Atch 5 - ARCH 3 of 4 - DRAWINGS.pdf
PDF 19 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - Marion Federal contract opportunity
- Solicitation number
- 36C77622B0040
About this file
This document provides details for a federal solicitation seeking infrastructure upgrades and renovations at a Department of Veterans Affairs facility in Marion. The solicitation number is 36C77622B0040 and seeks to upgrade electrical, HVAC, communications, physical security and fiber infrastructure across campus and between buildings. It also involves modifying impacted roads, walks, grading, drainage and other utilities. Data center WAN updates and hazardous material abatement are required. The opportunity is posted by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TB3b
(1 ) LAYER 5/8" TYPE "X"
GYPSUM BOARD EACH SIDE
3 5/8" METAL STUD
FRAMING
3" SOUND ATTENUATING
INSULATION
UP TO 1 HR FIRE RATING
UL DESIGN U419
STC 49
0'-4 7/8"
NOTE: AT THE VA'S DISCRETION, PREFABRICATED ONE-HOUR FIRE
RATED NEGATIVE AIR MONITORING PANELS MAY BE PERMITTED IN
LIEU OF PARTITION TYPE 'TB3b'. REFER TO SPECIFICATION 01 35 26
SAFETY REQUIREMENTS FOR MORE INFORMATION.
INFECTION CONTROL & CONSTRUCTION
BARRIER GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE
MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED
COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE
PERMITTED BY CLASS AND THE VA INFECTION CONTROL DEPARTMENT. ALL OTHER
CONSTRUCTION AREAS TO BE SEALED VIA A HARD WALL ICRA - CONSTRUCTION BARRIER (SEE
TYPICAL DETAIL ON SHEET B138-GC111) AS SPECIFIED AND LISTED IN ICRA CLASS OR WHERE
REQUIRED BY THE VA INFECTION CONTROL DEPARTMENT IN PROJECT SCOPE AREAS, WHETHER
OR NOT DELINEATED ON THE ARCHITECTURE CONSTRUCTION BARRIER AND PHASING PLANS.
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS AS SPECIFIED.
MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND
ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE A REQUEST
VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION CONTROL NURSE.
UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST TEN (10)
WORKING DAYS NOTICE FOR EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR TO
DECK/FLOOR ABOVE. TAPE, MUD, SAND JOINTS AND PAINT ON NON-CONSTRUCTION SIDE OF
BARRIER WHERE BARRIER IS OF STUD/GYPSUM BOARD CONSTRUCTION.
6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM AND AFTER
8:00 PM OR DIRECTED BY COR
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN
1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF.
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY
EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE
COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED
AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY
UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.
10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS, CONSTRUCT NEW
SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER PLANS OR CONSTRUCT INFECTION
CONTROL BARRIER TO ACT AS SMOKE BARRIER.
11. ALL ICRA/CONSTRUCTION BARRIERS, PARTITION TYPE 'TB3b' (SEE 'TYPES - TEMPORARY PARTITION - ICRA' DETAIL THIS SHEET) SHALL BE MINIMUM 1 HOUR FIRE RATED. HIGHER FIRE
RATINGS ARE REQUIRED WHERE SHOWN IN THE CONSTRUCTION BARRIER AND PHASING PLANS.
WHERE PERMITTED BY THE VA'S INFECTION CONTROL DEPARTMENT, ICRA/CONSTRUCTION
BARRIERS MAY BE CONSTRUCTED OF A STARC SYSTEMS FIREBLOCK WALL PANELS OR
APPROVED EQUAL. TYPE OF TEMPORARY PARTITION TO BE DETERMINED BY THE VA'S INFECTION
CONTROL DEPARTMENT ON A SPACE BY SPACE BASIS. CONTRACTOR TO COORDINATE TYPE W/
VA
12. WHEN BUILDING IS SPRINKLERED, MODIFY SPRINKLER HEADS TO BE UPTURNED AND EXTENDED
TO 18" OF STRUCTURE AS FINISHED CEILINGS ARE REMOVED OR MODIFIED.
13. WHERE THE VA APPROVES NON-RATED CONSTRUCTION BARRIERS (PLASTIC SHEETING) FOR
CONSTRUCTION SEPARATION AND THE CONTRACTOR IDENTIFIES UPCOMING WORK THAT RESULTS
IN LONG-TERM (OVERNIGHT) CEILING REMOVAL,THE CONTRACTOR WILL DISCUSS WITH THE COR
WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTED OR TEMPORARY UPRIGHT SPRINKLERS
INSTALLED.
14. CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED TO MINIMIZE OBSTRUCTIONS TO
CORRIDOR EGRESS CLEARANCE. AT NO TIME SHALL CORRIDORS BE REDUCED TO LESS THAN 36"
CLEAR.
15. AT THE DISCRETION OF THE VA INFECTION CONTROL AND COR, THE CONTRACTOR SHALL BE
REQUIRED TO USE PORTABLE CONTAINMENT CARTS FOR ABOVE CEILING ACCESS WORK IN
PATIENT CARE AREAS, OR OTHER AREAS DETERMINED BY THE VA, WHERE HARD BARRIERS ARE
OTHERWISE NOT USED.
16. INFECTION CONTROL MEASURES ARE REQUIRED FOR ALL BUILDINGS WITHIN THE SCOPE OF WORK, SUBJECT TO INFECTION CONTROL REQUIREMENTS SPECIFIED IN SECTION '01 35 26 SAFETY
REQUIREMENTS' AND MEETING THE INTENT OF THE INFECTION CONTROL AND PHASING PLAN
DRAWING SHEETS FOR EACH BUILDING, WHETHER OR NOT THE SCOPE IS SHOWN IN THE
ARCHITECTURAL DRAWINGS. SEE OTHER DISCIPLINE DRAWINGS FOR OTHER PROJECT SCOPE OF
WORK.
CONSTRUCION PHASING GENERAL NOTES
1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE CAN INVOLVE
MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00 1.6.G PHASING.
2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING WITH ALL
TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE A WRITTEN NARRATIVE
TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE PLANS, VALIDATING AND ELABORATING ON
THIS PHASING DESCRIPTION.
3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO WORK MAY BE
CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR DELAYING WORK UNDER THIS
CONTRACT, OR OTHER CONTRACTS ON THE PROJECT SITE OR WORK BY OWNER.
4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE SEQUENCE,
COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND APPROVAL DATES AND
MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL FOR ALL PHASES OF THE WORK.
5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE SEQUENCE
SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION PHASING DESCRIPTION.
6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH THE VA
INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND THE CONTRACTOR
PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON COMPLETION OF A PARTICULAR PHASE,
THE ENTIRE AREA COVERED BY THAT PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL
SYSTEMS FUNCTIONING PROPERLY.
7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL CONTRACTOR SHALL
SUBMIT AN UPDATED COPY OF THE SCHEDULE.
8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL THE COMPLETION OF THAT
PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.
9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED AREAS IN SUCH A
MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED USE OF ALL OCCUPIED AREAS,
INCLUDING THE APPLICABLE MECHANICAL AND ELECTRICAL SYSTEMS SERVING THESE AREAS.
10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL DRAWING(S) AND
DEMOLITION PLANS.
11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS FOR ARCHITECT-
OWNER PLANNING PURPOSES ONLY.
12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS OF EGRESS
THROUGHOUT ALL PHASING.
13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND VACATE THE FOLLOW-ON PHASES. THE VA
WILL ACCELERATE THIS TIME WHEN POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS
OCCURS.
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)
TYPE A
TYPE B
TYPE C
TYPE D
INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT
LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING
WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND
ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF
WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL
DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE
AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF
WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).
ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,
SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF
FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL
CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE
CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH
CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR
COVERING REMOVAL (WITH SANDING OR GRINDING).
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS
NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK
SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.
GROUP 1
LOW RISK
• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT
CARE, INCLUDING INTERSTITIAL SPACES.
• ENGINEERING OR EMS OFFICE/WORK AREAS
• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE
AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR
EXAMINATIONS.
• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO
PATIENT UNITS OR TREATMENT LOCATIONS.
GROUP 2
MEDIUM
RISK
• OUTPATIENT AREAS:
1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS
2. BEHAVIORAL/MENTAL HEALTH AREAS
3. EXTENDED CARE / REHAB CLINIC AREAS
4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)
GROUP 3
HIGH RISK
• IN-PATIENT UNITS:
1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING
UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;
CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /
ONCOLOGY; DIALYSIS
GROUP 4
HIGHEST
RISK
• ICU/SICU
• OR/PACU/ENDOSCOPY
• GI
• STERILE PROCESSING SERVICES (SPS)
• PHARMACY
• CATH LAB
CLASS
I
KEEP AREAS FREE OF DEBRIS, TRASH
EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)
IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION
(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)
CLASS
II
SAME AS CLASS I PLUS:
1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.
3. BLOCK OFF AND SEAL AIR VENTS
4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.
5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.
9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA
CLASS
III
SAME AS CLASS I AND II PLUS:
1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION
2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE
CORRECTIVE ACTION AS NEEDED
3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.
5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY
6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE
SPREADING DUST. DEBRIS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP AREA WITH CLEANER/DISINFECTANT.
9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.
10. DISPLAY ICRA AT SITE
11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.
CLASS
IV
SAME AS CLASS I, II AND III PLUS:
1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED
2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION
3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
LI
M
IT
S
O F
C O
N S
T R
U C
T
IO
N
005B
TR
005C
SPS
UPS
025D
TR
MORGUE
025B
LOCKER
025C
BATH
019E
STORAGE
019F
STORAGE
C24
CLOSET
019B
OFFICE
019C
SCANNNG
019D
OFFICE
019G
CHASE
019H
STORAGE
S3
STAIRS
OFFICE
021A
OFFICE
021B
OFFICE
OPEN
OFFICE
C005
CORRIDOR
H.A.C.
H.A.C.
024A
FMS
024B
FMS024C
FMS
CONFERENCE
025A
COOLER
PT EFFECTS
STORAGE027
TOILET
TOILET
ELEC
EXISTING
SWITCH
ROOM
STORAGE
013A
CORRIDOR
MECH
MECH
S001
STAIRS
C000
CORRIDOR
013B
MECH
CLOSET
C002
CORRIDOR
MECHANICAL
003C
EQUIPMENT
STORAGE
003B
OFFICE
STAFF
LOUNGE
007B
EMS
DECON
DECON
007A
EQUIP
OFFICE
C003
CORRIDOR
008A
BATH
C001
CORRIDOR
005A
MECHANICAL
CHASE
005D
CLEAN
STERILE
SUPPLY
009A
OFFICE
OFFICE
OFFICE
OFFICE
MECHANICAL
LOCKER
ROOM
003A H.A.C.
RECEIVING
003E
STORAGE
STAIRS
STERILE
SUPPLY
002A
FMS
003D
STORAGE
V E
S T C004
CORRIDOR
019J
FE
ELEVATOR
ELEVATOR
ELEVATOR
PS-7
CORRIDOR
TB3b
TB3b
TB3b
TB3b
TB3b
TB3b
TB3b
TB3b TB3b
TB3b
TYPE D, GROUP 1, CLASS III
CONST ACTIVITIES - REFER ALSO
TO CRITICAL BARRIER PREP DETAIL -
/2 B138-GC111
TYPE C, GROUP 1, CLASS III CONST
ACTIVITIES (CORRIDOR SCOPE, INCL NEW
DOORS) - REFER ALSO TO CRITICAL
BARRIER PREP DETAIL /2 B138-GC111
TYPE D CONST ACTIVITIES, RISK
GROUP 4, CLASS IV - REFER
ALSO TO CRITICAL BARRIER
DETAIL
THIS AREA OF VESTIBULE TO
SERVE AS ICRA ANTE ROOM
DURING CONSTRUCTION IN
THIS AREA
ICRA
ANTE-ROOM
/2 B138-GC111
THIS AREA OF VESTIBULE TO
SERVE AS ICRA ANTE ROOM
DURING CONSTRUCTION OF
NEW SPS 005C ALCOVE AREA
SPS
ALCOVE
TYPE D CONST ACTIVITIES, RISK
GROUP 1, CLASS III - REFER
ALSO TO CRITICAL BARRIER
DETAIL /2 B138-GC111
M
IN
5' -0
C
L
/3 B138-GC111
(3 6"
M
IN
C
LR
'-0
(3 6"
M
IN
'-0
C
LR
NEW PERMANENT DOOR PANELS NOT TO BE
INSTALLED WHILE THE TEMPORARY
CONSTRUCTION BARRIER IS IN PLACE, TYP
AT ALL CONSTRUCTION BARRIERS.
NOTE: REFER ALSO TO SHEET B138-GC111 FOR
CRITICAL BARRIER PREP DETAIL
AND TYPICAL CONSTRUCTION BARRIER DETAIL
/2 B138-GC111
PHASE 1 (BASEMENT):
CONSTRUCTION PROJECT ACTIVITY TYPE - D, TYPICAL, UNO ON THE ICRA FLOOR PLAN
INFECTION CONTROL RISK GROUP - GROUP 1: LOW RISK, UNO ON THE ICRA FLOOR PLAN
CONTROL RISK PROCEDURE CLASS - III, UNO ON THE ICRA FLOOR PLAN
NOTE: TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE. FINAL DETERMINATION BY THE VA WILL
BE MADE AT A LATER DATE.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
BY PROJECT AREA USE AND PHASE
1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER LOCATION, AND
DOOR, WHERE SHOWN
INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND
LIMITS OF CONSTRUCTION
TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER
LOCATION, WHERE APPROVED BY THE VA. UPGRADE TO 1 HOUR RATED
PARTITION AND DOOR WHEN DIRECTED BY THE VA
DOOR
KEY PLAN
MAIN
ENTRY
BUILDING 138
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
20459 04/15/2022
Sheet of 156
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Tom Olesak
Date: 04-15-2022
License Number: MN# 18157
B
IM
/2
V
A M a ri o n E
H R
M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6
-7
.B
.A
R
.r v t
/1
/2
:5
:5
P
M
B138-GC101
BASEMENT LEVEL INFECTION
CONTROL & PHASING PLAN
EHRM INFRASTRUCTURE
UPGRADES, MARION, IN
MARION, IN
610-21-701
B138
LA CM
16181
1 1/2" = 1'-0"
TYPES - TEMPORARY PARTITION - ICRA
0 8' 16'4'3/32" = 1'-0"
BASEMENT LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN
Revisions: Date:
LI
M
IT
S
O F
C O
N S
T R
U C
T
IO
N
LIMITS OF CONSTRUCTION
104C
TR 163
TR
OFFICE
OFFICE 113
CONFERENCE
IV PREP
OFFICE
OFFICE
OFFICE
OFFICE
H.A.C.
STAIRS
VAULT
107A
FMS
TOILET
TOILET
Room -
BATH
NURSING
OFFICE
104A
RECEPTION
103A
VESTIBLE
OFFICE
OFFICE
ROOM
TOILET
TOILET
STAIRS
STERILE
SUPPLY
OFFICE
OFFICE
OFFICE
HAC
OFFICE
STAFF
LOUNGE
160A
SUPPLY
159A
DATA
TOILET
TOILET
ROOM
TOILET
TOILET
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
STAIRS
NOURISHMENT
147A
ELEC
EXAM
OFFICE
EXAM
EXAM
EXAM
SUPPLY
ROOM
EXAM
EXAM
CONSULT
CONSULT
OFFICE
EXAM
TELEHEALTH
EXAM
TELEHEALTH
EXAM
TELEHEALTH
EXAM
TELEHEALTH
EXAM
MEDS
EXAM128
EXAM
NURSE
STATION
B106
CORRIDOR
DRUGS
OFFICE
WAITING
104B
FMS
C101
CORRIDOR
121A
FMS
122A
CLOSET
REGISTRATIONC103
CORRIDOR
128A
VESTIBULE
C102
CORRIDOR
WAITING
WAITING
164A
FE C145
FE
C107
CORRIDOR
146A
ELEC
C105
CORRIDOR
NURSE
STATION
C104
CORRIDOR
C106
CORRIDOR
VESTIBULE
117A Room
137A
MECH
125A
AMBULANCE
BAY
ELEVATOR
ELEVATOR
ELEVATOR
Registration
Room
Room
Room
Room
Room
Room
Room
Room
Room
TB3b
TB3bTB3b
TB3b
TB3b
LIMITS OF
CONSTRUCTION
TB3b
TYPE D, GROUP 4
HIGHEST RISK, CLASS IV
AT PHARMACY/DRUGS
AREA
ICRA
ANTE-ROOM
TB3b
5' -0
(36" MIN
+/- 3'-8"
CLR)
(3 6"
M
IN
'-5
C
LR
6 MIL POLY OVER
CEILING PENETRATION
NOTES:
1. ALL CORNERS TO FORM 90 ANGLE WITH NO RADIUS
2. SEAL ALL SIDES OF POLY WITH DUCT TAPE
3. SEAL ALL CRACKS WITH DUCT TAPE.
6 MIL POLY OVER
EQUIPMENT OR
FURNISHING
6 MIL POLY OVER
WALL PROTRUSION
FLOOR
DOOR
BEYOND
WINDOW
BEYOND
CEILING
6 MIL POLY OVER
WALL OPENINGS
6 MIL POLY OVER
DOORS & WINDOWS
CEILING
TB3b
(1 ) LAYER 5/8" TYPE "X"
GYPSUM BOARD EACH SIDE
3 5/8" METAL STUD
FRAMING
3" SOUND ATTENUATING
INSULATION
UP TO 1 HR FIRE RATING
UL DESIGN U419
STC 49
0'-4 7/8"
NOTE: AT THE VA'S DISCRETION, PREFABRICATED ONE-HOUR FIRE
RATED NEGATIVE AIR MONITORING PANELS MAY BE PERMITTED IN
LIEU OF PARTITION TYPE 'TB3b'. REFER TO SPECIFICATION 01 35 26
SAFETY REQUIREMENTS FOR MORE INFORMATION.
PHASE 1 (FIRST FLOOR):
CONSTRUCTION PROJECT ACTIVITY TYPE - D, TYP, UNO ON THE ICRA FLOOR PLAN
INFECTION CONTROL RISK GROUP - GROUP 2: MEDIUM RISK, EXCEPT GROUP 4 HIGHEST RISK AT PHARMACY/DRUGS AREA, UNO
ON THE ICRA FLOOR PLAN
CONTROL RISK PROCEDURE CLASS - III, EXCEPT CLASS IV AT PHARMACY/DRUGS AREA, UNO ON THE ICRA FLOOR PLAN
NOTE: TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE. FINAL DETERMINATION BY THE VA WILL
BE MADE AT A LATER DATE.
INFECTION CONTROL RISK ASSESSMENT
(ICRA) BY PROJECT AREA USE AND PHASE
1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER LOCATION, AND
DOOR, WHERE SHOWN
INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND
LIMITS OF CONSTRUCTION
TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER
LOCATION, WHERE APPROVED BY THE VA. UPGRADE TO 1 HOUR RATED
PARTITION AND DOOR WHEN DIRECTED BY THE VA
DOOR
CONTINUOUS DUCT
TAPE SEAL EACH SIDE
AT CEILING
COMPRESSIBLE
INSULATION
CONTINUOUS DUCT
TAPE SEAL EACH
SIDE
EXISTING FINISHED
FLOOR
(1) LAYER 5/8" GYP BD EACH
SIDE. FINISH OCCUPIED SIDE
WITH GLOSS PAINT
CLOSE OPEN DUCTS WITH
6 MIL POLYETHYLENE
BARRIER. SEAL EDGES
WITH CONTINUOUS DUCT
TAPE
"WORK" SIDE OF BARRIER OCCUPIED SIDE OF BARRIER
BOTTOM OF EXISTING FLOOR SLAB
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
REMOVE PORTION OF EXISTING CEILING AS REQUIRED FOR
INSTALLATION OF BARRIER
FRAME AND SEAL BARRIER
AROUND ANY EXISTING
MECHANICAL, ELECTRICAL,
PLUMBING, TECHNOLOGY, MED
GAS, ETC. SYSTEMS AS
REQUIRED.
TB3b
SEE CRITICAL BARRIER PREP
DETAIL ON SHEET B138-GC111
FOR SEALING REQUIREMENTS
OF EXISTING SPACES ON THE
"WORK" SIDE
INFECTION CONTROL & CONSTRUCTION
BARRIER GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE
MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED
COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE
PERMITTED BY CLASS AND THE VA INFECTION CONTROL DEPARTMENT. ALL OTHER
CONSTRUCTION AREAS TO BE SEALED VIA A HARD WALL ICRA - CONSTRUCTION BARRIER (SEE
TYPICAL DETAIL ON SHEET B138-GC111) AS SPECIFIED AND LISTED IN ICRA CLASS OR WHERE
REQUIRED BY THE VA INFECTION CONTROL DEPARTMENT IN PROJECT SCOPE AREAS, WHETHER
OR NOT DELINEATED ON THE ARCHITECTURE CONSTRUCTION BARRIER AND PHASING PLANS.
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS AS SPECIFIED.
MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND
ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE A REQUEST
VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION CONTROL NURSE.
UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST TEN (10)
WORKING DAYS NOTICE FOR EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR TO
DECK/FLOOR ABOVE. TAPE, MUD, SAND JOINTS AND PAINT ON NON-CONSTRUCTION SIDE OF
BARRIER WHERE BARRIER IS OF STUD/GYPSUM BOARD CONSTRUCTION.
6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM AND AFTER
8:00 PM OR DIRECTED BY COR
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN
1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF.
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY
EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE
COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED
AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY
UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.
10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS, CONSTRUCT NEW
SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER PLANS OR CONSTRUCT INFECTION
CONTROL BARRIER TO ACT AS SMOKE BARRIER.
11. ALL ICRA/CONSTRUCTION BARRIERS, PARTITION TYPE 'TB3b' (SEE 'TYPES - TEMPORARY PARTITION - ICRA' DETAIL THIS SHEET) SHALL BE MINIMUM 1 HOUR FIRE RATED. HIGHER FIRE
RATINGS ARE REQUIRED WHERE SHOWN IN THE CONSTRUCTION BARRIER AND PHASING PLANS.
WHERE PERMITTED BY THE VA'S INFECTION CONTROL DEPARTMENT, ICRA/CONSTRUCTION
BARRIERS MAY BE CONSTRUCTED OF A STARC SYSTEMS FIREBLOCK WALL PANELS OR
APPROVED EQUAL. TYPE OF TEMPORARY PARTITION TO BE DETERMINED BY THE VA'S INFECTION
CONTROL DEPARTMENT ON A SPACE BY SPACE BASIS. CONTRACTOR TO COORDINATE TYPE W/
VA
12. WHEN BUILDING IS SPRINKLERED, MODIFY SPRINKLER HEADS TO BE UPTURNED AND EXTENDED
TO 18" OF STRUCTURE AS FINISHED CEILINGS ARE REMOVED OR MODIFIED.
13. WHERE THE VA APPROVES NON-RATED CONSTRUCTION BARRIERS (PLASTIC SHEETING) FOR
CONSTRUCTION SEPARATION AND THE CONTRACTOR IDENTIFIES UPCOMING WORK THAT RESULTS
IN LONG-TERM (OVERNIGHT) CEILING REMOVAL,THE CONTRACTOR WILL DISCUSS WITH THE COR
WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTED OR TEMPORARY UPRIGHT SPRINKLERS
INSTALLED.
14. CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED TO MINIMIZE OBSTRUCTIONS TO
CORRIDOR EGRESS CLEARANCE. AT NO TIME SHALL CORRIDORS BE REDUCED TO LESS THAN 36"
CLEAR.
15. AT THE DISCRETION OF THE VA INFECTION CONTROL AND COR, THE CONTRACTOR SHALL BE
REQUIRED TO USE PORTABLE CONTAINMENT CARTS FOR ABOVE CEILING ACCESS WORK IN
PATIENT CARE AREAS, OR OTHER AREAS DETERMINED BY THE VA, WHERE HARD BARRIERS ARE
OTHERWISE NOT USED.
16. INFECTION CONTROL MEASURES ARE REQUIRED FOR ALL BUILDINGS WITHIN THE SCOPE OF WORK, SUBJECT TO INFECTION CONTROL REQUIREMENTS SPECIFIED IN SECTION '01 35 26 SAFETY
REQUIREMENTS' AND MEETING THE INTENT OF THE INFECTION CONTROL AND PHASING PLAN
DRAWING SHEETS FOR EACH BUILDING, WHETHER OR NOT THE SCOPE IS SHOWN IN THE
ARCHITECTURAL DRAWINGS. SEE OTHER DISCIPLINE DRAWINGS FOR OTHER PROJECT SCOPE OF
WORK.
CONSTRUCION PHASING GENERAL NOTES
1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE CAN INVOLVE
MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00 1.6.G PHASING.
2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING WITH ALL
TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE A WRITTEN NARRATIVE
TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE PLANS, VALIDATING AND ELABORATING ON
THIS PHASING DESCRIPTION.
3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO WORK MAY BE
CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR DELAYING WORK UNDER THIS
CONTRACT, OR OTHER CONTRACTS ON THE PROJECT SITE OR WORK BY OWNER.
4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE SEQUENCE,
COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND APPROVAL DATES AND
MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL FOR ALL PHASES OF THE WORK.
5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE SEQUENCE
SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION PHASING DESCRIPTION.
6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH THE VA
INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND THE CONTRACTOR
PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON COMPLETION OF A PARTICULAR PHASE,
THE ENTIRE AREA COVERED BY THAT PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL
SYSTEMS FUNCTIONING PROPERLY.
7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL CONTRACTOR SHALL
SUBMIT AN UPDATED COPY OF THE SCHEDULE.
8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL THE COMPLETION OF THAT
PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.
9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED AREAS IN SUCH A
MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED USE OF ALL OCCUPIED AREAS,
INCLUDING THE APPLICABLE MECHANICAL AND ELECTRICAL SYSTEMS SERVING THESE AREAS.
10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL DRAWING(S) AND
DEMOLITION PLANS.
11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS FOR ARCHITECT-
OWNER PLANNING PURPOSES ONLY.
12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS OF EGRESS
THROUGHOUT ALL PHASING.
13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND VACATE THE FOLLOW-ON PHASES. THE VA
WILL ACCELERATE THIS TIME WHEN POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS
OCCURS.
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)
TYPE A
TYPE B
TYPE C
TYPE D
INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT
LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING
WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND
ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF
WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL
DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE
AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF
WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).
ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,
SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF
FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL
CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE
CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH
CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR
COVERING REMOVAL (WITH SANDING OR GRINDING).
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS
NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK
SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.
GROUP 1
LOW RISK
• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT
CARE, INCLUDING INTERSTITIAL SPACES.
• ENGINEERING OR EMS OFFICE/WORK AREAS
• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE
AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR
EXAMINATIONS.
• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO
PATIENT UNITS OR TREATMENT LOCATIONS.
GROUP 2
MEDIUM
RISK
• OUTPATIENT AREAS:
1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS
2. BEHAVIORAL/MENTAL HEALTH AREAS
3. EXTENDED CARE / REHAB CLINIC AREAS
4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)
GROUP 3
HIGH RISK
• IN-PATIENT UNITS:
1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING
UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;
CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /
ONCOLOGY; DIALYSIS
GROUP 4
HIGHEST
RISK
• ICU/SICU
• OR/PACU/ENDOSCOPY
• GI
• STERILE PROCESSING SERVICES (SPS)
• PHARMACY
• CATH LAB
CLASS
I
KEEP AREAS FREE OF DEBRIS, TRASH
EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)
IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION
(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)
CLASS
II
SAME AS CLASS I PLUS:
1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.
3. BLOCK OFF AND SEAL AIR VENTS
4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.
5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.
9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA
CLASS
III
SAME AS CLASS I AND II PLUS:
1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION
2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE
CORRECTIVE ACTION AS NEEDED
3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.
5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY
6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE
SPREADING DUST. DEBRIS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP AREA WITH CLEANER/DISINFECTANT.
9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.
10. DISPLAY ICRA AT SITE
11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.
CLASS
IV
SAME AS CLASS I, II AND III PLUS:
1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED
2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION
3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE
KEY PLAN
MAIN
ENTRY
BUILDING 138
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
20459 04/15/2022
Sheet of 156
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Tom Olesak
Date: 04-15-2022
License Number: MN# 18157
B
IM
/2
V
A M a ri o n E
H R
M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6
-7
.B
.A
R
.r v t
/1
/2
:5
:0
P
M
B138-GC111
FIRST LEVEL INFECTION
CONTROL & PHASING PLAN
EHRM INFRASTRUCTURE
UPGRADES, MARION, IN
MARION, IN
610-21-701
B138
LA CM
16181
3/32" = 1'-0"
FIRST LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN
0 8' 16'4'
12" = 1'-0"
CRITICAL BARRIER PREP
1 1/2" = 1'-0"
TYPES - TEMPORARY PARTITION - ICRA
1/2" = 1'-0"
FIRE RATED ICRA / CONSTRUCTION BARRIER (TYP)
PHASE 1 (SECOND-THIRD FLOORS):
CONSTRUCTION PROJECT ACTIVITY TYPE - D, TYPICAL, UNO
INFECTION CONTROL RISK GROUP - GROUP 2: MEDIUM RISK
CONTROL RISK PROCEDURE CLASS - III
NOTE: TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE. FINAL DETERMINATION BY THE VA WILL
BE MADE AT A LATER DATE.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
BY PROJECT AREA USE AND PHASE
1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER LOCATION, AND
DOOR, WHERE SHOWN
INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND
LIMITS OF CONSTRUCTION
TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER
LOCATION, WHERE APPROVED BY THE VA. UPGRADE TO 1 HOUR RATED
PARTITION AND DOOR WHEN DIRECTED BY THE VA
DOOR
LIMITS OF
CONSTRUCTION
LIMITS OF
CONSTRUCTION
LIMITS OF
CONSTRUCTION
LIMITS OF
CONSTRUCTION
LIMITS OF CONSTRUCTION
TR
233B
OFFICE
233A
STORAGE
TOILET
P A
S S
A G
E W
A Y
278A
PHYSIATRY
OFFICE
272B
TR
EXAM
X-RAY
253A
BATH
X-RAY
WORKROOM
ELEC
X-RAY
CHECK IN
OFFICE247
CT SCAN
247A
CT
CONTROL
247B
BATH
245A
BATH
SUPPLY
OFFICE
252A
BATH
256A
BATH
C207
CORRIDOR
SUB-WAIT
ELEC
TOILET
STAIRS
STORAGE
CLEAN
SUPPLY
SOILED
LINEN
TOILET
PROCEDURE
PROCEDURE
OFFICE
NEUROLOGY
STORAGE
FMS
TOILET
C208
CORRIDOR
267A
FE
C206
CORRIDOR
ULTRASOUND
OFFICE
OFFICE
STORAGE
241A
EYE EXAM
C201
CORRIDOR
TOILET
OPERATORY
OPERATORY
OPERATORY
OPERATORY
DENTAL LAB
H .A
.C
DENTAL
TREATMENT
OFFICE
CHECK IN
DENTAL
WAITING
DENTAL
STORAGE
EXAM
AUDIO
EXAM
EXAM
EXAM
210C
STORAGE
210B
FMS
210A
STORAGE
SOILED
UTILITY
MECH
CHASE
PHLEMB
LAB
OFFICE
224A
BATH
CHECK IN
H.A.C.
S2
STAIRS
AUDIOLOGY
EXAM
OFFICE
OFFICE 217
CORRIDOR
STAFF
LOUNGE
SUPPLY
TOILET
C200
CORRIDOR
OFFICE
OFFICE
272A
EXAM
240A
CHECK IN
WAITING
LOCKER235
LOUNGE
236A
BATH
237A
BATH
ELEC
C205
CORRIDOR
214A
FE
C204
CORRIDOR
C203
CORRIDOR
C202
CORRIDOR
CLEAN
UTILITY
OPERATORY
OPERATORY
ORAL
SURGERY
206A
FMS
STORAGE
OFFICE
C O
R R
ID
O
R
CORRIDOR
C209
LOCKER
OFFICE
VEST
S1
STAIRS
CORRIDOR
CORRIDOR
PHLEMB
LAB
274A
FE
ELECT
TESTER
OFFICE
AUDIO
TESTING
BOOTH
ELEVATOR
ELEVATOR
ELEVATOR
LIMITS OF
CONSTRUCTION
TB3b
TB3b
TB3b
LIMITS OF CONSTRUCTION
TB3b
TB3b
TB3b
TB3b
TB3b
TB3b
TB3b
TB3b
NOTE: REFER ALSO TO SHEET B138-GC111 FOR
CRITICAL BARRIER PREP DETAIL
AND TYPICAL CONSTRUCTION BARRIER DETAIL
/2 B138-GC111
/3 B138-GC111
TB3b
TB3b
(36" MIN CLR)
+/- 6'-0"
NEW PERMANENT DOOR PANELS NOT TO BE
INSTALLED WHILE THE TEMPORARY
CONSTRUCTION BARRIER IS IN PLACE, TYP
AT ALL CONSTRUCTION BARRIERS WHERE
SPACE IS LIMITED.
(3 6"
M
IN
4' -1
C
LR
(3 6"
M
IN
C
LR
'-0
COMPLETE REPLACEMENT OF NEW DOOR
TO TR ROOM 272B BEFORE WORK IN THE
REST OF TR ROOM 272B COMMENCES.
CONSTRUCTION BARRIER MAY BE REMOVED
AND EXAM ROOM 272A MADE ACCESSIBLE
ONCE PERMANENT DOOR TO TR ROOM 272B
IS INSTALLED AND WORK WITHIN VESTIBLE
272 IS COMPLETE
COMPLETE CONSTRUCTION OF EXAM
ROOM 242 BEFORE BEGINNING
DEMOLITION OR CONSTRUCTION OF
TR ROOM 272B
TB3b
EXAM ROOM 272A TO BE VACATED BEFORE
CONSTRUCTION BARRIER TO TO VESTIBULE
272 IS INSTALLED
TB3b
(1 ) LAYER 5/8" TYPE "X"
GYPSUM BOARD EACH SIDE
3 5/8" METAL STUD
FRAMING
3" SOUND ATTENUATING
INSULATION
UP TO 1 HR FIRE RATING
UL DESIGN U419
STC 49
0'-4 7/8"
NOTE: AT THE VA'S DISCRETION, PREFABRICATED ONE-HOUR FIRE
RATED NEGATIVE AIR MONITORING PANELS MAY BE PERMITTED IN
LIEU OF PARTITION TYPE 'TB3b'. REFER TO SPECIFICATION 01 35 26
SAFETY REQUIREMENTS FOR MORE INFORMATION.
INFECTION CONTROL & CONSTRUCTION
BARRIER GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE
MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED
COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE
PERMITTED BY CLASS AND THE VA INFECTION CONTROL DEPARTMENT. ALL OTHER
CONSTRUCTION AREAS TO BE SEALED VIA A HARD WALL ICRA - CONSTRUCTION BARRIER (SEE
TYPICAL DETAIL ON SHEET B138-GC111) AS SPECIFIED AND LISTED IN ICRA CLASS OR WHERE
REQUIRED BY THE VA INFECTION CONTROL DEPARTMENT IN PROJECT SCOPE AREAS, WHETHER
OR NOT DELINEATED ON THE ARCHITECTURE CONSTRUCTION BARRIER AND PHASING PLANS.
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS AS SPECIFIED.
MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND
ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE A REQUEST
VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION CONTROL NURSE.
UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST TEN (10)
WORKING DAYS NOTICE FOR EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR TO
DECK/FLOOR ABOVE. TAPE, MUD, SAND JOINTS AND PAINT ON NON-CONSTRUCTION SIDE OF
BARRIER WHERE BARRIER IS OF STUD/GYPSUM BOARD CONSTRUCTION.
6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM AND AFTER
8:00 PM OR DIRECTED BY COR
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN
1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF.
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY
EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE
COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED
AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY
UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.
10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS, CONSTRUCT NEW
SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER PLANS OR CONSTRUCT INFECTION
CONTROL BARRIER TO ACT AS SMOKE BARRIER.
11. ALL ICRA/CONSTRUCTION BARRIERS, PARTITION TYPE 'TB3b' (SEE 'TYPES - TEMPORARY PARTITION - ICRA' DETAIL THIS SHEET) SHALL BE MINIMUM 1 HOUR FIRE RATED. HIGHER FIRE
RATINGS ARE REQUIRED WHERE SHOWN IN THE CONSTRUCTION BARRIER AND PHASING PLANS.
WHERE PERMITTED BY THE VA'S INFECTION CONTROL DEPARTMENT, ICRA/CONSTRUCTION
BARRIERS MAY BE CONSTRUCTED OF A STARC SYSTEMS FIREBLOCK WALL PANELS OR
APPROVED EQUAL. TYPE OF TEMPORARY PARTITION TO BE DETERMINED BY THE VA'S INFECTION
CONTROL DEPARTMENT ON A SPACE BY SPACE BASIS. CONTRACTOR TO COORDINATE TYPE W/
VA
12. WHEN BUILDING IS SPRINKLERED, MODIFY SPRINKLER HEADS TO BE UPTURNED AND EXTENDED
TO 18" OF STRUCTURE AS FINISHED CEILINGS ARE REMOVED OR MODIFIED.
13. WHERE THE VA APPROVES NON-RATED CONSTRUCTION BARRIERS (PLASTIC SHEETING) FOR
CONSTRUCTION SEPARATION AND THE CONTRACTOR IDENTIFIES UPCOMING WORK THAT RESULTS
IN LONG-TERM (OVERNIGHT) CEILING REMOVAL,THE CONTRACTOR WILL DISCUSS WITH THE COR
WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTED OR TEMPORARY UPRIGHT SPRINKLERS
INSTALLED.
14. CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED TO MINIMIZE OBSTRUCTIONS TO
CORRIDOR EGRESS CLEARANCE. AT NO TIME SHALL CORRIDORS BE REDUCED TO LESS THAN 36"
CLEAR.
15. AT THE DISCRETION OF THE VA INFECTION CONTROL AND COR, THE CONTRACTOR SHALL BE
REQUIRED TO USE PORTABLE CONTAINMENT CARTS FOR ABOVE CEILING ACCESS WORK IN
PATIENT CARE AREAS, OR OTHER AREAS DETERMINED BY THE VA, WHERE HARD BARRIERS ARE
OTHERWISE NOT USED.
16. INFECTION CONTROL MEASURES ARE REQUIRED FOR ALL BUILDINGS WITHIN THE SCOPE OF WORK, SUBJECT TO INFECTION CONTROL REQUIREMENTS SPECIFIED IN SECTION '01 35 26 SAFETY
REQUIREMENTS' AND MEETING THE INTENT OF THE INFECTION CONTROL AND PHASING PLAN
DRAWING SHEETS FOR EACH BUILDING, WHETHER OR NOT THE SCOPE IS SHOWN IN THE
ARCHITECTURAL DRAWINGS. SEE OTHER DISCIPLINE DRAWINGS FOR OTHER PROJECT SCOPE OF
WORK.
CONSTRUCION PHASING GENERAL NOTES
1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE CAN INVOLVE
MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00 1.6.G PHASING.
2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING WITH ALL
TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE A WRITTEN NARRATIVE
TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE PLANS, VALIDATING AND ELABORATING ON
THIS PHASING DESCRIPTION.
3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO WORK MAY BE
CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR DELAYING WORK UNDER THIS
CONTRACT, OR OTHER CONTRACTS ON THE PROJECT SITE OR WORK BY OWNER.
4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE SEQUENCE,
COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND APPROVAL DATES AND
MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL FOR ALL PHASES OF THE WORK.
5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE SEQUENCE
SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION PHASING DESCRIPTION.
6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH THE VA
INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND THE CONTRACTOR
PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON COMPLETION OF A PARTICULAR PHASE,
THE ENTIRE AREA COVERED BY THAT PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL
SYSTEMS FUNCTIONING PROPERLY.
7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL CONTRACTOR SHALL
SUBMIT AN UPDATED COPY OF THE SCHEDULE.
8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL THE COMPLETION OF THAT
PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.
9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED AREAS IN SUCH A
MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED USE OF ALL OCCUPIED AREAS,
INCLUDING THE APPLICABLE MECHANICAL AND ELECTRICAL SYSTEMS SERVING THESE AREAS.
10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL DRAWING(S) AND
DEMOLITION PLANS.
11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS FOR ARCHITECT-
OWNER PLANNING PURPOSES ONLY.
12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS OF EGRESS
THROUGHOUT ALL PHASING.
13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND VACATE THE FOLLOW-ON PHASES. THE VA
WILL ACCELERATE THIS TIME WHEN POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS
OCCURS.
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)
TYPE A
TYPE B
TYPE C
TYPE D
INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT
LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING
WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND
ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF
WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL
DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE
AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF
WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).
ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,
SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF
FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL
CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE
CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH
CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR
COVERING REMOVAL (WITH SANDING OR GRINDING).
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS
NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK
SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.
GROUP 1
LOW RISK
• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT
CARE, INCLUDING INTERSTITIAL SPACES.
• ENGINEERING OR EMS OFFICE/WORK AREAS
• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE
AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR
EXAMINATIONS.
• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO
PATIENT UNITS OR TREATMENT LOCATIONS.
GROUP 2
MEDIUM
RISK
• OUTPATIENT AREAS:
1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS
2. BEHAVIORAL/MENTAL HEALTH AREAS
3. EXTENDED CARE / REHAB CLINIC AREAS
4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)
GROUP 3
HIGH RISK
• IN-PATIENT UNITS:
1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING
UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;
CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /
ONCOLOGY; DIALYSIS
GROUP 4
HIGHEST
RISK
• ICU/SICU
• OR/PACU/ENDOSCOPY
• GI
• STERILE PROCESSING SERVICES (SPS)
• PHARMACY
• CATH LAB
CLASS
I
KEEP AREAS FREE OF DEBRIS, TRASH
EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)
IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION
(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)
CLASS
II
SAME AS CLASS I PLUS:
1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.
3. BLOCK OFF AND SEAL AIR VENTS
4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.
5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.
9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA
CLASS
III
SAME AS CLASS I AND II PLUS:
1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION
2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE
CORRECTIVE ACTION AS NEEDED
3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.
5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY
6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE
SPREADING DUST. DEBRIS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP AREA WITH CLEANER/DISINFECTANT.
9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.
10. DISPLAY ICRA AT SITE
11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.
CLASS
IV
SAME AS CLASS I, II AND III PLUS:
1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED
2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION
3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE
KEY PLAN
MAIN
ENTRY
BUILDING 138
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
20459 04/15/2022
Sheet of 156
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Tom Olesak
Date: 04-15-2022
License Number: MN# 18157
B
IM
/2
V
A M a ri o n E
H R
M I n fr a s tr u c tu re U p g ra d e s D e s ig n /6
-7
.B
.A
R
.r v t
/1
/2
:5
:0
P
M
B138-GC121
SECOND LEVEL INFECTION
CONTROL & PHASING PLAN
EHRM INFRASTRUCTURE
UPGRADES, MARION, IN
MARION, IN
610-21-701
B138
LA CM
16181
3/32" = 1'-0"
SECOND LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN
0 8' 16'4'
1 1/2" = 1'-0"
TYPES - TEMPORARY PARTITION - ICRA
GYPSUM BOARD EACH SIDE
3 5/8" METAL STUD
FRAMING
3" SOUND ATTENUATING
INSULATION
UP TO 1 HR FIRE RATING
UL DESIGN U419
STC 49
0'-4 7/8"
NOTE: AT THE VA'S DISCRETION, PREFABRICATED ONE-HOUR FIRE
RATED NEGATIVE AIR MONITORING PANELS MAY BE PERMITTED IN
LIEU OF PARTITION TYPE 'TB3b'. REFER TO SPECIFICATION 01 35 26
SAFETY REQUIREMENTS FOR MORE INFORMATION.
PHASE 1 (SECOND-THIRD FLOORS):
CONSTRUCTION PROJECT ACTIVITY TYPE - D, TYPICAL, UNO
INFECTION CONTROL RISK GROUP - GROUP 2: MEDIUM RISK
CONTROL RISK PROCEDURE CLASS - III
NOTE: TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE. FINAL DETERMINATION BY THE VA WILL
BE MADE AT A LATER DATE.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
BY PROJECT AREA USE AND PHASE
1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER LOCATION, AND
DOOR, WHERE SHOWN
INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND
LIMITS OF CONSTRUCTION
TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER
LOCATION, WHERE APPROVED BY THE VA. UPGRADE TO 1 HOUR RATED
PARTITION AND DOOR WHEN DIRECTED BY THE VA
DOOR
TR
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
367A
TR
367B
OFFICE
OFFICE
317B
OFFICE
317C
STORAGE
317D
EXAM
CORRIDOR
317A
OFFICE
EXAM ROOM
C305
CORRIDOR
MULTI-PURPOSE
319A
BATH
VESTIBULE
MENS
TOILET
319B
MECH
CHASE
ELECT
STAIRS
SUPPLY
H A C
TOILET
WOMEN
CLEAN
LINEN
STORAGE
OFFICE
327A
WORK
ROOM
OFFICE
OFFICE
OFFICE
C307
WAITING
FMS
OFFICE/STORAGE
CLINIC
346A
OFFICE
OFFICE
ELEC
CLINIC
OFFICE
TOILET
STORAGE
STORAGE
340A
BATH
ORTHO LAB
CLINIC
339A
BATH
FE
CLINIC
BREAKROOM
CONSULT
CONSULT
C310
CORRIDOR
CONSULT
OFFICE
OFFICE
EXAM
C300
CORRIDOR
VESTIBULE
337A
WAITING
ROOM
337B
BATH
366B
BATH
336A
VESTIBULE
C308
CORRIDOR
TOILET
ICE
MACHINE
334A
VEST
FMS
335A
STORAGE
333A E K G
333C
STORAGE
EKG
333B
HOLTER
ROOM
331A
STORAGE
H.A.C.
OFFICE/EXAM
OFFICE/EXAM
C304
CORRIDOR
OFFICE/EXAM
308A
OFFICE
OFFICE
CHECK-IN
TELEHEALTH
OFFICE
FE
STORAGE
STAFF
LOUNGE
OFFICE
BATH
302A
SHOWER
H A C
PS-5
ELEVATOR
PS-6
ELEVATOR
372C
LOUNGE
372B
STORAGE
STAIRS
TOILET
STORAGE
TOILET
338A
STORAGE
TOILET
STORAGE
H A C
STAIRS
359A
OFFICE
372A
PULMINARY
LAB
CARDIO
PULMINARY
372E
STORAGE
C306
CORRIDOR
C303
CORRIDOR 303A
ELECT
E
LE
C
335B
STORAGE
CONFERENCE
FEC
365C
FMS
C311
CORRIDOR
C309
CORRIDOR
C302
CORRIDOR
STORAGE
C301
CORRIDOR
MECH
ELEVATOR
TB3b
TB3b
TB3b
TB3b TB3b
TB3b
NOTE: REFER ALSO TO SHEET B138-GC111 FOR
CRITICAL BARRIER PREP DETAIL
AND TYPICAL CONSTRUCTION BARRIER DETAIL
/2 B138-GC111
/3 B138-GC111
(3 6"
M
IN
'-0
C
LR
NEW PERMANENT DOOR PANEL NOT TO BE
INSTALLED WHILE THE TEMPORARY
CONSTRUCTION BARRIER IS IN PLACE, TYP
AT ALL CONSTRUCTION BARRIERS.
(3 6"
M
IN
'-0
HANDRAIL REPLACEMENTS AND PATCHING OF
WALL FINISHES IN 'CORRIDOR C300' AND
'CORRIDOR C301' TO OCCUR AFTER BUILDING
BUSINESS HOURS OR ON WEEKENDS, AS
DIRECTED BY THE VA COR OR OTHER
AUTHORIZED GOVERNMENT AUTHORITY
C
LR
CLR)
1' -6
(3 6"
M
IN
'-0
C
LR
(36" MIN
+/- 3'-9 1/4"
NEW PERMANENT DOOR PANELS NOT TO BE
INSTALLED WHILE THE TEMPORARY
CONSTRUCTION BARRIER IS IN PLACE, TYP AT
ALL CONSTRUCTION BARRIERS.
COMPLETE REPLACEMENT OF DOOR BEFORE
WORK WITHIN BREAK ROOM 341 COMMENCES.
INFECTION CONTROL & CONSTRUCTION
BARRIER GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE
MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED
COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE
PERMITTED BY CLASS AND THE VA INFECTION CONTROL DEPARTMENT. ALL OTHER
CONSTRUCTION AREAS TO BE SEALED VIA A HARD WALL ICRA - CONSTRUCTION BARRIER (SEE
TYPICAL DETAIL ON SHEET B138-GC111) AS SPECIFIED AND LISTED IN ICRA CLASS OR…
This is the start of the file's text. The full file is on GovTribe.