Atch 5 - ARCH 3 of 4 - DRAWINGS.pdf

PDF 19 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - Marion Federal contract opportunity
Solicitation number
36C77622B0040
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal solicitation seeking infrastructure upgrades and renovations at a Department of Veterans Affairs facility in Marion. The solicitation number is 36C77622B0040 and seeks to upgrade electrical, HVAC, communications, physical security and fiber infrastructure across campus and between buildings. It also involves modifying impacted roads, walks, grading, drainage and other utilities. Data center WAN updates and hazardous material abatement are required. The opportunity is posted by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - Marion, newest first.
File Type Posted
36C77622B0040 0005.pdf PDF
Clarifications - Marion.pdf PDF
Atch 27 - Construction Wage Rates - Grant 8-19-22.pdf PDF
36C77622B0040 0004.pdf PDF
Atch 27 - Construction Wage Rates - Grant 8-12-22.pdf PDF
Technical Questions - FINAL - Marion 8-11-22.pdf PDF
03 30 00 - Cast-In-Place Concrete.pdf PDF
36C77622B0040 0003.pdf PDF
Atch 27 - Construction Wage Rates - Grant 7-15-22.pdf PDF
36C77622B0040 0002.pdf PDF
Atch 27 - Construction Wage Rates - Grant 7-8-22.pdf PDF
Site Visit Sign-in Sheet - Marion 7-11-22.pdf PDF
36C77622B0040 0001.pdf PDF
Atch 7 - CIVIL 1 of 2 - DRAWINGS.pdf PDF
Atch 11 - ELEC 3 of 3 - DRAWINGS.pdf PDF
Atch 13 - HAZARDOUS ASBESTOS - DRAWINGS.pdf PDF
Atch 14 - HAZARDOUS LEAD BASED PAINT - DRAWINGS.pdf PDF
Atch 22 - STRUCTURAL - DRAWINGS.pdf PDF
Atch 24 - TELECOM 2 of 2 - DRAWINGS.pdf PDF
Atch 25 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Atch 15 - MECH 1 of 7 - DRAWINGS.pdf PDF
Atch 1 - SPECIFICATIONS.pdf PDF
Atch 4 - ARCH 2 of 4 - DRAWINGS.pdf PDF
Atch 9 - ELEC 1 of 3 - DRAWINGS.pdf PDF
Atch 10 - ELEC 2 of 3 - DRAWINGS.pdf PDF
Atch 12 - GENERAL - DRAWINGS.pdf PDF
Atch 16 - MECH 2 of 7 - DRAWINGS.pdf PDF
Atch 20 - MECH 6 of 7 - DRAWINGS.pdf PDF
Atch 23 - TELECOM 1 of 2 - DRAWINGS.pdf PDF
Atch 27 - Construction Wage Rates - Grant 6-10-22.pdf PDF
Atch 2 - DRAWINGS SHEET INDEX.pdf PDF
Atch 6 - ARCH 4 of 4 - DRAWINGS.pdf PDF
Atch 17 - MECH 3 of 7 - DRAWINGS.pdf PDF
Atch 18 - MECH 4 of 7 - DRAWINGS.pdf PDF
Atch 19 - MECH 5 of 7 - DRAWINGS.pdf PDF
Atch 28 - Contractor Safety - Environmental Form.docx DOCX document
Atch 29 - Site Visit Instructions.pdf PDF
36C77622B0040 - 6-27-22.pdf PDF
Atch 3 - ARCH 1of 4 - DRAWINGS.pdf PDF
Atch 8 - CIVIL 2 of 2 - DRAWINGS.pdf PDF
Atch 26 - Limitations on Subcontracting - Construction.docx DOCX document
Atch 21 - MECH 7 of 7 - DRAWINGS.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TB3b

(1 ) LAYER 5/8" TYPE "X"

GYPSUM BOARD EACH SIDE

3 5/8" METAL STUD

FRAMING

3" SOUND ATTENUATING

INSULATION

UP TO 1 HR FIRE RATING

UL DESIGN U419

STC 49

0'-4 7/8"

NOTE: AT THE VA'S DISCRETION, PREFABRICATED ONE-HOUR FIRE

RATED NEGATIVE AIR MONITORING PANELS MAY BE PERMITTED IN

LIEU OF PARTITION TYPE 'TB3b'. REFER TO SPECIFICATION 01 35 26

SAFETY REQUIREMENTS FOR MORE INFORMATION.

INFECTION CONTROL & CONSTRUCTION

BARRIER GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE

MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED

COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE

PERMITTED BY CLASS AND THE VA INFECTION CONTROL DEPARTMENT. ALL OTHER

CONSTRUCTION AREAS TO BE SEALED VIA A HARD WALL ICRA - CONSTRUCTION BARRIER (SEE

TYPICAL DETAIL ON SHEET B138-GC111) AS SPECIFIED AND LISTED IN ICRA CLASS OR WHERE

REQUIRED BY THE VA INFECTION CONTROL DEPARTMENT IN PROJECT SCOPE AREAS, WHETHER

OR NOT DELINEATED ON THE ARCHITECTURE CONSTRUCTION BARRIER AND PHASING PLANS.

3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS AS SPECIFIED.

MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND

ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.

4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE A REQUEST

VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION CONTROL NURSE.

UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST TEN (10)

WORKING DAYS NOTICE FOR EACH PERMIT.

5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR TO

DECK/FLOOR ABOVE. TAPE, MUD, SAND JOINTS AND PAINT ON NON-CONSTRUCTION SIDE OF

BARRIER WHERE BARRIER IS OF STUD/GYPSUM BOARD CONSTRUCTION.

6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM AND AFTER

8:00 PM OR DIRECTED BY COR

7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN

1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF.

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY

EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE

COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED

AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY

UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.

10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS, CONSTRUCT NEW

SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER PLANS OR CONSTRUCT INFECTION

CONTROL BARRIER TO ACT AS SMOKE BARRIER.

11. ALL ICRA/CONSTRUCTION BARRIERS, PARTITION TYPE 'TB3b' (SEE 'TYPES - TEMPORARY PARTITION - ICRA' DETAIL THIS SHEET) SHALL BE MINIMUM 1 HOUR FIRE RATED. HIGHER FIRE

RATINGS ARE REQUIRED WHERE SHOWN IN THE CONSTRUCTION BARRIER AND PHASING PLANS.

WHERE PERMITTED BY THE VA'S INFECTION CONTROL DEPARTMENT, ICRA/CONSTRUCTION

BARRIERS MAY BE CONSTRUCTED OF A STARC SYSTEMS FIREBLOCK WALL PANELS OR

APPROVED EQUAL. TYPE OF TEMPORARY PARTITION TO BE DETERMINED BY THE VA'S INFECTION

CONTROL DEPARTMENT ON A SPACE BY SPACE BASIS. CONTRACTOR TO COORDINATE TYPE W/

VA

12. WHEN BUILDING IS SPRINKLERED, MODIFY SPRINKLER HEADS TO BE UPTURNED AND EXTENDED

TO 18" OF STRUCTURE AS FINISHED CEILINGS ARE REMOVED OR MODIFIED.

13. WHERE THE VA APPROVES NON-RATED CONSTRUCTION BARRIERS (PLASTIC SHEETING) FOR

CONSTRUCTION SEPARATION AND THE CONTRACTOR IDENTIFIES UPCOMING WORK THAT RESULTS

IN LONG-TERM (OVERNIGHT) CEILING REMOVAL,THE CONTRACTOR WILL DISCUSS WITH THE COR

WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTED OR TEMPORARY UPRIGHT SPRINKLERS

INSTALLED.

14. CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED TO MINIMIZE OBSTRUCTIONS TO

CORRIDOR EGRESS CLEARANCE. AT NO TIME SHALL CORRIDORS BE REDUCED TO LESS THAN 36"

CLEAR.

15. AT THE DISCRETION OF THE VA INFECTION CONTROL AND COR, THE CONTRACTOR SHALL BE

REQUIRED TO USE PORTABLE CONTAINMENT CARTS FOR ABOVE CEILING ACCESS WORK IN

PATIENT CARE AREAS, OR OTHER AREAS DETERMINED BY THE VA, WHERE HARD BARRIERS ARE

OTHERWISE NOT USED.

16. INFECTION CONTROL MEASURES ARE REQUIRED FOR ALL BUILDINGS WITHIN THE SCOPE OF WORK, SUBJECT TO INFECTION CONTROL REQUIREMENTS SPECIFIED IN SECTION '01 35 26 SAFETY

REQUIREMENTS' AND MEETING THE INTENT OF THE INFECTION CONTROL AND PHASING PLAN

DRAWING SHEETS FOR EACH BUILDING, WHETHER OR NOT THE SCOPE IS SHOWN IN THE

ARCHITECTURAL DRAWINGS. SEE OTHER DISCIPLINE DRAWINGS FOR OTHER PROJECT SCOPE OF

WORK.

CONSTRUCION PHASING GENERAL NOTES

1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE CAN INVOLVE

MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00 1.6.G PHASING.

2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING WITH ALL

TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE A WRITTEN NARRATIVE

TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE PLANS, VALIDATING AND ELABORATING ON

THIS PHASING DESCRIPTION.

3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO WORK MAY BE

CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR DELAYING WORK UNDER THIS

CONTRACT, OR OTHER CONTRACTS ON THE PROJECT SITE OR WORK BY OWNER.

4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE SEQUENCE,

COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND APPROVAL DATES AND

MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL FOR ALL PHASES OF THE WORK.

5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE SEQUENCE

SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION PHASING DESCRIPTION.

6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH THE VA

INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND THE CONTRACTOR

PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON COMPLETION OF A PARTICULAR PHASE,

THE ENTIRE AREA COVERED BY THAT PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL

SYSTEMS FUNCTIONING PROPERLY.

7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL CONTRACTOR SHALL

SUBMIT AN UPDATED COPY OF THE SCHEDULE.

8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL THE COMPLETION OF THAT

PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.

9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED AREAS IN SUCH A

MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED USE OF ALL OCCUPIED AREAS,

INCLUDING THE APPLICABLE MECHANICAL AND ELECTRICAL SYSTEMS SERVING THESE AREAS.

10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL DRAWING(S) AND

DEMOLITION PLANS.

11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS FOR ARCHITECT-

OWNER PLANNING PURPOSES ONLY.

12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS OF EGRESS

THROUGHOUT ALL PHASING.

13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND VACATE THE FOLLOW-ON PHASES. THE VA

WILL ACCELERATE THIS TIME WHEN POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS

OCCURS.

CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)

TYPE A

TYPE B

TYPE C

TYPE D

INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT

LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION

LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING

WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND

ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL

DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE

AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF

WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).

ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,

SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF

FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL

CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE

CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH

CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR

COVERING REMOVAL (WITH SANDING OR GRINDING).

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS

NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK

SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.

GROUP 1

LOW RISK

• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT

CARE, INCLUDING INTERSTITIAL SPACES.

• ENGINEERING OR EMS OFFICE/WORK AREAS

• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE

AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR

EXAMINATIONS.

• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO

PATIENT UNITS OR TREATMENT LOCATIONS.

GROUP 2

MEDIUM

RISK

• OUTPATIENT AREAS:

1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS

2. BEHAVIORAL/MENTAL HEALTH AREAS

3. EXTENDED CARE / REHAB CLINIC AREAS

4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)

GROUP 3

HIGH RISK

• IN-PATIENT UNITS:

1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING

UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;

CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /

ONCOLOGY; DIALYSIS

GROUP 4

HIGHEST

RISK

• ICU/SICU

• OR/PACU/ENDOSCOPY

• GI

• STERILE PROCESSING SERVICES (SPS)

• PHARMACY

• CATH LAB

CLASS

I

KEEP AREAS FREE OF DEBRIS, TRASH

EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)

IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION

(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)

CLASS

II

SAME AS CLASS I PLUS:

1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY

2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.

3. BLOCK OFF AND SEAL AIR VENTS

4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.

5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.

7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.

9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA

CLASS

III

SAME AS CLASS I AND II PLUS:

1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION

2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE

CORRECTIVE ACTION AS NEEDED

3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.

5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY

6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE

SPREADING DUST. DEBRIS.

7. VACUUM WORK WITH HEPA FILTERED VACUUM.

8. WET MOP AREA WITH CLEANER/DISINFECTANT.

9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.

10. DISPLAY ICRA AT SITE

11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.

CLASS

IV

SAME AS CLASS I, II AND III PLUS:

1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED

2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION

3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

LI

M

IT

S

O F

C O

N S

T R

U C

T

IO

N

005B

TR

005C

SPS

UPS

025D

TR

MORGUE

025B

LOCKER

025C

BATH

019E

STORAGE

019F

STORAGE

C24

CLOSET

019B

OFFICE

019C

SCANNNG

019D

OFFICE

019G

CHASE

019H

STORAGE

S3

STAIRS

OFFICE

021A

OFFICE

021B

OFFICE

OPEN

OFFICE

C005

CORRIDOR

H.A.C.

H.A.C.

024A

FMS

024B

FMS024C

FMS

CONFERENCE

025A

COOLER

PT EFFECTS

STORAGE027

TOILET

TOILET

ELEC

EXISTING

SWITCH

ROOM

STORAGE

013A

CORRIDOR

MECH

MECH

S001

STAIRS

C000

CORRIDOR

013B

MECH

CLOSET

C002

CORRIDOR

MECHANICAL

003C

EQUIPMENT

STORAGE

003B

OFFICE

STAFF

LOUNGE

007B

EMS

DECON

DECON

007A

EQUIP

OFFICE

C003

CORRIDOR

008A

BATH

C001

CORRIDOR

005A

MECHANICAL

CHASE

005D

CLEAN

STERILE

SUPPLY

009A

OFFICE

OFFICE

OFFICE

OFFICE

MECHANICAL

LOCKER

ROOM

003A H.A.C.

RECEIVING

003E

STORAGE

STAIRS

STERILE

SUPPLY

002A

FMS

003D

STORAGE

V E

S T C004

CORRIDOR

019J

FE

ELEVATOR

ELEVATOR

ELEVATOR

PS-7

CORRIDOR

TB3b

TB3b

TB3b

TB3b

TB3b

TB3b

TB3b

TB3b TB3b

TB3b

TYPE D, GROUP 1, CLASS III

CONST ACTIVITIES - REFER ALSO

TO CRITICAL BARRIER PREP DETAIL -

/2 B138-GC111

TYPE C, GROUP 1, CLASS III CONST

ACTIVITIES (CORRIDOR SCOPE, INCL NEW

DOORS) - REFER ALSO TO CRITICAL

BARRIER PREP DETAIL /2 B138-GC111

TYPE D CONST ACTIVITIES, RISK

GROUP 4, CLASS IV - REFER

ALSO TO CRITICAL BARRIER

DETAIL

THIS AREA OF VESTIBULE TO

SERVE AS ICRA ANTE ROOM

DURING CONSTRUCTION IN

THIS AREA

ICRA

ANTE-ROOM

/2 B138-GC111

THIS AREA OF VESTIBULE TO

SERVE AS ICRA ANTE ROOM

DURING CONSTRUCTION OF

NEW SPS 005C ALCOVE AREA

SPS

ALCOVE

TYPE D CONST ACTIVITIES, RISK

GROUP 1, CLASS III - REFER

ALSO TO CRITICAL BARRIER

DETAIL /2 B138-GC111

M

IN

5' -0

C

L

/3 B138-GC111

(3 6"

M

IN

C

LR

'-0

(3 6"

M

IN

'-0

C

LR

NEW PERMANENT DOOR PANELS NOT TO BE

INSTALLED WHILE THE TEMPORARY

CONSTRUCTION BARRIER IS IN PLACE, TYP

AT ALL CONSTRUCTION BARRIERS.

NOTE: REFER ALSO TO SHEET B138-GC111 FOR

CRITICAL BARRIER PREP DETAIL

AND TYPICAL CONSTRUCTION BARRIER DETAIL

/2 B138-GC111

PHASE 1 (BASEMENT):

CONSTRUCTION PROJECT ACTIVITY TYPE - D, TYPICAL, UNO ON THE ICRA FLOOR PLAN

INFECTION CONTROL RISK GROUP - GROUP 1: LOW RISK, UNO ON THE ICRA FLOOR PLAN

CONTROL RISK PROCEDURE CLASS - III, UNO ON THE ICRA FLOOR PLAN

NOTE: TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE. FINAL DETERMINATION BY THE VA WILL

BE MADE AT A LATER DATE.

INFECTION CONTROL RISK ASSESSMENT (ICRA)

BY PROJECT AREA USE AND PHASE

1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER LOCATION, AND

DOOR, WHERE SHOWN

INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND

LIMITS OF CONSTRUCTION

TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER

LOCATION, WHERE APPROVED BY THE VA. UPGRADE TO 1 HOUR RATED

PARTITION AND DOOR WHEN DIRECTED BY THE VA

DOOR

KEY PLAN

MAIN

ENTRY

BUILDING 138

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 04/15/2022

Sheet of 156

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name:

Tom Olesak

Date: 04-15-2022

License Number: MN# 18157

B

IM

/2

V

A M a ri o n E

H R

M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6

-7

.B

.A

R

.r v t

/1

/2

:5

:5

P

M

B138-GC101

BASEMENT LEVEL INFECTION

CONTROL & PHASING PLAN

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

LA CM

16181

1 1/2" = 1'-0"

TYPES - TEMPORARY PARTITION - ICRA

0 8' 16'4'3/32" = 1'-0"

BASEMENT LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN

Revisions: Date:

LI

M

IT

S

O F

C O

N S

T R

U C

T

IO

N

LIMITS OF CONSTRUCTION

104C

TR 163

TR

OFFICE

OFFICE 113

CONFERENCE

IV PREP

OFFICE

OFFICE

OFFICE

OFFICE

H.A.C.

STAIRS

VAULT

107A

FMS

TOILET

TOILET

Room -

BATH

NURSING

OFFICE

104A

RECEPTION

103A

VESTIBLE

OFFICE

OFFICE

ROOM

TOILET

TOILET

STAIRS

STERILE

SUPPLY

OFFICE

OFFICE

OFFICE

HAC

OFFICE

STAFF

LOUNGE

160A

SUPPLY

159A

DATA

TOILET

TOILET

ROOM

TOILET

TOILET

EXAM

EXAM

EXAM

EXAM

EXAM

OFFICE

STAIRS

NOURISHMENT

147A

ELEC

EXAM

OFFICE

EXAM

EXAM

EXAM

SUPPLY

ROOM

EXAM

EXAM

CONSULT

CONSULT

OFFICE

EXAM

TELEHEALTH

EXAM

TELEHEALTH

EXAM

TELEHEALTH

EXAM

TELEHEALTH

EXAM

MEDS

EXAM128

EXAM

NURSE

STATION

B106

CORRIDOR

DRUGS

OFFICE

WAITING

104B

FMS

C101

CORRIDOR

121A

FMS

122A

CLOSET

REGISTRATIONC103

CORRIDOR

128A

VESTIBULE

C102

CORRIDOR

WAITING

WAITING

164A

FE C145

FE

C107

CORRIDOR

146A

ELEC

C105

CORRIDOR

NURSE

STATION

C104

CORRIDOR

C106

CORRIDOR

VESTIBULE

117A Room

137A

MECH

125A

AMBULANCE

BAY

ELEVATOR

ELEVATOR

ELEVATOR

Registration

Room

Room

Room

Room

Room

Room

Room

Room

Room

TB3b

TB3bTB3b

TB3b

TB3b

LIMITS OF

CONSTRUCTION

TB3b

TYPE D, GROUP 4

HIGHEST RISK, CLASS IV

AT PHARMACY/DRUGS

AREA

ICRA

ANTE-ROOM

TB3b

5' -0

(36" MIN

+/- 3'-8"

CLR)

(3 6"

M

IN

'-5

C

LR

6 MIL POLY OVER

CEILING PENETRATION

NOTES:

1. ALL CORNERS TO FORM 90 ANGLE WITH NO RADIUS

2. SEAL ALL SIDES OF POLY WITH DUCT TAPE

3. SEAL ALL CRACKS WITH DUCT TAPE.

6 MIL POLY OVER

EQUIPMENT OR

FURNISHING

6 MIL POLY OVER

WALL PROTRUSION

FLOOR

DOOR

BEYOND

WINDOW

BEYOND

CEILING

6 MIL POLY OVER

WALL OPENINGS

6 MIL POLY OVER

DOORS & WINDOWS

CEILING

TB3b

(1 ) LAYER 5/8" TYPE "X"

GYPSUM BOARD EACH SIDE

3 5/8" METAL STUD

FRAMING

3" SOUND ATTENUATING

INSULATION

UP TO 1 HR FIRE RATING

UL DESIGN U419

STC 49

0'-4 7/8"

NOTE: AT THE VA'S DISCRETION, PREFABRICATED ONE-HOUR FIRE

RATED NEGATIVE AIR MONITORING PANELS MAY BE PERMITTED IN

LIEU OF PARTITION TYPE 'TB3b'. REFER TO SPECIFICATION 01 35 26

SAFETY REQUIREMENTS FOR MORE INFORMATION.

PHASE 1 (FIRST FLOOR):

CONSTRUCTION PROJECT ACTIVITY TYPE - D, TYP, UNO ON THE ICRA FLOOR PLAN

INFECTION CONTROL RISK GROUP - GROUP 2: MEDIUM RISK, EXCEPT GROUP 4 HIGHEST RISK AT PHARMACY/DRUGS AREA, UNO

ON THE ICRA FLOOR PLAN

CONTROL RISK PROCEDURE CLASS - III, EXCEPT CLASS IV AT PHARMACY/DRUGS AREA, UNO ON THE ICRA FLOOR PLAN

NOTE: TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE. FINAL DETERMINATION BY THE VA WILL

BE MADE AT A LATER DATE.

INFECTION CONTROL RISK ASSESSMENT

(ICRA) BY PROJECT AREA USE AND PHASE

1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER LOCATION, AND

DOOR, WHERE SHOWN

INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND

LIMITS OF CONSTRUCTION

TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER

LOCATION, WHERE APPROVED BY THE VA. UPGRADE TO 1 HOUR RATED

PARTITION AND DOOR WHEN DIRECTED BY THE VA

DOOR

CONTINUOUS DUCT

TAPE SEAL EACH SIDE

AT CEILING

COMPRESSIBLE

INSULATION

CONTINUOUS DUCT

TAPE SEAL EACH

SIDE

EXISTING FINISHED

FLOOR

(1) LAYER 5/8" GYP BD EACH

SIDE. FINISH OCCUPIED SIDE

WITH GLOSS PAINT

CLOSE OPEN DUCTS WITH

6 MIL POLYETHYLENE

BARRIER. SEAL EDGES

WITH CONTINUOUS DUCT

TAPE

"WORK" SIDE OF BARRIER OCCUPIED SIDE OF BARRIER

BOTTOM OF EXISTING FLOOR SLAB

3 5/8" STEEL STUDS @ 16"

OC WITH FULL BATT SOUND

ATTENUATING INSULATION

3 5/8" STEEL STUDS @ 16"

OC WITH FULL BATT SOUND

ATTENUATING INSULATION

REMOVE PORTION OF EXISTING CEILING AS REQUIRED FOR

INSTALLATION OF BARRIER

FRAME AND SEAL BARRIER

AROUND ANY EXISTING

MECHANICAL, ELECTRICAL,

PLUMBING, TECHNOLOGY, MED

GAS, ETC. SYSTEMS AS

REQUIRED.

TB3b

SEE CRITICAL BARRIER PREP

DETAIL ON SHEET B138-GC111

FOR SEALING REQUIREMENTS

OF EXISTING SPACES ON THE

"WORK" SIDE

INFECTION CONTROL & CONSTRUCTION

BARRIER GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE

MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED

COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE

PERMITTED BY CLASS AND THE VA INFECTION CONTROL DEPARTMENT. ALL OTHER

CONSTRUCTION AREAS TO BE SEALED VIA A HARD WALL ICRA - CONSTRUCTION BARRIER (SEE

TYPICAL DETAIL ON SHEET B138-GC111) AS SPECIFIED AND LISTED IN ICRA CLASS OR WHERE

REQUIRED BY THE VA INFECTION CONTROL DEPARTMENT IN PROJECT SCOPE AREAS, WHETHER

OR NOT DELINEATED ON THE ARCHITECTURE CONSTRUCTION BARRIER AND PHASING PLANS.

3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS AS SPECIFIED.

MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND

ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.

4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE A REQUEST

VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION CONTROL NURSE.

UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST TEN (10)

WORKING DAYS NOTICE FOR EACH PERMIT.

5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR TO

DECK/FLOOR ABOVE. TAPE, MUD, SAND JOINTS AND PAINT ON NON-CONSTRUCTION SIDE OF

BARRIER WHERE BARRIER IS OF STUD/GYPSUM BOARD CONSTRUCTION.

6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM AND AFTER

8:00 PM OR DIRECTED BY COR

7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN

1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF.

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY

EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE

COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED

AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY

UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.

10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS, CONSTRUCT NEW

SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER PLANS OR CONSTRUCT INFECTION

CONTROL BARRIER TO ACT AS SMOKE BARRIER.

11. ALL ICRA/CONSTRUCTION BARRIERS, PARTITION TYPE 'TB3b' (SEE 'TYPES - TEMPORARY PARTITION - ICRA' DETAIL THIS SHEET) SHALL BE MINIMUM 1 HOUR FIRE RATED. HIGHER FIRE

RATINGS ARE REQUIRED WHERE SHOWN IN THE CONSTRUCTION BARRIER AND PHASING PLANS.

WHERE PERMITTED BY THE VA'S INFECTION CONTROL DEPARTMENT, ICRA/CONSTRUCTION

BARRIERS MAY BE CONSTRUCTED OF A STARC SYSTEMS FIREBLOCK WALL PANELS OR

APPROVED EQUAL. TYPE OF TEMPORARY PARTITION TO BE DETERMINED BY THE VA'S INFECTION

CONTROL DEPARTMENT ON A SPACE BY SPACE BASIS. CONTRACTOR TO COORDINATE TYPE W/

VA

12. WHEN BUILDING IS SPRINKLERED, MODIFY SPRINKLER HEADS TO BE UPTURNED AND EXTENDED

TO 18" OF STRUCTURE AS FINISHED CEILINGS ARE REMOVED OR MODIFIED.

13. WHERE THE VA APPROVES NON-RATED CONSTRUCTION BARRIERS (PLASTIC SHEETING) FOR

CONSTRUCTION SEPARATION AND THE CONTRACTOR IDENTIFIES UPCOMING WORK THAT RESULTS

IN LONG-TERM (OVERNIGHT) CEILING REMOVAL,THE CONTRACTOR WILL DISCUSS WITH THE COR

WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTED OR TEMPORARY UPRIGHT SPRINKLERS

INSTALLED.

14. CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED TO MINIMIZE OBSTRUCTIONS TO

CORRIDOR EGRESS CLEARANCE. AT NO TIME SHALL CORRIDORS BE REDUCED TO LESS THAN 36"

CLEAR.

15. AT THE DISCRETION OF THE VA INFECTION CONTROL AND COR, THE CONTRACTOR SHALL BE

REQUIRED TO USE PORTABLE CONTAINMENT CARTS FOR ABOVE CEILING ACCESS WORK IN

PATIENT CARE AREAS, OR OTHER AREAS DETERMINED BY THE VA, WHERE HARD BARRIERS ARE

OTHERWISE NOT USED.

16. INFECTION CONTROL MEASURES ARE REQUIRED FOR ALL BUILDINGS WITHIN THE SCOPE OF WORK, SUBJECT TO INFECTION CONTROL REQUIREMENTS SPECIFIED IN SECTION '01 35 26 SAFETY

REQUIREMENTS' AND MEETING THE INTENT OF THE INFECTION CONTROL AND PHASING PLAN

DRAWING SHEETS FOR EACH BUILDING, WHETHER OR NOT THE SCOPE IS SHOWN IN THE

ARCHITECTURAL DRAWINGS. SEE OTHER DISCIPLINE DRAWINGS FOR OTHER PROJECT SCOPE OF

WORK.

CONSTRUCION PHASING GENERAL NOTES

1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE CAN INVOLVE

MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00 1.6.G PHASING.

2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING WITH ALL

TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE A WRITTEN NARRATIVE

TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE PLANS, VALIDATING AND ELABORATING ON

THIS PHASING DESCRIPTION.

3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO WORK MAY BE

CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR DELAYING WORK UNDER THIS

CONTRACT, OR OTHER CONTRACTS ON THE PROJECT SITE OR WORK BY OWNER.

4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE SEQUENCE,

COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND APPROVAL DATES AND

MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL FOR ALL PHASES OF THE WORK.

5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE SEQUENCE

SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION PHASING DESCRIPTION.

6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH THE VA

INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND THE CONTRACTOR

PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON COMPLETION OF A PARTICULAR PHASE,

THE ENTIRE AREA COVERED BY THAT PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL

SYSTEMS FUNCTIONING PROPERLY.

7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL CONTRACTOR SHALL

SUBMIT AN UPDATED COPY OF THE SCHEDULE.

8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL THE COMPLETION OF THAT

PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.

9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED AREAS IN SUCH A

MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED USE OF ALL OCCUPIED AREAS,

INCLUDING THE APPLICABLE MECHANICAL AND ELECTRICAL SYSTEMS SERVING THESE AREAS.

10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL DRAWING(S) AND

DEMOLITION PLANS.

11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS FOR ARCHITECT-

OWNER PLANNING PURPOSES ONLY.

12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS OF EGRESS

THROUGHOUT ALL PHASING.

13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND VACATE THE FOLLOW-ON PHASES. THE VA

WILL ACCELERATE THIS TIME WHEN POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS

OCCURS.

CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)

TYPE A

TYPE B

TYPE C

TYPE D

INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT

LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION

LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING

WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND

ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL

DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE

AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF

WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).

ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,

SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF

FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL

CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE

CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH

CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR

COVERING REMOVAL (WITH SANDING OR GRINDING).

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS

NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK

SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.

GROUP 1

LOW RISK

• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT

CARE, INCLUDING INTERSTITIAL SPACES.

• ENGINEERING OR EMS OFFICE/WORK AREAS

• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE

AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR

EXAMINATIONS.

• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO

PATIENT UNITS OR TREATMENT LOCATIONS.

GROUP 2

MEDIUM

RISK

• OUTPATIENT AREAS:

1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS

2. BEHAVIORAL/MENTAL HEALTH AREAS

3. EXTENDED CARE / REHAB CLINIC AREAS

4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)

GROUP 3

HIGH RISK

• IN-PATIENT UNITS:

1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING

UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;

CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /

ONCOLOGY; DIALYSIS

GROUP 4

HIGHEST

RISK

• ICU/SICU

• OR/PACU/ENDOSCOPY

• GI

• STERILE PROCESSING SERVICES (SPS)

• PHARMACY

• CATH LAB

CLASS

I

KEEP AREAS FREE OF DEBRIS, TRASH

EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)

IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION

(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)

CLASS

II

SAME AS CLASS I PLUS:

1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY

2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.

3. BLOCK OFF AND SEAL AIR VENTS

4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.

5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.

7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.

9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA

CLASS

III

SAME AS CLASS I AND II PLUS:

1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION

2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE

CORRECTIVE ACTION AS NEEDED

3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.

5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY

6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE

SPREADING DUST. DEBRIS.

7. VACUUM WORK WITH HEPA FILTERED VACUUM.

8. WET MOP AREA WITH CLEANER/DISINFECTANT.

9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.

10. DISPLAY ICRA AT SITE

11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.

CLASS

IV

SAME AS CLASS I, II AND III PLUS:

1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED

2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION

3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE

KEY PLAN

MAIN

ENTRY

BUILDING 138

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 04/15/2022

Sheet of 156

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name:

Tom Olesak

Date: 04-15-2022

License Number: MN# 18157

B

IM

/2

V

A M a ri o n E

H R

M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6

-7

.B

.A

R

.r v t

/1

/2

:5

:0

P

M

B138-GC111

FIRST LEVEL INFECTION

CONTROL & PHASING PLAN

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

LA CM

16181

3/32" = 1'-0"

FIRST LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN

0 8' 16'4'

12" = 1'-0"

CRITICAL BARRIER PREP

1 1/2" = 1'-0"

TYPES - TEMPORARY PARTITION - ICRA

1/2" = 1'-0"

FIRE RATED ICRA / CONSTRUCTION BARRIER (TYP)

PHASE 1 (SECOND-THIRD FLOORS):

CONSTRUCTION PROJECT ACTIVITY TYPE - D, TYPICAL, UNO

INFECTION CONTROL RISK GROUP - GROUP 2: MEDIUM RISK

CONTROL RISK PROCEDURE CLASS - III

NOTE: TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE. FINAL DETERMINATION BY THE VA WILL

BE MADE AT A LATER DATE.

INFECTION CONTROL RISK ASSESSMENT (ICRA)

BY PROJECT AREA USE AND PHASE

1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER LOCATION, AND

DOOR, WHERE SHOWN

INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND

LIMITS OF CONSTRUCTION

TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER

LOCATION, WHERE APPROVED BY THE VA. UPGRADE TO 1 HOUR RATED

PARTITION AND DOOR WHEN DIRECTED BY THE VA

DOOR

LIMITS OF

CONSTRUCTION

LIMITS OF

CONSTRUCTION

LIMITS OF

CONSTRUCTION

LIMITS OF

CONSTRUCTION

LIMITS OF CONSTRUCTION

TR

233B

OFFICE

233A

STORAGE

TOILET

P A

S S

A G

E W

A Y

278A

PHYSIATRY

OFFICE

272B

TR

EXAM

X-RAY

253A

BATH

X-RAY

WORKROOM

ELEC

X-RAY

CHECK IN

OFFICE247

CT SCAN

247A

CT

CONTROL

247B

BATH

245A

BATH

SUPPLY

OFFICE

252A

BATH

256A

BATH

C207

CORRIDOR

SUB-WAIT

ELEC

TOILET

STAIRS

STORAGE

CLEAN

SUPPLY

SOILED

LINEN

TOILET

PROCEDURE

PROCEDURE

OFFICE

NEUROLOGY

STORAGE

FMS

TOILET

C208

CORRIDOR

267A

FE

C206

CORRIDOR

ULTRASOUND

OFFICE

OFFICE

STORAGE

241A

EYE EXAM

C201

CORRIDOR

TOILET

OPERATORY

OPERATORY

OPERATORY

OPERATORY

DENTAL LAB

H .A

.C

DENTAL

TREATMENT

OFFICE

CHECK IN

DENTAL

WAITING

DENTAL

STORAGE

EXAM

AUDIO

EXAM

EXAM

EXAM

210C

STORAGE

210B

FMS

210A

STORAGE

SOILED

UTILITY

MECH

CHASE

PHLEMB

LAB

OFFICE

224A

BATH

CHECK IN

H.A.C.

S2

STAIRS

AUDIOLOGY

EXAM

OFFICE

OFFICE 217

CORRIDOR

STAFF

LOUNGE

SUPPLY

TOILET

C200

CORRIDOR

OFFICE

OFFICE

272A

EXAM

240A

CHECK IN

WAITING

LOCKER235

LOUNGE

236A

BATH

237A

BATH

ELEC

C205

CORRIDOR

214A

FE

C204

CORRIDOR

C203

CORRIDOR

C202

CORRIDOR

CLEAN

UTILITY

OPERATORY

OPERATORY

ORAL

SURGERY

206A

FMS

STORAGE

OFFICE

C O

R R

ID

O

R

CORRIDOR

C209

LOCKER

OFFICE

VEST

S1

STAIRS

CORRIDOR

CORRIDOR

PHLEMB

LAB

274A

FE

ELECT

TESTER

OFFICE

AUDIO

TESTING

BOOTH

ELEVATOR

ELEVATOR

ELEVATOR

LIMITS OF

CONSTRUCTION

TB3b

TB3b

TB3b

LIMITS OF CONSTRUCTION

TB3b

TB3b

TB3b

TB3b

TB3b

TB3b

TB3b

TB3b

NOTE: REFER ALSO TO SHEET B138-GC111 FOR

CRITICAL BARRIER PREP DETAIL

AND TYPICAL CONSTRUCTION BARRIER DETAIL

/2 B138-GC111

/3 B138-GC111

TB3b

TB3b

(36" MIN CLR)

+/- 6'-0"

NEW PERMANENT DOOR PANELS NOT TO BE

INSTALLED WHILE THE TEMPORARY

CONSTRUCTION BARRIER IS IN PLACE, TYP

AT ALL CONSTRUCTION BARRIERS WHERE

SPACE IS LIMITED.

(3 6"

M

IN

4' -1

C

LR

(3 6"

M

IN

C

LR

'-0

COMPLETE REPLACEMENT OF NEW DOOR

TO TR ROOM 272B BEFORE WORK IN THE

REST OF TR ROOM 272B COMMENCES.

CONSTRUCTION BARRIER MAY BE REMOVED

AND EXAM ROOM 272A MADE ACCESSIBLE

ONCE PERMANENT DOOR TO TR ROOM 272B

IS INSTALLED AND WORK WITHIN VESTIBLE

272 IS COMPLETE

COMPLETE CONSTRUCTION OF EXAM

ROOM 242 BEFORE BEGINNING

DEMOLITION OR CONSTRUCTION OF

TR ROOM 272B

TB3b

EXAM ROOM 272A TO BE VACATED BEFORE

CONSTRUCTION BARRIER TO TO VESTIBULE

272 IS INSTALLED

TB3b

(1 ) LAYER 5/8" TYPE "X"

GYPSUM BOARD EACH SIDE

3 5/8" METAL STUD

FRAMING

3" SOUND ATTENUATING

INSULATION

UP TO 1 HR FIRE RATING

UL DESIGN U419

STC 49

0'-4 7/8"

NOTE: AT THE VA'S DISCRETION, PREFABRICATED ONE-HOUR FIRE

RATED NEGATIVE AIR MONITORING PANELS MAY BE PERMITTED IN

LIEU OF PARTITION TYPE 'TB3b'. REFER TO SPECIFICATION 01 35 26

SAFETY REQUIREMENTS FOR MORE INFORMATION.

INFECTION CONTROL & CONSTRUCTION

BARRIER GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE

MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED

COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE

PERMITTED BY CLASS AND THE VA INFECTION CONTROL DEPARTMENT. ALL OTHER

CONSTRUCTION AREAS TO BE SEALED VIA A HARD WALL ICRA - CONSTRUCTION BARRIER (SEE

TYPICAL DETAIL ON SHEET B138-GC111) AS SPECIFIED AND LISTED IN ICRA CLASS OR WHERE

REQUIRED BY THE VA INFECTION CONTROL DEPARTMENT IN PROJECT SCOPE AREAS, WHETHER

OR NOT DELINEATED ON THE ARCHITECTURE CONSTRUCTION BARRIER AND PHASING PLANS.

3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS AS SPECIFIED.

MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND

ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.

4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE A REQUEST

VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION CONTROL NURSE.

UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST TEN (10)

WORKING DAYS NOTICE FOR EACH PERMIT.

5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR TO

DECK/FLOOR ABOVE. TAPE, MUD, SAND JOINTS AND PAINT ON NON-CONSTRUCTION SIDE OF

BARRIER WHERE BARRIER IS OF STUD/GYPSUM BOARD CONSTRUCTION.

6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM AND AFTER

8:00 PM OR DIRECTED BY COR

7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN

1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF.

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY

EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE

COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED

AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY

UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.

10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS, CONSTRUCT NEW

SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER PLANS OR CONSTRUCT INFECTION

CONTROL BARRIER TO ACT AS SMOKE BARRIER.

11. ALL ICRA/CONSTRUCTION BARRIERS, PARTITION TYPE 'TB3b' (SEE 'TYPES - TEMPORARY PARTITION - ICRA' DETAIL THIS SHEET) SHALL BE MINIMUM 1 HOUR FIRE RATED. HIGHER FIRE

RATINGS ARE REQUIRED WHERE SHOWN IN THE CONSTRUCTION BARRIER AND PHASING PLANS.

WHERE PERMITTED BY THE VA'S INFECTION CONTROL DEPARTMENT, ICRA/CONSTRUCTION

BARRIERS MAY BE CONSTRUCTED OF A STARC SYSTEMS FIREBLOCK WALL PANELS OR

APPROVED EQUAL. TYPE OF TEMPORARY PARTITION TO BE DETERMINED BY THE VA'S INFECTION

CONTROL DEPARTMENT ON A SPACE BY SPACE BASIS. CONTRACTOR TO COORDINATE TYPE W/

VA

12. WHEN BUILDING IS SPRINKLERED, MODIFY SPRINKLER HEADS TO BE UPTURNED AND EXTENDED

TO 18" OF STRUCTURE AS FINISHED CEILINGS ARE REMOVED OR MODIFIED.

13. WHERE THE VA APPROVES NON-RATED CONSTRUCTION BARRIERS (PLASTIC SHEETING) FOR

CONSTRUCTION SEPARATION AND THE CONTRACTOR IDENTIFIES UPCOMING WORK THAT RESULTS

IN LONG-TERM (OVERNIGHT) CEILING REMOVAL,THE CONTRACTOR WILL DISCUSS WITH THE COR

WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTED OR TEMPORARY UPRIGHT SPRINKLERS

INSTALLED.

14. CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED TO MINIMIZE OBSTRUCTIONS TO

CORRIDOR EGRESS CLEARANCE. AT NO TIME SHALL CORRIDORS BE REDUCED TO LESS THAN 36"

CLEAR.

15. AT THE DISCRETION OF THE VA INFECTION CONTROL AND COR, THE CONTRACTOR SHALL BE

REQUIRED TO USE PORTABLE CONTAINMENT CARTS FOR ABOVE CEILING ACCESS WORK IN

PATIENT CARE AREAS, OR OTHER AREAS DETERMINED BY THE VA, WHERE HARD BARRIERS ARE

OTHERWISE NOT USED.

16. INFECTION CONTROL MEASURES ARE REQUIRED FOR ALL BUILDINGS WITHIN THE SCOPE OF WORK, SUBJECT TO INFECTION CONTROL REQUIREMENTS SPECIFIED IN SECTION '01 35 26 SAFETY

REQUIREMENTS' AND MEETING THE INTENT OF THE INFECTION CONTROL AND PHASING PLAN

DRAWING SHEETS FOR EACH BUILDING, WHETHER OR NOT THE SCOPE IS SHOWN IN THE

ARCHITECTURAL DRAWINGS. SEE OTHER DISCIPLINE DRAWINGS FOR OTHER PROJECT SCOPE OF

WORK.

CONSTRUCION PHASING GENERAL NOTES

1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE CAN INVOLVE

MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00 1.6.G PHASING.

2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING WITH ALL

TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE A WRITTEN NARRATIVE

TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE PLANS, VALIDATING AND ELABORATING ON

THIS PHASING DESCRIPTION.

3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO WORK MAY BE

CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR DELAYING WORK UNDER THIS

CONTRACT, OR OTHER CONTRACTS ON THE PROJECT SITE OR WORK BY OWNER.

4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE SEQUENCE,

COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND APPROVAL DATES AND

MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL FOR ALL PHASES OF THE WORK.

5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE SEQUENCE

SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION PHASING DESCRIPTION.

6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH THE VA

INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND THE CONTRACTOR

PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON COMPLETION OF A PARTICULAR PHASE,

THE ENTIRE AREA COVERED BY THAT PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL

SYSTEMS FUNCTIONING PROPERLY.

7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL CONTRACTOR SHALL

SUBMIT AN UPDATED COPY OF THE SCHEDULE.

8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL THE COMPLETION OF THAT

PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.

9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED AREAS IN SUCH A

MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED USE OF ALL OCCUPIED AREAS,

INCLUDING THE APPLICABLE MECHANICAL AND ELECTRICAL SYSTEMS SERVING THESE AREAS.

10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL DRAWING(S) AND

DEMOLITION PLANS.

11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS FOR ARCHITECT-

OWNER PLANNING PURPOSES ONLY.

12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS OF EGRESS

THROUGHOUT ALL PHASING.

13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND VACATE THE FOLLOW-ON PHASES. THE VA

WILL ACCELERATE THIS TIME WHEN POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS

OCCURS.

CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)

TYPE A

TYPE B

TYPE C

TYPE D

INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT

LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION

LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING

WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND

ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL

DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE

AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF

WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).

ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,

SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF

FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL

CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE

CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH

CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR

COVERING REMOVAL (WITH SANDING OR GRINDING).

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS

NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK

SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.

GROUP 1

LOW RISK

• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT

CARE, INCLUDING INTERSTITIAL SPACES.

• ENGINEERING OR EMS OFFICE/WORK AREAS

• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE

AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR

EXAMINATIONS.

• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO

PATIENT UNITS OR TREATMENT LOCATIONS.

GROUP 2

MEDIUM

RISK

• OUTPATIENT AREAS:

1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS

2. BEHAVIORAL/MENTAL HEALTH AREAS

3. EXTENDED CARE / REHAB CLINIC AREAS

4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)

GROUP 3

HIGH RISK

• IN-PATIENT UNITS:

1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING

UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;

CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /

ONCOLOGY; DIALYSIS

GROUP 4

HIGHEST

RISK

• ICU/SICU

• OR/PACU/ENDOSCOPY

• GI

• STERILE PROCESSING SERVICES (SPS)

• PHARMACY

• CATH LAB

CLASS

I

KEEP AREAS FREE OF DEBRIS, TRASH

EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)

IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION

(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)

CLASS

II

SAME AS CLASS I PLUS:

1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY

2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.

3. BLOCK OFF AND SEAL AIR VENTS

4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.

5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.

7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.

9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA

CLASS

III

SAME AS CLASS I AND II PLUS:

1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION

2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE

CORRECTIVE ACTION AS NEEDED

3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.

5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY

6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE

SPREADING DUST. DEBRIS.

7. VACUUM WORK WITH HEPA FILTERED VACUUM.

8. WET MOP AREA WITH CLEANER/DISINFECTANT.

9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.

10. DISPLAY ICRA AT SITE

11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.

CLASS

IV

SAME AS CLASS I, II AND III PLUS:

1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED

2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION

3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE

KEY PLAN

MAIN

ENTRY

BUILDING 138

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 04/15/2022

Sheet of 156

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name:

Tom Olesak

Date: 04-15-2022

License Number: MN# 18157

B

IM

/2

V

A M a ri o n E

H R

M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6

-7

.B

.A

R

.r v t

/1

/2

:5

:0

P

M

B138-GC121

SECOND LEVEL INFECTION

CONTROL & PHASING PLAN

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

LA CM

16181

3/32" = 1'-0"

SECOND LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN

0 8' 16'4'

1 1/2" = 1'-0"

TYPES - TEMPORARY PARTITION - ICRA

GYPSUM BOARD EACH SIDE

3 5/8" METAL STUD

FRAMING

3" SOUND ATTENUATING

INSULATION

UP TO 1 HR FIRE RATING

UL DESIGN U419

STC 49

0'-4 7/8"

NOTE: AT THE VA'S DISCRETION, PREFABRICATED ONE-HOUR FIRE

RATED NEGATIVE AIR MONITORING PANELS MAY BE PERMITTED IN

LIEU OF PARTITION TYPE 'TB3b'. REFER TO SPECIFICATION 01 35 26

SAFETY REQUIREMENTS FOR MORE INFORMATION.

PHASE 1 (SECOND-THIRD FLOORS):

CONSTRUCTION PROJECT ACTIVITY TYPE - D, TYPICAL, UNO

INFECTION CONTROL RISK GROUP - GROUP 2: MEDIUM RISK

CONTROL RISK PROCEDURE CLASS - III

NOTE: TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE. FINAL DETERMINATION BY THE VA WILL

BE MADE AT A LATER DATE.

INFECTION CONTROL RISK ASSESSMENT (ICRA)

BY PROJECT AREA USE AND PHASE

1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER LOCATION, AND

DOOR, WHERE SHOWN

INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND

LIMITS OF CONSTRUCTION

TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER

LOCATION, WHERE APPROVED BY THE VA. UPGRADE TO 1 HOUR RATED

PARTITION AND DOOR WHEN DIRECTED BY THE VA

DOOR

TR

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

367A

TR

367B

OFFICE

OFFICE

317B

OFFICE

317C

STORAGE

317D

EXAM

CORRIDOR

317A

OFFICE

EXAM ROOM

C305

CORRIDOR

MULTI-PURPOSE

319A

BATH

VESTIBULE

MENS

TOILET

319B

MECH

CHASE

ELECT

STAIRS

SUPPLY

H A C

TOILET

WOMEN

CLEAN

LINEN

STORAGE

OFFICE

327A

WORK

ROOM

OFFICE

OFFICE

OFFICE

C307

WAITING

FMS

OFFICE/STORAGE

CLINIC

346A

OFFICE

OFFICE

ELEC

CLINIC

OFFICE

TOILET

STORAGE

STORAGE

340A

BATH

ORTHO LAB

CLINIC

339A

BATH

FE

CLINIC

BREAKROOM

CONSULT

CONSULT

C310

CORRIDOR

CONSULT

OFFICE

OFFICE

EXAM

C300

CORRIDOR

VESTIBULE

337A

WAITING

ROOM

337B

BATH

366B

BATH

336A

VESTIBULE

C308

CORRIDOR

TOILET

ICE

MACHINE

334A

VEST

FMS

335A

STORAGE

333A E K G

333C

STORAGE

EKG

333B

HOLTER

ROOM

331A

STORAGE

H.A.C.

OFFICE/EXAM

OFFICE/EXAM

C304

CORRIDOR

OFFICE/EXAM

308A

OFFICE

OFFICE

CHECK-IN

TELEHEALTH

OFFICE

FE

STORAGE

STAFF

LOUNGE

OFFICE

BATH

302A

SHOWER

H A C

PS-5

ELEVATOR

PS-6

ELEVATOR

372C

LOUNGE

372B

STORAGE

STAIRS

TOILET

STORAGE

TOILET

338A

STORAGE

TOILET

STORAGE

H A C

STAIRS

359A

OFFICE

372A

PULMINARY

LAB

CARDIO

PULMINARY

372E

STORAGE

C306

CORRIDOR

C303

CORRIDOR 303A

ELECT

E

LE

C

335B

STORAGE

CONFERENCE

FEC

365C

FMS

C311

CORRIDOR

C309

CORRIDOR

C302

CORRIDOR

STORAGE

C301

CORRIDOR

MECH

ELEVATOR

TB3b

TB3b

TB3b

TB3b TB3b

TB3b

NOTE: REFER ALSO TO SHEET B138-GC111 FOR

CRITICAL BARRIER PREP DETAIL

AND TYPICAL CONSTRUCTION BARRIER DETAIL

/2 B138-GC111

/3 B138-GC111

(3 6"

M

IN

'-0

C

LR

NEW PERMANENT DOOR PANEL NOT TO BE

INSTALLED WHILE THE TEMPORARY

CONSTRUCTION BARRIER IS IN PLACE, TYP

AT ALL CONSTRUCTION BARRIERS.

(3 6"

M

IN

'-0

HANDRAIL REPLACEMENTS AND PATCHING OF

WALL FINISHES IN 'CORRIDOR C300' AND

'CORRIDOR C301' TO OCCUR AFTER BUILDING

BUSINESS HOURS OR ON WEEKENDS, AS

DIRECTED BY THE VA COR OR OTHER

AUTHORIZED GOVERNMENT AUTHORITY

C

LR

CLR)

1' -6

(3 6"

M

IN

'-0

C

LR

(36" MIN

+/- 3'-9 1/4"

NEW PERMANENT DOOR PANELS NOT TO BE

INSTALLED WHILE THE TEMPORARY

CONSTRUCTION BARRIER IS IN PLACE, TYP AT

ALL CONSTRUCTION BARRIERS.

COMPLETE REPLACEMENT OF DOOR BEFORE

WORK WITHIN BREAK ROOM 341 COMMENCES.

INFECTION CONTROL & CONSTRUCTION

BARRIER GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE

MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED

COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE

PERMITTED BY CLASS AND THE VA INFECTION CONTROL DEPARTMENT. ALL OTHER

CONSTRUCTION AREAS TO BE SEALED VIA A HARD WALL ICRA - CONSTRUCTION BARRIER (SEE

TYPICAL DETAIL ON SHEET B138-GC111) AS SPECIFIED AND LISTED IN ICRA CLASS OR…

This is the start of the file's text. The full file is on GovTribe.