Atch 1 - SOW_Connect Corridor 687-24-101.docx
DOCX document 20 KB Posted
- Solicitation number
- 36C26026R0080
About this file
This is a Statement of Work (SOW) for construction services at the Jonathon M. Wainwright Memorial Medical Center in Walla Walla, Washington. The project involves complete demolition of an exterior connecting corridor that has exceeded its useful life, relocation of all active utilities currently situated beneath the corridor to underground trenches, and demolition of associated utility lines, fire sprinkler systems, mechanical systems, and electrical systems. Following demolition and utility relocation, the contractor must install architectural repairs, ramps, staircases, sidewalks, security cameras, and landscaping materials in areas specified in the contract drawings. The contractor must complete all work within a 365-calendar-day performance period, with a detailed schedule requiring Notice to Proceed and preconstruction conference completion within 21 days, product data submittals by day 77, material and equipment procurement by day 105, mobilization by day 119, site work completion by day 355, and final demobilization and acceptance testing by day 365. Deliverables include inspection and testing documents, manuals, and warranty documents per specifications, with final acceptance requiring a functionality demonstration.
This solicitation (36C26026R0080) is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20. The project magnitude is between $5,000,000 and $10,000,000 with NAICS Code 238910 and a size standard of $19 million. The mandatory site visit is scheduled for August 3, 2026, from 10:00 a.m. to 1:00 p.m. PDT, with questions due by August 10, 2026, at 11:00 a.m. PDT, and proposals due by August 26, 2026, at 11:00 a.m. PDT. The source selection will utilize competitive, best value tradeoff procedures in accordance with FAR Part 15.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
687-24-101 Demolish and Regrade Connecting Corridor
STATEMENT OF WORK FOR CONSTRUCTION SERVICES
Jonathon M. Wainwright Memorial Medical Center Walla Walla, Washington June 3, 2026
1. General This corridor structure at the Walla Walla VA has exceeded its useful life and needs to be demolished for future facility plans. This project aims to completely demolish the connecting corridor, restore or repair the exterior features that are touching the corridor and relocate all utilities that are still active from underneath the corridor in trenches below grade. Sidewalks, staircases, ramps and some landscaping will be added where indicated after demolition and utility relocation has occurred.
2. Scope The scope of work for this project includes the following for the corridor structure:
a. Demolition of the structure identified in the plans as the connecting corridor
b. Demolition of inactive and active utility lines underneath the corridor and relocating active utility lines under grade
c. Demolition of fire sprinkler systems, mechanical, and electrical where identified in the contract drawings
d. Installation of architectural repairs, ramps, staircases and sidewalk
e. Installation of security cameras for camera coverage
f. Installation of landscaping materials in areas identified by the contract drawings
3. Security Requirements The Certification & Accreditation (C&A) requirements do not apply. A security package is not required.
4. Deliverables Inspection, testing documents, manuals and warranty documents per Specifications.
5. Period of Performance The contractor has 365 days to perform all described work.
PERIOD OF PERFORMANCE CHART (IN CALENDAR DAYS AFTER AWARD)
| Level Complete |
| Calendar days |
| VA Review |
| Resubmit if Comments |
| Total Days after NTP |
1. Notice to Proceed/Preconstruction Conference – Contractor Buyout / Core Submittal Creation/ Required Submittals Submit/Review/ VA Agenda / Core Doc / Site Visit for ICRA/PCRA Review: Submittal Register & Schedule
| 21 |
| 0 |
| 0 |
| 21 |
| 2. Product Data Material Submittals |
| 28 |
| 21 |
| 7 |
| 77 |
| 3. Material & Equipment Procurement |
| 28 |
| 0 |
| 0 |
| 105 |
| 4. Mobilization On-Site including Performance of Work |
| 14 |
| 0 |
| 0 |
| 119 |
| 5. Period of Performance – Site-work |
| 236 |
| 0 |
| 0 |
| 355 |
| 6. Contractor Demobilization; Pre-Acceptance / Acceptance Test / Inspect |
| 5 |
| 5 |
| 0 |
| 365 |
6. Performance Monitoring The COR assigned to the contract will evaluate all work and testing performed. Items must be in a clean state and in a proper and acceptable working condition.
7. Inspection and Acceptance Criteria As part of final construction acceptance, a functionality demonstration is required per Specifications.
8. Work Hours Work hours will be coordinated with COR per Specification.
9. Place of Performance Walla Walla VA Medical Center - Jonathon M. Wainwright Memorial Medical Center located at 77 Wainwright Drive, Walla Walla, WA 99362-3975.
File details come from the government source that posted it. Updated .