This document appears to be a template for a Waste Diversion Plan and Waste Diversion Report related to a federal construction project. The template includes sections for capturing anticipated and actual waste diversion information, including material types, diversion methods, weights diverted and landfilled, and diversion rates. It also includes a certification section for an authorized company representative to certify the accuracy of the reported information. The document provides conversion factors for estimating weights of various construction materials by volume. This template is intended to be used to track and report on construction and demolition waste diversion for a federal project.

View the file

Other files for this federal contract opportunity

Other files attached to Haines / Fairbanks Generators, newest first.
File Type Posted
Sol_SBSA_GC_April 2024 amend 05.pdf PDF
Solicitation Amendment 47PL0124R0032_0005.pdf PDF
Copy of Fairbanks Original MCC Drawings.pdf PDF
Copy of Fairbanks002.PDF PDF
Copy of Fairbanks Original Safety Switches.pdf PDF
R10 SOW for Dispose Replace Electrical Generators REV 1 8_2_2024.docx DOCX document
Solicitation Amendment 47PL0124R0032_0004.pdf PDF
2017-12-18 Fairbanks Arc Flash Hazard Analysis Report.pdf PDF
Copy of Fairbanks Original Panelboard Drawings.pdf PDF
Copy of AK0029ZZ 1979-07-10 FEDERAL BUILDING - ELECTRICAL - POWER ONE LINE AND RISER DIAGRAM.pdf PDF
Copy of 2016-11-11 FBKS HVACR - Updated Electrical As-Builts E3-2.pdf PDF
2017-10-10 Fairbanks One Line (2).pdf PDF
Copy of Fairbanks Original Dist Panel Drawings.pdf PDF
Copy of Fairbanks001.PDF PDF
Generator PPI Log- Questions and Responses.xlsx XLSX spreadsheet
Sol_SBSA_GC_April 2024 amend 03.pdf PDF
Solicitation Amendment 47PL0124R0032_0003.pdf PDF
Solicitation Amendment 47PL0124R0032_0002.pdf PDF
Sol_SBSA_GC_April 2024 amend 02.pdf PDF
Sol_SBSA_GC_April 2024 amend 01.pdf PDF
FFB GEN DB SOW 2024-07-08.docx DOCX document
Solicitation Amendment 47PL0124R0032_0001.pdf PDF
Att 6_P-120.pdf PDF
Att 5_R10 NCMMS Asset ImpExp Template.xlsx XLSX spreadsheet
7_2_Vendor Security Training_6_2021.pptx PPTX presentation
7_5 R10 NCMMS Asset Equipment In-Place Template .xlsx XLSX spreadsheet
Sol_SBSA_GC_April 2024.pdf PDF
Att 3_PMIS Kahua.pdf PDF
Att 7_R10 - Electrical and Telecom DC Reqs.pdf PDF
7_8 Haines LPOE Replace ATS SOW.pdf PDF
R10 SOW for Dispose Replace Electrical Generators 4_26_2024.docx DOCX document
Exhibit 1 - Key Personnel Resume Format.pdf PDF
Exhibit 2 - Project Experience Form.pdf PDF
Att 1_Vendor Security Training_6_2021.pptx PPTX presentation
Att 8_GSA Func requirements.pdf PDF
7_3_Controlled Unclassified Information CUI 3490_3.pdf PDF
WD AK20240001 06142024.pdf PDF
Exhibit 3 Past Performance Questionnaire.docx DOCX document
Exhibit 00 - Read Me First - CUI Document.docx DOCX document
47PL0124R0032 Form.pdf PDF
Att 9_Exhib 5a - Fire Alarm Design-Install-Test Policy.pdf PDF
Att 2_Controlled Unclassified Information.pdf PDF
Att 10_Exhib 5b - Policy for Fire Watch-Suppression.pdf PDF
FFB GEN DB SOW 2024-04-25.docx DOCX document
Att 11_GSA FFB Project location.pdf PDF
7_4 External Users Access To Kahua .pptx PPTX presentation
7_6_ PBS 120 .pdf PDF
7_7_LPOE_Replace Day tank SOW Rv2.pdf PDF
Reps and Certs GC May 2024.pdf PDF
Agr_SBSA_GC_May 2024.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Waste Diversion Plan

: +christopher.clever@gsa.gov +walter.tersch@gsa.gov

(For consideration as an alternate). Anticipated sections match Actual to the right for 1:1 comparison.

-Jake Begnaud - WPIDBB Fine with either, will defer to +walter.tersch@gsa.gov Seems like it only boils down to estimating method or not.

-Christopher Clever - PCBL That's correct.

-Jake Begnaud - WPIDBBProject Waste Management PlanSubmittal Type:Waste Diversion Plan (Anticipated):FALSEWaste Diversion Report (Final) :FALSE
The general info in these gray cells replicates onto the Report tabs.
Project Name:ECC (estimated construction cost):Project Manager:ePM/ePMX Project # :
Project Short Description:PM email or phone:gBUILD Project # :
Building Number:Service Center / Field Office:Budget Activity:(list all applicable)RWA # :

Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)

Material*
(see weight conversion factors below)Diversion MethodTarget Diversion Rate for each material, by weight
(Change to actual target(s) as needed)Diverted (lbs)Landfilled (lbs)Total C&D material weight (Diverted + Landfilled) (lbs)Diversion

Rate

Reuse*Recycle or CompostDonation
AsphaltFALSEFALSEFALSE50%000n/a
Brick, Masonry, and TileFALSEFALSEFALSE50%000n/a
CardboardFALSEFALSEFALSE50%000n/a
Carpet, including PaddingFALSEFALSEFALSE50%000n/a
Ceiling tileFALSEFALSEFALSE50%000n/a
ConcreteFALSEFALSEFALSE50%000n/a
Drywall/ sheetrock (unpainted)FALSEFALSEFALSE50%000n/a
MetalsFALSEFALSEFALSE50%000n/a
Painted wood, drywall, or plywoodFALSEFALSEFALSE50%000n/a
Reusable itemsFALSEFALSEFALSE50%000n/a
RoofingFALSEFALSEFALSE50%000n/a
Soil, Rock, Land Clearing DebrisFALSEFALSEFALSE50%000n/a
Wood (unpainted)FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Total**:000n/a
Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse.
ItemReuse OnsiteReuse OffsiteOff-Site Recipient or Salvage/ Deconstruction Company
Volume-to-Weight Conversion Factor Reference Table
If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal.
Asphalt paving: 1 cubic yard = 773 lbsDirt or sand: 1 cubic yard = 929 lbs
Asphalt or composite roof shingles: 1 cubic yard = 731 lbsFiberglass insulation, loose: 1 cubic yard = 17 lbs
Brick, laid flat: 1 flat square foot = 20 lbsMixed (composite) C&D material: 1 cubic yard = 417 lbs
Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs)Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs
Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbsRock, crushed: 1 cubic yard = 2,570 lbs
Concrete: 1 cubic yard = 860 lbsWood: 1 cubic yard = 169 lbs
*Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 1

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 2

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 3

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 4

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 5

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 6

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 7

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 8

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 9

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 10

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 11

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 12

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.