Atch 8 General Conditions Breakout.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 36C24926R0064
About this file
This is a General Conditions Breakout template for construction contract pricing submissions, required by the Veterans Affairs Acquisition Regulation (VAAR) 852.243-70 for construction contract changes. The document establishes that contractors must provide a detailed breakdown of General Conditions costs when submitting a Schedule of Values, with the contractual restriction that overhead and fee percentages must include insurance, supervisory personnel, security, small tools, job burdens, and home office expenses with no separate allowances permitted.
The template categorizes General Conditions costs into three primary sections: Project Management (including superintendent, safety manager, CPM scheduler, quality assurance, project managers, field office staff, and project expeditor positions); Bonds and Insurance (builder's risk insurance, general liability insurance, and security/payment/performance bonds); and Site Conditions (encompassing temporary utilities, SWPPP measures, security systems, temporary structures, protective measures, and documentation requirements such as pre-construction and progress photography). All line items in the template are currently set to zero dollars, indicating this is a blank form to be completed by the contractor with actual cost estimates for the specific construction project.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GC Breakout
| GENERAL CONDITIONS BREAKOUT | ||
| When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Construction Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage. | ||
| General Condition Description | Value | |
| Project Management: | $ - 0 | |
| Superintendent(s) | $ - 0 | |
| Safety Manager | $ - 0 | |
| CPM Scheduler | $ - 0 | |
| Quality Assurance/Quality Control | $ - 0 | |
| Project Manager (s) | $ - 0 | |
| Project Executive | $ - 0 | |
| Field Office Engineer | $ - 0 | |
| Field Office Support Staff | $ - 0 | |
| Project Expeditor | $ - 0 | |
| Assistant Superintendent (s) | $ - 0 | |
| Project Manager Subtotal: | $ - 0 | |
| Bonds and Insurance (excluding any for Subcontractors): | $ - 0 | |
| Builder’s Risk Insurance | $ - 0 | |
| General Liability Insurance | $ - 0 | |
| Security, Payment & Performance Bonds | $ - 0 | |
| Bonds and Insurance Subtotal: | $ - 0 | |
| Site Conditions: | $ - 0 | |
| Temporary Power Consumption (Offices) | $ - 0 | |
| Temporary Power Consumption (General Site Use) | $ - 0 | |
| Temporary Water and Sewer Consumption | $ - 0 | |
| Temporary Water Hookup, Distribution & Meters | $ - 0 | |
| Temporary Electrical Hookup, Distribution & Meters | $ - 0 | |
| Temporary Telephone & Network System Installation | $ - 0 | |
| Temporary Telephone & Internet Consumption Fees | $ - 0 | |
| Temporary Fire Protection | $ - 0 | |
| Temporary Heating & Cooling | $ - 0 | |
| Temporary Fencing | $ - 0 | |
| Temporary Covered Walkways | $ - 0 | |
| SWPPP Measures | $ - 0 | |
| Temporary Entries and Truck Washes | $ - 0 | |
| Street Cleaning (by G.C.) | $ - 0 | |
| Traffic Control Measures | $ - 0 | |
| Temporary Barricades & Signage | $ - 0 | |
| Temporary Roads & Walkways (install & maintenance) | $ - 0 | |
| Temporary Lighting | $ - 0 | |
| Temporary Partitions & Covered Floor Openings | $ - 0 | |
| Temporary Toilets/Sanitary Measures | $ - 0 | |
| Temporary Laydown (prep and restoration) | $ - 0 | |
| Security System/Watchman | $ - 0 | |
| Pre-construction Photo Documentation | $ - 0 | |
| Progress Photos | $ - 0 | |
| Temporary Protection (in place work/adjacent structures) | $ - 0 | |
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| General Conditions Total | $ - 0 |
File details come from the government source that posted it. Updated .