Atch 1 Video camera design changes- York.pdf

PDF 16 MB Posted

Attached to
Z1DA--Project 626A4-22-104_Video Surveillance Security TVHS VAMC - Alvin C. York Campus
Solicitation number
36C24926R0064
Issued by

About this file

Summary: Video Surveillance Security York – Bid Documents

These are engineering bid documents for a Video Surveillance Security upgrade project at the Alvin C. York Campus (VA Medical Center) in Murfreesboro, Tennessee. The project, identified as VA Project #626A4-22-104, encompasses the design and installation of a comprehensive closed-circuit television (CCTV) system across multiple buildings on the 3,400 Lebanon Road campus. The project involves removal of existing cameras and installation of 242 new security cameras of various types (H6 fixed dome, H6SL non-analytic dome, multisensor panoramic, dual-head, and fisheye cameras) distributed across Buildings 1–9, 112, 117, and 120, along with associated networking infrastructure, cabling, and equipment racks.

The contractor is responsible for providing all labor, materials, and equipment to install new 4-pair UTP copper cabling (or fiber optic cable for runs exceeding 295 feet) from camera locations to designated telecommunications rooms in each building, with a central equipment server room in Building 5 Room 115. Key technical requirements include compliance with NFPA 70 (NEC), ANSI/TIA standards, BICSI guidelines, and VA OIT standards; installation of Cisco 9300 switches and Avigilon NVR equipment; proper firestopping and conduit sizing; and adherence to Infection Control Risk Assessment (ICRA) protocols for work in a healthcare facility. The project documents include detailed floor plans, site plans, technology riser diagrams, equipment specifications, camera type schedules (112 H6 fixed domes, 23 H6SL domes, 17 stairwell H6SL variants, 47 270-degree multisensor, 13 360-degree multisensor, 17 fisheye, and 2 180-degree multisensor cameras), and specifications for telecommunications outlets, J-hook support systems, and UL-compliant penetration details. Contractors must coordinate all routing with the Contracting Officer Representative and Infection Control personnel prior to rough-in and must minimize disruption to ongoing patient care operations throughout the campus.

View the file

Other files

File Type Posted
S06 AMEND_7 36C24926R0064 0007-York Campus.pdf PDF
S02 AMEND-6_36C24926R0064 0006 MUR.pdf PDF
S02 36C24926R0064 0005 VIDEO -YORK.pdf PDF
Atch 24 JA Brand Name Avigilon VIDEO 626A4-22-104 MUR_Redacted.pdf PDF
S02 AMEND_4 36C24926R0064 0004.pdf PDF
S02 AMEND 36C24926R0064 0003 Protest.pdf PDF
S02 AMEND 36C24926R0064 0002 VIDEO-York.pdf PDF
S02 AMEND 36C24926R0064 0002 VIDEO-York.pdf PDF
Atch 1 Video camera design changes.pdf PDF
Atch 1 Site Visit Sign In Sheet 626A4-22-104 _York.pdf PDF
S02 AMEND_1 36C24926R0064 0001 VIDEO York.pdf PDF
S02 36C24926R0064_1 VIDEO 626A4-22-104 YORK.pdf PDF
Atch 18 22-215Y BD Dwgs _Part8.pdf PDF
Atch 14 22-215Y BD Dwgs _Part4.pdf PDF
Atch 13 22-215Y BD Dwgs _Part3.pdf PDF
Atch 11 22-215Y BD Dwgs _Part1.pdf PDF
Atch 9 Price Breakout Schedule.xlsx XLSX spreadsheet
Atch 2 WD SCA 2015-4647 REV31 _05.13.2026 Rutherford-Davidson.docx DOCX document
36C24926R0064_1.docx DOCX document
Atch 23 SF1442 36C24926R0064_2.pdf PDF
Atch 19 HotWorkPermit.pdf PDF
Atch 16 22-215Y BD Dwgs _Part6.pdf PDF
Atch 7 Contractor EMR Certification Form.docx DOCX document
Atch 6 Calc. of Self Performed Work.xlsx XLSX spreadsheet
Atch 4 UEI _ TAX ID.docx DOCX document
Atch 22 JA Brand Name JCI VIDEO 626A4-22-104 MUR_1_Redacted.pdf PDF
Atch 17 22-215Y BD Dwgs _Part7.pdf PDF
Atch 12 22-215Y BD Dwgs _Part2.pdf PDF
Atch 10 22-215Y BD Specs.pdf PDF
Atch 8 General Conditions Breakout.xlsx XLSX spreadsheet
Atch 5 RFI Form.docx DOCX document
Atch 21 JA Brand Name Avigilon VIDEO 626A4-22-104 MUR_2_Redacted.pdf PDF
Atch 20 Fire-Smoke Barrier Permit.doc DOC document
Atch 15 22-215Y BD Dwgs _Part5.pdf PDF
Atch 3 Past Performance Questionnaire York.docx DOCX document
Atch 1 WD DBA-TN20260187 BUILDING MOD-0 01.02.2026 - MUR.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

/1

/2

:2

:1

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

G-001

ENG. PROJECT COVER

1 3LS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

VIDEO SURVEILLANCE SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129

VA PROJECT #: 626A4-22-104

JVE

DRAWING LIST

GENERAL

G-001 ENG. PROJECT COVER 1 3

G-002 SITE PLAN - MURFREESBORO VAMC 2 3

G-100 ICRA INFORMATION AND DETAILS 3 3

TECHNOLOGY

T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 26

TS101 TECHNOLOGY SITE PLAN 2 26

TS102 TECHNOLOGY SITE PLAN 3 26

1.T-101 BUILDING 1 GROUND FLOOR SECURITY PLAN 4 26

1.T-102 BULIDING 1 FIRST FLOOR SECURITY PLAN 5 26

2.T-101 BULDING 2 GROUND FLOOR SECURITY PLAN 6 26

3.T-101 BUILDING 3 GROUND FLOOR SECURITY PLAN 7 26

3.T-102 BUILDING 3 FIRST FLOOR SECURITY PLAN 8 26

4.T-101 BULIDING 4 GROUND FLOOR SECURITY PLAN 9 26

5.T-101 BUILDING 5 FIRST FLOOR SECURITY PLAN 10 26

6.T-101 BULDING 6 GROUND FLOOR SECURITY PLAN 11 26

7.T-101 BULDING 7 GROUND FLOOR SECURITY PLAN 12 26

7.T-102 BULDING 7 FIRST FLOOR SECURITY PLAN 13 26

8.T-101 BUILDING 8 GROUND FLOOR SECURITY PLAN 14 26

8.T-102 BUILDING 8 FIRST FLOOR SECURITY PLAN 15 26

8.T-103 BUILDING 8 SECOND FLOOR SECURITY PLAN 16 26

9.T-101 BUILDING 9 GROUND FLOOR SECURITY PLAN 17 26

9.T-102 BUILDING 9 FIRST FLOOR SECURITY PLAN 18 26

9.T-103 BUILDING 9 SECOND FLOOR SECURITY PLAN 19 26

112.T-101 BUILDING 112 GROUND FLOOR SECURITY PLAN 20 26

117.T-101 BUILDING 117 GROUND FLOOR SECURITY PLAN 21 26

117.T-102 BUILDING 117 FIRST FLOOR SECURITY PLAN 22 26

120.T-101 BUILDING 120 SECURITY PLANS 23 26

T-501 TECHNOLOGY DETAILS 24 26

T-502 TECHNOLOGY DETAILS 25 26

T-601 TECHNOLOGY RISERS 26 26

PROJECT LOCATION

DocuSign Envelope ID: 4170B743-6FE2-4320-BC0E-F6BE3A006436

6/12/2024

AREA OF WORK

LEGEND

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:2

:2

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

G-002

SITE PLAN - MURFREESBORO VAMC

2 3LS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

JVE

N O

R T

H

0 10050 20055 110 220

A. REFERENCE SHEET TS101 FOR EXTERIOR

CAMERA LOCATIONS.

B. ALL EXISTING CONDITIONS ARE BASED ON THE

BEST AVAILABLE INFORMATION AT THE TIME OF

SURVEY.

C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'

OC ABOVE CEILING IN CORRIDORS.

D. ALL CONDUIT SHALL BE 3/4" MINIMUM. EC TO SIZE

CONDUIT. PER THE MOST CURRENT EDITION OF

THE NEC.

E. WERE LENGTH FROM CAMERA TO RACK

EQUIPMENT EXCEED 295' (90M) CONTRACTOR

SHALL USE FIBER OPTIC CABLE.

F. COORDINATE AND CONFIRM ALL ROUTING WITH

COR PRIOR TO ROUGH-IN.

Scale: 1" = 110'-0"

SITE PLAN - MURFREESBORO VAMC

1,2,3,4,5,6,7,8,9,10,11, 17,106,117,120,146,147

IIILOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework or other building components.

• New drywall placement.

• Renovation work in a single room.

• Nonexisting cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

• Physical Therapy

• Radiology departments

• All patient waiting rooms

• All outpatient clinics

• Research Areas

• Respiratory Therapy

• Office areas (non-clinical)

• FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

• Emergency Room

• Clinical Laboratories (specimen)

• Same Day Surgery

• Pharmacy

• Nutrition and Food

Service/Canteen

• Procedural Areas (GI)

• Inpatient Mental Health

• Any area caring for immunocompromised patients

• Cardiac Cath Lab/IR

• Central Sterile Supply

• Sterile Processing Service

• Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

During Construction Project Upon Completion of Project

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

14. Contain all trash and debris in the work area.

15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

16. Worker clothing must be clean and free of visible dust before leaving the work area.

HEPA vacuuming of clothing or use of cover suites is acceptable.

17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

• Medical/Surgical Units

• Negative pressure isolation rooms

• Outpatient Chemotherapy

Areas

• Operating rooms

• Post Anesthesia Care Unit

• Dialysis

• Dental

C

LA

S S

V

1. Includes all activities required by Class IV

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

7. Personnel will be required to wear coveralls at all times during Class V work activities.

Coveralls must be removed before leaving the anteroom.

8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

15. Contain all trash and debris in the work area.

16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).

Damaged shoe covers must be immediately changed.

19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project

C

LA

S S

I

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activities in areas that are not directly occupied with patients.

4. Perform noninvasive work activity in a manner that does not create dust.

5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

C

LA

S S

II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Includes all activities required by Class I

2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

4. This Class of Precautions must never be used for construction or renovation activities.

5. Provide active means to prevent airborne dust from dispersing into atmosphere.

6. Water mist work surfaces to control dust while cutting.

7. Seal unused doors with duct tape.

8. Block off and seal air vents.

9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:

1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.

2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.

4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

C

LA

S S

II

I

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Provide active means to prevent airborne dust dispersion into the occupied areas.

4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

7. If work area is contained, then it must be neutrally to negatively pressurized at all times.

8. Seal all doors with tape that will not leave residue.

9. Contain all trash and debris in the work area.

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.

For Type C activities, follow procedures for Class IV.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

[VIDEO SURVEILLANCE SECURITY - YORK]

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

INFECTION CONTROL RISK

ASSESSMENT, INTERIM LIFE

SAFETY MEASURES, FIRE

WATCH AND MISCELLANEOUS

FORMS

PAPER

CADDY

FIRE EXTINGUISHER

ON PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

SUPPLY DUCTS

COVER WHEN NOT

RUNNING TO KEEP

DUST OUT

COVER ALL

RETURNS AT THE

GRATE/DIFFUSERS

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

EXISTING WALL

BARRIER

GI002

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

NOTE:

TAG SHALL BE PLACED ON ALL ILSM

TEMPORARY BARRIERS, FINAL LOCATION BY G.C.

POST ICRA,

ILSM, FIRE

INSPECTION

SHEETS

VISIBLE TO

PUBLIC

G-100

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

A P

P R

O X

A .F

.F

EXISTING CEILING

TOP SEALING RUNNER

EXISTING WALL

ASSEMBLY

PLASTIC SHEET BARRIER

SUPPORT POLES, QUANTITY

PER MANUF.

RECOMMENDATIONS

BOTTOM SEALING

RUNNER

REQU.

AS

A PLASTIC SHEET BARRIER

NON-RATED

PLASTIC

WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H

E

IG

H T

HEPA NEGATIVE

AIR UNIT

EXISTING

WALL

EXISTING CEILINGFLEX DUCT

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:2

:2

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

G-100

ICRA INFORMATION AND DETAILS

3 3NPM

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

GTS

A. TAPE ALL SERVICES TO PROTECT AGAINST

CONTAMINATION

B. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR AND THE MEDICAL CENTER

C. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER

AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.

ANY CEILING ACCESS PANELS OPENED FOR

INVESTIGATION BEYOND SEALED AREAS SHALL BE

SEALED IMMEDIATELY WHEN UNATTENDED.

D. AT COMPLETION, REMOVE CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS. VACUUM AND

CLEAN ALL SURFACES FREE OF DUST AFTER THE

REMOVAL.

E. CONTRACTOR TO VERIFY AND COORDINATE FINAL

AND APPROVED ICRA MEASURES WITH THE

NASHVILLE VA MEDICAL CENTER'S ICRA PERSONNEL,

PRIOR TO THE COMMENCEMENT OF CONSTRUCTION

ACTIVITY.

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

Scale: 1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 12" = 1'-0"

ILSM BARRIER TAG

Scale: 1/2" = 1'-0"

ICRA ROOM ELEVATION

Scale: 3/4" = 1'-0"

ICRA BARRIER WALL TYPE

Scale: 1/2" = 1'-0"

ICRA MOBILE CONTAINMENT CART

TECHNOLOGY GENERAL NOTES

1. PROVIDE TECHNOLOGY DEVICES AND EQUIPMENT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT, LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI STANDARDS, AND VA OIT

STANDARDS.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE BUILDING CONSTRUCTION IS NOT

SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP OR PROTECT ANNULAR SPACE AROUND PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN ACCORDANCE WITH REQUIREMENTS OF NFPA 70, UL LISTING

REQUIREMENT AND APPLICABLE BUILDING CODES.

4. PROVIDE CABLING THAT COMPLIES WITH THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION

METHOD MANUAL AND ANSI/TIA/EIA PUBLICATIONS.

5. COMPLY WITH THE LATEST ANSI/TIA/EIA 758 AND 607D - BONDING AND GROUNDING TELECOMMUNICATIONS.

6. COMPLY WITH THE LATEST ANSI/TIA/EIA 568.1E - COMMERCIAL BUILDING TELECOMMUNICATIONS WIRING

STANDARD.

7. COMPLY WITH THE LATEST ANSI/TIA/EIA 569E - TELECOMMUNICATIONS PATHWAYS AND SPACES.

8. COMPLY WITH ANSI/TIA-1069 STANDARD FOR HOSPITAL SIGNALING & NURSE CALL EQUIPMENT.

9. COMPLY WITH ANSI/TIA-1179 HEALTHCARE FACILITY TELECOMMUNICATION INFRASTRUCTURE STANDARD.

10. COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.

11. COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.

12. COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.

13. CONTRACTOR RESPONSIBLE FOR THE COORDINATION OF ALL WORK WITH ALL OTHER TRADES PRIOR TO

INSTALLATION.

14. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL IN ACCORDANCE WITH SPECIFIED PROCESSES FOR APPROVAL AND APPROVED BY THE COR

WILL BE ACCEPTABLE. COMPLY WITH "BUY AMERICAN ACT".

15. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR EQUIPMENT UNLESS NOTED

OTHERWISE.

16. PROVIDE RGS OR EMT CONDUIT UNLESS OTHERWISE NOTED.

17. PROVIDE MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT LABEL LISTED BY APPROVED THIRD PARTY

TESTING AGENCY.

18. NOTIFY COR REGARDING DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS FOR CLARIFICATION. THE MORE

STRINGENT SHALL TAKE PRECEDENCE.

19. PROVIDE TIA/EIA 4 PR UTP COPPER CABLE, JACKS, AND CONNECTORS.

20. ALL WORK AREA OUTLETS SHALL BE 8 PIN, 8P8C KEYSTONE JACK WIRED PER T568B.

21. LABEL DEVICES IN ACCORDANCE WITH LATEST ANSI/TIA 606A OR 606B EDITION AS WELL AS THE STANDARDS SET

FORTH BY THE VAMC OIT.

22. PROVIDE A MINIMUM OF 12" CLEARANCE ABOVE THE CABLE TRAY PER TIA/EIA 569.B PARAGRAPH 4.5.6.2.

23. VA SHALL CONDUCT A WAP SURVEY AND PROVIDE THE SURVEY TO THE CONTRACTOR. CONTRACTOR SHALL INSTALL CABLING AND EQUIPMENT IN ACCORDANCE WITH THE SURVEY. COORDINATE WITH COR/OIT.

24. ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.

25. MINIMUM CONDUIT SIZE TO BE USED IS 1 1/4" CONDUIT.

26. WALL MOUNTED DEVICES PLACED IN TELECOMMUNICATIONS ROOM TO BE MOUNTED ON FIRE RETARDANT

PLYWOOD.

27. ALL CAMERAS SHALL BE IN COMPLIANCE WITH THE NATIONAL DEFENSE AUTHORIZATION ACT.

ADO AUTOMATIC DOOR OPERATOR

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

BOD BASIS OF DESIGN

CCTV CLOSED CIRCUIT TELEVISION

COAX COAXIAL CABLE

COMM COMMUNICATION

COR CONTRACTING OFFICER REPRESENTATIVE

DC DOOR CONTACT SWITCH

DN DOWN

DO DOOR OPERATOR

DVC DIGITAL VOICE COMMAND

DVR DIGITAL VIDEO RECORDER

E EXISTING DEVICES

EEB EMERGENCY EXIT BUTTON

EL ELECTRICAL STRIKE

EMT ELECTRICAL METALLIC CONDUIT

ETR EXISTING TO REMAIN

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FAAP FIRE ALARM ANNUNCIATOR PANEL

FO FIBER OPTIC

FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL

IT INTERCOMMUNICATION ROOM

MATV MASTER ANTENNA TELEVISION

MMF MULTI MODE FIBER

NAC NOTIFICATION APPLIANCE CONTROL PANEL

N NEW DEVICES

NCA NETWORK CONTROL ANNUNCIATOR

NS NO SCALE

NTS NOT TO SCALE

NVR NETWORK VIDEO RECORDER

TECHNOLOGY ABBREVIATIONS LIST

OC ON CENTER

OIT OFFICE OF INFORMATION TECHNOLOGY

PACS PHYSICAL ACCESS CONTROL SYSTEM

PAMN PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM

PB PUSH BUTTON

PBB PRIMARY BONDING BUSBAR

PDU RACK POWER DISTRIBUTION UNITS

POE POWER OVER ETHERNET

PR PAIR

RBB RACK BONDING BUSBAR

RGS RIGID GALVANIZED STEEL CONDUIT

RX REQUEST TO EXIT

SBB SECONDARY BONDING BUSBAR

SEP SERVICE ENTRANCE PROTECTION

SLC SIGNALING LINE CIRCUIT

SM SINGLE MODE FIBER

SSTV SECURITY SURVAILLANCE TELEVISION SYSTEM

TBB TELECOM BONDING CONDUCTOR

TEL TELEPHONE

TM TELEMONITORING

TP TWISTED PAIR

TR TELECOM ROOM

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

WM WIRE MANAGEMENT

WAP WIRELESS ACCESS POINT

UL UNDERWRITERS LABORATORY

UPS UNINTERRUPTIBLE POWER SUPPLY

UTP UNSHIELDED TWISTED PAIR

CABLES AND CONNECTORS COLOR LEGEND

NOTES

4 PAIR CABLE

4 PAIR CABLE

SSTV

4 PAIR CABLE

6/12/24/36

6/12

MULTI COLOR

CONDUCTORS

4 PAIR UTP

COAX RG6

MULTI COLOR

CONDUCTORS

TELEPHONE

DESCRIPTION

ITEM JACK CABLE PATCH CABLES I.D.

DATA/COMPUTER

IVORY

BLUE

IVORY

BLUE

IVORY

BLUE

T

C

WIRELESS

ACCESS POINT

FIBER - MULTI-MODE

FIBER - SINGLE-MODE

SOUND SYSTEM

NURSE CALL

MATV

SSTV - IP

GREEN

BLACK

IVORY

N/A

WHITE

N/A

N/A

GREEN3

AQUA

YELLOW3

GREEN3

WHITE

YELLOW3

BLACK

GREEN

AQUA

YELLOW

WHITE

N/A

N/A

N/A

WAP

FO

FO

SS

SSTV

NC

MATV

PACS N/A GRAY N/A PACS

CONDUIT COLOR

BLUE1

YELLOW2

YELLOW2

YELLOW2

YELLOW2

YELLOW2

1. HORIZONTAL DATA RUNS SHALL BE INSTALLED IN BLUE CONDUIT WHERE USED FOR HORIZONTAL DATA CABLING. OTHER THAN HORIZONTAL CABLING CONDITIONS SHALL

BE IDENTIFIED BY THE FOLLOWING COLORS:

DEMARCATION POINT - ORANGE

NETWORK CONNECTION - GREEN

FIRST LEVEL, TERMINATING BUILDING BACKBONE, MC(CD) TO IC(BD) - WHITE

SECOND LEVEL, IC(BD) TO TR(HD/FD) - GRAY

CAMPUS BACKBONE - BROWN

2. YELLOW CONDUIT SHALL HAVE A SECONDARY IDENTIFIER COLOR ADDED AS A STRIPE IN ORDER TO INDICATE SPECIFIC SYSTEM SERVED. COORDINATE SECONDARY

INDICATING COLOR WITH COR.

3. WHERE MULTIPLE SYSTEMS UTILIZE THE SAME CABLE COLOR, SYSTEM SPECIFIC CABLING SHALL HAVE A STRIPE IN ORDER TO INDICATE SPECIFIC SYSTEM SERVED.

COORDINATE STRIPE COLOR FOR SPECIFIC SUBSYSTEMS WITH COR.

GENERAL TECHNOLOGY SYMBOL LEGEND

DATA OUTLET - N-4 PR UTP

TELCO OUTLET - N-4 PR UTP

SYMBOL HEIGHT DESCRIPTION

18"

48"

WIRELESS ACCESS POINT - N-4 PR UTP

WALL PHONE JACKW

N

TV OUTLET WALL MOUNTED

48"

N

N

AS NOTED

CEILING

SECURE WIRELESS ACCESS POINT - N-4 PR UTP

N

CEILING

S

(N - QUANTITY)

(N - QUANTITY)

(N - QUANTITY)

(N - QUANTITY)

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERSEDE THOSE LISTED HERE.

SEE DRAWINGS FOR MORE INFORMATION.

NOTE: NOT ALL SYMBOLS ARE USED.

CHANNEL TR EQUIPMENT RACKFLOOR

TR EQUIPMENT CABINET

MATV EQUIPMENT CABINETMATV 6' TO TOP

FLOOR

LADDER CABLE TRAY (4" HIGH - SEE PLANS FOR OTHER DIMENSIONS)

HIGH CAPACITY FLOOR BOX FOR DATA (2-4P) & POWER (4-RECEPTACLE)FLOOR

J JUNCTION BOX - AS NOTED ON PLANSAS NOTED

GROUND BUS

ABOVE

CEILING

18"

4'x8'x3/4" FIRE RETARDED TTB8"

SECURITY SYMBOL LEGEND

SYMBOL HEIGHT DESCRIPTION

ELECTRONIC LOCKING MECHANISM

DOOR CONTACT

REQUEST FOR EXIT SENSOR

CARD READER

(K - KEYPAD)

48"CR

ES

DC

RX

48" EMERGENCY EXIT BUTTON TO RELEASE DOOR (EEB)

IC

INTERCOM WITH CAMERA

IC

INTERCOM MASTER WITH PUSH TO RELEASE DOORM

54"

DESK

DOOR

DOOR

ABOVE

DOOR

PHYSICAL ACCESS CONTROL SYSTEMPACS 6' TO TOP

ELECTRONIC PANIC HARDWAREEP

ADO DOOR OPERATOR

HANDWAVE

DOOR

DOOR

48"

88" MOTION DETECTOR

MD

SSTV H6 ANALYTIC DOME CAMERA FIXEDCEILING

SSTV H6SL NON ANALYTIC DOME CAMERA FIXEDCEILING

H6SL

H6

SSTV 90 DEGREE PANORAMIC MULTISENSOR CAMERA CEILING

SSTV DUAL HEAD CAMERA FIXEDCEILING

SSTV 180 DEGREE PANORAMIC MULTISENSOR CAMERA CEILING

SSTV 270 DEGREE PANORAMIC MULTISENSOR CAMERA CEILING

SSTV 360 DEGREE PANORAMIC MULTISENSOR CAMERA CEILING

SSTV FISHEYE PANORAMIC CAMERA CEILING

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERSEDE THOSE LISTED HERE.

SEE DRAWINGS FOR MORE INFORMATION.

NOTE: NOT ALL SYMBOLS ARE USED.

SSTV CAMERA EQUIPMENT CABINETSSTV FLOOR

AREA OF REFUGE PANEL6' TO TOP

AREA OF REFUGE ANNUNCIATION PANEL6' TO TOP

AOF

AOFA

IC AREA OF REFUGE INTERCOM48"

AREA OF REFUGE STROBE LIGHTCEILINGSL

DP

DPP

DURESS PANIC ALARM PUSH BUTTON48"

DURESS PANIC ALARM PANEL6' TO TOP

DH

FE

SW

SSTV H6SL NON ANALYTIC DOME CAMERA FIXED, 2MP VARIENT FOR STAIRWELLCEILING

PROPOSED PHASING SCHEME

1. INSTALL FIBER BACKBONE CABLING FROM NEW SECURITY CAMERA HEADENED EQUIPMENT TO

NEW POE CISCO SWITCH TO BE INSTALLED IN ROOM 115, BUILDING 5, TO FACILITATE

CONNECTION TO CAMPUS SECURED FIBER OPTIC NETWORK.

2. RUN NEW CAT6A COPPER CABLES (OR FIBER CABLES FOR DISTANCES OVER 90 METERS) FROM

EXISTING IT ROOM TO CAMERA LOCATIONS.

3. INSTALL SECURITY CAMERA HEADEND EQUIPMENT, CONDUIT ALONG WITH EQUIPMENT RACK IN

SERVER ROOM 115 AND REQUIRED POWER OUTLETS.

4. INSTALL MONITORS IN POLICE DISPATCH ROOM.

5. INSTALL WALL MOUNTED AND CEILING MOUNTED SECURITY CAMERAS. NEW CAMERAS TO BE

CONNECTED PRIOR TO REMOVAL OF THOSE BEING REPLACED TO AVOID BLIND SPOTS.

6. MAKE CONNECTIONS TO CAMERAS.

7. REMOVE ALL REMAINING EXISTING CAMERAS, EQUIPMENT AND CABLING.

8. REMOVE ALL REMAINING EXISTING CAMERAS, EQUIPMENT AND CABLING.

9. REMOVE REPLACED EXISTING CAMERAS AND UNUSED POWER AND DATA CABLES.

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:1

:4

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

T-001

TECHNOLOGY GENERAL NOTES,

SYMBOL LEGEND, AND

ABBREVIATIONS

1 26LAS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

JVE

CAMERA TYPE SCHEDULE

HEIGHT TYPE DESCRIPTION MANUFACTURER COUNT

12'-0" AFG

UNO

H5A DH SSTV DUEL HEAD AVIGILON (BASIS OF DESIGN) 11

12'-0" AFG

UNO

H5A FE SSTV FISH EYE AVIGILON (BASIS OF DESIGN) 17

12'-0" AFG

UNO

H5A MS 180 SSTV

MULTISENSOR

AVIGILON (BASIS OF DESIGN) 2

12'-0" AFG

UNO

H5A MS 270 SSTV

MULTISENSOR

AVIGILON (BASIS OF DESIGN) 47

12'-0" AFG

UNO

H5A MS 360 SSTV

MULTISENSOR

AVIGILON (BASIS OF DESIGN) 13

12'-0" AFG

UNO

H6 SSTV FIXED DOME AVIGILON (BASIS OF DESIGN) 112

12'-0" AFG

UNO

H6SL SSTV FIXED DOME AVIGILON (BASIS OF DESIGN) 23

12'-0" AFG

UNO

H6SL SW SSTV FIXED DOME AVIGILON (BASIS OF DESIGN) 17

Grand total: 242 242

WALL RATING LEGEND

Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44

7/24/2024

H6 N #133

WP

H6 N #139

WP

H6

RP

#140

WP

H6

RP

#141

WP

H6 N #134

WP

H6

RP

#137

WP

H6

RP

#138

WP

H6 N #135

WP

N #132

WP

H6 N #136

WP

N #107

WP

H6 N #111

WPH6

N #110

WP

H6 N #112

WP

FIXED

RV

WP

H6 N #109

WP

H6 N #97

WP

N #95

WP

N #94

WP

H6 N #96

WP

BLDG 6

RM 'G25'

BLDG 6

RM 'G25'

BLDG 6

RM 'G25'

BLDG 6

RM 'G25'

BLDG 5

RM '115'

BLDG 5

RM '115'

BLDG 5

RM '115'

BLDG 5

RM '115'

BLDG 7

RM '102'

BLDG 7

RM '102' BLDG 7

RM '102'

BLDG 7

RM '102'

BLDG 7

RM '102' BLDG 7

RM '102'

BLDG 7

RM '102'

BLDG 7

RM '102'

BLDG 7

RM '102'

BLDG 7

RM '102'

3 3

FIXED

RV

WP

2 5

N #108

WPBLDG 6

RM 'G25'

BLDG 6

RM 'G25'

1 1

IRM SERVER ROOM "115"

TR ROOM "G25"

TR ROOM "102"

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:1

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

TS101

TECHNOLOGY SITE PLAN

2 26LAS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

JVE

1 EXISTING CAMERA APPROXIMATELY 12 FEET AFG

TO BE REMOVED AND REPLACED WITH NEW

CAMERA.

2 PROVIDE CORNER MOUNT BRACKET.

3 PROVIDE FLAT WALL BRACKET.

5 LENS OF MULTISENSOR CAMERA TO BE

DIRECTED TO COVER ENTRANCE OF BUILDING.

Scale: 1" = 110'-0"

SITE PLAN - MURFREESBORO VAMC - NORTH

A. DEMOLISH CAMERAS AS NOTED (SEE CAMERA

ABBREVIATIONS). REMOVE CABLING AND

CONDUIT BACK TO SOURCE. PATCH/REPAIR

AND PAINT SURFACES AFFECTED BY

DEMOLITION TO MATCH SURROUNDING AREA.

REPLACE ANY CEILING TILES DAMAGED OR

BROKEN DURING DEMOLITION AT NO

ADDITIONAL COST TO THE VA.

B. PROVIDE AND INSTALL NEW CAMERAS AS

NOTED (SEE CAMERA ABBREVIATIONS). RUN

NEW 4 PR UTP TO CCTV EQUIPMENT IN

DESIGNATED IT ROOM.

C. REMOVE AND REPLACE CAMERAS AS NOTED

(SEE CAMERA ABBREVIATIONS). RUN NEW 4 PR

UTP TO CCTV EQUIPMENT IN DESIGNATED IT

ROOM.

D. CCTV SERVICES ARE TO REMAIN ACTIVE

OUTSIDE AREAS UNDER ACTIVE

CONSTRUCTION AT ALL TIMES. FIELD VERIFY

CIRCUITS SHOWN AND RETAIN SERVICES TO

ALL DEVICES AND/OR SYSTEMS DURING

DEMOLITION AND REMODEL OF THE

RESPECTIVE AREAS.

E. ALL EXISTING CONDITIONS AND DEVICES ARE

BASED ON THE BEST AVAILABLE INFORMATION

AT THE TIME OF SURVEY AND VISUAL

INSPECTION. VERIFY EXISTING CONDITIONS IN

FIELD.

F. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'

OC ABOVE CEILING IN CORRIDORS.

G. ALL CONDUIT SECURITY JUNCTION BOXES AND

RACEWAY PROVIDED BY ELECTRICAL

CONTRACTOR UNO. ALL CONDUIT SHALL BE

3/4" MINIMUM. ELECTRICAL CONTRACTOR TO

SIZE CONDUIT PER THE MOST CURRENT

EDITION OF THE NEC.

H. ALL EXPOSED BOXES AND PANELS MOUNTED

ON OR IN THE EXTERIOR WALLS SHALL BE

WEATHERPROOF AND RAIN-TIGHT.

I. WHERE LENGTH FROM CAMERA TO RACK

EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR

SHALL USE FIBER OPTIC CABLE.

J. ALL CAMERAS AND EQUIPMENT THAT IS

REMOVED SHALL BE TURNED OVER TO THE

POLICE DEPARTMENT. COORDINATE WITH

COR.

K. ALL EXTERIOR CAMERAS TO BE

WEATHERPROOF.

M. ALL EXTERIOR 270 DEGREE CAMERAS TO BE

MOUNTED DIRECTLY ON THE CORNERS OF THE

BUILDINGS.

N. CONTRACTOR SHALL PLAN PENETRATIONS

AND CONDUIT RUNS FROM EXTERIOR

CAMERAS INTO THE BUILDINGS SO AS TO

MINIMIZE THE CHANGES TO THE BUILDINGS

EXTERIOR AND WILL MINIMIZE THE NECESSARY

CONDUIT RUNS ON THE EXTERIOR OF THE

BUILDING.

O. COORDINATE EXTERIOR CAMERA MOUNTING

HEIGHT WITH THE INTERIOR CEILING HEIGHT

TO MINIMIZE EXTERIOR CONDUIT RUNS. REUSE

EXISTING CONDUIT RUNS AND BUILDING

PENETRATIONS WHEN POSSIBLE.

P. COORDINATE ALL NEW CAMERA LOCATIONS

WITH COR PRIOR TO ROUGH-IN.

Q. ALL CONDUIT RUNS ON THE EXTERIOR OF THE

BUILDING SHALL BE PAINTED TO MATCH THE

BUILDING COLOR PRIOR TO ROUGH-IN.

N O

R T

H

0 3015 60

Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44

7/24/2024

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Text Box Or chnage these 2 to a 270

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Text Box The courtyard is already covered, so move these two as indicated.

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Text Box Add H6 or change to 270. 270 preferred.

H6

#157

WP

H6 N #191

WP

H6 N #192

WP

H6 N #193

WP

N #189

WP

H6 N #194

WP

H6 N #195

WP

H6 N #196

WP

H6 N #197

WP

H6 N #198

WP

H6 N #199

WP

RP

#190

WP

H6 N #37

WP

H6 N #38

WP

H6 N #39

WP

RP

#36

WP

H6 N #40

WP

H6 N #41

WP

H6 N #42

WPH6

N #74

WP

H6 N #75

WP

H6 N #76

WP

H6 N #77

WP

H6 N #78

WP

H6 N #79

WP

N #71

WP

RP

#72

WP

N #73

WP

N #236

WP

N #17

WP

N #16

WP

N #18

WP

H6 N #21

WP

N #19

WP

H6 N #22

WP

RP

#20

WP

H6 N #160

WP

N #156

WP

H6 N #158

WP

H6 N #159

WP

H6 N #89

WP

H6 N #90

WP

H6 N #91

WPH6

N #88

WP

H6 N #92

WP

BLDG 4

RM 'G112A'

BLDG 4

RM 'G112A'

BLDG 4

RM 'G112A'

BLDG 4

RM 'G112A'

BLDG 4

RM 'G112A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 3

RM 'G03A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 2

RM 'G20A'

BLDG 117

RM 'G63'

BLDG 1

RM '106A'

BLDG 1

RM '106A'

BLDG 1

RM '106A'

BLDG 1

RM '106A'

BLDG 1

RM '106A'

BLDG 1

RM '106A'

BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 9

RM '127'BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 9

RM '127'

BLDG 8

RM '143'

BLDG 8

RM '143'

BLDG 8

RM '143'

BLDG 8

RM '143'

BLDG 8

RM '143'

1 2

1 21 2

1 22

BLDG 9

RM '127'

BLDG 3

RM 'G03A'

BLDG 1

RM '106A'

BLDG 9

RM '127'

TR RM '106A'

TR RM 'G20A'

TR RM 'G03A'

TR RM 'G112A'

TR RM '143'

TR RM 'G63'

RP

#241

WP

BLDG 120

RM 'G02'

2 H6 N #242

WP

BLDG 120

RM 'G02'

BLDG 120

RM 'G02'

RP

#240

WP

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:4

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

TS102

TECHNOLOGY SITE PLAN

3 26LAS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

JVE

Scale: 1" = 110'-0"

SITE PLAN - MURFREESBORO VAMC - SOUTH

1 EXISTING CAMERA APPROXIMATELY 12 FEET AFG

TO BE REMOVED AND REPLACED WITH NEW

CAMERA.

2 PROVIDE CORNER MOUNT BRACKET.

3 PROVIDE FLAT WALL BRACKET.

4 REPLACE CAMERA AT ENTRANCE UNDER

OVERHANG.

5 LENS OF MULTISENSOR CAMERA TO BE

DIRECTED TO COVER ENTRANCE OF BUILDING.

A. DEMOLISH CAMERAS AS NOTED (SEE CAMERA

ABBREVIATIONS). REMOVE CABLING AND

CONDUIT BACK TO SOURCE. PATCH/REPAIR

AND PAINT SURFACES AFFECTED BY

DEMOLITION TO MATCH SURROUNDING AREA.

REPLACE ANY CEILING TILES DAMAGED OR

BROKEN DURING DEMOLITION AT NO

ADDITIONAL COST TO THE VA.

B. PROVIDE AND INSTALL NEW CAMERAS AS

NOTED (SEE CAMERA ABBREVIATIONS). RUN

NEW 4 PR UTP TO CCTV EQUIPMENT IN

DESIGNATED IT ROOM.

C. REMOVE AND REPLACE CAMERAS AS NOTED

(SEE CAMERA ABBREVIATIONS). RUN NEW 4 PR

UTP TO CCTV EQUIPMENT IN DESIGNATED IT

ROOM.

D. CCTV SERVICES ARE TO REMAIN ACTIVE

OUTSIDE AREAS UNDER ACTIVE

CONSTRUCTION AT ALL TIMES. FIELD VERIFY

CIRCUITS SHOWN AND RETAIN SERVICES TO

ALL DEVICES AND/OR SYSTEMS DURING

DEMOLITION AND REMODEL OF THE

RESPECTIVE AREAS.

E. ALL EXISTING CONDITIONS AND DEVICES ARE

BASED ON THE BEST AVAILABLE INFORMATION

AT THE TIME OF SURVEY AND VISUAL

INSPECTION. VERIFY EXISTING CONDITIONS IN

FIELD.

F. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'

OC ABOVE CEILING IN CORRIDORS.

G. ALL CONDUIT SECURITY JUNCTION BOXES AND

RACEWAY PROVIDED BY ELECTRICAL

CONTRACTOR UNO. ALL CONDUIT SHALL BE

3/4" MINIMUM. ELECTRICAL CONTRACTOR TO

SIZE CONDUIT PER THE MOST CURRENT

EDITION OF THE NEC.

H. ALL EXPOSED BOXES AND PANELS MOUNTED

ON OR IN THE EXTERIOR WALLS SHALL BE

WEATHERPROOF AND RAIN-TIGHT.

I. WHERE LENGTH FROM CAMERA TO RACK

EQUIPMENT EXCEED 295' (90M) CONTRACTOR

SHALL USE FIBER OPTIC CABLE.

J. ALL CAMERAS AND EQUIPMENT THAT IS

REMOVED SHALL BE TURNED OVER TO THE

POLICE DEPARTMENT. COORDINATE WITH

COR.

K. ALL EXTERIOR CAMERAS TO BE

WEATHERPROOF.

M. ALL EXTERIOR 270 DEGREE CAMERAS TO BE

MOUNTED DIRECTLY ON THE CORNERS OF THE

BUILDINGS.

N. CONTRACTOR SHALL PLAN PENETRATIONS

AND CONDUIT RUNS FROM EXTERIOR

CAMERAS INTO THE BUILDINGS SO AS TO

MINIMIZE THE CHANGES TO THE BUILDINGS

EXTERIOR AND WILL MINIMIZE THE NECESSARY

CONDUIT RUNS ON THE EXTERIOR OF THE

BUILDING.

O. COORDINATE EXTERIOR CAMERA MOUNTING

HEIGHT WITH THE INTERIOR CEILING HEIGHT

TO MINIMIZE EXTERIOR CONDUIT RUNS. REUSE

EXISTING CONDUIT RUNS AND BUILDING

PENETRATIONS WHEN POSSIBLE.

P. COORDINATE ALL NEW CAMERA LOCATIONS

WITH COR PRIOR TO ROUGH-IN.

Q. ALL CONDUIT RUNS ON THE EXTERIOR OF THE

BUILDING SHALL BE PAINTED TO MATCH THE

BUILDING COLOR PRIOR TO ROUGH-IN.

N O

R T

H

0 3015 60

Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44

7/24/2024

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Text Box This will change due to Dental project

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Text Box Add two H6 Here

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Text Box Or change these 2 into a 270 on the corner

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Text Box

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Change to 270

BUILDING 1BUILDING 120

BUILDING 1

BUILDING 117

2 2

RM 'A-17A'

RM '106A'

RM 'G63'

N #1

H6SL

N #6

SW

N #7

H6 N #4

N #2

N #3

SW

N #8

H6 N #5

RM '106A'

RM '106A'

RM '106A'

RM '106A'

RM '106A'

RM '106A'

RM '106A'

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:5

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

1.T-101

BUILDING 1 GROUND FLOOR SECURITY

PLAN

4 26LAS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

JVE

Scale: 3/32" = 1'-0"

BUILDING 1 GROUND FLOOR SECURITY PLAN

1 ROUTE UTP CABLING UP TO TELECOM ROOM

ABOVE.

2 INSTALL NEW CAMERAS. PROVIDE NEW 4 PR

UTP CABLING FROM CAMERA TO NEW POE

SWITCH IN TELECOM ROOM. REPAIR/

REPLACE SURFACES AFFECTED BY CAMERA

EQUIPMENT INSTALLATION TO MATCH

SIMILAR/EXISTING CONDITIONS.

CONTRACTOR TO REPLACE DAMAGED

CEILING TILE AND GRID ASSOCIATED WITH

WORK AT NO ADDITIONAL COST TO

GOVERNMENT.

A. REFERENCE SHEET TS101 AND TS102 FOR

EXTERIOR CAMERA LOCATIONS.

B. ALL EXISTING CONDITIONS ARE BASED ON THE

BEST AVAILABLE INFORMATION AT THE TIME

OF SURVEY.

C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'

OC ABOVE CEILING IN CORRIDORS.

D. ALL CONDUIT SHALL BE 3/4" MINIMUM.

ELECTRICAL CONTRACTOR TO SIZE CONDUIT.

PER THE MOST CURRENT EDITION OF THE NEC.

E. WHERE LENGTH FROM CAMERA TO RACK

EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR

SHALL USE FIBER OPTIC CABLE.

F. COORDINATE AND CONFIRM ALL ROUTING

WITH COR PRIOR TO ROUGH-IN.

G. SEE SHEET G-100 FOR ICRA MEASURES.

H. USE MOBILE CONTAINMENT CART (6/G-100)

ALONG CORRIDORS.

N O

R T

H

0 84 16

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44

7/24/2024

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Add H6

TR ROOM 106A:

3 PR SPARE MMF1 2 3 4

1 2

RP

#10

FIXED

RV

FIXED

RV

H6 N #13

SW

N #15

N #11

H6 N #14

RM '106A'

RM '106A'

RM '106A'

RM '106A'

BUILDING 1BUILDING 120

BUILDING 1

BUILDING 117

BUILDING

BUILDING 117

BUILDING 1

RM '106A'

H5A FE

N #9

RP

#12

RM '106A'

RM '106A'

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:0

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

1.T-102

BULIDING 1 FIRST FLOOR SECURITY

PLAN

5 26LAS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

JVE

Scale: 3/32" = 1'-0"

BUILDING 1 FIRST FLOOR SECURITY PLAN

1 REMOVE EXISTING CAMERAS AND CABLING

BACK TO SOURCE. REPAIR/REPLACE

EXISTING SURFACES AFFECTED BY

REMOVAL OF CAMERA EQUIPMENT TO

MATCH SIMILAR EXISTING CONDITIONS.

2 INSTALL NEW CAMERAS. PROVIDE NEW 4 PR

UTP CABLING FROM CAMERA TO NEW POE

SWITCH IN TELECOM ROOM. REPAIR/

REPLACE SURFACES AFFECTED BY CAMERA

EQUIPMENT INSTALLATION TO MATCH

SIMILAR/EXISTING CONDITIONS.

CONTRACTOR TO REPLACE DAMAGED

CEILING TILE AND GRID ASSOCIATED WITH

WORK AT NO ADDITIONAL COST TO

GOVERNMENT.

3 PROPOSED LOCATION OF NEW CISCO 9300

SWITCH AND PATCH PANEL. VERIFY

LOCATION WITH COR AND OIT

REPRESENTATIVE.

4 ROUTE MMF FROM TELECOM ROOM TO

RACKS IN BUILDING 5 SERVER ROOM.

N O

R T

H

0 84 16

A. REFERENCE SHEET TS101 AND TS102 FOR

EXTERIOR CAMERA LOCATIONS.

B. ALL EXISTING CONDITIONS ARE BASED ON THE

BEST AVAILABLE INFORMATION AT THE TIME

OF SURVEY.

C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'

OC ABOVE CEILING IN CORRIDORS.

D. ALL CONDUIT SHALL BE 3/4" MINIMUM.

ELECTRICAL CONTRACTOR TO SIZE CONDUIT.

PER THE MOST CURRENT EDITION OF THE NEC.

E. WHERE LENGTH FROM CAMERA TO RACK

EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR

SHALL USE FIBER OPTIC CABLE.

F. COORDINATE AND CONFIRM ALL ROUTING

WITH COR PRIOR TO ROUGH-IN.

G. SEE SHEET G-100 FOR ICRA MEASURES.

H. USE MOBILE CONTAINMENT CART (6/G-100)

ALONG CORRIDORS.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44

7/24/2024

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Text Box Existing 360 here. Change this one to a fixed camera and place above conference room looking back down hall.

VHATVHWILKEJ

Pencil

VHATVHWILKEJ

Pencil

1 2 3 4

TR ROOM G20B:

5 PR SPARE MMF

6 PR SPARE SMF

2RM 'G20B'

RM 'G20B'

RM 'G20B'

RM 'G20B'

RM 'G20B'

RM 'G20B'

RM 'G20A'

RM 'G20B'

RM 'G20B'

RM 'G20B'

RM 'G20B'

RM 'G20B'

H6 N #29

N #27

H5A FE

N #25

N #28

H6 N #30

SW

N #35

H5A DH

N #23

H5A DH

N #24

H6 N #31

H6 N #32

H5A FE

N #26

B U

IL

D

IN

G

B U

IL

D

IN

G

BUILDING 2

BUILDING 117

H6 N #33

RM 'G20B'

H6 N #34

RM 'G20B'

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approv…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .