This is Amendment 0005 to Solicitation 36C26026R0080 for Project 687-24-101, Demo Regrade Connecting Corridor, issued by the NCO 20 Network Contracting Office at Vancouver, WA on August 26, 2026. The amendment adds clarification regarding Toxicity Characteristic Leaching Procedure (TCLP) analysis requirements for lead-based paint (LBP) debris handling and disposal.
The VA Response clarifies that offerors must include TCLP analysis/sampling in their proposals using representative samples that include substrate material (wood) attached to the sampled material. Offerors shall base their proposals on disposal of material at a standard landfill, subject to TCLP analytical results. Should TCLP results indicate that material requires disposal at a facility other than a standard landfill, the Government will address any resulting additional disposal requirements and associated costs through a contract modification. The amendment references Attachment 21 (Hazmat Survey Report) and Attachment 22 (Lead Based Paint Survey 07-2006) as supporting documentation. Contractors or offerors are required to acknowledge receipt of this amendment prior to the hour and date specified in the solicitation.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0005 08-26-2026
687-24-101
36C260
NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd
Bldg.17, Suite B428
Vancouver WA 98661
To all Offerors/Bidders
36C26026R0080
X
X X
X one
The purpose of this amendment is to add an RFI question and VA response.
See Continuation Page for details.
Susan Howe
Contracting Officer
Solicitation 36C26026R0080 Amendment 0005
SF30 BLOCK 14 CONTINUATION PAGE(S)
687-24-101, Demo Regrade Connecting Corridor
RFI Question:
RFI 10 response states that a TCLP was completed and is included in the provided reports. After searching, the TCLP is not included. LBP survey states on page 4 that it was not provided. Please confirm that offerors should include performing the TCLP upon award. Please confirm that if LBP debris fails testing, the VA will issue a contract modification for the additional cost of handling and disposing of the hazardous waste to a permitted facility.
VA Response:
Offerors shall include TCLP analysis/sampling in their proposals. TCLP sampling shall be performed using representative samples that include the substrate material (wood) attached to the sampled material.
Offerors shall base their proposals on disposal of the material at a standard landfill, subject to
TCLP analytical results. If TCLP results indicate that the material requires disposal at a facility other than a standard landfill, any resulting additional disposal requirements and associated costs will be addressed by the Government through a contract modification.
Ref: Atch 21 - 02 82 11.1 Hazmat Survey Report and Atch 22 - 02 83 33.13.1 Lead Based Paint
Survey 07-2006