Atch 11 - Divisional Price Breakout_Connect Corridor 687-24-101.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C26026R0080
About this file
This is a Price Schedule Breakdown template for a fixed-price construction contract. The document provides instructions and a structured format for contractors to submit detailed pricing for the Demo and Regrade Connecting Corridor Project (RFQ 36C26026R0080) at Jonathan M. Wainwright VA Medical Center in Walla Walla, Washington. Contractors must break down costs across Construction Specification Institute (CSI) Divisions, including General Requirements, Existing Conditions, Concrete, Masonry, Woods/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, HVAC, Electrical, Earthwork, and Exterior Improvements, with subtotals required for each division.
The pricing template requires contractors to provide itemized costs for mobilization/demobilization, insurance/bonds, taxes, O&M manuals and red-line drawings, overhead rate (applied as a percentage and daily rate), subcontract mark-up rate, profit rate, and any other items not listed above. The contract is a 365-calendar-day fixed-price award with an estimated magnitude between $5,000,000 and $10,000,000. This solicitation is 100% set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS Code 238910. The Department of Veterans Affairs Veterans Health Administration is the contracting agency. Contractors are responsible for ensuring all formula calculations and price transpositions are accurate, and field office overhead and general conditions are applied only once to the contract.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| RFQ: 36C26026R0080 |
Project Number / Title: 687-24-101, Demo and Regrade Connecting Corridor Project Location: Jonathan M. Wainwright VA Medical Center, Walla Walla, WA
| Rates | Base Item | |
| Price | ||
| Division 1 General Requirements | ||
| Division 2 Existing Conditions | ||
| Division 3 Concrete | ||
| Division 4 Masonry | ||
| Division 6 Woods, Plastic and Composites | ||
| Division 7 Thermal and Moisture Protection | ||
| Division 8 Openings | ||
| Division 9 Finishes | ||
| Division 23 HVAC | ||
| DivisIon 26 Electrical | ||
| Division 31 Earthwork | ||
| Division 32 Exterior Improvements |
SubTotals N/A $0.00
Period of Performance (FAR 52.211-10) ________ days
| Mobilization / Demobilization | ||
| Insurance / Bonds | ||
| Taxes / Other Fees (provide itemized list) | ||
| O&M Manuals and Red Line Drawings | ||
| Overhead | Rate _______% | |
| Overhead (daily rate) | Per Day $0.00 | |
| SubContract Mark-Up | Rate _______% | |
| Profit | Rate _______% | |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
CONTRACT TOTALS $0.00