20260821 Walla Walla_E-504.pdf

PDF 640 KB Posted

Attached to
Z2DA--687-24-101 Demolish Regrade Connecting Corridor
Solicitation number
36C26026R0080
Issued by

About this file

This is a bid document containing electrical design and construction specifications for a site lighting and surveillance system project at Jonathan M. Wainwright Memorial VA Medical Center in Walla Walla, Washington. The project involves demolishing and regrading a connecting corridor, with associated electrical infrastructure for surveillance cameras and site lighting.

The document specifies all electrical work must comply with the latest editions of the National Electrical Code (NEC), NFPA standards, and OSHA requirements. Conductors must be copper minimum #12 THW or THWN installed in Schedule 80 conduit for aboveground applications and Schedule 40 for underground runs. All branch circuits must include insulated green grounding conductors sized per NEC specifications. The project requires installation of surveillance poles (25-foot height), wall-mounted surveillance equipment, junction boxes (24" x 24" x 6" NEMA 3R), ethernet switches, duplex receptacles, and conduit systems for both fiber optic and power conductors. The contractor must coordinate work with civil contract documents to ensure routing paths and mounting arrangements avoid interference with other equipment and maintain required working clearances. All materials and equipment must be heavy-duty and UL-approved, installed per manufacturer specifications. The project manager is Connor Henderson (Facilities Management Service) at the VA Medical Center, with the design firm being JD Engineering, PC, located in Hamilton, Montana. The issue date for these bid documents is April 28, 2026.

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
36C26026R0080 0004.pdf PDF
20260821 Walla Walla_EP106.pdf PDF
Amendment 0003.pdf PDF
Atch 18 - QUESTIONS and ANSWERS - 36C26026R0080.pdf PDF
Atch 19 - 00 01 10 TOC.pdf PDF
Atch 22 - 02 83 33.13.1 Lead Based Paint Survey 07-2006.pdf PDF
Atch 25 - Civil_C-401 and C-404 Safety Railing.pdf PDF
Atch 27 - GeoTech Report 1.pdf PDF
Atch 20 - 01 45 00 - QUALITY CONTROL rev1.pdf PDF
Atch 26 - Electrical WW R2 20260818.pdf PDF
Amendment 0002.pdf PDF
Atch 21 - 02 82 11.1 Hazmat Survey Report 06-12-25.pdf PDF
Atch 23 - 28 23 00 Video Surveillance rev1.pdf PDF
Atch 28 - GeoTech Report 2.pdf PDF
Atch 24 - Civil_GC101 Staging Area.pdf PDF
Atch 16 - Site Visit Sign In Sheet.pdf PDF
Amendment 0001.pdf PDF
Atch 17 - Wage Determination 05.18.2026.pdf PDF
Solicitation 36C26026R0080_Connect Corridor 687-24-101.pdf PDF
Atch 1 - SOW_Connect Corridor 687-24-101.docx DOCX document
Atch 7 - Bldg 74 Sprinkler Demo PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 11 - Divisional Price Breakout_Connect Corridor 687-24-101.xlsx XLSX spreadsheet
Atch 5 - Bldg 68 Sprinkler Demo Install PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 10 - Bldg 80 Phase 3 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 14 - Past Performance Questionnaire_Connect Corridor 687-24-101.docx DOCX document
Atch 15 - Wage Determination 01.23.2026, Connect Corridor, 687-24-101.pdf PDF
Atch 6 - Bldg 74 Phase 4 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 9 - Bldg 78 Phase 1 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 2 - Drawings_Connect Corridor 687-24-101.pdf PDF
Atch 3 - Specs_Connect Corridor 687-24-101.pdf PDF
Atch 4 - Bldgs 68 and 69 Phase 3 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 8 - Bldg 75 Phase 2 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 12 - Limitations on Subcontracting_Connect Corridor 687-24-101.pdf PDF
Atch 13 - Contractor Rules of Behavior_Connect Corridor 687-24-101.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FT

FT

Project Number

Building Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

U. S. Department of Veterans Affairs

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 504.684.4408; Sean Fitzpatrick

JONATHAN M.WAINWRIGHT

MEMORIAL VA MC - DEMOLISH AND

REGRADE CONNECTING CORRIDOR

Walla Walla, Washington

687-24-101

N/A Project Manager

04/28/2026Revisions: Date:

Connor Henderson General Engineer Facilities Management Service (FMS) Phone: (509) 759-2923 Email: Connor.Henderson@va.gov

ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Sheet Number

E-504

SITE LIGHTING CAMERA'S

KEYED NOTES

GENERAL NOTES

1. ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, AND OSHA. THE CONTRACTOR SHALL

PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL EQUIPMENT AND

CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM TO OTHER

DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE,

FUNCTIONAL ELECTRICAL SYSTEM.

2. CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN SCH

80. CONDUITS FOR ABOVEGROUND AND SCH 40. FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM SCH 40. TO SCH 80. CONDUIT

(RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE GROUND

SURFACE.

3. ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILE THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5. WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES.

COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

6. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO

ADDITIONAL COST.

7. COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING

JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL

ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING

CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.

8. FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS

INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS

EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS

PRIOR TO THE START OF THE AFFECTED WORK.

9. ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED

AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.

1. PROVIDE ONE 1" CONDUIT WITH 1" SPARE FOR FIBER, AND A SEPARATE 1" CONDUIT

WITH 1" SPARE FOR FUTURE ELECTRICAL USE. REFER TO SHEET EP107 DETAIL 3

FOR TRENCH DETAIL.

2. CONDUIT WITH FIBER OPTIC CONDUCTORS BETWEEN JUNCTION BOX AND

PULLBOX.

3. CONDUIT WITH POWER CONDUCTORS BETWEEN JUNCTION BOX AND PULLBOX.

SCALE: NTS

SURVEILLANCE POLE PLAN VIEWC2 SCALE: NTS

SURVEILLANCE POLE ELEVATION VIEWD5

NEMA 3R POLE

MOUNTED

JUNCTION BOX

CAMERA #1

PANORAMIC CAMERA

ELECTRICAL

PULLBOX

25FT POLE

SURVEILLANCE POLE

ETHERNET SWITCH

DUPLEX

RECEPTACLE

24'' X 24'' X 6''

NEMA 3R

JUNCTION BOX

GRADE

SCALE: NTS

SURVEILLANCE WALL MOUNTED PLAN VIEWF1 SCALE: NTS

SURVEILLANCE WALL MOUNTED ELEVATION VIEWF5

NEMA 3R POLE

MOUNTED

JUNCTION BOX

ELECTRICAL

PULLBOX

24'' X 24'' X 6''

NEMA 3R

JUNCTION BOX

GRADE

scott Text Box

ADDEDMENT 001

scott Text Box 08/12/2026 scott Polygon scott Text Box scott Image scott Pen

TN

scott Pen scott Pen scott Pen scott Pen scott Cloud scott Cloud scott Polygon scott Text Box scott Polygon scott Text Box scott Polygon scott Text Box scott Cloud

Sheets and Views
E-504