Attachment 00 PWS Annex K - Heating and Cooling.pdf

PDF 184 KB Posted

Attached to
Facilities Maintenance and Repair, Base Maintenance Services for US Army Garrison Rheinland Pfalz, Germany
Solicitation number
W564KV20R2000
Issued by

About this file

This federal contract opportunity announcement solicits proposals for facilities maintenance and repair base maintenance services at U.S. Army Garrison Rheinland-Pfalz in Germany. Services required include operating and maintaining central heating and cooling plants, water treatment facilities, and non-outsourced components of exterior water systems. Proposers must request the technical exhibits pertaining to installation maps by 23 March 2020. Questions are due by the same date. The government provides no previous information as binding and notifies offerors to request updated requirements.

View the file

Other files

File Type Posted
QandA-4 W564KV20R2000 Solicitation 03Jun2020.pdf PDF
Question 152 - additional data.pdf PDF
Amendment 03 W564KV20R2000 03-Jun-2020.pdf PDF
Amendment 03 Conformed W564KV20R2000 03-Jun-2020.pdf PDF
Question 184 - additional data.pdf PDF
FY19 DMO RAW DATA BY SHOPS.XLSX XLSX spreadsheet
TE-0047 Railroad tracks UPDATED.pdf PDF
TE-0080A Grounds Maintenance GAD GR and CWS UPDATED.pdf PDF
TE-0075A Grounds Maintenance KMC UPDATED.pdf PDF
TE-1039 Utility Privatization GAD UPDATED.pdf PDF
TE-1027 Fire Protec Sys HO2 GAD UPDATED.pdf PDF
Attachment 00 PWS Annex A - TMC 2020-May-04 UPDATED.pdf PDF
TE-3039 Utility Privatization UPDATED.pdf PDF
TE-3027 Fire Protec Sys HO2 CWS UPDATED.pdf PDF
TE-2061 Pest Gruenstadt UPDATED.pdf PDF
Gruenstadt Germersheim CWS Incumbent Pay Groups.pdf PDF
Gruenstadt Germersheim CWS Incumbent Electrician guild membership.pdf PDF
TE-2018 Exterior Lighting Video Monitoring Syst UPDATED.pdf PDF
ATTACHMENT 02 Deliverables UPDATED 18May2020 Update.pdf PDF
TE-5061 Pest Control CWS.pdf PDF
TE-1018 Exterior Lighting Video Monitoring Systems GAD UPDATED.pdf PDF
Gruenstadt Germersheim CWS Incumbent 2006 Collective Bargaining Agreement.pdf PDF
Amendment 02 Conformed W564KV20R2000-0002 26-May-2020.pdf PDF
Attachment 00 PWS Annex F - Grounds Maintenance 2020-May-04 UPDATED.pdf PDF
TE-3018 Exterior Lighting Video Monitoring Systems CWS UPDATED.pdf PDF
TE-2039 Utility Privatization GR UPDATED.pdf PDF
ATTACHMENT 04 Price Book FINAL 18May2020.xlsx XLSX spreadsheet
Attachment 00 PWS Annex H - Facilities Maintenance Vertical 2020-May-18UPDATED.pdf PDF
QandA-3 W564KV20R2000 Solicitation 26May2020.pdf PDF
Attachment 00 PWS Annex L - Wastewater Services 2020-May-08 UPDATED.pdf PDF
TE-4018 Exterior Lighting Video Monitoring Systems GAD 7815 UPDATED.pdf PDF
Amendment 02 W564KV20R2000-0002 26-May-2020.pdf PDF
QandA-2 W564KV20R2000 Solicitation 06May2020.pdf PDF
Revised Incumbent 613a Data 15-Apr-20 -Redacted.pdf PDF
Incumbent Current Summary Collective Agreement 2009.pdf PDF
ATTACHMENT 07 PAST PERFORMANCE EVALUATION QUESTIONNAIRE FORM.docx DOCX document
Incumbent Verguetungstarifvertrag Table of wages-Redacted.pdf PDF
TE-4016 Liquid Waste Oil Gas and Storage Tanks GAD 7815.pdf PDF
QandA W564KV20R2000 Solicitation 17Apr2020.pdf PDF
Incumbent Current Summary Tariff Agreements Remuneration 2009.pdf PDF
Amendment 001 RFP W564KV20R2000 TMC R-P.pdf PDF
TE-0011 Roofs Rain Gutters and Downspouts.pdf PDF
TE-0076M Miesau Ammo Depot Overview.pdf PDF
TE-1041 Transformer Stations GAD.pdf PDF
TE-2022 Cranes Hoist Lifts Elevators Conveyors.pdf PDF
TE-4026 Fire Alarm Detec Sys GAD 7815.pdf PDF
ATTACHMENT 07 Past Performance Evaluation Questionaire Form.pdf PDF
TE-0003 Facilities Listing KMC.pdf PDF
TE-0016 Liquid waste oil gas and storage tanks.pdf PDF
TE-1029 Fire Extinguisher Systems CO2 GAD.pdf PDF
Show 40 more

Latest 50 of 304 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex K

Heating and Cooling Services

27 January 2020 Updated

PWS Annex K, Heating and Cooling Services Page 2 of 14

Table of Contents

1.0 GENERAL INFORMATION

1.1 Overview

1.2 Air Pollution Regulations

2.0 DESCRIPTION OF SERVICES

2.1 Scope of Services

2.2 Heating and Boiler Plant Staffing

2.3 Operation of Heating Plants

2.3.1 Unattended Heating Plants

2.4 Central Boiler Plants

2.5 Summer Overhaul

2.6 Idle Standby Boilers

2.7 Monthly Inspections

2.8 Boiler/Heat Plant Shutdowns

2.9 Boiler Water Treatment Chemicals

2.10 Boiler Water Test Samples

2.14 Operational Considerations

3.0 PURCHASE OF FUELS

4.0 AC AND REFRIGERATION PLANTS AND SYSTEMS

4.1 Scope

4.2 Daily Inspection of Chillers

4.2.1 Daily Log

5.0 WATER SERVICES (OTHER THAN WASTE WATER)

5.1 OPERATION OF GOVERNMENT-OWNED WATER PLANTS, WATER SOURCES,13

PWS Annex K, Heating and Cooling Services Page 3 of 14

1.0 General Information.

1.1 Overview. Heating and Cooling Services provide steam, hot water, chilled water for heating, cooling, domestic hot water, and facility processes using Government-owned central heating and cooling plants, and distribution systems. Operating Government-owned central heating and cooling plants; and distribution systems includes all contract costs associated with full operation and maintenance (O&M) staff, oversight of contracted plant (other than a Utilities Privatization Contractor), O&M, periodic regulatory inspections and certifications, purchase of fuels (coal, natural gas, fuel oil, etc.), storage of fuels;

maintenance, inspection, and certification of fuel storage facilities; periodic operators training and certification, supervision and administration tasks, and purchase of chemicals and supplies.

1.2 Air Pollution Regulations. The Contractor shall operate all heating plants in compliance with all Federal, State, and local air pollution regulations. The Contractor shall address all non-compliance issues immediately to the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR) (Deliverable 0092).

2.0 Description of Services.

2.1 Scope of Services. The Contractor shall operate and maintain all heating plants and systems (steam meters, automatic tank monitoring system, boilers, and furnaces) used in the production of domestic heat (including the provision of unscheduled services) as requested by the COR/ACOR. The contractor ensures that all systems are fully functional within the areas supported by the USAG-RP. Facilities shall be operated, regularly inspected, and maintained in accordance with the Contractor’s COR-approved PMP and as described in this PWS. The Contractor shall provide steam, hot water, and chilled water for heating, cooling, domestic hot water, and facility processing using Government- owned central heating and cooling plants and distribution systems. Major components and all other heating plants and equipment (including domestic hot water heaters) are listed in provided TE-0052;TE-1052; TE-3052 TE-4052; TE-5052; TE-0053; TE-0055.

Operation of Government-owned central heating and cooling plants and distribution systems under this Service includes all in-house and contract costs associated with full operation and maintenance staff, oversight of contracted plant operations and maintenance, periodic regulatory inspections and certifications, storage of fuels, and maintenance/inspection/certification of fuel storage facilities, periodic operators training and certification, preventive maintenance of heating plants and their components, supervision and administration tasks, and purchase of chemicals and supplies. Work shall include disconnection or permanent shut off of unnecessary heating units and radiators as identified by the COR.

The equipment shall be operated and maintained according to the applicable DIN standards and/or Host Nation Regulations, and to the standards of the industry, as specified. While performing any work on ventilation and air conditioning systems, the Contractor shall comply with all applicable manufacturer recommendations.

The Contractor shall develop a scheduled maintenance plan as recommended by the equipment manufacturer as dictated (VDMA), Deutscher Kaelte-und Klima Techniker Verein or applicable industry standard. The standards for equipment (including

PWS Annex K, Heating and Cooling Services Page 4 of 14 components) listed in the TEs, and resulting frequencies, checks, inspections, testing, servicing and parts replacement shall reflect the highest maintenance rates recommended by the industry.

The Contractor shall comply with VDI standards for the cleaning and seasonal maintenance for ducts. The Contractor shall maintain all chillers that are not currently in use in a ready condition. The Contractor shall mark and color code all new or unmarked exposed piping or conduit for chilled water, domestic water, oil, electric, natural gas, refrigerant, and all related ventilation, air conditioning and refrigeration systems. Any new marking or renewal of obscure and faded markings shall conform to Installation policies and all applicable Host Nation and Army regulations. The Contractor shall be responsible for notification of heating service disruption, which shall include the reason for the disruption, whether the disruption will completely interrupt or reduce the level of service, which facilities or areas are affected by the disruption, the date and time of the disruption, and an estimate when normal service will resume.

2.1.1 Work Management:

The Contractor shall perform tests, maintenance, and cleaning of the system in regular intervals according to the basic rules of the safety and health regulations. These requirements are necessary to grant faultless function of the system, and a clean and hygienic work place for the personnel. All work shall be performed by qualified personnel in accordance with applicable laws, regulations, and Government-developed short and long-range plans. The equipment shall be operated and maintained according to the applicable DIN standards and/or Host Nation Regulations, and to the standards of the industry, as specified. While performing any work on ventilation and air conditioning systems, the Contractor shall comply with all applicable manufacturer recommendations. The Contractor shall develop a scheduled maintenance plan as recommended by the equipment manufacturer as dictated (VDMA), Deutscher Kaelte-und Klima Techniker Verein or applicable industry standard. The standards for equipment (including components) listed in the TEs, and resulting frequencies, checks, inspections, testing, servicing and parts replacement shall reflect the highest maintenance rates recommended by the industry. The Contractor shall comply with VDI standards for the cleaning and seasonal maintenance for ducts. The Contractor shall maintain all chillers that are not currently in use in a ready condition. The Contractor shall mark and color code all new or unmarked exposed piping or conduit for chilled water, domestic water, oil, electric, natural gas, refrigerant, and all related ventilation, air conditioning and refrigeration systems. Any new marking or renewal of obscure and faded markings shall conform to Installation policies and all applicable Host Nation and Army regulations. The Contractor shall be responsible for notification of heating service disruption, which shall include the reason for the disruption, whether the disruption will completely interrupt or reduce the level of service, which facilities or areas are affected by the disruption, the date and time of the disruption, and an estimate when normal service will resume.

Work Area: USAG-RP has out-sourced a significant portion of utilities in certain areas and is currently in the process of continuing out-sourcing of various utilities at various installations. Thus, where indicated in the following section, the Contractor shall limit work to non-out-sourced utility systems and may have different responsibilities

PWS Annex K, Heating and Cooling Services Page 5 of 14 depending on area and utility involved. The Contractor has responsibility for all required hot water heating and steam systems from the space-heating unit and/or heat exchanger station to the supply or return service shut-off valves or limit of responsibility as applicable, including heating unit replacement, electrical heating systems for rooms, secondary heat and/or steam supply lines (primary and return lines) from the heat exchanger station or steam generation station to secondary connected buildings and/or warm water generators and boilers. Heat and steam lines may be underground or interior above-ground heat lines. Where heating systems have been out-sourced, the Contractor’s responsibilities shall be limited to the secondary systems. The Contractor’s responsibility for hot water utility systems shall vary by installation.

2.2 Heating and Boiler Plant Staffing. The Contractor shall provide boiler operators who are properly certified in conformance with all applicable Federal, State, and local laws and regulations. All work shall be performed by qualified personnel in accordance with applicable laws, regulations, and Government-developed short and long-range plans.

2.3 Operation of Heating Plants. The Contractor shall operate the steam/hot water heating plants listed in provided TE-0053.

In accordance with (IAW) AR 420-49. Operation of these plants includes start-up and shutdown of heating equipment; operator maintenance and inspection (maintenance required to operate heating plants on a daily basis; e.g., during operational visits ensure the plant is operating properly). Operation also includes keeping required logs, correction of improper operating conditions, and making minor adjustments to the plant and equipment.

Operating logs (including watchclock disks or tapes) maintained on these plants shall be submitted to the COR/ACOR by the 10th of each month for the preceding month. The operator shall employ lead/lag procedures in the buildings listed in provided TEs when required, based on temperatures and conditions (Deliverable 0074).

2.3.1 Unattended Heating Plants. The Contractor shall operate all unattended heating plants. Operation of these plants shall include seasonal start- up and shut down of heating equipment.

2.3.2 OPERATION OF GOVERNMENT-OWNED CENTRAL HEATING/COOLING

PLANTS AND DISTRIBUTION SYSTEMS

2.3.2.1 SCHEDULED OPERATION OF BOILER AND HEATING PLANTS

The Contractor shall perform scheduled operation of heating plants as described in the PMP in order to ensure full operation of heating systems and components. The following tasks shall be performed on a scheduled basis:

(1) Operation of Boiler and Heating Plants: The Contractor shall operate heating and

PWS Annex K, Heating and Cooling Services Page 6 of 14 boiler plants in accordance with manufacturers’ manuals and the applicable regulations.

The Contractor shall not provide, install, or use portable electric or fuel operated heating units without authorization from the COR. Further:

a. Heating Period: Heat shall not be supplied to any facility from 1 June through 31

August unless requested by the COR. Unless otherwise requested by the COR, heat shall not be supplied between 1 September and 31 May unless the average outside daily temperature is below 60 F (15.5°C) for 5 consecutive days. The COR may request shut down of heat supply during the month of May if outside temperatures are above 60 F (15.5°C). The only exceptions are in medical and dental treatment and childcare facilities. When heat is provided, indoor temperatures shall not exceed the maximum permissible temperatures listed in AR 11-27, unless approved by the COR. Heat will not be required during the summer period unless the average daily outside temperature is below 60 F (15.5°C) for 72 consecutive hours. In this case, the Contractor shall provide heat as required within 24 hours of written request by the COR.

b. Operating Temperatures/Pressure: The Contractor shall provide the heat/domestic hot water to the facilities serviced by the heating plants at the minimum temperature and pressure in accordance with applicable Host Nation requirements and Army regulations.

(2) Plant Operating Schedule and Inspection/Task Logs: The Contractor shall maintain and post, in a conspicuous location at each heating plant and substation, a current plant-operating schedule. The Contractor shall also maintain inspection/task logs for each heating plant. The Contractor shall develop an inspection/task log format to meet this requirement and submit it to the COR for approval with the PMP.

(3) Combustion Efficiency and Record-keeping: Boiler and heating plants and stations shall be operated to obtain maximum operation efficiency. After each repair, heating personnel shall check heating functions for system pressure and functional condition and shall bleed and fill the system, if required. Space heating temperatures shall be maintained IAW those specified in AR 11-27. Domestic hot water shall be provided and temperatures maintained. Exceptions shall be obtained telephonically from the COR. All maintenance, operation, repair, and renovation work shall be IAW EnEV.

a. The Contractor shall maintain efficiency records for each boiler. As a minimum, efficiency records shall include minimum required CO2 level, measured O2 level, required flue gas temperature and measured flue gas temperature of each boiler and total down time for each month. The minimum required CO2 level as well as the required flue gas temperature are dependent on the loading of the boiler and shall be such that efficient combustion is attained.

b. The Contractor shall review and interpret efficiency records and shall submit a report to the COR. Reports shall be submitted routinely and after any repairs. The report shall discuss probable causes for low efficiency ratings and the corrective actions that were taken or are scheduled. A copy of the overall efficiency records in question shall be attached to the report of findings.

(4) Heating Plant Data and Installed Equipment and Systems Information Data Base: The Contractor shall verify and update, within the first six months after contract effective date, the accuracy of existing data in the GFEBS computer data base of heating plant and installed equipment and systems. Also within the first six months of

PWS Annex K, Heating and Cooling Services Page 7 of 14 the contract, the Contractor shall identify missing data elements, determine the correct information by site visit, records search or other means, and perform the data entry to complete the database. A printout of this updated completed database shall then be submitted to the COR for inclusion into the contract. After the initial six month period after the contract effective date referenced above, subsequent copies shall be provided to COR (Deliverable 0074A), for review, verification, and acceptance. The appendices provided shall include all changes submitted by the DPW and accepted by the Contractor, as well as required changes based upon routine maintenance, repair or replacement of equipment accomplished by the Contractor up to that point. Upon request by the COR, the Contractor shall provide printouts of the appendices required for the processing of contract modifications (Deliverable 0074A). “Printouts” of appendices may be provided electronically.

(5) Heating Plant Security: The Contractor shall not store equipment and materials, which do not belong to the heating and/or hot water operation in the heating plants. Any unauthorized storage shall be reported immediately to the Installation Coordinator and the COR. Heating and/or water operation areas shall be identified by appropriate signs on entrance doors. Keys for entrance doors of plants and connected substations shall be kept at the central boiler plants/heating station. Key control for boiler plant areas shall be addressed in the key control plan. The cooperation and coordination with the local IC is important to complete this task successfully.

2.3.2.2 SCHEDULED INSPECTIONS AND MAINTENANCE

The Contractor shall perform scheduled inspection and maintenance as described in the PMP in order to ensure full operation of heating and cooling systems and components.

The following tasks shall be performed on a scheduled basis:

(1) Technical Surveillance Acceptance Inspections: The Contractor shall perform technical surveillance acceptance inspections (TÜV or equivalent) on all EIP, IBE and heating plant equipment. Frequency of technical surveillance acceptance inspections shall be as required by Host Nation regulations. The Contractor shall submit to the COR for approval, a list of equipment and parts needed for technical surveillance acceptance inspections. (Deliverable 0074B). Upon completion of technical surveillance acceptance inspections (TÜV) the Contractor shall forward written inspection findings to the COR. For storage tanks, if deficiencies are noted on the TÜV report, (Deliverable 0074C) the Contractor shall initiate repairs by DMO, or preventive work order (PWO) as required. Upon completion of repairs, the Contractor shall schedule the follow-up TÜV inspection as required.

(2) Maintenance of Boiler and Heating Plants: The Contractor shall perform maintenance of heating and boiler plants in accordance with manufacturers’ manuals and the applicable regulations. The Contractor shall not provide, install, or use portable electric or fuel operated heating units without authorization from the COR. The service shall include testing, inspection, preventive maintenance, and water treatment required of heating systems to include, but not limited to: hot water heating systems, heat exchanger, shut off valves, pumps, ancillary electric systems, distribution lines, heat controls, and individual room radiators.

a. Domestic Hot Water: All domestic hot water systems shall be inspected, maintained, and repaired in accordance with frequencies established in the Contractor’s COR-approved PMP, and hot water tanks shall be opened and cleaned in accordance

PWS Annex K, Heating and Cooling Services Page 8 of 14 with frequencies established in the PMP. Hot water systems shall be tested by the Contractor. If testing reveals a health hazard in the domestic hot water the Contractor shall, within 3 hours, notify the COR. The Contractor shall inspect hot water tanks.

b. Water Treatment Program: The Contractor shall conduct a water treatment program in accordance with AR 420-49, TRD 611, Rules of VdTÜV and VBG to ensure the water quality of boiler feed water, heating system water and condensate.

Results in accordance with industry standards and specifications of boiler, heating water and condensate samplings shall be reported (Deliverable 0077) to the COR.

c. Protection Against Freezing: The Contractor shall operate boilers and heat exchangers to protect from freezing. The Contractor shall perform routinely inspections of heating plants, and substations during the heating period and more frequently inspections during freezing temperatures. The Contractor shall be held responsible for any damages inside Government buildings, which result from freezing.

2.4 Central Boiler Plants. The central boiler plant located in Building (3777) via steam and condensate lines are approximately (100) Meters. It is not Part of this Contract! The approximate age of the boiler plant is ca. (22) years and the condition of associated piping is good. This Boiler plant is maintained by Innogy, the main contractor of the Verbandsgemeindewerke Landstuhl.

2.5 Summer Overhaul. The Contractor shall schedule summer overhauls for boiler plants that cannot be overhauled during the heating season because of operational requirements. The Contractor shall perform shutdowns over weekends and holidays when requested by the COR/ACOR. The Contractor shall submit a written schedule of summer boiler shutdowns to the Contracting Officer (KO) for approval at least thirty (30) calendar days prior to the beginning of the proposed shutdown period. The approved shutdown schedule shall have minimal disruptions.

The Contractor shall establish a Summer Overhaul Program for maintenance and repair which cannot be done during the heating season. The written summer overhaul program shall be submitted to the COR for review and approval NLT 31 Dec each year(Deliverable 0078). Work identified in this plan will be executed as an PWO.

Material ordering for summer overhaul work approved by the COR shall be completed by 28 February.

Actual performance of the summer overhaul work shall start following the end of the heating season and shall be completed prior to the start of the next heating season. A report of the status of the summer overhaul work (Deliverable 0078A) shall be submitted to the U.S. Government.

(3) Summer Overhaul Inspections (Survey for Summer Overhaul): The Contractor shall perform inspections of all equipment, distribution systems, and individual building controls that are covered under the specifications. These inspections shall be performed prior to the start of the heating season.

(4) Water Analysis and Treatment (All Systems): The Contractor shall analyze raw water, boiler feed water, and condensate in accordance with Host Nation and Army regulations. The Contractor shall use the chemicals for water treatment in accordance with the Host Nation and manufacturer’s standards of the trade. The procedures set forth in Army regulations shall be used when no other standards exist. Closed heating water systems shall be inspected after they have been refilled with treated water and

PWS Annex K, Heating and Cooling Services Page 9 of 14 corrected as required.

(5) Close Down of Heat Exchangers: Frequency of close down depends on the conductivity and pH of heat exchanger water. The heat exchanger shall be closed down when required to maintain acceptable water quality and no more than once per shift.

(6) Air Emission Source Monitoring and Sampling: In accordance with the FGS-G and Host Nation requirements, the Contractor shall coordinate the performance of air emission source monitoring and sampling for all oil-fired and gas-fired heating facilities where heating is not out-sourced.

2.6 Idle Standby Boilers. All boilers not in use shall be maintained in a fully operational condition, except when deactivated. In the event that any boiler cannot be placed on-line within two (2) hours, a notification that includes the probable cause shall be submitted to the COR/ACOR. Proper lay-up procedures shall be used IAW Technical Manual (TM) 5- 650, Repairs and Utilities: Central Boiler Plants, when deactivating boilers.

2.7 Monthly Inspections. The Contractor shall perform monthly visual inspections of the central steam and hot water distribution and condensation systems. The inspection shall include, but not be limited to, general condition and cleanliness of all exterior and working parts, and evidences of large or small leaks from steam or hot water equipment, emissions, pipes, valves, and covers. The Contractor shall submit a report outlining the results of the inspection to the COR/ACOR within three (3) working days. However, any defects identified by the Contractor shall be submitted in writing to the COR/ACOR on the same work day (Deliverable 0078B).

2.8 Boiler/Heat Plant Shutdowns. The Contractor shall inform the COR/ACOR within thirty (30) minutes of shutting down any boiler or heating plant for unplanned repairs. The Contractor shall provide written notice thirty (30) days in advance of planned repairs that require the shutdown of any boiler or heat plant, unless shutdown is otherwise requested by the COR/ACOR (Deliverable 0078C).

2.9 Boiler Water Treatment Chemicals. The Contractor shall supply the chemicals necessary to maintain all boiler water chemistry IAW TM 5-650.

2.10 Boiler Water Test Samples. In addition to the required boiler and distribution system water testing and treatment, the Contractor shall submit monthly, a series of boiler plant water samples to a Government designated lab as requested by the COR/ACOR. Analysis, results, and comments will be sent to the Contractor. The Contractor shall pay the costs for submission and lab analysis of these samples. The Contractor shall pay lab analysis costs directly to the Government designated lab. The water samples submitted each month shall include a boiler water sample, a condensate sample, and the Contractor plant test results for these samples. Test results and water samples from one (1) boiler/condensate system are required from each of the high-pressure boiler plants operated for the Government.

Additional tests may be required if the Contractor's test results and the lab's test results vary by ten (10) percent. Additional tests shall be at the Contractor’s expense. The Contractor shall provide copies of Lab Water Analysis Reports to the COR/ACOR within five (5) days after receipt. Water sample bottles and shipping containers are available

PWS Annex K, Heating and Cooling Services Page 10 of 14 from the Government designated lab. The Contractor shall furnish required boiler plant water test kits and test material.

2.11. The TÜV (Technischer Überwachungsverein or a similar Certified Organisation will provide regularly Inspections to all relevant boilers.

2.12. While the TÜV Inspection all relevant Items will controlled by the Inspector.

2.13. Reserved.

2.14 Operational Considerations. The following considerations apply to all-heating plants and systems covered under this contract.

3.0 Purchase of Fuels.

3.1 The Contractor shall provide fuel needed to run Emergency and Standby Generators.

3.2 Natural Gas Distribution System

The Heating Plant Building 208 in Sembach will be provided with natural Gas. The supply is privatized and will be maintained by the Stadtwerke Kaiserslautern (SWK).

Inside the plant the Maintanance will be performed by the Contractor.

The Contractor shall perform tests, maintenance, and cleaning of the system in regular intervals according to the basic rules of the safety and health regulations. These requirements are necessary to grant faultless function of the system, and a clean and hygienic work place for the personnel. All work shall be performed by qualified personnel in accordance with applicable laws, regulations, and Government-developed short and long-range plans. The equipment shall be operated and maintained according to the applicable DIN standards and/or Host Nation Regulations, and to the standards of the industry, as specified.

3.3 Other Fuels

For installations where gas service is out-sourced, the Contractor’s responsibilities are limited to the secondary systems, which are generally limited to systems inside Garrison Buildings, and propane/butane tanks and systems. Storage tank systems and equipment covered include, but are not limited to, the following:

(1) Filling stations

(2) Fuel oil

(3) MOGAS

(4) Diesel fuel

(5) Waste oil

(6) Antifreeze

(7) Liquid gas

(8) JP-8.

Building and structure maintenance at hospitals, clinics, and other medical facilities shall

PWS Annex K, Heating and Cooling Services Page 11 of 14 be performed as part of Services contained in the corresponding Annex, Facility Maintenance Vertical (ANNEX H).

Protection of Furniture and Equipment: The Contractor shall take the necessary steps to protect all furniture, equipment, fixtures, and facility features (for example, baseboards and trim) from any damage resulting from the work performed in this functional area.

When necessary, existing furniture and equipment may be moved by the Contractor from the work site and returned to the original location after the completion of work.

When electrical outlets, switch covers and other fixtures are removed, they must be reinstalled upon completion of the work. Damaged items shall be repaired to their original condition or replaced at the expense of the Contractor.

4.0 AC and Refrigeration Plants and Systems.

4.1 Scope. The AC plants and systems include central systems for multi-building cooling as well as independent systems for single building or partial building cooling. HVAC lists is provided in corresponding TE-0032; TE-1032; TE-3032; TE-4032; TE-5032 While performing any work on ventilation and air conditioning systems, the Contractor shall comply with all applicable manufacturer recommendations. The Contractor shall develop a scheduled maintenance plan as recommended by the equipment manufacturer as dictated (VDMA), Deutscher Kälte-und Klima Techniker Verein or applicable industry standard. The standards for equipment (including components) listed in the TEs, and resulting frequencies, checks, inspections, testing, servicing and parts replacement shall reflect the highest maintenance rates recommended by the industry. The Contractor shall comply with VDI standards for the cleaning and seasonal maintenance for ducts. The Contractor shall maintain all chillers that are not currently in use in a ready condition.

4.2 Daily Inspection of Chillers. The Contractor shall perform daily inspections of all chiller units.

4.2.1 Daily Log. The Contractor shall observe the complete cycle of the mechanical operation of the chiller plant and cooling tower, and report any problems to the COR/ACOR immediately. The Contractor shall provide and maintain a daily log that includes, but is not limited to, the data listed below (Deliverable 0078E).

a. Chiller MCD number,

b. Purifier purge monitor and start-up number,

c. Chiller supply and return water temperature,

d. Compressor suction and discharge pressure and MCD number,

e. Refrigerant temperature in the evaporator,

f. Branch line control pressure,

g. Evaporator pressure,

h. Measure and record pressure drop through the condenser,

i. Oil pressure,

j. Condenser in and out water temperature,

k. Oil temperature in bearings,

l. Oil temperature in sump,

m. Oil pump motor amperage, PWS Annex K, Heating and Cooling Services Page 12 of 14

n. Outdoor temperature and relative humidity,

o. Any abnormalities occurring in the operation of the unit.

For centrifugal chillers, the contractor shall maintain the Log.

5.0 WATER SERVICES (OTHER THAN WASTE WATER). (TE-0056; TE-1056; TE-2056;

TE-3056; TE-4056; TE-3070)

Scope of Services: The Contractor shall operate and maintain water service utilities facilities, components, and systems in good working order and ensure systems are fully functional within the areas supported by the USAG-RP. Facilities shall be operated, regularly inspected, and maintained in accordance with the Contractor’s COR-approved PMP. The Contractor shall provide water for potable and non-potable uses for domestic and industrial purposes using Government-owned plants and distribution systems.

Operation of Government-owned water treatment plants, water sources, storage facilities, and distribution systems under this Service includes all in-house and contract costs associated with full operation and maintenance staff, oversight of contracted plant operations and maintenance, periodic regulatory inspections and certifications, periodic operators training and certification, preventive maintenance of plants and their components, supervision and administration tasks, and purchase of chemicals and supplies. This service also includes chlorination and fluoridation of purchased water.

The Contractor shall operate, inspect, and perform a total maintenance program on all water treatment and distribution systems under the U.S. Government control IAW the respective manufactures’ instructions, Army regulations, DIN standards, and the PMP.

As a general rule, scheduled inspection and maintenance tasks performed on water systems and components—excluding transmission and distribution systems—located outside of 5 feet of buildings shall be performed under this section. Repair and modernization of water systems performed outside of 5 feet of buildings and inspection, maintenance, and repair of water transmission and distribution systems; repair, inspection, and maintenance tasks performed on water system components located within 5 feet of buildings or in sole support a building shall be performed as part of Services contained in the corresponding Annex, Facility Maintenance Vertical (ANNEX H).Work Management: All work performed under this Section shall be by qualified personnel in accordance with applicable laws, regulations, and Government-developed short and long-range plans. The equipment shall be operated according to the applicable DIN standards and/or Host Nation Regulations, and to the standards of the industry, as specified, and the COR-approved PMP. The Contractor shall perform the specific tasks of inspection, testing, maintenance, leak detection, and repair for all non-out-sourced component parts of the exterior/interior water systems to include bathtubs, commodes, urinals and sinks, sprinkler systems and fountains. The Contractor shall maintain and repair non-out-sourced water distribution systems and water consuming appliances to include but not limited to water treatment stations, distribution systems, showers, tubs, water closets, vehicle washing facilities, water pumps, lawn sprinkler systems, and fire hydrants. The Contractor shall provide electronic and hard copy updates to current maps/drawings. The Contractor shall maintain records showing operating reports and records of bacteriological results in accordance with the Final Governing Standards (FGS-G). Copies shall be provided to the COR. In the event of a

PWS Annex K, Heating and Cooling Services Page 13 of 14 water line or main break, the Contractor shall disinfect the lines and main in accordance with Host Nation requirements. The Directorate of Emergency Services and the COR shall be notified immediately when any section of the water distribution system is out of service and when the system has been returned to normal service. The Contractor shall make every attempt to utilize existing loop systems to minimize the impact on normal service operations. The Contractor shall provide temporary water service, including domestic hot water, to critical facilities while the system is down, as approved by the COR.

Work Area: The Contractor shall limit work to non-out-sourced water systems and may have different responsibilities depending on area and utility involved. Water systems and equipment under this section include, but are not limited to, the following:

(1) Chlorination and fluoridation stations

(2) Water softeners

(3) Water treatment equipment

(4) Water wells and pumps For installations where water service is out-sourced, the Contractor’s responsibilities are limited to the non-out-sourced secondary systems, which generally is limited to the downstream side of the water meter. The Contractor’s responsibility for water utility systems shall vary by installation.

5.1 OPERATION OF GOVERNMENT-OWNED WATER PLANTS, WATER SOURCES,

AND DISTRIBUTION SYSTEMS. (TE-0056; TE-0056; TE-1056; TE-2056; TE-3056;

TE-4056)

5.1.1 SCHEDULED OPERATIONS

The Contractor shall operate the non-out-sourced water systems under Army control to include all components. The Contractor shall provide treatment for all water sources in compliance with the FGS-G, Chapter 3, Drinking Water and the PMP. The majority of the treatment of drinking water shall consist of fluoridation and post chlorination in accordance with Final Governing Standards, regardless of source of origin (well or city).

5.1.2 SCHEDULED INSPECTIONS AND MAINTENANCE

The Contractor shall perform scheduled inspection, cleaning, and maintenance described in the PMP in order to ensure full operation of water systems and components. The following tasks shall be performed on a scheduled basis:

(1) Maintenance of Water Systems: The Contractor shall inspect and maintain non-out-sourced water system equipment, distribution lines and ancillary equipment in accordance with Host Nation requirements, Army regulations, manufacturer’s instructions and industry standards. The Contractor shall develop an inspection schedule in the Maintenance and Service plan.

(2) Water Sampling and Testing: As part of the PMP, the Contractor shall submit for COR review and approval a Sampling Plan. The plan implemented shall be consistent with the FGS-G and local directives.

(3) Testing for Chlorine and Fluoride: In accordance with the FGS-G, the Contractor shall test each water network and record the chlorine and fluoride levels in the operating

PWS Annex K, Heating and Cooling Services Page 14 of 14 log. The Contractor shall adjust levels as required to comply with the FGS-G.

(4) Water Softening Systems and Dosing Plants: The Contractor shall inspect, maintain and repair water softening systems and dosing plants in accordance with manufacturer’s instructions, Host Nation requirements, and Army regulations.

Maintenance services shall be conducted in accordance with manufacturer’s requirements, and water softeners shall be tested routinely.

(5) Flush Main Water Line: The Contractor shall flush the non-out-sourced main water lines in accordance with the FGS-G and the COR-approved PMP.

(6) Particulate Filters: The Contractor shall maintain particulate filters in accordance with the COR-approved PMP.

Annex K
Table of Contents
1.0 General Information.
2.0 Description of Services.
3.0 Purchase of Fuels.
4.0 AC and Refrigeration Plants and Systems.

File details come from the government source that posted it. Updated .