Atch 24 - TELECOM 2 of 2 - DRAWINGS.pdf

PDF 12 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - Marion Federal contract opportunity
Solicitation number
36C77622B0040
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This federal contract opportunity solicitation involves infrastructure upgrades and renovations to buildings on a Department of Veterans Affairs campus. The solicitation number is 36C77622B0040 and is for project Y1AZ--EHRM Infrastructure Upgrades Construction - Marion. The project scope includes electrical, bonding, UPS, building management system interfaces, HVAC, communication, physical security upgrades, and fiber infrastructure backbone campus wide within and between buildings. It also includes modification to impacted roads, walks, grading and drainage, and other existing utilities. Data Center WAN updates and hazardous material abatement are required. The solicitation is open to all offerors and is issued by the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - Marion, newest first.
File Type Posted
36C77622B0040 0005.pdf PDF
Clarifications - Marion.pdf PDF
Atch 27 - Construction Wage Rates - Grant 8-19-22.pdf PDF
36C77622B0040 0004.pdf PDF
Atch 27 - Construction Wage Rates - Grant 8-12-22.pdf PDF
Technical Questions - FINAL - Marion 8-11-22.pdf PDF
03 30 00 - Cast-In-Place Concrete.pdf PDF
36C77622B0040 0003.pdf PDF
Atch 27 - Construction Wage Rates - Grant 7-15-22.pdf PDF
36C77622B0040 0002.pdf PDF
Atch 27 - Construction Wage Rates - Grant 7-8-22.pdf PDF
Site Visit Sign-in Sheet - Marion 7-11-22.pdf PDF
36C77622B0040 0001.pdf PDF
Atch 7 - CIVIL 1 of 2 - DRAWINGS.pdf PDF
Atch 11 - ELEC 3 of 3 - DRAWINGS.pdf PDF
Atch 13 - HAZARDOUS ASBESTOS - DRAWINGS.pdf PDF
Atch 14 - HAZARDOUS LEAD BASED PAINT - DRAWINGS.pdf PDF
Atch 22 - STRUCTURAL - DRAWINGS.pdf PDF
Atch 25 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Atch 15 - MECH 1 of 7 - DRAWINGS.pdf PDF
Atch 1 - SPECIFICATIONS.pdf PDF
Atch 4 - ARCH 2 of 4 - DRAWINGS.pdf PDF
Atch 5 - ARCH 3 of 4 - DRAWINGS.pdf PDF
Atch 9 - ELEC 1 of 3 - DRAWINGS.pdf PDF
Atch 10 - ELEC 2 of 3 - DRAWINGS.pdf PDF
Atch 12 - GENERAL - DRAWINGS.pdf PDF
Atch 16 - MECH 2 of 7 - DRAWINGS.pdf PDF
Atch 20 - MECH 6 of 7 - DRAWINGS.pdf PDF
Atch 23 - TELECOM 1 of 2 - DRAWINGS.pdf PDF
Atch 27 - Construction Wage Rates - Grant 6-10-22.pdf PDF
36C77622B0040 - 6-27-22.pdf PDF
Atch 3 - ARCH 1of 4 - DRAWINGS.pdf PDF
Atch 8 - CIVIL 2 of 2 - DRAWINGS.pdf PDF
Atch 26 - Limitations on Subcontracting - Construction.docx DOCX document
Atch 21 - MECH 7 of 7 - DRAWINGS.pdf PDF
Atch 2 - DRAWINGS SHEET INDEX.pdf PDF
Atch 6 - ARCH 4 of 4 - DRAWINGS.pdf PDF
Atch 17 - MECH 3 of 7 - DRAWINGS.pdf PDF
Atch 18 - MECH 4 of 7 - DRAWINGS.pdf PDF
Atch 19 - MECH 5 of 7 - DRAWINGS.pdf PDF
Atch 28 - Contractor Safety - Environmental Form.docx DOCX document
Atch 29 - Site Visit Instructions.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

B138-T302 C1

B138-T302 F4

WAP

WAP

191817161515s

13 14

14s13s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

1V

2D

WAP

WAP

2D/1V

1V

2D/3V

2D/3V 2D/3V

2D/3V

3V

2D/3V

2D/3V

2D/3V

2D/3V

1D

2D

2D

2D/2V 2D/1V

2D/3V

2D/3V

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:0

PM

B138-T102-B

SECOND LEVEL FLOOR PLAN -

AREA B - TELECOM - DEMO

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

155 313

1/8" = 1'-0"F3 SECOND LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS - DEMO

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

Revisions: Date:

B

AR

EA

C

AR

EA

B

AR

EA

C

WAP

WAP

WAP

27 28 29

23m

24s

25s 25 2626s

22 23s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

2D/3V

2D/3V

2D/3V

2D/3V

2D

2D/3V

3D 2D/3V

4D

2D/3V

2D

2D/3V

2D/3V

2D/3V

2D/3V

1V

2D 2D

2D/3V 2D/2V

1V

2D 3V

1V 2D

2D/3V

2D/3V

2D

2D

3V 2D

3V2D

4D 3D/3V

2D/3V

2D

1D1D

4D

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:0

PM

B138-T102-C

SECOND LEVEL FLOOR PLAN -

AREA C - TELECOM - DEMO

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

156 313

1/8" = 1'-0"F3 SECOND LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS - DEMO

0 8' 16'4'

GENERAL NOTES:

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

TU R 27 28 29

23m

24s

25s 25 2626s

22 23s

191817161515s

13 14

14s13s

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

LIMITS OF CABLING DEMOLITION

KEY PLAN

MAIN

ENTRY

BUILDING 138

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:0

PM

B138-T103

THIRD LEVEL FLOOR PLAN -

OVERALL - TELECOM - DEMO

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

157 313

3/32" = 1'-0"F1 THIRD LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS - DEMO

0 8' 16'4'

GENERAL NOTES:

A

AR

EA

B

AR

EA

A

AR

EA

B

B138-T303 F1

WAP

WAP

WAP

WAP

WAP

WAP WAP

WAP

WAP

WAP

TU R

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

WAP

WAP

3D

3D

2D

2D

W

4D

2D

W

2D

2D

2D

2D

4D

4D

4D

4D 2D

2D

2D

W

4D

2D 2D

3D

2D

2D2D

2D

2D

2D

2D

2D 2D

4D4D

2D

2D

W

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:1

PM

B138-T103-A

THIRD LEVEL FLOOR PLAN - AREA

A - TELECOM - DEMO

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

158 313

1/8" = 1'-0"F3 THIRD LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS - DEMO

0 8' 16'4'

GENERAL NOTES:

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

B138-T303 C1

B138-T303 F4

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

191817161515s

13 14

14s13s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

W

2D 2D2D

2D

1D W

2D

4D

4D

4D3D 2D

1D

2D

2D

1D 2D

1D

4D4D

4D 1D

3D

2D

2D

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:1

PM

B138-T103-B

THIRD LEVEL FLOOR PLAN - AREA

B - TELECOM - DEMO

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

159 313

1/8" = 1'-0"F3 THIRD LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS - DEMO

0 8' 16'4'

GENERAL NOTES:

B

AR

EA

C

AR

EA

B

AR

EA

C

WAP

WAP

WAP WAP

WAPWAP

WAP

WAP

WAPWAP

WAP/G

WAP

WAP

27 28 29

23m

24s

25s 25 2626s

22 23s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

2D

WAP/G

2D 2D

2D

2D 1D

2D 2D

2D

2D

2D

2D

4D

4D 4D

2D 2D

2D4D

2D2D2D 2D

2D

2D

4D

4D

W 2D

2D

2D

2D 2D4D

2D 2D

2D

2D

2D 2D

2D2D

2D

4D

W

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:1

PM

B138-T103-C

THIRD LEVEL FLOOR PLAN - AREA

C - TELECOM - DEMO

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

160 313

1/8" = 1'-0"F3 THIRD LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS - DEMO

0 8' 16'4'

GENERAL NOTES:

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

TU R 27 28 29

23m

24s

25s 25 2626s

22 23s

191817161515s

13 14

14s13s

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

SSIU-138-476A

SSIU-138-416A

KEY PLAN

MAIN

ENTRY

BUILDING 138

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:1

PM

B138-T104

FOURTH LEVEL FLOOR PLAN -

OVERALL - TELECOM - DEMO

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

161 313

3/32" = 1'-0"F1 FOURTH LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS - DEMO

0 8' 16'4'

1. HORIZONTAL CABLING IN THIS AREA IS NOT INCLUDED IN THE SCOPE OF THS PROJECT.

SHEET NOTES:

GENERAL NOTES:

A

AR

EA

B

AR

EA

A

AR

EA

B

B138-T304 F5

TU R

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:2

PM

B138-T104-A

FOURTH LEVEL FLOOR PLAN -

AREA A - TELECOM - DEMO

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

162 313

1/8" = 1'-0"F3 FOURTH LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS - DEMO

0 8' 16'4'

GENERAL NOTES:

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

B138-T304 F1

191817161515s

13 14

14s13s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:2

PM

B138-T104-B

FOURTH LEVEL FLOOR PLAN -

AREA B - TELECOM - DEMO

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

163 313

1/8" = 1'-0"F3 FOURTH LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS - DEMO

0 8' 16'4'

GENERAL NOTES:

B

AR

EA

C

AR

EA

B

AR

EA

C

27 28 29

23m

24s

25s 25 2626s

22 23s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:2

PM

B138-T104-C

FOURTH LEVEL FLOOR PLAN -

AREA C - TELECOM - DEMO

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

164 313

1/8" = 1'-0"F3 FOURTH LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS - DEMO

0 8' 16'4'

GENERAL NOTES:

CR AC

AC

CR

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

STORAGE

019ECLOSET

C24

OFFICE

019B

SCANNNG

019C

CHASE

019G

OFFICE

021A

CORRIDOR

C005

COOLER

025A

TR

005B

MECHANICAL

CHASE

005A

VEST

FMS

002A

CORRIDOR

C003

ELEVATOR

FMS

024A

FMS

024B

H.A.C.

DECON

MECH

OFFICE

019D

STORAGE

019F

CLEAN STERILE

SUPPLY

005D

EQUIP

007A

DECON

STAFF LOUNGE

EMS

007B

OFFICE

SPS-1

005C-1

STERILE SUPPLY

BATH

008A OFFICE

009A

OFFICE

MECHANICAL

H.A.C.

003A

OFFICE

003B

STORAGE

003D

EQUIPMENT

STORAGE

003C

STORAGE

003E

RECEIVING

STAIRS

STAIRS

S3

STORAGE

019H

OFFICE

OFFICE

021B

OPEN OFFICE

H.A.C.

FMS

024C

CONFERENCE

MORGUE

BATH

025C

PT EFFECTS

STORAGE

026 TR

025D

TOILET

CORRIDOR

C000

CORRIDOR

C001

CORRIDOR

C002

UPS

MECH

CLOSET

CORRIDOR

013A

MECH

013B

STORAGE

014 EXISTING SWITCH

ROOM

ELEC

CORRIDOR

C004

TOILET

OFFICE

CORRIDOR

PS-7

OFFICE

MECHANICAL

ELEVATOR

ELEVATOR

39LOCKER ROOM

TU R 27 28 29

23m

24s

25s 25 2626s

22 23s

191817161515s

13 14

14s13s

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

NEW CABLING IN THIS AREA TO BE ROUTED

FROM TELECOMMUNICATIONS ROOM 025D

NEW CABLING IN THIS AREA TO BE ROUTED

FROM TELECOMMUNICATIONS ROOM 005B

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP WAP

WAP

WAP

WAP

WAP

WAP

WAPWAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

KEY PLAN

MAIN

ENTRY

BUILDING 138

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:3

PM

B138-T200

BASEMENT LEVEL FLOOR PLAN -

OVERALL - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

165 313

3/32" = 1'-0"F1 BASEMENT LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

(GENERAL NOTES SHALL APPLY TO ALL TELECOMMUNICATION PLANS FOR THIS BUILDING)

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

B. CABLE TRAY OR CABLE TROUGH EXIST THROUGHOUT CORRIDORS WITHIN THIS BUILDING. CONTRACTOR TO

FIELD VERIFY EXISTING PATHWAYS AND CREATE AS BUILT DRAWINGS INDICATING LOCATIONS. CONTRACTOR SHALL WORK TO PHASE INSTALLATION OF NEW CATEGORY CABLING WHILE MAINTAINING THE EXISTING CABLING UNTIL THE NEW CABLING HAS BEEN ACTIVATED. CONTRACTOR MAY USE EXISTING CABLE TRAY WHERE AVAILABLE TO SUPPORT NEW CABLING. WHERE CABLING IS NOT SUPPORTED BY EXISTING CABLE TRAY, SUPPORT CABLING WITH JHOOK SUPPORTS MAX OF 5’ ON CENTER ENTIRE ROUTE. EXISTING CABLE TROUGH SHALL NOT BE REUSED. PROVIDE TEMPORARY SUPPORT OF EXISTING CABLING AS REQUIRED TO

SUPPORT INSTALLATION AND PHASING.

EA

A

AR

EA

B

AR

EA

A

AR

EA

B

B138-T400 F7

WAP

WAP

WAP

WAP

WAP

WAP

WAP

TU R

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

2D/2V

2D/2V

5D

2D

4D

4D

2D

W 3D

3D

2D/2V

2D/4V

2D/3V

2D/2V

TR

005B

MECHANICAL

CHASE

005A

VEST

FMS

002A

CORRIDOR

C003

DECON

CLEAN STERILE

SUPPLY

005D

EQUIP

007A

DECON

STAFF LOUNGE

EMS

007B

OFFICE

SPS-1

005C-1

STERILE SUPPLY

BATH

008A OFFICE

009A

OFFICE

MECHANICAL

H.A.C.

003A

OFFICE

003B

STORAGE

003D

EQUIPMENT

STORAGE

003C

STORAGE

003E

RECEIVING

STAIRS

LOCKER ROOM

D

D

C4

C4

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:3

PM

B138-T200-A

BASEMENT LEVEL FLOOR PLAN -

AREA A - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

166 313

1/8" = 1'-0"F3 BASEMENT LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

C

CR

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

B138-T401 F7

WAP

WAP

WAP

WAP

WAP

191817161515s

13 14

14s13s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

2D/3V

2D/2V 2D

ELEVATOR

MECH

OFFICE

MORGUE

BATH

025C

PT EFFECTS

STORAGE

TR

025D

TOILET

CORRIDOR

C000

CORRIDOR

C001

CORRIDOR

C002

UPS

MECH

CLOSET

CORRIDOR

013A

MECH

013B

STORAGE

014 EXISTING SWITCH

ROOM

MECHANICAL

ELEVATOR

ELEVATOR

STAIRS

S001

Room

D

WR

D

D

D D

C4 C4

C4

WAP

WAP

KEYPAD

WAP

WAP

WAP

WAP

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:3

PM

B138-T200-B

BASEMENT LEVEL FLOOR PLAN -

AREA B - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

167 313

1/8" = 1'-0"F3 BASEMENT LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

SHEET NOTES:

1. PROVIDE DATA CONNECTION FOR ELECTRICAL METERING SYSTEM. COORDINATE WITH MANUFACTURER OF

METERING DEVICES FOR EXACT REQUIREMENTS.

2. PROVIDE DATA CONNECTION TO UPS FOR UPS MONITORING SYSTEM. COORDINATE WITH MANUFACTURER

OF MONITORING SYSTEM FOR EXACT REQUIREMENTS.

CR AC

EA

B

AR

EA

C

AR

EA

B

AR

EA

C

WAP

27 28 29

23m

24s

25s 25 2626s

22 23s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

2D/2V 3V 2D/2V 2D/3V

2D/2V

2D/2V2D

2D/2V2D

2D/2V

2D/2V

2D/2V

2D/2V

2D/2V

2D

2D/2V

2D/2V 2D/2V

2D/2V

2D

FF

2D/1V 2D/1V

2D/1V 2D/1V

2D/1V 2D/1V

2D/2V 2D/2V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

2D/1V

FF

2D/1V 2D/1V

2D/1V 2D/1V

STORAGE

019ECLOSET

C24

OFFICE

019B

SCANNNG

019C

CHASE

019G

OFFICE

021A

CORRIDOR

C005

COOLER

025A

FMS

024A

FMS

024B

H.A.C.

OFFICE

019D

STORAGE

019F

STAIRS

S3

STORAGE

019H

OFFICE

OFFICE

021B

OPEN OFFICE

H.A.C.

FMS

024C

CONFERENCE

MORGUE

TR

025D

EXISTING SWITCH

ROOM

ELEC

CORRIDOR

C004

TOILET

OFFICE

CORRIDOR

PS-7

OFFICE

C4

KEYPAD

WAP

WAP

WAP

WAP

WAP

WAP WAP

WAPWAP

WAP

WAP

WAP

WAP

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:3

PM

B138-T200-C

BASEMENT LEVEL FLOOR PLAN -

AREA C - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

168 313

1/8" = 1'-0"F3 BASEMENT LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

FMS

107A

MEDS

OFFICE

NURSE STATION

CORRIDOR

C106

ELEC

147A

ELEC

146A

FE

C145

ROOM

SUPPLY

160A

DATA

159A

TOILET

EXAM

TOILET

TOILET

FE

164A

FMS

121A

CLOSET

122A

OFFICE

TOILET

TOILET

OFFICE

OFFICE

OFFICE

OFFICE

STAFF LOUNGE

OFFICE

OFFICE

BATH

ROOM

STERILE SUPPLY

OFFICE

OFFICE

HAC

Room

Room

Room

Room

Room 117A

Room

CORRIDOR

C102

CORRIDOR

C107

NURSE STATION

FMS

104B

Room

OFFICE

OFFICE

TOILET

TOILET

TOILET

EXAM

EXAM

OFFICE

EXAM

EXAM

EXAM

OFFICE

EXAM

OFFICE

MECH

137A

CONSULT

EXAM

TELEHEALTH

EXAM

TELEHEALTH

EXAM

EXAM

Room

OFFICE

CORRIDOR

C101

WAITING

Room

RECEPTION

104A

IV PREP

VAULT

VESTIBLE

103A

OFFICE

ELEVATOR

Room

NOURISHMENT

EXAM

SUPPLY ROOM

TELEHEALTH

EXAM

TELEHEALTH

EXAM

EXAM

WAITING

CONSULT

EXAM

EXAM

Room

AMBULANCE BAY

125A

NURSING

ELEVATOR

ELEVATOR

STAIRS

VESTIBULE

Room

VESTIBULE

128A

REGISTRATION

Registration

CORRIDOR

C104

CORRIDOR

C105

WAITING

CORRIDOR

C103

H.A.C.

TR

104C

DRUGS

TR

EXAM

CORRIDOR

B106

CONFERENCE

TU R 27 28 29

23m

24s

25s 25 2626s

22 23s

191817161515s

13 14

14s13s

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

NEW CABLING IN THIS AREA TO BE ROUTED

FROM TELECOMMUNICATIONS ROOM 163

NEW CABLING IN THIS AREA TO BE ROUTED

FROM TELECOMMUNICATIONS ROOM 104C

WAP

WAP

WAP

WAP

WAP

WAP

WAP WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAPWAP

WAP

WAP

WAP

WAPWAP

KEY PLAN

MAIN

ENTRY

BUILDING 138

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:4

PM

B138-T201

FIRST LEVEL FLOOR PLAN -

OVERALL - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

169 313

3/32" = 1'-0"F1 FIRST LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

C

C C

C C

C

C

C

C

C

C

CC

C

C

AR

EA

A

AR

EA

B

AR

EA

A

AR

EA

B

FMS

107A

OFFICE

TOILET

TOILET

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BATH

Room

Room

Room

Room 117A

Room

FMS

104B

OFFICE

CORRIDOR

C101

WAITING

Room

RECEPTION

104A

IV PREP

VAULT

VESTIBLE

103A

OFFICE

Room

NURSING

Room

H.A.C.

TR

104C

DRUGS

CORRIDOR

B106

CONFERENCE

B138-T402 F7

WAP

WAP

WAP/G

WAP

WAP

WAP

WAP

WAP

WAP

TU R

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

4D 2D

4D

2D

2D

2D

4D 2D

2D

2D

2D 2D

4D

4D 4D 4D

3D 4D

4D

4D

1D 4D

3D 3D

3D

1D

2D2D

2D

5D 3D

2D

4D

2D 2D 3D

1D

3D3D

4D

STAIRS

C4 C4

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:4

PM

B138-T201-A

FIRST LEVEL FLOOR PLAN - AREA

A - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

170 313

1/8" = 1'-0"F3 FIRST LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

C

C

C

C C

C

C

C C

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

OFFICE

NURSE STATION

EXAM

FE

164A

FMS

121A

CLOSET

122A

OFFICE

STAFF LOUNGE

OFFICE

OFFICE

BATH

ROOM

STERILE SUPPLY

OFFICE

OFFICE

HAC

Room

Room

Room

CORRIDOR

C102

Room

OFFICE

OFFICE

TOILET

TOILET

Room

CORRIDOR

C101

WAITING

ELEVATOR

Room

WAITING

AMBULANCE BAY

125A

NURSING

ELEVATOR

ELEVATOR

STAIRS

VESTIBULE

Room

VESTIBULE

128A

REGISTRATION

Registration

WAITING

CORRIDOR

C103

TR

B138-T403 F7

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP/G

191817161515s

13 14

14s13s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

WAP

4D

4D

4D

4D 6D

4D 4D

4D

4D

2D

3D

6D2D

2D

1D 4D

4D

4D 4D

4D 4D

4D

4D

4D

4D

4D

1D

2D

3D

4D

OFFICE

C4C4

C4

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:5

PM

B138-T201-B

FIRST LEVEL FLOOR PLAN - AREA

B - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

171 313

1/8" = 1'-0"F3 FIRST LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

EA

B

AR

EA

C

AR

EA

B

AR

EA

C

MEDS

OFFICE

NURSE STATION

CORRIDOR

C106

ELEC

147A

ELEC

146A

FE

C145

ROOM

SUPPLY

160A

DATA

159A

TOILET

EXAM

TOILET

TOILET

STAFF LOUNGE

Room

CORRIDOR

C107

NURSE STATION

TOILET

EXAM

EXAM

OFFICE

EXAM

EXAM

EXAM

OFFICE

EXAM

OFFICE

MECH

137A

CONSULT

EXAM

TELEHEALTH

EXAM

TELEHEALTH

EXAM

EXAM

NOURISHMENT

EXAM

SUPPLY ROOM

TELEHEALTH

EXAM

TELEHEALTH

EXAM

EXAM

CONSULT

EXAM

EXAM

VESTIBULE

128A

CORRIDOR

C104

CORRIDOR

C105

EXAM

WAP

WAP/G

WAP

WAP

27 28 29

23m

24s

25s 25 2626s

22 23s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

3D

4D

2D 2D

4D

4D

2D

2D

4D

4D

2D 2D

2D

2D 2D

W

2D

6D 4D 2D

4D

4D

4D

1D

4D

4D 2D

2D

2D 2D 2D

2D

2D 4D

STAIRS

OFFICE

C4

C4

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:5

PM

B138-T201-C

FIRST LEVEL FLOOR PLAN - AREA

C - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

172 313

1/8" = 1'-0"F3 FIRST LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

SUPPLY

ORAL SURGERY

CLEAN UTILITY

EXAM

DENTAL STORAGE

STORAGE

210C

STORAGE

210A

OFFICE

CHECK IN

OFFICE

CT CONTROL

247A

ELEC

CT SCAN

ELEC

BATH

247B

BATH

245A

NEUROLOGY

FMS

BATH

252A

TOILET

CORRIDOR

C208

STORAGE

TOILET

ULTRASOUND

SOILED LINEN

TOILET

CLEAN SUPPLY

STORAGE

BATH

237A

OFFICE

X-RAY

X-RAY

OFFICE

ELECT

ELEC

STORAGE

LOCKER

C209

BATH

236A

CORRIDOR

OFFICE

OFFICE

EXAM

SOILED UTILITY

TESTER OFFICE

AUDIO TESTING

BOOTH

BATH

224A

STORAGE

233A

OFFICE

FE

267A

H.A.C.

TOILET

TOILET

LOCKER

H.A.C.

BATH

253A

STORAGE

VEST

EYE EXAM

241A

AUDIO EXAM

EXAM

EXAM

STAIRS

2FE

214A

CHECK IN

FMS

210B

AUDIOLOGY

CORRIDOR

C207

SUB-WAIT

CORRIDOR

CORRIDOR

C206

CORRIDOR

C205

CORRIDOR

CORRIDOR

C200

CHECK IN

240A

WAITING

CORRIDOR

C203

CORRIDOR

C201

ELEVATOR

OPERATORY

DENTAL

TREATMENT

CORRIDOR

DENTAL WAITING

PROCEDURE

BATH

256A

WORKROOM

X-RAY

ELEVATOR

PHLEMB LAB

SUPPLY

229 STAFF LOUNGE

CORRIDOR

C204

CHECK IN

OPERATORY

DENTAL LAB

PHYSIATRY

OFFICE

278A

OPERATORY

FE

274A

OPERATORY

OPERATORY

TR

272B OFFICE

EXAM

272A

OFFICE

EXAM

OFFICE

OFFICE

LOUNGE

OFFICE

CORRIDOR

C202

MECH CHASE

PHLEMB LAB

TOILET

OPERATORY

CORRIDOR

ELEVATOR

OFFICE

PROCEDURE

TU R 27 28 29

23m

24s

25s 25 2626s

22 23s

191817161515s

13 14

14s13s

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

NEW CABLING IN THIS AREA TO BE ROUTED

FROM TELECOMMUNICATIONS ROOM 272B

NEW CABLING IN THIS AREA TO BE ROUTED

FROM TELECOMMUNICATIONS ROOM 226

TR

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAPWAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP WAP

WAP

WAP

WAPWAP

KEY PLAN

MAIN

ENTRY

BUILDING 138

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:5

PM

B138-T202

SECOND LEVEL FLOOR PLAN -

OVERALL - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

173 313

3/32" = 1'-0"F1 SECOND LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A

AR

EA

B

AR

EA

A

AR

EA

B

EXAM

DENTAL STORAGE

STORAGE

210C

STORAGE

210A

OFFICE

OFFICE

EXAM

SOILED UTILITY

TESTER OFFICE

AUDIO TESTING

BOOTH

BATH

224A

STORAGE

233A

OFFICE

TOILET

TOILET

H.A.C.

AUDIO EXAM

EXAM

EXAM

FE

214A

CHECK IN

FMS

210B

AUDIOLOGY

CORRIDOR

C205

CORRIDOR

CORRIDOR

C203

DENTAL

TREATMENT

CORRIDOR

DENTAL WAITING

PHLEMB LAB

SUPPLY

STAFF LOUNGE

CORRIDOR

C204

CHECK IN

OPERATORY

MECH CHASE

PHLEMB LAB

OFFICE

B138-T404 F7

WAP

TU R

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

2D

4V

2D

4V 4V 2D

2D

4V

4V

4V

2D

4V 2D 4V 2D 2D

2D

1D

UNKNOWN 2V 2D/1V

UNKNOWN

UNKNOWN

2D/3V

UNKNOWN

2D3V

2D/3V 2D

2D/3V

2D/3V

2D/3V2D

2D/3V

2D

2D 2D

3V

4V 2D

2D

1D

2D/3V

2D

2D

2D/1V 2D/2V

2D/3V

2D

2D/3V

1V

1V

2D

WAP

STAIRS

S2

TR

E

E

E

EEE

C4

C4

2D

2D1

2D1

1 2D 2D 2D1

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:0

PM

B138-T202-A

SECOND LEVEL FLOOR PLAN -

AREA A - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

174 313

1/8" = 1'-0"F3 SECOND LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

SHEET NOTES:

1. ADDITIONAL CERNER DEVICES WILL BE INSTALLED PRIOR TO THIS PROJECT'S COMPLETION. LOCATIONS OF

DATA CABLES ARE YET TO BE DETERMINED. PROVIDE WITHIN BID TO PROVIDE DATA CABLING QUANTITIES INDICATED ON PLANS AT LOCATIONS TO BE DETERMINED AT TIME OF CABLING INSTALLATION. COORDINATE

ON EXACT LOCATION OF INSTALLATION WITH VA PROJECT MANAGER.

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

ORAL SURGERY

CLEAN UTILITY

STORAGE

210C

BATH

237A

ELECT

ELEC

STORAGE

LOCKER

C209

BATH

236A

CORRIDOR

OFFICE

EXAM

H.A.C.

LOCKER

STORAGE

VEST

EYE EXAM

241A

CORRIDOR

C200

CHECK IN

240A

WAITING

CORRIDOR

C201

ELEVATOR

OPERATORY

ELEVATOR

OPERATORY

DENTAL LAB

PHYSIATRY

OFFICE

278A

OPERATORY

FE

274A

OPERATORY

OPERATORY

OFFICE

EXAM

272A

EXAM

OFFICE

LOUNGE

OFFICE

CORRIDOR

C202

TOILET

OPERATORY

CORRIDOR

ELEVATOR

B138-T405 F7

WAP

191817161515s

13 14

14s13s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

1V

2D

2D/1V

WAP

1V

2D/3V

2D/3V 2D/3V

2D/3V

3V

2D/3V

2D/3V

2D/3V

2D/3V

1D

2D

2D

2D/2V 2D/1V

2D/3V

STAIRS

S1

2D

44" 2D

2D

TR

272B

C4

4"

4"

WAP WAP

2D

2D 1

2D 1

2D1 WAP

WAP

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:0

PM

B138-T202-B

SECOND LEVEL FLOOR PLAN -

AREA B - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

175 313

1/8" = 1'-0"F3 SECOND LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

SHEET NOTES:

1. ADDITIONAL CERNER DEVICES WILL BE INSTALLED PRIOR TO THIS PROJECT'S COMPLETION. LOCATIONS OF

DATA CABLES ARE YET TO BE DETERMINED. PROVIDE WITHIN BID TO PROVIDE DATA CABLING QUANTITIES INDICATED ON PLANS AT LOCATIONS TO BE DETERMINED AT TIME OF CABLING INSTALLATION. COORDINATE

B

AR

EA

C

AR

EA

B

AR

EA

C

SUPPLY

246 CHECK IN

OFFICE

CT CONTROL

247A

ELEC

CT SCAN

ELEC

BATH

247B

BATH

245A

NEUROLOGY

FMS

BATH

252A

TOILET

CORRIDOR

C208

STORAGE

TOILET

ULTRASOUND

SOILED LINEN

TOILET

CLEAN SUPPLY

STORAGE

OFFICE

X-RAY

X-RAY

OFFICE

FE

267A

BATH

253A

STAIRS

CORRIDOR

C207

SUB-WAIT

CORRIDOR

CORRIDOR

C206

PROCEDURE

BATH

256A

WORKROOM

X-RAY

OFFICE

EXAM

272A

OFFICE

EXAM

OFFICE

OFFICE

PROCEDURE

WAP

27 28 29

23m

24s

25s 25 2626s

22 23s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

2D/3V

2D/3V

2D/3V

2D

2D/3V

3D 2D/3V

4D

2D/3V

2D

2D/3V

2D/3V

2D/3V

2D/3V

1V

2D 2D

2D/3V 2D/2V

1V

2D 3V

1V 2D

2D/3V

2D/3V

2D

2D

3V 2D

3V2D

4D 3D/3V

2D/3V

2D

1D1D

4D

STAIRS

2D

44" 2D

TR

272B 4"

4"

2D1 WAP

WAP

WAP

2D 1

WAP

WAP

2D 2D 1 1

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:0

PM

B138-T202-C

SECOND LEVEL FLOOR PLAN -

AREA C - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

176 313

1/8" = 1'-0"F3 SECOND LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

SHEET NOTES:

1. ADDITIONAL CERNER DEVICES WILL BE INSTALLED PRIOR TO THIS PROJECT'S COMPLETION. LOCATIONS OF

DATA CABLES ARE YET TO BE DETERMINED. PROVIDE WITHIN BID TO PROVIDE DATA CABLING QUANTITIES INDICATED ON PLANS AT LOCATIONS TO BE DETERMINED AT TIME OF CABLING INSTALLATION. COORDINATE

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

MECH CHASE

345STORAGE

CONSULT

CORRIDOR

C310

VESTIBULE

VESTIBULE

STORAGE

331A

STORAGE

372B

MECH CHASE

319B

CORRIDOR

C305

ELECT

CORRIDOR

H A C

354OFFICE-1

366-1

FEC

Room 372D

FMS

365C

ELEVATOR

FE

TOILET WOMEN

CORRIDOR

C304

FE

H.A.C.

STORAGE

335A

BATH

366B

ELEVATOR

PS-5

ELEVATOR

PS-6CORRIDOR

C303

CORRIDOR

C311

CORRIDOR

C309

STORAGE

338A

ELECT

303A

BATH

CORRIDOR

C302

CORRIDOR

C308

ICE MACHINE

TOILET

CORRIDOR

C300

FMS

STORAGE

317C

EXAM

317D

VESTIBULE

BATH

319A

OFFICE

STORAGE

CLEAN LINEN

OFFICE

WORK ROOM

327A

EKG

STORAGE

TOILET

H A C

BATH

337B

Room

OFFICE

STAFF LOUNGE

304 SHOWER

302A

SUPPLY

MENS TOILET

CHECK-IN

WAITING

C307

MULTI-PURPOSE

TELEHEALTH

OFFICE

CORRIDOR

C306

OFFICE

STORAGE

OFFICE/EXAM

TR

OFFICE

317B

OFFICE

317A

EXAM ROOM

FMS

OFFICE

VEST

334A

HOLTER ROOM

333B

STORAGE

335B

CONFERENCE

CORRIDOR

C301

TR

367A

PULMINARY LAB

372A

MECH

H A C

TOILET

LOUNGE

372C

STORAGE

372E

ELEC

OFFICE

367B

OFFICE-2

366-2

EXAM

OFFICE

TOILET

CLINIC

BREAKROOM

CONSULT

OFFICE

359A

OFFICE

STORAGE

ELEC

OFFICE

CLINIC

CLINIC

OFFICE

346A

OFFICE

TOILET

STORAGE

--1 338-1

--2 338-2

BATH

339A

STORAGE

ORTHO LAB

OFFICE/STORAGE

336A

OFFICE

308A

CARDIO

PULMINARY

WAITING ROOM

337A

CLINIC

CONSULT

E K G 333A

STORAGE

333C

OFFICE/EXAM

OFFICE/EXAM

OFFICE

TU R 27 28 29

23m

24s

25s 25 2626s

22 23s

191817161515s

13 14

14s13s

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

NEW CABLING IN THIS AREA TO BE ROUTED

FROM TELECOMMUNICATIONS ROOM 367A

NEW CABLING IN THIS AREA TO BE ROUTED

FROM TELECOMMUNICATIONS ROOM 314

WAP

WAP

WAP

WAP

WAP

WAP WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAPWAP

WAP

WAP

WAP

WAP

WAPWAP

WAP

WAP

WAP

WAP

WAP

KEY PLAN

MAIN

ENTRY

BUILDING 138

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:1

PM

B138-T203

THIRD LEVEL FLOOR PLAN -

OVERALL - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

177 313

3/32" = 1'-0"F1 THIRD LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A

AR

EA

B

AR

EA

A

AR

EA

B

MECH CHASE

319B

CORRIDOR

C305

ELECT

CORRIDOR

TOILET WOMEN

CORRIDOR

C304

FE

CORRIDOR

C303

ELECT

303A

BATH

CORRIDOR

C302

STORAGE

317C

EXAM

317D

VESTIBULE

BATH

319A

OFFICE

STORAGE

CLEAN LINEN

OFFICE

WORK ROOM

327A

H A C

Room

OFFICE

STAFF LOUNGE

SHOWER

302A

SUPPLY

MENS TOILET

CHECK-IN

MULTI-PURPOSE

TELEHEALTH

OFFICE

CORRIDOR

C306

OFFICE

STORAGE

OFFICE/EXAM

TR

OFFICE

317B

OFFICE

317A

EXAM ROOM

OFFICE

MECH

OFFICE

308A

OFFICE/EXAM

OFFICE/EXAM

OFFICE

B138-T406 F7

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

TU R

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

3D

3D

2D

2D

W

4D

2D

W

2D

2D

2D

2D

4D

4D

4D

4D 2D

2D

2D

W

4D

2D 2D

3D

2D

2D2D

2D

2D

2D

2D

2D 2D

4D4D

2D

2D

W

STAIRS

C4 C4

C4

2D

2D

WAP

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:1

PM

B138-T203-A

THIRD LEVEL FLOOR PLAN - AREA

A - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

178 313

1/8" = 1'-0"F3 THIRD LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

SHEET NOTES:

1. ADDITIONAL CERNER DEVICES WILL BE INSTALLED PRIOR TO THIS PROJECT'S COMPLETION. LOCATIONS OF

DATA CABLES ARE YET TO BE DETERMINED. PROVIDE WITHIN BID TO PROVIDE DATA CABLING QUANTITIES INDICATED ON PLANS AT LOCATIONS TO BE DETERMINED AT TIME OF CABLING INSTALLATION. COORDINATE

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

VESTIBULE

STORAGE

331A

STORAGE

372B

FEC

Room 372D

ELEVATOR

36 H.A.C.

STORAGE

335A

ELEVATOR

PS-5

ELEVATOR

PS-6

CORRIDOR

C308

ICE MACHINE

TOILET

FMS

EKG

SHOWER

302A

WAITING

C307

FMS

OFFICE

VEST

334A

HOLTER ROOM

333B

STORAGE

335B

CONFERENCE

CORRIDOR

C301

TR

367A

PULMINARY LAB

372A

MECH

H A C

TOILET

LOUNGE

372C

STORAGE

372E

ELEC

OFFICE

367B

336A

CARDIO

PULMINARY

E K G 333A

STORAGE

333C

OFFICE

B138-T407 F7

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

191817161515s

13 14

14s13s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

W

2D 2D2D

2D

1D W

2D

4D

4D

4D3D 2D

2D

2D

1D 2D

4D 1D

3D

2D

2D

STAIRS

C4 C4

C4

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:1

PM

B138-T203-B

THIRD LEVEL FLOOR PLAN - AREA

B - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

179 313

1/8" = 1'-0"F3 THIRD LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

B

AR

EA

C

AR

EA

B

AR

EA

C

MECH CHASE

STORAGE

CONSULT

CORRIDOR

C310

VESTIBULE

VESTIBULE

H A C

OFFICE-1

366-1

FMS

365C

FE

BATH

366B

CORRIDOR

C311

CORRIDOR

C309

STORAGE

338A

CORRIDOR

C300

STORAGE

TOILET

BATH

337B

TR

367A

OFFICE

367B

OFFICE-2

366-2

EXAM

OFFICE

TOILET

CLINIC

BREAKROOM

CONSULT

OFFICE

359A

OFFICE

STORAGE

ELEC

OFFICE

CLINIC

CLINIC

OFFICE

346A

OFFICE

TOILET

STORAGE

--1 338-1

--2 338-2

BATH

339A

STORAGE

ORTHO LAB

OFFICE/STORAGE

336A

WAITING ROOM

337A

CLINIC

CONSULT

WAP

WAP

WAP WAP

WAPWAP

WAP

WAP

WAPWAP

WAP

WAP

27 28 29

23m

24s

25s 25 2626s

22 23s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

2D

WAP/G

2D 2D

2D

2D 1D

2D 2D

2D

2D

2D

2D

4D

4D 4D

2D 2D

2D4D

WAP/G

2D2D2D 2D

2D

2D

4D

4D

W 2D

2D

2D

2D 2D4D

2D 2D

2D

2D

2D 2D

2D2D

2D

4D

W

STAIRS

BATH

340A

C4 C4

C4

2D

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:2

PM

B138-T203-C

THIRD LEVEL FLOOR PLAN - AREA

C - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

180 313

1/8" = 1'-0"F3 THIRD LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

SHEET NOTES:

1. ADDITIONAL CERNER DEVICES WILL BE INSTALLED PRIOR TO THIS PROJECT'S COMPLETION. LOCATIONS OF

DATA CABLES ARE YET TO BE DETERMINED. PROVIDE WITHIN BID TO PROVIDE DATA CABLING QUANTITIES INDICATED ON PLANS AT LOCATIONS TO BE DETERMINED AT TIME OF CABLING INSTALLATION. COORDINATE

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

TU R 27 28 29

23m

24s

25s 25 2626s

22 23s

191817161515s

13 14

14s13s

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

KEY PLAN

MAIN

ENTRY

BUILDING 138

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:2

PM

B138-T204

FOURTH LEVEL FLOOR PLAN -

OVERALL - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

181 313

3/32" = 1'-0"F1 FOURTH LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS

0 8' 16'4'

SHEET NOTES:

1. HORIZONTAL CABLING IN THIS AREA IS NOT INCLUDED IN THE SCOPE OF THS PROJECT.

GENERAL NOTES:

A

AR

EA

B

AR

EA

A

AR

EA

B

TU R

10KL

MNOPQS

5s 6 6s 7m

7s

J

Jw

Cm

2 3

4 4s

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

AUDIO CONTROL

423A

CORRIDOR

400G

EQ

ELEC.

AUDIO CONTROL

422A

AUDIO EXAM

422B

AUDIO EXAM

423B

AUDIO CONTROL

423A

AUDIO EXAM

424B

AUDIO CONTROL

424A

CHASE

425B

TLT. PAT.

OFC, AUD. CHIEF

LOUNGE

CERUMEN MGMT.

STORAGE

VISUAL FIELDS

EXAM TECH

EXAM

EXAM

TR

EYE PROV.

410C

EYE PROV.

410A

EYE PROV.

410B

LOUNGE

400GA

Room

CORRIDOR

400H

OFC, OPT. CHIEF

OFC, OPTH./OPT.

CHIEF

TLT, STAFF

STORAGE

HEARING AID FAB.

INST. CAL.

US/OPT. COH.

PHOTO

CLERICAL

407A

CLERICAL

407B

EXAM

CORRIDOR

400I

PATIENT

EDUCATION

FITTING

CLEAN SUPPLY

EYE WAIT

OFC, OPTH. CHIEF

SOILED ULTILITY

REC.-1

432-1

REC.-2

432-2

RECEPTION-1

434-1

RECEPTION-2

434-2

WAITING

B138-T408 F7

STAIRS

C4

C4 C4

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:2

PM

B138-T204-A

FOURTH LEVEL FLOOR PLAN -

AREA A - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

182 313

1/8" = 1'-0"F3 FOURTH LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

A

AR

EA

B

AR

EA

B

AR

EA

C

AR

EA

A

AR

EA

B

AR

EA

B

AR

EA

C

191817161515s

13 14

14s13s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

TR

476ELEVATOR

ELEVATOR

VISUAL FIELDS

OFFICE

RECEPTION-2

475-2

H. A. C.

ELEC

PRETEST

STORAGE

EQUIPMENT

EXAM, OPT

EXAM, OPTH

EXAM, OPT

EXAM, OPT

PRETEST

PRETEST

PATIENT

EDUCATION

FITTING

SHELL

TOILET

TOILET

CONFERENCE

CLEAN SUPPLY

W.C. ALCOVE

ALCOVE

400X

SUPPLY

EQUIPMENT

CRASH CART

DIL. WAIT

RECEPTION

CORRIDOR

400F

CHECK-IN KIOSK

EYE WAIT

W.C. ALCOVE

CORRIDOR

400A

WATING

RECEPTION-1

434-1

RECEPTION-2

434-2

B138-T409 F7

STAIRS

C4

C4

C4

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:3

PM

B138-T204-B

FOURTH LEVEL FLOOR PLAN -

AREA B - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

183 313

1/8" = 1'-0"F3 FOURTH LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

B

AR

EA

C

AR

EA

B

AR

EA

C

27 28 29

23m

24s

25s 25 2626s

22 23s

J

Jw

Cm

Im

Iw

Hm

A

B

C

D

E

F

G

H

Am

Bw

I

TR

CHASE

455B

400EA

RECEPTION-1

475-1

H A C

H A C

MECHANICAL

EQUIPMENT

LOUNGE

LOCKER ROOM

MEN

LOCKER ROOM

WOMEN

OFFICE DENTAL

CHIEF

458TOILET STAFF

STORAGE,

DENTAL SUPPLY

CORRIDOR

400D

SOIL UTILITY

CT CONTROL

446A

TOILET PATIENT

475B

CLEAN

OFFICE

OFFICE

CT, CONE BEAM

446B

STORAGE

STERILE

INSTRUMENTS

ORAL SURGERY

ORAL SURGERY

RECEPTION-2

475-2

DTR

DTR

DTR

DTR

SUB-WAIT

SUB WAITING

DENTAL TECH

460C

DENTAL TECH

460B

DENTAL TECH

460A

LAB, GENERAL

459A

LAB, SHIP / REC

459D

LAB, ARC. PROC

459B

LAB, ACR. FINISH

459C

WORK, STAFF

DENTIST

456C

WORK, STAFF

DENTIST

456B

SUB-WAITING

475C

SCRUB

CORRIDOR

400C

Room

CORRIDOR

400B

SHELL

DTR

DTR, SPECIAL

CORRIDOR

400E

DTR

WORK, STAFF

DENTIST

456A

STAIRS

ROOM

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:3

PM

B138-T204-C

FOURTH LEVEL FLOOR PLAN -

AREA C - TELECOM

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

184 313

1/8" = 1'-0"F3 FOURTH LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS

0 8' 16'4'

GENERAL NOTES:

CR

C

CR

E LENEL ENCLOSURE (TOP)

ALTRONIX ENCLOSURE (BOTTOM)

D

D

D

D

E

LIMITS OF TOTAL DEMOLITIONE

KEEP EXISTING

22 23s

E

E

D

D

D

D

E

LIMITS OF TOTAL DEMOLITION

KEEP EXISTING

LENEL

ENCLOSURE

(TOP)

ALTRONIX

ENCLOSURE

(BOTTOM)

T R2 3

D

E

WAP

D

LIMITS OF TOTAL DEMOLITION

Cm

D

E LIMITS OF COMPLETE DEMOLITION

VA NORTHERN INDIANA HEALTH CARE SYSTEMS

OFFICE OF INFORMATION AND TECHNOLOGY

NETWORK PATCH CABLE COLOR DIAGRAM

CABLE COLOR FUNCTION

BLUE WORKSTATION/ PC DEVICE

YELLOW PRINTER/ PERIPHERAL OUTPUT

WHITE VOICE

BLACK MEDICAL DEVICE

RED SECURITY/ INFRASTRUCTURE

ORANGE WIRELESS ACCESS POINT

PURPLE NURSE CALL & VTC

GREEN MISCELLANEOUS (VENDOR & RTLS)

(EXISTING SITE CABLE COLOR LEGEND)

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:3

PM

B138-T300

TELECOMMUNICATIONS - DEMO -

ENLARGED PLANS

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

185 313

1/2" = 1'-0"C1 ENLARGED DEMO PLAN - ROOM 002A

1/2" = 1'-0"C5 ENLARGED DEMO PLAN - ROOM 024B

0 2' 4'1'0 2' 4'1'

1/2" = 1'-0"F1 ENLARGED DEMO PLAN - ROOM 005B

0 2' 4'1'

1/2" = 1'-0"F5 ENLARGED DEMO PLAN - ROOM 025D

SHEET NOTES:

1. EXISTING ANALOG WALL FIELD SHALL BE REMOVED ONCE NEW RACK MOUNT ANALOG DISTRIBUTION IS IN

PLACE. CONTRACTOR SHALL WALK THE SITE WITH A LOCAL OIT REPRESENTATIVE TO IDENTIFY LOCATIONS TO RECEIVE NEW ANALOG CONNECTION. IT IS ANTICIPATED THAT 95% OF EXISTING ANALOG LOCATIONS WILL BE REMOVED AND NOT REFED. REFER TO GENERAL CABLING NOTES FOR ANTICIPATED OVERALL QUANTITIES. CONTRACTOR SHALL FIELD VERIFY EACH EXISTING LOCATION. NEW CABLING SHALL BE FED

FROM DEDICATED ANALOG PATCH PANELS WITHIN NEW TELECOM ROOM.

2. EXISTING TELECOMMUNICATIONS SPACE (CAGE) SHALL BE BE REMOVED AS A PART OF THIS PROJECT.

EXISTING RACK AND WALL MOUNT COMPONENTS SHALL BE INCLUDED WITHIN THE SCOPE OF DEMOLITION.

EXISTING CABLING AND ASSOCIATED OUTLET SHALL BE REMOVED AND REPLACED 1 FOR 1 AND REFED FROM DISTRIBUTION EQUIPMENT LOCATED WITHIN NEW TELECOMMUNICATIONS ROOM. REFER TO GENERAL

CABLING NOTE FOR APPROXIMATE QUANTITIES.

3. EXISTING ACCESS CONTROL PANELS WILL BE DEMOLISHED. THE NEW TELECOMMUNICATIONS ROOM (TR) WILL HAVE NEW PANELS INSTALLED. COORDINATION WITH THE OWNER IS REQUIRED TO AVOID SERVICE INTERRUPTION. WORK SHALL BE COMPLETED BY THE EXISTING VENDOR AS IDENTIFIED WITHIN THE PROJECT SPECIFICATION AND COORDINATION SCHEDULE. THE VENDOR SHALL BE RESPONSIBLE FOR

IDENTIFYING EXACT SCOPE OF WORK PRIOR TO BID.

4. POWER OVER ETHERNET INJECTOR

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE.

THE CABLE RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED

FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE

PRESENT IN THE SPACE AT THE COMPLETION OF THE PROJECT.

ROOM 002A

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 105

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 105 TO ROOM 005B

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

0 2' 4'1'

ROOM 024B

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 200

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 48 TO ROOM 005b

153 TO ROOM 025D

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

VA NORTHERN INDIANA HEALTH CARE SYSTEMS

OFFICE OF INFORMATION AND TECHNOLOGY

NETWORK PATCH CABLE COLOR DIAGRAM

CABLE COLOR FUNCTION

BLUE WORKSTATION/ PC DEVICE

YELLOW PRINTER/ PERIPHERAL OUTPUT

WHITE VOICE

BLACK MEDICAL DEVICE

RED SECURITY/ INFRASTRUCTURE

ORANGE WIRELESS ACCESS POINT

PURPLE NURSE CALL & VTC

GREEN MISCELLANEOUS (VENDOR & RTLS)

(EXISTING SITE CABLE COLOR LEGEND)

K8

E

3DE

E

E

E E E E

E

S4

D

E

2D

WAP

R

D

LIMITS OF TOTAL DEMOLITION

13s

F

ALTRONIX ENCLOSURE (TOP)

LENEL ENCLOSURE (BOTTOM)

2 4D

D

DE

D

D

D

LENEL ENCLOSURE (BOTTOM)

LIMITS OF TOTAL DEMOLITION

E

Cm

D

E

4D

4D D

D

R

WAP

LIMITS OF TOTAL DEMOLITION

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES PROJECT #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

20459 Sheet of

BI

M

- V A

M ar io n

EH

R

M In fra st ru ct ur e

U pg ra de s D es ig n/

0-

1.

B1

.T

_R

.rv t

4/

/2

7:

:4

PM

B138-T301

TELECOMMUNICATIONS - DEMO -

ENLARGED PLANS

EHRM INFRASTRUCTURE

UPGRADES, MARION, IN

MARION, IN

610-21-701

B138

04/15/2022 JLK SSK

16181

186 313

SHEET NOTES:

1. NOT USED

2. EXISTING TELECOMMUNICATIONS SPACE (CAGE) SHALL BE BE REMOVED AS A PART OF THIS PROJECT.

EXISTING RACK AND WALL MOUNT COMPONENTS SHALL BE INCLUDED WITHIN THE SCOPE OF DEMOLITION.

EXISTING CABLING AND ASSOCIATED OUTLET SHALL BE REMOVED AND REPLACED 1 FOR 1 AND REFED FROM DISTRIBUTION EQUIPMENT LOCATED WITHIN NEW TELECOMMUNICATIONS ROOM. REFER TO GENERAL

CABLING NOTE FOR APPROXIMATE QUANTITIES.

3. EXISTING ACCESS CONTROL PANELS WILL BE DEMOLISHED. THE NEW TELECOMMUNICATIONS ROOM (TR) WILL HAVE NEW PANELS INSTALLED. COORDINATION WITH THE OWNER IS REQUIRED TO AVOID SERVICE INTERRUPTION. WORK SHALL BE COMPLETED BY THE EXISTING VENDOR AS IDENTIFIED WITHIN THE PROJECT SPECIFICATION AND COORDINATION SCHEDULE. THE VENDOR SHALL BE RESPONSIBLE FOR

IDENTIFYING EXACT SCOPE OF WORK PRIOR TO BID.

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE.

THE CABLE RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED

FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE

PRESENT IN THE SPACE AT THE COMPLETION OF THE PROJECT.

ROOM 121A

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 250

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT6): 125 TO ROOM 104C, 125 TO ROOM 163

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

1/2" = 1'-0"C1 ENLARGED DEMO PLAN - ROOM 104B

1/2" = 1'-0"F1 ENLARGED DEMO PLAN - ROOM 104C

1/2" = 1'-0"C4 ENLARGED DEMO PLAN - ROOM 121A

1/2" = 1'-0"C6 ENLARGED DEMO PLAN - ROOM 159A

1/2" = 1'-0"F4 ENLARGED DEMO PLAN - ROOM 163

0 2' 4'1' 0 2' 4'1' 0 2' 4'1'

0 2' 4'1'0 2' 4'1'

OFFICE OF INFORMATION AND TECHNOLOGY

NETWORK PATCH CABLE COLOR DIAGRAM

CABLE COLOR FUNCTION

BLUE WORKSTATION/ PC DEVICE

YELLOW PRINTER/ PERIPHERAL OUTPUT

WHITE VOICE

BLACK MEDICAL DEVICE

RED SECURITY/ INFRASTRUCTURE

ORANGE WIRELESS ACCESS POINT

PURPLE NURSE CALL & VTC

GREEN MISCELLANEOUS (VENDOR & RTLS)

(EXISTING SITE CABLE COLOR LEGEND)

F

ALTRONIX ENCLOSURE (TOP)

LENEL ENCLOSURE (BOTTOM)

D

D D

E

D

LIMITS OF TOTAL DEMOLITION

K8

E

LIMITS OF TOTAL DEMOLITION

E

R S3 4

D

E

LIMITS OF TOTAL DEMOLITION

2D/1V D

Cm

D

E

2D/3V

2D/3V

LIMITS…