Atch 12 22-215Y BD Dwgs _Part2.pdf

PDF 2 MB Posted

Attached to
Z1DA--Project 626A4-22-104_Video Surveillance Security TVHS VAMC - Alvin C. York Campus
Solicitation number
36C24926R0064
Issued by

About this file

These are bid documents for a video surveillance security improvement project at the Alvin C. York Campus (Murfreesboro VA Medical Center) in Murfreesboro, Tennessee. The project, designated VA Project Number 22-215 with ACG Project Number 626A4-22-104, consists of technology site plans and building security plans prepared by Apogee Consulting Group, P.A. for the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management.

The scope of work includes demolishing existing cameras and cabling, installing new cameras with updated positioning throughout the campus, and running new four-pair unshielded twisted pair (4 PR UTP) cabling from cameras to designated IT equipment rooms in Buildings 1, 2, 3, 4, 8, 9, 117, and 120. Key technical requirements specify that all exterior cameras must be weatherproof, 270-degree cameras must be mounted directly on building corners, new CCTV cabling must be run on J-hooks spaced 2 feet on center above ceilings in corridors, and conduit must be a minimum of 3/4 inch. For camera runs exceeding 295 feet, fiber optic cable is required. Exterior conduit must be painted to match building colors prior to rough-in. The contractor must maintain active CCTV services outside construction areas, coordinate all new camera locations with the Contracting Officer's Representative prior to rough-in, and coordinate mounting heights with interior ceiling heights to minimize exterior conduit runs. Removed cameras and equipment must be turned over to the police department. The construction documents are dated June 13, 2024.

View the file

Other files

File Type Posted
S06 AMEND_7 36C24926R0064 0007-York Campus.pdf PDF
S02 AMEND-6_36C24926R0064 0006 MUR.pdf PDF
S02 36C24926R0064 0005 VIDEO -YORK.pdf PDF
Atch 24 JA Brand Name Avigilon VIDEO 626A4-22-104 MUR_Redacted.pdf PDF
S02 AMEND_4 36C24926R0064 0004.pdf PDF
S02 AMEND 36C24926R0064 0003 Protest.pdf PDF
Atch 1 Video camera design changes- York.pdf PDF
S02 AMEND 36C24926R0064 0002 VIDEO-York.pdf PDF
S02 AMEND 36C24926R0064 0002 VIDEO-York.pdf PDF
Atch 1 Video camera design changes.pdf PDF
Atch 1 Site Visit Sign In Sheet 626A4-22-104 _York.pdf PDF
S02 AMEND_1 36C24926R0064 0001 VIDEO York.pdf PDF
S02 36C24926R0064_1 VIDEO 626A4-22-104 YORK.pdf PDF
Atch 18 22-215Y BD Dwgs _Part8.pdf PDF
Atch 14 22-215Y BD Dwgs _Part4.pdf PDF
Atch 13 22-215Y BD Dwgs _Part3.pdf PDF
Atch 11 22-215Y BD Dwgs _Part1.pdf PDF
Atch 9 Price Breakout Schedule.xlsx XLSX spreadsheet
Atch 2 WD SCA 2015-4647 REV31 _05.13.2026 Rutherford-Davidson.docx DOCX document
36C24926R0064_1.docx DOCX document
Atch 23 SF1442 36C24926R0064_2.pdf PDF
Atch 19 HotWorkPermit.pdf PDF
Atch 16 22-215Y BD Dwgs _Part6.pdf PDF
Atch 7 Contractor EMR Certification Form.docx DOCX document
Atch 6 Calc. of Self Performed Work.xlsx XLSX spreadsheet
Atch 4 UEI _ TAX ID.docx DOCX document
Atch 21 JA Brand Name Avigilon VIDEO 626A4-22-104 MUR_2_Redacted.pdf PDF
Atch 20 Fire-Smoke Barrier Permit.doc DOC document
Atch 15 22-215Y BD Dwgs _Part5.pdf PDF
Atch 3 Past Performance Questionnaire York.docx DOCX document
Atch 1 WD DBA-TN20260187 BUILDING MOD-0 01.02.2026 - MUR.docx DOCX document
Atch 22 JA Brand Name JCI VIDEO 626A4-22-104 MUR_1_Redacted.pdf PDF
Atch 17 22-215Y BD Dwgs _Part7.pdf PDF
Atch 10 22-215Y BD Specs.pdf PDF
Atch 8 General Conditions Breakout.xlsx XLSX spreadsheet
Atch 5 RFI Form.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H6 N #133

WP

H6 N #139

WP

H6

RP

#140

WP

H6

RP

#141

WP

H6 N #134

WP

H6

RP

#137

WP

H6

RP

#138

WP

H6 N #135

WP

N #132

WP

H6 N #136

WP

N #107

WP

H6 N #111

WPH6

N #110

WP

H6 N #112

WP

FIXED

RV

WP

H6 N #109

WP

H6 N #97

WP

N #95

WP

N #94

WP

H6 N #96

WP

BLDG 6

RM 'G25'

BLDG 6

RM 'G25'

BLDG 6

RM 'G25'

BLDG 6

RM 'G25'

BLDG 5

RM '115'

BLDG 5

RM '115'

BLDG 5

RM '115'

BLDG 5

RM '115'

BLDG 7

RM '102'

BLDG 7

RM '102' BLDG 7

RM '102'

BLDG 7

RM '102'

BLDG 7

RM '102' BLDG 7

RM '102'

BLDG 7

RM '102'

BLDG 7

RM '102'

BLDG 7

RM '102'

BLDG 7

RM '102'

3 3

FIXED

RV

WP

2 5

N #108

WPBLDG 6

RM 'G25'

BLDG 6

RM 'G25'

1 1

IRM SERVER ROOM "115"

TR ROOM "G25"

TR ROOM "102"

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:1

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

TS101

TECHNOLOGY SITE PLAN

2 26LAS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

JVE

1 EXISTING CAMERA APPROXIMATELY 12 FEET AFG

TO BE REMOVED AND REPLACED WITH NEW

CAMERA.

2 PROVIDE CORNER MOUNT BRACKET.

3 PROVIDE FLAT WALL BRACKET.

5 LENS OF MULTISENSOR CAMERA TO BE

DIRECTED TO COVER ENTRANCE OF BUILDING.

Scale: 1" = 110'-0"

SITE PLAN - MURFREESBORO VAMC - NORTH

A. DEMOLISH CAMERAS AS NOTED (SEE CAMERA

ABBREVIATIONS). REMOVE CABLING AND

CONDUIT BACK TO SOURCE. PATCH/REPAIR

AND PAINT SURFACES AFFECTED BY

DEMOLITION TO MATCH SURROUNDING AREA.

REPLACE ANY CEILING TILES DAMAGED OR

BROKEN DURING DEMOLITION AT NO

ADDITIONAL COST TO THE VA.

B. PROVIDE AND INSTALL NEW CAMERAS AS

NOTED (SEE CAMERA ABBREVIATIONS). RUN

NEW 4 PR UTP TO CCTV EQUIPMENT IN

DESIGNATED IT ROOM.

C. REMOVE AND REPLACE CAMERAS AS NOTED

(SEE CAMERA ABBREVIATIONS). RUN NEW 4 PR

UTP TO CCTV EQUIPMENT IN DESIGNATED IT

ROOM.

D. CCTV SERVICES ARE TO REMAIN ACTIVE

OUTSIDE AREAS UNDER ACTIVE

CONSTRUCTION AT ALL TIMES. FIELD VERIFY

CIRCUITS SHOWN AND RETAIN SERVICES TO

ALL DEVICES AND/OR SYSTEMS DURING

DEMOLITION AND REMODEL OF THE

RESPECTIVE AREAS.

E. ALL EXISTING CONDITIONS AND DEVICES ARE

BASED ON THE BEST AVAILABLE INFORMATION

AT THE TIME OF SURVEY AND VISUAL

INSPECTION. VERIFY EXISTING CONDITIONS IN

FIELD.

F. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'

OC ABOVE CEILING IN CORRIDORS.

G. ALL CONDUIT SECURITY JUNCTION BOXES AND

RACEWAY PROVIDED BY ELECTRICAL

CONTRACTOR UNO. ALL CONDUIT SHALL BE

3/4" MINIMUM. ELECTRICAL CONTRACTOR TO

SIZE CONDUIT PER THE MOST CURRENT

EDITION OF THE NEC.

H. ALL EXPOSED BOXES AND PANELS MOUNTED

ON OR IN THE EXTERIOR WALLS SHALL BE

WEATHERPROOF AND RAIN-TIGHT.

I. WHERE LENGTH FROM CAMERA TO RACK

EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR

SHALL USE FIBER OPTIC CABLE.

J. ALL CAMERAS AND EQUIPMENT THAT IS

REMOVED SHALL BE TURNED OVER TO THE

POLICE DEPARTMENT. COORDINATE WITH

COR.

K. ALL EXTERIOR CAMERAS TO BE

WEATHERPROOF.

M. ALL EXTERIOR 270 DEGREE CAMERAS TO BE

MOUNTED DIRECTLY ON THE CORNERS OF THE

BUILDINGS.

N. CONTRACTOR SHALL PLAN PENETRATIONS

AND CONDUIT RUNS FROM EXTERIOR

CAMERAS INTO THE BUILDINGS SO AS TO

MINIMIZE THE CHANGES TO THE BUILDINGS

EXTERIOR AND WILL MINIMIZE THE NECESSARY

CONDUIT RUNS ON THE EXTERIOR OF THE

BUILDING.

O. COORDINATE EXTERIOR CAMERA MOUNTING

HEIGHT WITH THE INTERIOR CEILING HEIGHT

TO MINIMIZE EXTERIOR CONDUIT RUNS. REUSE

EXISTING CONDUIT RUNS AND BUILDING

PENETRATIONS WHEN POSSIBLE.

P. COORDINATE ALL NEW CAMERA LOCATIONS

WITH COR PRIOR TO ROUGH-IN.

Q. ALL CONDUIT RUNS ON THE EXTERIOR OF THE

BUILDING SHALL BE PAINTED TO MATCH THE

BUILDING COLOR PRIOR TO ROUGH-IN.

N O

R T

H

0 3015 60

Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44

7/24/2024

H6 N #157

WP

H6 N #191

WP

H6 N #192

WP

H6 N #193

WP

N #189

WP

H6 N #194

WP

H6 N #195

WP

H6 N #196

WP

H6 N #197

WP

H6 N #198

WP

H6 N #199

WP

RP

#190

WP

H6 N #37

WP

H6 N #38

WP

H6 N #39

WP

RP

#36

WP

H6 N #40

WP

H6 N #41

WP

H6 N #42

WPH6

N #74

WP

H6 N #75

WP

H6 N #76

WP

H6 N #77

WP

H6 N #78

WP

H6 N #79

WP

N #71

WP

RP

#72

WP

N #73

WP

N #236

WP

N #17

WP

N #16

WP

N #18

WP

H6 N #21

WP

N #19

WP

H6 N #22

WP

RP

#20

WP

H6 N #160

WP

N #156

WP

H6 N #158

WP

H6 N #159

WP

H6 N #89

WP

H6 N #90

WP

H6 N #91

WPH6

N #88

WP

H6 N #92

WP

BLDG 4

RM 'G112A'

BLDG 4

RM 'G112A'

BLDG 4

RM 'G112A'

BLDG 4

RM 'G112A'

BLDG 4

RM 'G112A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 117

RM 'G63'

BLDG 1

RM '106A'

BLDG 1

RM '106A'

BLDG 1

RM '106A'

BLDG 1

RM '106A'

BLDG 1

RM '106A'

BLDG 1

RM '106A'

BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 9

RM '127'BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 8

RM '143'

BLDG 8

RM '143'

BLDG 8

RM '143'

BLDG 8

RM '143'

BLDG 8

RM '143'

1 2

1 21 2

1 22

BLDG 9

RM '127'

BLDG 3

RM 'G03A'

BLDG 1

RM '106A'

BLDG 9

RM '127'

TR RM '106A'

TR RM 'G20A'

TR RM 'G03A'

TR RM 'G112A'

TR RM '143'

TR RM 'G63'

RP

#241

WP

BLDG 120

RM 'G02'

2 H6 N #242

WP

BLDG 120

RM 'G02'

BLDG 120

RM 'G02'

RP

#240

WP

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:4

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

TS102

TECHNOLOGY SITE PLAN

3 26LAS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

JVE

Scale: 1" = 110'-0"

SITE PLAN - MURFREESBORO VAMC - SOUTH

1 EXISTING CAMERA APPROXIMATELY 12 FEET AFG

TO BE REMOVED AND REPLACED WITH NEW

CAMERA.

2 PROVIDE CORNER MOUNT BRACKET.

3 PROVIDE FLAT WALL BRACKET.

4 REPLACE CAMERA AT ENTRANCE UNDER

OVERHANG.

5 LENS OF MULTISENSOR CAMERA TO BE

DIRECTED TO COVER ENTRANCE OF BUILDING.

A. DEMOLISH CAMERAS AS NOTED (SEE CAMERA

ABBREVIATIONS). REMOVE CABLING AND

CONDUIT BACK TO SOURCE. PATCH/REPAIR

AND PAINT SURFACES AFFECTED BY

DEMOLITION TO MATCH SURROUNDING AREA.

REPLACE ANY CEILING TILES DAMAGED OR

BROKEN DURING DEMOLITION AT NO

ADDITIONAL COST TO THE VA.

B. PROVIDE AND INSTALL NEW CAMERAS AS

NOTED (SEE CAMERA ABBREVIATIONS). RUN

NEW 4 PR UTP TO CCTV EQUIPMENT IN

DESIGNATED IT ROOM.

C. REMOVE AND REPLACE CAMERAS AS NOTED

(SEE CAMERA ABBREVIATIONS). RUN NEW 4 PR

UTP TO CCTV EQUIPMENT IN DESIGNATED IT

ROOM.

D. CCTV SERVICES ARE TO REMAIN ACTIVE

OUTSIDE AREAS UNDER ACTIVE

CONSTRUCTION AT ALL TIMES. FIELD VERIFY

CIRCUITS SHOWN AND RETAIN SERVICES TO

ALL DEVICES AND/OR SYSTEMS DURING

DEMOLITION AND REMODEL OF THE

RESPECTIVE AREAS.

E. ALL EXISTING CONDITIONS AND DEVICES ARE

BASED ON THE BEST AVAILABLE INFORMATION

AT THE TIME OF SURVEY AND VISUAL

INSPECTION. VERIFY EXISTING CONDITIONS IN

FIELD.

F. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'

OC ABOVE CEILING IN CORRIDORS.

G. ALL CONDUIT SECURITY JUNCTION BOXES AND

RACEWAY PROVIDED BY ELECTRICAL

CONTRACTOR UNO. ALL CONDUIT SHALL BE

3/4" MINIMUM. ELECTRICAL CONTRACTOR TO

SIZE CONDUIT PER THE MOST CURRENT

EDITION OF THE NEC.

H. ALL EXPOSED BOXES AND PANELS MOUNTED

ON OR IN THE EXTERIOR WALLS SHALL BE

WEATHERPROOF AND RAIN-TIGHT.

I. WHERE LENGTH FROM CAMERA TO RACK

EQUIPMENT EXCEED 295' (90M) CONTRACTOR

SHALL USE FIBER OPTIC CABLE.

J. ALL CAMERAS AND EQUIPMENT THAT IS

REMOVED SHALL BE TURNED OVER TO THE

POLICE DEPARTMENT. COORDINATE WITH

COR.

K. ALL EXTERIOR CAMERAS TO BE

WEATHERPROOF.

M. ALL EXTERIOR 270 DEGREE CAMERAS TO BE

MOUNTED DIRECTLY ON THE CORNERS OF THE

BUILDINGS.

N. CONTRACTOR SHALL PLAN PENETRATIONS

AND CONDUIT RUNS FROM EXTERIOR

CAMERAS INTO THE BUILDINGS SO AS TO

MINIMIZE THE CHANGES TO THE BUILDINGS

EXTERIOR AND WILL MINIMIZE THE NECESSARY

CONDUIT RUNS ON THE EXTERIOR OF THE

BUILDING.

O. COORDINATE EXTERIOR CAMERA MOUNTING

HEIGHT WITH THE INTERIOR CEILING HEIGHT

TO MINIMIZE EXTERIOR CONDUIT RUNS. REUSE

EXISTING CONDUIT RUNS AND BUILDING

PENETRATIONS WHEN POSSIBLE.

P. COORDINATE ALL NEW CAMERA LOCATIONS

WITH COR PRIOR TO ROUGH-IN.

Q. ALL CONDUIT RUNS ON THE EXTERIOR OF THE

BUILDING SHALL BE PAINTED TO MATCH THE

BUILDING COLOR PRIOR TO ROUGH-IN.

N O

R T

H

0 3015 60

BUILDING 1BUILDING 120

BUILDING 1

BUILDING 117

2 2

RM 'A-17A'

RM '106A'

RM 'G63'

N #1

H6SL

N #6

SW

N #7

H6 N #4

N #2

N #3

SW

N #8

H6 N #5

RM '106A'

RM '106A'

RM '106A'

RM '106A'

RM '106A'

RM '106A'

RM '106A'

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:5

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

1.T-101

BUILDING 1 GROUND FLOOR SECURITY

PLAN

4 26LAS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

JVE

Scale: 3/32" = 1'-0"

BUILDING 1 GROUND FLOOR SECURITY PLAN

1 ROUTE UTP CABLING UP TO TELECOM ROOM

ABOVE.

2 INSTALL NEW CAMERAS. PROVIDE NEW 4 PR

UTP CABLING FROM CAMERA TO NEW POE

SWITCH IN TELECOM ROOM. REPAIR/

REPLACE SURFACES AFFECTED BY CAMERA

EQUIPMENT INSTALLATION TO MATCH

SIMILAR/EXISTING CONDITIONS.

CONTRACTOR TO REPLACE DAMAGED

CEILING TILE AND GRID ASSOCIATED WITH

WORK AT NO ADDITIONAL COST TO

GOVERNMENT.

A. REFERENCE SHEET TS101 AND TS102 FOR

EXTERIOR CAMERA LOCATIONS.

B. ALL EXISTING CONDITIONS ARE BASED ON THE

BEST AVAILABLE INFORMATION AT THE TIME

OF SURVEY.

C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'

OC ABOVE CEILING IN CORRIDORS.

D. ALL CONDUIT SHALL BE 3/4" MINIMUM.

ELECTRICAL CONTRACTOR TO SIZE CONDUIT.

PER THE MOST CURRENT EDITION OF THE NEC.

E. WHERE LENGTH FROM CAMERA TO RACK

EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR

SHALL USE FIBER OPTIC CABLE.

F. COORDINATE AND CONFIRM ALL ROUTING

WITH COR PRIOR TO ROUGH-IN.

G. SEE SHEET G-100 FOR ICRA MEASURES.

H. USE MOBILE CONTAINMENT CART (6/G-100)

ALONG CORRIDORS.

N O

R T

H

0 84 16

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

TR ROOM 106A:

3 PR SPARE MMF1 2 3 4

1 2

RP

#10

FIXED

RV

FIXED

RV

H6 N #13

SW

N #15

N #11

H6 N #14

RM '106A'

RM '106A'

RM '106A'

RM '106A'

BUILDING 1BUILDING 120

BUILDING 1

BUILDING 117

BUILDING

BUILDING 117

BUILDING 1

RM '106A'

H5A FE

N #9

RP

#12

RM '106A'

RM '106A'

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:0

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

1.T-102

BULIDING 1 FIRST FLOOR SECURITY

PLAN

5 26LAS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

JVE

Scale: 3/32" = 1'-0"

BUILDING 1 FIRST FLOOR SECURITY PLAN

1 REMOVE EXISTING CAMERAS AND CABLING

BACK TO SOURCE. REPAIR/REPLACE

EXISTING SURFACES AFFECTED BY

REMOVAL OF CAMERA EQUIPMENT TO

MATCH SIMILAR EXISTING CONDITIONS.

2 INSTALL NEW CAMERAS. PROVIDE NEW 4 PR

UTP CABLING FROM CAMERA TO NEW POE

SWITCH IN TELECOM ROOM. REPAIR/

REPLACE SURFACES AFFECTED BY CAMERA

EQUIPMENT INSTALLATION TO MATCH

SIMILAR/EXISTING CONDITIONS.

CONTRACTOR TO REPLACE DAMAGED

CEILING TILE AND GRID ASSOCIATED WITH

WORK AT NO ADDITIONAL COST TO

GOVERNMENT.

3 PROPOSED LOCATION OF NEW CISCO 9300

SWITCH AND PATCH PANEL. VERIFY

LOCATION WITH COR AND OIT

REPRESENTATIVE.

4 ROUTE MMF FROM TELECOM ROOM TO

RACKS IN BUILDING 5 SERVER ROOM.

N O

R T

H

0 84 16

A. REFERENCE SHEET TS101 AND TS102 FOR

EXTERIOR CAMERA LOCATIONS.

B. ALL EXISTING CONDITIONS ARE BASED ON THE

BEST AVAILABLE INFORMATION AT THE TIME

OF SURVEY.

C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'

OC ABOVE CEILING IN CORRIDORS.

D. ALL CONDUIT SHALL BE 3/4" MINIMUM.

ELECTRICAL CONTRACTOR TO SIZE CONDUIT.

PER THE MOST CURRENT EDITION OF THE NEC.

E. WHERE LENGTH FROM CAMERA TO RACK

EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR

SHALL USE FIBER OPTIC CABLE.

F. COORDINATE AND CONFIRM ALL ROUTING

WITH COR PRIOR TO ROUGH-IN.

G. SEE SHEET G-100 FOR ICRA MEASURES.

H. USE MOBILE CONTAINMENT CART (6/G-100)

ALONG CORRIDORS.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

22-215YELEC
Sheets
1.T-101 - BUILDING 1 GROUND FLOOR SECURITY PLAN
1.T-102 - BULIDING 1 FIRST FLOOR SECURITY PLAN
TS101 - TECHNOLOGY SITE PLAN
TS102 - TECHNOLOGY SITE PLAN

File details come from the government source that posted it. Updated .