Atch 6 - ARCH 4 of 4 - DRAWINGS.pdf
PDF 10 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - Marion Federal contract opportunity
- Solicitation number
- 36C77622B0040
About this file
This federal contract opportunity solicitation involves infrastructure upgrades and renovations to existing spaces at the Marion VA Medical Center. The solicitation seeks contractors to perform electrical, HVAC, communication, physical security, and fiber infrastructure upgrades across multiple buildings on campus. Additional requirements include modifying impacted roads, walks, grading and drainage, hazardous material abatement, and Data Center WAN updates. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas under number 36C77622B0040.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIMITS OF CONSTRUCTION
LI
M
IT
S
O F
C O
N S
T R
U C
T
IO
N
BREAKROOM
/ WORK
ROOM
C100
CORRIDOR
C103
CORRIDOR
TR
FN2
FN1
FN1
IN-01.31
IN-03.01
SD-1
EXIST FLRG
FINISH PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
FN1 FINISH PARTITION WITH P-5 & RB-1.
FN2
TELECOM ROOM TYPICAL FINISHES; SD-1 AT FLOOR, RB-1 AT BASE. ALL
WALL MOUNTED PLYWOOD TO HAVE FP-1, ALL OTHER WALL SURFACES TO
HAVE P-1. SEE 1 & 2/AE211 FOR ADDITONAL INFORMATION.
FN3
FINISH PARTITION TO MATCH EXISTING THIS AREA, INCLUDING, BUT NOT
LIMITED TO, PAINT, WALLCOVERING, WALL PROTECTION AND WALL BASE.
CONTRACTOR TO PROVIDE LABOR AND MATERIALS.
FN4
WHERE EXISTING FINISHES ARE DISTURBED BY CONSTRUCTION, FINISH TO
MATCH ADJACENT FINISHES; FLOOR, WALL & CEILING AS REQUIRED.
FN5
EXISTING AREAS OF RAISED FLOORING TO REMAIN. FINISH ALL VERTICAL
EDGES AND FIRST 4 INCHES OF HORIZONTAL EDGE EPY-2, IN AREA SHOWN
HATCHED.
FN6
PATCH WALL AND FLOOR FINISHES TO PROVIDE A SMOOTH FINISH,
CONSISTENT W/ ADJACENT FINISH, WHERE WIRE PARTITION HAS BEEN
REMOVED.
FN7 INSTALL NEW MANUAL ROLLER WINDOW SHADES, WS-1.
FN8
MODIFICATION OF FURNITURE SYSTEMS AND INSTALLATION BY FURNITURE
SYSTEMS VENDOR.
FN9
MODIFICATION OF FURNITURE SYSTEMS AND INSTALLATION BY FURNITURE
SYSTEMS VENDOR.
FN10
MODIFY RAILING AS REQUIRED. PROVIDE RAILING SUPPORTS, ENDCAPS,
RETURNS AND ALL HARDWARE, TO MATCH EXISTING AS REQUIRED FOR
INSTALLATION – HR-1.
FN11 REPAINT WALL, COLOR TO MATCH EXISTING.
FN12
MODIFY RAILING AS REQUIRED. PROVIDE RAILING SUPPORTS, ENDCAPS,
RETURNS AND ALL HARDWARE, TO MATCH EXISTING AS REQUIRED FOR
INSTALLATION – HR-2.
FN13
NEW HAND/CRASH/BUMPER RAILS TO MATCH EXISTING ADJACENT
HAND/CRASH/BUMPER RAILS.
FN14
PATCH FLOOR FINISH DISTURBED BY CONSTRUCTION TO MATCH EXISTING
FLOOR FINISH THIS AREA.
AT ACOUSTICAL CEILING (TILE)
CT CERAMIC TILE
EP EPOXY PAINT
EPY EPOXY FLOORING
GWB (SC) GYPSUM WALLBACK SYSTEMS (SPECIAL COATING)
LVT LUXURY VINYL TILE
P PAINT
PT PORCELAIN TILE (FLOOR AND BASE)
PWT PORCELAIN WALL TILE
RB RESILIENT BASE
RES RESINOUS EPOXY FLOORING
RES-W RESINOUS/EPOXY WALL/CEILING
RWC RIGID VINYL WALL COVERING
RF RUBBER FLOORING
S SOLID SURFACE
SC SPECIAL COATING
SD STATIC DISSIPATIVE
SP SPECIAL FACED
WSF WELDED SEAM SHEET FLOORING (HEAT WELDED WITH ROD)
ROOM FINISH LEGEND & ABBREVIATIONS
MATERIAL INSTALL
DIRECTION
KEYNOTECORNER GUARD
WALL
PROTECTION
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
CG
VCTCPT
AF10
IN-03.01 SIGN TAG
NOTE: REFER TO SHEETS AF600 & AW600 FOR ADDITIONAL
FINISH & SIGNAGE INFORMATION
FLOOR FINISH
TRANSITION
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
20459
NON-SPRINKLERED
04/15/2022
Sheet of 156
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Tom Olesak
Date: 04-15-2022
License Number: MN# 18157
B
IM
/2
V
A M a ri o n E
H R
M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6
-7
.B
.A
R
.r v t
/1
/2
:1
:4
P
M
B173- AF112
FIRST LEVEL FINISH AND
WAYFINDING PLAN
EHRM INFRASTRUCTURE
UPGRADES, MARION, IN
MARION, IN
610-21-701
B173
CM MRP
16181
1/8" = 1'-0"
FIRST LEVEL FINISH PLAN
0 8' 16'4'
Revisions: Date:
TR
CI-4
LOBBY
ELEVATOR
H.A.C.
COOLER
STAIR
124B
WOMENS
TOILET
124BB
WOMEN
LOCKERS
LOUNGE
CI-3
CORRIDOR
FOOD
PRODUCTION
OFFICE
H.A.C.
OFFICE
124A
MENS
TOILET
124AA
MENS
LOCKERS
118A
FREEZER
118B
FREEZER
118C
FREEZER
118D
FREEZER
SUBSISTENCE
STORAGE
110D
FREEZER
111A
RECEIVING
AREA
CI-12
CORRIDOR
SHIPPING
AND
RECIVING
DOCK
OFFICE
(CLERK)
NON FOOD
STORAGE
FOOD
STORAGE
FOOD
SERVICE
COORD
CENTER
INGRED
CONTROL
CI-2
CORRIDOR
C1-1
CORRIDOR
ELEVATOR
STORAGE
STAIR
C1-11
CORRIDOR
UTILITY
ELECTRICAL
C1-10
CORRIDOR
CI-8
CORRIDOR
104K
CLERK
104J
SUPERVISOR
SEC. WAIT
103A
CHIEF
OFFICE
103B
ASSISTANT
CHIEF
OFFICE
CAFETERIA
SEATING
CLERK
CI-5
CORRIDOR
104D
CLINIC DIET
104E
CLINIC DIET
DINING
ROOM
104A
CLINIC DIET
104B
CLINIC DIET
104C
STORAGE
MAIN FOOD
PREP AREA
DISH
WASHING
101A
OFFICE
100A H.A.C.
OFFICE
100B
COOK LINE
111C
TOILET
111B
FMS
113A H.A.C.
STORAGE
STORAGE
PAIR OF DOORS TO REMAIN CLOSED DURING
CONSTRUCTION OF NEW TR ROOM DOOR AND SCOPE OF
WORK WITHIN CORRIDOR C1-11. DISPLAY ICRA SIGNAGE AT
DOORS.
LI
M
IT
S
O F
C O
N S
T R
U C
T
IO
N
TB3b
COMPLETE CONSTRUCTION OF NEW DOOR TO ROOM 110,
PARTITION INFILL, AND FIRE EXTINGUISHER CABINET
INSTALLATION BEFORE WORK WITHIN ROOMS 109 AND 110
COMMENCES.
PATCHING OF CORRIDOR FINISHES TO BE DONE AFTER
BUSINESS HOURS OR ON WEEKENDS, AS DIRECTED BY THE
VA COR OR OTHER AUTHORIZED GOVERNMENT AUTHORITY
APPROXIMATE ROUTING OF BEW ELECTRICAL CONDUIT SHOWN
DASHED. TIMING FOR REMOVAL AND REINSTALLATION OF
CEILING FINISHES AND PROTECTION OF EXISTING SURFACES W/
PLASTIC SHEETING OR CONTAINMENT CARTS TO REROUTE
CONDUIT ABOVE THE EXISTING FINISHED CEILING TO BE DONE
AFTER BUSINESS HOURS OR ON WEEKENDS, AS DIRECTED BY
THE VA COR OR OTHER AUTHORIZED GOVERNMENT AUTHORITY.
REFER TO ELECTRICAL FOR NEW UTILITY ROUTING
TO
BUILDING
APPROXIMATE ROUTING OF NEW ELECTRIC
CONDUIT SHOWN DASHED. TIMING FOR
REMOVAL AND REINSTALLATION OF CEILING
FINISHES AND PROTECTION OF EXISTING
SURFACES W/ PLASTIC SHEETING OR
CONTAINMENT CARTS TO REROUTE CONDUIT
ABOVE THE EXISTING FINISHED CEILING TO BE
DONE AFTER BUSINESS HOURS OR ON
WEEKENDS, AS DIRECTED BY THE VA COR OR
OTHER AUTHORIZED GOVERNMENT AUTHORITY.
REFER TO ELECTRICAL FOR NEW UTILITY
ROUTING
F R
O M
B A
S E
M E
N T
TO BUILDING 127
PHASE 1:
CONSTRUCTION PROJECT ACTIVITY TYPE - C
INFECTION CONTROL RISK GROUP - GROUP 1: LOW RISK
CONTROL PROCEDURE CLASS - III
NOTE: TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE. FINAL DETERMINATION BY THE VA
WILL BE MADE AT A LATER DATE.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
BY PROJECT AREA USE AND PHASE
1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER LOCATION, AND
DOOR, WHERE SHOWN
INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND
LIMITS OF CONSTRUCTION
TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER
LOCATION, WHERE APPROVED BY THE VA FOR USE IN RISK TYPE B.
UPGRADE TO 1 HOUR RATED PARTITION AND DOOR WHEN DIRECTED BY
THE VA
DOOR
INFECTION CONTROL & CONSTRUCTION
BARRIER GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE
MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE
SEALED COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING
OPERATIONS, WHERE PERMITTED BY CLASS AND THE VA INFECTION CONTROL
DEPARTMENT. ALL OTHER CONSTRUCTION AREAS TO BE SEALED VIA A HARD WALL ICRA -
CONSTRUCTION BARRIER (SEE TYPICAL DETAIL THIS SHEET) AS SPECIFIED AND LISTED IN
ICRA CLASS OR WHERE REQUIRED BY THE VA INFECTION CONTROL DEPARTMENT IN
PROJECT SCOPE AREAS, WHETHER OR NOT DELINEATED ON THE ARCHITECTURE
CONSTRUCTION BARRIER AND PHASING PLANS..
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS AS
SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION
AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE A
REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION
CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION.
PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR TO
DECK/FLOOR ABOVE. TAPE, MUD, SAND JOINTS AND PAINT ON NON-CONSTRUCTION SIDE
OF BARRIER WHERE BARRIER IS OF STUD/GYPSUM BOARD CONSTRUCTION.
6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM AND
AFTER 8:00 PM OR DIRECTED BY COR
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE NEGATIVE
PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN
AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND
10000 SF.
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY
EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE
COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH
REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN
AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR
EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR
CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE
AND/OR EMERGENCY IN AN ADJACENT AREA.
10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS, CONSTRUCT NEW
SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER PLANS OR CONSTRUCT
INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER.
11. ALL ICRA/CONSTRUCTION BARRIERS, PARTITION TYPE 'TB3b' (SEE 'TYPES - TEMPORARY
PARTITION - ICRA' DETAIL THIS SHEET) SHALL BE MINIMUM 1 HOUR FIRE RATED. HIGHER
FIRE RATINGS ARE REQUIRED WHERE SHOWN IN THE CONSTRUCTION BARRIER AND
PHASING PLANS. WHERE PERMITTED BY THE VA'S INFECTION CONTROL DEPARTMENT,
ICRA/CONSTRUCTION BARRIERS MAY BE CONSTRUCTED OF A STARC SYSTEMS FIREBLOCK
WALL PANELS OR APPROVED EQUAL. TYPE OF TEMPORARY PARTITION TO BE DETERMINED
BY THE VA'S INFECTION CONTROL DEPARTMENT ON A SPACE BY SPACE BASIS.
CONTRACTOR TO COORDINATE TYPE W/ VA.
12. WHEN BUILDING IS SPRINKLERED, MODIFY SPRINKLER HEADS TO BE UPTURNED AND
EXTENDED TO 18" OF STRUCTURE AS FINISHED CEILINGS ARE REMOVED OR MODIFIED.
13. WHERE THE VA APPROVES NON-RATED CONSTRUCTION BARRIERS (PLASTIC SHEETING)
FOR CONSTRUCTION SEPARATION AND THE CONTRACTOR IDENTIFIES UPCOMING WORK
THAT RESULTS IN LONG-TERM (OVERNIGHT) CEILING REMOVAL,THE CONTRACTOR WILL
DISCUSS WITH THE COR WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTED OR
TEMPORARY UPRIGHT SPRINKLERS INSTALLED.
14. CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED TO MINIMIZE OBSTRUCTIONS TO
CORRIDOR EGRESS CLEARANCE. AT NO TIME SHALL CORRIDORS BE REDUCED TO LESS
THAN 36" CLEAR.
15. AT THE DISCRETION OF THE VA INFECTION CONTROL AND COR, THE CONTRACTOR SHALL
BE REQUIRED TO USE PORTABLE CONTAINMENT CARTS FOR ABOVE CEILING ACCESS WORK
IN PATIENT CARE AREA, OR OTHER AREAS DETERMINED BY THE VA, WHERE HARD BARRIERS
ARE OTHERWISE NOT USED.
16. INFECTION CONTROL MEASURES ARE REQUIRED FOR ALL BUILDINGS WITHIN THE SCOPE
OF WORK, SUBJECT TO INFECTION CONTROL REQUIREMENTS SPECIFIED IN SECTION '01 35 26
SAFETY REQUIREMENTS' AND MEETING THE INTENT OF THE INFECTION CONTROL AND
PHASING PLAN DRAWING SHEETS FOR EACH BUILDING, WHETHER OR NOT THE SCOPE IS
SHOWN IN THE ARCHITECTURAL DRAWINGS. SEE OTHER DISCIPLINE DRAWINGS FOR OTHER
PROJECT SCOPE OF WORK.
CONSTRUCION PHASING GENERAL NOTES
1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE
CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00
1.6.G PHASING.
2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING
WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE
A WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE
PLANS, VALIDATING AND ELABORATING ON THIS PHASING DESCRIPTION.
3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO
WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR
DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE
PROJECT SITE OR WORK BY OWNER.
4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE
SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND
APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL
FOR ALL PHASES OF THE WORK.
5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE
SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION
PHASING DESCRIPTION.
6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH
THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND
THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON
COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT
PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL SYSTEMS
FUNCTIONING PROPERLY.
7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL
CONTRACTOR SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.
8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE
CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL
THE COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.
9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED
AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED
USE OF ALL OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND
ELECTRICAL SYSTEMS SERVING THESE AREAS.
10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL
DRAWING(S) AND DEMOLITION PLANS.
11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS
FOR ARCHITECT-OWNER PLANNING PURPOSES ONLY.
12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS
OF EGRESS THROUGHOUT ALL PHASING.
13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN
PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND
VACATE THE FOLLOW-ON PHASES. THE VA WILL ACCELERATE THIS TIME WHEN
POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS OCCURS.
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)
TYPE A
TYPE B
TYPE C
TYPE D
INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT
LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING
WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND
ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF
WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL
DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE
AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF
WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).
ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,
SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF
FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL
CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE
CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH
CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR
COVERING REMOVAL (WITH SANDING OR GRINDING).
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS
NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK
SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.
GROUP 1
LOW RISK
• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT
CARE, INCLUDING INTERSTITIAL SPACES.
• ENGINEERING OR EMS OFFICE/WORK AREAS
• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE
AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR
EXAMINATIONS.
• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO
PATIENT UNITS OR TREATMENT LOCATIONS.
GROUP 2
MEDIUM
RISK
• OUTPATIENT AREAS:
1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS
2. BEHAVIORAL/MENTAL HEALTH AREAS
3. EXTENDED CARE / REHAB CLINIC AREAS
4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)
GROUP 3
HIGH RISK
• IN-PATIENT UNITS:
1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING
UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;
CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /
ONCOLOGY; DIALYSIS
GROUP 4
HIGHEST
RISK
• ICU/SICU
• OR/PACU/ENDOSCOPY
• GI
• STERILE PROCESSING SERVICES (SPS)
• PHARMACY
• CATH LAB
CLASS
I
KEEP AREAS FREE OF DEBRIS, TRASH
EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)
IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION
(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)
CLASS
II
SAME AS CLASS I PLUS:
1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.
3. BLOCK OFF AND SEAL AIR VENTS
4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.
5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.
9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA
CLASS
III
SAME AS CLASS I AND II PLUS:
1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION
2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE
CORRECTIVE ACTION AS NEEDED
3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.
5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY
6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE
SPREADING DUST. DEBRIS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP AREA WITH CLEANER/DISINFECTANT.
9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.
10. DISPLAY ICRA AT SITE
11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.
CLASS
IV
SAME AS CLASS I, II AND III PLUS:
1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED
2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION
3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE
6 MIL POLY OVER
CEILING PENETRATION
NOTES:
1. ALL CORNERS TO FORM 90 ANGLE WITH NO RADIUS
2. SEAL ALL SIDES OF POLY WITH DUCT TAPE
3. SEAL ALL CRACKS WITH DUCT TAPE.
6 MIL POLY OVER
EQUIPMENT OR
FURNISHING
6 MIL POLY OVER
WALL PROTRUSION
FLOOR
DOOR
BEYOND
WINDOW
BEYOND
CEILING
6 MIL POLY OVER
WALL OPENINGS
6 MIL POLY OVER
DOORS & WINDOWS
CEILING
TB3b
(1 ) LAYER 5/8" TYPE "X"
GYPSUM BOARD EACH SIDE
3 5/8" METAL STUD
FRAMING
3" SOUND ATTENUATING
INSULATION
UP TO 1 HR FIRE RATING
UL DESIGN U419
STC 49
0'-4 7/8"
NOTE: AT THE VA'S DISCRETION, PREFABRICATED ONE-HOUR
RATED NEGATIVE AIR MONITORING PANELS MAY BE PERMITTED
IN LIEU OF PARTITION TYPE 'TB3b'. REFER TO SPECIFICATION
01 35 26 SAFETY REQUIREMENTS FOR MORE INFORMATION
CONTINUOUS DUCT
TAPE SEAL EACH SIDE
AT CEILING
COMPRESSIBLE
INSULATION
CONTINUOUS DUCT
TAPE SEAL EACH
SIDE
EXISTING FINISHED
FLOOR
(1) LAYER 5/8" GYP BD EACH
SIDE. FINISH OCCUPIED SIDE
WITH GLOSS PAINT
CLOSE OPEN DUCTS WITH
6 MIL POLYETHYLENE
BARRIER. SEAL EDGES
WITH CONTINUOUS DUCT
TAPE
"WORK" SIDE OF BARRIER OCCUPIED SIDE OF BARRIER
BOTTOM OF EXISTING
FLOOR SLAB
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
REMOVE PORTION OF EXISTING CEILING AS REQUIRED FOR
INSTALLATION OF BARRIER
FRAME AND SEAL BARRIER
AROUND ANY EXISTING
MECHANICAL, ELECTRICAL,
PLUMBING, TECHNOLOGY, MED
GAS, ETC. SYSTEMS AS
REQUIRED.
TB3b
SEE CRITICAL BARRIER PREP
DETAIL THIS SHEET FOR SEALING
REQUIREMENTS OF EXISTING
SPACES ON THE "WORK" SIDE
KEY PLAN
MAIN
ENTRY
BUILDING 174
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
20459 04/15/2022
Sheet of 156
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Tom Olesak
Date: 04-15-2022
License Number: MN# 18157
B
IM
/2
V
A M a ri o n E
H R
M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6
-7
.B
.A
R
.r v t
/1
/2
:1
:2
P
M
B174-GC111
FIRST LEVEL INFECTION
CONTROL & PHASING PLAN
EHRM INFRASTRUCTURE
UPGRADES, MARION, IN
MARION, IN
610-21-701
B174
LA CM
16181
3/32" = 1'-0"
FIRST LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN
12" = 1'-0"
CRITICAL BARRIER PREP
1 1/2" = 1'-0"
TYPES - TEMPORARY PARTITION - ICRA
0 8' 16'4'
1/2" = 1'-0"
FIRE RATED ICRA / CONSTRUCTION BARRIER (TYP)
CI-4
LOBBY
ELEVATOR
H.A.C.
COOLER
STAIR
124B
WOMENS
TOILET
124BB
WOMEN
LOCKERS
LOUNGE
CI-3
CORRIDOR
FOOD
PRODUCTION
OFFICE
H.A.C.
OFFICE
124A
MENS
TOILET
124AA
MENS
LOCKERS
118A
FREEZER
118B
FREEZER
118C
FREEZER
118D
FREEZER
SUBSISTENCE
STORAGE
110D
FREEZER
111A
RECEIVING
AREA
CI-12
CORRIDOR
SHIPPING
AND
RECIVING
DOCK
OFFICE
(CLERK)
NON FOOD
STORAGE
FOOD
STORAGE
FOOD
SERVICE
COORD
CENTER
INGRED
CONTROL
CI-2
CORRIDOR
C1-1
CORRIDOR
ELEVATOR
STORAGE
STAIR
C1-11
CORRIDOR
UTILITY
TR
ELECTRICAL
C1-10
CORRIDOR
CI-8
CORRIDOR
104K
CLERK
104J
SUPERVISOR
SEC. WAIT
103A
CHIEF
OFFICE
103B
ASSISTANT
CHIEF
OFFICE
CAFETERIA
SEATING
CLERK
CI-5
CORRIDOR
104D
CLINIC DIET
104E
CLINIC DIET
CI-6
STORAGE
104G
TOILET
104F
STORAGE
DINING
ROOM
104A
CLINIC DIET
104B
CLINIC DIET
104C
STORAGE
MAIN FOOD
PREP AREA
DISH
WASHING
101A
OFFICE
100A H.A.C.
OFFICE
100B
COOK LINE
111C
TOILET
111B
FMS
113A H.A.C.
104L
CLOSET
STORAGE
A B C D E G H J K L M N P Q R SB.5
B174-AE112
(E)FEC
(E)FEC
(E)FEC
(E)FEC
(E)FEC
(E)FEC
(E)FEC
(E)FEC
LIMITS OF CONSTRUCTION
STORAGE
F E
C
E X
IT
E X
IT
EXIT EXIT
EXIT
EXIT
LI
M
IT
S
O F
C O
N S
T R
U C
T
IO
N
BUILDING 174 SCOPE OF WORK DESCRIPTION
PARTIAL REMODEL OF THE FIRST LEVEL OF BUILDING 174 TO
ACCOMODATE A NEW TELECOMMUNICATION ROOM (TR) AND
ASSOCIATED INFRASTRUCTURE.
TESTRATING (HRS)
TOTAL
(EXCLUDING BASEMENT)
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
FIRE-RESISTIVE REQUIREMENTS
TYPE(S) OF CONSTRUCTION
BUILDING AREA LIMITATIONS (SF)
FIRST FLOOR
ADDITIONAL NOTES
SEE FLOOR PLAN
PLUMBING FIXTURES
(NFPA 220 TABLE 4.1.1)
OCCUPANT LOAD AND THUS MEANS OF EGRESS CAPACITY
REMAIN UNCHANGED BY SCOPE OF WORK.
EGRESS
SEPARATED OCCUPANCIES?
OCCUPANCY CLASSIFICATION(S)
2018 NFPA LSC (TABLE 6.1.14.1)
(NFPA 101 LSC, CH 12-42)
NOYES
FIRE RESISTIVE CORRIDORS?
SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)
INCIDENTAL USE AREA RATING(S) SEE
PLANS
MISCELLANEOUS
INTERIOR FINISHES CLASSIFICATION (NFPA 101 40.3.3)
WALL AND CEILING IN EXITS/EXIT ACCESS CORRIDORS A OR B
WALL AND CEILING IN ALL OTHER AREAS A, B OR C
FLOOR FINISH IN EXIT ENCLOSURES
CODE SUMMARY - BUILDING 174
THE FOLLOWING CODE SUMMARY IS BASED IN PART BY ASBUILT
DRAWINGS PROVIDED BY THE MARION VA MEDICAL CENTER AND
FIELD OBSERVATIONS.
IF THE CONTRACTOR IDENTIFIES EXISTING LIFE SAFETY QUALITIES
THAT DIFFER FROM WHAT IS REPRESENTED IN THESE DRAWINGS,
THEY SHOULD NOTIFY THE VA COR AND ARCHITECT OF RECORD.
CH. 40 INDUSTRIAL, ORDINARY HAZARD, GENERAL (UNCHANGED)
(IBC EQUIVALENT F-1 FACTORY MODERATE HAZARD)
NO
TYPE V (000) CONSTRUCTION - FULLY-SPRINKLERED
PATIENT BUILDING? NO
BASEMENT
BUILDING HEIGHT AND NUMBER OF STORIES LIMITATIONS
BUILDING HEIGHT (FT)
NUMBER OF STORIES
ALLOWED ACTUAL (UNCHANGED)
60'-0" 17'-1 1/2"
2 BASEMENT + 1
(IBC 2018 TABLE 504.3 AND 504.4)
USE DIETICS: FOOD PROCESSING
AND PREPARATION
(IBC 2018 TABLE 506.2)
ALLOWED ACTUAL (UNCHANGED)
18,894
31,394
31,39434,000
EXISTING MEANS OF EGRESS TO REMAIN UNCHANGED.
PLUMBING FIXTURE COUNTS AND OCCUPANT LOADS REMAIN
UNCHANGED BY SCOPE OF WORK.
(NFPA 101 40.3.2)
(NFPA 101 40.3.6)
(NFPA 101 40.3.6)
(NFPA 220 TABLE 4.1.1)
CL I OR II
EXIST
0 EXIST
0 EXIST
0 EXIST
0 EXIST
0 EXIST
0 EXIST
0 EXIST
EXIST
EXIST
LIFE SAFETY SYMBOLS
0 HR SMOKE
PARTITION
1 HOUR FIRE
BARRIER
2 HOUR FIRE
BARRIER
EXIT EXIT
FIRE EXTINGUISHERFE
FIRE EXTINGUISHER
CABINET
FEC
LIMITS OF
CONSTRUCTION
NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN
SHAFT
ADJACENT SYMBOLS SHOW PARTITION RATING AND
DAMPER REQUIREMENTS
HAZARDOUS USE
ADJACENT SYMBOLS SHOW PARTITION RATING.
OPENINGS REQUIRE CLOSER & LATCH
EXIT PASSAGEWAY
RATE AS STAIR
ALL OPENINGS TO BE RATED AS STAIR SHAFT
(E) EXISTING
KEY PLAN
MAIN
ENTRY
BUILDING 174
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
20459 04/15/2022
Sheet of 156
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Tom Olesak
Date: 04-15-2022
License Number: MN# 18157
B
IM
/2
V
A M a ri o n E
H R
M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6
-7
.B
.A
R
.r v t
/1
/2
:1
:1
P
M
B174-AE111
FIRST LEVEL FLOOR PLAN -
OVERALL
EHRM INFRASTRUCTURE
UPGRADES, MARION, IN
MARION, IN
610-21-701
B174
LA CM
16181
0 8' 16'4'
1/8" = 1'-0"B174-AE111
1 FIRST LEVEL FLOOR PLAN
J K L M
STAIR
C1-11
CORRIDOR
UTILITY
TR
ELECTRICAL
C1-10
CORRIDOR
113A H.A.C.
FL1
FL2
STORAGE
7' -1
0"
XN3
FL4
'-2
B3b
FL5
FL6
FL7
F E
C
TYPICAL: FL8 FL9
FL10 FL10
1' -6
" XN3
B3b
FL3
FL12
LIMITS OF CONSTRUCTION
LI
M
IT
S
O F
C O
N S
T R
U C
T
IO
N
FL11
FL1
(SIMILAR)
FL13
H J K L M N P
CI-12
CORRIDOR
C1-1
CORRIDOR
ELEVATOR
STAIR
C1-11
CORRIDOR
UTILITY
ELECTRICAL
C1-10
CORRIDOR
CI-8
CORRIDOR
113A H.A.C.
STORAGE
DE1
DE2
DE3
DE4
F
LO
O R
IN
G
T O
R E
M A
IN
'-1
0"
STORAGE
DE5
LIMITS OF CONSTRUCTION
LI
M
IT
S
O F
C O
N S
T R
U C
T
IO
N
CI-12
CORRIDOR
C1-1
CORRIDOR
ELEVATOR
STAIR
C1-11
CORRIDOR
UTILITY
TR
ELECTRICAL
C1-10
CORRIDOR
CI-8
CORRIDOR
RC1
STORAGE
RC2
RC3
LIMITS OF CONSTRUCTION
LI
M
IT
S
O F
C O
N S
T R
U C
T
IO
N
FLOOR PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
FL1 ELECTRICAL PANEL - SEE ELECTRICAL
FL2 REFER TO DETAILS 2 AND 3/AE211 FOR TYPICAL TR INTERIOR ELEVATIONS
FL3
PREP FLOOR FOR SCHEDULED FINISH. SEE SPECIFICATION SECTION 09 05
16 SUBSURFACE PREPARATION FOR FLOOR FINISHES
FL4
FINISH WALLS TO MATCH EXTISING WALL FINISH THIS AREA INLCUDING
TILE WALL BASE
FL5
INSTALL DOOR JAMB AS CLOSE AS POSSIBLE TO ORIGINAL DOOR THAT
WAS DEMOLISHED SO CORRIDOR HANDRAILS AND WALL BASE DISRUPTION
ARE MINIMIZED
FL6 CARD READER / KEYPAD - SEE TELECOMMUNICATIONS
FL7
FULLY RECESSED 1-HR FIRE RATED FIRE EXTINGUISHER CABINET FOR
NEW CO2 EXTINGUISHER. SEE DETAIL 6/AE211 FOR MORE INFORMATION
FL8
REFER TO SHEET GI003 FOR GENERAL PROJECT NOTES, MORE DETAILED
GENERAL FLOOR PLAN, DEMO PLAN, AND RCP NOTES, AND SYMBOL
LEGENDS
FL9
REFER TO SHEET AE601 FOR DEFINITION OF PARTITION TYPES TAGGED IN
THE FLOOR PLANS, AND PARTITION GENERAL NOTES AND DETAILS
FL10 TELECOMMUNICATIONS RACK - SEE TELECOMMUNICATIONS
FL11 GROUND BAR - SEE TELECOMMUNICATIONS
FL12
APPLY LEAK-PREVENTION BARRIER WATERPROOFING MEASURES ON THIS
PARTITION, AS DETAILED IN 7/AE211, INCLUDING INSTALLING
WATER-RESISTANT GYP BD, METAL BACKER AND SHEET AND LIQUID
WATERPROOFING MEMBRANE AS SHOWN.
FL13
MODIFY EXISTING INTERIOR PARTITIONS ENCLOSING THIS ROOM TO
ACOUSTICALLY INSULATED 1 HOUR FIRE BARRIER WALL ASSEMBLIES,
SIMILAR TO PARTITION TYPE 'B3b'. FIRESTOP ALL EXISTING AND NEW
PENETRATIONS AND JOINTS IN THESE FIRE BARRIER WALL ASSEMBLIES
USING FM OR UL APPROVED FIRESTOPPING SYSTEMS. INCREASE FIRE
RATING OF FIRE BARRIER AND FIRESTOPPING TO MATCH EXISTING IF
EXISTING CONSTRUCTION IS DISCOVERED DURING DEMOLITION OR
CONSTRUCTION TO BE RATED MORE THAN 1 HOUR.
DEMOLITION PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
DE1
DEMO AND DISCARD EXISTING FINISHED CEILING SYSTEM AND CEILING
MOUNTED EQUIPMENT IN THIS AREA AS NECESSARY FOR NEW
CONSTRUCTION, INCLUDING BUT NOT LIMITED TO CEILING SUPPORTS,
HANGER WIRES, MECHANICAL, LIGHTING, ACCESS PANELS, SECURITY, AND
FIRE SYSTEMS. SEE FLOOR PLANS FOR SCOPE OF NEW CONSTRUCTION
DE2
DEMO EXIST DOOR & FRAME ASSEMBLY AND WALL AS NECESSARY TO
FRAME NEW DOOR OPENING,INSTALL NEW CARD READER AND FIRE
EXTINGUISHER CABINET
DE3
REMOVE AND SALVAGE EXISTING FINISHED CEILING AND CEILING
MOUNTED EQUIPMENT INCLUDING BUT NOT LIMITED TO LIGHTING,
MECHANICAL, ELECTRICAL, SECURITY, AND FIRE SYSTEMS FOR
REINSTALLATION AFTER NEW PARTITIONS ARE CONSTRUCTED
DE4
REMOVE EXISTING FLOOR FINISH, WALL BASE AND ADHESIVES IN
PREPARATION FOR SUBSTRATE TO RECEIVE NEW FINISH AS INDICATED IN
THE ROOM FINISH SCHEDULE
DE5
REMOVE EXISTING SHEATHING ON THIS PARTITION IN PREPARATION FOR
WATER-RESISTANT SHEATHING. SEE ENLARGED FLOOR PLANS FOR MORE
INFORMATION.
REFLECTED CEILING PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
RC1 NO FINISHED CEILING IN THIS ROOM OR AREA
RC2
REINSTALL EXISTING SUSPENDED CEILING SYSTEM REMOVED AND
SALVAGED DURING DEMOLITION FOR THE INSTALLATION OF NEW
PARTITIONS. MODIFY GRID AND CUT TILES AS NECESSARY TO FIT AROUND
NEW PARTITIONS. REPLACE PANELS AND GRID SYSTEM WITH NEW
COMPONENTS IF EXISTING COMPONENTS WERE DAMAGED DURING
DEMOLITION OR CONSTRUCTION
RC3 WALL MOUNTED SPLIT SYSTEM AIR CONDITIONER - SEE MECHANICAL
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
20459 04/15/2022
Sheet of 156
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Tom Olesak
Date: 04-15-2022
License Number: MN# 18157
B
IM
/2
V
A M a ri o n E
H R
M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6
-7
.B
.A
R
.r v t
/1
/2
:1
:2
P
M
B174-AE112
FIRST LEVEL ENLARGED FLOOR
PLAN, DEMO AND RCP
EHRM INFRASTRUCTURE
UPGRADES, MARION, IN
MARION, IN
610-21-701
B174
LA CM
16181
0 4' 8'2' 1/4" = 1'-0"
TR ROOM 110 ENLARGED FLOOR PLAN
1/8" = 1'-0"
FIRST LEVEL PARTIAL DEMOLITION PLAN
0 8' 16'4' 1/8" = 1'-0"
TR ROOM 110 FIRST LEVEL PARTIAL RCP
0 8' 16'4'
FINISHED
FLOOR
HMS-1
O P
E N
IN
G
H E
IG
H
T
WIDTH
OPENING
FINISHED
FLOOR
HM-F
WD-F
WIDTH
OPENING
O P
E N
IN
G
H E
IG
H
T
PANEL PREFIXES
AL- ALUMINUM
CG- COILING GRILLE
CS- COILING SLATS
HM- HOLLOW METAL
OS- OVERHEAD SECTIONAL
RD3- REVOLVING DOOR 3 PANEL
RD4- REVOLVING DOOR 4 PANEL
VL- VERTICAL LIFT
WD- WOOD
AG ALL GLASS
BF BIFOLD
BFGBIFOLD GLASS
D DUTCH
DG DUTCH GLASS
DSDUTCH W/SHELF
FFLUSH
G2GLASS 2 LIGHT
G3GLASS 3 LIGHT
GFGLASS FULL
GH GLASS HALF
LF LOUVER FULL
LGHLOUVER GLASS HALF
LH LOUVER HALF
HM-GF
FRAME PREFIXES
0 FRAMED-CASED OPENING
1 DOOR ONLY
2 SIDELIGHT(S) 1 SIDE
3 SIDELIGHT(S) 1 SIDE W/HORIZONTAL
4 SIDELIGHT(S) BOTH SIDES
5 SIDELIGHT(S) BOTH SIDES W/HORIZONTAL
6 DOOR W/TRANSOM
7 DOOR W/TRANSOM W/SIDELIGHT(S) 1 SIDE
8 TRANSOM W/SIDELIGHT(S) 1 SIDE W/HORIZONTAL
9 TRANSOM W/SIDELIGHT(S) BOTH SIDES
10 TRANSOM W/SIDELIGHT(S) BOTH SIDES W/HORIZONTAL
11 FULL WIDTH TRANSOM W/SIDELIGHT(S) 1 SIDE
1X1 1 LIGHT WIDE AND 1 LIGHT HIGH
2X2 2 LIGHTS WIDE AND 2 LIGHTS HIGH
3X3 3 LIGHTS WIDE AND 3 LIGHTS HIGH
(NOTE: OTHER COMBINATIONS POSSIBLE)
OX FIXED PANEL, ACTIVE PANEL
OXO FIXED PANEL, ACTIVE PANEL, FIXED PANEL
OXX FIXED, ACTIVE, ACTIVE
OXXO FIXED, ACTIVE, ACTIVE, FIXED
OXXXXO FIXED, ACTIVE, ACTIVE, ACTIVE, ACTIVE, FIXED
HMS-2
LNV LOUVER NARROW VISION
NVNARROW VISION
NV2 NARROW VISION 2 LIGHT
NV3 NARROW VISION 3 LIGHT
NVCNARROW VISION CENTERED
RP2 RAISED PANEL 2 PANEL
RP4 RAISED PANEL 4 PANEL
RP6 RAISED PANEL 6 PANEL
RP8 RAISED PANEL 8 PANEL
VVISION
W WINDOWS (1 ROW)
WT WINDOWS THROUGHOUT
DOOR PANEL NAMING
DOOR FRAME NAMING NOTE: ACTUAL FRAMES MAY VARY FROM DESCRIPTIONS
BELOW, REFER TO FRAME TYPE ELEVATIONS
NOTE: ACTUAL PANELS MAY VARY FROM
DESCRIPTIONS BELOW, REFER TO PANEL TYPE
ELEVATIONS
PANEL SUFFIXES
AL- ALUMINUM
AL-BL- ALUMINUM BORROWED LIGHT
AL-SL- ALUMINUM SLIDING
ALR- ALUMINUM REVOLVING
CW## CURTAINWALL
HMM- HOLLOW METAL MASONRY
HMM-BL- HMM BORROWED LIGHT
HMM-DE- HMM DOUBLE EGRESS
HMS- HOLLOW METAL STUD
HMS-BL- HMS BORROWED LIGHT
HMS-DE- HMS DOUBLE EGRESS
OC- OVERHEAD COILING
OS- OVERHEAD SECTIONAL
VL- VERTICAL LIFT
WD- WOOD
WD-BL- WOOD BORROWED LIGHT
WDP- WOOD POCKET
FRAME SUFFIXES
VARIES
A S
S C
H E
D
METAL STUD BOX BEAM
GYP BD
HM DOOR FRAME
DOOR AS SCHED
2"
METAL RUNNER
NOTE:
1. FOR PARTITION THICKNESS SEE PLANS AND PARTITION TYPE
DETAILS.
2. SEE 3/B174-AE540 FOR HM DOOR FRAME PROFILE INFO.
NOTE:
1. FOR PARTITION THICKNESS SEE PLANS AND PARTITION TYPE
DETAILS.
2. SEE 3/B174-AE540 FOR HM DOOR FRAME PROFILE INFO.
A S
S C
H E
D
GYP BD
HM FRAME
DOOR AS SCHED
2"
DOUBLE
METAL STUDS
@ NEW AND
EXISTING
OPENINGS
STEEL STUD
ANCHOR CLIP
5/ 8"
2"
(DOOR SIDE)
1 15/16"
VARIES
VARIES
1/2" 1/2"
GAGE AS
SPECIFIED
PARTITION DIM
FINISHED
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
20459 04/15/2022
Sheet of 156
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Tom Olesak
Date: 04-15-2022
License Number: MN# 18157
B
IM
/2
V
A M a ri o n E
H R
M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6
-7
.B
.A
R
.r v t
/1
/2
:1
:2
P
M
B174-AE540
OPENING DETAILS, TYPES AND
SCHEDULE
EHRM INFRASTRUCTURE
UPGRADES, MARION, IN
MARION, IN
610-21-701
B174
LA CM
16181
TYPES - FRAMES TYPES - PANELS
OPENING SCHEDULE
ASSOCIATED ROOMS OPENING PANEL INFORMATION FRAME INFORMATION
H D
W G
R O
U P
F
IR
E L
A B
E L
(M
IN
G A
S K
E T
E
LE
C T
R
IC
A L
S L
A B
E L
COMMENTSFROM ROOM NAME TO ROOM NAME NUMBER WIDTH HEIGHT
PANEL
TYPE
2ND
PANEL
TYPE
PANEL
GLAZING FRAME TYPE JAMB DETAIL HEAD DETAIL
CORRIDOR TR 110 3'-0" 7'-0" HM-F NONE HMS-1 2/B174-AE540 1/B174-AE540 3.2 45
1 1/2" = 1'-0"1
HM DOOR FRAME - HEAD
1 1/2" = 1'-0"2
HM DOOR FRAME - JAMB
3" = 1'-0"3
STANDARD HM DOOR FRAME
LI
M
IT
S
O F
C O
N S
T R
U C
T
IO
N
ELECTRICAL
UTILITY
SHIPPING
AND
RECIVING
CI-12
CORRIDOR
C1-11
CORRIDOR
STAIR
TR
STORAGE
C1-10
CORRIDOR
IN-03.01
IN-01.31
FN2
FN3
FN3
T H
IS
A
R E
A
F
IN
IS
H
E N
T
IR
E W
A
LL SD-1
EXIST FLRG
FINISH PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
FN1 FINISH PARTITION WITH P-5 & RB-1.
FN2
TELECOM ROOM TYPICAL FINISHES; SD-1 AT FLOOR, RB-1 AT BASE. ALL
WALL MOUNTED PLYWOOD TO HAVE FP-1, ALL OTHER WALL SURFACES TO
HAVE P-10. REFER TO DETAILS 2 AND 3/AE211 FOR TYPICAL TR INTERIOR
ELEVATIONS.
FN3
FINISH PARTITION TO MATCH EXISTING THIS AREA, INCLUDING, BUT NOT
LIMITED TO, PAINT, WALLCOVERING, WALL PROTECTION AND WALL BASE.
CONTRACTOR TO PROVIDE LABOR AND MATERIALS.
FN4
WHERE EXISTING FINISHES ARE DISTURBED BY CONSTRUCTION, FINISH TO
MATCH ADJACENT FINISHES; FLOOR, WALL & CEILING AS REQUIRED.
FN5
EXISTING AREAS OF RAISED FLOORING TO REMAIN. FINISH ALL VERTICAL
EDGES AND FIRST 4 INCHES OF HORIZONTAL EDGE EPY-2, IN AREA SHOWN
HATCHED.
FN6
PATCH WALL AND FLOOR FINISHES TO PROVIDE A SMOOTH FINISH,
CONSISTENT W/ ADJACENT FINISH, WHERE WIRE PARTITION HAS BEEN
REMOVED.
FN7 INSTALL NEW MANUAL ROLLER WINDOW SHADES, WS-1.
FN8
MODIFICATION OF FURNITURE SYSTEMS AND INSTALLATION BY FURNITURE
SYSTEMS VENDOR.
FN9 FINISH FIRE RESISTANT PLYWOOD WITH FP-1.
FN10 INSTALL NEW HANDRAIL – HR-1
FN11 REPAINT WALL, COLOR TO MATCH EXISTING.
FN12
MODIFY RAILING AS REQUIRED. PROVIDE RAILING SUPPORTS, ENDCAPS,
RETURNS AND ALL HARDWARE, TO MATCH EXISTING AS REQUIRED FOR
INSTALLATION – HR-2.
FN13
NEW HAND/CRASH/BUMPER RAILS TO MATCH EXISTING ADJACENT
HAND/CRASH/BUMPER RAILS.
FN14
PATCH FLOOR FINISH DISTURBED BY CONSTRUCTION TO MATCH EXISTING
FLOOR FINISH THIS AREA.
AT ACOUSTICAL CEILING (TILE)
CT CERAMIC TILE
EP EPOXY PAINT
EPY EPOXY FLOORING
GWB (SC) GYPSUM WALLBACK SYSTEMS (SPECIAL COATING)
LVT LUXURY VINYL TILE
P PAINT
PT PORCELAIN TILE (FLOOR AND BASE)
PWT PORCELAIN WALL TILE
RB RESILIENT BASE
RES RESINOUS EPOXY FLOORING
RES-W RESINOUS/EPOXY WALL/CEILING
RWC RIGID VINYL WALL COVERING
RF RUBBER FLOORING
S SOLID SURFACE
SC SPECIAL COATING
SD STATIC DISSIPATIVE
SP SPECIAL FACED
WSF WELDED SEAM SHEET FLOORING (HEAT WELDED WITH ROD)
ROOM FINISH LEGEND & ABBREVIATIONS
MATERIAL INSTALL
DIRECTION
KEYNOTECORNER GUARD
WALL
PROTECTION
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
CG
VCTCPT
AF10
IN-03.01 SIGN TAG
NOTE: REFER TO SHEETS AF600 & AW600 FOR ADDITIONAL
FINISH & SIGNAGE INFORMATION
FLOOR FINISH
TRANSITION
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
20459 04/15/2022
Sheet of 156
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Tom Olesak
Date: 04-15-2022
License Number: MN# 18157
B
IM
/2
V
A M a ri o n E
H R
M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6
-7
.B
.A
R
.r v t
/1
/2
:1
:2
P
M
B174-AF112
FIRST LEVEL FINISH AND
WAYFINDING PLAN
EHRM INFRASTRUCTURE
UPGRADES, MARION, IN
MARION, IN
610-21-701
B174
CM MRP
16181
1/8" = 1'-0"
FIRST LEVEL FINISH PLAN
0 4' 8'2'
MAIN
ELECTRICAL
ROOM
#1
STAIR
GENERATION
ROOM
TB3b
REFER TO ELECTRICAL
DRAWINGS FOR SCOPE OF
WORK IN THIS AREA
LIMITS OF CONSTRUCTION
LI
M
IT
S
O F
C O
N S
T R
U C
T
IO
N
PHASE 1:
CONSTRUCTION PROJECT ACTIVITY TYPE - C
INFECTION CONTROL RISK GROUP - GROUP 1: LOW RISK
CONTROL PROCEDURE CLASS - III
NOTE: TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE. FINAL DETERMINATION BY THE VA
WILL BE MADE AT A LATER DATE.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
BY PROJECT AREA USE AND PHASE
1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER LOCATION, AND
DOOR, WHERE SHOWN
INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND
LIMITS OF CONSTRUCTION
TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER
LOCATION, WHERE APPROVED BY THE VA FOR USE IN RISK TYPE B.
UPGRADE TO 1 HOUR RATED PARTITION AND DOOR WHEN DIRECTED BY
THE VA
DOOR
INFECTION CONTROL & CONSTRUCTION
BARRIER GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE
MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE
SEALED COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING
OPERATIONS, WHERE PERMITTED BY CLASS AND THE VA INFECTION CONTROL
DEPARTMENT. ALL OTHER CONSTRUCTION AREAS TO BE SEALED VIA A HARD WALL ICRA -
CONSTRUCTION BARRIER (SEE TYPICAL DETAIL THIS SHEET) AS SPECIFIED AND LISTED IN
ICRA CLASS OR WHERE REQUIRED BY THE VA INFECTION CONTROL DEPARTMENT IN
PROJECT SCOPE AREAS, WHETHER OR NOT DELINEATED ON THE ARCHITECTURE
CONSTRUCTION BARRIER AND PHASING PLANS.
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS AS
SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION
AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE A
REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION
CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION.
PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR TO
DECK/FLOOR ABOVE. TAPE, MUD, SAND JOINTS AND PAINT ON NON-CONSTRUCTION SIDE
OF BARRIER WHERE BARRIER IS OF STUD/GYPSUM BOARD CONSTRUCTION.
6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM AND
AFTER 8:00 PM OR DIRECTED BY COR
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE NEGATIVE
PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN
AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND
10000 SF.
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY
EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE
COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH
REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN
AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR
EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR
CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE
AND/OR EMERGENCY IN AN ADJACENT AREA.
10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS, CONSTRUCT NEW
SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER PLANS OR CONSTRUCT
INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER.
11. ALL ICRA/CONSTRUCTION BARRIERS, PARTITION TYPE 'TB3b' (SEE 'TYPES - TEMPORARY
PARTITION - ICRA' DETAIL THIS SHEET) SHALL BE MINIMUM 1 HOUR FIRE RATED. HIGHER
FIRE RATINGS ARE REQUIRED WHERE SHOWN IN THE CONSTRUCTION BARRIER AND
PHASING PLANS. WHERE PERMITTED BY THE VA'S INFECTION CONTROL DEPARTMENT,
ICRA/CONSTRUCTION BARRIERS MAY BE CONSTRUCTED OF A STARC SYSTEMS FIREBLOCK
WALL PANELS OR APPROVED EQUAL. TYPE OF TEMPORARY PARTITION TO BE DETERMINED
BY THE VA'S INFECTION CONTROL DEPARTMENT ON A SPACE BY SPACE BASIS.
CONTRACTOR TO COORDINATE TYPE W/ VA.
12. WHEN BUILDING IS SPRINKLERED, MODIFY SPRINKLER HEADS TO BE UPTURNED AND
EXTENDED TO 18" OF STRUCTURE AS FINISHED CEILINGS ARE REMOVED OR MODIFIED.
13. WHERE THE VA APPROVES NON-RATED CONSTRUCTION BARRIERS (PLASTIC SHEETING)
FOR CONSTRUCTION SEPARATION AND THE CONTRACTOR IDENTIFIES UPCOMING WORK
THAT RESULTS IN LONG-TERM (OVERNIGHT) CEILING REMOVAL,THE CONTRACTOR WILL
DISCUSS WITH THE COR WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTED OR
TEMPORARY UPRIGHT SPRINKLERS INSTALLED.
14. AT THE DISCRETION OF THE VA INFECTION CONTROL AND COR, THE CONTRACTOR SHALL
BE REQUIRED TO USE PORTABLE CONTAINMENT CARTS FOR ABOVE CEILING ACCESS WORK
IN PATIENT CARE AREA, OR OTHER AREAS DETERMINED BY THE VA, WHERE HARD BARRIERS
ARE OTHERWISE NOT USED.
15. INFECTION CONTROL MEASURES ARE REQUIRED FOR ALL BUILDINGS WITHIN THE SCOPE
OF WORK, SUBJECT TO INFECTION CONTROL REQUIREMENTS SPECIFIED IN SECTION '01 35 26
SAFETY REQUIREMENTS' AND MEETING THE INTENT OF THE INFECTION CONTROL AND
PHASING PLAN DRAWING SHEETS FOR EACH BUILDING, WHETHER OR NOT THE SCOPE IS
SHOWN IN THE ARCHITECTURAL DRAWINGS. SEE OTHER DISCIPLINE DRAWINGS FOR OTHER
PROJECT SCOPE OF WORK.
CONSTRUCION PHASING GENERAL NOTES
1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE
CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00
1.6.G PHASING.
2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING
WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE
A WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE
PLANS, VALIDATING AND ELABORATING ON THIS PHASING DESCRIPTION.
3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO
WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR
DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE
PROJECT SITE OR WORK BY OWNER.
4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE
SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND
APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL
FOR ALL PHASES OF THE WORK.
5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE
SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION
PHASING DESCRIPTION.
6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH
THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND
THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON
COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT
PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL SYSTEMS
FUNCTIONING PROPERLY.
7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL
CONTRACTOR SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.
8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE
CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL
THE COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.
9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED
AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED
USE OF ALL OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND
ELECTRICAL SYSTEMS SERVING THESE AREAS.
10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL
DRAWING(S) AND DEMOLITION PLANS.
11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS
FOR ARCHITECT-OWNER PLANNING PURPOSES ONLY.
12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS
OF EGRESS THROUGHOUT ALL PHASING.
13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN
PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND
VACATE THE FOLLOW-ON PHASES. THE VA WILL ACCELERATE THIS TIME WHEN
POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS OCCURS.
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)
TYPE A
TYPE B
TYPE C
TYPE D
INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT
LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING
WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND
ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF
WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL
DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE
AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF
WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).
ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,
SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF
FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL
CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE
CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH
CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR
COVERING REMOVAL (WITH SANDING OR GRINDING).
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS
NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK
SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.
GROUP 1
LOW RISK
• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT
CARE, INCLUDING INTERSTITIAL SPACES.
• ENGINEERING OR EMS OFFICE/WORK AREAS
• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE
AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR
EXAMINATIONS.
• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO
PATIENT UNITS OR TREATMENT LOCATIONS.
GROUP 2
MEDIUM
RISK
• OUTPATIENT AREAS:
1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS
2. BEHAVIORAL/MENTAL HEALTH AREAS
3. EXTENDED CARE / REHAB CLINIC AREAS
4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)
GROUP 3
HIGH RISK
• IN-PATIENT UNITS:
1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING
UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;
CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /
ONCOLOGY; DIALYSIS
GROUP 4
HIGHEST
RISK
• ICU/SICU
• OR/PACU/ENDOSCOPY
• GI
• STERILE PROCESSING SERVICES (SPS)
• PHARMACY
• CATH LAB
CLASS
I
KEEP AREAS FREE OF DEBRIS, TRASH
EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)
IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION
(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)
CLASS
II
SAME AS CLASS I PLUS:
1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.
3. BLOCK OFF AND SEAL AIR VENTS
4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.
5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.
9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA
CLASS
III
SAME AS CLASS I AND II PLUS:
1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION
2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE
CORRECTIVE ACTION AS NEEDED
3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.
5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY
6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE
SPREADING DUST. DEBRIS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP AREA WITH CLEANER/DISINFECTANT.
9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.
10. DISPLAY ICRA AT SITE
11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.
CLASS
IV
SAME AS CLASS I, II AND III PLUS:
1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED
2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION
3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE
6 MIL POLY OVER
CEILING PENETRATION
NOTES:
1. ALL CORNERS TO FORM 90 ANGLE WITH NO RADIUS
2. SEAL ALL SIDES OF POLY WITH DUCT TAPE
3. SEAL ALL CRACKS WITH DUCT TAPE.
6 MIL POLY OVER
EQUIPMENT OR
FURNISHING
6 MIL POLY OVER
WALL PROTRUSION
FLOOR
DOOR
BEYOND
WINDOW
BEYOND
CEILING
6 MIL POLY OVER
WALL OPENINGS
6 MIL POLY OVER
DOORS & WINDOWS
CEILING
TB3b
(1 ) LAYER 5/8" TYPE "X"
GYPSUM BOARD EACH SIDE
3 5/8" METAL STUD
FRAMING
3" SOUND ATTENUATING
INSULATION
UP TO 1 HR FIRE RATING
UL DESIGN U419
STC 49
4 7/8"
NOTE: AT THE VA'S DISCRETION, PREFABRICATED ONE-HOUR
RATED NEGATIVE AIR MONITORING PANELS MAY BE PERMITTED
IN LIEU OF PARTITION TYPE 'TB3b'. REFER TO SPECIFICATION 01
35 26 SAFETY REQUIREMENTS FOR MORE INFORMATION
CONTINUOUS DUCT
TAPE SEAL EACH SIDE
AT CEILING
COMPRESSIBLE
INSULATION
CONTINUOUS DUCT
TAPE SEAL EACH
SIDE
EXISTING FINISHED
FLOOR
(1) LAYER 5/8" GYP BD EACH
SIDE. FINISH OCCUPIED SIDE
WITH GLOSS PAINT
CLOSE OPEN DUCTS WITH
6 MIL POLYETHYLENE
BARRIER. SEAL EDGES
WITH CONTINUOUS DUCT
TAPE
"WORK" SIDE OF BARRIER OCCUPIED SIDE OF BARRIER
BOTTOM OF EXISTING FLOOR SLAB
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
REMOVE PORTION OF EXISTING CEILING AS REQUIRED FOR
INSTALLATION OF BARRIER
FR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .