Atch 18 22-215Y BD Dwgs _Part8.pdf

PDF 241 KB Posted

Attached to
Z1DA--Project 626A4-22-104_Video Surveillance Security TVHS VAMC - Alvin C. York Campus
Solicitation number
36C24926R0064
Issued by

About this file

This document is a technical riser diagram for a Video Surveillance Security (SSTV) System improvement project at the Alvin C. York Campus in Murfreesboro, Tennessee, prepared by Apogee Consulting Group, P.A. for the U.S. Department of Veterans Affairs (VA Project 22-215, Drawing T-601).

The project specifies installation of video surveillance infrastructure across multiple buildings, including two 44-unit server cabinets equipped with Avigilon NVR5-PRM-288TB-S19-NA network video recorders with 10G Ethernet connections, an SMT3000C UPS for power continuity, 24-port PoE switches with 2-10 GigE uplinks (to be provided by VA), fiber optic and copper patch panels, and wire management systems. Additional requirements include three 55-inch VSS monitors with HDMI inputs for the Police Dispatch room (wall-mounted), one monitor with desk stand (HDMI inputs), a slide-out 17-inch laptop workstation, and new telecommunications outlets in the dispatch area. The contractor must coordinate exact fiber routing, conduit penetrations with fire-caulking for rated walls/floors, and all stub-up locations with the Contracting Officer's Representative (COR) prior to rough-in. Cabling specifications mandate Cat 6A UTP for runs under 295 feet (minimum 1-1/4" conduit) and fiber for longer runs (minimum 3/4" electrical conduit). The project is marked "Fully Sprinklered" and dated June 13, 2024, with coordination required among VA, COR, Police, and OIT representatives.

View the file

Other files

File Type Posted
S06 AMEND_7 36C24926R0064 0007-York Campus.pdf PDF
S02 AMEND-6_36C24926R0064 0006 MUR.pdf PDF
S02 36C24926R0064 0005 VIDEO -YORK.pdf PDF
Atch 24 JA Brand Name Avigilon VIDEO 626A4-22-104 MUR_Redacted.pdf PDF
S02 AMEND_4 36C24926R0064 0004.pdf PDF
S02 AMEND 36C24926R0064 0003 Protest.pdf PDF
Atch 1 Video camera design changes- York.pdf PDF
S02 AMEND 36C24926R0064 0002 VIDEO-York.pdf PDF
S02 AMEND 36C24926R0064 0002 VIDEO-York.pdf PDF
Atch 1 Video camera design changes.pdf PDF
Atch 1 Site Visit Sign In Sheet 626A4-22-104 _York.pdf PDF
S02 AMEND_1 36C24926R0064 0001 VIDEO York.pdf PDF
S02 36C24926R0064_1 VIDEO 626A4-22-104 YORK.pdf PDF
Atch 21 JA Brand Name Avigilon VIDEO 626A4-22-104 MUR_2_Redacted.pdf PDF
Atch 20 Fire-Smoke Barrier Permit.doc DOC document
Atch 15 22-215Y BD Dwgs _Part5.pdf PDF
Atch 3 Past Performance Questionnaire York.docx DOCX document
Atch 1 WD DBA-TN20260187 BUILDING MOD-0 01.02.2026 - MUR.docx DOCX document
Atch 14 22-215Y BD Dwgs _Part4.pdf PDF
Atch 13 22-215Y BD Dwgs _Part3.pdf PDF
Atch 11 22-215Y BD Dwgs _Part1.pdf PDF
Atch 9 Price Breakout Schedule.xlsx XLSX spreadsheet
Atch 2 WD SCA 2015-4647 REV31 _05.13.2026 Rutherford-Davidson.docx DOCX document
36C24926R0064_1.docx DOCX document
Atch 23 SF1442 36C24926R0064_2.pdf PDF
Atch 19 HotWorkPermit.pdf PDF
Atch 16 22-215Y BD Dwgs _Part6.pdf PDF
Atch 7 Contractor EMR Certification Form.docx DOCX document
Atch 6 Calc. of Self Performed Work.xlsx XLSX spreadsheet
Atch 4 UEI _ TAX ID.docx DOCX document
Atch 22 JA Brand Name JCI VIDEO 626A4-22-104 MUR_1_Redacted.pdf PDF
Atch 17 22-215Y BD Dwgs _Part7.pdf PDF
Atch 12 22-215Y BD Dwgs _Part2.pdf PDF
Atch 10 22-215Y BD Specs.pdf PDF
Atch 8 General Conditions Breakout.xlsx XLSX spreadsheet
Atch 5 RFI Form.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

24 PORT PoE

SWITCH(ES)

WIRE MANAGEMENT

WIRE MANAGMENT

FIBER OPTIC

PATCH PANEL

WIRE MANAGMENT

COPPER

PATCH PANEL

WIRE MANAGEMENT

SPACE

NVR

NVR

NVR

BUILDING 5

(IRM SERVER ROOM 115)

4UPS

55" VSS

MONITOR

PC

DISPATCH ROOM

55" VSS

MONITOR

55" VSS

MONITOR

6 6 6

8 8

BUILDING 112

(IRM SERVER ROOM 115)

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:0

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts

\E -2

-2

Y

-V A

Y o rk

-V id e o S e c I m p ro v -T

N ls ta rn e s C

B U

M B

.r v t

T-601

TECHNOLOGY RISERS

26 26LAS

VIDEO SURVEILLANCE

SECURITY YORK

ALVIN C. YORK CAMPUS

3400 LEBANON ROAD

MURFREESBORO, TN 37129 JUNE 13, 2024

BID DOCUMENTS

626A4-22-10422-215

JVE

1 INCOMING MMF FIBER FROM TELECOM

ROOMS ROUTED TO FIBER OPTIC PATCH

PANEL IN SERVER RACK.

2 CCTV CABINET SHALL BE 44 Us - 23"W x 30"D -

FRONT GLASS DOOR, QUIET FAN WITH

FILTER, POWER STRIP SURGE PROTECTION

WITH FILTER, VERTICAL GROUND BUS BAR,

AND SHELVES.

13.CCTV CABINET, IN BUILDING 74, SHALL BE

44 Us - 23"W x 30"D - FRONT GLASS DOOR, QUIET FAN WITH FILTER, POWER STRIP

SURGE PROTECTION WITH FILTER, VERTICAL

GROUND BUS BAR, AND SHELVES.

3 AVIGILON (BASIS OF DESIGN) MODEL

#NVR5-PRM-288TB--S19-NA INSTALLED IN

NEW CCTV CABINET. INCLUDE 10G

ETHERNET CONNECTION.

4 NEW SMT3000C UPS TO PROVIDE

CONTINUITY OF POWER FOR RACK

EQUIPMENT.

5 RUN CAT 6A CABLING FROM SPARE PORTS IN

EXISTING SWITCH OR PATCH PANEL TO NEW

TELECOMMUNICATIONS OUTLET.

6 VSS MONITORS SHALL HAVE HDMI INPUTS.

VSS MONITORS SHALL BE WALL MOUNTED IN

POLICE DISPATCH. COORDINATE VSS

MONITOR CONNECTIONS WITH COR AND

POLICE.

7 VSS MONITOR SHALL HAVE HDMI INPUTS.

PROVIDE DESK STAND FOR VSS MONITOR.

COORDINATE VSS MONITOR CONNECTIONS

WITH COR AND OIT REPRESENTATIVE.

8 PROVIDE NEW TELECOMMUNICATIONS

OUTLET IN POLICE DISPATCH TO SERVE NEW

MONITOR WORKSTATION - PC, KEYBOARD,

MOUSE INCLUDED. COORDINATE WITH COR

AND POLICE FOR PC LOCATION.

9 PROVIDE SLIDE OUT LAPTOP. LAPTOP SHALL

HAVE 17" SCREEN.

10 COORDINATE LOCATION OF TELECOM

CLOSET WITH OIT AND COR.

Scale: No Scale

SSTV SYSTEM RISER DIAGRAM

A. FIBER ROUTING SHOWN IS DIAGRAMMATIC TO

INDICATE PROPOSED ROUTING. CONTRACTOR

TO COORDINATE EXACT ROUTING IN FIELD

WITH THE COR PRIOR TO ROUGH-IN.

B. CONTRACTOR SHALL FIELD COORDINATE ALL

STUB UP LOCATIONS WITH COR AND FIELD

CONDITIONS PRIOR TO ROUGH-IN.

C. PROVIDE FIRE-CAULK FOR ALL CONDUIT/CABLE

PENETRATIONS THROUGH RATED WALLS

AND/OR FLOORS.

D. SEE PROPOSED PHASING SCHEME, SHEET

T-001, FOR ADDITIONAL INFORMATION.

E. VA TO PROVIDE PoE DATA SWITCH WITH 2-10

GIG UPLINK FOR ALL CCTV EQUIPMENT SHALL.

F. USE 4 PR UTP FOR CABLE RUNS OF LESS THAN

295 FEET.

G. USE FIBER FOR CABLE RUNS GREATER THAN

295 FEET.

H. ALL ELECTRICAL CONDUIT SHALL BE MINIMUM

3/4" CONDUIT. ALL 4 PAIR BALANCED TWISTED

PAIR CONDUIT SHALL BE MINIMUM 1-1/4"

CONDUIT.

Scale: No Scale

SSTV SYSTEM RISER DIAGRAM

Docusign Envelope ID: B9B77CD2-F0C1-4BAA-8538-6B315B443E44

7/24/2024

22-215YELEC
Sheets
T-601 - TECHNOLOGY RISERS

File details come from the government source that posted it. Updated .