This document contains details of a federal solicitation for construction services. The Tomah VA Medical Center is seeking a general contractor to expand building 32 and incorporate a new data center to meet EHRM requirements. The contractor will furnish all labor, materials, equipment, and supervision to construct an approximately 5,000 square foot addition between building 32 and the tramway to the east. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The contractor will be responsible for expanding and upgrading the IT infrastructure to correct facility condition deficiencies related to accessibility, the main computer room, and demarcation room.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REMOVE
REFRIGERANT PIPING
REMOVE PRV AND
ACCESSORIES
REMOVE HPS
PIPING TO
WHERE
INDICATED
REMOVE
CONDENSATE
PUMP, PC
PIPING, VENT
PIPING, ETC.
REMOVE
REFRIGERANT
PIPING
REMOVE
DUCTWORK
REMOVE STEAM
AND PC PIPING
REMOVE LPR PIPING
REMOVE COND PIPING
FROM LIEBERT UNITS
REMOVE SUMP PIT
ASSEMBLY COMPLETE
REMOVE
REFRIGERANT PIPING
REMOVE HPS PIPING
NOTE:
EXISTING WALL IS BEING DEMOLISHED. ALL EQUIPMENT, DUCTWORK,
PIPING AND ACCESSORIES SHOULD BE REMOVED.
REMOVE PRV AND
ACCESSORIES
REMOVE REFRIGERANT
PIPING BACK TO LIEBERT
UNITS
REMOVE COND PIPING
BACK TO LIEBERTS
REMOVE LPR PIPING
REMOVE PC PIPING
REMOVE HPS PIPING
REMOVE HPS PIPING
REMOVE SUMP PIT
ASSEMBLY COMPLETE
NOTE:
EXISTING WALL IS BEING DEMOLISHED. ALL EQUIPMENT, DUCTWORK,
PIPING AND ACCESSORIES SHOULD BE REMOVED.
REMOVE FTR AND
RELATED HPS PIPING
EXISTING ELECTRICAL
BUS DUCT AND CONDUITS
TO REMAIN
REMOVE FTR AND
RELATED HPS PIPING
REMOVE FTR AND
RELATED HPS PIPING
EXISTING CABLING TO
REMAIN DURING
CONSTRUCTION REMOVE
REFRIGERANT PIPING
FROM (3) CONDENSING
UNITS
CONDENSING UNIT TO BE RELOCATED
AS PER PLANS. REMOVE REFRIGERANT
PIPING BACK TO AC UNIT
3770 S. PENNSYLVANIA AVENUE, UNIT 8
ST. FRANCIS, WISCONSIN 53235
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
PROJECT LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
EHRM INFRASTRUCTURE
UPGRADES TIER 2
VA MEDICAL CENTER TOMAH, WI
FEB. 4, 2022 HFB JMD
MD103MD103
FINAL BID DOCUMENTS
676-21-701MECHANICAL
DEMOLITION ELEVATIONS
NTS1 MECHANICAL ROOM EAST WALL 1
NTS2 MECHANICAL ROOM EAST WALL2
NTS3 HALLWAY EAST WALL1
NTS4 HALLWAY EAST WALL 2
NTS5 EXTERIOR VIEW OF EAST WALL
No. Description Date
C
B
A
SD-2
14X12
RG-1
12X12
SD-2
14X12
SD-2
14X12
SD-2
24X12
SD-2
24X12
SD-1
SD-1
SD-1
RG-1
24X24
RG-2
24X14
20X14 28X16 28X18 36X18
X
20X14
X
30X20 30X20
44X16
B32-L-1
B32-EF-1
B32-VAV-7
B32-H-1
B32-P-1B
B32-P-1A
B32-HX-2
B32-HX-1
B32-VAV-5
B32-CP-2
B32-VAV-1
B32-AHU-1
FINAL FILTER
SA FAN
COOLING COIL
HEATING COIL
FD
B32-VAV-4
14X14
M402
X
SD-1
OFFSET UP
B32-ERC-1
B32-ERC-2
36X20 RELIEF
DUCT TO
PLENUM
72X44X30
RELIEF
PLENUM
X
X
M402
B32-ET-1
C
B
A
CHEMICAL
POT FEEDER
1. REFER TO GC SHEETS FOR PHASING PLANS. ALL WORK TO BE DONE IN ACCORDANCE
WITH THE PHASES IDENTIFIED.
2. REFER TO SHEET M001 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS.
3. INFORMATION REGARDING EXISTING CONDITIONS HAS BEEN OBTAINED FROM
EXISTING DRAWINGS AND DO NOT REPRESENT AS BUILT CONDITIONS OF THE SITE.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING
CONDITIONS, MATERIALS, DIMENSIONS & AND ELEVATIONS. THE EXTENT OF WORK IN
PLACE AND REQUIRED, QUANTITIES, LOCATIONS, CLEARANCES, AND SO ON, OF SUCH
SUFFICIENCY TO ENABLE SUBMISSION OF FAITHFUL BIDS AND PRIOR TO
COMMENCING CONSTRUCTION.
4. ALL PENETRATIONS, BOTH NEW AND EXISTING, THROUGH DESIGNATED FIRE RATED
WALLS, CEILINGS, FLOOR SLABS, SHAFTS AND OR OTHER CHASES SHALL BE
PROPERLY SEALED ON BOTH SIDES ACCORDING TO THE FIRE STOPPING
MANUFACTURER'S APPROVED INSTALLATION DETAILS TO MAINTAIN THE DESIGNATED
FIRE RESISTANCE RATING.
5. ALL HOLES, PENETRATION OR OTHER OPENINGS IN EXISTING FULL HEIGHT WALL
SHALL BE FILLED WITH MATERIAL EQUIVALENT TO THE WALL CONSTRUCTION OR FIRE
STOPPING MATERIAL PER SPECIFICATIONS.
6. COORDINATE ALL WORK WITH OTHER TRADES. WRITTEN DIMENSIONS TAKE
PRECEDENCE OVER SCALED DRAWINGS.
7. CONTRACTOR SHALL NOTIFY AND RECEIVE WRITTEN APPROVAL FROM OWNER
PRIOR TO SCHEDULED INTERRUPTION OF ANY SERVICE; SEE SPECIFICATIONS.
GENERAL NOTES
20X14 SA DUCT UP THRU FLOOR ABOVE.
20X14 RA DUCT UP THRU FLOOR ABOVE.
36X20 OA DUCT UP THRU FLOOR ABOVE.
KEYED NOTES
3770 S. PENNSYLVANIA AVENUE, UNIT 8
ST. FRANCIS, WISCONSIN 53235
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
PROJECT LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
KEY PLAN N
BLDG 32
T R
A M
W A
Y
BLDG 401
BLDG 32
EHRM INFRASTRUCTURE
UPGRADES TIER 2
VA MEDICAL CENTER TOMAH, WI
FEB. 4, 2022 HFB JMD
MH101MH101
FINAL BID DOCUMENTS
676-21-701MECHANICAL
FIRST FLOOR DUCTWORK PLAN -
NEW WORK
1/4" = 1'-0"1 FIRST FLOOR PLAN
1. REFER TO GC SHEETS FOR PHASING PLANS. ALL WORK TO BE DONE IN ACCORDANCE
WITH THE PHASES IDENTIFIED.
2. REFER TO SHEET M001 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS.
3. INFORMATION REGARDING EXISTING CONDITIONS HAS BEEN OBTAINED FROM
EXISTING DRAWINGS AND DO NOT REPRESENT AS BUILT CONDITIONS OF THE SITE.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING
CONDITIONS, MATERIALS, DIMENSIONS & AND ELEVATIONS. THE EXTENT OF WORK IN
PLACE AND REQUIRED, QUANTITIES, LOCATIONS, CLEARANCES, AND SO ON, OF SUCH
SUFFICIENCY TO ENABLE SUBMISSION OF FAITHFUL BIDS AND PRIOR TO
COMMENCING CONSTRUCTION.
4. ALL PENETRATIONS, BOTH NEW AND EXISTING, THROUGH DESIGNATED FIRE RATED
WALLS, CEILINGS, FLOOR SLABS, SHAFTS AND OR OTHER CHASES SHALL BE
PROPERLY SEALED ON BOTH SIDES ACCORDING TO THE FIRE STOPPING
MANUFACTURER'S APPROVED INSTALLATION DETAILS TO MAINTAIN THE DESIGNATED
FIRE RESISTANCE RATING.
5. ALL HOLES, PENETRATION OR OTHER OPENINGS IN EXISTING FULL HEIGHT WALL
SHALL BE FILLED WITH MATERIAL EQUIVALENT TO THE WALL CONSTRUCTION OR FIRE
STOPPING MATERIAL PER SPECIFICATIONS.
6. COORDINATE ALL WORK WITH OTHER TRADES. WRITTEN DIMENSIONS TAKE
PRECEDENCE OVER SCALED DRAWINGS.
7. CONTRACTOR SHALL NOTIFY AND RECEIVE WRITTEN APPROVAL FROM OWNER PRIOR
TO SCHEDULED INTERRUPTION OF ANY SERVICE; SEE SPECIFICATIONS.
GENERAL NOTES
C
B
A
44X20 SA DUCT (8000 CFM)
RG-1
24x12
RG-1
12x12
B32-CRAC-2B32-CRAC-1
X
X
B32-VAV-2
B32-VAV-3
SD-1
B32-VAV-6
B32-CRAC-3
36/20
B32-CRAC-4
X
SD-2
24x12
FD
SD-1
12x12
SD-2
24X12
M402
M402
36X20 OA DUCT UP
THRU ROOF ABOVE
TO B32-IH-1
14"x14"
"x
14"x14"
36X20 OA DUCT
DOWN IN CHASE
44X20 SA DUCT (8000 CFM)
X
R A
D U
C T
SET DAMPER
TO 2750 CFM
SET DAMPER
TO 2200 CFM
SET DAMPER
TO 1125 CFM
SET DAMPER
TO 2200 CFM
C
B
A
FD
FD
X
R A
D U
C T
X
R A
D U
C T
SET DAMPER
TO 2750 CFM
SET DAMPER
TO 1925 CFM
SET DAMPER
TO 1925 CFM
X
R A
D U
C T
RA DUCT (16X16) DOWN TO
CABINET VERTICAL EXH
CONNECTION. CONFIRM WITH IT
CONTRACTOR CONNECTION SIZE.
TRANSISTION AS REQUIRED.
PROVIDE DAMPER SET TO 550
CFM. TYPICAL OF 25.
SET DAMPER
TO 1125 CFM
RA DUCT (16X16) DOWN TO
CABINET VERTICAL EXH
CONNECTION. CONFIRM WITH
IT CONTRACTOR CONNECTION
SIZE. TRANSISTION AS
REQUIRED. PROVIDE DAMPER
SET TO 450 CFM. TYPICAL OF 5.
3770 S. PENNSYLVANIA AVENUE, UNIT 8
ST. FRANCIS, WISCONSIN 53235
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
PROJECT
LEADER:
Department of Veterans Affairs
CONSULTANTS
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS
TOMAH, WI 54660
MEDICAL CENTER
VETERANS
FULLY
500 E VETERANS
TOMAH, WI 54660
MEDICAL CENTER
VETERANS
FULLY
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY FULLY
KEY PLAN N
BLDG 32
T R
A M
W A
Y
BLDG 401
BLDG 32
EHRM INFRASTRUCTURE
UPGRADES TIER 2
VA MEDICAL CENTER TOMAH, WI
FEB. 4, 2022 HFB JMD
MH102MH102
FINAL BID DOCUMENTS
676-21-701MECHANICAL
SECOND FLOOR DUCTWORK
PLAN - NEW WORK
1/4" = 1'-0"1 SECOND FLOOR PLAN
B
A
B32-ACCU-5
B32-IH-1
B32-ACCU-1B32-ACCU-2B32-ACCU-3B32-ACCU-4
M402
M402
1 1 1 1
4 5
3 3
1. REFER TO GC SHEETS FOR PHASING PLANS. ALL WORK TO BE DONE IN
ACCORDANCE WITH THE PHASES IDENTIFIED.
2. REFER TO SHEET M001 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS.
3. INFORMATION REGARDING EXISTING CONDITIONS HAS BEEN OBTAINED FROM
EXISTING DRAWINGS AND DO NOT REPRESENT AS BUILT CONDITIONS OF THE SITE.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING
CONDITIONS, MATERIALS, DIMENSIONS & AND ELEVATIONS. THE EXTENT OF WORK
IN PLACE AND REQUIRED, QUANTITIES, LOCATIONS, CLEARANCES, AND SO ON, OF
SUCH SUFFICIENCY TO ENABLE SUBMISSION OF FAITHFUL BIDS AND PRIOR TO
COMMENCING CONSTRUCTION.
4. ALL PENETRATIONS, BOTH NEW AND EXISTING, THROUGH DESIGNATED FIRE
RATED WALLS, CEILINGS, FLOOR SLABS, SHAFTS AND OR OTHER CHASES SHALL
BE PROPERLY SEALED ON BOTH SIDES ACCORDING TO THE FIRE STOPPING
MANUFACTURER'S APPROVED INSTALLATION DETAILS TO MAINTAIN THE
DESIGNATED FIRE RESISTANCE RATING.
5. ALL HOLES, PENETRATION OR OTHER OPENINGS IN EXISTING FULL HEIGHT WALL
SHALL BE FILLED WITH MATERIAL EQUIVALENT TO THE WALL CONSTRUCTION OR
FIRE STOPPING MATERIAL PER SPECIFICATIONS.
6. COORDINATE ALL WORK WITH OTHER TRADES. WRITTEN DIMENSIONS TAKE
PRECEDENCE OVER SCALED DRAWINGS.
7. CONTRACTOR SHALL NOTIFY AND RECEIVE WRITTEN APPROVAL FROM OWNER
PRIOR TO SCHEDULED INTERRUPTION OF ANY SERVICE; SEE SPECIFICATIONS.
GENERAL NOTES
MOUNT CONDENSERS ON SUPPORT RAILS. SEE DETAIL 14/M501. SEE ARCH DWGS FOR
FURTHER INFORMATION.
1-1/2" STEAM RELIEF VENT. OUTLET TO BE MIN 7'-0" ABOVE ROOF AND CUT AT A 45 DEG
ANGLE. PROVIDE WARNING SIGN.
(2) 5/8" RL AND (2) 1-3/8" RS PIPING DOWN FROM ACCU. PROVIDE PIPE CURB PER DETAIL 6/M502.
(2) 1-5/8" RL AND (2) 2-1/8" RS PIPING DN FROM ACCU-5. PROVIDE PIPE CURB PER DETAIL 6/M502.
B32-IH-1 ON MFG ROOF CURB. SEAL AND FLASH TO BE WEATHERTIGHT.
KEYED NOTES
3770 S. PENNSYLVANIA AVENUE, UNIT 8
ST. FRANCIS, WISCONSIN 53235
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
PROJECT LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
KEY PLAN N
BLDG 32
T R
A M
W A
Y
BLDG 401
BLDG 32
EHRM INFRASTRUCTURE
UPGRADES TIER 2
VA MEDICAL CENTER TOMAH, WI
FEB. 4, 2022 HFB JMD
MH103MH103
FINAL BID DOCUMENTS
676-21-701MECHANICAL
ROOF PLAN - NEW WORK
1/4" = 1'-0"1 ROOF PLAN
B
A
3 3
EXISTING LIQUID AND VAPOR
LINE SETS UP TO AHU (ETR)
1 1/2" HPS
1" PC
1 1/2" V
NEW TRAMWAY TUNNEL
EX. TRAMWAY TUNNEL
EXISTING BAS
CONTROL PANELS
EX. 3/4" COND
FROM EX. LIEBERT
UNIT
1 1/2" HPS
1" PC
EX. LIEBERT
UNIT #1 TO
REMAIN
EX. LIEBERT
UNIT TO
REMAIN
TELEPHONE
EQUIPMENT RM
MECHANICAL ROOM
NEW 1-1/2"
STEAM VENT UP
SIDE OF BLDG TO
TERMINATION
B32-CP-1
M401
B32-PRV-2
SEE SHEET M401
FOR WORK IN
THIS AREA
SEE SHEET M401
FOR WORK IN
THIS AREA
SEE SHEET M401
FOR WORK IN
THIS AREA
C
B
A
NEW 1-1/2" HPS AND 1" PC
THRU WALL AND DN
BELOW GRADE. SEE CIVIL
PLAN FOR CONTINUATION
ROUTE LPR BACK
TO CP-1
HPS
ST-8
ST-9
ST-7
PROVIDE PROTECTIVE
ENCLOSURE AROUND
PIPING
AVOID DISTURBING
TELECOMM CONDUIT
ALONG WALL
AVOID DISTURBING
4X4 ELECTRICAL BUS
DUCT OVERHEAD IN
THIS AREA
INSTALL RELOCATED CONDENSER ON NEW CONC PAD. PROVIDE NEW
REFRIGERANT PIPING AND INSTALLATION AS INDICATED AND REQUIRED.
RECONNECT REFRIGERANT PIPING TO EXISTING PIPING. REPLACE EXISTING
INSULATION TO COMPLETE SEAL OF VAPOR BARRIER.
REFRIGERANT PIPING THRU EXISTING WALL. CORE AND SEAL ALL OPENINGS FOR
PIPE PENETRATIONS TO BE WATERTIGHT.
NEW 1-1/2" HPS AND 3/4" PC UNDERGROUND PIPING. CORE AND ROUTE THRU
WALL AND OFFSET TIGHT TO STRUCTURE.
RECONNECT NEW STEAM AND COND PIPING TO EXISTING CONNECTIONS.
KEYED NOTES
1. REFER TO GC SHEETS FOR PHASING PLANS. ALL WORK TO BE DONE IN
ACCORDANCE WITH THE PHASES IDENTIFIED.
2. REFER TO SHEET M001 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS.
3. INFORMATION REGARDING EXISTING CONDITIONS HAS BEEN OBTAINED FROM
EXISTING DRAWINGS AND DO NOT REPRESENT AS BUILT CONDITIONS OF THE SITE.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING
CONDITIONS, MATERIALS, DIMENSIONS & AND ELEVATIONS. THE EXTENT OF WORK
IN PLACE AND REQUIRED, QUANTITIES, LOCATIONS, CLEARANCES, AND SO ON, OF
SUCH SUFFICIENCY TO ENABLE SUBMISSION OF FAITHFUL BIDS AND PRIOR TO
COMMENCING CONSTRUCTION.
4. ALL PENETRATIONS, BOTH NEW AND EXISTING, THROUGH DESIGNATED FIRE
RATED WALLS, CEILINGS, FLOOR SLABS, SHAFTS AND OR OTHER CHASES SHALL
BE PROPERLY SEALED ON BOTH SIDES ACCORDING TO THE FIRE STOPPING
MANUFACTURER'S APPROVED INSTALLATION DETAILS TO MAINTAIN THE
DESIGNATED FIRE RESISTANCE RATING.
5. ALL HOLES, PENETRATION OR OTHER OPENINGS IN EXISTING FULL HEIGHT WALL
SHALL BE FILLED WITH MATERIAL EQUIVALENT TO THE WALL CONSTRUCTION OR
FIRE STOPPING MATERIAL PER SPECIFICATIONS.
6. COORDINATE ALL WORK WITH OTHER TRADES. WRITTEN DIMENSIONS TAKE
PRECEDENCE OVER SCALED DRAWINGS.
7. CONTRACTOR SHALL NOTIFY AND RECEIVE WRITTEN APPROVAL FROM OWNER
PRIOR TO SCHEDULED INTERRUPTION OF ANY SERVICE; SEE SPECIFICATIONS.
GENERAL NOTES
3770 S. PENNSYLVANIA AVENUE, UNIT 8
ST. FRANCIS, WISCONSIN 53235
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
PROJECT LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
KEY PLAN N
BLDG 32
T R
A M
W A
Y
BLDG 401
BLDG 32
EHRM INFRASTRUCTURE
UPGRADES TIER 2
VA MEDICAL CENTER TOMAH, WI
FEB. 4, 2022 HFB JMD
MP101MP101
FINAL BID DOCUMENTS
676-21-701MECHANICAL
BASEMENT FLOOR PIPING PLAN -
NEW WORK
1/4" = 1'-0"1 BASEMENT FLOOR PLAN
B
A
B32-VAV-4 B32-VAV-7
B32-AHU-1
B32-ET-1
B32-P-1B
B32-P-1A
B32-HX-2
B32-HX-1
B32-CP-2
B32-VAV-5B32-VAV-1
COOLING
HEATING COIL
B32-P-2
2" V UP THRU
FLOOR ABOVE
1 1/2" V
2-1/2" HPS
3/4" PC
SA FAN
FINAL FILTER
L P
S
B32-ERC-1
B32-ERC-2
2-1/2" HWS/HWR
PIPING
1" HWS/HWR PIPING
UP TO CRAC
3/4" LPS PIPING
UP TO CRAC
2" HWS/HWR PIPING
TO HEATING COIL
1-5/8" RL/2-1/8" RS
PIPING TO DX COIL
1-5/8" RL/2-1/8" RS
PIPING UP TO ROOF
1" HWS/HWR PIPING
TO VAV BOXES
1 1/2" V
2-1/8" RS
1-5/8" RL
2-1/8" RS
1-5/8" RL
1-1/2" LPS PIPING
1" HWS/HWR
PIPING UP TO
CRAC
3/4" LPS PIPING
UP TO CRAC
1-1/2" HWS
1-1/2" HWR
1-1/2" HWS
1-1/2" HWR
7 7
B
M401
A
M401
H P
S
P C
H P
S
P C
5" HPS
3" PC
H P
S
P C
M401
M402
B32-H-1
M402
B32-PRV-1
L P
S
L P
S
T
T
T
T
T
C
B
A
1" HWS/HWR PIPING
UP TO CRAC
3/4" LPS PIPING
UP TO CRAC 1" HWS/HWR PIPING
UP TO CRAC
3/4" LPS PIPING
UP TO CRAC
ST-10
ST-11
CHEMICAL
POT FEEDER
1. REFER TO GC SHEETS FOR PHASING PLANS. ALL WORK TO BE DONE IN
ACCORDANCE WITH THE PHASES IDENTIFIED.
2. REFER TO SHEET M001 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS.
3. INFORMATION REGARDING EXISTING CONDITIONS HAS BEEN OBTAINED FROM
EXISTING DRAWINGS AND DO NOT REPRESENT AS BUILT CONDITIONS OF THE SITE.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING
CONDITIONS, MATERIALS, DIMENSIONS & AND ELEVATIONS. THE EXTENT OF WORK
IN PLACE AND REQUIRED, QUANTITIES, LOCATIONS, CLEARANCES, AND SO ON, OF
SUCH SUFFICIENCY TO ENABLE SUBMISSION OF FAITHFUL BIDS AND PRIOR TO
COMMENCING CONSTRUCTION.
4. ALL PENETRATIONS, BOTH NEW AND EXISTING, THROUGH DESIGNATED FIRE
RATED WALLS, CEILINGS, FLOOR SLABS, SHAFTS AND OR OTHER CHASES SHALL
BE PROPERLY SEALED ON BOTH SIDES ACCORDING TO THE FIRE STOPPING
MANUFACTURER'S APPROVED INSTALLATION DETAILS TO MAINTAIN THE
DESIGNATED FIRE RESISTANCE RATING.
5. ALL HOLES, PENETRATION OR OTHER OPENINGS IN EXISTING FULL HEIGHT WALL
SHALL BE FILLED WITH MATERIAL EQUIVALENT TO THE WALL CONSTRUCTION OR
FIRE STOPPING MATERIAL PER SPECIFICATIONS.
6. COORDINATE ALL WORK WITH OTHER TRADES. WRITTEN DIMENSIONS TAKE
PRECEDENCE OVER SCALED DRAWINGS.
7. CONTRACTOR SHALL NOTIFY AND RECEIVE WRITTEN APPROVAL FROM OWNER
PRIOR TO SCHEDULED INTERRUPTION OF ANY SERVICE; SEE SPECIFICATIONS.
GENERAL NOTES
RS AND RL PIPING CONNECTION TO AHU DX COIL.
HWS AND HWR PIPING CONNECTION TO AHU HW COIL. SEE DETAIL 13/M502.
ENERGY RECOVERY COIL WITH RECIRCULATION PUMP. SEE DETAIL 1/M502.
CONDENSATE PUMP. SEE DETAIL 1/M503.
STEAM HEAT EXCHANGER. SEE DETAIL 8/M502.
HW INLINE PUMP SYSTEM. SEE DETAIL 10/M502.
HWS/HWR PIPING, LPS PIPING, COND PIPING UP TO CRAC UNIT. SEE CRAC
SCHEDULE ON SHEET M601 FOR PIPING CONNECTIONS.
OFFSET PIPING IN JOIST SPACE OVER DUCTWORK.
OFFSET PIPING DOWN AND ROUTE TO CONNECTION POINT OF EXISTING PIPING.
DURING SHUTDOWN, DISCONNECT TEMPORARY HPS AND PC PIPING AND
CONNECT NEW PIPING. REMOVE TEMPORARY PIPING BACK TO ISOLATION VALVES
IN TRAMWAY. PROVIDE BLIND FLANGES ON END OF VALVES.
PROVIDE LOCKABLE PROTECTION COVER OVER THERMOSTAT.
5" HPS AND 3" PC PIPING DOWN THROUGH FLOOR. SEE DETAIL 3/M401 FOR
CONTINUATION.
CHEMICAL POT FEEDER. ROUTE 1" INFEED AND DISCHARGE PIPING TO HWS
PIPING CONNECTION POINTS (VIF). ROUTE DRAIN TO NEAR FLOOR DRAIN.
KEYED NOTES
3770 S. PENNSYLVANIA AVENUE, UNIT 8
ST. FRANCIS, WISCONSIN 53235
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
PROJECT LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
KEY PLAN N
BLDG 32
T R
A M
W A
Y
BLDG 401
BLDG 32
EHRM INFRASTRUCTURE
UPGRADES TIER 2
VA MEDICAL CENTER TOMAH, WI
FEB. 4, 2022 HFB JMD
MP102MP102
FINAL BID DOCUMENTS
676-21-701MECHANICAL
FIRST FLOOR PIPING PLAN - NEW
WORK
1/4" = 1'-0"1 FIRST FLOOR PLAN
B
A
B32-VAV-2
B32-VAV-3
B32-VAV-6
1 1
-1
/2
H W
S
-1
/2
H W
R
M402
M402
T5
T
C
B
A
1. REFER TO GC SHEETS FOR PHASING PLANS. ALL WORK TO BE DONE IN
ACCORDANCE WITH THE PHASES IDENTIFIED.
2. REFER TO SHEET M001 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS.
3. INFORMATION REGARDING EXISTING CONDITIONS HAS BEEN OBTAINED FROM
EXISTING DRAWINGS AND DO NOT REPRESENT AS BUILT CONDITIONS OF THE SITE.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING
CONDITIONS, MATERIALS, DIMENSIONS & AND ELEVATIONS. THE EXTENT OF WORK
IN PLACE AND REQUIRED, QUANTITIES, LOCATIONS, CLEARANCES, AND SO ON, OF
SUCH SUFFICIENCY TO ENABLE SUBMISSION OF FAITHFUL BIDS AND PRIOR TO
COMMENCING CONSTRUCTION.
4. ALL PENETRATIONS, BOTH NEW AND EXISTING, THROUGH DESIGNATED FIRE
RATED WALLS, CEILINGS, FLOOR SLABS, SHAFTS AND OR OTHER CHASES SHALL
BE PROPERLY SEALED ON BOTH SIDES ACCORDING TO THE FIRE STOPPING
MANUFACTURER'S APPROVED INSTALLATION DETAILS TO MAINTAIN THE
DESIGNATED FIRE RESISTANCE RATING.
5. ALL HOLES, PENETRATION OR OTHER OPENINGS IN EXISTING FULL HEIGHT WALL
SHALL BE FILLED WITH MATERIAL EQUIVALENT TO THE WALL CONSTRUCTION OR
FIRE STOPPING MATERIAL PER SPECIFICATIONS.
6. COORDINATE ALL WORK WITH OTHER TRADES. WRITTEN DIMENSIONS TAKE
PRECEDENCE OVER SCALED DRAWINGS.
7. CONTRACTOR SHALL NOTIFY AND RECEIVE WRITTEN APPROVAL FROM OWNER
PRIOR TO SCHEDULED INTERRUPTION OF ANY SERVICE; SEE SPECIFICATIONS.
GENERAL NOTES
RS/RL PIPING TO CRAC UNIT. SEE CRAC SCHEDULE FOR PIPING CONNECTIONS.
1-1/2" STEAM VENT, 1-5/8" RL, AND 2-1/8" RS UP THRU ROOF.
REFRIGERANT PIPING FROM CRAC UNITS UP TO CONDENSER ON ROOF.
1-1/2" HWS/HWR PIPING DOWN THRU FLOOR.
PROVIDE LOCKABLE PROTECTION COVER OVER THERMOSTAT.
KEYED NOTES
3770 S. PENNSYLVANIA AVENUE, UNIT 8
ST. FRANCIS, WISCONSIN 53235
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
PROJECT LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
KEY PLAN N
BLDG 32
T R
A M
W A
Y
BLDG 401
BLDG 32
EHRM INFRASTRUCTURE
UPGRADES TIER 2
VA MEDICAL CENTER TOMAH, WI
FEB. 4, 2022 HFB JMD
MP103MP103
FINAL BID DOCUMENTS
676-21-701MECHANICAL
SECOND FLOOR PIPING PLAN -
NEW WORK
1/4" = 1'-0"1 SECOND FLOOR PLAN
GRADE
REMOVE EXIST 4"
HPS PIPING
REMOVE EXIST
2-1/2" PC PIPING
EXISTING
CEILING
EXISTING
EXTERIOR WALL
EXISTING
ROOF
EX. 2" ELEC
CONDUIT
EX. 1" ELEC
CONDUIT
UNEXCAVATED
PROVIDE TEMPORARY
2-1/2" PC PIPING
EXIST 2-1/2" PC PIPING
FROM B23
EXIST 4" HPS
PIPING FROM B23
PROVIDE
TEMPORARY 4"
HPS PIPING
E X
IS
T
IN
G
B
E
X T
E R
IO
R
W A
L L
PROVIDE
TEMPORARY PIPE
SUPPORTS, SEE
DETAIL 6 ON
DRAWING C502,
TYPICAL
EXCAVATE AT TRAMWAY
FOUNDATION WALL AND
CORE HOLES FOR
TEMPORARY PIPES, PATCH
HOLES WHEN COMPLETE
AN TEMPORARY PIPES REMOVED.
FILL EXCAVATION WITH #2 STONE
WHILE TEMPORARY PIPES ARE IN USE.
TRAMWAY
8' - 0"
GRADE
REMOVE
EXIST 4"
HPS PIPING
REMOVE EXIST
2-1/2" PC PIPING
EXISTING
CEILING
EXISTING
EXTERIOR WALL
EXISTING
ROOF
EX. 2" ELEC
CONDUIT
EX. 1" ELEC
CONDUIT
UNEXCAVATED
REMOVE EXIST 4"
HPS PIPING
REMOVE EXIST
2-1/2" PC PIPING
HPS AND PC
FROM B23
INTO EXISTING
TRAMWAY
TRAMWAY
EXIST HPS MAIN
EXIST ABANDONED 12" PIPE
EXIST 5" PC MAIN
EXIST
ABANDONED 6"
PIPE
DEMOLISH EXISTING
HPS AND PC,
PROVIDE NEW 5"HPS
AND 3"PC
TEMPORARY 4"HPS AND 2-1/2"PC,
CONNECT TO12" HPS AND 5" PC
WITHIN B401 CRAWL SPACE. SEE
SHEET MD102 FOR CONTINUATION.
TEMPORARY 4"HPS
AND PERMANENT
4"HPS, CONNECT
TO 12"HPS WITHIN
B401 CRAWL SPACE
4"HPS WITH ASBESTOS
INSULATION, ABANDON
IN PLACE
2" HPS AND 1-1/2"PC
CONNECTION TO REMAIN
REMOVE 2"HPS
AND 1-1/2"PC TO B32
CONNECT TO EXISTING 2"HPS
AND 1-1/2" PC AND PROVIDE
NEW 2"HPS AND 1-1/2"PC TO
EXISTING B32
SAW-CUT NEW 36"
BY 48" HIGH OPENING IN
TRAMWAY FOUNDATION WALL
ENLARGE EXISTING
OPENING BY
SAW-CUTTING EXISTING
FOUNDATION WALL,
NEW OPENING 36" BY
48" HIGH
SAW-CUT NEW 36" BY
48" HIGH OPENING IN
TRAMWAY FOUNDATION
WALL
ENLARGE EXISTING
OPENINGBY SAW-CUTTING
EXISTING FOUNDATION WALL,
NEWOPENING 24" BY 24" HIGH
CORE HOLES IN EXISTING
FOUNDATION WALL FOR
TEMPORARY HPS AND PC PIPES
CONNECT TO EXIST
5" HPS & 3" PC
UP THRU FLOOR. SEE
SHEET MP101 FOR
CONTINUATION.
5"HPS
3"PC
"H
P S
"P
C
ROUTE NEW PIPING BELOW
GRADE UNDER NEW
BUILDING FOUNDATION. SEE
DETAILS 5 AND 10 ON SHEET
C502 FOR BURIED PIPING
INSTALLATION
REQUIREMENTS
OUTLINE OF
BUILDING
-1
/2
H P
S
P C
1-1/2" HPS
1" PC
1- 1/
2" H
P S
1" P
C
COORDINATE ROUTING OF
NEW UNDERGROUND HPS
AND PC PIPING WITH EX
UNDERGROUND CONDUITS
EX STEAM TUNNEL TO
BE REMOVED. SEE
CIVIL DRAWINGS.
PROVIDE NEW ISOLATION
VALVE IN PIPING
PROVIDE NEW
ISOLATION
VALVE IN PIPING
PROVIDE NEW
ISOLATION
VALVE IN PIPING
3770 S. PENNSYLVANIA AVENUE, UNIT 8
ST. FRANCIS, WISCONSIN 53235
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By
Building Number
Project Number
Drawing Number
Drawn By
PROJECT LEADER:
Department of
Veterans Affairs
CONSULTANTS:
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
VA FORM 08-6231, OCT 1978
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Office of Facilities
Management
B
A
C
D
E
F
97 8654321
F
E
D
C
B
A
1 2 3 4 5 6 87 9
FULLY SPRINKLEREDFULLY SPRINKLERED
EHRM INFRASTRUCTURE
UPGRADES TIER 2
VA MEDICAL CENTER TOMAH, WI
FEB. 4, 2022 HFB JMD
M401M401
FINAL BID DOCUMENTS
676-21-701MECHANICAL
ENLARGED PLAN AND SECTIONS
NTS1 SECTION @ TRAMWAY FROM B023
NTS2 SECTION @ TRAMWAY NEAR B401
NTS3 PARTIAL PLAN AT EXISTING BELOW GRADE TRAMWAY