This is a Price Schedule Breakdown template for a fixed-price construction contract. The document provides instructions and a structured format for contractors to submit detailed pricing for the Demo and Regrade Connecting Corridor Project (RFQ 36C26026R0080) at Jonathan M. Wainwright VA Medical Center in Walla Walla, Washington. Contractors must break down costs across Construction Specification Institute (CSI) Divisions, including General Requirements, Existing Conditions, Concrete, Masonry, Woods/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, HVAC, Electrical, Earthwork, and Exterior Improvements, with subtotals required for each division.

The pricing template requires contractors to provide itemized costs for mobilization/demobilization, insurance/bonds, taxes, O&M manuals and red-line drawings, overhead rate (applied as a percentage and daily rate), subcontract mark-up rate, profit rate, and any other items not listed above. The contract is a 365-calendar-day fixed-price award with an estimated magnitude between $5,000,000 and $10,000,000. This solicitation is 100% set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS Code 238910. The Department of Veterans Affairs Veterans Health Administration is the contracting agency. Contractors are responsible for ensuring all formula calculations and price transpositions are accurate, and field office overhead and general conditions are applied only once to the contract.

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
36C26026R0080 0004.pdf PDF
20260821 Walla Walla_EP106.pdf PDF
20260821 Walla Walla_E-504.pdf PDF
Amendment 0003.pdf PDF
Atch 19 - 00 01 10 TOC.pdf PDF
Atch 24 - Civil_GC101 Staging Area.pdf PDF
Amendment 0002.pdf PDF
Atch 22 - 02 83 33.13.1 Lead Based Paint Survey 07-2006.pdf PDF
Atch 23 - 28 23 00 Video Surveillance rev1.pdf PDF
Atch 25 - Civil_C-401 and C-404 Safety Railing.pdf PDF
Atch 27 - GeoTech Report 1.pdf PDF
Atch 18 - QUESTIONS and ANSWERS - 36C26026R0080.pdf PDF
Atch 28 - GeoTech Report 2.pdf PDF
Atch 21 - 02 82 11.1 Hazmat Survey Report 06-12-25.pdf PDF
Atch 20 - 01 45 00 - QUALITY CONTROL rev1.pdf PDF
Atch 26 - Electrical WW R2 20260818.pdf PDF
Atch 16 - Site Visit Sign In Sheet.pdf PDF
Atch 17 - Wage Determination 05.18.2026.pdf PDF
Amendment 0001.pdf PDF
Atch 3 - Specs_Connect Corridor 687-24-101.pdf PDF
Atch 12 - Limitations on Subcontracting_Connect Corridor 687-24-101.pdf PDF
Atch 8 - Bldg 75 Phase 2 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 6 - Bldg 74 Phase 4 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 13 - Contractor Rules of Behavior_Connect Corridor 687-24-101.pdf PDF
Atch 4 - Bldgs 68 and 69 Phase 3 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 7 - Bldg 74 Sprinkler Demo PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 1 - SOW_Connect Corridor 687-24-101.docx DOCX document
Solicitation 36C26026R0080_Connect Corridor 687-24-101.pdf PDF
Atch 2 - Drawings_Connect Corridor 687-24-101.pdf PDF
Atch 9 - Bldg 78 Phase 1 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 5 - Bldg 68 Sprinkler Demo Install PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 15 - Wage Determination 01.23.2026, Connect Corridor, 687-24-101.pdf PDF
Atch 10 - Bldg 80 Phase 3 PCRA_Connect Corridor 687-24-101.pdf PDF
Atch 14 - Past Performance Questionnaire_Connect Corridor 687-24-101.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
RFQ: 36C26026R0080

Project Number / Title: 687-24-101, Demo and Regrade Connecting Corridor Project Location: Jonathan M. Wainwright VA Medical Center, Walla Walla, WA

RatesBase Item
Price
Division 1 General Requirements
Division 2 Existing Conditions
Division 3 Concrete
Division 4 Masonry
Division 6 Woods, Plastic and Composites
Division 7 Thermal and Moisture Protection
Division 8 Openings
Division 9 Finishes
Division 23 HVAC
DivisIon 26 Electrical
Division 31 Earthwork
Division 32 Exterior Improvements

SubTotals N/A $0.00

Period of Performance (FAR 52.211-10) ________ days

Mobilization / Demobilization
Insurance / Bonds
Taxes / Other Fees (provide itemized list)
O&M Manuals and Red Line Drawings
OverheadRate _______%
Overhead (daily rate)Per Day $0.00
SubContract Mark-UpRate _______%
ProfitRate _______%
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS $0.00