Atch 6 Calc. of Self Performed Work.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C24926R0064
About this file
This is a calculation template for self-performed versus subcontracted work that offerors must complete as part of their proposal submission. The template is designed for specialty trade contractors (NAICS code 23xxxxx) and requires demonstration that at least 25 percent of the contract performance cost for personnel will be performed by the prime contractor's own employees rather than subcontractors. The form requires offerors to provide a detailed breakdown of personnel costs and material/equipment costs organized by specification division applicable to the project, with clear identification of which work will be self-performed by the prime contractor. Home office overhead, profit/fee, and bond costs are calculated separately after the personnel and material/equipment subtotals are established.
The template includes a structured calculation methodology to verify self-performed work compliance. Offerors must list each subcontractor and designate whether they are small business (SB) vendors, then calculate the total personnel costs across the prime and all subcontractors, subtract subcontractor personnel costs, and determine the remaining self-performed work percentage. Personnel costs are defined to include labor, mechanics, tradesmen, and office personnel directly charged to the project, including project management, superintendent, administrative, and estimating staff. The form requires certification by an authorized representative that all representations are true and correct, with signature, typed name, title, and date fields provided. This template applies to the VA's Video Surveillance Security project at the Alvin C. York Campus (Solicitation 36C24926R0064), which is a 100 percent set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK | ||||||
| Offerors for All Other Specialty Trade Contractors (NAICS code 23xxxxx) must provide | ||||||
| at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format. | ||||||
| Specification Division | SB Vendor (Y or N) | Personnel Cost | Material/Equipment Costs | |||
| Prime | Y | $0.00 | $0.00 | Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only. | ||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| (Add additional lines as necessary for each Division applicable to this project) | $ | $ | ||||
| $ - 0 | $0.00 |
| $ | $ | ||||
| Sub Total (Personnel Costs, Material/Equipment Costs) | $ | 0.00 | Add percentage to gray areas only. | ||
| Percentage | 0 | Profit | $ | 0.00 | |
| Percentage | 0 | Home Office Overhead | $ | 0.00 | |
| Percentage | 0 | Bond | $ | 0.00 | |
| Grand Total | $ | 0.00 | |||
| Calculation of self-performed personnel costs: | |||||
| 1. Total personnel costs * both prime and all subcontractors: | $0.00 | ||||
| 2. Subtract all subcontractor personnel costs* companies that will perform work | |||||
| on this contract: | $0.00 | ||||
| 3. Remainder is ‘Total amount of work to be self-performed under the | |||||
| Contract’: | $0.00 | ||||
| 4. Self-performed work = Line 3/Line 1 x 100 = | ERROR:#DIV/0! |
| *personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to |
| the project (includes project manager, job superintendent, administrative, estimators, etc.) |
| I certify the above representations are true and correct to the best of my knowledge. |
(Signature and Typed Name of Authorized Representative) Date
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .