This is a VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction (January 2023), which is a required certification form for federal contract offerors.

The document outlines subcontracting limitations applicable to Department of Veterans Affairs contracts based on the predominant NAICS code. For service contracts (except construction), contractors cannot pay more than 50% of government-paid amounts to non-certified SDVOSB/VOSB firms. For general construction contracts, the limit is 85% of government-paid amounts to non-certified firms, with materials excluded from subcontracting calculations. For special trade construction contracts, the limit is 75% of government-paid amounts to non-certified firms, also excluding materials. Subwork performed by certified SDVOSB/VOSB subcontractors that is further subcontracted counts toward these thresholds. Offerors must acknowledge that false certifications are subject to criminal, civil, or administrative penalties under 18 U.S.C. § 1001. The VA may require contractors to provide documentation during performance and upon completion to verify compliance, including invoices, subcontracts, or task value lists. Non-compliance may result in referral to the VA Suspension and Debarment Committee, fines, or prosecution. Submission of a completed, signed certification is mandatory; offers without the certification will be deemed ineligible for evaluation and award.

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
20260821 Walla Walla_E-504.pdf PDF
36C26026R0080 0004.pdf PDF
20260821 Walla Walla_EP106.pdf PDF
Amendment 0003.pdf PDF
Atch 18 - QUESTIONS and ANSWERS - 36C26026R0080.pdf PDF
Atch 19 - 00 01 10 TOC.pdf PDF
Atch 22 - 02 83 33.13.1 Lead Based Paint Survey 07-2006.pdf PDF
Atch 25 - Civil_C-401 and C-404 Safety Railing.pdf PDF
Atch 27 - GeoTech Report 1.pdf PDF
Amendment 0002.pdf PDF
Atch 21 - 02 82 11.1 Hazmat Survey Report 06-12-25.pdf PDF
Atch 23 - 28 23 00 Video Surveillance rev1.pdf PDF
Atch 28 - GeoTech Report 2.pdf PDF
Atch 20 - 01 45 00 - QUALITY CONTROL rev1.pdf PDF
Atch 26 - Electrical WW R2 20260818.pdf PDF
Atch 24 - Civil_GC101 Staging Area.pdf PDF
Atch 16 - Site Visit Sign In Sheet.pdf PDF
Amendment 0001.pdf PDF
Atch 17 - Wage Determination 05.18.2026.pdf PDF
Solicitation 36C26026R0080_Connect Corridor 687-24-101.pdf PDF
Atch 1 - SOW_Connect Corridor 687-24-101.docx DOCX document
Atch 7 - Bldg 74 Sprinkler Demo PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 11 - Divisional Price Breakout_Connect Corridor 687-24-101.xlsx XLSX spreadsheet
Atch 6 - Bldg 74 Phase 4 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 9 - Bldg 78 Phase 1 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 5 - Bldg 68 Sprinkler Demo Install PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 10 - Bldg 80 Phase 3 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 14 - Past Performance Questionnaire_Connect Corridor 687-24-101.docx DOCX document
Atch 15 - Wage Determination 01.23.2026, Connect Corridor, 687-24-101.pdf PDF
Atch 2 - Drawings_Connect Corridor 687-24-101.pdf PDF
Atch 3 - Specs_Connect Corridor 687-24-101.pdf PDF
Atch 4 - Bldgs 68 and 69 Phase 3 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 8 - Bldg 75 Phase 2 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 13 - Contractor Rules of Behavior_Connect Corridor 687-24-101.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF

COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)

(a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that—

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: [Contracting Officer check the appropriate box below based on the predominant NAICS code assigned to the instant acquisition as set forth in FAR 19.102.]

(i) [ ] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.

(ii) [X ] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDBOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(iii) [ ] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDBOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

https://www.acquisition.gov/far/2.101 https://www.acquisition.gov/far/19.102 https://www.va.gov/oal/library/vaar/vaar852.asp#85221973 https://www.va.gov/oal/library/vaar/vaar852.asp#85221974 https://www.va.gov/oal/library/vaar/vaar852.asp#85221973 https://www.va.gov/oal/library/vaar/vaar852.asp#85221974 https://www.va.gov/oal/library/vaar/vaar852.asp#85221973 https://www.va.gov/oal/library/vaar/vaar852.asp#85221974

(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

(3) If VA determines that an SDVOSB/VOSB awarded a contract pursuant to 38

U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:

(i) Referral to the VA Suspension and Debarment Committee;

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1));

and

(iii) Prosecution for violating 18 U.S.C. 1001.

(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

Certification:

I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].

Printed Name of Signee:________________________________________ Printed Title of Signee:_________________________________________ Signature:___________________________________________________ Date:_____________________

Company Name and Address:______________________________________

File details come from the government source that posted it. Updated .