These are security plan drawings for a video surveillance improvement project at the Alvin C. York Campus of the U.S. Department of Veterans Affairs in Murfreesboro, Tennessee. The project, identified as VA Project Number 22-215 (ACG Project Number 626A4-22-104), includes bid documents dated June 13, 2024, and covers security upgrades across multiple buildings.
The work encompasses camera installation and cabling infrastructure improvements across Buildings 9, 112, and 117. Key deliverables include removing existing cameras and cabling while repairing affected surfaces, installing new cameras with new 4-pair UTP cabling routed to Power-over-Ethernet (POE) switches located in telecom rooms, and establishing fiber optic multimode (MMF) connections from telecom rooms to server racks in Building 5. For camera runs exceeding 295 feet (90 meters), contractors must utilize fiber optic cable. Additional requirements include installing a Cisco 9300 switch and patch panel in designated locations, routing new Cat 6A copper cable to owner-provided switches in Building 112, and providing telecommunications outlets and monitor workstations for the police dispatch area. All cabling must be installed on J-hooks at 2-foot on-center spacing above ceilings in corridors, with minimum 3/4-inch conduit per the National Electrical Code. The contractor is responsible for coordinating routing with the Contracting Officer's Representative (COR) and Office of Information Technology (OIT) prior to rough-in work, replacing damaged ceiling tiles and grids at no additional cost, and implementing infection control and risk assessment (ICRA) measures per referenced specifications.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TR ROOM 127
1 2 3 4
N #174
N #175
SW
N #177
SW
N #178
H6 N #176
H5A DH
N #173
RM '127'
RM '127'RM '127'
RM '127'
RM '127'
RM '127'
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:4
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
9.T-102
BUILDING 9 FIRST FLOOR SECURITY
PLAN
18 26LAS
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
JVE
Scale: 1/8" = 1'-0"
BUILDING 9 FIRST FLOOR SECURITY PLAN
1 REMOVE EXISTING CAMERAS AND CABLING
BACK TO SOURCE. REPAIR/REPLACE
EXISTING SURFACES AFFECTED BY
REMOVAL OF CAMERA EQUIPMENT TO
MATCH SIMILAR EXISTING CONDITIONS.
2 INSTALL NEW CAMERAS. PROVIDE NEW 4 PR
UTP CABLING FROM CAMERA TO NEW POE
SWITCH IN TELECOM ROOM. REPAIR/
REPLACE SURFACES AFFECTED BY CAMERA
EQUIPMENT INSTALLATION TO MATCH
SIMILAR/EXISTING CONDITIONS.
CONTRACTOR TO REPLACE DAMAGED
CEILING TILE AND GRID ASSOCIATED WITH
WORK AT NO ADDITIONAL COST TO
GOVERNMENT.
3 PROPOSED LOCATION OF NEW CISCO 9300
SWITCH AND PATCH PANEL. VERIFY
LOCATION WITH COR AND OIT
REPRESENTATIVE.
4 ROUTE MMF FROM TELECOM ROOM TO
RACKS IN BUILDING 5 SERVER ROOM.
N O
R T
H
0 4 8 16
A. REFERENCE SHEET TS101 AND TS102 FOR
EXTERIOR CAMERA LOCATIONS.
B. ALL EXISTING CONDITIONS ARE BASED ON THE
BEST AVAILABLE INFORMATION AT THE TIME
OF SURVEY.
C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'
OC ABOVE CEILING IN CORRIDORS.
D. ALL CONDUIT SHALL BE 3/4" MINIMUM.
ELECTRICAL CONTRACTOR TO SIZE CONDUIT.
PER THE MOST CURRENT EDITION OF THE NEC.
E. WHERE LENGTH FROM CAMERA TO RACK
EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR
SHALL USE FIBER OPTIC CABLE.
F. COORDINATE AND CONFIRM ALL ROUTING
WITH COR PRIOR TO ROUGH-IN.
G. SEE SHEET G-100 FOR ICRA MEASURES.
H. USE MOBILE CONTAINMENT CART (6/G-100)
ALONG CORRIDORS.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44
7/24/2024
H6SL
N #184
H6 N #183
N #180
H6SL
N #185
H6SL
N #186
N #181
SW
N #187
H5A FE
N #179
N #182
SW
N #188
RM '127'
RM '127'
RM '127'
RM '127'
RM '127'
RM '127'
RM '127'
RM '127'
RM '127'
RM '127'
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:4
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
9.T-103
BUILDING 9 SECOND FLOOR SECURITY
PLAN
19 26LAS
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
JVE
Scale: 1/8" = 1'-0"
BUILDING 9 SECOND FLOOR SECURITY PLAN
1 ROUTE UTP CABLING DOWN TO TELECOM
ROOM.
2 INSTALL NEW CAMERAS. PROVIDE NEW 4 PR
UTP CABLING FROM CAMERA TO NEW POE
SWITCH IN TELECOM ROOM. REPAIR/
REPLACE SURFACES AFFECTED BY CAMERA
EQUIPMENT INSTALLATION TO MATCH
SIMILAR/EXISTING CONDITIONS.
CONTRACTOR TO REPLACE DAMAGED
CEILING TILE AND GRID ASSOCIATED WITH
WORK AT NO ADDITIONAL COST TO
GOVERNMENT.
N O
R T
H
0 4 8 16
A. REFERENCE SHEET TS101 AND TS102 FOR
EXTERIOR CAMERA LOCATIONS.
B. ALL EXISTING CONDITIONS ARE BASED ON THE
BEST AVAILABLE INFORMATION AT THE TIME
OF SURVEY.
C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'
OC ABOVE CEILING IN CORRIDORS.
D. ALL CONDUIT SHALL BE 3/4" MINIMUM.
ELECTRICAL CONTRACTOR TO SIZE CONDUIT.
PER THE MOST CURRENT EDITION OF THE NEC.
E. WHERE LENGTH FROM CAMERA TO RACK
EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR
SHALL USE FIBER OPTIC CABLE.
F. COORDINATE AND CONFIRM ALL ROUTING
WITH COR PRIOR TO ROUGH-IN.
G. SEE SHEET G-100 FOR ICRA MEASURES.
H. USE MOBILE CONTAINMENT CART (6/G-100)
ALONG CORRIDORS.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:4
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
112.T-101
BUILDING 112 GROUND FLOOR
SECURITY PLAN
20 26LAS
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
JVE
Scale: 3/32" = 1'-0"
BUILDING 112 GROUND FLOOR SECURITY PLAN
N O
R T
H
0 84 16
1 NEW CAT 6A COPPER CABLE TO OWNER
PROVIDED SWITCH LOCATED IN IT ROOM.
COORDINATE WITH OIT AND COR.
2 PROVIDE NEW TELECOMMUNICATIONS
OUTLET IN POLICE DISPATCH TO SERVE NEW
MONITOR WORKSTATION - PC, KEYBOARD,
MOUSE INCLUDED. COORDINATE WITH COR
AND POLICE FOR PC LOCATION. REFERENCE
SHEET T-001 FOR SPECIFICATIONS
CONCERNING THE PC BASIS OF DESIGN.
3 NEW TV'S AND MONITORS LOCATED ON
WALL. COORDINATE WITH OIT AND COR.
A. ALL EXISTING CONDITIONS ARE BASED ON THE
BEST AVAILABLE INFORMATION AT THE TIME
OF SURVEY.
B. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'
OC ABOVE CEILING IN CORRIDORS.
C. ALL CONDUIT SHALL BE 3/4" MINIMUM.
ELECTRICAL CONTRACTOR TO SIZE CONDUIT.
PER THE MOST CURRENT EDITION OF THE NEC.
D. COORDINATE AND CONFIRM ALL ROUTING
WITH COR PRIOR TO ROUGH-IN.
E. SEE SHEET G-100 FOR ICRA MEASURES.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
ROOM G63
1 2 3 4
11 2
1 2
1 2
1 2
1 2
1 2
1 2
BUILDING 117
BUILDING 3
BUILDING 117
BUILDING 120
BUILDING 1
B U
IL
D
IN
G
B
U
IL
D
IN
G
BUILDING 105BUILDING 3
H6
RP
#211
H6 N #213
N #204
H6SL
N #215
H5A FE
N #201
N #205
N #206
H6SL
RP
#216
FIXED
RV
H6SL
RP
#217
FIXED
RV
FIXED
RV
FIXED
RV
FIXED
RV
FIXED
RV
FIXED
RV
H6SL
RP
#218
FIXED
RV
FIXED
RV
H6SL
RP
#219
H6SL
RP
#220
FIXED
RV
H6SL
RP
#221
H6
RP
#214
N #207
H5A FE
N #202
H6SL
N #222
H5A DH
N #200
H6SL
N #223
H6SL
N #224
RM 'G63'
RM 'G63'
RM 'G63'
RM 'G63' RM 'G63'
RM 'G63'
RM 'G63'
RM 'G63'
RM 'G63'RM 'G63'RM 'G63'
RM 'G63'
RM 'G63'
RM 'G63'
RM 'G63'
1 2
RM 'G63'
RM 'G63'
RM 'G63'
RM 'G63'
RM 'G63'
N #208
N #209
RM 'G63'
H6SL
N #225
RM 'G63'
SW
N #226
RM 'G63'
RM 'G63'
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:5
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
117.T-101
BUILDING 117 GROUND FLOOR
SECURITY PLAN
21 26LAS
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
JVE
Scale: 1/8" = 1'-0"
BUILDING 117 GROUND FLOOR SECURITY PLAN
1 REMOVE EXISTING CAMERAS AND CABLING
BACK TO SOURCE. REPAIR/REPLACE
EXISTING SURFACES AFFECTED BY
REMOVAL OF CAMERA EQUIPMENT TO
MATCH SIMILAR EXISTING CONDITIONS.
2 INSTALL NEW CAMERAS. PROVIDE NEW 4 PR
UTP CABLING FROM CAMERA TO NEW POE
SWITCH IN TELECOM ROOM. REPAIR/
REPLACE SURFACES AFFECTED BY CAMERA
EQUIPMENT INSTALLATION TO MATCH
SIMILAR/EXISTING CONDITIONS.
CONTRACTOR TO REPLACE DAMAGED
CEILING TILE AND GRID ASSOCIATED WITH
WORK AT NO ADDITIONAL COST TO
GOVERNMENT.
3 PROPOSED LOCATION OF NEW CISCO 9300
SWITCH AND PATCH PANEL. VERIFY
LOCATION WITH COR AND OIT
REPRESENTATIVE.
4 ROUTE MMF FROM TELECOM ROOM TO
RACKS IN BUILDING 5 SERVER ROOM.
A. REFERENCE SHEET TS101 AND TS102 FOR
EXTERIOR CAMERA LOCATIONS.
B. ALL EXISTING CONDITIONS ARE BASED ON THE
BEST AVAILABLE INFORMATION AT THE TIME
OF SURVEY.
C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'
OC ABOVE CEILING IN CORRIDORS.
D. ALL CONDUIT SHALL BE 3/4" MINIMUM.
ELECTRICAL CONTRACTOR TO SIZE CONDUIT.
PER THE MOST CURRENT EDITION OF THE NEC.
E. WHERE LENGTH FROM CAMERA TO RACK
EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR
SHALL USE FIBER OPTIC CABLE.
F. COORDINATE AND CONFIRM ALL ROUTING
WITH COR PRIOR TO ROUGH-IN.
G. SEE SHEET G-100 FOR ICRA MEASURES.
H. USE MOBILE CONTAINMENT CART (6/G-100)
ALONG CORRIDORS.
N O
R T
H
0 84 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
| 22-215YELEC |
| Sheets |
| 9.T-102 - BUILDING 9 FIRST FLOOR SECURITY PLAN |
| 9.T-103 - BUILDING 9 SECOND FLOOR SECURITY PLAN |
| 112.T-101 - BUILDING 112 GROUND FLOOR SECURITY PLAN |
| 117.T-101 - BUILDING 117 GROUND FLOOR SECURITY PLAN |
File details come from the government source that posted it. Updated .