Atch 1 - SOW_Connect Corridor 687-24-101.docx

DOCX document 20 KB Posted

Attached to
Z2DA--687-24-101 Demolish Regrade Connecting Corridor
Solicitation number
36C26026R0080
Issued by

About this file

This is a Statement of Work (SOW) for construction services at the Jonathon M. Wainwright Memorial Medical Center in Walla Walla, Washington. The project involves complete demolition of an exterior connecting corridor that has exceeded its useful life, relocation of all active utilities currently situated beneath the corridor to underground trenches, and demolition of associated utility lines, fire sprinkler systems, mechanical systems, and electrical systems. Following demolition and utility relocation, the contractor must install architectural repairs, ramps, staircases, sidewalks, security cameras, and landscaping materials in areas specified in the contract drawings. The contractor must complete all work within a 365-calendar-day performance period, with a detailed schedule requiring Notice to Proceed and preconstruction conference completion within 21 days, product data submittals by day 77, material and equipment procurement by day 105, mobilization by day 119, site work completion by day 355, and final demobilization and acceptance testing by day 365. Deliverables include inspection and testing documents, manuals, and warranty documents per specifications, with final acceptance requiring a functionality demonstration.

This solicitation (36C26026R0080) is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20. The project magnitude is between $5,000,000 and $10,000,000 with NAICS Code 238910 and a size standard of $19 million. The mandatory site visit is scheduled for August 3, 2026, from 10:00 a.m. to 1:00 p.m. PDT, with questions due by August 10, 2026, at 11:00 a.m. PDT, and proposals due by August 26, 2026, at 11:00 a.m. PDT. The source selection will utilize competitive, best value tradeoff procedures in accordance with FAR Part 15.

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
20260821 Walla Walla_E-504.pdf PDF
36C26026R0080 0004.pdf PDF
20260821 Walla Walla_EP106.pdf PDF
Amendment 0003.pdf PDF
Atch 18 - QUESTIONS and ANSWERS - 36C26026R0080.pdf PDF
Atch 19 - 00 01 10 TOC.pdf PDF
Atch 22 - 02 83 33.13.1 Lead Based Paint Survey 07-2006.pdf PDF
Atch 25 - Civil_C-401 and C-404 Safety Railing.pdf PDF
Atch 27 - GeoTech Report 1.pdf PDF
Atch 20 - 01 45 00 - QUALITY CONTROL rev1.pdf PDF
Atch 26 - Electrical WW R2 20260818.pdf PDF
Amendment 0002.pdf PDF
Atch 21 - 02 82 11.1 Hazmat Survey Report 06-12-25.pdf PDF
Atch 23 - 28 23 00 Video Surveillance rev1.pdf PDF
Atch 28 - GeoTech Report 2.pdf PDF
Atch 24 - Civil_GC101 Staging Area.pdf PDF
Atch 16 - Site Visit Sign In Sheet.pdf PDF
Amendment 0001.pdf PDF
Atch 17 - Wage Determination 05.18.2026.pdf PDF
Solicitation 36C26026R0080_Connect Corridor 687-24-101.pdf PDF
Atch 7 - Bldg 74 Sprinkler Demo PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 11 - Divisional Price Breakout_Connect Corridor 687-24-101.xlsx XLSX spreadsheet
Atch 5 - Bldg 68 Sprinkler Demo Install PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 10 - Bldg 80 Phase 3 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 14 - Past Performance Questionnaire_Connect Corridor 687-24-101.docx DOCX document
Atch 15 - Wage Determination 01.23.2026, Connect Corridor, 687-24-101.pdf PDF
Atch 6 - Bldg 74 Phase 4 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 9 - Bldg 78 Phase 1 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 2 - Drawings_Connect Corridor 687-24-101.pdf PDF
Atch 3 - Specs_Connect Corridor 687-24-101.pdf PDF
Atch 4 - Bldgs 68 and 69 Phase 3 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 8 - Bldg 75 Phase 2 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 12 - Limitations on Subcontracting_Connect Corridor 687-24-101.pdf PDF
Atch 13 - Contractor Rules of Behavior_Connect Corridor 687-24-101.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

687-24-101 Demolish and Regrade Connecting Corridor

STATEMENT OF WORK FOR CONSTRUCTION SERVICES

Jonathon M. Wainwright Memorial Medical Center Walla Walla, Washington June 3, 2026

1. General This corridor structure at the Walla Walla VA has exceeded its useful life and needs to be demolished for future facility plans. This project aims to completely demolish the connecting corridor, restore or repair the exterior features that are touching the corridor and relocate all utilities that are still active from underneath the corridor in trenches below grade. Sidewalks, staircases, ramps and some landscaping will be added where indicated after demolition and utility relocation has occurred.

2. Scope The scope of work for this project includes the following for the corridor structure:

a. Demolition of the structure identified in the plans as the connecting corridor

b. Demolition of inactive and active utility lines underneath the corridor and relocating active utility lines under grade

c. Demolition of fire sprinkler systems, mechanical, and electrical where identified in the contract drawings

d. Installation of architectural repairs, ramps, staircases and sidewalk

e. Installation of security cameras for camera coverage

f. Installation of landscaping materials in areas identified by the contract drawings

3. Security Requirements The Certification & Accreditation (C&A) requirements do not apply. A security package is not required.

4. Deliverables Inspection, testing documents, manuals and warranty documents per Specifications.

5. Period of Performance The contractor has 365 days to perform all described work.

PERIOD OF PERFORMANCE CHART (IN CALENDAR DAYS AFTER AWARD)

Level Complete
Calendar days
VA Review
Resubmit if Comments
Total Days after NTP

1. Notice to Proceed/Preconstruction Conference – Contractor Buyout / Core Submittal Creation/ Required Submittals Submit/Review/ VA Agenda / Core Doc / Site Visit for ICRA/PCRA Review: Submittal Register & Schedule

21
0
0
21
2. Product Data Material Submittals
28
21
7
77
3. Material & Equipment Procurement
28
0
0
105
4. Mobilization On-Site including Performance of Work
14
0
0
119
5. Period of Performance – Site-work
236
0
0
355
6. Contractor Demobilization; Pre-Acceptance / Acceptance Test / Inspect
5
5
0
365

6. Performance Monitoring The COR assigned to the contract will evaluate all work and testing performed. Items must be in a clean state and in a proper and acceptable working condition.

7. Inspection and Acceptance Criteria As part of final construction acceptance, a functionality demonstration is required per Specifications.

8. Work Hours Work hours will be coordinated with COR per Specification.