Atch 15 - Wage Determination 01.23.2026, Connect Corridor, 687-24-101.pdf

PDF 2 MB Posted

Attached to
Z2DA--687-24-101 Demolish Regrade Connecting Corridor
Solicitation number
36C26026R0080
Issued by

About this file

Summary of General Decision WA20260117

This is a prevailing wage determination issued by the U.S. Department of Labor's Wage and Hour Division for building construction projects in Walla Walla County, Washington, effective January 23, 2026, superseding the prior General Decision WA20250117. The determination applies to all building construction projects excluding single-family homes and apartments up to four stories.

The document lists prevailing wage rates and fringe benefit percentages for over 50 construction classifications organized alphabetically by trade, including but not limited to: heat and frost insulators ($75.37/hour with 18.82% fringes), bricklayers ($39.57/hour with 20.5% fringes), carpenters ($44.21/hour with 17.28% fringes), electricians ($60.00/hour with 27.78% fringes), ironworkers ($43.40/hour with 32.77% fringes), laborers in various specialties ranging from $37.80 to $52.31/hour, plumbers ($47.15/hour with 27.20% fringes), and equipment operators classified into nine groups with rates from $38.17 to $43.34/hour. The rates are effective as of June 1, 2025, with some classifications dated January 1, 2025, and March 2024. Rate identifiers indicate whether rates are union-negotiated, weighted union averages, survey-based, or state-adopted. The determination includes references to Executive Order 13706 regarding paid sick leave and Executive Order 13658 regarding minimum wage requirements for federal contractors, with information on wage determination appeals processes directed to the Department of Labor's Wage and Hour Division.

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
20260821 Walla Walla_E-504.pdf PDF
36C26026R0080 0004.pdf PDF
20260821 Walla Walla_EP106.pdf PDF
Amendment 0003.pdf PDF
Atch 20 - 01 45 00 - QUALITY CONTROL rev1.pdf PDF
Atch 26 - Electrical WW R2 20260818.pdf PDF
Amendment 0002.pdf PDF
Atch 21 - 02 82 11.1 Hazmat Survey Report 06-12-25.pdf PDF
Atch 23 - 28 23 00 Video Surveillance rev1.pdf PDF
Atch 28 - GeoTech Report 2.pdf PDF
Atch 18 - QUESTIONS and ANSWERS - 36C26026R0080.pdf PDF
Atch 19 - 00 01 10 TOC.pdf PDF
Atch 22 - 02 83 33.13.1 Lead Based Paint Survey 07-2006.pdf PDF
Atch 25 - Civil_C-401 and C-404 Safety Railing.pdf PDF
Atch 27 - GeoTech Report 1.pdf PDF
Atch 24 - Civil_GC101 Staging Area.pdf PDF
Atch 16 - Site Visit Sign In Sheet.pdf PDF
Amendment 0001.pdf PDF
Atch 17 - Wage Determination 05.18.2026.pdf PDF
Atch 5 - Bldg 68 Sprinkler Demo Install PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 10 - Bldg 80 Phase 3 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 14 - Past Performance Questionnaire_Connect Corridor 687-24-101.docx DOCX document
Atch 6 - Bldg 74 Phase 4 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 9 - Bldg 78 Phase 1 PCRA_Connect Corridor 687-24-101.pdf PDF
Solicitation 36C26026R0080_Connect Corridor 687-24-101.pdf PDF
Atch 1 - SOW_Connect Corridor 687-24-101.docx DOCX document
Atch 7 - Bldg 74 Sprinkler Demo PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 11 - Divisional Price Breakout_Connect Corridor 687-24-101.xlsx XLSX spreadsheet
Atch 2 - Drawings_Connect Corridor 687-24-101.pdf PDF
Atch 3 - Specs_Connect Corridor 687-24-101.pdf PDF
Atch 4 - Bldgs 68 and 69 Phase 3 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 8 - Bldg 75 Phase 2 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 12 - Limitations on Subcontracting_Connect Corridor 687-24-101.pdf PDF
Atch 13 - Contractor Rules of Behavior_Connect Corridor 687-24-101.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .