This is a permit document for fire-smoke barrier installation requirements. The document outlines the specifications and compliance standards necessary for fire-smoke barriers that must be implemented as part of the video surveillance security installation project at the Tennessee Valley Healthcare System (TVHS) Alvin C. York Campus in Murfreesboro, Tennessee. The permit serves as an attachment to the solicitation for Project 626A4-22-104 and establishes the technical and safety requirements that the contractor must follow when installing fire-smoke barriers in conjunction with the surveillance system infrastructure.

The fire-smoke barrier permit specifies construction standards, material requirements, and inspection protocols to ensure compliance with building codes and fire safety regulations applicable to healthcare facility modifications. Contractors responding to this solicitation must incorporate these permit requirements into their technical proposals and project planning, as adherence to fire-smoke barrier specifications is a mandatory component of the overall video surveillance security installation at the Veterans Affairs facility. The permit documentation provides the regulatory framework within which the selected contractor must operate during system installation and testing phases.

View the file

Other files

File Type Posted
S06 AMEND_7 36C24926R0064 0007-York Campus.pdf PDF
S02 AMEND-6_36C24926R0064 0006 MUR.pdf PDF
S02 36C24926R0064 0005 VIDEO -YORK.pdf PDF
Atch 24 JA Brand Name Avigilon VIDEO 626A4-22-104 MUR_Redacted.pdf PDF
S02 AMEND_4 36C24926R0064 0004.pdf PDF
S02 AMEND 36C24926R0064 0003 Protest.pdf PDF
Atch 1 Video camera design changes- York.pdf PDF
S02 AMEND 36C24926R0064 0002 VIDEO-York.pdf PDF
S02 AMEND 36C24926R0064 0002 VIDEO-York.pdf PDF
Atch 1 Video camera design changes.pdf PDF
Atch 1 Site Visit Sign In Sheet 626A4-22-104 _York.pdf PDF
S02 AMEND_1 36C24926R0064 0001 VIDEO York.pdf PDF
S02 36C24926R0064_1 VIDEO 626A4-22-104 YORK.pdf PDF
Atch 23 SF1442 36C24926R0064_2.pdf PDF
Atch 19 HotWorkPermit.pdf PDF
Atch 16 22-215Y BD Dwgs _Part6.pdf PDF
Atch 7 Contractor EMR Certification Form.docx DOCX document
Atch 6 Calc. of Self Performed Work.xlsx XLSX spreadsheet
Atch 4 UEI _ TAX ID.docx DOCX document
Atch 21 JA Brand Name Avigilon VIDEO 626A4-22-104 MUR_2_Redacted.pdf PDF
Atch 15 22-215Y BD Dwgs _Part5.pdf PDF
Atch 3 Past Performance Questionnaire York.docx DOCX document
Atch 1 WD DBA-TN20260187 BUILDING MOD-0 01.02.2026 - MUR.docx DOCX document
Atch 22 JA Brand Name JCI VIDEO 626A4-22-104 MUR_1_Redacted.pdf PDF
Atch 17 22-215Y BD Dwgs _Part7.pdf PDF
Atch 12 22-215Y BD Dwgs _Part2.pdf PDF
Atch 10 22-215Y BD Specs.pdf PDF
Atch 8 General Conditions Breakout.xlsx XLSX spreadsheet
Atch 5 RFI Form.docx DOCX document
Atch 18 22-215Y BD Dwgs _Part8.pdf PDF
Atch 14 22-215Y BD Dwgs _Part4.pdf PDF
Atch 13 22-215Y BD Dwgs _Part3.pdf PDF
Atch 11 22-215Y BD Dwgs _Part1.pdf PDF
Atch 9 Price Breakout Schedule.xlsx XLSX spreadsheet
Atch 2 WD SCA 2015-4647 REV31 _05.13.2026 Rutherford-Davidson.docx DOCX document
36C24926R0064_1.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs

Memorandum 626-13-138-73 VA Tennessee Valley Healthcare System March 31, 2013

FIRE WALL AND SMOKE BARRIER PENETRATIONS

1. PURPOSE: To establish procedures regarding penetrations in ceilings, floors, pipe chases, fire walls, and smoke barriers for the purpose of maintaining the integrity of these structures as required by National Fire Protection Agency (NFPA) 101 and The Joint Commission to provide for the safety of occupants during fire incidents.

2. POLICY: All penetrations made in floors, ceilings, fire barriers, and smoke partitions for the purpose of installing/removing pipe, conduit, cable, or ductwork, other modifications including incidental damage, or the removal of such items, will be repaired/sealed upon completion of the work and documented as repaired. Temporary methods of sealing or a temporary barrier shall be used at the end of a work period if the repairs have not been completed. This policy applies to all vertical and horizontal penetrations and to all Department of Veterans Affairs Tennessee Valley Healthcare System (VA TVHS) staff and contractors.

3. DEFINITIONS:

a. Penetration: Any hole, opening, or fault created in a fire barrier or smoke partition that compromises the integrity or fire rating of the penetrated structure.

b. Fire stopping material: Material used to replace or repair any penetrations. Material must meet specifications to ensure the original integrity and rating of the penetrated surface is restored.

c. Fire barriers: Floor, ceiling assemblies, and walls, including supporting construction that meets the conditions of acceptance of NFPA 251. Fire barriers are designed to form fire compartments and are constructed to be continuous from outside wall to outside wall, from one fire barrier to another, or a combination thereof, including continuity through concealed spaces.

4. RESPONSIBILITIES:

a. Service Chiefs must be knowledgeable of the requirements of this guideline with respect to equipment installations or modifications that are coordinated within their assigned building spaces.

b. Safety and Occupational Health Staff will:

(1) Issue “Fire/Smoke Barrier Penetration” permits to VA TVHS staff and contractors.

(See Attachment A)

(2) Inspect and approve all completed work. This shall be done in conjunction with the Project Engineers, if indicated.

c. Project Engineers, Contracting Officer’s Representatives (CORs), Information Management Service and other staff coordinating or performing such work are responsible for compliance with this guideline.

5. PROCEDURES:

a. A Fire/Smoke Barrier Penetration permit is obtained from the VA TVHS Safety Section; the permit will be assigned a specific case number. The permit shall be available for inspection at the designated site(s).

b. Prior to installation of equipment, cables, power connect, conduit, etc., all work, including Information Resource Management projects, will be approved by the Safety Section, Project Engineers, or delegates. This will include a review of the location and scope of work with the individual(s) performing the project.

c. The penetration, after installation or modification of the barrier, must be repaired (sealed) according to accepted practice and utilizing approved materials.

d. Upon completion of any penetration repair, a visual inspection for approval must be requested from the Project Engineer (if related to an Engineering project) or Safety personnel.

e. The completed permit will be signed by the user/responsible person(s) and Safety staff. Records shall be maintained in Engineering Service.

6. REFERENCES:

a. NFPA Life Safety Code 101, Chapter 8

b. NFPA 251, Standard Methods of Tests of Fire Endurance of Building Construction

c. VA Tennessee Valley Healthcare System, Memorandum 626-10-138-29 "Fire Safety/Life Safety Management Program"

7. RESCISSION: TVHS Memorandum 626-10-138-73 dated April 26, 2010.

8. RESPONSIBILITY AND REVIEW DATE: This memorandum will be reviewed annually by the Chief, Engineering Service and will be reissued no later than April 30, 2016.

/s/ Juan A. Morales, RN, MSN 6/17/2013

Juan A. Morales, RN, MSN Health System Director Attachment: A Distribution: Safety Manual

ATTACHMENT A

FIRE WALL/SMOKE BARRIER PENETRATION PERMIT

Contractor/VA Service _________________________________________________

Responsible Person ___________________________________________________

Telephone number/Email ______________________________________________ Case # Assigned __________

Location of work (building, floor, room number) ____________________________

Scope of work ________________________________________________________

Materials used:

Firestopping __________________________________________________________

Wall board ____________________________________________________________

Other ________________________________________________________________

Approving Official and Title

Date

Upon completion of work, a representative from TVHS Safety staff will visually inspect the area to ensure compliance with requirements.

Inspected by _____________________________ Date ______________________

Contractor/VA staff signature ___________________________________________ Comments ___________________________________________________________