ATTACHMENT 02 Deliverables UPDATED 18May2020 Update.pdf
PDF 153 KB Posted
- Attached to
- Facilities Maintenance and Repair, Base Maintenance Services for US Army Garrison Rheinland Pfalz, Germany
- Solicitation number
- W564KV20R2000
About this file
This document outlines deliverables and reporting requirements for facilities maintenance and repair services at U.S. Army Garrison Rheinland-Pfalz in Germany. The contractor must provide a variety of recurring reports on tasks such as preventative maintenance, inspections, repairs, staffing, safety, environmental compliance and real property management. Key deliverables include weekly project status reports, monthly performance reports and ad hoc reports following incidents. The contractor must also develop and maintain plans for quality control, safety, environmental protection and contingency operations. Submission deadlines and approval procedures are defined for each deliverable.
View the file
Other files
Show 40 more
Latest 50 of 304 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Deliverable # PWS Para Deliverable Initial Submission Task Frequency Task Frequency Details Annex
0001 1.2.2.d Project Status Meeting / Project Status Reports /Meeting minutes
Ref PWS Weekly Ref PWS
ANNEX
A
0002 2.1.9 Quality Control Plan Within thirty (30) calendar days after contract award
Any changes to the accepted QCP will be required to be resubmitted for acceptance within five (5) calendar days prior to implementation
Annually
ANNEX
A
0003 2.1.9.3 Quality Control Report Upon Completion of Projects The QCR will document all Contractor’s work was quality controlled
Upon Completion of Projects
Daily
ANNEX
A
0004 2.5.1.4.1 Installation Access
Maintain an Installation Pass and CAC inventory on the Government’s shared drive, within 30 calendar days of contract award
NLT the 25th of each month - updates to spreadsheet Ref PWS
ANNEX
A
0005 2.5.1.6 Key Control NLT 30 calendars of contract award Monthly Updates NLT the 25th of each month
ANNEX
A
2.1.11.1.1.
Employee Log with Education & Training
30 Calendar days of contract award Monthly NLT the 25th of each month -updates to spreadsheet
ANNEX
A
0006A 2.1.11.1.4 Qualification Standards
The Contractor shall provide objective evidence of key personnel qualifications and years of experience to the KO for review and acceptance with proposal upon changes Ref PWS
ANNEX
A
0006B 2.1.11.1.10 Non-Disclosure Requirements
The Contractor shall provide signed non-disclosure agreements prior to commencement of work under the contract upon changes upon changes
ANNEX
A
0007 3.2 Phase-In and Phase-Out Plan with milestones and timeline
Draft copy with proposal package and within fifteen (15) calendar days after contract award
Deadlines according to
PWS
Ref PWS
ANNEX
A
0007A 3.2.2 Phase-in Plan (PIP) Spread Sheet Status Report
Every two (2) weeks during the phase-in period
Ref PWS Ref PWS
ANNEX
A
0008A 3.2.3 GFEBS during phase-in period - GFEBS, CACs & Computer User Accounts Status Report.
Procedure and deadlines according to
PWS
Ref PWS Ref PWS
ANNEX
A
0008B 3.2.3 a/b GFEBS during phase-in period, enter all data from a contingency standalone system into GFEBS
When GFEBS enabled
NLT twenty (20) /thirty
(30) calendar days after becoming GFEBS operational
Ref PWS
ANNEX
A
0008C 3.2.8 Documents and Libaries NLT thirty (30) calendar days before end of POP
Deadlines according to
PWS
Ref PWS
ANNEX
A
0009 3.2.10 Management Plan shall be submitted to the KO through the COR for review and acceptance within thirty (30) calendar days after date of contract award.Changes, will be required to be resubmitted for acceptance within five (5) calendar days prior to implementation.
Annually Annually / upon Changes
ANNEX
A
009A 3.3.1 CMR Deadlines according to PWS Ref PWS Ref PWS
ANNEX
A
0010 1.2.5.2 Preventive Maintenance (PM) Plan.
The Contractor shall submit to the KO, thru the COR, an annual work plan within 30 days from the date of a new yearly ordering period
Changes to Annual PM Plan NLT the 20th of each month Ref PWS
ANNEX
A
0011 1.2.5.9 PM Work Completion The Contractor shall perform PM work with acceptable deviations (Varies)
Ref PWS Ref PWS
ANNEX
A
Life, Health or Safety (LHS) issues identified by the Contractor immediately ANNEX
A 0012 1.2.5.10
Deficiencies found during Preventive Maintenance
Varies Deadlines according to PWS
Not LHS within three (3) calendar days
0013 1.2.5.11 Marking on-site The Contractor shall affix a Government approved label to individual equipment .
Every time preventive maintenance is performedRef PWS Ref PWS
ANNEX
A
0014 2.5.3.1 Safety Plan To the KO for review and acceptance within ten (10) days of commencement of work
Annually Deadlines for revision, re-sumission, review, according to PWS
ANNEX
A
0015 2.5.3.5 Safety Training The Contractor shall complete initial training prior to the conclusion of the phase-in period
Annually NLT the 25th of each month -updates to spreadsheet
ANNEX
A
0016 2.5.4.1 Training, Physical Requirements, or other Expertise Required
Within twenty-four (24) hours prior to employees commencing performance.
Deadlines according to
PWS
Deadlines according to PWS
ANNEX
A
0016A 2.5.5.5 Reporting Requirement Maintain and post records of all disposal actions Ref PWS
NLT the 25th of each month -update of incident log
ANNEX
A
0016B 2.5.5.5.1 One hour initial reporting requirement (specified 2.5.5.5.)
(ROF) within five (5) calendar days after the initial notification (paragraph
2.5.5.5.1). according to PWS Varies follow up with ROF within five (5) calendar days after the initial notification
ANNEX
A
0016C 2.5.5.5.2 Report of Findings (ROF) Contractor shall follow up by written reports (ROF) within five (5) calendar days after the initial notification.
Varies Ref PWS
ANNEX
A
0016D 2.5.5.6 Inspections Subject related documents, NLT five (5) calendar days after the receipt of documentation.
Varies Ref PWS
ANNEX
A
0016E
2.5.6 2.5.6.1 2.5.6.2 2.5.6.3 2.5.6.4 2.5.6.5
Contingency Plans NLT Contract start date / Within thirty
(30) calendar days after contract award
Deadlines according to
PWS
Deadlines according to PWS
Preventive Maintenance
0016 F 3.1.1.1.2 Damage Report (Damage caused by contractor)
The Contractor shall submit a monthly damage report to the COR/ACOR
Monthly Ref PWS
ANNEX
A
0020 2.5.2.4 Information Assurance Training
Within fifteen (15) calendar days after contract award and within thirty (30) calendar days after new employees commence contract performance.
Annually NLT the 25th of each month -updates to spreadsheet
ANNEX
A
0021 2.5.4.2 Evacuation Coordinator/Fire Prevention Training
Within thirty (30) calendar days of contract award or appointment
Varies NLT the 25th of each month -updates to spreadsheet
ANNEX
A
0022 2.5.4.3 Energy Monitor Training Within thirty (30) calendar days of contract award or appointment.
Varies NLT the 25th of each month -updates to spreadsheet
ANNEX
A
0022A 2.5.4.5 Environmental Management Officer (EMO)Training
Within thirty (30) calendar days of contract award or appointment.
Varies NLT the 25th of each month -updates to spreadsheet
ANNEX
A
0022AA 2.5.5.2 Environmental Requirements use of recycled and recovered products identified in the EPA’s Comprehensive Procurement Guidelines
Varies Ref PWS
ANNEX
A
ANNEX
A
0017 0018
2.5.2.1 2.5.2.2 2.5.2.3
AT Level I Training, OPSEC Training, iWATCH Training
Within thirty (30) calendar days after contract award or or thirty (30) calendar days after employment of new personnel
Deadlines / training frequency according to
PWS
Varies
0022AB 2.5.5.3.1
Environmental Protection Plan
(EPP)
To the KO through the COR for review and acceptance within thirty (30) calendar days after date of contract award.Ref PWS
Annually
The Contractor shall notify the COR/ACOR within one (1) hour, if the Contractor spills or releases any hazardous substances, i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification.
ANNEX
A
0022AC 2.5.5.3.4 Refrigerant Log Prepare refrigerant log for each pice of refrigeration equipment that contains more than 3 KG of any refrigerant.
Update if refrigerant materials are added or replaced.
Ref PWS
ANNEX
A
0022B 2.5.5.4 Spill Plan
To the KO for approval within thirty (30) days of contract award IAW Spill Prevention Control and Countermeasure Plan
Ref PWS Ref PWS
ANNEX
A
0023 2.5.4.4 Building Coordinator Training Within thirty (30) calendar days of contract award or appointment.
Varies NLT the 25th of each month -updates to spreadsheet
ANNEX
A
0024 2.2.2.1 GFEBS Certification
Requirements for obtaining GFEBS User Accounts and Training Guidance”, NLT 60 days of contract award (Procedure and deadlines according to PWS).
Ref PWS NLT the 25th of each month -updates to employee log
ANNEX
A
1.2.2 a/b 2.2.2.5.1
Performance Management Plans (PMPs)
Correct and maintain the information and data provided in Technical Exhibits in this contract so that the data reflected in each exhibit is current and accurate. b. Develop Performance Management Plans (PMPs) for each Annexed Service area of this PWS
Varies
ANNEX
A
Base Year: Initial PMPs to the Government for review/approval within 30 days after contract award.
The final PMPs will be approved by the end of the
0026 2.2.2.5.3 Other PMP Components
(LPPM)
Develop Performance Management Plans (PMPs) for each Annexed Service area of this PWS. (Deliverable 0025). Ensure work meets the quality and timeliness requirements specified in this contract
Varies
ANNEX
A
0027 2.2.2.5.4 Schedule for Submittals (PMPs) Procedure and deadlines according to PWS (e.g. initial s for review & approval within 30 days after contract award) annually/upon changes
ANNEX
A
0028 2.2.2.5.5 (1) Recurring Reports: Contractor Employee Report
10 days prior to the start of the period of performance
Ref PWS
Changes shall be submitted to the COR routinely. A new report 10 days prior to the start of a new performance
0029 2.2.2.5.5 (2) Recurring Reports: Work Load Data Report
By COB 5th calendar day of each month monthly monthly
ANNEX
A
0030 2.2.2.5.5 (3) Recurring Reports: Facility Improvements Report submit a report to the COR not later than 30 calendar days after completion of work as required Ref PWS
ANNEX
A
0031 2.2.2.5.5 (4) Recurring Reports: Work Status Report after minor repairs were performed as required Ref PWS
ANNEX
A
0032 2.2.2.5.5 (5) Recurring Reports: Emergency Service Report emergency service requests called in after normal work hours not later than 1200 (i.e., noon) the following workday as required phase-in period. Thereafter, the Contractor shall review and update the PMPs and submit to the Government annually. Also, upon changes and as determined by either the contractor or the COR, the contractor shall submit updated PMPs for approval within 30 calendar days.
0033 2.2.2.5.5 (6) Recurring Reports: Report of Findings
5 working days after completion of an inspection as required Ref PWS
ANNEX
A
0034 2.2.2.5.5 (7) Recurring Reports: Facility Violation Report
5 workdays after a violation is identified as required Ref PWS
ANNEX
A
0034A 2.2.2.5.5 (8) Recurring Reports: Personal Injuries Report
The Contractor shall maintain records and report personal injuries, lost man-hours and accident rates routinely-submit report to COR
Ref PWS Ref PWS
ANNEX
A
0034B 5.16.1.3 (8) Recurring Reports: Spill Clean-up Report Report to COR (also mentioned in ANNEX A)
At / after occurance / clean up Ref PWS Ref PWS
ANNEX
N
0034C 2.2.2.5.5 9) Recurring Reports:Report of Inspection Report
Complete inspection reports shall be made available to the COR upon request
Ref PWS Ref PWS
ANNEX
A
0035 2.2.2.5.5 (10) Recurring Reports: Monthly Performance Report (MPR) ten workdays after the end of each month
Monthly Provide to COR NLT10 workdays after the end of each month
ANNEX
A
0036 2.3.5.1 (a) Develop and Maintain Real Property Master Plan
The contractor shall provide GIS, CADDs to be used to generate ,update and maintain all of the DPW maps….
as required / as requested
Requirements and deadlines according to PWS
ANNEX
A
0036A 2.3.5.1 (b) Develop and Maintain Real Property Master Plan, Existing Condition Maps
The Contractor shall maintain all site and existing condition maps in a current status, reference PWS as required / as requested
Deadlines according to PWS
0036B 2.3.5.1 (c) Develop and Maintain Real Property Master Plan, As-Built Drawings
As-Builds within 7 days after submission.
Construction drawings within 60 days of receiving. Additional info/time: timeline to COR ref PWS.
as required / as requested / at occurance
Contractor’s in-house or sub-contract construction projects shall be incorporated into the as-built database as a draft and submitted to the DPW for review within 30 days of project completion
ANNEX
A
0036C 2.3.5.1 (d) Develop and Maintain Real Property Master Plan, Map Duplication and Reproduction
The Contractor shall provide scanned drawings to the DPW at latest the following day of the request as required / as requested
Deadlines according to PWS
ANNEX
A
0037 2.3.6 (a-c)
Schedule of Installation Status Report (ISR) (The Contractor shall provide the DPW with the required ISR facility condition rating.) Ref
PWS
A kick-off meeting shall be held at the DPW at the beginning of each quarter.
Quarterly Deadlines according to PWS
ANNEX
A
0038A 2.3.7.2.3 Material Safety Data Sheets
The Contractor shall maintain Material Safety Data (MSD) sheets for all hazardous items issued from the SHIP store, ref PWS
Daily Ref PWS
ANNEX
A
0038B 2.3.7.2.5 Self Help Instruction / Instruction Sheets to Self-Help customers ref
PWS
Upon request Daily Daily
ANNEX
A
0039 2.3.7.2.7 SHIP GFEBS Requirement Upon receipt of DMO request Ref PWS varies
ANNEX
A
2.3.7.2.8 (a-
e) Self Help Supply Procedures
Initial SHIP material inventory during Phase-in. Invoice, material accounting procedure reference PWS.
Daily Daily
0041 7.4.10 Flags (GOCO) Monthly inventory after receipt Monthly Ref PWS
A
0043C 2.2.5.6.2.1 Storm Water Management System Maintenance Plan (SWMSMP)
Within 30 Days after Contract Award 15 calendar days prior to the start of each option period
Also, upon changes and as determined by either the contractor or the COR
ANNEX
J
0043CC 2.2.5.6.4 Integrated Contingency Plan (ICP) Within 30 Days after Contract Award as required as required
ANNEX
J
0043D 2.2.5.6.5
Plan to safeguard wate water and storm water systems ensure assigned personnel receive the required training as contained in the plan..
Within 90 days of contract award upon changes / training records delivery upon request
Ref PWS
ANNEX
J
0044 2.1.7.2.3.1 A Response Time/Completion Timeline PRI 1
Deadlines according to PWS Daily Ref PWS
ANNEX
A
0045 2.1.7.2.3.1 B Downgrade DMO Level 1 in GFEBS to Level 2 or 3
Deadlines, procedure according to PWS Daily Ref PWS
ANNEX
A
0046 2.1.7.2.3.1 C Priority "1" Personnel Deadlines, procedure according to PWS Daily Ref PWS
ANNEX
A
0047 2.1.7.2.3.2 A Priority "2" Response and Completion
Deadlines, procedure according to PWS Daily Ref PWS
ANNEX
A
0048 2.1.7.2.3.2 B Downgrade Urgent Work in GFEBS Deadlines, procedure according to PWS Daily Ref PWS
0049 2.1.7.2.3.3 Priority "3" Response and Completion
Deadlines, procedure according to PWS Daily Ref PWS
ANNEX
A
0049A 2.2.2
GFEBS
The Contractor shall generate all reports in GFEBS and download them to excel format on Government's share drive "Work Documentation and Reporting.
The Government will use GFEBS as a production scheduling and contract monitoring system. Deadlines according to PWS
Daily
Daily;The Contractor shall post a final version on the Government’s shared drive as "Work Documentation and Reporting.
ANNEX
A
0049B 2.2.2.4.3 GFEBS - Unavailability (Exel Spreadsheet)
The Contractor shall commence entry to GFEBS NLT one (1) hour of GFEBS return to function. Contact customer NLT next day,provide GFEBS order numberDeadlines according to PWS
Daily Daily
ANNEX
A
0050 2.2.2.4.5 Consumed Time entry When GFEBS enabled Daily NLT next work day
ANNEX
A
0051 2.2.2.4.6
Task Order: The Contractor shall enter the correct task code for work The Contractor shall change generic code to appropriate work task code during a time confirmation process
When GFEBS enabled Daily Ref PWS
0052 2.2.2.4.7
Functional Location and GFEBS Inventory. The Contractor shall coordinate equipment update in GFEBS with GFEBS SME..
Ref PWS Daily Ref PWS
ANNEX
A
0053 2.2.2.4.8 GFEBS Entries for Consumed Material and Parts
When GFEBS enabled Daily Ref PWS
ANNEX
A
0054 2.2.2.4.9 Warranty Records in GFEBS
The Contractor shall enter warranty information during the life of this contract “Warranty Records in GFEBS
PWS
Daily Ref PWS
ANNEX
A
0054A 2.2.2.4.10 GFEBS Document Uploads (Hard Copies)
The Contractor shall upload maintenance order document into GFEBS (e.g. Insp.
Results, Bills etc.)
Daily Ref PWS
ANNEX
A
0055 2.1.2.1 (a) Roofs, Gutters and Downspouts Report.
Deadlines, procedure according to PWS Varies Varies
ANNEX
H
0056 2.1.2.2 Bay, Sliding, and Roll-up Doors
Keep data base up-to date on Government share drive. Report deficiencies on roofs, supporting structures one (1) hour after finding.
Varies Varies
ANNEX
H
0056A 2.22 TüV for Levelers, Cranes, Winches, and Hoists
Schedule inspections. Provide certificates and inspection report (upon request)
Varies Varies
ANNEX
H
0056B 2.22 GFEBS Records / TUEV Insp.
Schedule for Levelers, Cranes, Winches, and Hoists
After performed PM work Varies Varies
H
0057 2.15.2
Intrusion Detection Systems; the Contractor shall provide a by-name listing with ID number of the personnel authorized to perform installation and maintenance on IDS and closed-circuit television systems where part of IDS
When performing PM work Daily Daily
ANNEX
H
0058 2.15.3 a Lightning Protection and Grounding Systems, Inspection COR notification
Visual inspection procedures and reporting ref. PWS
Daily Daily
ANNEX
H
0059A 2.16 Recurring fire protection and prevention systems inspections, maintenance and repair a verbal report to the COR within two hours of any findings and submit a written report of findings by the end of the next business day
Daily Daily
ANNEX
H
0060 2.8.9 Fuel Level Log Request for Fuel Delivery Receipt of Fuel
Within thirty (30) days of contract award Weekly Weekly
ANNEX
H
0061 2.8.9 Fuel Oil Transportation Service To and from heating plants when directed by the COR.
Daily Daily
ANNEX
H
0073 2.1.8.10 Pest and Weed Control Report IAW the content of DD form 1532 monthly monthly
ANNEX
J
0074 2.3 Operation of Heating Plants
Operating logs (including watchclock disks or tapes) maintained on these plants shall be submitted to the COR/ACOR by the 10th of each month for the preceding month monthly monthly Annex
K
0074A 2.3.2.1(4) Operation of Boiler and Heating Plants
Heating Plant Data and Installed Equipment and Systems Information Data Base: Verify update and identify missing data elements.
print out to COR within the first six months after contract effective date after any update and upon request by COR
Annex K
0074B 2.3.2.2 Scheduled Inspections and Maintenance
Submit to the COR for approval, a list of equipment and parts needed for technical surveillance acceptance inspections at each occurrence at each occurrence Annex
K
0074C 2.3.2.2 Scheduled Inspections and Maintenance
Submit written inspection finding report, TÜV finding report to the COR at each occurrence at each occurrence Annex
K
0077 2.3.2.2 (b) Water Treatment Program IAW AR 420-49, TRD 611, Rules of VdTÜV and VBG
Within five (5) days of each inspection check. Negative data shall be reported immedeately.
Varies Varies
ANNEX
K
0078 2.5 Summer Overhaul Program written summer overhaul program shall be submitted to the COR for review and approval NLT 31 Dec each year
Annually Annually Annex
K
0078A 2.5 Summer Overhaul Program A report of the status of the summer overhaul work shall be submitted to the U.S. Government upon request
Annually Ref PWS Annex
K
0078B 2.7
Visual Monthly Inspection of central staeam & hot water distribution and condensation systems
Rresults of the inspection to the COR/ACOR within three (3) working days
Daily
However, any defects identified by the Contractor shall be submitted in writing to the COR/ACOR on the same work day.
Annex
0078C 2.8 Bioiler / Heat Plant Shutdowns Deadlines, procedure according to PWS (30 Minutes / 30 Days)
Daily Daily Annex
K
0078E 4.2
4.2.1 Daily Inspection of chiller / Daily Log
report any problems to the COR/ACOR immediately
Daily provide and maintain a daily log
Annex K
0079 2.2.4.4 Sanitary Maintenance Separator/Trap inspection cycles and amount of disposed material to be reported
Yearly Ref PWS
ANNEX
J
0085 5.16.1.6 Hazardous Waste Collection Point (HWCP) and central HWCP Inspection and Maintenance
An inspection report shall be submitted upon request for all hazardous waste collection points. Form will be provided by DPW
Varies Ref PWS
ANNEX
N
0086 2.2.5.4 Notice of Storm Drainage Service Disruption
Notice of Storm Drainage Service Disruption, reference PWS at each occurrence at each occurrence
ANNEX
J
0086A 2.3.2.5 Maintenance of storm water retention basin flow control valves / pumps as described in the PMP in order to ensure full operation (each occurance) as described in the
PMP
as described in the PMP
ANNEX
L
0091 2.5.5.7.3 Tree Report, Marking, Removal, Species List
If trees need to be removed, a tree cut request is to be submitted to the Environmental Division thru the COR at each occurrence at each occurrence
ANNEX
A
0091A 2.2.9.5 Inspection Report of Tree Removal and Replacement
Contractor shall inspect for dead, damaged, and diseased trees within High Visibility Areas and provide a written report to the COR/ACOR within five (5) working days of the end of each month monthly monthly
ANNEX
F
0092 1.2 Air Pollution Regulations, Heating Plants
Address all non-compliance issues immediately to the COR or ACOR
Immediately Daily
0097 2.3.1 POL Coalescence and Emulsion systems, Inspection Reports
The Contractor shall report any kind of obstruction that cannot be cleared to the
COR
at each occurrence at each occurrence
ANNEX
L
0098 1.3.1.2 Facilities Engineering Operating Log (Sewage General) IAW DA Form 4247 and DA Form 4178
10th Dday of each month Immedeately ROF within 5 Days
Ref PWS
ANNEX
L
0100 1.4 Licenses and Certification Within 30 Days of start of contract / upon request
Ref PWS Ref PWS
ANNEX
M
0101 1.4.1 Proof and Certification, Company and Personnel
Within 30 Days of start of contract / upon request
Upon changes or Expiration, new registration
Upon changes or Expiration, new registration
ANNEX
M
0102 1.5 e Pesticides, DD Form 1532 monthly pesticide usage on DD Form 1532 IAW USAG Rheinland-Pfalz IPMP
Monthly Monthly
ANNEX
M
0102A 1.5f Pesticides, Label & SDS book of Pestisides
Upon request Upon request Upon request
ANNEX
M
0103 1.5 g Pestisides Subcontracting 24 Hrs. in advance Ref PWS Ref PWS
ANNEX
M
0104 1.5 h Pestisides, approved pestisides change
10 working days in advance Ref PWS Ref PWS
ANNEX
M
0105 1.7 Structural Pests, Inspection Report annually by the end of the performance period (Options)
Ref PWS Ref PWS
ANNEX
M
0106 2.1.1 Indoor Pest Control, Pest Management Maintenance Record
Submittal shall begin ten (10) days after award
Weekly Ref PWS
ANNEX
M
0107 2.2.1 Outdoor Pest Control, Pest Management Maintenance Record
Submittal shall begin ten (10) days after award
Weekly Ref PWS
M
0108 2.2.3.6 Stray Animal Control Intake Form Contractor shall submit the completed form to the COR/ACOR within one (1) working day from capture.
Daily Daily
ANNEX
M
0109 2.2.3.7 Daily electronic summary report Example 1to KO ten (10) days after contract award for approval
Daily Ref PWS
ANNEX
M
0110 5.16.1.1 Environmental Inspections and Training within one (1) work week after inspection
Daily Daily
ANNEX
N
0112 5.16.1.7 Hazardous Material Inventory (US regulations as well as GFGS)
Quarterly Ref PWS Ref PWS
ANNEX
N
0113 5.16.1.11.3 Environmental Audit (EPAAS) Provide any deficiency to EMD within three working days after identification
Ref PWS Ref PWS
ANNEX
N
0114 5.16.1.11.6 Permits; Data Base Report on a monthly basis. Ref PWS Ref PWS
ANNEX
N
0116 1.1.2.1 (4) RY Cleanliness Management Paln During the Phasing in Work Performance as required Ref PWS
ANNEX
O
0117 2.1.11.1.8 Organizational Conflict of Interest Avoidance and Mitigation Plan
Provide draft OCI Plan with proposal
Final OCI Plan submitted within 15 calendar days after
Contract award
Ref PWS
FINAL 5 FEB