This electrical conduit routing plan and related federal contract opportunity are for infrastructure upgrades to the Tomah VA Medical Center. The plan details conduit routing needs for a new 5,000 square foot addition to Building 32 that will incorporate an expanded data center and correct deficiencies. The federal contract opportunity solicits general construction services to furnish labor, materials, and equipment to complete the expansion and upgrades. Services include core drilling through floors, installing new conduits above ceilings and dropping them in restrooms, offices, and communications rooms, as well as running two 3-inch conduits from the generator to the new building. The solicitation was issued by the VA Technology Acquisition Center Austin for the Tomah VAMC project numbered 676-21-701. The response due date and award date are not specified.

View the file

Other files

File Type Posted
36C77622B0025 0006.pdf PDF
C102 - Contractor Markup for Question 35.pdf PDF
P001 - COR Markup for Response 35.pdf PDF
36C77622B0025 0005.pdf PDF
Reference Pictures for Question 29.pdf PDF
Tech Questions - Tomah T2 - 5-12-22.pdf PDF
36C77622B0025 0004.pdf PDF
Att 9 - DBA Wage Rates - Monroe County - 04-29-22.pdf PDF
Updated Drawings - ELECTRICAL_ADD1.pdf PDF
36C77622B0025 0003.pdf PDF
Updated Drawings - CIVIL ADD1.pdf PDF
Tech Questions - Tomah T2 - 5-5-22.pdf PDF
Updated Specs - 055000 Metal Fabrications.pdf PDF
36C77622B0025 0002.pdf PDF
Tech Questions - Tomah T2 - 4-28-22.pdf PDF
36C77622B0025 0001.pdf PDF
Site Visit Sign-in Sheet - Tomah Tier 2.pdf PDF
Tech Questions from Site Visit - Tomah T2 - 4-20-22.pdf PDF
Tomah Tier 2 IFB 36C77622B0025 - 4-6-22.pdf PDF
Att 9 - DBA Wage Rates - Monroe County - 03-18-22.pdf PDF
Att 3 - Final Drawings 1 of 4.pdf PDF
Att 7 - VHA Supp Contract Reqs COVID-19 - 12-14-21.pdf PDF
Att 8 - Limitations on Subcontracting - Construction.docx DOCX document
Att 6 - Final Drawings 4 of 4.pdf PDF
Att 11 - Tomah VAMC - EHRM Tier 2 - Site Visit Map.pdf PDF
Att 10 - Contractor Safety - Enviro Record Eval Form.docx DOCX document
Att 5 - Final Drawings 3 of 4.pdf PDF
Att 1 - Final Specifications Vol 1.pdf PDF
Att 4 - Final Drawings 2 of 4.pdf PDF
Att 2 - Final Specifications Vol 2.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPEN

OFFICES

OFFICE

CONFERENCE

ROOM

MECHANICAL

ROOM

TOILET

COMPUTER

ROOM

LOBBY

OFFICE

TOILET

MDP

ATS-208-EQ

ATS-208-CR

B

P/1

MDP-208-EQ

KILL

SWITCH

FIRE

SYS

UPS UPS

BIX

PNL A

POWER COND

'A'

UPS

PNL

BYPASS

FLOW

IPX IPX IPX

LIGHTNING

PROTECTION

RACK

SERVER

SERVER

FIBER

FEED

LIEBERT

DS

PA ???

MECHANICAL

ROOM

OFFICE

TOILET

001A

STORAGE

TELEPHONE

EQUIPMENT

ROOM

001A

UP

3 KEYED NOTES

CORE DRILL 4" C THROUGH FLOOR. SEAL PENETRATION.

PROVIDE CONDULET FOR 4" CONDUITS. RUN ABOVE FINISHED CEILING IN RESTROOM

OFFICE, AND TELEPHONE AND DROP DOWN NEAR EXISTING FIBER FEED. TO BE

TERMINATED IN NEW ELECTRICAL ROOM. SEE SHEET EP101 AND ET100 FOR ADDITIONAL

INFORMATION.

PROVIDE (2) 3" C. FROM GENERATOR TO NEW BUILDING. SEE EP101 AND E701 FOR

ADDITIONAL INFORMATION.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

VA MEDICAL CENTER TOMAH, WI

676-21-701

Office of

Facilities

Management

FINAL BID DOCUMENTS

FEB. 4, 2022

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

EHRM INFRASTRUCTURE

UPGRADES TIER 2

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

1/4" = 1'-0"

EXISTING FIRST FLOOR PLAN

EP100

SJSHFB

ELECTRICAL

CONDUIT ROUTING PLAN

1/4" = 1'-0"

EXISTING BASEMENT PLAN

AutoCAD SHX Text (1)4"C

AutoCAD SHX Text (1)4"C

AutoCAD SHX Text (1)4"C

AutoCAD SHX Text (2)3"C

AutoCAD SHX Text

48 CAT6A

AutoCAD SHX Text

48MM

AutoCAD SHX Text

48SM

AutoCAD SHX Text

50 PAIRS

AutoCAD SHX Text

48SM

AutoCAD SHX Text

400 PAIRS

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

Sheets and Views
EP100

File details come from the government source that posted it. Updated .