Atch 1 Video camera design changes- York.pdf
PDF 16 MB Posted
- Solicitation number
- 36C24926R0064
About this file
Summary: Video Surveillance Security York – Bid Documents
These are engineering bid documents for a Video Surveillance Security upgrade project at the Alvin C. York Campus (VA Medical Center) in Murfreesboro, Tennessee. The project, identified as VA Project #626A4-22-104, encompasses the design and installation of a comprehensive closed-circuit television (CCTV) system across multiple buildings on the 3,400 Lebanon Road campus. The project involves removal of existing cameras and installation of 242 new security cameras of various types (H6 fixed dome, H6SL non-analytic dome, multisensor panoramic, dual-head, and fisheye cameras) distributed across Buildings 1–9, 112, 117, and 120, along with associated networking infrastructure, cabling, and equipment racks.
The contractor is responsible for providing all labor, materials, and equipment to install new 4-pair UTP copper cabling (or fiber optic cable for runs exceeding 295 feet) from camera locations to designated telecommunications rooms in each building, with a central equipment server room in Building 5 Room 115. Key technical requirements include compliance with NFPA 70 (NEC), ANSI/TIA standards, BICSI guidelines, and VA OIT standards; installation of Cisco 9300 switches and Avigilon NVR equipment; proper firestopping and conduit sizing; and adherence to Infection Control Risk Assessment (ICRA) protocols for work in a healthcare facility. The project documents include detailed floor plans, site plans, technology riser diagrams, equipment specifications, camera type schedules (112 H6 fixed domes, 23 H6SL domes, 17 stairwell H6SL variants, 47 270-degree multisensor, 13 360-degree multisensor, 17 fisheye, and 2 180-degree multisensor cameras), and specifications for telecommunications outlets, J-hook support systems, and UL-compliant penetration details. Contractors must coordinate all routing with the Contracting Officer Representative and Infection Control personnel prior to rough-in and must minimize disruption to ongoing patient care operations throughout the campus.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
/1
/2
:2
:1
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
G-001
ENG. PROJECT COVER
1 3LS
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
VIDEO SURVEILLANCE SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129
VA PROJECT #: 626A4-22-104
JVE
DRAWING LIST
GENERAL
G-001 ENG. PROJECT COVER 1 3
G-002 SITE PLAN - MURFREESBORO VAMC 2 3
G-100 ICRA INFORMATION AND DETAILS 3 3
TECHNOLOGY
T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 26
TS101 TECHNOLOGY SITE PLAN 2 26
TS102 TECHNOLOGY SITE PLAN 3 26
1.T-101 BUILDING 1 GROUND FLOOR SECURITY PLAN 4 26
1.T-102 BULIDING 1 FIRST FLOOR SECURITY PLAN 5 26
2.T-101 BULDING 2 GROUND FLOOR SECURITY PLAN 6 26
3.T-101 BUILDING 3 GROUND FLOOR SECURITY PLAN 7 26
3.T-102 BUILDING 3 FIRST FLOOR SECURITY PLAN 8 26
4.T-101 BULIDING 4 GROUND FLOOR SECURITY PLAN 9 26
5.T-101 BUILDING 5 FIRST FLOOR SECURITY PLAN 10 26
6.T-101 BULDING 6 GROUND FLOOR SECURITY PLAN 11 26
7.T-101 BULDING 7 GROUND FLOOR SECURITY PLAN 12 26
7.T-102 BULDING 7 FIRST FLOOR SECURITY PLAN 13 26
8.T-101 BUILDING 8 GROUND FLOOR SECURITY PLAN 14 26
8.T-102 BUILDING 8 FIRST FLOOR SECURITY PLAN 15 26
8.T-103 BUILDING 8 SECOND FLOOR SECURITY PLAN 16 26
9.T-101 BUILDING 9 GROUND FLOOR SECURITY PLAN 17 26
9.T-102 BUILDING 9 FIRST FLOOR SECURITY PLAN 18 26
9.T-103 BUILDING 9 SECOND FLOOR SECURITY PLAN 19 26
112.T-101 BUILDING 112 GROUND FLOOR SECURITY PLAN 20 26
117.T-101 BUILDING 117 GROUND FLOOR SECURITY PLAN 21 26
117.T-102 BUILDING 117 FIRST FLOOR SECURITY PLAN 22 26
120.T-101 BUILDING 120 SECURITY PLANS 23 26
T-501 TECHNOLOGY DETAILS 24 26
T-502 TECHNOLOGY DETAILS 25 26
T-601 TECHNOLOGY RISERS 26 26
PROJECT LOCATION
DocuSign Envelope ID: 4170B743-6FE2-4320-BC0E-F6BE3A006436
6/12/2024
AREA OF WORK
LEGEND
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:2
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
G-002
SITE PLAN - MURFREESBORO VAMC
2 3LS
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
JVE
N O
R T
H
0 10050 20055 110 220
A. REFERENCE SHEET TS101 FOR EXTERIOR
CAMERA LOCATIONS.
B. ALL EXISTING CONDITIONS ARE BASED ON THE
BEST AVAILABLE INFORMATION AT THE TIME OF
SURVEY.
C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'
OC ABOVE CEILING IN CORRIDORS.
D. ALL CONDUIT SHALL BE 3/4" MINIMUM. EC TO SIZE
CONDUIT. PER THE MOST CURRENT EDITION OF
THE NEC.
E. WERE LENGTH FROM CAMERA TO RACK
EQUIPMENT EXCEED 295' (90M) CONTRACTOR
SHALL USE FIBER OPTIC CABLE.
F. COORDINATE AND CONFIRM ALL ROUTING WITH
COR PRIOR TO ROUGH-IN.
Scale: 1" = 110'-0"
SITE PLAN - MURFREESBORO VAMC
1,2,3,4,5,6,7,8,9,10,11, 17,106,117,120,146,147
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
[VIDEO SURVEILLANCE SECURITY - YORK]
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
INFECTION CONTROL RISK
ASSESSMENT, INTERIM LIFE
SAFETY MEASURES, FIRE
WATCH AND MISCELLANEOUS
FORMS
PAPER
CADDY
FIRE EXTINGUISHER
ON PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
SUPPLY DUCTS
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT
COVER ALL
RETURNS AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
EXISTING WALL
BARRIER
GI002
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
NOTE:
TAG SHALL BE PLACED ON ALL ILSM
TEMPORARY BARRIERS, FINAL LOCATION BY G.C.
POST ICRA,
ILSM, FIRE
INSPECTION
SHEETS
VISIBLE TO
PUBLIC
G-100
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
A P
P R
O X
A .F
.F
EXISTING CEILING
TOP SEALING RUNNER
EXISTING WALL
ASSEMBLY
PLASTIC SHEET BARRIER
SUPPORT POLES, QUANTITY
PER MANUF.
RECOMMENDATIONS
BOTTOM SEALING
RUNNER
REQU.
AS
A PLASTIC SHEET BARRIER
NON-RATED
PLASTIC
WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H
E
IG
H T
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING CEILINGFLEX DUCT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:2
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
G-100
ICRA INFORMATION AND DETAILS
3 3NPM
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
GTS
A. TAPE ALL SERVICES TO PROTECT AGAINST
CONTAMINATION
B. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR AND THE MEDICAL CENTER
C. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER
AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.
ANY CEILING ACCESS PANELS OPENED FOR
INVESTIGATION BEYOND SEALED AREAS SHALL BE
SEALED IMMEDIATELY WHEN UNATTENDED.
D. AT COMPLETION, REMOVE CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS. VACUUM AND
CLEAN ALL SURFACES FREE OF DUST AFTER THE
REMOVAL.
E. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE
NASHVILLE VA MEDICAL CENTER'S ICRA PERSONNEL,
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION
ACTIVITY.
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 12" = 1'-0"
ILSM BARRIER TAG
Scale: 1/2" = 1'-0"
ICRA ROOM ELEVATION
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/2" = 1'-0"
ICRA MOBILE CONTAINMENT CART
TECHNOLOGY GENERAL NOTES
1. PROVIDE TECHNOLOGY DEVICES AND EQUIPMENT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT, LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI STANDARDS, AND VA OIT
STANDARDS.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE BUILDING CONSTRUCTION IS NOT
SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP OR PROTECT ANNULAR SPACE AROUND PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN ACCORDANCE WITH REQUIREMENTS OF NFPA 70, UL LISTING
REQUIREMENT AND APPLICABLE BUILDING CODES.
4. PROVIDE CABLING THAT COMPLIES WITH THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION
METHOD MANUAL AND ANSI/TIA/EIA PUBLICATIONS.
5. COMPLY WITH THE LATEST ANSI/TIA/EIA 758 AND 607D - BONDING AND GROUNDING TELECOMMUNICATIONS.
6. COMPLY WITH THE LATEST ANSI/TIA/EIA 568.1E - COMMERCIAL BUILDING TELECOMMUNICATIONS WIRING
STANDARD.
7. COMPLY WITH THE LATEST ANSI/TIA/EIA 569E - TELECOMMUNICATIONS PATHWAYS AND SPACES.
8. COMPLY WITH ANSI/TIA-1069 STANDARD FOR HOSPITAL SIGNALING & NURSE CALL EQUIPMENT.
9. COMPLY WITH ANSI/TIA-1179 HEALTHCARE FACILITY TELECOMMUNICATION INFRASTRUCTURE STANDARD.
10. COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.
11. COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.
12. COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.
13. CONTRACTOR RESPONSIBLE FOR THE COORDINATION OF ALL WORK WITH ALL OTHER TRADES PRIOR TO
INSTALLATION.
14. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL IN ACCORDANCE WITH SPECIFIED PROCESSES FOR APPROVAL AND APPROVED BY THE COR
WILL BE ACCEPTABLE. COMPLY WITH "BUY AMERICAN ACT".
15. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR EQUIPMENT UNLESS NOTED
OTHERWISE.
16. PROVIDE RGS OR EMT CONDUIT UNLESS OTHERWISE NOTED.
17. PROVIDE MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT LABEL LISTED BY APPROVED THIRD PARTY
TESTING AGENCY.
18. NOTIFY COR REGARDING DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS FOR CLARIFICATION. THE MORE
STRINGENT SHALL TAKE PRECEDENCE.
19. PROVIDE TIA/EIA 4 PR UTP COPPER CABLE, JACKS, AND CONNECTORS.
20. ALL WORK AREA OUTLETS SHALL BE 8 PIN, 8P8C KEYSTONE JACK WIRED PER T568B.
21. LABEL DEVICES IN ACCORDANCE WITH LATEST ANSI/TIA 606A OR 606B EDITION AS WELL AS THE STANDARDS SET
FORTH BY THE VAMC OIT.
22. PROVIDE A MINIMUM OF 12" CLEARANCE ABOVE THE CABLE TRAY PER TIA/EIA 569.B PARAGRAPH 4.5.6.2.
23. VA SHALL CONDUCT A WAP SURVEY AND PROVIDE THE SURVEY TO THE CONTRACTOR. CONTRACTOR SHALL INSTALL CABLING AND EQUIPMENT IN ACCORDANCE WITH THE SURVEY. COORDINATE WITH COR/OIT.
24. ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.
25. MINIMUM CONDUIT SIZE TO BE USED IS 1 1/4" CONDUIT.
26. WALL MOUNTED DEVICES PLACED IN TELECOMMUNICATIONS ROOM TO BE MOUNTED ON FIRE RETARDANT
PLYWOOD.
27. ALL CAMERAS SHALL BE IN COMPLIANCE WITH THE NATIONAL DEFENSE AUTHORIZATION ACT.
ADO AUTOMATIC DOOR OPERATOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
BOD BASIS OF DESIGN
CCTV CLOSED CIRCUIT TELEVISION
COAX COAXIAL CABLE
COMM COMMUNICATION
COR CONTRACTING OFFICER REPRESENTATIVE
DC DOOR CONTACT SWITCH
DN DOWN
DO DOOR OPERATOR
DVC DIGITAL VOICE COMMAND
DVR DIGITAL VIDEO RECORDER
E EXISTING DEVICES
EEB EMERGENCY EXIT BUTTON
EL ELECTRICAL STRIKE
EMT ELECTRICAL METALLIC CONDUIT
ETR EXISTING TO REMAIN
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FAAP FIRE ALARM ANNUNCIATOR PANEL
FO FIBER OPTIC
FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL
IT INTERCOMMUNICATION ROOM
MATV MASTER ANTENNA TELEVISION
MMF MULTI MODE FIBER
NAC NOTIFICATION APPLIANCE CONTROL PANEL
N NEW DEVICES
NCA NETWORK CONTROL ANNUNCIATOR
NS NO SCALE
NTS NOT TO SCALE
NVR NETWORK VIDEO RECORDER
TECHNOLOGY ABBREVIATIONS LIST
OC ON CENTER
OIT OFFICE OF INFORMATION TECHNOLOGY
PACS PHYSICAL ACCESS CONTROL SYSTEM
PAMN PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM
PB PUSH BUTTON
PBB PRIMARY BONDING BUSBAR
PDU RACK POWER DISTRIBUTION UNITS
POE POWER OVER ETHERNET
PR PAIR
RBB RACK BONDING BUSBAR
RGS RIGID GALVANIZED STEEL CONDUIT
RX REQUEST TO EXIT
SBB SECONDARY BONDING BUSBAR
SEP SERVICE ENTRANCE PROTECTION
SLC SIGNALING LINE CIRCUIT
SM SINGLE MODE FIBER
SSTV SECURITY SURVAILLANCE TELEVISION SYSTEM
TBB TELECOM BONDING CONDUCTOR
TEL TELEPHONE
TM TELEMONITORING
TP TWISTED PAIR
TR TELECOM ROOM
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
WM WIRE MANAGEMENT
WAP WIRELESS ACCESS POINT
UL UNDERWRITERS LABORATORY
UPS UNINTERRUPTIBLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
CABLES AND CONNECTORS COLOR LEGEND
NOTES
4 PAIR CABLE
4 PAIR CABLE
SSTV
4 PAIR CABLE
6/12/24/36
6/12
MULTI COLOR
CONDUCTORS
4 PAIR UTP
COAX RG6
MULTI COLOR
CONDUCTORS
TELEPHONE
DESCRIPTION
ITEM JACK CABLE PATCH CABLES I.D.
DATA/COMPUTER
IVORY
BLUE
IVORY
BLUE
IVORY
BLUE
T
C
WIRELESS
ACCESS POINT
FIBER - MULTI-MODE
FIBER - SINGLE-MODE
SOUND SYSTEM
NURSE CALL
MATV
SSTV - IP
GREEN
BLACK
IVORY
N/A
WHITE
N/A
N/A
GREEN3
AQUA
YELLOW3
GREEN3
WHITE
YELLOW3
BLACK
GREEN
AQUA
YELLOW
WHITE
N/A
N/A
N/A
WAP
FO
FO
SS
SSTV
NC
MATV
PACS N/A GRAY N/A PACS
CONDUIT COLOR
BLUE1
YELLOW2
YELLOW2
YELLOW2
YELLOW2
YELLOW2
1. HORIZONTAL DATA RUNS SHALL BE INSTALLED IN BLUE CONDUIT WHERE USED FOR HORIZONTAL DATA CABLING. OTHER THAN HORIZONTAL CABLING CONDITIONS SHALL
BE IDENTIFIED BY THE FOLLOWING COLORS:
DEMARCATION POINT - ORANGE
NETWORK CONNECTION - GREEN
FIRST LEVEL, TERMINATING BUILDING BACKBONE, MC(CD) TO IC(BD) - WHITE
SECOND LEVEL, IC(BD) TO TR(HD/FD) - GRAY
CAMPUS BACKBONE - BROWN
2. YELLOW CONDUIT SHALL HAVE A SECONDARY IDENTIFIER COLOR ADDED AS A STRIPE IN ORDER TO INDICATE SPECIFIC SYSTEM SERVED. COORDINATE SECONDARY
INDICATING COLOR WITH COR.
3. WHERE MULTIPLE SYSTEMS UTILIZE THE SAME CABLE COLOR, SYSTEM SPECIFIC CABLING SHALL HAVE A STRIPE IN ORDER TO INDICATE SPECIFIC SYSTEM SERVED.
COORDINATE STRIPE COLOR FOR SPECIFIC SUBSYSTEMS WITH COR.
GENERAL TECHNOLOGY SYMBOL LEGEND
DATA OUTLET - N-4 PR UTP
TELCO OUTLET - N-4 PR UTP
SYMBOL HEIGHT DESCRIPTION
18"
48"
WIRELESS ACCESS POINT - N-4 PR UTP
WALL PHONE JACKW
N
TV OUTLET WALL MOUNTED
48"
N
N
AS NOTED
CEILING
SECURE WIRELESS ACCESS POINT - N-4 PR UTP
N
CEILING
S
(N - QUANTITY)
(N - QUANTITY)
(N - QUANTITY)
(N - QUANTITY)
ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.
ANY HEIGHTS INDICATED IN PLANS SHALL SUPERSEDE THOSE LISTED HERE.
SEE DRAWINGS FOR MORE INFORMATION.
NOTE: NOT ALL SYMBOLS ARE USED.
CHANNEL TR EQUIPMENT RACKFLOOR
TR EQUIPMENT CABINET
MATV EQUIPMENT CABINETMATV 6' TO TOP
FLOOR
LADDER CABLE TRAY (4" HIGH - SEE PLANS FOR OTHER DIMENSIONS)
HIGH CAPACITY FLOOR BOX FOR DATA (2-4P) & POWER (4-RECEPTACLE)FLOOR
J JUNCTION BOX - AS NOTED ON PLANSAS NOTED
GROUND BUS
ABOVE
CEILING
18"
4'x8'x3/4" FIRE RETARDED TTB8"
SECURITY SYMBOL LEGEND
SYMBOL HEIGHT DESCRIPTION
ELECTRONIC LOCKING MECHANISM
DOOR CONTACT
REQUEST FOR EXIT SENSOR
CARD READER
(K - KEYPAD)
48"CR
ES
DC
RX
48" EMERGENCY EXIT BUTTON TO RELEASE DOOR (EEB)
IC
INTERCOM WITH CAMERA
IC
INTERCOM MASTER WITH PUSH TO RELEASE DOORM
54"
DESK
DOOR
DOOR
ABOVE
DOOR
PHYSICAL ACCESS CONTROL SYSTEMPACS 6' TO TOP
ELECTRONIC PANIC HARDWAREEP
ADO DOOR OPERATOR
HANDWAVE
DOOR
DOOR
48"
88" MOTION DETECTOR
MD
SSTV H6 ANALYTIC DOME CAMERA FIXEDCEILING
SSTV H6SL NON ANALYTIC DOME CAMERA FIXEDCEILING
H6SL
H6
SSTV 90 DEGREE PANORAMIC MULTISENSOR CAMERA CEILING
SSTV DUAL HEAD CAMERA FIXEDCEILING
SSTV 180 DEGREE PANORAMIC MULTISENSOR CAMERA CEILING
SSTV 270 DEGREE PANORAMIC MULTISENSOR CAMERA CEILING
SSTV 360 DEGREE PANORAMIC MULTISENSOR CAMERA CEILING
SSTV FISHEYE PANORAMIC CAMERA CEILING
ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.
ANY HEIGHTS INDICATED IN PLANS SHALL SUPERSEDE THOSE LISTED HERE.
SEE DRAWINGS FOR MORE INFORMATION.
NOTE: NOT ALL SYMBOLS ARE USED.
SSTV CAMERA EQUIPMENT CABINETSSTV FLOOR
AREA OF REFUGE PANEL6' TO TOP
AREA OF REFUGE ANNUNCIATION PANEL6' TO TOP
AOF
AOFA
IC AREA OF REFUGE INTERCOM48"
AREA OF REFUGE STROBE LIGHTCEILINGSL
DP
DPP
DURESS PANIC ALARM PUSH BUTTON48"
DURESS PANIC ALARM PANEL6' TO TOP
DH
FE
SW
SSTV H6SL NON ANALYTIC DOME CAMERA FIXED, 2MP VARIENT FOR STAIRWELLCEILING
PROPOSED PHASING SCHEME
1. INSTALL FIBER BACKBONE CABLING FROM NEW SECURITY CAMERA HEADENED EQUIPMENT TO
NEW POE CISCO SWITCH TO BE INSTALLED IN ROOM 115, BUILDING 5, TO FACILITATE
CONNECTION TO CAMPUS SECURED FIBER OPTIC NETWORK.
2. RUN NEW CAT6A COPPER CABLES (OR FIBER CABLES FOR DISTANCES OVER 90 METERS) FROM
EXISTING IT ROOM TO CAMERA LOCATIONS.
3. INSTALL SECURITY CAMERA HEADEND EQUIPMENT, CONDUIT ALONG WITH EQUIPMENT RACK IN
SERVER ROOM 115 AND REQUIRED POWER OUTLETS.
4. INSTALL MONITORS IN POLICE DISPATCH ROOM.
5. INSTALL WALL MOUNTED AND CEILING MOUNTED SECURITY CAMERAS. NEW CAMERAS TO BE
CONNECTED PRIOR TO REMOVAL OF THOSE BEING REPLACED TO AVOID BLIND SPOTS.
6. MAKE CONNECTIONS TO CAMERAS.
7. REMOVE ALL REMAINING EXISTING CAMERAS, EQUIPMENT AND CABLING.
8. REMOVE ALL REMAINING EXISTING CAMERAS, EQUIPMENT AND CABLING.
9. REMOVE REPLACED EXISTING CAMERAS AND UNUSED POWER AND DATA CABLES.
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:1
:4
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
T-001
TECHNOLOGY GENERAL NOTES,
SYMBOL LEGEND, AND
ABBREVIATIONS
1 26LAS
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
JVE
CAMERA TYPE SCHEDULE
HEIGHT TYPE DESCRIPTION MANUFACTURER COUNT
12'-0" AFG
UNO
H5A DH SSTV DUEL HEAD AVIGILON (BASIS OF DESIGN) 11
12'-0" AFG
UNO
H5A FE SSTV FISH EYE AVIGILON (BASIS OF DESIGN) 17
12'-0" AFG
UNO
H5A MS 180 SSTV
MULTISENSOR
AVIGILON (BASIS OF DESIGN) 2
12'-0" AFG
UNO
H5A MS 270 SSTV
MULTISENSOR
AVIGILON (BASIS OF DESIGN) 47
12'-0" AFG
UNO
H5A MS 360 SSTV
MULTISENSOR
AVIGILON (BASIS OF DESIGN) 13
12'-0" AFG
UNO
H6 SSTV FIXED DOME AVIGILON (BASIS OF DESIGN) 112
12'-0" AFG
UNO
H6SL SSTV FIXED DOME AVIGILON (BASIS OF DESIGN) 23
12'-0" AFG
UNO
H6SL SW SSTV FIXED DOME AVIGILON (BASIS OF DESIGN) 17
Grand total: 242 242
WALL RATING LEGEND
Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44
7/24/2024
H6 N #133
WP
H6 N #139
WP
H6
RP
#140
WP
H6
RP
#141
WP
H6 N #134
WP
H6
RP
#137
WP
H6
RP
#138
WP
H6 N #135
WP
N #132
WP
H6 N #136
WP
N #107
WP
H6 N #111
WPH6
N #110
WP
H6 N #112
WP
FIXED
RV
WP
H6 N #109
WP
H6 N #97
WP
N #95
WP
N #94
WP
H6 N #96
WP
BLDG 6
RM 'G25'
BLDG 6
RM 'G25'
BLDG 6
RM 'G25'
BLDG 6
RM 'G25'
BLDG 5
RM '115'
BLDG 5
RM '115'
BLDG 5
RM '115'
BLDG 5
RM '115'
BLDG 7
RM '102'
BLDG 7
RM '102' BLDG 7
RM '102'
BLDG 7
RM '102'
BLDG 7
RM '102' BLDG 7
RM '102'
BLDG 7
RM '102'
BLDG 7
RM '102'
BLDG 7
RM '102'
BLDG 7
RM '102'
3 3
FIXED
RV
WP
2 5
N #108
WPBLDG 6
RM 'G25'
BLDG 6
RM 'G25'
1 1
IRM SERVER ROOM "115"
TR ROOM "G25"
TR ROOM "102"
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:1
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
TS101
TECHNOLOGY SITE PLAN
2 26LAS
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
JVE
1 EXISTING CAMERA APPROXIMATELY 12 FEET AFG
TO BE REMOVED AND REPLACED WITH NEW
CAMERA.
2 PROVIDE CORNER MOUNT BRACKET.
3 PROVIDE FLAT WALL BRACKET.
5 LENS OF MULTISENSOR CAMERA TO BE
DIRECTED TO COVER ENTRANCE OF BUILDING.
Scale: 1" = 110'-0"
SITE PLAN - MURFREESBORO VAMC - NORTH
A. DEMOLISH CAMERAS AS NOTED (SEE CAMERA
ABBREVIATIONS). REMOVE CABLING AND
CONDUIT BACK TO SOURCE. PATCH/REPAIR
AND PAINT SURFACES AFFECTED BY
DEMOLITION TO MATCH SURROUNDING AREA.
REPLACE ANY CEILING TILES DAMAGED OR
BROKEN DURING DEMOLITION AT NO
ADDITIONAL COST TO THE VA.
B. PROVIDE AND INSTALL NEW CAMERAS AS
NOTED (SEE CAMERA ABBREVIATIONS). RUN
NEW 4 PR UTP TO CCTV EQUIPMENT IN
DESIGNATED IT ROOM.
C. REMOVE AND REPLACE CAMERAS AS NOTED
(SEE CAMERA ABBREVIATIONS). RUN NEW 4 PR
UTP TO CCTV EQUIPMENT IN DESIGNATED IT
ROOM.
D. CCTV SERVICES ARE TO REMAIN ACTIVE
OUTSIDE AREAS UNDER ACTIVE
CONSTRUCTION AT ALL TIMES. FIELD VERIFY
CIRCUITS SHOWN AND RETAIN SERVICES TO
ALL DEVICES AND/OR SYSTEMS DURING
DEMOLITION AND REMODEL OF THE
RESPECTIVE AREAS.
E. ALL EXISTING CONDITIONS AND DEVICES ARE
BASED ON THE BEST AVAILABLE INFORMATION
AT THE TIME OF SURVEY AND VISUAL
INSPECTION. VERIFY EXISTING CONDITIONS IN
FIELD.
F. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'
OC ABOVE CEILING IN CORRIDORS.
G. ALL CONDUIT SECURITY JUNCTION BOXES AND
RACEWAY PROVIDED BY ELECTRICAL
CONTRACTOR UNO. ALL CONDUIT SHALL BE
3/4" MINIMUM. ELECTRICAL CONTRACTOR TO
SIZE CONDUIT PER THE MOST CURRENT
EDITION OF THE NEC.
H. ALL EXPOSED BOXES AND PANELS MOUNTED
ON OR IN THE EXTERIOR WALLS SHALL BE
WEATHERPROOF AND RAIN-TIGHT.
I. WHERE LENGTH FROM CAMERA TO RACK
EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR
SHALL USE FIBER OPTIC CABLE.
J. ALL CAMERAS AND EQUIPMENT THAT IS
REMOVED SHALL BE TURNED OVER TO THE
POLICE DEPARTMENT. COORDINATE WITH
COR.
K. ALL EXTERIOR CAMERAS TO BE
WEATHERPROOF.
M. ALL EXTERIOR 270 DEGREE CAMERAS TO BE
MOUNTED DIRECTLY ON THE CORNERS OF THE
BUILDINGS.
N. CONTRACTOR SHALL PLAN PENETRATIONS
AND CONDUIT RUNS FROM EXTERIOR
CAMERAS INTO THE BUILDINGS SO AS TO
MINIMIZE THE CHANGES TO THE BUILDINGS
EXTERIOR AND WILL MINIMIZE THE NECESSARY
CONDUIT RUNS ON THE EXTERIOR OF THE
BUILDING.
O. COORDINATE EXTERIOR CAMERA MOUNTING
HEIGHT WITH THE INTERIOR CEILING HEIGHT
TO MINIMIZE EXTERIOR CONDUIT RUNS. REUSE
EXISTING CONDUIT RUNS AND BUILDING
PENETRATIONS WHEN POSSIBLE.
P. COORDINATE ALL NEW CAMERA LOCATIONS
WITH COR PRIOR TO ROUGH-IN.
Q. ALL CONDUIT RUNS ON THE EXTERIOR OF THE
BUILDING SHALL BE PAINTED TO MATCH THE
BUILDING COLOR PRIOR TO ROUGH-IN.
N O
R T
H
0 3015 60
Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44
7/24/2024
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Text Box Or chnage these 2 to a 270
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Text Box The courtyard is already covered, so move these two as indicated.
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Text Box Add H6 or change to 270. 270 preferred.
H6
#157
WP
H6 N #191
WP
H6 N #192
WP
H6 N #193
WP
N #189
WP
H6 N #194
WP
H6 N #195
WP
H6 N #196
WP
H6 N #197
WP
H6 N #198
WP
H6 N #199
WP
RP
#190
WP
H6 N #37
WP
H6 N #38
WP
H6 N #39
WP
RP
#36
WP
H6 N #40
WP
H6 N #41
WP
H6 N #42
WPH6
N #74
WP
H6 N #75
WP
H6 N #76
WP
H6 N #77
WP
H6 N #78
WP
H6 N #79
WP
N #71
WP
RP
#72
WP
N #73
WP
N #236
WP
N #17
WP
N #16
WP
N #18
WP
H6 N #21
WP
N #19
WP
H6 N #22
WP
RP
#20
WP
H6 N #160
WP
N #156
WP
H6 N #158
WP
H6 N #159
WP
H6 N #89
WP
H6 N #90
WP
H6 N #91
WPH6
N #88
WP
H6 N #92
WP
BLDG 4
RM 'G112A'
BLDG 4
RM 'G112A'
BLDG 4
RM 'G112A'
BLDG 4
RM 'G112A'
BLDG 4
RM 'G112A'
BLDG 3
RM 'G03A'
BLDG 3
RM 'G03A'
BLDG 3
RM 'G03A'
BLDG 3
RM 'G03A'
BLDG 3
RM 'G03A'
BLDG 3
RM 'G03A'
BLDG 3
RM 'G03A'
BLDG 3
RM 'G03A'
BLDG 2
RM 'G20A'
BLDG 2
RM 'G20A'
BLDG 2
RM 'G20A'
BLDG 2
RM 'G20A'
BLDG 2
RM 'G20A'
BLDG 2
RM 'G20A'
BLDG 2
RM 'G20A'
BLDG 117
RM 'G63'
BLDG 1
RM '106A'
BLDG 1
RM '106A'
BLDG 1
RM '106A'
BLDG 1
RM '106A'
BLDG 1
RM '106A'
BLDG 1
RM '106A'
BLDG 9
RM '127'
BLDG 9
RM '127'
BLDG 9
RM '127'BLDG 9
RM '127'
BLDG 9
RM '127'
BLDG 9
RM '127'
BLDG 9
RM '127'
BLDG 9
RM '127'
BLDG 9
RM '127'
BLDG 8
RM '143'
BLDG 8
RM '143'
BLDG 8
RM '143'
BLDG 8
RM '143'
BLDG 8
RM '143'
1 2
1 21 2
1 22
BLDG 9
RM '127'
BLDG 3
RM 'G03A'
BLDG 1
RM '106A'
BLDG 9
RM '127'
TR RM '106A'
TR RM 'G20A'
TR RM 'G03A'
TR RM 'G112A'
TR RM '143'
TR RM 'G63'
RP
#241
WP
BLDG 120
RM 'G02'
2 H6 N #242
WP
BLDG 120
RM 'G02'
BLDG 120
RM 'G02'
RP
#240
WP
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:4
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
TS102
TECHNOLOGY SITE PLAN
3 26LAS
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
JVE
Scale: 1" = 110'-0"
SITE PLAN - MURFREESBORO VAMC - SOUTH
1 EXISTING CAMERA APPROXIMATELY 12 FEET AFG
TO BE REMOVED AND REPLACED WITH NEW
CAMERA.
2 PROVIDE CORNER MOUNT BRACKET.
3 PROVIDE FLAT WALL BRACKET.
4 REPLACE CAMERA AT ENTRANCE UNDER
OVERHANG.
5 LENS OF MULTISENSOR CAMERA TO BE
DIRECTED TO COVER ENTRANCE OF BUILDING.
A. DEMOLISH CAMERAS AS NOTED (SEE CAMERA
ABBREVIATIONS). REMOVE CABLING AND
CONDUIT BACK TO SOURCE. PATCH/REPAIR
AND PAINT SURFACES AFFECTED BY
DEMOLITION TO MATCH SURROUNDING AREA.
REPLACE ANY CEILING TILES DAMAGED OR
BROKEN DURING DEMOLITION AT NO
ADDITIONAL COST TO THE VA.
B. PROVIDE AND INSTALL NEW CAMERAS AS
NOTED (SEE CAMERA ABBREVIATIONS). RUN
NEW 4 PR UTP TO CCTV EQUIPMENT IN
DESIGNATED IT ROOM.
C. REMOVE AND REPLACE CAMERAS AS NOTED
(SEE CAMERA ABBREVIATIONS). RUN NEW 4 PR
UTP TO CCTV EQUIPMENT IN DESIGNATED IT
ROOM.
D. CCTV SERVICES ARE TO REMAIN ACTIVE
OUTSIDE AREAS UNDER ACTIVE
CONSTRUCTION AT ALL TIMES. FIELD VERIFY
CIRCUITS SHOWN AND RETAIN SERVICES TO
ALL DEVICES AND/OR SYSTEMS DURING
DEMOLITION AND REMODEL OF THE
RESPECTIVE AREAS.
E. ALL EXISTING CONDITIONS AND DEVICES ARE
BASED ON THE BEST AVAILABLE INFORMATION
AT THE TIME OF SURVEY AND VISUAL
INSPECTION. VERIFY EXISTING CONDITIONS IN
FIELD.
F. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'
OC ABOVE CEILING IN CORRIDORS.
G. ALL CONDUIT SECURITY JUNCTION BOXES AND
RACEWAY PROVIDED BY ELECTRICAL
CONTRACTOR UNO. ALL CONDUIT SHALL BE
3/4" MINIMUM. ELECTRICAL CONTRACTOR TO
SIZE CONDUIT PER THE MOST CURRENT
EDITION OF THE NEC.
H. ALL EXPOSED BOXES AND PANELS MOUNTED
ON OR IN THE EXTERIOR WALLS SHALL BE
WEATHERPROOF AND RAIN-TIGHT.
I. WHERE LENGTH FROM CAMERA TO RACK
EQUIPMENT EXCEED 295' (90M) CONTRACTOR
SHALL USE FIBER OPTIC CABLE.
J. ALL CAMERAS AND EQUIPMENT THAT IS
REMOVED SHALL BE TURNED OVER TO THE
POLICE DEPARTMENT. COORDINATE WITH
COR.
K. ALL EXTERIOR CAMERAS TO BE
WEATHERPROOF.
M. ALL EXTERIOR 270 DEGREE CAMERAS TO BE
MOUNTED DIRECTLY ON THE CORNERS OF THE
BUILDINGS.
N. CONTRACTOR SHALL PLAN PENETRATIONS
AND CONDUIT RUNS FROM EXTERIOR
CAMERAS INTO THE BUILDINGS SO AS TO
MINIMIZE THE CHANGES TO THE BUILDINGS
EXTERIOR AND WILL MINIMIZE THE NECESSARY
CONDUIT RUNS ON THE EXTERIOR OF THE
BUILDING.
O. COORDINATE EXTERIOR CAMERA MOUNTING
HEIGHT WITH THE INTERIOR CEILING HEIGHT
TO MINIMIZE EXTERIOR CONDUIT RUNS. REUSE
EXISTING CONDUIT RUNS AND BUILDING
PENETRATIONS WHEN POSSIBLE.
P. COORDINATE ALL NEW CAMERA LOCATIONS
WITH COR PRIOR TO ROUGH-IN.
Q. ALL CONDUIT RUNS ON THE EXTERIOR OF THE
BUILDING SHALL BE PAINTED TO MATCH THE
BUILDING COLOR PRIOR TO ROUGH-IN.
N O
R T
H
0 3015 60
Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44
7/24/2024
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Text Box This will change due to Dental project
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Text Box Add two H6 Here
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Text Box Or change these 2 into a 270 on the corner
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Text Box
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Change to 270
BUILDING 1BUILDING 120
BUILDING 1
BUILDING 117
2 2
RM 'A-17A'
RM '106A'
RM 'G63'
N #1
H6SL
N #6
SW
N #7
H6 N #4
N #2
N #3
SW
N #8
H6 N #5
RM '106A'
RM '106A'
RM '106A'
RM '106A'
RM '106A'
RM '106A'
RM '106A'
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:5
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
1.T-101
BUILDING 1 GROUND FLOOR SECURITY
PLAN
4 26LAS
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
JVE
Scale: 3/32" = 1'-0"
BUILDING 1 GROUND FLOOR SECURITY PLAN
1 ROUTE UTP CABLING UP TO TELECOM ROOM
ABOVE.
2 INSTALL NEW CAMERAS. PROVIDE NEW 4 PR
UTP CABLING FROM CAMERA TO NEW POE
SWITCH IN TELECOM ROOM. REPAIR/
REPLACE SURFACES AFFECTED BY CAMERA
EQUIPMENT INSTALLATION TO MATCH
SIMILAR/EXISTING CONDITIONS.
CONTRACTOR TO REPLACE DAMAGED
CEILING TILE AND GRID ASSOCIATED WITH
WORK AT NO ADDITIONAL COST TO
GOVERNMENT.
A. REFERENCE SHEET TS101 AND TS102 FOR
EXTERIOR CAMERA LOCATIONS.
B. ALL EXISTING CONDITIONS ARE BASED ON THE
BEST AVAILABLE INFORMATION AT THE TIME
OF SURVEY.
C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'
OC ABOVE CEILING IN CORRIDORS.
D. ALL CONDUIT SHALL BE 3/4" MINIMUM.
ELECTRICAL CONTRACTOR TO SIZE CONDUIT.
PER THE MOST CURRENT EDITION OF THE NEC.
E. WHERE LENGTH FROM CAMERA TO RACK
EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR
SHALL USE FIBER OPTIC CABLE.
F. COORDINATE AND CONFIRM ALL ROUTING
WITH COR PRIOR TO ROUGH-IN.
G. SEE SHEET G-100 FOR ICRA MEASURES.
H. USE MOBILE CONTAINMENT CART (6/G-100)
ALONG CORRIDORS.
N O
R T
H
0 84 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44
7/24/2024
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Add H6
TR ROOM 106A:
3 PR SPARE MMF1 2 3 4
1 2
RP
#10
FIXED
RV
FIXED
RV
H6 N #13
SW
N #15
N #11
H6 N #14
RM '106A'
RM '106A'
RM '106A'
RM '106A'
BUILDING 1BUILDING 120
BUILDING 1
BUILDING 117
BUILDING
BUILDING 117
BUILDING 1
RM '106A'
H5A FE
N #9
RP
#12
RM '106A'
RM '106A'
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:0
P
M C
U s e rs
\l s ta rn e s \D o c u m e n ts
\E -2
-2
Y
-V A
Y o rk
-V id e o S e c I m p ro v -T
N ls ta rn e s C
B U
M B
.r v t
1.T-102
BULIDING 1 FIRST FLOOR SECURITY
PLAN
5 26LAS
VIDEO SURVEILLANCE
SECURITY YORK
ALVIN C. YORK CAMPUS
3400 LEBANON ROAD
MURFREESBORO, TN 37129 JUNE 13, 2024
BID DOCUMENTS
626A4-22-10422-215
JVE
Scale: 3/32" = 1'-0"
BUILDING 1 FIRST FLOOR SECURITY PLAN
1 REMOVE EXISTING CAMERAS AND CABLING
BACK TO SOURCE. REPAIR/REPLACE
EXISTING SURFACES AFFECTED BY
REMOVAL OF CAMERA EQUIPMENT TO
MATCH SIMILAR EXISTING CONDITIONS.
2 INSTALL NEW CAMERAS. PROVIDE NEW 4 PR
UTP CABLING FROM CAMERA TO NEW POE
SWITCH IN TELECOM ROOM. REPAIR/
REPLACE SURFACES AFFECTED BY CAMERA
EQUIPMENT INSTALLATION TO MATCH
SIMILAR/EXISTING CONDITIONS.
CONTRACTOR TO REPLACE DAMAGED
CEILING TILE AND GRID ASSOCIATED WITH
WORK AT NO ADDITIONAL COST TO
GOVERNMENT.
3 PROPOSED LOCATION OF NEW CISCO 9300
SWITCH AND PATCH PANEL. VERIFY
LOCATION WITH COR AND OIT
REPRESENTATIVE.
4 ROUTE MMF FROM TELECOM ROOM TO
RACKS IN BUILDING 5 SERVER ROOM.
N O
R T
H
0 84 16
A. REFERENCE SHEET TS101 AND TS102 FOR
EXTERIOR CAMERA LOCATIONS.
B. ALL EXISTING CONDITIONS ARE BASED ON THE
BEST AVAILABLE INFORMATION AT THE TIME
OF SURVEY.
C. NEW CCTV CABLING TO BE RUN ON J-HOOKS 2'
OC ABOVE CEILING IN CORRIDORS.
D. ALL CONDUIT SHALL BE 3/4" MINIMUM.
ELECTRICAL CONTRACTOR TO SIZE CONDUIT.
PER THE MOST CURRENT EDITION OF THE NEC.
E. WHERE LENGTH FROM CAMERA TO RACK
EQUIPMENT EXCEEDS 295' (90M) CONTRACTOR
SHALL USE FIBER OPTIC CABLE.
F. COORDINATE AND CONFIRM ALL ROUTING
WITH COR PRIOR TO ROUGH-IN.
G. SEE SHEET G-100 FOR ICRA MEASURES.
H. USE MOBILE CONTAINMENT CART (6/G-100)
ALONG CORRIDORS.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44
7/24/2024
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Text Box Existing 360 here. Change this one to a fixed camera and place above conference room looking back down hall.
VHATVHWILKEJ
Pencil
VHATVHWILKEJ
Pencil
1 2 3 4
TR ROOM G20B:
5 PR SPARE MMF
6 PR SPARE SMF
2RM 'G20B'
RM 'G20B'
RM 'G20B'
RM 'G20B'
RM 'G20B'
RM 'G20B'
RM 'G20A'
RM 'G20B'
RM 'G20B'
RM 'G20B'
RM 'G20B'
RM 'G20B'
H6 N #29
N #27
H5A FE
N #25
N #28
H6 N #30
SW
N #35
H5A DH
N #23
H5A DH
N #24
H6 N #31
H6 N #32
H5A FE
N #26
B U
IL
D
IN
G
B U
IL
D
IN
G
BUILDING 2
BUILDING 117
H6 N #33
RM 'G20B'
H6 N #34
RM 'G20B'
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approv…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .