nomenclature | per round type | For each [type] Active Protection System, identify the types of rounds/missiles associated with the Contractor's OMFV solution (live/inert). | ||
| 1.1.1.3.2.2 | Soft Kill Active Protective System | rounds | quantity | per vehicle | For each Soft Kill Active Protection System listed, identify the combat load associated with each live countermeasure(s). | ||
| 1.1.1.3.2.3 | Other Active Protection System | title | nomenclature | per round type | For each [type] Active Protection System, identify the types of rounds/missiles associated with the Contractor's OMFV solution (live/inert). | ||
| 1.1.1.3.2.3 | Other Active Protection System | rounds | quantity | per vehicle | For each Other Active Protection System listed, identify the combat load associated with each live countermeasure(s). | ||
| 1.1.1.3.10 | Other System Survivability | integral armor weight | pounds | per vehicle | Do not include this information if it is classified CONFIDENTIAL, SECRET, or TOP SECRET. | ||
| 1.1.1.3.10 | Other System Survivability | add-on armor weight | pounds | per vehicle | Do not include this information if it is classified CONFIDENTIAL, SECRET, or TOP SECRET. | ||
| 1.1.1.7 | Power Package/Drive Train | gross horsepower | horsepower | per engine | |||
| 1.1.1.7 | Power Package/Drive Train | displacement | cubic inches | per engine | |||
| 1.1.1.7 | Power Package/Drive Train | max torque | newton meter | per engine | |||
| 1.1.1.7 | Power Package/Drive Train | forward gears | quantity | per transmission | |||
| 1.1.1.7 | Power Package/Drive Train | reverse gears | quantity | per transmission | |||
| 1.1.1.7 | Power Package/Drive Train | total power generation capacity | kilowatts | per vehicle, per hour | |||
| 1.1.1.5 | Suspension/Steering | wheeled | logical | ||||
| 1.1.1.5 | Suspension/Steering | number of wheels | quantity | per vehicle | |||
| 1.1.1.5 | Suspension/Steering | number of axles | quantity | per vehicle | |||
| 1.1.1.5 | Suspension/Steering | wheel diameter | inches | per wheel | |||
| 1.1.1.5 | Suspension/Steering | wheel width | inches | per wheel | |||
| 1.1.1.5 | Suspension/Steering | tracked | logical | ||||
| 1.1.1.5 | Suspension/Steering | track segments | quantity | per vehicle | |||
| 1.1.1.5 | Suspension/Steering | track width | inches | per track | |||
| 1.1.1.5 | Suspension/Steering | torsion bars | quantity | per vehicle | |||
| 1.1.1.5 | Suspension/Steering | dampers | quantity | per vehicle | |||
| 1.1.1.5 | Suspension/Steering | track roller wheels | quantity | per vehicle | |||
| 1.1.1.10.1.1 | Primary Weapon | title | nomenclature | per round type | For each Lethal Armament, identify the types of rounds/missiles associated with the Contractor's OMFV solution (Armor Piercing, Airburst, Missile, Training Round, Training Missile, etc.). | ||
| 1.1.1.10.1.1 | Primary Weapon | live rounds / missiles | quantity | per vehicle | For each live round or missile associated with each Lethal Armament of the Contractor's OMFV solution, identify the combat load per vehicle per ammunition type. | ||
| 1.1.1.10.1.2 | Secondary Weapon | title | nomenclature | per round type | For each Lethal Armament, identify the types of rounds/missiles associated with the Contractor's OMFV solution (Armor Piercing, Airburst, Missile, Training Round, Training Missile, etc.). | ||
| 1.1.1.10.1.2 | Secondary Weapon | live rounds / missiles | quantity | per vehicle | For each live round or missile associated with each Lethal Armament of the Contractor's OMFV solution, identify the combat load per vehicle per ammunition type. | ||
| 1.1.1.10.1.3 | Commanders Weapon | title | nomenclature | per round type | For each Lethal Armament, identify the types of rounds/missiles associated with the Contractor's OMFV solution (Armor Piercing, Airburst, Missile, Training Round, Training Missile, etc.). | ||
| 1.1.1.10.1.3 | Commanders Weapon | live rounds / missiles | quantity | per vehicle | For each live round or missile associated with each Lethal Armament of the Contractor's OMFV solution, identify the combat load per vehicle per ammunition type. | ||
| 1.1.1.10.1.4 | Missle System | title | nomenclature | per round type | For each Lethal Armament, identify the types of rounds/missiles associated with the Contractor's OMFV solution (Armor Piercing, Airburst, Missile, Training Round, Training Missile, etc.). | ||
| 1.1.1.10.1.4 | Missle System | live rounds / missiles | quantity | per vehicle | For each live round or missile associated with each Lethal Armament of the Contractor's OMFV solution, identify the combat load per vehicle per ammunition type. | ||
| 1.1.1.10.1.5 | Non-Lethal Armament | title | nomenclature | per round type | For each Non-Lethal Armament, identify the types of munitions associated with the Contractor's OMFV solution (live/inert). | ||
| 1.1.1.10.1.5 | Non-Lethal Armament | live munitions | quantity | per vehicle | For each live munition associated with each non-Lethal Armament of the Contractor's OMFV solution, identify the combat load per munition type. | ||
| 1.1.1.10.1.6 | Other Armament | title | nomenclature | per round type | For each Other Armament listed, identify the types of munitions associated with the Contractor's OMFV solution (live/inert). | ||
| 1.1.1.10.1.6 | Other Armament | live munitions | quantity | per vehicle | For each live munition associated with each Other Armament of the Contractor's OMFV solution, identify the combat load per munition type. | ||
| DRAFT DD FORM 2794 (PAGE 8), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019 |
File details come from the government source that posted it. Updated .