Attachment_0001_CSDR_Plan.xls

XLS spreadsheet 181 KB Posted

Attached to
Optionally Manned Fighting Vehicle (OMFV) Draft Request for Proposal (RFP) W56HZV-22-R-0026
Solicitation number
W56HZV-22-R-0026
Issued by

About this file

This document is a draft Request for Proposal (RFP) for the Optionally Manned Fighting Vehicle (OMFV) program. The U.S. Army is seeking industry feedback on the draft RFP by May 2nd, 2022. The RFP scope includes detailed design, prototype build and testing for the OMFV. Classified and unclassified controlled information attachments to the RFP are available to interested parties that meet security requirements. Interested parties should submit any comments on the draft RFP or associated documents using the provided Comment Resolution Matrix templates. Instructions are provided for requesting classified and unclassified controlled information attachments. The Army will send approved documents only to the data custodian listed on the requesting company's DD2345 form.

View the file

Other files

File Type Posted
(Blank)_CRM_for_OMFV_PSPEC_Rev004.xlsx XLSX spreadsheet
Attachment_0042_ATPD_2232.pdf PDF
Attachment_0091_Digital_System_Model_OTD.docx DOCX document
Attachment_0059_NRMM_Data_Sheet_Wheeled_Tracked.xlsx XLSX spreadsheet
Attachment_0035_System_Support_Package_Component_Listing.xlsx XLSX spreadsheet
Attachment_0058_AFES_Analysis_Information_Request.docx DOCX document
Attachment_0013_Special_License_Requirements.docx DOCX document
Attachment_0017_Request_for_Use_of_Prohibited_Material.doc DOC document
Attachment_0047_Advanced_Manufacturing_Candidate_Parts_List.xlsx XLSX spreadsheet
Attachment_0057_Active_Protection_Data.xlsx XLSX spreadsheet
Attachment_0012_Technical_Data_and_Assertions.xlsx XLSX spreadsheet
Attachment_0060_Vehicle_Data_Package_for_Propulsion_System.xlsx XLSX spreadsheet
OMFV_Draft_CDRLs_W56HZV-22-R-0026_15APR_v2.docx DOCX document
Attachment_0034_Critical_Task_List.pdf PDF
Attachment_0090_CoSite_Data_Instructions.docx DOCX document
Attachment_0061_Tracked_Vehicle_Dynamics_Datasheet.xlsx XLSX spreadsheet
Attachment_0097_Modeling_and_Simulation_Analyses_and_Reports.docx DOCX document
Attachment_0078_Items_Requiring_IUID.xlsx XLSX spreadsheet
OMFV_Draft_RFP_W56HZV-22-R-0026_15APR.docx DOCX document
Attachment_0048_IUID_Sample_Data_Plate.docx DOCX document
(Blank)_CRM_for_OMFV_PSPEC_Rev003.xlsx XLSX spreadsheet
Attachment_0025_HMMR_Template.xlsx XLSX spreadsheet
Attachment_0016_Small_Business_Participation_Factor_Workbook.xlsx XLSX spreadsheet
Attachment_0042_ATPD_2232.pdf PDF
Attachment_0083_Logistics_Schedule.xlsx XLSX spreadsheet
Attachment_0075_OMFV_Program_Schedule_Rev001.docx DOCX document
Attachment_0072_DD_Form_254_Rev001.pdf PDF
Attachment_0043_After_Action_Report_Sample.docx DOCX document
Attachment_0049_IUID_Validation_and_Verification_Report_Sample.xlsx XLSX spreadsheet
Attachment_0100_ATTLA_Universal_Data_Sheet.xlsx XLSX spreadsheet
Attachment_0099_Data_Architecture_Artifacts_OTD.docx DOCX document
Attachment_0084_Raw_Scan_Report_Sample.docx DOCX document
Attachment_0087_Product_Level_TDP_Instruction.docx DOCX document
Attachment_0019_Small_Business_Participation_Factor_Workbook_Instructions.docx DOCX document
Attachment_0039_Master_Task_Data_List.xlsx XLSX spreadsheet
Attachment_0011_Developmental_Level_TDP_Instructions.docx DOCX document
Attachment_0002_Resource_Distro_Table.xlsx XLSX spreadsheet
Attachment_0022_Small_Business_Certification_Form_for_Proposed_Subcontractors.docx DOCX document
Attachment_0024_RMF_Package_Deliverables_Instructions.docx DOCX document
(Blank)_CRM_for_GCIA_Rev002.xlsx XLSX spreadsheet
Attachment_0096_RMF_One_Time_DID.docx DOCX document
Attachment_0064_JackTM_Model_Format.docx DOCX document
Attachment_0077_Prognostics_Predictive_Maintenance_System_Information.docx DOCX document
Attachment_0045_PPMx_Characteristics.xlsx XLSX spreadsheet
(Blank)_CRM_for_OMFV_DRAFT_RFP.xlsx XLSX spreadsheet
Attachment_0086_SAVE_Interface_Description_Document.docx DOCX document
Attachment_0055_Vehicle_Vulnerability_Data_Instructions.docx DOCX document
Attachment_0033_TM_Crosswalk_Template.xlsx XLSX spreadsheet
Attachment_0088_OMFV_Bill_of_Materials_(BOM).xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USG Attachment Coversheet

Attachment 0001
Cost and Software Data Reporting (CSDR) Plan
Revision No:000
Solicitation No.W56HZV-22-R-0026
Date3/29/22
Distribution Statement A: Approved for public release; distribution is unlimited.
SECURITY NOTICE: Contractor responses to the data requirements are likely to be at the Controlled Unclassified Information (CUI) level. For security related guidance and procedures on how to mark, handle, and transmit classified information, contractors should refer to DoD 5220.22-M National Industrial Security Program Operating Manual, 28 Feb 2006, supporting DD 254, and the OMFV Security Classification Guide signed by PEO GCS on 18 February 2021.
All CUI responses should be marked with the following CUI Designation Indicator and Distribution Statement:

Controlled by: the name of the Offeror company (not required if identified in the letterhead) Controlled by: identification of the office creating the document CUI Category: CTI, EXPT, SSEL Distribution Statement: E POC: name and phone number or email of POC

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense Components only; Proprietary Information (DFARS Limited/Restricted Rights); Export Control; date of determination is 18 February 2021. Other requests for this document shall be referred to the attention of the PM MCS Security Manager at: Program Executive Office Ground Combat Systems (PEO GCS), ATTN: SFAE-GCS-C, 6501 E. 11 Mile Road, Detroit Arsenal, MI 48397-5000.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed -- in whole or in part -- for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of -- or in connection with -- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. Source Selection Information -- See FAR 2.101 and 3.104.

Change Log

Mark as (CUI) when data is inputed
This worksheet documents changes to this attachment between contract modifications (except changes to the 'Change Log' itself, which are self-evident).
Change #DateMOD NumberRange ChangedChange Description
Mark as (CUI) when data is inputed

DD Form 2794, Pg 1 (METADATA)

COST AND SOFTWARE DATA REPORTING PLANOMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM NAME
Next Generation Combat Vehicles - Optionally Manned Fighting Vehicle (NGCV-OMFV)
1b. PHASE/MILESTONE (check all that apply)
Pre-A
XA
XB
C-LRIP
C-FRP
O&S
1c. PRIME MISSION PRODUCT
Optionally Manned Fighting Vehicle (OMFV)
1d. ACQUISITION CATEGORY (ACAT)
XPre-ACAT
ACAT I (MDAP)
ACAT IA (MAIS)
ACAT II
ACAT III
Other
2. COMMODITY TYPE
Ground Vehicle System
3. PLAN ITERATION TYPE
XINITIAL
REVISION
4. CURRENT SUBMISSION DATE (YYYYMMDD)
5. LAST APPROVED PLAN DATE (YYYYMMDD)
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
Teper, Gerald (Jerry)
6b. ADDRESS (Include ZIP Code)
6501 E 11 Mile Road

Warren, MI 48397-5000

6c. TELEPHONE NUMBER (Include Area Code)
(586) 282-5056
6d. E-MAIL ADDRESS
gerald.e.teper.civ@army.mil
7. PLAN TYPE
GOVERNMENT
XCONTRACT (PRIME)
CONTRACT (SUB)
8. PLAN GOVERNMENT PREPARING ORGANIZATION
SFAE-GCS-C
9a. CONTRACTOR NAME/ADDRESS
i. REPORTING ORGANIZATION NAME
TBD
ii. DIVISION NAME
iii. LOCATION
iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
XCBDR REQUIRED FOR THIS ORGANIZATION
9b. CONTRACT NUMBER (List all that apply, separated by commas)
9c. APPROPRIATION (check all that apply)
XRDT&E
PROCUREMENT
O&M
FMS
WCF
OTHER
10a. APPROVED PLAN NUMBER
10b. APPROVED PLAN REVISION NUMBER
10c. APPROVED PLAN REQUIREMENTS
XAT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy)
XAT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
XTECHNICAL DATA REQUIRED
10d. COST REPORT TYPE
XFLEXFILE
LEGACY DD 1921 SERIES
DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 2 (REPORTING)

COST AND SOFTWARE DATA REPORTING PLANCOST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN
11. WORK BREAKDOWN STRUCTURE (WBS)12. COST13. TECHNICAL DATA
a. WBS
CODEb. WBS
LEVELc. WBS ELEMENT NAMEa. ACTUALS TO
DATE (ATD)b. LEGACY
1921-1c. LEGACY
1921-2d. LEGACY
1921-5e. EAC/FAC
(See item 10d)a. QUANTITYb. SRDR
FORMATSc.

MAINT. &

REPAIR

PARTS

i. QUANTITY
DATAii. GFE

QUANTITY

1.01Optionally Manned Fighting Vehicle (OMFV)
1.12Family of OMFV
1.1.13OMFV
1.1.1.14OMFV Integration, Assembly, Test, and Checkout
1.1.1.1.15IntegrationXXX
1.1.1.1.25Test,Checkout and SupportXXX
1.1.1.24Hull/Frame/Body/Cab
1.1.1.2.15Hull StructureXXX
1.1.1.2.25Hatches/Access PanelsXXX
1.1.1.2.35Other Hull/Frame/Body/CabXXX
1.1.1.34System Survivability
1.1.1.3.15Chemical, Biological, Radiological, Nuclear, and Explosive ProtectionXXX
1.1.1.3.25Active Protection System(s)
1.1.1.3.2.16Hard Kill Active Protective SystemXXX
1.1.1.3.2.26Soft Kill Active Protective SystemXXX
1.1.1.3.2.36Other Active Protection SystemXXX
1.1.1.3.35Laser Warning Receiver(LWR)XXX
1.1.1.3.45Roof ArmorXXX
1.1.1.3.55IED CountermeasuresXXX
1.1.1.3.65Sensor SubsystemsXXX
1.1.1.3.75Fire Detection/SuppressionXXX
1.1.1.3.85CE ArmorXXX
1.1.1.3.95KE ArmorXXX
1.1.1.3.105Other System SurvivabilityXXX
1.1.1.44Turret Assembly
1.1.1.4.15Turret StructureXXX
1.1.1.4.25Hatches/Access PanelsXXX
1.1.1.4.35Turret BearingXXX
1.1.1.4.45SlipringXXX
1.1.1.4.55Other Turret AssemblyXXX
1.1.1.54Suspension/Steering
1.1.1.5.15Track/TireXXX
1.1.1.5.25Roadwheel/RimXXX
1.1.1.5.35Suspension SubassemblyXXX
1.1.1.5.45Other Suspension/SteeringXXX
1.1.1.64Vehicle Electronics
1.1.1.6.15ComputersXXX
1.1.1.6.25Data Distribution & Control SubsystemXXX
1.1.1.6.35Power Distribution HardwareXXX
1.1.1.6.45Solider DisplaysXXX
1.1.1.6.55Vehicle CablingXXX
1.1.1.6.65Situational AwarenessXXX
1.1.1.6.75Other Vehicle ElectronicsXXX
1.1.1.74Power Package/Drive Train
1.1.1.7.15EngineXXX
1.1.1.7.25TransmissionXXX
1.1.1.7.35Final Drive/DifferentialXXX
1.1.1.7.45Sprocket/DriveaxleXXX
1.1.1.7.55GeneratorXXX
1.1.1.7.65Heat Exchangers/CoolingXXX
1.1.1.7.75Power StorageXXX
1.1.1.7.85BrakingXXX
1.1.1.7.95Exhaust/Air Induction and FiltrationXXX
1.1.1.7.105Drive By Wire(DBW)XXX
1.1.1.7.115BatteriesXXX
1.1.1.7.125Other Power Package/Drive TrainXXX
1.1.1.84Auxiliary Automotive
1.1.1.8.15LightingXXX
1.1.1.8.25StowageXXX
1.1.1.8.35Fuel SystemsXXX
1.1.1.8.45HydraulicsXXX
1.1.1.8.55Environmental Control SystemXXX
1.1.1.8.65CBRMXXX
1.1.1.8.75Other Auxilary AutomotiveXXX
1.1.1.94Fire Control
1.1.1.9.15SensorsXXX
1.1.1.9.25Controls and DisplaysXXX
1.1.1.9.35Sights and ScopesXXX
1.1.1.9.45Gunner's SightXXX
1.1.1.9.55Commanders SightXXX
1.1.1.9.65Aided Target RecognitionXXX
1.1.1.9.75Gunner Embedded TrainerXXX
1.1.1.9.85Other Fire Control SubsystemXXX
1.1.1.104Armament
1.1.1.10.15Primary WeaponXXX
1.1.1.10.25Secondary WeaponXXX
1.1.1.10.35Commanders WeaponXXX
1.1.1.10.45Missle SystemXXX
1.1.1.10.55Non-Lethal Weapon(s)XXX
1.1.1.10.65Other ArmamentXXX
1.1.1.114Automatic Ammunition HandlingXXX
1.1.1.124Navigation and Remote Piloting Systems
1.1.1.12.15NavigationXXX
1.1.1.12.25Remote Piloting Systems
1.1.1.12.2.16Common Control and OperationXXX
1.1.1.12.2.26Driver Control and OperationXXX
1.1.1.12.2.36Imagery Control and OperationXXX
1.1.1.12.2.46Turret Controls and OperationXXX
1.1.1.12.2.56Other Remote Piloting SystemsXXX
1.1.1.134Special EquipmentXXX
1.1.1.144Communications
1.1.1.14.15RadiosXXX
1.1.1.14.25AntennasXXX
1.1.1.14.35Communication CablingXXX
1.1.1.14.45Mission CommandXXX
1.1.1.14.55IntercomXXX
1.1.1.14.65External CommunicationXXX
1.1.1.154OMFV Software Release CSCI(1..n) Contractor Shall SpecifyXXX
1.1.1.164Other OMFV SubsystemsXXX
1.1.23Variant 2...n (Specify)XXX
1.1.33Equipment Kits
1.1.3.14Underbelly Protection KitXXX
1.1.3.24Other Equipment Kits 1…n(Specify)XXX
1.22Secondary Vehicle
1.32Systems Engineering
1.3.13Software Systems EngineeringXX
1.3.23Integrated Logistics Support (ILS) Systems Engineering
1.3.2.14Maintainability Concept ReviewXX
1.3.2.24Maintenance AssessmentXX
1.3.2.34Supportability AnalysisXX
1.3.2.44RAM EngineeringXX
1.3.2.54Other ILS System EngineeringXX
1.3.33Cybersecurity Systems EngineeringXX
1.3.43Core Systems EngineeringXX
1.3.53Architecture Development EngineeringXX
1.3.63Other Systems EngineeringXX
1.42Program Management
1.4.13Software Program ManagementXX
1.4.23Integrated Logistics Support (ILS) Program ManagementXX
1.4.33Cybersecurity ManagementXX
1.4.43Core Program ManagementXX
1.4.53Other Program ManagementXX
1.52System Test and Evaluation
1.5.13Development Test and Evaluation
1.5.1.14Cybersecurity Test and EvaluationXX
1.5.1.24Automotive Performance Test and EvaluationXX
1.5.1.34Reliability,Availability and Maintainability(RAM) Test and EvaluationXX
1.5.1.44DT System Support PackageXXX
1.5.1.54Other Development Test and EvaluationXX
1.5.23Operational Test and Evaluation
1.5.2.14Cybersecurity Test and EvaluationXX
1.5.2.24Limited User Test(LUT) and EvaluationXX
1.5.2.34OT System Support PackageXXX
1.5.2.44Other Operational Test and EvaluationXX
1.5.33Live Fire Test and Evaluation
1.5.3.14Survivability Test
1.5.3.1.15Armor Coupon TestXX
1.5.3.1.25Ballastic Hull and Turret(BH&T) Test and EvaluationXX
1.5.3.1.35APS Test and EvaluationXX
1.5.3.1.45Underbelly Test and EvaluationXX
1.5.3.24Lethality Test and Evaluation
1.5.3.2.15Primary Weapon Test and EvaluationXX
1.5.3.2.25Missle Test and EvaluationXX
1.5.3.2.35System Support PackageXX
1.5.3.34Other Live Fire Test and EvaluationXX
1.5.43Mock-ups/System Integration Labs (SILs)XX
1.5.53Test and Evaluation SupportXX
1.5.63Test FacilitiesXX
1.62Training
1.6.13Equipment
1.6.1.14Operator Instructional EquipmentXX
1.6.1.24Maintainer Instructional EquipmentXX
1.6.23Services
1.6.2.14Operator Instructional ServicesXX
1.6.2.24Maintainer Instructional ServicesXX
1.6.33FacilitiesXX
1.6.43Training SoftwareXX
1.72Data
1.7.13Data DeliverablesXX
1.7.23Data RepositoryXX
1.7.33Data RightsXX
1.82Peculiar Support Equipment
1.8.13Test and Measurement EquipmentXX
1.8.23Support and Handling EquipmentXX
1.92Common Support Equipment
1.9.13Test and Measurement EquipmentXX
1.9.23Support and Handling EquipmentXX
1.102Operational/Site Activation by Site
1.10.13System Assembly, Installation, and Checkout on SiteXX
1.10.23Contractor Technical SupportXX
1.10.33Site ConstructionXX
1.10.43Site/Ship/Vehicle ConversionXX
1.10.53Interim Contractor Support (ICS)XX
1.112Contractor Logistics Support (CLS)XX
1.122Industrial Facilities
1.12.13Construction/Conversion/ExpansionXX
1.12.23Equipment Acquisition or ModernizationXX
1.12.33Maintenance (Industrial Facilities)XX
1.132Initial Spares and Repair PartsXXX
1.142Ballistic Hull & Turret (BH&T) Asset(s)XXX
Subtotal CostXX
Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX
Reporting Contractor Profit/Loss or FeeXX
Total PriceXX
DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019

DD Form 2794, Pg 3 (EVENTS)

COST AND SOFTWARE DATA REPORTING PLAN
14. CSDR SUBMISSION EVENTS
a.
EVENT IDb.
DATA REPORT(S)c.
SUBMISSION EVENT NAMEd.
REPORT CYCLEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1Cost and Hour Report (FlexFile), Quantity Data ReportContract AwardInitial2023042020230620
2Technical Data ReportContract AwardInitial2023042020230620
3SRDR DevelopmentContract AwardInitial2023042020230620
4Cost and Hour Report (FlexFile), Quantity Data ReportPreliminary Design Review(PDR)Interim2024042020240620
5Technical Data ReportPreliminary Design Review(PDR)Interim2024042020240620
6SRDR DevelopmentPreliminary Design Review(PDR)Interim2024042020240620
7Cost and Hour Report (FlexFile), Quantity Data ReportCritical Design Review(CDR)Interim2025042020250620
8Technical Data ReportCritical Design Review(CDR)Interim2025042020250620
9SRDR DevelopmentCritical Design Review(CDR)Interim2025042020250620
11Cost and Hour Report (FlexFile), Quantity Data ReportPrototype DeliveryFinal2026042020260620
12Technical Data ReportPrototype DeliveryFinal2026042020260620
13SRDR DevelopmentPrototype DeliveryFinal2026042020260620
DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 4 (REMARKS)

COST AND SOFTWARE DATA REPORTING PLAN
15. REMARKS
15. REMARKS
a. CSDR Planning Approach & Preparation Instructions

1. In addition to the direction provided in the associated CSDR Data Item Descriptions (DIDs) and the CSDR Manual (DoDM 5000.04), the following instructions, requirements, and considerations found on this page/worksheet shall be utilized when collecting data and preparing CSDR submissions.

2. This CSDR Contract plan is intended to capture costs associated with the contract number(s) listed in block 9.b. The contractor shall capture and report any and all costs incurred in order to perform the scopes of work on the Contract irrespective of contract type (e.g., firm-fixed price, cost-plus fixed fee) or funding source (i.e., via contract, via contractor internal research & development funds).

3. Costs reported against this CSDR Plan shall be cumulative in nature (i.e., each submission shall report any and all costs incurred on and prior to the submission’s “AS OF DATE” (block 14.e)).

4. Other than the Resource Distribution Table, submission events associated with this CSDR Plan are classified as either "Initial", "Interim", or "Final" submissions as identified in block 14.d of this CSDR Plan.

i. Submission events marked "Initial" shall report the Contractor's total anticipated contract cost and resulting price using the maximum allowable contractor quantities, hours, or options (as applicable). For sealed bid contracts (i.e., contracts awarded under FAR Part 14) the reported FAC/EAC shall equal the value of the Contractor's sealed bid (using the maximum allowable contractor quantities, hours, or options (as applicable)). For negotiated contracts (i.e., contracts award under FAR Part 15) the reported FAC/EAC shall be equal in overall value to the Contractor's best and final offer (and consistent in distribution with any supporting cost and pricing data (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). For all other contracts, the reported FAC/EAC shall be equal in overall value to the Contractor's final proposal and consistent in distribution with any supporting data provided to substantiate the contract's value, reasonableness, and/or realism (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). No ATD costs are anticipated to reported on an "Initial" submission except for any certified precontract costs incurred prior to or on the date of contract award.

ii. "Interim" report submissions are any report that is not either an "Initial" or "Final" report. Reported ATD, EAC/FAC, and quantities on "Interim" submissions shall be prepared reflecting only the value of work, quantities, hours, or options (as applicable) awarded on the report's "As Of Date" (do not include costs for anticipated but not awarded scopes of work, quantities, hours, or options).

iii. Reported ATD, EAC/FAC, and quantities on "Final" submissions shall be prepared reflecting the value of work, quantities, hours, and options (as applicable) anticipated to be awarded on a contract and meet the conditions listed in block 15.c.i.4.

5. Regarding the WBS Structure (block 11): This CSDR Plan utilizes MIL-STD-881E as the baseline for its WBS which has been extended to provide additional insight into system(s) or subsystem(s) which the Government believes to be high-risk or high-technical-interest in accordance with DoD Manual 5000.04.

i. WBS Element Names (block 11.c) Ending with "1...n (Contractor Shall Specify)": The contractor shall extend and specify (i.e., include additional WBS elements determined by the contractor) in order to provide additional insight into the contractor's technical approach or design. The additional WBS elements shall be developed in accordance with the WBS guidelines included in MIL-STD-881E and DoD Manual 5000.04.

ii. The contractor may extend any WBS element to allow the contractor to provide additional insight into its technical solution. Any and all extensions or tailoring of the WBS shall be in accordance with guidelines included in MIL-STD-881E and DoD Manual 5000.04.

iii. If changes to the contract scope, hours, or options (as applicable) necessitate the need to revise or add additional WBS elements to remain in compliance with MIL-STD-881E and DoD Manual 5000.04, any associated contract cost/price changes related to the updated CSDR Plan or submission of revised CSDR deliverables, shall be included within the contract modification that awards the changed scope of work, hours, or options (as applicable).

b. Resource Distribution Table

1. Submissions of the Resource Distriubtion Table (RDT) are required under the following conditions:

i. An RDT shall be delivered seven calendar days before the “Cost and Software Data Reporting Readiness Review”. Prepare this submission of the RDT at FAC/EAC value and utilizing the instructions at Block15.a.4.i.This copy of the RDT will be used during the “Cost and Software Data Reporting Readiness Review” in order to finalize which subcontractors will be required to provide CSDR reporting via electronic submission of deliverables directly to the Defense Cost and Resource Center (DCARC) and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.

ii. An RDT shall be delivered within thirty calendar days of the contractor identifying that a subcontractor who, at the time of initial subcontractor award, was not anticipated to qualify for direct subcontractor CSDR reporting via electronic submission of deliverables directly to the DCARC but is subsequently anticipated to meet the CSDR direct reporting subcontractor threshold value due to changes to scopes of work, end-item design, subcontractor/supplier, or subcontract price changes since initial contract award (unless the newly identified subcontractor has already been issued a subcontractor reporting waiver associated with this contract).

c. Submission Dates

1. All CSDR deliverable “AS OF DATE[S]” and “DUE DATE[S]” listed in blocks 14.e and 14.f are identified for planning purposes only. Submission dates are subject to change and are determined in accordance with the event drivers as identified below:

i. Except for the initial submission, all “DUE DATE” requirements are equal to the “AS OF DATE” plus 60 calendar days. The initial submission's"DUE DATE" shall be 90 days after the identified "AS OF DATE". If the calculated “Due Date” does not fall on a regular business day, the “Due Date” will be the next regular business day on the contractor’s accounting calendar.

ii. Initial Submission: Submission events marked as an "Initial" submission in block 14.d. shall have an “AS OF DATE” as of the date of contract award.

iii. Interim Submission(s): Submission events marked as an "Interim" submission in block 14.d shall have an "AS OF DATE" based on the submission event name in block 14.c. For example, if the submission event name was "Contract Award Plus 24 Months" then the submission's "AS OF DATE" is the contract award date plus 24 calendar months. If the submission event name was "Complete Delivery of First Article Test Assets" then the submission's "AS OF DATE" would be the date the final First Artical Test Asset was delivered.

"iv. Final Submission(s): Submission events marked as ""Final"" submission in block 14.d shall have an ""AS OF DATE"" when the following conditions have been met:

1. Condition 1: All end items anticipated to be procured on the contract have been delivered and accepted by the government (e.g., as evidenced by a completed DD Form 250) or higher tier contractor in the case of a subcontractor.

2. Condition 2: 95% or more of all ATD total costs have been incurred relative to all costs the reporting entity expects to incur for each and every Order/Lot (defined in Data Group B, Item 4 of the approved FlexFile DID)."

d. Cost and Hour Report (FlexFile)

1. The contractor shall utilize the following mappings from its accounting system when preparing and submitting FlexFile Actual Cost-Hour Data:

i. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system}

ii. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system}

iii. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system}

...n. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system}

2. The contractor shall utilize and include the following mappings from its accounting system to the Actual Cost-Hour Data tags:

i. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system} = Tag1

ii. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system} = Tag2

iii. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system} = Tag3

xxv. {To be determined during the Post-Award CSDR Conference based on contractor's accounting system} = Tag25

3. Order Lot Scope: Block 16 of this CSDR Plan is meant to capture the discrete Delivery Orders/Task Orders (as applicable) exercised on the contract. If a Delivery Order/Task Order (as applicable) is exercised on the contract but is not listed in block 16, the contractor shall submit the dollars and hours in the Cost and Hour Report (FlexFile) and the quantity information in the Quantity Report tagged using the name of the Delivery Order/Task Order (as applicable) utilized on the contract. The CSDR Plan will be updated to include the appropriate Delivery Order/Task Order (as applicable) name in block 16, after report submission, if required.

4. End Item Scope: Block 17 of this CSDR Plan is meant to capture the discrete hardware end items that are DD-250'ed, ordered, procured, or exercised (as applicable) on the contract. If an End Item is DD-250'ed, ordered, procured, or exercised (as applicable) on the contract but is not listed in block 17, the contractor shall submit the dollars and hours in the Cost and Hour Report (FlexFile) and the quantity information in the Quantity Report tagged using the name of the End Item utilized on the contract. The CSDR Plan will be updated to include the appropriate End Item name in block 17, after reprot submission, if required.

i. End Item ID 1: The "Common" end item tag shall be used to report costs and hours which are not incurred or directly attributable to an individual end item. For example, overarching program management costs and hours that are required, independent of the type or quantity of end items on contract would be tagged against the “Common” end item. Common hardware (i.e., identical/homogeneous part numbers) procured and integrated into multiple end items shall utilize the end item tag for the prime product they were integrated onto and shall not be tagged with the “Common” end item.

ii. End Item ID shall be reported against WBS with associated costs and hours attributed to the lowest level children WBS elements found beneath it.

"n. End Item ID n: Costs and hours attributed to the ""Spares Package(s)"" shall be reported against WBS 1.13 (Initial Spares and Repair Parts).

The contractor shall provide the following within the WBS Element Remarks (or via a supporting Excel or CSV file) for WBS Element 1.13 (Initial Spares and Repair Parts):

- Spares Package Nomenclature: Identify the nomenclature/title of the initial spares and repair parts package (e.g., Authorized Stoackage List 1, System Support Package for Test & Evaluation Support, FY21 Spares Order).

- Part Number: Include a listing of all contractor part numbers included within each Spares Package.

- Part Nomenclature: Include the contractor part nomenclature, for each contractor part number.

- National Stock Number (NSN) or National Item Identification Number (NIIN): Include the NSN or NIIN for each contractor part number. If a NSN or NIIN have not been assigned to a part number, utilize ""N/A"".

- Part Quantity: Report the quantity of parts included in each Spares Package(s), by contractor part number."

5. The contractor shall provide unit reporting for any given Order/Lot and End Item name as outlined in block 18 of this CSDR Plan. If Unit Reporting is selected in block18.c (Unit Reporting), it is expected that all touch labor costs and hours that are associated with the discrete units or sublots be tagged as Touch Manufacturing or Touch Maintenance as defined in DI-FNCL-82162, Data Group E, Item 7.

6. The contractor shall provide a description of the type and timing of all impacts to program schedule, incurred actual costs, and forecasted at complete costs, in process quantities, and delivered quantities which are directly attributable to the COVID-19 pandemic: provide general impacts within the Summary Remark; provide impacts to specific WBS Elements or Functional Elements within the WBS Element Definitions and Remarks by DD FORM 2794 WBS Element. If applicable, the contractor shall provide an explanation of any new charge codes, work packages, control accounts, pricing categories, or other methods explicitly utilized to capture impacts of COVID-19. Note any relevant information that could be used in the interpretation of the data. If applicable, the contractor shall utilize a “Tag” or the “Additional Data Field” referenced in Section B of the FlexFile DID (DI-FNCL-82162) to identify COVID-19 related data.

e. Period Of Performance & Additional Scope Of Work

1. If the Contract period of performance is extended by more than six months, or if the scope of work is modified to include work not otherwise covered by the CSDR Plan, the government may modify the CSDR Plan to require additional submission events and add additional WBS elements in order to ensure the accurate and complete collection of cost data associated with the modified contract. Depending on the scope and complexity of the contract modification, the contractor may be required to host or attend an additional Post-Award Cost and Software Data Reporting Conference to review the CSDR Plan changes and the contractor’s plan to collect and report costs associated with the additional scope of work.

f. Cost Accounting Standards (CAS) Disclosure Statement Differences

1. The contractor shall follow the accounting procedures specified in its latest approved CAS Disclosure Statement and with any clauses or requirements included in the contract. As part of the Cost and Software Data Reporting Readiness Review, the contractor shall identify any aspect(s) of its latest approved CAS Disclosure Statement which preclude or inhibit compliance with this CSDR Plan and DoD 5000.04 (CSDR Manual). The contractor shall identify any deviations from its CAS disclosure statement it intends to utilize to prepare CSDR submissions.

g. Nonrecurring/Recurring Segregation

1. The contractor shall utilize the specific definitions and requirements in the CSDR Manual (DoDM 5000.04) and the definitions in the DID for the Cost and Hour Report (FlexFile) report (DI-FNCL-82162) to segregate Recurring and Nonrecurring costs discretely and not as an aggregate.

h. 1921-3 CONTRACTOR BUSINESS DATA REPORT i.The Contractor Business Data Report shall be prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting and defending Forward Pricing Rate Agreement (FPRA) with the government. Data for Future Years should be reflective of the number of years contained in the most current document (i.e., the FPRP or the FPRA). If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates shall be provided for three future years.

i. The Contractor Business Data Report shall be prepared by and for the contractor's business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the Government.

ii. A 1921-3 report shall be submitted annually at the end of the contractor's fiscal year.

iii. Data for Future Years shall be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates shall be provided for three future years.

i. COVID-19 Reporting

"1. The contractor shall provide a description of the type and timing of all impacts to program schedule, incurred actual costs, forecasted at complete costs, in process quantities, and delivered quantities, which are directly attributable to the COVID-19 pandemic.

Per the DIDs, note any relevant information that could be used in the interpretation of the data. Provide general or, if available, quantifiable contract impacts within the Summary Remarks. Provide impacts to specific WBS Elements or Functional Elements within the Remarks by DD FORM 2794 WBS Element. Provide impacts to the business unit within the Remarks of each 1921-3 submission. Organize impacts under a heading in the remarks that refers to “COVID-19 impacts”, or similar language, that segments this information from the rest of the remarks.

If applicable, the contractor shall provide an explanation of any new charge codes, work packages, control accounts, pricing categories, or other methods explicitly utilized to capture impacts of COVID-19.

If there are no impacts to report, then report there are no impacts in the Summary Remarks of each FlexFile and the Remarks of each 1921-3 submission."

2. Additional Data Fields #1-#12 (FlexFile)

i. If applicable, the contractor shall utilize a “Tag” or the “Additional Data Field” referenced in Section B of the FlexFile DID (DI-FNCL-82162) to identify COVID-19 related data.

i. WBS Configuration Management

"1. The WBS Dictionary is a living document and must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The dictionary shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. The dictionary shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element.

The reporting entity must maintain and update the WBS Dictionary throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the “As of Date” of the submitted FlexFile report and indicate the changes to the WBS Index and Dictionary Definitions.

For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in the dictionary that “This CSDR WBS element is not associated with this contract’s scope of work”, and zero costs will be associated for ATD and FAC for these WBS elements."

DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 5 (SCOPE DEF)

COST AND SOFTWARE DATA REPORTING PLAN
INTRA-CONTRACT SCOPE REPORTING DEFINITION
16. ORDERS/LOTS
a. IDb. NAMEc. PHASE/MILESTONE
1Order Year 1B
17. END ITEMS
a. IDb. NAME
1Optionally Manned Fighting Vehicle (OMFV) Prototypes
2Ballastic Hull and Turret
18. OPTIONAL REQUIREMENTS
a. ORDER/LOT IDb. END ITEM IDc. UNIT REPORTING
(X if applicable)d. SEQUENCING

(X if applicable)

DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019

DD Form 2794, Pg 6 (SRDR DEV)

COST AND SOFTWARE DATA REPORTING PLAN - SRDR DEVELOPMENT
19. RELEASES
a. IDb. NAMEc. DATE
1OMFV Software Release 1...n (Contractor Shall Specify)
20. CSCI'S
a. IDb. NAME
21. PRODUCT SIZE REPORTING ELEMENTS
a. CODEb. NAMEc. RELEASE IDd. CSCI ID
22. PRODUCT SIZE SUBMISSIONSc. RELEASE ID:
a. NUMBERb. NAMEIncluded?Included?Included?
DRAFT DD FORM 2794 (PAGE 6), SRDR DEVELOPMENT, JANUARY 2019

DD Form 2794, Pg 8 (TECH RQTS)

COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS
26. WBS ELEMENT CODE27. WBS ELEMENT NAME28. ITEM TYPE29. TECHNICAL PARAMETER
a. PARAMETER NAMEb. UNIT OF MEASUREc. UNIT OF MEASURE QUALIFIERd. REPEATABLEe. REMARKS
1.1.1OMFVlengthinchesper vehicle
1.1.1OMFVwidthinchesper vehicle
1.1.1OMFVheightinchesper vehicle
1.1.1OMFVgross vehicle weightpoundsper vehicle
1.1.1OMFVcurb weightpoundsper vehicle
1.1.1OMFVempty weightpoundsper vehicle
1.1.1OMFVtop speedmilesper hour
1.1.1OMFVvehicle cone indexvehicle cone indexper vehicle
1.1.1OMFVfuel capacitygallonsper fuel tank
1.1.1OMFVfuel economymilesper gallon
1.1.1OMFVcruise rangemilesper vehicle, per fuel tank
1.1.1OMFVcrewquantityper vehicle
1.1.1OMFVpassengersquantityper vehicle
1.1.1OMFVground clearanceinchesper vehicle
1.1.1OMFVfording depthinchesper vehicle
1.1.1OMFVgap crossinginchesper vehicle
1.1.1OMFVcapacitypoundsper vehicle
1.1.1.2Hull/Frame/Body/Cabhull lengthinchesper vehicle
1.1.1.2Hull/Frame/Body/Cabhull widthinchesper vehicle
1.1.1.2Hull/Frame/Body/Cabhull heightinchesper vehicle
1.1.1.2Hull/Frame/Body/Cabhull weightinchesper vehicle
1.1.1.3.2.1Hard Kill Active Protective Systemtitlenomenclatureper round typeFor each [type] Active Protection System, identify the types of rounds/missiles associated with the Contractor's OMFV solution (live/inert).
1.1.1.3.2.1Hard Kill Active Protective Systemroundsquantityper vehicleFor each Hard Kill Active Protection System listed, identify the combat load associated with each live countermeasure(s).
1.1.1.3.2.2Soft Kill Active Protective Systemtitlenomenclatureper round typeFor each [type] Active Protection System, identify the types of rounds/missiles associated with the Contractor's OMFV solution (live/inert).
1.1.1.3.2.2Soft Kill Active Protective Systemroundsquantityper vehicleFor each Soft Kill Active Protection System listed, identify the combat load associated with each live countermeasure(s).
1.1.1.3.2.3Other Active Protection Systemtitlenomenclatureper round typeFor each [type] Active Protection System, identify the types of rounds/missiles associated with the Contractor's OMFV solution (live/inert).
1.1.1.3.2.3Other Active Protection Systemroundsquantityper vehicleFor each Other Active Protection System listed, identify the combat load associated with each live countermeasure(s).
1.1.1.3.10Other System Survivabilityintegral armor weightpoundsper vehicleDo not include this information if it is classified CONFIDENTIAL, SECRET, or TOP SECRET.
1.1.1.3.10Other System Survivabilityadd-on armor weightpoundsper vehicleDo not include this information if it is classified CONFIDENTIAL, SECRET, or TOP SECRET.
1.1.1.7Power Package/Drive Traingross horsepowerhorsepowerper engine
1.1.1.7Power Package/Drive Traindisplacementcubic inchesper engine
1.1.1.7Power Package/Drive Trainmax torquenewton meterper engine
1.1.1.7Power Package/Drive Trainforward gearsquantityper transmission
1.1.1.7Power Package/Drive Trainreverse gearsquantityper transmission
1.1.1.7Power Package/Drive Traintotal power generation capacitykilowattsper vehicle, per hour
1.1.1.5Suspension/Steeringwheeledlogical
1.1.1.5Suspension/Steeringnumber of wheelsquantityper vehicle
1.1.1.5Suspension/Steeringnumber of axlesquantityper vehicle
1.1.1.5Suspension/Steeringwheel diameterinchesper wheel
1.1.1.5Suspension/Steeringwheel widthinchesper wheel
1.1.1.5Suspension/Steeringtrackedlogical
1.1.1.5Suspension/Steeringtrack segmentsquantityper vehicle
1.1.1.5Suspension/Steeringtrack widthinchesper track
1.1.1.5Suspension/Steeringtorsion barsquantityper vehicle
1.1.1.5Suspension/Steeringdampersquantityper vehicle
1.1.1.5Suspension/Steeringtrack roller wheelsquantityper vehicle
1.1.1.10.1.1Primary Weapontitlenomenclatureper round typeFor each Lethal Armament, identify the types of rounds/missiles associated with the Contractor's OMFV solution (Armor Piercing, Airburst, Missile, Training Round, Training Missile, etc.).
1.1.1.10.1.1Primary Weaponlive rounds / missilesquantityper vehicleFor each live round or missile associated with each Lethal Armament of the Contractor's OMFV solution, identify the combat load per vehicle per ammunition type.
1.1.1.10.1.2Secondary Weapontitlenomenclatureper round typeFor each Lethal Armament, identify the types of rounds/missiles associated with the Contractor's OMFV solution (Armor Piercing, Airburst, Missile, Training Round, Training Missile, etc.).
1.1.1.10.1.2Secondary Weaponlive rounds / missilesquantityper vehicleFor each live round or missile associated with each Lethal Armament of the Contractor's OMFV solution, identify the combat load per vehicle per ammunition type.
1.1.1.10.1.3Commanders Weapontitlenomenclatureper round typeFor each Lethal Armament, identify the types of rounds/missiles associated with the Contractor's OMFV solution (Armor Piercing, Airburst, Missile, Training Round, Training Missile, etc.).
1.1.1.10.1.3Commanders Weaponlive rounds / missilesquantityper vehicleFor each live round or missile associated with each Lethal Armament of the Contractor's OMFV solution, identify the combat load per vehicle per ammunition type.
1.1.1.10.1.4Missle Systemtitlenomenclatureper round typeFor each Lethal Armament, identify the types of rounds/missiles associated with the Contractor's OMFV solution (Armor Piercing, Airburst, Missile, Training Round, Training Missile, etc.).
1.1.1.10.1.4Missle Systemlive rounds / missilesquantityper vehicleFor each live round or missile associated with each Lethal Armament of the Contractor's OMFV solution, identify the combat load per vehicle per ammunition type.
1.1.1.10.1.5Non-Lethal Armamenttitlenomenclatureper round typeFor each Non-Lethal Armament, identify the types of munitions associated with the Contractor's OMFV solution (live/inert).
1.1.1.10.1.5Non-Lethal Armamentlive munitionsquantityper vehicleFor each live munition associated with each non-Lethal Armament of the Contractor's OMFV solution, identify the combat load per munition type.
1.1.1.10.1.6Other Armamenttitlenomenclatureper round typeFor each Other Armament listed, identify the types of munitions associated with the Contractor's OMFV solution (live/inert).
1.1.1.10.1.6Other Armamentlive munitionsquantityper vehicleFor each live munition associated with each Other Armament of the Contractor's OMFV solution, identify the combat load per munition type.