About this file

This document is a Questions and Responses file related to a federal contract opportunity for the Design Build Disposal/Replacement of Electrical Generators at the Dalton Cache Land Port of Entry in Haines, Alaska and the Design Build Replacement of the Emergency Generator at the Fairbanks Federal Building in Fairbanks, Alaska.

The key details are:

  • The contract opportunity solicitation number is 47PL0124R0032. It is being issued by the General Services Administration Public Buildings Service Region 10.
  • The scope of work includes replacement of generators, day tanks, and automatic transfer switches at the two locations. It also includes providing referenced documents such as one-line diagrams and existing arc-flash studies.
  • Clarification was provided on several technical details, including the extent of building electrical service replacement, use of specifications in drawings, verification of heat exchanger sizing, and use of temporary generators during construction.
  • Responses indicate that existing fuel piping and components can be reused where applicable, and that a new automatic transfer switch is required for the Fairbanks Federal Building.

View the file

Other files for this federal contract opportunity

Other files attached to Haines / Fairbanks Generators, newest first.
File Type Posted
Solicitation Amendment 47PL0124R0032_0005.pdf PDF
Sol_SBSA_GC_April 2024 amend 05.pdf PDF
Copy of Fairbanks Original MCC Drawings.pdf PDF
Copy of Fairbanks002.PDF PDF
Copy of Fairbanks Original Safety Switches.pdf PDF
R10 SOW for Dispose Replace Electrical Generators REV 1 8_2_2024.docx DOCX document
Solicitation Amendment 47PL0124R0032_0004.pdf PDF
Copy of Fairbanks Original Dist Panel Drawings.pdf PDF
Copy of Fairbanks001.PDF PDF
2017-12-18 Fairbanks Arc Flash Hazard Analysis Report.pdf PDF
Copy of Fairbanks Original Panelboard Drawings.pdf PDF
Copy of AK0029ZZ 1979-07-10 FEDERAL BUILDING - ELECTRICAL - POWER ONE LINE AND RISER DIAGRAM.pdf PDF
Copy of 2016-11-11 FBKS HVACR - Updated Electrical As-Builts E3-2.pdf PDF
2017-10-10 Fairbanks One Line (2).pdf PDF
Sol_SBSA_GC_April 2024 amend 03.pdf PDF
Solicitation Amendment 47PL0124R0032_0003.pdf PDF
Solicitation Amendment 47PL0124R0032_0002.pdf PDF
Sol_SBSA_GC_April 2024 amend 02.pdf PDF
Solicitation Amendment 47PL0124R0032_0001.pdf PDF
Sol_SBSA_GC_April 2024 amend 01.pdf PDF
FFB GEN DB SOW 2024-07-08.docx DOCX document
Att 4_CD_Waste_Mgmt_Plan_Report_Temp.xlsx XLSX spreadsheet
Att 6_P-120.pdf PDF
Att 5_R10 NCMMS Asset ImpExp Template.xlsx XLSX spreadsheet
7_2_Vendor Security Training_6_2021.pptx PPTX presentation
7_5 R10 NCMMS Asset Equipment In-Place Template .xlsx XLSX spreadsheet
Sol_SBSA_GC_April 2024.pdf PDF
Att 9_Exhib 5a - Fire Alarm Design-Install-Test Policy.pdf PDF
Att 2_Controlled Unclassified Information.pdf PDF
Att 10_Exhib 5b - Policy for Fire Watch-Suppression.pdf PDF
FFB GEN DB SOW 2024-04-25.docx DOCX document
Att 11_GSA FFB Project location.pdf PDF
7_4 External Users Access To Kahua .pptx PPTX presentation
7_6_ PBS 120 .pdf PDF
7_7_LPOE_Replace Day tank SOW Rv2.pdf PDF
Reps and Certs GC May 2024.pdf PDF
Agr_SBSA_GC_May 2024.pdf PDF
Att 3_PMIS Kahua.pdf PDF
Att 7_R10 - Electrical and Telecom DC Reqs.pdf PDF
7_8 Haines LPOE Replace ATS SOW.pdf PDF
R10 SOW for Dispose Replace Electrical Generators 4_26_2024.docx DOCX document
Exhibit 1 - Key Personnel Resume Format.pdf PDF
Exhibit 2 - Project Experience Form.pdf PDF
Att 1_Vendor Security Training_6_2021.pptx PPTX presentation
Att 8_GSA Func requirements.pdf PDF
7_3_Controlled Unclassified Information CUI 3490_3.pdf PDF
WD AK20240001 06142024.pdf PDF
Exhibit 3 Past Performance Questionnaire.docx DOCX document
Exhibit 00 - Read Me First - CUI Document.docx DOCX document
47PL0124R0032 Form.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPI Log

Amend No.Item #Date SubmittedQuestion Type (Technical or Admin)QuestionResponse DateResponseResponded By
417/31/24TechnicalPlease provide the following referenced documents referenced in the Scope of Work and

Functional Specifications:

a. Fairbanks: Full One-Line Diagram, Existing Arc-Flash Study8/2/24Please see the attached ten (10) files.D. Fell
427/31/24TechnicalFor both sites, the scope of work requires replacement of the Day Tank and ATS. Only the Haines project has issued SOW/Specs for the ATS and Day Tank. Will a similar SOW/Spec be issued for the Fairbanks ATS/Day Tank or can we use the spec from the Haines project as the spec for the items at Fairbanks?8/2/24Haines-Day Tank and ATS have been replaced per another contract. The SOW for this solicitation has been revised.
Fairbanks - SOW 2.2.9 describes the sizing of the day tank. ATS and Day tank specifics is expected as part of the design build.D. Fell/R. Mayfield
437/31/24TechnicalPlease clarify the extent of the Fairbanks building service which is described as having exceeded its service life. Should replacement of the building electrical service be included in the design and construction scope?8/2/24The building electrical service is not required to be replaced and should not be part of the project's designD.Fell
447/31/24TechnicalWill full book specs be required? Can specs be inserted in the drawings if the spec requirements are small enough to be included there?8/2/24Specification book is not required and may be identified in the drawingsD. Fell
457/31/24TechnicalFairbanks. Do we need to verify that the heat exchanger is sized correctly or assume that it is correct and operate as such?8/2/24Contractor to verifyD.Fell
467/31/24TechnicalHaines: Is a temporary roll-up generator required for the duration of the project?8/2/24Yes, temporary generator will be needed when primary generators are off-lineR. Mayfield
477/31/24TechnicalFairbanks: Section 2.2.5 states to provide a load bank that has a load add/shed feature. Is this feature to include automatic operation with the EG while it is operating normally, or will this load bank add/shed feature only be used for generating testing?8/2/24This will be used for testingD.Fell
487/31/24TechnicalDo we need to isolate the EG pads when we add the concrete housekeeping pad?8/2/24Unknown which building and what exactly is being asked.D.Fell
497/31/24TechnicalDo they want us to provide the environmental control panel for the EG room and then tie that in with their BAS or would they rather use connect directly to their BAS?8/2/24Unknown which building and what exactly is being asked.D.Fell
4107/31/24TechnicalThe 50kW load bank may not be able to be located close to the wall. Is there more space at the site to move the load bank further from the wall?8/2/24Unknown which building and what exactly is being asked.D.Fell
4117/31/24TechnicalCan we assume that we can re-use the exiting fuel piping, valves, filters between the day tank and the 1000 FST to the greatest extent possible?8/2/24Yes, utilize the exiting fuel piping, valves, and filers where applicableD. Fell/R. Mayfield
4127/31/24TechnicalI think that the generators will be out of service for more than 5 days, as is assumed on page 3 of 4 in the ATS section of the SOW. The power from the utility should continue to power the facility during this time. Does the GSA want a temp generator there as back-up during the time the generators are being replaced?8/2/24Temp generators will be needed for both sites when backup generators are off-lineD. Fell/R. Mayfield
4137/31/24TechnicalThe one-line doesn’t show the existing 400A ATS as being replaced. The ATS section of the SOW requests a new ATS. Which is correct?8/2/24Haines-ATS has been replaced. Fairbanks would need a new ATS it has not yet been replacedR. Mayfield
4147/31/24TechnicalWhat do they mean by 125A seismic rating on ATS page 3 of 4 of the SOW?8/2/24125A is the seismic requirements of 2018 IBC, CBC, ASCE 7-16 and OSHPD have been met.R. Mayfield
4157/31/24TechnicalDrawing A1.02 states “Existing louvers (three)...” The pictures show 3 existing 90 degree hoods.8/2/24Please provide what picutes you are refering to